PORTFOLIO Anna Legrand

60
PORTFOLIO ANNA LEGRAND graduate architect ARCHITECTURE

description

 

Transcript of PORTFOLIO Anna Legrand

Page 1: PORTFOLIO Anna Legrand

PORTFOLIO

ANNA LEGRAND

graduate architect

ARCHITECTURE

Page 2: PORTFOLIO Anna Legrand
Page 3: PORTFOLIO Anna Legrand

2O13 A+ ARCHITECTURE IN BELGIUM EXHIBITION CURATOR’S ASSISTANT (4 MONTHS)

2O11 TOM RIJVEN, HABITAT VÉGÉTAL EXECUTIVE PLAN DRAWING (1 MONTH)

2OO5 RMP, RENOVATION-MAISON-PEINTURE HOUSE PAINTER (1 MONTH)

ANNA LEGRAND O9-O9-1988 (25 ans)

(FRENCH NATIONALITY)

rue de la prévoyance, 581OOO BRUSSELS, BELGIUM

OO32 (O)[email protected]

CURRICULUM VITAE PERSONAL DATA

SOFTWARE SKILLS

LANGUAGES

PROFESSIONAL EXPERIENCE

INTERNSHIPS

2D/3D++++++++++ AUTOCAD ++++++++++ ARCHICAD ++++++++++ ALLPLAN++++++++++ POWERCAD++++++++++ SKETCHUP

IMAGE++++++++++ PHOTOSHOP++++++++++ ILLUSTRATOR

RENDER++++++++++ CINEMA 4D

++++++++++ VRAY

LAYOUT++++++++++ INDESIGN++++++++++ ADOBE PREMIERE++++++++++ PACK OFFICE

NATIVE SPEAKER FRENCHFULL PROFESSIONAL SKILL ENGLISH FULL PROFESSIONAL SKILL ITALIAN BASIC ENDERSTANDING DUTCH

2O12 DAUREL ET ASSOCIÉS, ARCHITECTS BORDEAUX, FRANCE (1 MONTH)

2O1O BENTHEM & CROWEL, ARCHITECTS

AMSTERDAM, THE NETHERLANDS (1 MONTH)

2OO9 ABP, CARPENTER AND CHARPENTOER BORDEAUX, FRANCE (1 MONTH)

2O11-2O13 LA CAMBRE-HORTA, BRUSSELS, BELGIUM MASTER IN ARCHITECTURE

2O1O-2O11 FACOLTA DI ARCHITECTURA, FERRARA, ITALY ERASMUS, (LABORATORIO DI RESTAURO E DI ARCHITECTURA)

2OO8-2O1O ENSAP BORDEAUX, FRANCE 1th AND 2nd BACHELOR 2OO7-2OO8 FSL INDIA, KUNDAPUR, INDIA

NGO VOLUNTEERING

2OO4-2OO7 LYCÉE VICTOR LOUIS, TALENCE, FRANCE SCIENCE DEGREE, SPECIALITY MATHÉMATICS

EDUCATION

Page 4: PORTFOLIO Anna Legrand

O1

O7

O5O3

O6

O4

O8

O2

Page 5: PORTFOLIO Anna Legrand

TABLE OF CONTENT

EQUIPMENTS

PROJETC TYPE PROJETCS

URBAN PLANNING

RESTORATION

WORKSHOPS

O1 CAMPUS 2O15 FACULTY OF ARCHITECTURE IN HELSINKI

O2 FIERA DI ROMA NEW EXHIBITION’S PARK ENTRANCE

O3 ST-LAZARE MARKET COVERED MARKET IN BRUSSELS NORTH

O4 DELIRIOUS BRUSSELS BRUSSELS MIDI QUARTER

O5 HYBRID CITY ANS, A NEW WAY OF LIVING

O7 AIR SNAIL ENTRANCE OF BIENALE AGORA

O8 MUSEOLOGIA EXHIBITION WORK

O6 CERTOSA DI FERRARA RESTORATION OF THE CHARTREUSE OF FERRARE

Page 6: PORTFOLIO Anna Legrand
Page 7: PORTFOLIO Anna Legrand

HELSINKI

OTANIEMI

O1 - CAMPUS 2O15

TYPE: EQUIPMENT (for the architectural com-

petition : “CAMPUS 2015”)

COORDINATORS: M.RUEL + S.BERGEON

YEAR: 2012 (MA2)

SITE: ALVAR AALTO CAMPUS, OTANIEMI, HELSINKI, FINLAND

PROGRAM: ART ARCHITECTURE AND DE-SIGN FACULTY + UNIVERSITY RESTAURANT + SERVICES

SUPERFICY: 55000 m2

SITE DESCRIPTION: The project site is located at the heart of the Helsinki Univer-sity campus. It is isolated from the urban area and borders both the Gulf of Finland and an important highway junction.The site is characterized by a “brick” type archi-tecture, widely deployed in the abundant nature of the site.

