    Power Secto r Futu re Out loo k

    &

    Tata Powers Perspective

    K. K. Panda

    Chief CTDS, Corporate Engineering

  • 8/13/2019 Power sector future outlook

    2/32

    Message Box ( Arial, Font size 18 Bold)

    2

    Presentation Outline

    Highlight of Indian Power SectorInstalled Capacity till 11th Plan

    Growth of Installed Capacity

    Capacity Addition Target in 12th Plan

    Capacity Addition Challenges

    Fuel & Land Issues, Statutory Clearances and Financing

    Manufacturers for Main Plan Equipments

    Manufacturing Capacity of BOP Vendors

    Engineering Expertise & System Integration

    Construction Agencies & Critical Material

    Skilled Manpower for Construction / O&M

    Tata Powers Perspective

  • 8/13/2019 Power sector future outlook

    3/32

    Message Box ( Arial, Font size 18 Bold)

    3

    Highlights of Indian Power Sector

    0

    20000

    40000

    60000

    80000

    100000

    120000

    140000

    160000

    180000200000

    InstalledCapacity in

    1947

    InstalledCapacity in

    2012

    1362

    1,99,887

    0

    100

    200

    300

    400

    500

    600

    700

    800900

    Per CapitaConsumption in

    1950

    Per CapitaConsumption in

    2011

    15

    814

    Multi-fold increase in per capita consumption & installed capacity

    ..... Continued Growth

    Per Capita consumption in unit / year and Installed capacity in MW

  • 8/13/2019 Power sector future outlook

    4/32

    Message Box ( Arial, Font size 18 Bold)

    4

    Highlights of Indian Power Sector

    In 2011-12, energy deficit of 9.25% and peak deficit of 10.63%.

    130

    200

    283

    116

    0

    50

    100

    150

    200

    250

    300

    2011-2012(Actual)

    2016-2017(Projected)

    2021-2022(Projected)

    Peak Demand in GW

    Peak Met in GW

    937

    1,355

    1,905

    858

    0

    500

    1,000

    1,500

    2,000

    2,500

    2011-2012(Actual)

    2016-2017(Projected)

    2021-2022(Projected)

    Energy Demand in BU

    Energy Met in BU

  • 8/13/2019 Power sector future outlook

    5/32

    Message Box ( Arial, Font size 18 Bold)

    5

    Highlights of Indian Power Sector

    7th Plan -Achieved

    8th Plan -Achieved

    9th Plan -Achieved

    10th Plan -Achieved

    11th Plan -Achieved

    12th Plan(Planned)

    21,407 MW16,422 MW 19,119 MW

    21,180 MW

    54,964 MW

    88,537 MW

    Plan wise Capacity Addition

    Total 88, 537 MW Capacity addition is targeted in 12th Plan (2012-

    2017) through conventional sources

  • 8/13/2019 Power sector future outlook

    6/32

    Message Box ( Arial, Font size 18 Bold)

