POWER QUALITY
HARMONICS & THEIR CONTROL
I N T E R N AT I O N A L C O N F E R E N C E S B U S I N E S S P R E S E N T S
2014
JuneMON-TUE
23rd / 24th Delhi.
2014
JuneWED-THU
25th / 26th Chennai.
2014
JuneFRI-SAT
27th / 28th Mumbai.
2014
JuneMON-TUE
30th June / 01st July Kolkata.
International Business Conferences training
courses are thoroughly researched and
structured to provide intense and intimate
practical training to your organisation.
Our format:
Pre-course questionnaire :
To ensure that you gain maximum benefit from
this event, a detailed pre-questionnaire will be
sent for establishing your exact training needs
via email. The completed forms will be analysed
by the course trainer prior to the event. As a
result, we ensure the course is delivered at an
appropriate level and all the relevant issues are
well - addressed. The comprehensive course
material will enable you to digest the subject
matter in your own time.
Combination of educational presentation
with case studies, productive in-session
assignments and participant's collaboration
to provide an actionable learning.
Register early to avoid any disappointment!
Strictly limited numbers and one-to-one
greater interaction with the trainer.
Detailed pre-course questionnaires to allow
you to tailor the programme to address your
individual concerns as the ROI.
[
[
[
[
Tel:
+91 22 6711 2400
Fax:
+91 22 6711 2422
E-mail:
Web:
www.ibcinfo.com
Information Intelligence Innovation
COURSE OBJECTIVES :
The objective of the course is to familiarize the participants with the causes of power quality problems, their effect on
electrical and electronic systems and various alternatives for mitigating them..
The course is meant for professionals who would like to ensure not only continuity and sufficiency of power available
to them but to secure all the plant equipments from damages and reduced life as well as maintain their process
parameters against poor power quality.
-
POWER QUALITY
HARMONICS & THEIR CONTROL
INTRODUCTION ON TOPIC :
All large scale users of electricity are
normally concerned about the continuity of
power at the demand rate required by
them. An issue of bigger concern is the
quality of power received by them.
By definition power quality is : Power made
available at stipulated voltage and
frequency without distortion of waveform
or loss of symmetry and with minimum
instances/duration of variations beyond
the specified limits or unscheduled
interruptions.
The attributes of power quality can be
summarized as:
MAIN ATTRIBUTES.
Voltage within specified limits.
Frequency within specified limits.
P
P
P Negligible instances of unscheduled power interruptions.
Control of transients or surges in the supply voltage (sub-cycle
disturbances).
Control of voltage fluctuations resulting in lamp flicker.
In the case of a three phase supply, symmetry of line/phase
voltages.
Sinusoidal waveform without appreciable distortion.
MANY OF THE ABOVE PHENOMENON ARE UNAVOIDABLE AND ARE
PRESENT IN ANY POWER SUPPLY DUE TO :
P Voltage drop along conductors.
P Variable load profile.
P Process conditions such as motor starting.
P Changes in power supply network configuration.
P Faults and interruptions.
P Load characteristics.
THE POOR POWER QUALITY AFFECTS THE WORKING OF ELECTRICAL
AND ELECTRONIC EQUIPMENTS CONNECTED TO THE SUPPLY
SYSTEM IN A NUMBER OF WAYS, SUCH AS :
P Overheating.
P Speed / torque variations in motors.
P Integrity of protection and metering devices.
P Poor power factor.
P Malfunctioning of sensitive electronic devices.
P Frequent failures in power electronic equipments.
P Excessive voltage and thermal stresses.
P
P
P
OTHER ATTRIBUTES.
P
I N T E R N AT I O N A L C O N F E R E N C E S B U S I N E S S P R E S E N T S
2014
JuneMON-TUE
23rd / 24th Delhi.
2014
JuneWED-THU
25th / 26th Chennai.
2014
JuneFRI-SAT
27th / 28th Mumbai.
2014
JuneMON-TUE
30th June / 01st July Kolkata.
