Potential Bond Issues 2016-2020

download Potential Bond Issues 2016-2020

of 10

Transcript of Potential Bond Issues 2016-2020

  • 8/20/2019 Potential Bond Issues 2016-2020

    1/24

    Location 2016 2017 2018-2020

    Bridgepoint Elementary 542,000$ -$ -$

    Jonathan Jennings Elementary 550,000$ -$ -$

    Maple Elementary -$ 420,000$ -$

    New Washington Elementary -$ 340,000$ 50,000$

    Northaven Elementary 2,000,000$ 2,000,000$ 1,699,000$

    Parkwood Elementary 513,000$ 100,000$ 1,500,000$

    Pleasant Ridge Elementary 5,000$ 1,528,000$ -$

    Riverside Elementary -$ 32,500$ -$Spring Hill Elementary -$ 415,000$ 700,000$

    Thomas Jefferson Elementary -$ 601,000$ 1,064,000$

    Utica Elementary -$ 1,133,000$ 2,299,500$

    Wilson Elementary -$ 401,000$ 755,000$

    Charlestown Middle 2,037,500$ 2,070,000$ 8,366,988$

    Parkview Middle 145,000$ 1,405,000$ -$

    River Valley Middle 2,032,000$ 1,920,000$ 8,225,450$

    Charlestown High 1,235,000$ 2,000,000$ 2,000,000$Jeffersonville High 1,990,000$ 2,430,000$ 2,200,000$

