PowerPoint Presentationapcfallseminar.com/FS2015PPT/CLOSING/01FSCLOSING_HEIGEL.pdf · Clarks Summit...

39

Transcript of PowerPoint Presentationapcfallseminar.com/FS2015PPT/CLOSING/01FSCLOSING_HEIGEL.pdf · Clarks Summit...

$-

$100,000,000

$200,000,000

$300,000,000

$400,000,000

$500,000,000

$600,000,000

Other Programs Highway Program

$-

$100,000,000

$200,000,000

$300,000,000

$400,000,000

$500,000,000

$600,000,000

$700,000,000

$800,000,000

Highway Other

$450M/year $50M/year

RoadwaySafety$1,07517.7%

Bridge, Tunnel & Misc

Structure$931

15.3%

TotalReconstruction

$2,89547.5%

Interchanges$4096.7%Highway

Miscellaneous$2994.9%

CashlessTolling

Conversion$4827.9%

110 Construction Contracts 50 Contractors $1.88 Billion Total Contract Value $710 Million Balance Remaining

CY 15 to Date – Low Bid to Estimate: +2.4%

Change Order Review (Feb. ‘14 - May ‘15): -1.9% (149 CO’s/53 Contracts)

BUTLER

LAWRENCE

BEAVER

WASHINGTON

ALLEGHENY

WESTMORELAND

FAYETTESOMERSET BEDFORD FULTON FRANKLIN

HUNTINGTON

CUMBERLAND

YORK

DAUPHINLEBANON

LANCASTER CHESTER

BERKS

LACKAWANNA

LUZERNE

CARBON

LEHIGH

BUCKS

MONTGOMERY

Status as of November 2015Completed - 113 milesUnder Construction - 19 milesIn Design – 126 miles

Milepost 202 to Milepost 206

Release – June 8, 2016Bid – July 20, 2016

Excavation – 750,000 cy (various classes)

Pipe – 35,000 lf (various types/sizes)

Bituminous Paving Courses – 1,500,000 sy

1 – Two-Span Prestressed Concrete Box Beam Bridge – SR 997 over Turnpike

3 – Mainline Single Span Prestressed Concrete Box Beam Bridges

Concrete Box Extensions – 335 lf

CIP Retaining Wall – 250 lf and Solider Pile Retaining Wall – 250 lf

Milepost A31 to Milepost A38

Release – September 14, 2016Bid – October 26, 2016

Excavation – 997,000 cy (various classes)

Pipe – 50,000 lf (various types/classes)

Bituminous Paving Courses – 2,000,000 sy

1 – Mainline Single Span Concrete Bulb Tee Bridge

3 – Mainline Prestressed Concrete Box Beam Bridges (2 – single/1 – 3-span)

Retaining Wall – 3,645 lf and Sound Wall – 13,675 lf

)

SR 903 Interchange

Section D-10(2014 – 2017)

Section D-20(2015 – 2018)

I-95 Interchange

I-95 Interchange

Bridge Program

Percentage of Structurally Deficient Bridges (by Count)

Bridge Program

Percentage of Structurally Deficient Bridges (by Deck Area)

Bridge Replacement: Milepost 12.58

Release – November 4, 2015Bid – December 16, 2015

Replacement of PTC owned 3-span – 400,000 lbs. Structural Steel

Bridge Replacement: Milepost 353.96

Release – December 9, 2015Bid – January 20, 2016

PECO relocations

Superstructure Replacement: Milepost 20.47

Release – August 3, 2016Bid – September 14, 2016

Accelerated Bridge Construction

Bridge Replacement: Milepost A120.68

Release – August 10, 2016Bid – September 21, 2016

Bridge Replacement: Milepost 228.54

Release – September 21, 2016Bid – November 2, 2016

Bridge Replacement: Milepost A44.40

Release – October 4, 2016Bid – November 15, 2016

Bridge Replacement: Milepost A130.23

Release – October 26, 2016Bid – December 7, 2016

Bridge Program

Accelerated Bridge Construction

NB-355; MP A57.66 – D/B/B – Bid in 2016

NB-360; MP A58.88 – D/B – Bid in 2017

NB-363; MP A559.20 -?

NB-376; MP A62.84 - ?

Roadway Program

42%

36%

22%

Defective Lots

Defective97% Payment94% Payment

62%3%

29%

6%

Remove & Replace

70% Payment

50% Payment

0% Payment

88.5% - 100% Payment

Existing Section – Northeast Extension72 ft. out-to-out

Bituminous Overlay: Willow Grove IC; Milepost 342.91

Clarks Summit IC: Milepost A130.64Gateway IC; Milepost 1.44

Pittsburgh IC; Milepost 56.56

1st and 2nd Quarters of 2016

Bituminous Overlay: Milepost A49 – Milepost A59Milepost 174 – Milepost 180Milepost 192 – Milepost 197Milepost 246 – Milepost 255Milepost 319 – Milepost 326Milepost 109 – Milepost 123

4th Quarter of 2016

173 Active Engineering Services Agreements 76 Different Firms $1.25 Billion Total Contract Value $638 Million Balance Remaining

Procurement of Professional Services

Mon-Fayette & Southern Beltway

1. US 22 to I-792. I-79 to Mon-Fayette3. SR 51 to Duquesne4. Mon River to I-376

Southern Beltway: US 22 to I-79

Wetland Mitigation; Section 55W

Release – November 4, 2015Bid – December 2, 2015

Excavation – 45,000 cy (various classes)

Topsoil – 7,000 cy

Temporary Stream Crossing/Access Road

Section 55-A1

Release – August 17, 2016Bid – September 28, 2016

Excavation – 5,400,000 cy (various classes)

Pipe – 40,000 lf (various types/classes) Inlets – 340 ea

PCC pavement/shoulders – 179,000 sy Bituminous Paving – 49,000 sy

6 – Mainline and 1 – Overhead bridges

1,100,000 lbs. Fabricated Structural Steel

8,110 lf Prestressed Concrete Beams

Section 55-B

Release – September 28, 2016Bid – November 9, 2016

Excavation – 4,800,000 cy (various classes)

Pipe – 26,000 lf (various types/classes) Inlets – 230 ea

PCC pavement/shoulders – 124,000 sy

2 – Mainline (Dual bridges – 1,500’ in length/110’ in height)

7,300,000 lbs. Fabricated Structural Steel

Section 55-C1-1

Release – November 2, 2016Bid – December 14, 2016

Excavation – 1,000,000 cy (various classes)

Pipe – 32,000 lf (various types/classes) Inlets – 270 ea

PCC pavement/shoulders – 105,000 sy Bituminous Paving – 52,000 sy

2 – Mainline (Dual bridges – 1,015’ in length/100’ in height)

6,500,000 lbs. Fabricated Structural Steel

1560 lf Prestressed Concrete Beams

Section 55-C2-2 Bid – 2nd Q of 2017

Section 55-A2 Bid – 3rd Q of 2017

Section C1-2 Bid – 4th Q of 2017

Section C2-1Section S Bid – 1st Q of 2018Section T

Section M Bid - TBD

Mon Fayette: SR 51 to I-376

Mon Fayette: SR 51 to I-376