    Installed Capacity till 11th Plan

    Coal / Lignite

    112022 MW56%

    Hydro38990 MW

    20%

    Nuclear4780MW2%

    RES24504 MW

    12%

    Diesel1200 MW

    1%

    Gas18381 MW

    9%

    Coal

    Hydro

    Nuclear

    RES

    Diesel

    Gas

    Total Installed Capacity as on end of 11th Plan =1,99,877 MW

  • 8/13/2019 Power sector future outlook

    7/32Message Box ( Arial, Font size 18 Bold)7

    Growth of Installed Capacity

    1362 1713 2813 50639583 1370318282

    2843430283 42710

    6411269915

    86337

    105456

    132329

    182680

    199877

    0

    50000

    100000

    150000

    200000

    250000

    1947

    1950

    1956

    1961

    1966

    1969

    1974

    1979

    1980

    1985

    1990

    1992

    1997

    2002

    2007

    2011

    2012

    Installed Capacity in MW

  • 8/13/2019 Power sector future outlook

    8/32Message Box ( Arial, Font size 18 Bold)8

    Capacity Addition Target in 12th Plan

    0

    10000

    20000

    30000

    40000

    50000

    60000

    70000

    COAL GAS HYDRO NUCLEAR

    69800 MW

    2539.6 MW

    10897 MW

    5300MW

    CENTRAL,26,182 MW

    STATE,

    15,530 MW

    PRIVATE,46,825 MW

  • 8/13/2019 Power sector future outlook

    9/32Message Box ( Arial, Font size 18 Bold)9

    Capacity Addition - Challenges

    Major Challenges are:

    Fuel & Land Issues, Statutory Clearances & Financial Closures

    Manufacturers for Main Plant Equipments

    Manufacturing Capacity of BOP Vendors

    Engineering Expertise & System Integration

    Construction Agencies & Critical Material

    Skilled Manpower for Construction / O&M

    Resolution of above issues is critical for meeting the 12th Plan Target.

  • 8/13/2019 Power sector future outlook

    10/32Message Box ( Arial, Font size 18 Bold)10

    Fuel & Land Issues, Statutory Clearances and

    Financing

    Project delays are possible due to:

    Non availability of Fuels.

    Linkage not available, FSA not signed.

    Delay in land acquisition.

    Delay in getting the statutory clearances

    Delay in Financing

    Proactive resolution is above issues for meeting targeted capacity is must.

  • 8/13/2019 Power sector future outlook

    11/32Message Box ( Arial, Font size 18 Bold)11

    Manufacturers for Main Plan Equipments

    BHEL

    L&T-MHI

    Toshiba-JSW

    Alstom Bharat Forge

    Ansaldo Gammon

    BGR Hitachi

    Thermax Babcock

    Chinese Suppliers like Shanghai Electric, Dongfang,

    Harbin

    Korean Suppliers

    Russian Suppliers

    European & US Suppliers like Alstom, Siemens, GE

    Many Indian companies through JV routes are developing manufacturing

    capacity in India for Main Plant Equipments

  • 8/13/2019 Power sector future outlook

    12/32Message Box ( Arial, Font size 18 Bold)12

    Manufacturers for Main Plan Equipments

    Sl. No. Manufacturer Boiler

    Technology Capacity

    1 BHEL* Alstom 20,000

    2 L&T-MHI* MHI 4,000

    3 Thermax Babcock Babcock 3,000

    4 BGR Energy Hitachi Hitachi 4,000

    5 Gammon Ansaldo Ansaldo 1,000

    6 Doosan Doosan 3,000

    TOTAL 35,000

    Boiler Manufacturing Capacity within India (MW/Year)

    European, Japanese and US vendors have well established proven

    technology and are known for quality products. But due to high cost of

    manufacturing they may not be competitive in Indian market.

    * BHEL and L&T-MHI plants are operational. Others will be operational in 2014

  • 8/13/2019 Power sector future outlook

    13/32Message Box ( Arial, Font size 18 Bold)

    13

    Manufacturers for Main Plan Equipments

    Sl. No. Manufacturer TG

    Technology Capacity

    1 BHEL* Siemens 20,000

    2 L&T-MHI* MHI 4,000

    4 BGR Energy Hitachi Hitachi 4,000

    7 JSW Toshiba Toshiba 3,000

    8 Bharat Forge Alstom Alstom 5,000

    TOTAL 36,000

    TG Manufacturing Capacity within India (MW/Year)

    Additionally Chinese Suppliers have a combined manufacturing capacity in

    excess of 100,000MW per annum. With above manufacturing capacity of domestic and international

    manufacturer, supply of BTG equipments are not likely to be constraints for

    meeting 12th Plan Target.

    * BHEL and L&T-MHI plants are operational. Others will be operational in 2013, 2014

  • 8/13/2019 Power sector future outlook

    14/32Message Box ( Arial, Font size 18 Bold)

    14

    Manufacturing Capacity of BOP Vendors

    Sl.