    New Washington Middle High 150,000$ 435,000$ 510,000$

    Cordon Porter 75,000$ -$ -$

    Clark County Middle High -$ -$ 55,000$

    Administration Building 22,000$ 16,000$ 1,175,000$

    Service Center 2,000,000$ 2,000,000$ 2,000,000$

    Old Corden Porter 55,000$ -$ -$

    Totals 13,351,500$ 19,246,500$ 32,599,938$

    SUMMARY OF POTENTIAL CAPITAL PROJECTS

    2016-2020

  • 8/20/2019 Potential Bond Issues 2016-2020

    2/24

    Bridgepoint Elementary

    Constructed in 1957

     Square Feet

    Upgrade of HVAC System 2012

    IMPROVEMENTS NEEDED 2016 2017 2018-2020

    1. Roofs 372,000$

    2. Additional Carpet 50,000$

    3. New Gym Floor 100,000$

    4. New Cafeteria Tables 20,000$

    Totals 542,000$ -$ -$

  • 8/20/2019 Potential Bond Issues 2016-2020

    3/24

    Jonathan Jennings Elementary

    Constructed in 1965

    53,582 Square Feet

    IMPROVEMENTS NEEDED 2016 2017 2018-2020

    1. Replace Roof Top Units - Mini Splits 250,000$

    2. Roof Maintenance 15,000$

    3. HVAC Control Upgrade 35,000$

    4. Carpet Building & Redo Hallway Flooring 190,000$

    5. New Cafeteria Flooring 35,000$

    6. Additional Security Upgrades 25,000$

    Totals 550,000$ -$ -$

  • 8/20/2019 Potential Bond Issues 2016-2020

    4/24

    Maple Elementary

    Constructed in 1961

    47,466 Square Feet

    IMPROVEMENTS NEEDED 2016 2017 2018-2020

    1. Replace three (3) Boilers 135,000$

    2. Replace Roof Top Units - Mini Splits 250,000$

    3. HVAC Control Upgrade 35,000$

    Totals -$ 420,000$ -$

  • 8/20/2019 Potential Bond Issues 2016-2020

    5/24

    New Washington Elementary

    Constructed in 1972

    Renovation/Addition in 2004

    68,833 Square Feet

    IMPROVEMENTS NEEDED 2016 2017 2018-2020

    1. New Playground and Site Work 50,000$

    2. Air Condition Gym 250,000$

    3. Computer Lab Upgrade 30,000$

    4. Paint Gym 10,000$

    5. Refinish Gym Floor 25,000$

    6. Replace Cafeteria Tables 20,000$

    7. Replace Gym Speakers 5,000$

    Totals -$ 340,000$ 50,000$

  • 8/20/2019 Potential Bond Issues 2016-2020

    6/24

    Northaven Elementary

    Constructed in 1969

    69,112 Square Feet

    IMPROVEMENTS NEEDED 2016 2017 2018-2020

    1. Eliminate Open Concept $2,000,000 2,000,000$ 1,000,000$

    2. Upgrade HVAC System 400,000$

    3. HVAC Control Upgrade 35,000$

    4. Relocate Office Area to Front of Building 250,000$

    5. New Intercom System 14,000$

    Totals 2,000,000$ 2,000,000$ 1,699,000$

  • 8/20/2019 Potential Bond Issues 2016-2020

    7/24

    Parkwood Elementary

    Constructed in 1968

    62,298 Square Feet

    Upgrade of HVAC System 2012

    IMPROVEMENTS NEEDED 2016 2017 2018-2020

    1. Roof 438,000$

    2. Add Four (4) Classrooms - Addition 1,500,000$

    3. Eliminate Open Concept in Pod Area 75,000$

    4. Portables 100,000$

    Total 513,000$ 100,000$ 1,500,000$

  • 8/20/2019 Potential Bond Issues 2016-2020

    8/24

    Pleasant Ridge Elementary

    Constructed in 1992

    61,320 Square Feet

    Portbles Added 2005

    4,000 Square Feet

    Upgraded HVAC 2006

    IMPROVEMENTS NEEDED 2016 2017 2018-2020

    1. Roof  958,000$

    2. Move Headstart Playground 5,000$

    3. Carpet 250,000$

    4. Upgrade Parking Lots 200,000$

    5. Upgrade Brick Walls Around Building 50,000$

    6. Upgrade Security System 25,000$

    7. New Stage Curtains 20,000$

    8. New Electronic Sign 25,000$

    Total 5,000$ 1,528,000$ -$

  • 8/20/2019 Potential Bond Issues 2016-2020

    9/24

    Riverside Elementary

    Constructed in 2006

    79,760 Square Feet

    IMPROVEMENTS NEEDED 2016 2017 2018-2020

    1. Chairs (100) - Primary and Intermediate 25,000$

    2. Upgrade Sound Insualtion in Cafeteria 7,500$

    Total -$ 32,500$ -$

