portfolio small 66
-
Upload
silvia-pizzini -
Category
Documents
-
view
9 -
download
2
Transcript of portfolio small 66
NOTES:Report all errors and discrepancies promptly to architects before proceeding withthe works.Do not scale drawing. Figured dimensions to be worked to in all cases.The contractor is responsible for checking dimensions, tolerances and references.All structural information to be taken from engineers drawings. www.crawfordpartnership.co.uk
Company number 3499361
[email protected]: 020 8444 2070 · Fax: 020 8444 1180
1a Muswell Hill, London, N10 3TH
Architecture Interior Design Development
crawford partnershipWORKING DRAWINGS UNLESS LABELLED OTHERWISEDetailed Loft Plan
13 FIRS AVENUE
2009-235-2-900
MR & MRS MACLEOD
CHECKED:
7,137
3,53
4
03
04
01
02
BBBB
CCCC
BEDROOM
WARDROBE
ENSUITE
D1
D2
D3
RL1
RL2
WALK IN SHOWER
DD DD
'Velux' or similar conservationcentre pivot rooflight
new window
new window
'Velux' or similar conservationcentre pivot rooflight
STORAGE
W1
W2
STORAGE
STORAGE
STORAGE
LOFT S
PA
CE
(LIMITE
DA
CC
ES
S)
LOFT S
PA
CE
NO
AC
CE
SS
LOFT
Existing and proposed plans, and proposed sections of loft, Firs Avenue, London - Crawford PartnershipNOTES:Report all errors and discrepancies promptly to architects before proceeding withthe works.Do not scale drawing. Figured dimensions to be worked to in all cases.The contractor is responsible for checking dimensions, tolerances and references.All structural information to be taken from engineers drawings. www.crawfordpartnership.co.uk
Company number 3499361
[email protected]: 020 8444 2070 · Fax: 020 8444 1180
1a Muswell Hill, London, N10 3TH
Architecture Interior Design Development
crawford partnershipWORKING DRAWINGS UNLESS LABELLED OTHERWISESections BB, CC, DD
13 FIRS AVENUE
2009-235-2-901
MR & MRS MACLEOD
CHECKED:
1,064
1,54
8
2,27
8
1,99
7
BOOKCASE
NEW VELUX TYPE WINDOW
SECTION CC
12
34
56
78
9
2,351
2,29
7
NEW VELUX TYPE WINDOW
SECTION DD
STORAGE ENSUITE
2,27
9
6,804
SECTION BB
01
02
04
03
Loft
conv
ersi
on, L
ondo
n.
NOTES:Report all errors and discrepancies promptly to architects before proceeding withthe works.Do not scale drawing. Figured dimensions to be worked to in all cases.The contractor is responsible for checking dimensions, tolerances and references.All structural information to be taken from engineers drawings. www.crawfordpartnership.co.uk
Company number 3499361
[email protected]: 020 8444 2070 · Fax: 020 8444 1180
1a Muswell Hill, London, N10 3TH
Architecture Interior Design Development
crawford partnershipWORKING DRAWINGS UNLESS LABELLED OTHERWISESections BB, CC, DD
13 FIRS AVENUE
2009-235-2-901
MR & MRS MACLEOD
CHECKED:
1,064
1,54
8
2,27
8
1,99
7
BOOKCASE
NEW VELUX TYPE WINDOW
SECTION CC
12
34
56
78
9
2,351
2,29
7
NEW VELUX TYPE WINDOW
SECTION DD
STORAGE ENSUITE
2,27
9
6,804
SECTION BB
Pictures crawford partnership www.crawfordpartnership.co.ukTel: 020 8444 2070 · Fax: 020 8444 1180
1a Muswell Hill, London, N10 3TH
1:5000, 1:25000 @ A3
Report all errors and discrepancies promptly to architects before proceeding with the works.Do not scale drawing. Figured dimensions to be worked to in all cases.The contractor is responsible for checking dimensions, tolerances and references.All structural information to be taken from engineers drawings.
NOTES:
July 09 13 Firs Avenue Mr & Mrs Macleod SP 2009-235-2-118ACPlanning PROJECT:SCALE:STATUS: CHECKED: DRAWING TITLE: DRAWING NO.:REV: CLIENT: DRAWN:DATE:
OS Map crawford partnership www.crawfordpartnership.co.ukTel: 020 8444 2070 · Fax: 020 8444 1180
1a Muswell Hill, London, N10 3TH
1:1250 @ A3
Report all errors and discrepancies promptly to architects before proceeding with the works.Do not scale drawing. Figured dimensions to be worked to in all cases.The contractor is responsible for checking dimensions, tolerances and references.All structural information to be taken from engineers drawings.
NOTES:
July 09 13 Firs Avenue Mr & Mrs Macleod SP 2009-235-2-117ACPlanning PROJECT:SCALE:STATUS: CHECKED: DRAWING TITLE: DRAWING NO.:REV: CLIENT: DRAWN:DATE:
04m8961
04m8941
04m8961
04m8941
08m
285
508m
285
5
08m
283
508m
283
5
895895
284
284
to
Posts
to
82
84
2513
to89
96
31
98to
33
35 to 45
102
104
49
to108
110to
53
47
51
114
116to
77
57 to 75
120
55
7981
PH
Surgery
85
122
FIRS CLOSE
83
107
109
87to
113 to 117
105
119
121
20
111
8
CR
Ward Bdy
4
104.2m
2
FIRS AVENUE
TCB
123 to 137
27
FIRS AVENUE
CW
13
139 to 153
93
155 to 169
CF
FW
CF
36
2
22
1018
Und
39
BIRCHWOOD AVENUE
BIRCHWOOD AVENUE
3St Jam
es' Church
Mem
orial Hall
25
CF
21
13
20 0 20 40 60 80 100
Metres
11
Proposed Lower Ground Floor Plan crawford partnership www.crawfordpartnership.co.ukTel: 020 8444 2070 · Fax: 020 8444 1180
1a Muswell Hill, London, N10 3TH
1:50 @ A3
Report all errors and discrepancies promptly to architects before proceeding with the works.Do not scale drawing. Figured dimensions to be worked to in all cases.The contractor is responsible for checking dimensions, tolerances and references.All structural information to be taken from engineers drawings.
NOTES:
July 09 13 Firs Avenue Mr & Mrs Macleod SP 2009-235-2-100ACPlanning PROJECT:SCALE:STATUS: CHECKED: DRAWING TITLE: DRAWING NO.:REV: CLIENT: DRAWN:DATE:
F
1 2 3 4 5
123456
4,775
3,672
3,601
AA
new fixed roof light
with obscured glass
shelving unit
new breakfast bar
folding sliding doors
Pre-planning drawings, planning packages and planning applications for private houses in the Muswell Hill area with the Crawford Partnership.Proposed section AA crawford partnership www.crawfordpartnership.co.ukTel: 020 8444 2070 · Fax: 020 8444 1180
1a Muswell Hill, London, N10 3TH
1:50 @ A3
Report all errors and discrepancies promptly to architects before proceeding with the works.Do not scale drawing. Figured dimensions to be worked to in all cases.The contractor is responsible for checking dimensions, tolerances and references.All structural information to be taken from engineers drawings.
NOTES:
July 09 13 Firs Avenue Mr & Mrs Macleod SP 2009-235-2-101ACPlanning PROJECT:SCALE:STATUS: CHECKED: DRAWING TITLE: DRAWING NO.:REV: CLIENT: DRAWN:DATE: