Potential Bio-fuel Supply at Taupo

17
Potential Bio-fuel Supply at Taupo A case study for EECA, and for input into an investigation of the potential for co-generation on the Tenon sawmill and Fletcher Wood Panels site at Taupo John Scott Consulting February 2004

description

Potential Bio-fuel Supply at Taupo. A case study for EECA, and for input into an investigation of the potential for co-generation on the Tenon sawmill and Fletcher Wood Panels site at Taupo. J ohn S cott C onsulting February 2004. - PowerPoint PPT Presentation

Transcript of Potential Bio-fuel Supply at Taupo

Page 1: Potential Bio-fuel Supply at Taupo

Potential Bio-fuel Supply at TaupoA case study for EECA, and for input into an investigation of the potential for co-

generation on the Tenon sawmill and Fletcher Wood Panels site at Taupo

John Scott Consulting February 2004

Page 2: Potential Bio-fuel Supply at Taupo

Page

1 Cover

2 Contents

3 Executive Summary

4 Taupo Site Overview

5 FWP Fibre Flow

6 Tenon Fibre Flow

7 Supply of Residuals from Wood Processing Operations

8 Demand for Biomass

9 Biomass Dumped at Taupo

10 Burning Biomass Currently Dumped

11 Effect of Moisture Content on Net Heat from Biomass

12 Potential Diversion from Dumping to Burning

13 Forestry Biomass Utilisation Chart

14 Potential Forestry Biomass Picture

15 Forestry Biomass Summary Table

16 Cost of Recovering More Forestry Biomass

17 Conclusions

Potential Bio-fuel Supply at Taupo 27th February 2004

A case study for EECA, and for input into an investigation of the potential for co-generation on the Fletcher Wood Panels and Tenon sawmill site at Taupo

J ohn Scott Consul ting51 Melville Drive • Whakatane • New Zealand

Mobile: 021 822 433 • Phone/Fax: 07 308 4702 • Email: [email protected]

Page 3: Potential Bio-fuel Supply at Taupo

3 Taupo Biomass 27 Feb 04 John Scott Consulting

Executive Summary• The Taupo site is a major processor of wood and wood processing residuals:

– FWP produces about 195,000 m3 per annum of panel products

– Tenon produces about 205,000 m3 per annum of lumber products

– both operations are in very competitive markets and need to mitigate rising energy prices to remain internationally competitive

• FWP utilises relatively low cost sawdust and shavings from up to 100 km away as a feedstock for production of MDF and particle board

• Tenon is a typical sawmill, generating about 87,000 tonnes per annum of sawmill chips and 66,000 tonnes par annum of bark, sawdust and shavings

• The supply of traditional residuals from wood processing operations in the CNI is expected to remain about the same - output will vary with market conditions using existing capacity levels

• The demand for forestry residuals has been steadily increasing, with no sign of abatement.

• Up to 33,000 tonnes per annum of (bark equivalent) biomass could potentially be recovered instead of being dumped at the Bleakley landfill in Taupo, but the cost is unknown.

• Biomass from CNI wood processing activities is already well utilised, but there is potential to recover more material from harvesting and log-making operations.

– the estimated cost of at least $20 per tonne for recovering, processing and transporting this material has been prohibitive to date.

• It may be worth undertaking some research to better estimate the recovery costs and potential volumes of biomass from harvesting and log-making activities.

Page 4: Potential Bio-fuel Supply at Taupo

4 Taupo Biomass 27 Feb 04 John Scott Consulting

The Taupo site produces about 400,000 m3 per annum of wood products and needs to minimise energy costs

• The Fletcher Wood Panel (FWP) operation produces 195,000 m3 per annum of panel products from two manufacturing lines:

– 150,000 m3 per annum of Lakepine medium density fibreboard (MDF)

– 45,000 m3 per annum of Superfine particle board (PB).

• The Tenon (previously FCF) Taupo sawmill operation produces about 205,000 m3 per annum of sawn timber.