  • 8/20/2019 Potential Bond Issues 2016-2020

    10/24

    Spring Hill Elementary

    Constructed in 1967

    60,685 Square Feet

    IMPROVEMENTS NEEDED 2016 2017 2018-2020

    1. Roof 300,000$

    2. Replace Roof Top Units - Mini Splits 250,000$

    3. HVAC Control Upgrade 30,000$

    4. Install Three (3) New Boilers 135,000$

    5. Upgrade Windows 400,000$

    Total -$ 415,000$ 700,000$

  • 8/20/2019 Potential Bond Issues 2016-2020

    11/24

    Thomas Jefferson Elementary

    Constructed in 1953

    47,915 Square Feet

    IMPROVEMENTS NEEDED 2016 2017 2018-2020

    1. Roof 650,000$

    2. Replace Roof Top Units - Mini Splits 250,000$

    3. HVAC Control Upgrade 30,000$

    4. Install Two (2) New Boilers and  Upgrade HVAC 310,000$

    5. Replace Gym Floor 75,000$

    6. Carpet 250,000$

    7. Gym Fan 11,000$

    8. Intercom system 14,000$

    9. Upgrade Exterior Doors and Security 40,000$

    10. Upgrade Cafeteria - Wall 15,000$

    11. New Cafeteria Tables 20,000$

    Total -$ 601,000$ 1,064,000$

  • 8/20/2019 Potential Bond Issues 2016-2020

    12/24

    Utica Elementary

    Constructed in 2000

    61,320 Square Feet

    IMPROVEMENTS NEEDED 2016 2017 2018-2020

    1. Roof and Vertical Shear Wall Repairs 998,000$

    2. New Intercom System 25,000$

    3. Sound Panels in Cafeteria 20,000$

    4. Install Two (2) New Boilers 90,000$

    5. Geothermal Retrofit 2,299,500$

    Totals -$ 1,133,000$ 2,299,500$

  • 8/20/2019 Potential Bond Issues 2016-2020

    13/24

    Wilson Elementary

    Constructed in 1964

    68,671 Square Feet

    IMPROVEMENTS NEEDED 2016 2017 2018-2020

    1. Gym Fan System 20,000$

    2. Roof 755,000$

    3. Upgrade HVAC Controls 36,000$

    4. Install Five (5) New Boilers 225,000$

    5. Install New Cafeteria Floor 20,000$

    6. Carpet 25,000$

    7. Remodel Front Office 75,000$

    Totals -$ 401,000$ 755,000$

  • 8/20/2019 Potential Bond Issues 2016-2020

    14/24

    Charlestown Middle School

    Constructed in 1979

    144,053 Square Feet

    IMPROVEMENTS NEEDED 2016 2017 2018-2020

    1. Eliminate Open Concept 1,800,000$ 2,000,000$ 2,000,000$

    2. Resurface Track 10,000$

    3. Ultra Violet Pool Filter 30,000$

    4. Roofs 615,000$

    5. Renovate Pool Mechanical System 17,500$

    6. New HVAC Controls 70,000$

    7. Cooling Tower and Piping Replacement 350,000$

    8. Install New Flooring in Cafeteria 80,000$

    9. Two (2) mini buses 100,000$

    10. Geothermal Retrofit 5,401,988$

    Totals 2,037,500$ 2,070,000$ 8,366,988$

  • 8/20/2019 Potential Bond Issues 2016-2020

    15/24

    Parkview Middle School

    Constructed in 1960

    133,801 Square Feet

    Upgraded HVAC and Electrical Systems 2012  

    IMPROVEMENTS NEEDED 2016 2017 2018-2020

    1. Remodel Auditorium 500,000$

    2. Upgrade Gym 400,000$

    3. Renovate Cafeteria 100,000$

    4. Resurface/Reseal Track 10,000$

    5. New Student Desks 100,000$

    6. Roof Maintenance 25,000$

    7. Replace Two (2) Chillers 200,000$

    8. Upgrade Security System 30,000$

    9. Upgrade Auxiliary Gym Floor 50,000$

    10. Two (2) Mini Buses 100,000$

    11. Tennis Courts Resurfacing 35,000$

    Total 145,000$ 1,405,000$ -$

  • 8/20/2019 Potential Bond Issues 2016-2020

    16/24

    River Valley Middle School

    Constructed in 1979

    166,012 Square Feet

    IMPROVEMENTS NEEDED 2016 2017 2018-2020

    1. Eliminate Open Concept 1,000,000$ 1,800,000$ 2,000,000$

    2. Resurface Track 10,000$

    3. Ultra Violet Pool Filter 30,000$

    4. Roofs 102,000$

    5. Purchase Whorle Property 400,000$

    6. New HVAC Controls 70,000$

    7. Cooling Tower and Piping Replacement 350,000$

    8. Clear Pond Area and Resurface 40,000$

    9. Tennis Court Resurfacing 50,000$

    10. Two (2) Mini Buses 100,000$