Le site du projet est situé au coeur du campus universitaire d’Helsinki. Celui-ci est isolé de l’aire urbaine et borde, à la fois, le golfe de Finlande et une importante bretelle d’autoroute. Le site est caractérisé par une architecture de br-iques, très déployé dans la nature abondante du lieu.

O1 - CAMPUS 2O15

Page 8: PORTFOLIO Anna Legrand

ART/ARCHITECTURE /DESIGN FACULTY

34OOO m2

VTT EXTENSION8OOO m2

UNIVERSITY RESTAURANT52OO m2

SHOPS72OO m2

The project implementation is guided by two main axes in a way that emphasizes the per-spective of the Aalto building and respects the architectural “modesty” of the site.The first axis connects the main residential areas through the ancient tree-lined alley and the second connects the university sports centre to the seafront promenade.In addition, a transparent roof connects the buildings and gives a base to the Alvar Aalto building.

L’implantation du projet est guidé par deux axes principaux, tout en accentuant la per-spective sur le bâtiment Aalto et en respect-ant la “pudeur” architecturale du lieu. Le premier axe relie les zones principales d’habitation en passant par l’ancienne allée boisée et l’autre relie le centre sportif univer-sitaire à la promenade maritime. De plus, une toiture transparente connecte les bâtiments tou en appuyant l’assise de l’édifice d’ Alvar Aalto.

Page 9: PORTFOLIO Anna Legrand
Page 10: PORTFOLIO Anna Legrand

CLASSROOMS/AMPHITHEATER 21OO m2

WORKING STUDIOS 13 OOO m2

LIBRARY 15OO m2

COMMON AREAS/CIRCULATON 14 6OOm2

COMPUTER ROOMS 6OO m2

COMMON AREAS/SERVICES 25OO m2

ADMINISTRATION/RESEARCH 12 OOO m2

GROUND FLOOR PLAN

Page 11: PORTFOLIO Anna Legrand
Page 12: PORTFOLIO Anna Legrand

The faculty of art, architecture and design is conceived as a permanently linked whole. Firstly, as a visual link between the two bod-ies of the faculty, and secondly as a program-matic link between the different fields.For this, the different studios are connected by mezzanines and are adjustable according to their usage.The large circulation spaces are appropriable by the students.The studios open to the outside, are the showcase of the faculty.

La faculté d’art, d’architecture et de design est imaginée comme un tout en lien constant. Dans un premier temps, en lien visuel entre les deux entités de la faculté, et en lien pro-grammatique entre les différents domaines.Pour cela, les ateliers de différentes natures sont connectés par les mezzanines et sont ainsi modulables selon les usages.Les vastes espaces de circulation sont égale-ment appropriables par les étudiants.Les ateliers ouverts sur l’extérieur forment la vitrine de la faculté.

Page 13: PORTFOLIO Anna Legrand

MODEL LABORATORY29Om² x6

MODEL STORAGE

WORKSPACE

WORKSPACE

WORKSPACE

WORKSPACEWORKSPACE

WORKSPACE

WORK SPACEWORKSPACEWORKSPACE

STORAGE

STORAGE BLACK ROOM/STORAGEWORKING TOOLSSTORAGE

WORKING STUDIO21Om² x18

DESIGN LABORATORY3OOm² x6

SCULPTURE LABORATORY24Om² x6

PAINTING/PHOTOGRAPHIC LABORATORY14Om² x9

BB SECTION

Page 14: PORTFOLIO Anna Legrand

The public space created between the build-ings merges with the interior space of the fac-ulty and enhances the perspective towards the seafront promenade.

L’espace public creusé entre les bâtiments se confond avec l’espace intérieur de la faculté et accentue la perspective vers la promenade maritime.