    No.

    BOP Packages Tentative Requirement

    of BOP Packages in12th Plan

    No of Vendors

    1 CHP 65-70 7

    2 AHP 65-70 6

    3 WTP 65-70 6

    4 Cooling Tower 65-70 (119 128)* 5

    5 Chimney 65-70 3

    6 CW Pumps 65-70 4

    7 FO System 65-70 5

    8 Fire Protection System 65-70 7

    * No of Cooling Towers in bracket

  • 8/13/2019 Power sector future outlook

    15/32Message Box ( Arial, Font size 18 Bold)

    15

    Manufacturing Capacity of BOP Vendors

    Sl.No.

    BOP Packages Vendors

    1 CHP TRF, Elecon, L&T, Tecpro, Thyssenkrupp, Energo, Mcnally

    Bharat

    2 AHP Indure, BSBK, DCIPS, Mahindra, Tecpro, Mcnally Bharat

    3 WTP Driplex, Doshi Ion, Ion Exchange, Thermax, Triveni,Acquatech

    4 Cooling Tower Phaharpur, Gammon, BGR, NBCC, L&T

    5 Chimney Gammon, NBCC, Simplex

    6 CW Pumps KBL, M&P, WPIL, Flowmore

    7 FO System Technofab, Unitech, Thermo System, Techno Electric,

    General Mechanical Works

    8 Fire Protection System Technofab, Unitech, Agnice, Fire Pro, Thermo System,

    Vijay Fire, Tyco

  • 8/13/2019 Power sector future outlook

    16/32Message Box ( Arial, Font size 18 Bold)

    16

    Manufacturing Capacity of BOP Vendors

    Limited number of vendors for BOP Packages has led to delay in completion of projects

    in recent past. We need to:

    Sensitize the industry for widening the vendor base for BOP Packages.

    Enhance manufacturing capacity .

    Encourage new entrepreneur in these area.

    Review the Qualifying requirements for new Vendors.

    Standardise BOP System

    Work in hand / Bid Capacity shall find place in tender documents.

    Use of latest construction methods with mechanised equipments.

    Developing BOP Vendors is critical for meeting target of 12th Plan

  • 8/13/2019 Power sector future outlook

    17/32Message Box ( Arial, Font size 18 Bold)

    17

    Manufacturing Capacity of BOP Vendors

    Even in the available vendors, there are concerns regarding their execution capacities,

    quality and HSE compliance. For available BOP vendors:

    Web based data base of BOP vendors needs to be developed with all

    information's viz order in hands, implementation status so that developer can take

    informed decision during selection of BOP vendors.

    BOP Vendors shall be rated based on their performance.

    Training of skilled and semi skilled manpower for BOP needs to be strengthen.

    BOP may be ordered on EPC basis.

    Engineering & Integration strength of BOP Vendors needs to be enhanced.

    Execution of BOP Packages with emphasis on cost, quality, safety and

    reliability is still a challenge for Indian Power Industry

  • 8/13/2019 Power sector future outlook

    18/32

    Message Box ( Arial, Font size 18 Bold)18

    Engineering Expertise & System Integration

    Availability of Engineering Expertise.

    Integration Expertise.

    System Design Consultants

    Detail Engineering Consultants

    Concurrent working on 88,000 +MW Project

    Quality & Safety Compliance

    For ensuring timely completion of 12th Plan Projects, large numbers

    of experienced professionals and consultancy organizations are

    required.

  • 8/13/2019 Power sector future outlook

    19/32

    Message Box ( Arial, Font size 18 Bold)19

    Construction Agencies & Critical Material

    Availability of construction agencies.

    Experience of construction agencies for execution of complex fast track projects.

    Availability of advanced tools and plants.

    Availability of EPC companies.

    Availability of cold rolled grain oriented (CRGO) for transformers.

    Worldwide shortage of CRGO steel and shortage of quality CRGO steel in India.

    Availability of Boiler Quality Plates, alloy steel piping & tubing.

    Availability of Castings and forgings.

    Approx 1.15 Million Ton of CRGO Steel, 70,000 Tons of Forging and

    Casting, 92,000 Tons Boiler Quality Plates and 6,72, 000 Tones of

    Tubes and Pipes will be required in 12th Plan.

  • 8/13/2019 Power sector future outlook

    20/32

    Message Box ( Arial, Font size 18 Bold)20

    Skilled Manpower for Construction / O&M

    Shortage of Skilled Manpower in the country.

    Around 1 million additional skilled supervisors and workmen required for

    meeting 12th plan target.

    Training and development of technicians required.

    Training institutes with focus on technologies applicable for power projects

    needs to be developed.

  • 8/13/2019 Power sector future outlook

    21/32

    Message Box ( Arial, Font size 18 Bold)21

    Tata Powers Perspective

    India's largest integrated power company

    with a significant international presence.

    Total installed generation capacity of 8,521

    MW in India.

    Presence in all the segments of the power

    sector viz Generation (thermal, hydro,

    solar and wind), Transmission,

    Distribution and Trading.

    It has successful public-private

    partnerships in Generation,

    Transmission and Distribution in India .

  • 8/13/2019 Power sector future outlook

    22/32

    Message Box ( Arial, Font size 18 Bold)22

    Tata Powers Perspective

    Coal, 6497.5

    Gas*, 1028

    Hydro, 447DG,

    121.5

    RES**,427.27

    Tata Power's Installed capacity 8521 MW

    * Gas capacity includes NG based CCPP, OCPP, NG Fired Boilers and

    COG/BFG Fired Boilers.

    ** RES includes wind and solar.

  • 8/13/2019 Power sector future outlook

    23/32

    Message Box ( Arial, Font size 18 Bold)23

    Tata Powers Perspective

    It is one of the largest renewable energy

    players in India.

    Developed country's first 4000 MW Ultra

    Mega Power Project at Mundra Gujarat

    based on super-critical technology.

    Tata Powers Strategic Intent:

    26,000 MW Generation Capacity By

    2020

    4,000 MW of Retail Distribution

    Business

    50 MTPA of Energy Resources

  • 8/13/2019 Power sector future outlook

    24/32

    Message Box ( Arial, Font size 18 Bold)

    Thank You

  • 8/13/2019 Power sector future outlook

    25/32

    Message Box ( Arial, Font size 18 Bold)25

    L&T - MHI

    L&T-MHI Boilers Private Limited is a Joint Venture Company between Larsen

    & Toubro Limited (L&T), India and Mitsubishi Heavy Industries Limited (MHI).

    L&T-MHI Turbine Private Limited is a Joint Venture Company between Larsen

    & Toubro Limited (L&T), India and Mitsubishi Heavy Industries Limited (MHI).

    Manufacturing facility located at Hazira, Near Surat, Gujarat.

    The current installed capacity is 4000 MW per year.

    Major Projects under execution are:

    2 x 660 MW JP Power Ventures

    2 x 700 MW Nabha Power

    2 x 660 MW MAHAGENCO Koradi Boiler Package

    2 X 800 MW APGENCO Krishnapattam

    MHI Technology for Pulveriser and Hyden Technology for Fans

  • 8/13/2019 Power sector future outlook

    26/32

    Message Box ( Arial, Font size 18 Bold)26

    Thermax - Babcock

    A joint venture between Thermax Limited, Pune, India and Babcock & Wilcox

    Power Generation Group, Inc., USA.

    This license covers transfer of technical know-how pertaining to design and

    engineering, manufacturing and installation of Subcritical Boilers of capacity

    1000 TPH (300 MW) and above and the full range of Supercritical Boilers.

    Currently, TBWES is in the process of setting up a manufacturing facility

    with an annual capacity of 3000 MW and provisions for an expansion up to

    5000 MW. It is located about 50 kms from Pune in Maharashtra on the

    Mumbai-Bangalore national highway (NH4).