Tel:
+91 22 6711 2400
Fax:
+91 22 6711 2422
E-mail:
Web:
www.ibcinfo.com
Information Intelligence Innovation
-
POWER QUALITY
HARMONICS & THEIR CONTROL
Meet Your Expert Coach
Mr. Ratan Mathur
An Electrical engineer with 40 years experience in Industrial Automation, Electrical projects and
Power Electronics Education and certification
B.Sc( Elect. Engg) ,1972, Institute of Technology, Benares Hindu University
Diploma in Marketing Management, 1979 ,J.B. Institute of Management studies University of
Bombay
Certified Energy Auditor Exam, 2005, Bureau of Energy Efficiency, New Delhi, Ministry of
Power Govt. of India
Current professional status
Instructor and writer for industrial training courses . since 2007: conducting on site and public
courses on Drives, PLC's, SCADA systems, Energy efficiency, Electrical Safety and
electrical power engg. subjects.
Member expert panel, National safety council of India (NSCI) New Bombay Since 2008 for
conducting safety audits industrial installations. And training programs on electrical safety.
Inspector- quality assurance and inspection services with Crown Agents ,New Delhi since 2005
Past work experience .
1972 1989: Siemens Mumbai with Cables, Projects and Automation divisions.
1989 -1992: Crompton Greaves Ltd. at Nasik -Divisional Marketing Manager ( Industrial Electronics Div).
1992 -2004: own set up at Nasik for system integration projects involving Siemens PLC's and Drives
P
P
P
P
P
P
WHAT WOULD YOU MISS BY NOT ATTENDING ?
Inadequate understanding of power quality issues and effective measures to control them can lead to down time,
reduced life of equipment, wastage of energy, freak behavior of electronic equipments / relays, and their failure and
excessive maintenance costs.
Tel:
+91 22 6711 2400
Fax:
+91 22 6711 2422
E-mail:
Web:
www.ibcinfo.com
Information Intelligence Innovation
2014
JuneMON-TUE
23rd / 24th Delhi.
2014
JuneWED-THU
25th / 26th Chennai.
2014
JuneFRI-SAT
27th / 28th Mumbai.
2014
JuneMON-TUE
30th June / 01st July Kolkata.
-
DAY - 1 DAY - 2
FORENOON
What is power quality. Limits on power parameters :
Why power quality matters ?
Who is responsible for power quality- Utility,
T&D, Consumer ?
Power quality acceptance criterion
PQ indicators. Introduction to each PQ attributes.
Need for PQ improvement :
Interruptions, Voltage / Frequency fluctuations,
harmonics, Surges, noise.
Main causes of the disturbances and their effects.
Possible measures for avoidance of poor PQ.
Understanding concepts of various attributes of power
quality.
Pre course assessment questionnaire Discussion with
participants about the type of PQ problems faced by them.
AFTERNOON
Dealing with interruptions. Types of UPS :
Planned/unplanned interruptions.
Critical loads.
Selection criterion for standby power sources.
PF compensation :
Concept of reactive power.
Causes of poor PF.
Estimation of reactive power compensation.
Criterion for location of capacitor banks.
Introduction to various types of UPS their features and
applications. Basics of power factor compensations.
Exercises.
P
s
s
s
P
s
s
s
P
s
s
s
P
s
s
s
s
BENEFITS :
ACTIVITY :
BENEFITS :
ACTIVITY :
FORENOON
Harmonics in electrical systems. Sources of
harmonics. effect and control :
What are harmonics ?
Sources of harmonics.
Deleterious effects of harmonics.
Avoiding harmonics.
Control measures.
Surges and protection against them :
Defining parameters of suges / impulses.
Sourses of surges/Impulses.
Control and protection.
Conceptual understanding of harmonics and surges and
solutions for limiting their damage potential.
Participants to be quizzed vide a questionnaire.
AFTERNOON
Electrical noise and its control :
Sources of noise.
Control and protection measures.
International standards for EMC in equipment
design.
Open session :
Qs and answers on topics covered.
Discussion of specific cases from participants.
Discussion of any other related topics.
Feed back and closing.
How electromagnetic compatibility of various electrical
and electronic equipment is ensured.
Post course assessment.
Open forum.
P
s
s
s
s
s
P
s
s
s
P
s
s
s
P
s
s
s
s
P
P
s IEEE-519 Recommendation for harmonic
distortions.
