  • POST INSTALL INSTRUCTIONS

    Layout your deck or patio to

    optimize the railing sections and

    posts.

    Use speed square for placement of post.

    Important to have blocking below decking

    and fastened to or through the blocking or

    substructure.

    Start fastening the post

    flange to deck and use

    shims for plumbing posts.

    Pre Drill and use the APPROVED Building

    Code methods to attach and install the

    POST. CHECK WITH YOUR LOCAL BUILDING

    CODE OFFICIAL. Fasten and shim, check for

    plumb.

    Trim shims with utility knife, score and snap.

    Finalize the plumbing of the post, then take

    the 2 pc Flange Cover and slide 3 sided

    flange into place and then snap final piece

    of the flange to complete assembly

    To detach the flange cover, simply pull

    straight up and twist the side of the casting

    to remove the 2nd piece.

  • Railing Installation Guidelines For:

    ULTRA MAX

    • Please read all instruction completely before starting any installation of our Pro Railing systems

    • Railing Boxed Kits come complete with Top/Bottom Rails, In Rail Connectors, brackets, balusters and hardware

    • Rail Sections come in 4ft, 6ft & 8ft

    • Posts are available in RESIDENTIAL Rated (2.5” & 3.0”) and COMMERCIAL (3” .125 wall with 6 Boss channels)

    • MAX railings should be installed using accepted building principles in accordance with Local Building codes and

    the installation guidelines.

    • MAX has been tested by ATI and meets the current testing standards for IRC and IBC construction codes

    • If you have any questions, Please call YOUR Distributor or check their website for more install details

    • SAFETY: Always be safe and follow all instructions when using power tools and always wear safety goggles!

    • NOTE: consult your local building code official and check all Code Requirements.

    • Any Questions? Call 800-656-4420 and Ask for your Railing Specialist!

    • Visit our website www.ultrarailing.com

    All fasteners are included in box kits

    ULTRA MAX Boxed Railing kits include Top Rail, Bottom Rail, ¾” Square balusters, Two (2) Top MAX Drop In Brackets, Two (2)

    Bottom Drop In Brackets, 18/8 Stainless Steel Fasteners 12-#14-Type F self-Threading, Foot-block and shoe.

    #14 Type F, 12 self-threading screws included, 2 screws for bracket attachment to post and 1 painted screw for securing profile to

    the top bracket. Use a # 3 screwdriver bit for a sure fit. Stairs brackets include 5-#14 TEK screws. Foot-block assembly has 3-#8’s,

    1-TEK for the connector and two Type A for the shoe.

    STAIR BRACKETS

    INSTRUCTIONINSTRUCTIONINSTRUCTIONINSTRUCTIONSSSS

    BUILDING MATERIALS: HARDWARE & PROFILES

  • R

    Layout the deck or patio for the

    best for optimizing the railing

    sections.

    Use speed square for placement of post and

    flange. Important to have blocking below

    decking and fastened to or through the

    blocking or substructure

    Start fastening the post

    flange to deck and use

    shims for plumbing posts,

    snap on Flange covers.

    Level, Rubber Mallet, 2-speed square, cordless Drill and impact driver, Quick clamp grips, Measuring Tape, meter

    saw with high tooth count, 13/64” drill bit, #3 screwdriver bit, ratchet set, Portable Band Saw

    TOOLS

    MAX Railing kits are packaged for secure and

    safe shipment. Rails and balusters are

    separated by a corrugated compartments and

    bracket kit is packaged securely and placed in

    compartment of the box.

    Picket template provided in the box to help

    stabilize the top pickets when installing and

    aligning top rail. Brackets can be installed on

    the post manually or with the Install Guide

    Template. Sold separately

    MANUALLY: place BOTTOM BRACKET, 1- 3/8”

    from top of post plate. Measure from bottom

    of INSTALLED BOTTOM BRACKET and mark at

    32.5”. Draw line for placement of Top bracket.

    Place BRACKETS on marks, mark the holes or

    use bracket as template for drilling 13/64” pilot

    holes. Attach all (4) brackets with 2- #14 1”

    Type F screws. Place the BOTTOM RAIL

    adjacent to the 2 post and use speed square to

    transfer cut lines and mark. Double check the

    length at bottom and top of posts with tape

    measure for square. Cut the top and bottom

    railing profiles to size. Assemble the top and

    bottom rail by inserting the baluster into the In

    Rail Connector and build railing section.

    Fully assembled panel is lifted and placed

    onto the 4 pre-installed Brackets.