    11. Geothermal Retrofit 6,225,450$

    Total 2,032,000$ 1,920,000$ 8,225,450$

  • 8/20/2019 Potential Bond Issues 2016-2020

    17/24

    Charlestown High

    Constructed in 1976

    Renovated in 2010

    282,366 Square Feet

    IMPROVEMENTS NEEDED 2016 2017 2018-2020

    1. Auditorium Stage Extension 15,000$

    2. Three (3) Mini Buses 150,000$

    4. Replace Football Facility/Tennis Courts/Track 2,000,000$

    5. Tennis Courts and Track 2,000,000$

    5. Add Security Cameras 25,000$

    6. Reseal Parking Lot and Stripe 50,000$

    7. Land Acquisition 575,000$

    8. Relocate Mechanical Room Louvers 10,000$

    9. Upgrade Gym Sound System 25,000$

    10. Roof Replacement for 1976 Portion of Building 235,000$

    11. Upgrade HVAC System in Choir/Band Wing 100,000$

    12. Witten Automotive Equipment 50,000$

    Totals 1,235,000$ 2,000,000$ 2,000,000$

  • 8/20/2019 Potential Bond Issues 2016-2020

    18/24

    Jeffersonville High

    Constructed in 1971

    422,348 Square Feet Renovated 2010

    New Addition in 2010

    35,593 Square Feet

    461,793 Total Square Feet

    IMPROVEMENTS NEEDED 2016 2017 2018-2020

    1. Radio/TV 650,000$

    2. Auditorium/Stage/Seating/Curtains/Sound 800,000$

    3. Four (4) Minil Buses 200,000$

    4. New Security Camera System 90,000$

    5. Marshal Building 250,000$

    6. Auxiliary Gym Roof Top HVAC Unit 100,000$

    7. Football Field and Complex 2,000,000$

    8. Resurface Tennis Courts 130,000$

    9. Expand Johnson Arena for Lobby/Concessions 2,000,000$

    Weight Room and Cardio Room

    10. Tuckpoint Building 200,000$ 200,000$

    Totals 1,990,000$ 2,430,000$ 2,200,000$

  • 8/20/2019 Potential Bond Issues 2016-2020

    19/24

    New Washington Middle/High

    Constructed in 1986

    133,646 Square Feet Renovated

    New Addition in 2009

    6,977 Square Feet

    140,623 Total Square Feet

    IMPROVEMENTS NEEDED 2016 2017 2018-2020

    1. New Bleachers 250,000$

    2. Ultra Violet Pool Filter 30,000$

    3. Softball Pressbox 15,000$

    4. Replace Student and Locker Room Lockers 125,000$

    5. Portable Risers for Cafetorium 15,000$

    6. Chairs and Racks for Cafetorium 10,000$

    7. Lights at Athletic Fields 500,000$

    8. Three (3) Mini Buses 150,000$

    Totals 150,000$ 435,000$ 510,000$

  • 8/20/2019 Potential Bond Issues 2016-2020

    20/24

    Corden Porter

    Construction in 1954

     17,920 Square Feet

    Complete Remodel in 2011

    IMPROVEMENTS NEEDED 2016 2017 2018-2020

    1. Reseal Parking Lot and Fence 25,000$

    2. Two (2) Mini Buses 50,000$

    Totals 75,000$ -$ -$

  • 8/20/2019 Potential Bond Issues 2016-2020

    21/24

    Clark County Middle High

    Constructed in 1969

    9,516 Square Feet

    Complete Remodel in 2010

    IMPROVEMENTS NEEDED 2016 2017 2018-2020

    1. New Boiler  25,000$

    2. Upgrade HVAC Controls 30,000$

    Totals -$ -$ 55,000$

  • 8/20/2019 Potential Bond Issues 2016-2020

    22/24

    Administration Building

    Constructed in 2002

    30,000 Square Feet

    IMPROVEMENTS NEEDED 2016 2017 2018-2020

    1. Two New Boilers 50,000$

    2. Building Camera System 16,000$

    3. Repair/Seal/Stripe Parking Lot 22,000$

    4. Geothermal Retrofit 1,125,000$

    Totals 22,000$ 16,000$ 1,175,000$

  • 8/20/2019 Potential Bond Issues 2016-2020

    23/24

    Service Center

    IMPROVEMENTS NEEDED 2016 2017 2018-2020

    1. Improvements 2,000,000$ 2,000,000$ 2,000,000$

    Totals 2,000,000$ 2,000,000$ 2,000,000$

  • 8/20/2019 Potential Bond Issues 2016-2020

    24/24

    Old Corden Porter

    Constructed in 1930

     26,193 Square Feet

    IMPROVEMENTS NEEDED 2016 2017 2018-2020

    1. Maintenance of HVAC system 5,000$

    2. Roof  50,000$

    Total 55,000$ -$ -$