COUPE CC

WORKSPACES CIRCULATION

NATURAL LIGHT

Page 15: PORTFOLIO Anna Legrand
Page 16: PORTFOLIO Anna Legrand
Page 17: PORTFOLIO Anna Legrand

O2 - FIERA DI ROMAROME

FIERA DI ROMA

TYPE: EQUIPMENT

COORDINATORS: B.LELLI

YEAR: 2011 (BA3)

SITE: FIERA DI ROMA, ROME, ITALY

PROGRAM: NEW ENTRANCE OF THE EX-HIBITION CENTER + MIXTE USE BUILDING

( HOUSES+ SERVICES)

SITE DESCRIPTION: The project is located outside of the urban area of Rome, in the heart of a vast industrial zone where the exhibi-tion park is localized.The Tiber and the railway mark the limits of the site which is characterized by the widespread de-ployment of brownfield warehouses.

Le projet se situe à l’extérieur de l’aire urbaine de Rome, au coeur d’une vaste zone industrielle dans laquelle est localisé le parc des expositions. Le Tibre et la voie ferrée marquent les limites du site. Celui-ci est caractérisé par le large déploie-ment des entrepôts dans une nature en friche.

O2 - FIERA DI ROMA

Page 18: PORTFOLIO Anna Legrand

AA SECTION

The master plan of the project is guided by an axis connecting the station to the marina. This contradicts the uniform urbanization of the site, which follows a strict frame denying the river.The entrance to the exhibition park is thus moved to the end of the building allowing a link with this new axis.Beyond the new entry, the ambition of the project is to integrate the river in the urbani-zation of the site.

Le plan masse du projet est guidé par un axe reliant la gare à la marina. Cet axe contredit l’urbanisation uniforme du site, qui suit une trame stricte niant le fleuve.L’entrée du parc des expositions est ainsi déplacée à l’extrémité du bâtiment pour per-mettre un lien avec ce nouvel axe.Au-delà de la nouvelle entrée, l’ambition du projet est de faire “entrer” le fleuve dans l’urbanisation du site.

NEW LINKS/NEW ENTRANCE

NATURE INPUT

Page 19: PORTFOLIO Anna Legrand

AA

Page 20: PORTFOLIO Anna Legrand

The new entrance to the exhibition park con-sists of a 100m long ramp allowing direct ac-cess to the central gateway of the building.The structure which includes the ramp, hous-es a restaurant, shops and a covered outdoor relaxation and exhibition space

La nouvelle entrée du parc des expositions se compose selon une rampe de 100m de long permettant l’accès direct à la passerelle cen-trale du bâtiment.La structure qui englobe la rampe accueille un restaurant, des commerces et notamment un espace couvert extérieur, de détente et d’exposition.

Page 21: PORTFOLIO Anna Legrand
Page 22: PORTFOLIO Anna Legrand
Page 23: PORTFOLIO Anna Legrand
Page 24: PORTFOLIO Anna Legrand
Page 25: PORTFOLIO Anna Legrand

BRUXELLES

BOULEVARD ST-LAZARE

O3 - MARCHÉ ST-LAZARE

TYPE: EQUIPMENT

COORDINATORS: A.SIMON + E.DEPREZ

YEAR: 2012 (MA1)

SITE: BOULEVARD SAINT LAZARE, BRUS-SELS, BELGIUM

PROGRAM: COVERED MARKET + PUBLIC

SPACE

SITE DESCRIPTION: The project is located at the end of the boulevard Saint-Lazare, in the structure of the north-south railway junc-tion. The latter marks the clear separation be-tween the popular Prairie district, the North busi-ness district and the Rogier shopping area.

Le projet est situé au bout du boulevard Saint-Lazare, dans la structure de la jonction ferroviaire nord-midi. Celle-ci marque la franche séparation entre le quartier populaire des Prairies , le quarti-er d’affaires Nord et le quartier commerçant de Rogier.

O3 - ST-LAZARE MARKET

Page 26: PORTFOLIO Anna Legrand

Gare du Nord

Place St Lazare

Gare du Nord

Rue

Brab

antRu

e Ae

rsch

ot

Rue

Neuve

Gare du Nord

Gare du Nord

Parc Botanique

For this work, the program and the project location weren’t defined.At the urban level, the project aims to recre-ate a long gone link between the North, Prai-rie and Rogier districts, while anchoring in a succession of pulse points along the boule-vard St-Lazare.At the programmatic level, the focus is on shopping continuity between the «rue Neuve and the “rue du Brabant”, while preserving the popular aspect of the Prairie district.The SNCB building structure and the junction itself are reused to accommodate a covered market and some shops.