• Both operations require electricity to run the plants:– FWP use averages 9 MW (about $6 million per annum)

– Tenon sawmill use averages 2.6 MW (about $2 million per annum)

• Both operations require heat energy to dry and/or cure their products:– FWP use averages about 1,300 GJ/day of natural gas (about $2.7 million per annum) plus 900 GJ/day

from sander dust and bark/hog

– Tenon sawmill uses about 1,700 GJ/day of natural gas (about $3.5 million per annum)

• Increasing energy prices have driven both FWP and Tenon to minimise their energy costs:– one option is to burn more bio-fuel to produce more steam and possibly generate electricity

Page 5: Potential Bio-fuel Supply at Taupo

5 Taupo Biomass 27 Feb 04 John Scott Consulting

Fletcher Wood Panel’s Taupo operation uses forestry/sawmill residuals mainly as production feedstock

“Lakepine” MDF Production

Furnaces

Furnace

Shavings

ChipsMDF

Particle Board

SanderDust Hogger

Saw Trim

Sander Dust

NaturalGas

“Superfine” Particle BoardProduction

Waste toDump

FWP Taupo Simplified Fibre Flow

Bark/Hog

Sawdust

Page 6: Potential Bio-fuel Supply at Taupo

6 Taupo Biomass 27 Feb 04 John Scott Consulting

Tenon Taupo is a typical sawmill, with about 50% of the input logs ending up as bark, chips, sawdust, shavings and other residuals

FCF Taupo Sawmill

Lumber

Sawdust

Sawmill Chip

Bark/Hog

Tenon Taupo Sawmill Simplified Fibre Flow000 tonnes per annum

40

87

12

23

47,000 m3

Remanufacturing Mouldings

Mouldings

5

Dumped Material

Dumped Material

Shavings

3

205,000 m3

Drying and Surfacing

175,000 m3

Shavings

Lumber

9

166,000 m3

Sawlogs

395

Page 7: Potential Bio-fuel Supply at Taupo

7 Taupo Biomass 27 Feb 04 John Scott Consulting

The supply of residuals from wood processing in the CNI is expected to remain about the same

• The volume of harvesting in the Central North Island is not expected to increase:– harvest levels have been relatively high over recent years:

• FCF total sales volumes for all estates is projected to reduce from 4.5 million m3 in 2003 to 3.9 million m3 in 2004 (ref. Grant Samuel report to shareholders)

– there is now pressure to harvest closer to 30 years rather than 25 years of age in order to improve the strength/yield of structural grade/value from the logs

– the “wall of wood” is mainly coming from other regions such as the East Coast and Northland

• Additional investment in wood processing capacity in the CNI is uncertain:– Tenon projects manufactured sales volume to increase by 7,000 m3 in 2004 and another 97,000 m3 (14%,

mainly in lumber/roundwood) in 2005, (ref. FCF Prospective Financial Information document): • the location of this increase was not stated, and

• the same document indicated capital spending in 2004 and 2005 only to maintain existing capacity

– it is not clear why significant processing expansion would be located at or near Taupo

– sawmills are likely to follow their established pattern of altering production to match market conditions by increasing or decreasing the number of shifts, using their existing capacity.

• Many wood processors have historically varied their output, for example by increasing or decreasing the number of shifts, in response to market conditions.

• The trend for delivered logs to have less bark will continue:– mechanised harvesting and de-limbing has resulted in more bark being removed from the trees during

harvesting and left in the forest.

– cost and safety factors will drive further increases in mechanical harvesting and de-limbing

Page 8: Potential Bio-fuel Supply at Taupo

8 Taupo Biomass 27 Feb 04 John Scott Consulting

The demand for forestry residuals has been steadily increasing

• New boilers installed in recent years are increasing demand for biomass:– the operation of the CHH Kinleith biomass boiler is improving with annual demand of up to 200,000 tonnes, well in

excess of secured supplies, driving the recovery of more higher cost biomass from logging operations

– a new biomass boiler at Pan Pac’s mill near Napier means that biomass flows to Taupo will cease or reverse• all chip and bark from the Pederson Taupo sawmill adjacent to FWP Taupo is now going to Pan Pac

– the co-generation plant at the Waipa sawmill has been importing biomass from other sawmills and running much harder in response to the higher electricity prices

• A number of sawmill that have been “giving away” biomass are installing or considering installing or upgrading their own biomass boilers to provide heat for timber drying kilns.

• Alternative uses are evolving for forestry biomass:– bark is increasingly sought after for garden mulch and potting mix

– farmers are finding new uses for shavings and sawdust

• Long time “importers” of biomass, such as the Kawerau mill, have indicated that it is becoming increasing difficult (and costly) to maintain adequate biomass supplies right through the year:

– it is possible that the Kawerau mill may reduce its biomass imports, but CHH Kinleith would absorb it.

• Sawmills are now hoping to get paid for sawdust and other residuals that a few years ago incurred a disposal charge:

– should this occur, there is a risk that operations such as FWP and biomass fired co-gen plants could become uneconomic

– existing biomass users are therefore strongly motivated to prevent the increasing demand from pushing up the price of biomass supplies

Page 9: Potential Bio-fuel Supply at Taupo

9 Taupo Biomass 27 Feb 04 John Scott Consulting

A variety of biomass material is dumped at the Bleakley landfill near the FWP/Tenon site at Taupo

Offcuts Sander Dust

General RubbishMDF Fibre

Bark

Dockings

Page 10: Potential Bio-fuel Supply at Taupo

10 Taupo Biomass 27 Feb 04 John Scott Consulting

Most of the biomass that is currently dumped at Taupo could potentially be burnt

• Consistency of particle size is important for efficient boiler operation– some material must be broken up or hogged before it can be burnt

– if a mixture of materials is to be burnt then separation, storage and then blending may be required to achieve satisfactory efficiency and control of emissions

• Contamination with dirt, pumice and/or rocks will accelerate boiler erosion– much of the potential material would need to be separated from the contaminants, preferably before

collection

• Some of the material is not available on a continuous basis:– bark supply changes markedly with the seasons - it tends to fall off the logs during harvesting at spring

time

– some material only arises from irregular production upsets

• In theory, some of the material already dumped at Taupo could be “mined”, but the cost of recovering, separating and processing this material would be high - probably at least $25 per tonne (based on experience at Kawerau).

• A key factor is the moisture content - wetter material has lower net heat available– refer to next page for details

Page 11: Potential Bio-fuel Supply at Taupo

11 Taupo Biomass 27 Feb 04 John Scott Consulting

The net heat available from biomass is very dependent on its moisture content

• Moisture content has a double negative effect:– more moisture per tonne means less dry material per tonne

• for example sawdust typically at 40% Oven Dry (OD) content has 60% water by weight

– some energy from the dry material is used up just to heat and evaporate the water content

– so the more water, the less gross energy and then even less net energy after evaporating the water

Net GJ of heat per tonne of biomass

0123456789

101112131415

35% 40% 45% 50% 55% 60% 65% 70% 75% 80% 85% 90%

Percent Oven Dried Content of Biomass

Net G

J h

eat per

t bio

mass

0

1

2

3

4

5

Tonnes o

f S

team

per

Tonne

Bio

mass

Page 12: Potential Bio-fuel Supply at Taupo

12 Taupo Biomass 27 Feb 04 John Scott Consulting

About 33,000 tonnes per annum of biomass (bark equivalent) could potentially be burnt instead of being dumped at Taupo

• The following estimate is based on various sources including:– KJ Bleakley records of m3 (cubic metres) dumped

– sampling of Tenon weigh dockets to establish typical tonnes per m3

– FWP records of tonnes dumped

– Oven Dry % estimates based on measurements of similar material at Kawerau

SourceTonnes

per annum

Contaminated?

Needs Hogging

Steady supply

Est. Oven Dry %

Net GJ per

tonne

Total Net GJ

Estimated Potential

Recoverable %

Recoverable Net GJ

Net equivalent tonnes of

bark at 50% OD

Sludge 4,500 Y N 35% 4.2 18,703 0% 0 0Yard Waste 17,636 Y Y 40% 5.1 89,539 50% 44,770 6,488Reject Sawdust 814 Y N 40% 5.1 4,135 80% 3,308 479Wet Fibre 2,205 N 40% 5.1 11,195 80% 8,956 1,298Factory Rubbish 10,703 Y Y 60% 8.8 93,766 50% 46,883 6,795General Waste 2,323 60% 8.8 20,351 70% 14,246 2,065Dockings 2,121 Y N 80% 12.4 26,388 90% 23,749 3,442Dry Fibre and Sanderdust 2,544 N 80% 12.4 31,660 90% 28,494 4,130Reject Shavings 27 N 85% 13.4 361 50% 180 26Board Trim and Rejects 1,910 Y 85% 13.4 25,527 90% 22,975 3,330Sander Dust 2,884 85% 13.4 38,547 90% 34,692 5,028TOTAL 47,667 360,174 228,253 33,080