    This state-of-the-art facility will have the capacity to manufacture

    Supercritical and Subcritical boilers and is scheduled to be commercially

    operational by August 2013.

  • 8/13/2019 Power sector future outlook

    27/32

    Message Box ( Arial, Font size 18 Bold)27

    BGR Energy - Hitachi

    Joint venture between Hitachi Power Europe Gmbh, Germany, and

    BGR Energy Systems Limited, India, with equity participation of 70%

    by BGR Energy Systems Limited and 30% by Hitachi Power Europe

    Gmbh. T

    The Company offers: Design, Manufacturing, Inspection,

    Installation, Commissioning, Selling and/or Servicing of Supercritical Boiler Steam Turbines & Generators of 660 MW / 700MW / 800

    MW / 1000 MW.

    The Company is currently setting up a Manufacturing Unit in Tamil

    Nadu.

    6 x 660 MW NTPC Bulk Tender- Boiler Package (Meja, Solapur)

    4 x 800 MW NTPC Bulk Tender Turbine Package (Lara)

  • 8/13/2019 Power sector future outlook

    28/32

    Message Box ( Arial, Font size 18 Bold)28

    Gammon - Ansaldo Caldie

    Established in 2005, AnsaldoCaldaie Boilers India Pvt. Ltd., currently

    26% owned by Ansaldo Caldaie, operates directly and autonomously

    on Indias Power market providing engineering, procurement and

    manufacturing for Ansaldo Caldaie projects both in India and

    worldwide.

    ACB Headquarters are located in Chennai, while the Manufacturing

    Facilities are in Trichy, Tamil Nadu, in the South of India.

  • 8/13/2019 Power sector future outlook

    29/32

    Message Box ( Arial, Font size 18 Bold)29

    Doosan

    Manufacturing Facility Near Chennai

    Manufacturing facility operational.

    Order executed / under execution in India

    5 x 800 MW Mundra UMPP Boiler Package

    2 x 660 MW GMR Raipur

    3 x 660 MW NTPC Sipat

    5 x 800 MW NTPC Bulk Tender Boiler Package (Kudgi, Mauda)

  • 8/13/2019 Power sector future outlook

    30/32

    Message Box ( Arial, Font size 18 Bold)30

    Toshiba JSW

    JV between Toshiba and JSW

    Factory located at Chennai, Tamilnadu

    Manufacturing of 500 1000 MW steam turbine.

    Order executed / under execution in India

    5 x 800 MW NTPC Bulk Tender Turbine Package (Kudgi, Mauda)

  • 8/13/2019 Power sector future outlook

    31/32

    Message Box ( Arial, Font size 18 Bold)31

    Bharat Forge Alstom

    Manufacturing facility at Sanand

    JV between Alstom and Bharat Forge

    Manufacturing of sub critical and super critical steam turbine.

    Order executed / under execution in India

    3 x 660 MW NTPC Bulk Tender Turbine Package

    T t P P j t d l i / ti

  • 8/13/2019 Power sector future outlook

    32/32

    Message Box ( A i l F t i 18 B ld)32

    Tata Power Projects under planning / execution

    stage

    114 MW Dagachhu Hydro Project in partnership with the Royal

    Government of Bhutan (RGoB) Under Execution

    240 MW Sorik Marapi Geothermal Project - Tata Power with consortium

    partners Origin Energy and PT Supraco. In Indonesia Under Execution.

    236 MW Dugar Hydro Project Himachal Pradesh Under Planning /

    Development

    3 x 67.5 MW Kalinganagar, Orissa Under Execution

    3 x 150 MW Kalinganagar, Orissa Under Planning / Development

    1980 MW Tiruldih Power Project, Jharkhand Under Planning /

    Development

    1600 MW Coastal Maharashtra Project Dehrand Under Planning /Development

    Distribution Franchise for Jamshedpur Circle Under Implementation