Pour ce travail, le programme et l’implantation du projet étaient à définir. Au niveau urbanistique, le projet tend à recréer un lien révolu entre les différents quartiers Nord, Prairie et Rogier, tout en s’ancrant dans un chapelet de points d’impulsions le long du boulevard St-Lazare.Au niveau programmatique, l’accent se porte sur la continuité commerciale entre la rue neuve et la rue du brabant, tout en préservant l’aspect populaire du quartier Prairie. La structure du bâtiment SNCB et de la jonc-tion elle-même est ainsi réutilisée pour accue-illir un marché couvert et des commerces.

OLD SHOPPING STREET

GROUND FLOOR PLAN

TRAIN LEVEL LINKS

GROUND FLOOR LINKS

AA

BB

Page 27: PORTFOLIO Anna Legrand
Page 28: PORTFOLIO Anna Legrand

The market which is located at the outlet of the passage Rogier merges with the shops along the junction animating the impenetra-ble wall formed by the railway infrastructure.The public space that unfolds along the axis of the botanical park extends to a public stair-case connecting the place to the train plat-forms. In this context, platforms are becoming an extension of the public space and allow creating an aerial continuity of the botanical park which is constantly perceived between towers around the junction.

Le marché qui se situe à la sortie du passage Rogier et les commerces qui longent la jonc-tion se confondent et animent le mur intra-versable formé par l’infrastructure ferroviaire.L’espace public qui se déploie dans l’axe du parc botanique se prolonge en un escalier public reliant la place aux quais de gare. Dans cette optique, les quais deviennent une pro-longation de l’espace public et permettent de créer continuité aérienne du parc botanique que l’on perçoit constamment entre les tours qui enlacent la jonction.

AA SECTION

Page 29: PORTFOLIO Anna Legrand
Page 30: PORTFOLIO Anna Legrand

BB SECTION

Page 31: PORTFOLIO Anna Legrand

The new public space that unfolds over the junction can also offer two store windows to the newly implanted shops along the railway infrastructure.Therefore, it isn’t only a public station plat-form but an aerial urban street.In addition, the facade of the future market is removable so you can eventually extend the market outdoors along “la rue Aarscoth” and “la place St-Lazare.

Le nouvel espace public qui se déploie sur la jonction permet également de proposer une double vitrine aux commerces qui viennent s’implanter le long de l’infrastructure ferro-viaire.Il ne s’agit donc plus seulement d’un quai de gare publique mais d’une rue urbaine aéri-enne.De plus, la façade du futur marché couvert est imaginée amovible de façon à pouvoir éventuellement déployer le marché en exté-rieur le long de la rue Aarscoth et sur la place St-Lazare.

Page 32: PORTFOLIO Anna Legrand
Page 33: PORTFOLIO Anna Legrand
Page 34: PORTFOLIO Anna Legrand

BRUXELLES

GARE DU MIDI

O4 - BRUXELLES DÉLIRE

Page 35: PORTFOLIO Anna Legrand

BRUXELLES

GARE DU MIDI

O4 - BRUXELLES DÉLIRE

TYPE: URBAN PLANNING

COORDINATORS: L.DELEUZE + R.UNESCOU

YEAR: 2012 (MA1)

SITE: MIDI QUARTER, BRUSSELLS, BEL-GIUM

PROGRAM: REDEVELOPMENT OF THE

MIDI DISTRICT

SITE DESCRIPTION: The project site extends along the North-South railway junc-tion. The site is characterized by its morphologi-cal multiplicity, “meeting point” of three Brussels municipalities encircling the international Midi station.

Le site du projet s’étend de le long de la jonction ferroviaire Nord-Midi. Le site est caractérisé par la multiplicité morphologique de ses abords, à la rencontre de trois communes bruxelloises qui en-cerclent la gare internationale du Midi.

O4 - DELIRIOUS BRUSSELS

Page 36: PORTFOLIO Anna Legrand

Tour du Midi

Immeuble d’affaireMaison bruxelloise

RailsRDC

Métro

This project proposes to offer for this diffuse area, cut by the North-South junction, a true picture of an entrance threshold of the Brus-sels capital region.The urban characteristic of the site is a clear absence of references; in fact, the confusion of the various urban strata disturbs the analy-sis of the site as station district.Thus, based on this observation, we devised a district developed over different levels, con-sidering the “soil” as a mass suitable to be ex-truded and hollowed out to aerate the space below the junction.The station is the pulse point of the project; it is enlarged and reconnected to the city by enhancing the commercial axis of the ‘rue du Midi”.

