Power System Engineering Want to own your Customer’s Power System?

13
Power System Engineering Want to own your Customer’s Power System?

Transcript of Power System Engineering Want to own your Customer’s Power System?

Page 1: Power System Engineering Want to own your Customer’s Power System?

Power System Engineering

Want to own your Customer’s Power System?

Page 2: Power System Engineering Want to own your Customer’s Power System?

Schneider Electric 2- Engineering Services – January 2009

PSE Helps You Own the Power System – Then What?

●LEVERAGE● EVERY $1 in PSE that you sell equates to $8 in Pull-Through

Products/Services

●Customers come to you without BIDDING!● 75% of the PSE pull-through comes without hitting the street

●Your Solutions Provider reputation increases!● PSE takes the system view, with customer economic benefit as primary

driver

Page 3: Power System Engineering Want to own your Customer’s Power System?

Schneider Electric 3- Engineering Services – January 2009

What sets PSE above the competition?

●Credentials● Engineers recognized as Industry Experts

● Local and National IEEE Leadership & Knowledge

● Registered Professional Engineers, Licensed Engineering Firm

●Experience and Expertise● Square D has been doing studies since 1966

● History since 1998: 7000+ studies, 750+ assessments/turnkey projects

● Innovative analysis tools & methodologies, applied consistently across US

●Regional Locations● Regional PSE Engineers deployed strategically across US – all time zones

● Knowledge of local markets, codes, and AHJs

Page 4: Power System Engineering Want to own your Customer’s Power System?

Schneider Electric 4- Engineering Services – January 2009

Power System AssessmentsShort Circuit StudiesOvercurrent Coordination StudiesArc Flash StudiesLoad Flow, Circuit Capacity StudiesGrounding and Ground Fault AnalysisPower Quality TroubleshootingPower Factor and Harmonics AnalysisOnsite Testing & Data CollectionMotor Starting StudiesConsulting, Analysis and Design

DERIVED>CURRENTC-AMPS(02-03-97)(14:59:23)

0 100000 200000 300000 400000-4000

-2000

0

2000

4000

6000

Time (mS)

Cu

rre

nt

(A)

DERIVED>CURRENTB-AMPS(02-03-97)(14:59:23)

0 100000 200000 300000 400000-6000

-4000

-2000

0

2000

4000

Time (mS)

Cu

rre

nt

(A)

DERIVED>CURRENT-A-AMPS(02-03-97)(14:59:23)

0 100000 200000 300000 400000-4000

-3000

-2000

-1000

0

1000

2000

3000

4000

Time (mS)

Cu

rre

nt

(A)

ASHEVI~1>CA_VOLTS-VOLTS(02-03-97)(14:59:23)

0 100000 200000 300000 400000-1000

-750

-500

-250

0

250

500

750

1000

Time (mS)

Volt

age

(V

)

ASHEVI~1>BC_VOLTS-VOLTS(02-03-97)(14:59:23)

0 100000 200000 300000 400000-1000

-750

-500

-250

0

250

500

750

1000

Time (mS)

Volt

age

(V

)

ASHEVI~1>AB_VOLTS-VOLTS(02-03-97)(14:59:23)

0 100000 200000 300000 400000-1000

-750

-500

-250

0

250

500

750

1000

Time (mS)

Volt

age

(V

)

MSBNorthMain

R2ThermalOx1

R2MCC

PPM

R2ThermalOX2

PanelLP

R2Coater

0.5 1 10 100 1K 10K0.01

0.10

1

10

100

1000

CURRENT IN AMPERES

MainNorth.tcc Ref. Voltage: 480 Current Scale X 10^1

TIM

E IN

SE

CO

ND

S

Power System Engineering Offers

Power System Studies & Analysis

Power System Onsite Assessments & Troubleshooting

Power System Improvement

Projects

Page 5: Power System Engineering Want to own your Customer’s Power System?

