Powering a world in progress
Jacques Vandermeiren, CEO Elia Group15/10/2013
15/10/2013
2
Elia Group: reliable and resilientnetworks
TenneTGmbH
EUR million 2012
Revenues 1,306.6
EBITDA 455.5
EBIT 305.4
Net Income 155.0
Equity 2,108.5
Net financial debt2,910.8
Regulated Asset Base 5,300
Investments 2012 : 400.0 m
Investments 2013 : 600.0 m
15/10/2013
In Europe what are the Key Challenges…
• Fast increasing share of Renewable Energy Sources• Need to achieve (quickly)
• Investments in flexible Generation and Demand• Adequate Transmission capacity• Highly liquid day-ahead and Intraday markets
• Harmonized or at least compatible marketmechanisms
• Facing the power system reality…
15/10/2013 3
Important energy flows in Europa Some units of productionThousand of decentralizedunits
… because the energy Transition is on…
15/10/2013 4
total
PV
wind
2020
2020 Be-D-NL: Wind +PV > 50% - peak of consumption
15/10/2013 5
windphotovoltaicsbiomass
Area proportional to installed capacityEvolution of the RES in Germany
Source: 50Hertz, TenneT, Amprion, TransnetBW, Google Earth
20002000 20062006 20122012
6
5,892 MW 20,472 MW 31,290 MW62 MW 2,405 MW 31,451 MW
510 MW 3,010 MW 6,465 MW
15/10/2013
50Hertz measures approvedby Federal Network Agency50Hertz Measures not yet approvedby Federal Network Agency
In Germany:Grid Development Plan 2012confirmed measures proposed by 50Hertz
Corridor D confirmed byFederal Network Agency(2 GW HVDC; route length 450 km)
Construction of a new HVDC line fromLauchstädt (50Hertz) to Meitingen(Amprion)
Direct current
Alternating current
15/10/2013
Cabinet-draft on the Federal Requirement Planof December 2012, adopted in June 2013
7
Investments 2012–20 for Belgium
8
Reinforcement North borderAdditional PST, second circuitGramme-Van Eyck
Decentralised production Meer,Rijkevorsel, Merksplas
Project Brabo in port of AntwerpReinforcement Baekeland-Mercator-Doel
Reinforcement “Eastloop” onshore wind
Project Stevin for shorereinforcement
Offshore platforms to accomodatefuture offshore wind parks
Reinforcement South border
ALEGrO , a new electricity interconnector between Belgium and Germany
Bi-directional capacity 950 – 1.200 MW
Total project budget 430 M€
Construction 2016 – 2018
Commercial operation 2018 / 2019
49 kms
51 kms
Security ofsupply
Security ofsupply
Renewablesintegration
Renewablesintegration
Priceconvergence
Priceconvergence
15/10/2013 9
1015/10/2013