Highway to Handsome GIS
Powerco’s GIS roadmap
Lokesh AddagadaPowerco / 28 March 2014
Key Objectives Generate a return on the investment we have already made and to justify
future investment
Powerco GIS data to be made available to both on and offline users
To drive asset management excellence
Move from data input to data analysis - Ability for end users to submit data directly into GIS without delay, meaning Powerco employees have a greater QA focus rather than data inputting
Simplified access to data and associated applications
GIS data available in the way that people want to use it
List of Issues/Scenarios to be addressed
Non delivery of user demand for enhanced services and capabilities ◦ The current GIS services do not contain many features and tools that users have been exposed to
elsewhere and are requesting◦ Poor integration to cloud based services and data
Weak controls and measures around data quality
◦ Data is being replicated multiple times ◦ Powerco staff are being used as data inputters rather than data auditors and quality controllers
Data visibility and collection
◦ In most cases data is not entered into the GIS system for periods of months and in some cases years. This leads to the following issues: Unable to capitalise some assets Unable to provide asset location to evacuation contractors Unable to provide accurate, timely data to Outage Management Systems
◦ No ability to deploy electronic data to field staff for validating/updating, as a result data quality and decision quality is limited
Incorrect balance between reactive and proactive workloads
◦ Powerco staff are increasingly being used to manage the existing aged system and develop custom built features that are out of the box with later versions of ArcGIS
Supporting Architecture
The proposed architecture changes will be delivered in four phases.
Project 10.1 Scope
Improvement Areas The objectives of the architecture vision are to provide the following improvement areas to the
GIS service
MappingFunctionality
Simplicity & Flexibility
QA Focus Great Analysis Ability
Field Data Processing
Greater Visibility
Technology Neutral
Greater Integration
More Data Self Service Mobile Simple Access
Improve Productivit
yImprovement
Powerco GIS data to be made available to both on and offline users ● ● ● ● ● ● ● ● ●
Application sets to be intuitive and to provide greater tools and features than at present, in particular end user analysis ● ● ● ●
Ability for end users to submit data direct into GIS without delay, meaning Powerco employees have a greater QA focus rather than data inputting
● ● ● ● ● ● ●
Improved GIS data quality techniques, promoting GIS as a primary source of Powerco asset data ● ● ● ● ● ● ● ●
Simplified access to data and associated applications ● ● ● ● ● ● ●
Project 10.1.2
Phase 10.1.2 - The vision of this phase is to upgrade and expand on the current web services that serve the GIS data
Provide GIS data to users over a common web platform Make the platform available to both internal and external users
Phase 10.1.3 The vision of this phase is to configure and introduce tools that help to achieve the following
goals: Provide workflow management tools that give users visibility of asset data over lifecycle stages Improve asset decision making
Phase 10.1.4 The vision of this phase is to improve GIS mobility, collaboration and accessibility to help
achieve the following goals: Mobile/device agnostic access to GIS data from the field User ability to self-serve and consume data in a personal and customised manner
Improvement area delivery phases The below charts depict the required improvement areas and the phase(s) which will be
delivering the improvements.
End Vision Statement The GIS programme of work, spread over four distinct phases, will transform the way in which
users consume and contribute to Powerco asset data. Key to the transformation and the success of the programme will be the way in which the data is presented and consumed.
The two most critical phases to the programme are the first phase; 10.1.1, and the final phase
10.1.4. In the first phase the foundation for the entire programme vision will be laid. Upon this foundation, numerous features and enhancements will be built, until eventually the final phase 10.1.4 will deliver the majority of the improvements.
As the majority of the improvements will be delivered in the final phase, it is crucial that all
phases are architected, engineered and implemented with this vision in mind. Any deviations from the vision, standards and principles may have an impact on the success of the programme, and thus should be managed carefully.
The vision is for data access to be web based, device agnostic, and give the user the ability to
consume and contribute to the data whilst both on and offline and how they see fit.
This progression towards self-sufficiency and creativity will enable Powerco data owners and administrators to move into a more proactive role of data quality assessors rather than inputters.