Ce projet propose d’offrir à ce quartier dif-fus et tranché par la jonction Nord-Midi, une véritable image de seuil d’entrée de la région Bruxelles capitale.La particularité urbaine du site réside dans l’absence évidente de niveau de référence; en effet, la confusion des diverses strates ur-baines perturbe la lecture du lieu en tant que quartier de la gare.Ainsi, à la base de ce constat, nous avons im-aginé un quartier développé sur différents niveaux, en considérant le “sol” comme une masse capable à extruder et creuser afin de d’aérer l’espace sous la jonction.La gare constitue le point d’impulsion du pro-jet, elle est agrandie et reconnectée à la ville en accentuant l’axe commercial de la rue du midi.

NEGATIVE

EXTRUDER

FAILLES

EXCAVATING

NO REFERENCE LEVEL

GABARITS CONNECTION

CITY CONNECTION

VISUAL BREAKTROUGHS

Page 37: PORTFOLIO Anna Legrand

AA

Page 38: PORTFOLIO Anna Legrand

à l’échelle de la ville(musée, halles, complexe hôtelier, ...)

à l’échelle du quartier(Bibliothèque, Maison de quartier, ...)

en dialogue avec les bureaux(Complexe sportif )

en dialogue avec le parvis et fonctionnant le soir(Théâtre))

ées du projet

Nouveau quartiermidi

Aéroport

AéroportCentre ville

Zones de Bureaux

Centres commer-ciaux

Ecoles

Accès PMR

é

The presence of the junction is essential here and determinates the nature of the project. It slips under the new height of the rails to provide a new facade and parvis, in direct connection with the subway, in the Midi train station.The commercial gallery is separated from the station to become a commercial street to the scale of the city.The project treatment as a homogeneous mass involves gateways, marked by the im-plantation of large public facilities.

La présence de la jonction est ici détermi-nante de la nature du projet. Celui-ci vient se glisser sous la nouvelle hauteur des rails pour offrir une nouvelle façade et un parvis, en connexion directe avec le métro, à la gare du midi.La galerie commerçante est extraite de la gare pour devenir un axe commerçant à l’échelle de la ville.Le traitement du projet en tant que masse homogène implique des portes d’entrée, marquée par l’implantation de grands équipe-ments publics.

AA ZOOM SECTION

Page 39: PORTFOLIO Anna Legrand
Page 40: PORTFOLIO Anna Legrand

The new station area includes three levels of differentiated public spaces.The first is hollowed and thickens at city level. There is a direct axis starting from the city centre going right inside the Midi train station.The second level is at the ground floor level and is related to the district scale.The last, more local, grows in height and just crosses the mass of the project.

Le nouveau quartier de la gare comporte ainsi 3 niveaux d’espaces publics différenciés.Le premier est creusé et s’épaissit à l’échelle de la métropole. Il constitue un axe direct au départ du centre-ville jusqu’à l’intérieur même de la gare du midi.Le second niveau se situe en rez-de-chaussée et se mesure à l’échelle du quartier.Enfin, le dernier, plus local encore, se dével-oppe en hauteur et vient sillonner la masse du projet.

AA SECTION

Page 41: PORTFOLIO Anna Legrand
Page 42: PORTFOLIO Anna Legrand
Page 43: PORTFOLIO Anna Legrand

LIÈGE

GARE DE ANS

O5 - VILLE HYBRIDE

TYPE: URBAN PLANNING (the student com-

petition : “UWA&MRAU”)

COORDINATORS: G.LELOUTRE + N.CASABELLA

YEAR: 2013 (MA2)

SITE: ANS, BELGIUM

PROGRAM: HOUSING AREA

SITE DESCRIPTION: The project site is located between the railway and the high-way junction in the south of Ans.This area is mostly used as wastelands and is characterized by the punctual presence of in-dustries, agriculture and housing in a diffuse and confused space.

Le site du projet se trouve entre la voie ferrée et la bretelle d’autoroute située au sud de la com-mune de Ans.Cette zone est à grande majorité en friche, elle est caractérisée par la présence ponctuelle d’industries, d’agriculture et de pavillonnaire dans un espace diffus et confus.

O5 - HYBRID CITY

Page 44: PORTFOLIO Anna Legrand

TONGER

EN

LIÈGE

LIÈGE

LIÈGE

WAREMME

GRA

CE-H

OLL

OG

NE

+ + +

The project site is located in the middle of an old mining area. The reconversion of the site’s heaps is the first goal of the project up to im-agine a “heaps walk” in the heights of Liege.The second aim of the project was to give order the confusion between industries, un-cultivated land, agriculture and housing in an interdependent whole, while replacing the station in the centre of the city of Ans.