BENEFITS :
ACTIVITY :
BENEFITS :
ACTIVITY :
09:30 am
10:00 am
11:30 am - 11:45 am
01:00 pm - 02:00 pm
03:30 pm - 03:45 pm
06:00 pm
Registration & Introduction
Course Commences
Tea Break
Lunch
Tea Break
Course Ends
Program Schedule for two days
Our Customised Training Solutions team are veterans of in-
house training with a portfolio of specialists unrivaled
anywhere in Asia Pacific! To design your training project with
significant business impact, please contact
Mr. Ronit Kapur : +91 98203 54333
Email: [email protected] / [email protected]
Customised Training Solutions is the in-house training division of IBC
Would You Like to
Run This Course
In-House? Information Intelligence Innovation
-
Yes! Please register the following delegates
for
(For Additional delegates please photocopy this form)
Company Name ......................................................................................................................................................
Address ......................................................................................................................................................................
Pin:......................................................... Tel:...................................................... Fax: ..............................................
PERSONAL DETAILS
IBC Cancellation, Postponement and Substitution Policy:
You may substitute delegates at any time. IBC does not provide
refunds for cancellations.
For cancellations received in writing more than seven (7) days prior
to the Workshop you will receive a 100% credit to be used at another
IBC conference for up to one year from the date of issuance.
For cancellations received seven (7) days or less prior to an event
(including day 7), no credit will be issued. In the event that IBC
cancels an event, delegate payments at the date of cancellation will
be credited to a future IBC event. This credit will be available for up to
one year from the date of issuance.
In the event that IBC postpones an event, delegate payments at the
postponement date will be credited towards the rescheduled date. If
the delegate is unable to attend the rescheduled event, the delegate
will receive a 100% credit representing payments made towards a
future IBC event. This credit will be available for up to one year from
the date of issuance. No refunds will be available for cancellations or
postponements.
IBC is not responsible for any loss or damage as a result of a
substitution, alteration or cancellation/postponement of an event.
IBC shall assume no liability whatsoever in the event this Workshop
is cancelled, rescheduled or postponed due to a fortuitous event, Act
of God, unforeseen occurrence or any other event that renders
performance of this Workshop impracticable or impossible. For
purposes of this clause, a fortuitous event shall include, but not be
limited to: war, fire, labor strike, extreme weather or other
emergency.
Please note that speakers and topics were confirmed at the time of
publishing, however, circumstances beyond the control of the
organizers may necessitate substitutions, alterations or cancellations
of the speakers and/or topics. As such, IBC reserves the right to alter
or modify the advertised speakers and/or topics if necessary.
F
F
F
F
F
F
Payment Policy:
Payment Terms:
NON - RESIDENTIAL PROGRAM
Payment in full is required in advance or at the time of registration. This Registration
Fee includes lunches, refreshment and conference/workshop materials.
F O U R E A S Y WAY S T O R E G I S T E R
WEBSITE : www.ibcinfo.com
International Business Conferences
301, Rajesh Centre, Level 3, Opp. Reliance Energy,
S.V Road, Andheri(W), Mumbai - 400 058.
+91 22 6711 2400
+91 22 6711 2422
+91 9820354333
Mr. Ronit Kapur
A confirmation letter and invoice will be sent on receipt of your
registration. Payment is required within 5 working days of receipt of
invoice. Please note that full payment must be received prior to the event.
All payment should be in favour of International Business
Conferences and couriered to 301 Rajesh Centre, Level 3, Opp.
Reliance Energy, S.V. Road, Andheri (W), Mumbai - 400 0 58.
HOW MUCH ?
Venue details -Ten days prior to the event.
1 Delegate ` 24,500/-
Service Tax 12.36%
+
Name Job Title Department
1 Delegate .......................................... .......................................... ..........................................
2 Delegates .......................................... .......................................... ..........................................
3 Delegates .......................................... .......................................... ..........................................
5 Delegates .......................................... .......................................... ..........................................
4 Delegates .......................................... .......................................... ..........................................
4* / 5* Hotel Kolkata.
WHEN? WHERE ?
REGISTRATION FORM4* / 5* Hotel Delhi.23rd / 24th June 2014
25th / 26th June 2014
27th / 28th June 2014
30th June / 01st July 2014
4* / 5* Hotel Chennai.
4* / 5* Hotel Mumbai.
POWER QUALITY
HARMONICS & THEIR CONTROL
POWER QUALITY
HARMONICS & THEIR CONTROL
Page 1Page 2Page 3Page 4Page 5