Schneider Electric 5- Engineering Services – January 2009

Power System EngineersPower System Engineers

40

Power System Engineering Team

Credentials● Registered Professional

Engineers, Licensed Engineering Firm

● Performed thousands of power system studies

● Backgrounds include EE, ME; many advanced degrees

● Industry recognized professionals who have authored many technical articles

● Present and past leaders of various IEEE, IEC, ANSI, NEMA & UL committees and working groups

Page 6: Power System Engineering Want to own your Customer’s Power System?

Schneider Electric 6- Engineering Services – January 2009

“We Want to Comply with NFPA 70E”

Arc Flash Deliverable Customer Benefit

Single-Line Electrical Drawings Lockout/Tagout, Troubleshooting

System & Equipment Assessment Identification of Reliability, Code Concerns

Short-Circuit Analysis Identification of Under-rated Equipment

Time-Current Coordination Optimal Settings for Overcurrent Devices

Arc Flash Analysis Reduced Arc Flash Exposure, PPE, Labels

Corrective Action Recommendations Prioritized System Improvement Projects

Page 7: Power System Engineering Want to own your Customer’s Power System?

Schneider Electric 7- Engineering Services – January 2009

New NFPA 70E-2009 Released

●NFPA Standards Council issued 70E-2009 in July 2008, not widely available until late 2008

●Maintains ‘mandatory’ language of a consensus standard●Represents results of over 500 proposals, 800 comments on previous

70E-2004 version●Many wording changes throughout document; described as ‘same

intent’, but changed for clarity

●PSE processes, methodologies, reports, labels, fully compliant with new version

2009 – Now’s the Time!

Page 8: Power System Engineering Want to own your Customer’s Power System?

Schneider Electric 8- Engineering Services – January 2009

Key Changes to NFPA 70E-2009

● Category 0/1 threshold– now 1.2 cal/cm2 vs former 2.0 cal/cm2

●Ear plugs at all categories, not just >Category 2

● Analysis cut-off point changed - was <240V and <10kA; now 240V or less served by single transformer <125 kVA

● Labeling now requires PPE category or incident energy level

●Analysis to be updated at time of renovation and reviewed periodically not to exceed every 5 years

● Emphasis on maintenance and testing● Emphasis on equipment integrity – ‘exposure

to electrical hazard’ vs ‘working on or near exposed parts’

Page 9: Power System Engineering Want to own your Customer’s Power System?

Schneider Electric 9- Engineering Services – January 2009

Construction Studies – Value!

●Verify equipment ratings● Short-circuit analysis results

●Value engineer project● Head off project problems due to unusual or less optimal designs

●Identify protective coordination issues● Ensure selectivity

●NEC Article 700/701 support (e.g. – Healthcare Projects)● Get the right BOM to satisfy special coordination requirements

●Arc flash analysis● Calculate exposure levels, identify arc flash mitigation opportunities

Use Our Updated Specs!Sales & Marketing home page, then Services, Power System Engineering

Page 10: Power System Engineering Want to own your Customer’s Power System?

Schneider Electric 10- Engineering Services – January 2009

2009 Key Offers

●Arc flash compliance – 2009, Now’s the Time!● PSE methodologies already updated to 70E-2009 standards● Customers should update old studies

●To 2009 standards●If renovations have been made, or if study >5 yrs old

● Arc-flash reduction techniques can reduce exposure

●Construction studies – Value-based and customer focused● Have you tried Square D – lately?

●Healthcare Risk Assessments● ID power system deficiencies, prioritize improvements

●Power System Improvement Projects● Help customer optimize scarce refurbishment dollars

●Power Quality Testing and Troubleshooting● Don’t let power problems fester, call the experts

Page 11: Power System Engineering Want to own your Customer’s Power System?

Schneider Electric 11- Engineering Services – January 2009

Whom to Contact?

●PSE / Regional Engineer●Principal Engineer●Eddie Jones / Janet Powell

Page 12: Power System Engineering Want to own your Customer’s Power System?

Schneider Electric 12- Engineering Services – January 2009

PSE Information●Now have Intranet area●White Papers, Specifications, How to Sell, Regional Line Card

Page 13: Power System Engineering Want to own your Customer’s Power System?

Schneider Electric 13- Engineering Services – January 2009

PSE Information

●External webpages