Power Line Carrier CommunicationPower Line Carrier Communicationbasedbased
Automated Meter Reading SystemAutomated Meter Reading System
AMR & Interoperability for Meter Data Exchange April 25, 2008; New Delhi, INDIA
Contents:Contents:
• Present Status of LT Energy Metering in Domestic
• Issues with Other Communication Network
• Critical Benefits from PLCC Communication
• PLCC Based AMR Network Architecture
• Primary Components
• Advantages
Present Status of LT Energy Metering in Present Status of LT Energy Metering in DomesticDomestic
• To measure energy various Utilities still uses Electro mechanical meters and low cost digital meters with accuracy class is 1.0 above.
• Line loss rate is estimated to be much beyond 20% due to tampering.
• Readings of the meter is done manually that leads to obvious error and wastage of time and resource.
• It is difficult to make exact load consumption analysis.
Issues with Other Communication NetworkIssues with Other Communication Network
• Highly depends on other mobile network.
• Accessibility of Mobile network in remote areas is not available.
• In many cases manual reading is also not feasible.
• Billing cycle requires excessive time.
• System Maintenance is very expensive.
Critical Benefits from PLCC CommunicationCritical Benefits from PLCC Communication
• Most economically viable technology for transferring Meter Data to DCU.
• Using this technique of communication the data can be transferred over the existing LT Power lines.
• Narrow Band Direct Sequence Spread Spectrum Power Line Carrier Communications Technology.
• Encryption is provided for, to ensure the data accuracy, integrity and security.
Cont.,
Benefit Categories– Operational Savings– Supply Side Savings– New Revenue
Opportunities
The New Frontier– Power Quality– Outage Management– Reliability Improvement
Benefits of PLCC - Benefits of PLCC - AMRAMR
Cont.,
Operational SavingsOperational Savings
• Real Time Meter Reading• No Estimated Bills• Meter accuracy• Ease in maintenance of
the AMR system• Outage care center
•Outage investigation & follow-up
•Outage Reliability indices•Load research•Current diversion•Collections
Supply Side SavingsSupply Side Savings
• Distribution Planning• Transmission Planning• Generation Expansion• Load Forecasting• Demand-Response
New Revenue OpportunitiesNew Revenue Opportunities
• Power Quality Monitoring• Power Outage Notification• kW Demand Monitoring• kW Threshold Alerts• Load Profile Data Services
Quantifiable BenefitsQuantifiable Benefits
•Reduced expenses•More effective planning •Minimise the losses•Reduction in capital expenditures•New revenue opportunities
Intangible BenefitsIntangible Benefits
• Customer service benefits• Improved relations with Customers• Strategic benefits
Device Layer
Data Layer
Operations Support Layer
Business Support Layer
ADLS Metering System
Internet/GSM
RS 232/ PLCC/RF/IR/ RS 485RS 232/ PLCC/RF/IR/ RS 485
GSM / GPRS/RF/PLCC Modems
Local DB
GIS Application
Custom Data Management System
Local DB
BB/VSAT/GPRS/ FO/DSL
Master DB
Internet
Master DB
Billing Application
Customer Care and IVR Solutions
Energy Audit Applications
The Enterprise Architecture of AMR The Enterprise Architecture of AMR systemsystem
PLCC Based AMR Network Architecture for LT PLCC Based AMR Network Architecture for LT Commercial & Domestic ConsumersCommercial & Domestic Consumers
DCU BCS
RURU RU RU
RURU RU RU
HT LINE
LT LINE
PLCCData FlowFrom DCU
To DCU
PSTN/GSM/GPRS CDMA
Overview of the PLCC – AMR System Overview of the PLCC – AMR System
MRC: Meter reading front-end computer MSC: Management system front-end computerPSC: Power selling front-end computer CRM: Card reader/writerBCS: Base computer station DCU: Data concentrator unitPOS: Point of sale
Primary ComponentsPrimary Components
• 1 phase and 3 phase Direct Connected / CT operated Multi-function Energy Meter with in-built PLCC Modem.
• Data Concentrator Unit (DCU) with inbuilt PLCC Modem for communication with Meters & GSM /GPRS/ PSTN Modem communicating with the central station.
• Base Computer software (BCS) installed at Master Station Server with GSM/GPRS/ PSTN Modem.
Advantages of PLCC - AMRAdvantages of PLCC - AMR
• Remotely Connect / Disconnection of Power supply through PLCC Meter
• Ability to detect tamper events and outage occurrences
• Monitor electrical load in real time.
• System has no running cost for data acquisition.
• Reduction in manual meter reading costs.
Contd ….
• Reduction in late and estimated billing costs.
• Improved meter accuracy & Reduced meter maintenance expenses.
• Reduction in Revenue Protection losses
• Pre-Paid Metering can be done remotely, without requiring local smart card / Swipe Card.
• Power Quality, Outage Management and Reliability Improvement.
Advantages Contd….Advantages Contd….
Thank You
For further details Please contactFor further details Please contact:
Deepak L Shenoy B G S RajanGroup Head – Metering Manager – Metering SolutionsHand phone: +91 98450 09282 Hand phone: +91 9343621259Landline: +91 80 67177070 Landline: +91 80 67177072Email: [email protected], Email:
[email protected] [email protected]
Easun Reyrolle Limited# 389, “Rasukumaki”,
Hulimavu, Bannergatta road,Bangalore, INDIA – 560 076Web: www.easunreyrolle.com