Portfolio of Selected Professional Work

13
STEPHEN THOMAS HINES PORTFOLIO OF SELECTED PROFESSIONAL WORK DESIGN CONSTRUCTION METHODS BIM SYSTEM INTEGRATION Problem Solving Solution Driven

description

Short vignettes and descriptions of selected projects in key building types with table of contents.

Transcript of Portfolio of Selected Professional Work

Page 1: Portfolio of Selected Professional Work

STEPHEN THOMAS HINES

PORTFOLIO OF

SELECTED PROFESSIONAL WORK

DESIGN

CONSTRUCTION

METHODS

BIM

SYSTEM

INTEGRATION

Problem Solving

Solution Driven

Page 2: Portfolio of Selected Professional Work

5 - PROFESSIONAL PROJECTS

Stephen Thomas Hines � April 4, 2009 5.1

� CONTENTS� Centerpoint - Jackson, Wyoming 5.2� Averon Technologies - Mine Hill, New Jersey 5.2� Talley Residence - Fayetteville, Arkansas 5.3� Courtesy Dealership - McKinney, Texas 5.3� Serranos Salsa Company - Lafayette, Louisiana 5.4� Inspiring Body of Christ Church - Dallas, Texas 5.5� St. Matthew Cumberland Presbyterian Church

Fort Worth, Texas 5.6� Armstrong Ballroom - Sheraton Canal Street

New Orleans, Louisiana 5.6� Appelt Aggieland Visitors Center

Texas A&M University - College Station, Texas 5.7� La Belle Maison - New Orleans, Louisiana 5.7� Vet-At-The-Barn - Chestnut Ridge, New York 5.8� Southwood Welcome Center - Tallahassee, Florida 5.8� Besh Steakhouse - Harrah’s Casino

New Orleans, Louisiana 5.9� Windmark Welcome Home Center 5.9� Ganote Residence - Jackson Hole, Wyoming 5.10� Fire Station #5 - City of Plano, Texas 5.11� Southwood Swimming Pool - College Station, Tx. 5.11� Our Mother of Mercy School - Fort Worth, Texas 5.12

Armstrong Ballroom - Sheraton CanalStreet, New Orleans, LA.

Page 3: Portfolio of Selected Professional Work

5 - PROFESSIONAL PROJECTS

Stephen Thomas Hines � April 4, 2009 5.2

Aviron Computer Technologies - Mine Hill, New

Jersey

� Program Accomplishments� Construction time reduced 4

months;� HRV Systems to recycle energy;� Energy consumption reduced

25%.� ArchiCAD Software - BIM Infused

� Program Accomplishments� Construction time reduced 6

months;� Building shell and systems were

30% below maximum allowed bythe New Jersey State EnergyCode requirements.

� Steel system reduced 45% fromconventional.

� ArchiCAD Software - BIM Infused

� Centerpoint Office Building - Jackson,Wyoming.� Project Highlights:

� 9,600 SF Speculative OfficeSpace - Two Floors

� 1,000 Common and Support � 10,600 SF - $2.2 Million - Not

Built� Construction Composition

� EPS Core SIPs for wall and roofconstruction;

� Half log veneer and stone;wainscot for exterior walls;

� Full log framing and accentsfrom burned forests;

� Concentric boilers

� Aviron Computer Technology, Inc. -Mine Hill Industrial Park, Mine Hill, NewJersey� Project Highlights:

� 8,000SF for Mezzanines� 57,000SF operational floor

space� 65,000 SF - $4.3 Million

� Construction Composition� 8" tilt-up concrete panels with

three zones of verticalreinforcement to also act asretaining walls;

� Rigid insulation for walls, roofand foundation perimeter;

� Building is partially buried.