Estimate of Recoverable Biomass Dumped at Taupo

Page 13: Potential Bio-fuel Supply at Taupo

13 Taupo Biomass 27 Feb 04 John Scott Consulting

CNI forestry biomass is generally well utilised Trees

Harvesting

Trunks

Log Making

Logs for Export

Pulplogs

Peeler andSmall logs

Sawlogs

Sawmilling

Plywood andPost making

Pulp & Paper

Short Ends

Branches

Bark/Hog

Sawdust

Chipping

Wood Panels

Sawmill Chips

Wholelog Chips Tub Chips

Fibre Recovery

Shavings

Green Timber

TimberProducts

Timber Processing

Plywood andPost Products

Storage and Export

Export Logs

Page 14: Potential Bio-fuel Supply at Taupo

14 Taupo Biomass 27 Feb 04 John Scott Consulting

More biomass could be recovered during harvesting and log-making

Page 15: Potential Bio-fuel Supply at Taupo

15 Taupo Biomass 27 Feb 04 John Scott Consulting

Summary of Forestry Residuals Sources and End Uses

Type Source Comments on Source End Use Comments on Use

Branches Harvesting Removed from trunksbefore transport

Potential biofuel, but not utilised High cost of collecting, transportingand processing

Harvesting Some bark falls off duringharvesting and transport

Potential biofuel, but not utilised Small volumes widely dispersed,with high cost of collecting,transporting and processing

Log making Some bark falls off duringhandling

Generally left in forest, but someis recovered from centralprocessing yards

Challenge to minimisecontamination from dirt andpumice/rocks

Bark/Hog

Sawmilling,plywood, postmaking,chipping

Remaining bark removedbefore milling or chipping

Boilers, garden mulch Highly sought after

Log making inforest

Dispersed through forestareas

Potential biofuel, but not utilised Cost of collecting from dispersedforest skids and transporting tochipper

Short logends

Centralised logprocessing

Just a few sites in CentralNorth Island

Mostly recovered for chipping Lower quality chips suitable forpanel manufacture

Sawdust Sawmilling andtimberprocessing

Boilers, panel manufacture, Only dumped if contaminated

Shavings Timberprocessing

Dry but bulky Panel manufacture, boilers,farms.

Generally highly sought after

Sawmillchips

Sawmilling Up to 30% of ingoing logs Pulp and paper manufacture, chipexports

Highly valued and always utilised

More biomass could be recovered during harvesting and log-making

Page 16: Potential Bio-fuel Supply at Taupo

16 Taupo Biomass 27 Feb 04 John Scott Consulting

Recovery of more biomass from harvesting and log-making operations has been too costly

• About 40% of CNI harvest is transported as whole trunks for log-making in central processing yards:

– it has been economic to recover some bark and most small log ends for “fibre recovery” operations and sale as bark, whole log chips, tub chips and hog fuel

– some bark from the “yard sweepings” is deemed to be too contaminated to be utilised:• either the yards need to be sealed to prevent contamination, or the material needs to be de-contaminated prior to being

fed into a boiler

• In general it has been uneconomic to recover more biomass from the harvesting operations and from log-making that is is carried out in the forests

– the material, including branches, bark that has fallen off, and small log ends, is widely dispersed

– the cost of collecting, transporting and processing this material to be suitable for burning has been estimated to be at least $20 per tonne

– the delivered costs will vary depending on the type (eg branches or small logs), degree of dispersion, degree of contamination, and the location.

• CHH has started to recover some material from harvesting/logmaking operations to supplement the supply for their Kinleith co-generation plant:

– CHH is facing a shortfall - their boiler can use about 200,000 tonnes of biomass per annum

– it is likely that CHH will be developing innovative methods to minimise the costs of this operation, but no details have been available

Page 17: Potential Bio-fuel Supply at Taupo

17 Taupo Biomass 27 Feb 04 John Scott Consulting

Conclusions

• All existing biomass supplies from wood processors are “spoken for”:– the viability of the FWP operation depends on utilisation of relatively low cost sawdust and shavings as

a feedstock for production of MDF and particle board

– the supply from conventional sources remains static:

– a number of biomass users and potential users are looking for additional supplies, if possible without driving up the price of existing supplies:

• It may be possible to redirect up to 33,000 tonnes per annum of biomass currently dumped at the Bleakley landfill at Taupo:

– the costs of getting this material into a form suitable for burning are not known, but will vary considerably with the type and source of material.

• There is additional biomass potentially recoverable from harvesting and log-making operations:– the costs for getting this material into a form suitable for burning are not known, but will vary

considerably.

– previous estimates have been in the order of $20 per tonne minimum, which is has been uneconomic for new biomass co-generation projects.

– the potential volume could be very large, but with the costs increasing with dispersion and distance

• It may be worth undertaking some research to better estimate the recovery costs and potential volumes of biomass from harvesting and log-making activities.