Power Alt application on establishment of a new 10_7 MW Power station- NERSA presentation 07 October...
-
Upload
james-muchongwe -
Category
Documents
-
view
152 -
download
0
Transcript of Power Alt application on establishment of a new 10_7 MW Power station- NERSA presentation 07 October...
NERSA
PRESENTATION
ESTABLISHMENT OF A NEW
10.7 MW POWER STATION
PRESENTERS
James Muchongwe
Vicus Esterhuizen
DATE: 7 October 2010
POWER ALT PROJECT10.7 MW POWER STATION
Project Developer for 30.7 MW– ADC (Pty) Ltd.
1ST Phase – 10.7 MW
2ND Phase – 20 MW
Client– Thos Begbie Holdings (Pty) Ltd
Site– Middelburg, Mpumalanga, South Africa
Contract Basis– BOO 12 Year Take Or Pay
Technology– GE Jenbacher Reciprocating Engines
PROJECT STRUCTURE
LOAN CAPITAL
79% DEBT
SHAREHOLDERS
21% EQUITY
POWER ALTORIGINAL
EQUIPMENT SUPPLIER
EQUIPMENT
SUPPLYPROJECT
DEVELOPER
PROJECT
MANAGEMENT
SERVICES
OPERATIONS
CONTRACT
MAINTENANCE
CONTRACT
EPC
CONTRACT
LUBRICATION
CONTRACT
LEGAL REVIEW
CONTRACT
GEOTECH&
SURVEY
CONTRACTS
ELECTRICITY SUPPLY
CONTRACT
LONG-TERM CONTRACTS
EXECUTION CONTRACTS
SHAREHOLDING STRUCTURE
ADC: 10%
Investec: 20%
Astra: 19%
Jubilee: 51%
– Jubilee has an option to acquire Astra’s total
shareholding.
POWER ALT PROJECT TECHNICAL FEASIBILITIES
Assessment of Client demand and technical interface
requirements
– Measurements of harmonic distortion done and recorded
– Measurements of electrical currents done and recorded
Technology matching and decision
– Matched specific demand requirements with Technology
– Technology Provider supply all spare parts and do all
major services and overhauls over 12 years
Control philosophy to operate in parallel with Municipal grid
done in conformance with Grid Code
POWER ALT PROJECTLONG TERM CONTRACTS
Gas Supply– Sasol : 18 year contract
– Tolling arrangement whereby Thos Begbie buys gas from Sasol and supply to Power Alt (Gas take off point on Thos Begbie site)
Maintenance, Overhauls and Spare Parts Supply– GE Jenbacher: 12 year contract
Oil Supply– Engen: As required
Operations and Business Administration– ADC: 12 year contract
POWER ALT PROJECTENVIRONMENTAL IMPACT
ASSESSMENT
Thos Begbie site– Power Plant on Thos Begbie site
– Industrial zone privately owned
Emissions – In full conformance to European Standards
No public/government assets– No overhead systems
– No roads
– No underground systems
EIA – Approval in Place from Dept of Environmental Affairs
POWER ALT PROJECTTHOS BEGBIE STATUS
6 MW available from Municipality– Weekly power shedding
– Cannot operate all furnaces at same time
– Desperately needs additional power
Expansion for Ferromanganese– 1st 2.5MVA arc furnace installed
– Converter bought and on site
– Other furnaces on order
– Jubilee expansion plans envisaged
THANK YOU