Centerpoint Office Building - Jackson, Wyoming

Page 4: Portfolio of Selected Professional Work

5 - PROFESSIONAL PROJECTS

Stephen Thomas Hines � April 4, 2009 5.3

Nissan of McKinney Courtesy Dealership

McKinney, Texas

� Program Accomplishments:� Construction time reduced 4 ½

months;� HRV Systems to recycle energy;� Energy consumption reduced

30%.� ArchiCAD Software - BIM Infused

� Program Accomplishments� Structural steel system reduced

40% from conventional;� Energy efficiency was 40% below

State of Texas maximum;� Construction time reduced 30%.

� Talley Residence - Fayetteville,Arkansas� Project Highlights:

� Four Bedrooms, 3 ½ Baths,Formal Living Room, FormalDining Room, Great Room,Kitchen, Study, Bonus Roomover Garage, Lanai, PoolCabana, 3 Car Garage

� 6,400 SF - $650,000.� Construction Composition

� Light Gauge Steel Frame forwalls and roof;

� Spray applied Bio-baseUrethane insulation for wallsand roof structure;

� Climate Controlled SealedAttic;

� Courtesy Dealership - McKinney,Texas� Project Scope

� New Nissan and BuickAutomobile Dealerships Side-by-Side

� Seven Buildings includingShowrooms,

� 93,000 SF - $10 Million� Construction Composition

� 4" Spray applied urethaneroof system;

� Spray applied urethane foaminsulation;

� Energy Star light fixtures;� Central chiller plant for

optimum efficiency.

Talley Residence - Fayetteville, Arkansas

Lonestar Buick Courtesy Dealership - McKinney, Tx.

Page 5: Portfolio of Selected Professional Work

5 - PROFESSIONAL PROJECTS

Stephen Thomas Hines � April 4, 2009 5.4

� Serranos Salsa Company - Lafayette,Louisiana� Project Highlights:

� Stand-alone Brand marqueerestaurant for company asshowcase image across theI-10 Louisiana Corridor servingLatin American Cuisine

� 3 dining areas and patio, barand bar patio; kitchen andoffice

� 6,000 SF - $1.4 Million� Construction Composition

� EPS core SIPs for walls androof deck construction;

� Spray applied Bio-baseUrethane Foam insulation forentry stick-built walls;

� 3" Spray applied bio-basedUrethane foam roofmembrane;

� Mechanical equipment sizereduced 25%.

� Program Accomplishments:� Construction time reduced 3

months;� HRV Systems to recycle

energy;� Energy consumption reduced

30%.� ArchiCAD Software - BIM

Infused.

Serranos - Main Bar Dining

Serranos - Main Entry and Dining Patio

Serranos - Accent and Banquette Dining

Page 6: Portfolio of Selected Professional Work

5 - PROFESSIONAL PROJECTS

Stephen Thomas Hines � April 4, 2009 5.5

� Inspiring Body of Christ Church (IBOC)Dallas, Texas� Project Highlights:

� 4,200 Seat Auditorium� Fellowship Hall to Seat 400

with Dining Patio and FullCommercial Kitchen;

� Choir Practice Room; Youthand Teen Facilities,

� Administration and PastoralSuite

� 172,677 SF - $34 Million � Construction Composition

� 9" tilt-up concrete panels;� Rigid insulation for panel walls

and roof;� TPO membrane roof for lower

roofs - white reflective color;� 70,000 gallon salt water

aquarium used as heat sink;� Three Trane air-cooled chillers

with scroll compressors thatwill load shed and ramp-upas required for optimumefficiency;

� Trane EMS to balance andmanage energy consump-tion goals which also controlslighting

� Program accomplishments� Building shell energy

consumption is 40% betterthan State of Texas EnergyCode requirements;

� Energy consumption to beapproximate 25% less thanconventional

� ArchiCAD Software - BIMInfused

IBOC - Inside South Entry through 70,000 Gallon

Saltwater Aquarium

IBOC - East Aerial - Dallas, Texas

IBOC - South (Main) Entrance from Fountain

Page 7: Portfolio of Selected Professional Work

5 - PROFESSIONAL PROJECTS

Stephen Thomas Hines � April 4, 2009 5.6

� St. Matthew Cumberland PresbyterianChurch - Fort Worth, Texas (Not Built)� Project Highlights

� 1,000 Seat Sanctuary� Renovated Lobby, � Classrooms and Offices;� New Church and Facade

Image� 20,000 SF - $2.9 Million

� Construction Concepts� Insulated Concrete Forms

(ICF) exterior walls;� Glu-Laminated arch and

deck structural system forsanctuary and addition;

� Spray applied bio-basedurethane foam insulation toretrofit existing fellowship hall.

� Program Accomplishments� Construction time reduced 6

months;� Building shell energy

consumption is 40% betterthan State of Texas EnergyCode requirements.

� ArchiCAD Software - BIMInfused

� Armstrong Ballroom - Sheraton CanalStreet New Orleans, Louisiana� Project Highlights

� Restore and renovate to theroom Armstrong resultingdamage caused byHurricane Katrina.

� Work included ballroom,cabana rooms, corridor andbreak-out rooms

� 20,000 SF - Cost notdisclosed

St. Matthew CPC - Aerial Showing New Sanctuary

St. Matthew CPC - Main Entry

Armstrong Ballroom - Sheraton Canal Street

Page 8: Portfolio of Selected Professional Work

5 - PROFESSIONAL PROJECTS

Stephen Thomas Hines � April 4, 2009 5.7

� Appelt Aggieland Visitor Center inRudder Tower, Texas A&M UniversityCollege Station, Texas� Project Highlights

� Provide a new and invitingsingle point of service forvisitors to Texas A&MUniversity.

� Multi-media mini-theater with16 screen computer-generated program andmusic

� Three computer stations foruser interactive applicationproviding information tostudents and visitors aboutthe university, the communityand the region

� Information Desk, CommonsArea and Storage.

� 3,500 SF - $1.3 Million

� La Belle Maison - New Orleans,Louisiana - Fairfield Timeshare Resorts� Project Highlights:

� 134 Key TimeshareCondominium incorporatingfour civil war era masonrystructures and adding floorsup to nine stories;

� 228,000 SF +, $28 million� Construction Concepts

� Unreinforced masonry wallsinsulated and strengthenedwith 4" spray applied bio-based urethane foam;

Visitor Center - Information

Desk

Aggieland Visitor Center - Main Entry

La Belle Maison - Magazine

Street Elevation

Page 9: Portfolio of Selected Professional Work

5 - PROFESSIONAL PROJECTS

Stephen Thomas Hines � April 14, 2009 5.8

� Vet-At-The-Barn - Chestnut Ridge,New York� Project Highlights:

� Eight Exam Rooms. Lobby,Retail Sales, TreatmentArea, Surgical Suite,Boarding Kennel,Amenities,

� 9,400 SF - $1.5 Million� Construction Composition

� 8" EPS Core SIPs for walland roof construction;

� Mechanical equipmentsize reduced 25%;

� Program Accomplishments� Construction time

reduced 4 months;� HRV System to recycle

energy;� Energy consumption

reduced 25%;� ArchiCAD Software- BIM

Infused.

� Southwood Welcome Home CenterTallahassee, Florida - St. Joe LandCompany� Project Highlights:

� Prototype facility for a newconcept in thedevelopment of healthycommunities and sellinghomes utilizing electronictechnology to link all theSt. Joe communitiestogether

� 9,800 SF - $750,000.00including specialtyinteractive technology

Vet-at-the-Barn - Main Entrance

Southwood - Reception Area

Southwood - Living Room

Page 10: Portfolio of Selected Professional Work

5 - PROFESSIONAL PROJECTS

Stephen Thomas Hines � April 14, 2009 5.9

� Besh Steakhouse at Harrah’s Casino -New Orleans, Louisiana � Project Highlights

� Renovation and Additionenlarging the existingrestaurant and adjacentpublic restrooms;

� Renovate kitchen, staffareas and dining facilities

� Re-opened after HurricaneKatrina

� WindMark Beach Welcome Center -Port St. Joe, Florida for St. Joe Townsand Resorts.� Project Scope Included:

� The second of a newconcept in the develop-ment of healthy commu--nities and selling homesutilizing electronictechnology to link all theSt. Joe communitiestogether.

� 10,000 SF - $1.1 millionincluding interactivetechnology

Besh Steakhouse - Horseshoe Bar

Besh Steakhouse - Main Dining Area

Windmark Beach - Living Room

Page 11: Portfolio of Selected Professional Work

5 - PROFESSIONAL PROJECTS

Stephen Thomas Hines � April 14, 2009 5.10

� Ganote Residence - Jackson,Wyoming� Project Highlights:

� Main HouseFour Bedrooms, FormalLiving Room, FormalDining RoomArea: 7,100 SF

� Guest HouseTwo Bedrooms, Kitchen,Great Room, Two CarGarageArea: 1,000 SF

� Construction Composition:� Wood Frame Walls, Half

Log Siding:� Log Roof Purlins and

Elements� Interior Full Log Walls, River

Rock Wainscot.� 8,100 SF - $4.4 Million

Ganote Residence - Main Entry Stair

Ganote Residence - Rear (West) Elevation

Page 12: Portfolio of Selected Professional Work

5 - PROFESSIONAL PROJECTS

Stephen Thomas Hines � May 14, 2009 5.11

� Program Accomplishments� Increased filter system

efficiency by 50%;� Stopped leaking through shell

and construction joints;� Reduced pool operation costs

30%.

� Fire Station #5 - Plano, Texas� Project Highlights:

� Three apparatus bays� Day Room, Kitchen,

Watch Room, Dorm Area,Dressing and Showers

� Equipment Storage, SiteWork

� 6,000 SF - $555,000� Construction Composition

� Structural Steel Frame;� Light Gauge Steel Walls

with Brick Veneer� CMU for apparatus bays

with Brick Veneer;� 4 Ply Roof Membrane

� Southwood Swimming Pool - CollegeStation, Texas� Project Highlights:

� Repairs to Pool Shell andBeach Entry

� Install new stainless steel (OGRS); overflow gutterrecirculating system;

� Install Chemical Injectionand Monitor System, FlowMeter and Automatic FillSystem

� Replace Valves andupper layer of sand in theexisting Filter System

� Service Pumps andreplace catch basket.

� Pool Size: 145,000 Gallons- $225,000

Fire Department #5 - Plano, Texas

Southwood Swimming Pool - College Station. Tx.

Fire Station #5 - Plano, Texas

Page 13: Portfolio of Selected Professional Work

5 - PROFESSIONAL PROJECTS

Stephen Thomas Hines � May 14, 2009 5.12

� Program Accomplishments� Energy consumption reduced

30%;� Energy efficiency is reduced

30% better than State of Texasrequirements;

� ArchiCAD Software - BIM Infused

� Our Mother of Mercy School - FortWorth, Texas� Project Highlights:

� Demolition of the existingPre-World War II Facility

� New Facility is for K-8. � 8 Classrooms, Library,

Music Room, CafeteriaCommercial Kitchen,Administration Offices

� 16,000 SF - $2.4 Million� Construction Composition

� 8" ICF Exterior Walls withEIFS Coating;

� Wood Truss Roof withComposition Shingles;

� 4" Spray applied UrethaneInsulation for Roof

� Mechanical EquipmentSize Reduced 25%

� Classroom and Gymnasium Additionto Caldwell Middle School -McKinney ISD� Project Highlights:

� Replacement after fireburned fifty year oldgymnasium

� Four Classrooms, TeacherLounge

� Restrooms and Junior HighGymnasium

� 9,200 SF - $550,000

Our Mother of Mercy School - Fort Worth, Texas

Our Mother of Mercy School - Fort Worth, Texas

Caldwell Middle School - McKinney, Texas