    Foot Block provided needs to be added to the

    center point of all sections, attach connector to

    bottom profile with 1-#8 1” TEK screw and

    install. Friction fit pre-cut foot block (2”) and

    place shoe on baluster. Set in place and take

    remaining #8 5/8” Type A screws and attach

    shoe to substrate. (screw provided for wood or

    composites)

    POST

    Pre Drill with 13/64” Drill Bit from bottom

    of Top Rail into the Top Drop In Bracket,

    Use 2- #14 1” Type F PAINTED HEAD, screw

    and fasten the top rail to Bracket.

  • AIRSAIRSAIRSAIRS

    MAX PIVOT STAIRSMAX PIVOT STAIRSMAX PIVOT STAIRSMAX PIVOT STAIRS or Friction Fit Stairsor Friction Fit Stairsor Friction Fit Stairsor Friction Fit Stairs

    THE MAX PIVOT STAIRS PIVOT FROM 0 TO 38, FRICTION FIT WORKS FROM RANGE 30 TO 40 DEGREES

    ELIMINATING THE CALCULATION OF RISE AND RUN, FOR YOUR ANGLES ON STAIRS.

    Mark your length of RUN by setting

    BOTTOM RAIL on the nose of the steps and

    clamp to the two posts. Use (2) speed

    squares (see pic) on steps to keep BOTTOM

    RAIL off the steps and allow for clearance of

    flange cover on TOP post installation.

    NOTE: Place Flange cover on post base for

    clearance of bottom rail

    Mark with speed square and cut the profiles

    square, use Chop saw, cut at the marks and

    view your location mark to match how you pre-

    measured the Stair Railing originally, VERY

    IMPORTANT to LINE UP AND PLACE STAIR

    SECTION BACK THE SAME AS ORIGINAL.

    USE YOUR MARKS FOR PLACMENTS

    After clamping Railing section, mark TOP and

    BOTTOM RAILS with pencil, use your POST as

    your straight edge. (Use white mark on dark

    profiles) Clearly label your TOP and Bottom

    Rails for identification when cutting and

    installation. T for TOP, B for Bottom, L and R

    Double check your measurements by placing

    the Upper and lower STAIR BRACKET flush to

    the POST and check the distance for added

    accuracy. IMPORTANT: MARK YOUR RAILING

    FOR PROPER REALIGNMENT & Installation

    Clamp Stair template, (see picture) to

    outside of POSTS, using quick clamp grips,

    when centered and sized so that top and

    bottom BALUSTERS are symmetric and

    plumb to the two posts.

    MARK and CUT: TOP & BOTTOM RAIL OF STAIRS

    TOP of MARKED RAILS (A1 and B1) Measure

    from bottom of angle, 1.25” to the Right.

    BOTTOM of MARKED RAILS (A2 and B2)

    Measure from top of angle, 1.25” to Left.

  • After placing the assembled stair section

    between the two posts, MARK your TOP and

    BOTTOM BACKER plates.

    Now make location MARKS on STAIR BACKER

    PLATES. NOW, mark/outline the BACKER PLATE

    position with the 4 BACKER PLATES. This is

    important, as you will install the BACKER PLATES

    to the POST with #14 TEK Screws, after removing

    the stair section.

    Drop TOP and BOTTOM Rail into position on the

    installed BACKER PLATES. Set #14 TEK Screw on

    TOP RAIL at the BOTTOM of the Stair Run. This will

    allow the TOP RAIL to PIVOT, UP and DOWN for

    Baluster placement. (see Pics).

    Remove stair section in whole and remove all 4 stair

    brackets. Separate the RAILING CUPS from the

    BACKER PLATES (remove #14 set screws) Now install

    the 4 BACKER PLATES and attach to the previous

    marked position on the POSTS. Secure all (4) Stair

    RAIL CUPS to the top and bottom rails. USE #14 TEK

    screws.

    When all Baluster are in position between

    the POSTS. Secure last of #14 TEK Screws

    into the Stair Brackets.

  • INSTALL GUIDE TEMPLATE INSTRUCTIONS

    TEMPLATE FOR INSTALLATION OF MAX BRACKETS

    Place ULTRA MAX template on the post

    and using a BRACKET, Drill a 13/64” pilot

    hole. Secure brackets by using the #14 x

    1”-TYPE F-18/8 SS screws provided.

    Place the posts in the position desired for

    railing placement, fasten the post with the

    proper fasteners and begin shim process.

    Level, Plumb and SECURE.

    The assembled panel will DROP IN to the

    attached brackets on the posts. Connect top covers