Le site du projet se trouve en plein coeur du croissant minier. La reconversion des terrils présents sur le site constitue la première am-bition du projet; jusqu’à imaginer une “prom-enade des terrils” dans les hauteurs de la ville de Liège.La seconde ambition du projet était de hiérar-chiser la confusion entre industries, nature en friche, agriculture et pavillonnaire en un tout interdépendant, tout en replaçant la gare de Ans au centre de la commune.

BUILDS

PUBLIC TRANSPORT

INDUSTRIES LOCATION

GREEN NETWORK

WATER NETWORK

Page 45: PORTFOLIO Anna Legrand
Page 46: PORTFOLIO Anna Legrand

TOUTE LES EAUX

EAUX PRÉTRAITÉES

EAUX ÉPURÉES

EAUX ÉPURÉESTOUTE LES EAUX

BASSIN TAMPONSTOCKAGE ET RÉGULATIONDES EAUX USÉES ENTRANTES

LE TAMIS RETIENT LES DECHETSSUPÉRIEURS A 1 mm

ELIMINATION DU PHOSPHORE ETDÉNITRIFIVATION

ELIMINATION DE LA POLLUTION CARBONÉE ET NITRIFICATION

BASSIN TAMPON BASSIN TAMPON BASSIN TAMPON

PAROI VÉGÉTALE

-15 dBMURET EXISTANT

-7 dB

TOUTE LES EAUX

EAUX PRÉTRAITÉES

EAUX ÉPURÉES

EAUX ÉPURÉESTOUTE LES EAUX

BASSIN TAMPONSTOCKAGE ET RÉGULATIONDES EAUX USÉES ENTRANTES

LE TAMIS RETIENT LES DECHETSSUPÉRIEURS A 1 mm

ELIMINATION DU PHOSPHORE ETDÉNITRIFIVATION

ELIMINATION DE LA POLLUTION CARBONÉE ET NITRIFICATION

BASSIN TAMPON BASSIN TAMPON BASSIN TAMPON

PAROI VÉGÉTALE

-15 dBMURET EXISTANT

-7 dB

The project is surrounded by the elevated highway junction and the underground rail-way. These two dominant infrastructures which are a priori impassable boundaries become the guiding elements of the composi-tion of the project.The latter has been conceived as two crossing and interdependent strata.The project is thus developed according to three main areas, one production area, a pub-lic use area and a reconversion area.A main axis links the station to the first heap of the “heaps walk.” This axis is the backbone of the district.The housing configuration is conceived in open blocks crossed by green pathways open to soft mobility and facilities necessary for the neighbourhood.Finally, at the edge of the motorway junction, the uncultivated land and the underground river are mastered and doubly exploited. Firstly to produce the energy required for the autonomy of the new district, secondly to master the noise coming from the highway infrastructure.

Le projet est cadré par la bretelle d’autoroute aérienne et la voie ferrée enterrée. Ces deux infrastructures dominantes qui constituent à priori des limites infranchissable sont dev-enus maitresse de la composition du projet.Celui-ci a été imaginé en double strates tra-versantes et interdépendantes.Le projet se développe ainsi selon 3 zones principales, une zone de production, une zone d’usage et une zone de reconversion.Un axe principal relie la gare au premier terril de la “promenade des terrils”. Cet axe con-stitue la colonne vertébrale du quartier.La configuration des logements est imaginée en îlots ouverts traversés par des axes verts accueillant les mobilités douces et les équipe-ments nécessaires à l’échelle du quartier.Enfin, aux abords de la bretelle d’autoroute, la nature en friche et le fleuve enterré sont maitrisés et doublement mis à profit. Premi-èrement pour produire l’énergie nécessaire à l’autonomie du futur quartier, mais aussi pour maitriser les nuisances sonores émises par l’infrastructure autoroutière.

TOUTE LES EAUX

EAUX PRÉTRAITÉES

EAUX ÉPURÉES

EAUX ÉPURÉESTOUTE LES EAUX

BASSIN TAMPONSTOCKAGE ET RÉGULATIONDES EAUX USÉES ENTRANTES

LE TAMIS RETIENT LES DECHETSSUPÉRIEURS A 1 mm

ELIMINATION DU PHOSPHORE ETDÉNITRIFIVATION

ELIMINATION DE LA POLLUTION CARBONÉE ET NITRIFICATION

BASSIN TAMPON BASSIN TAMPON BASSIN TAMPON

PAROI VÉGÉTALE

-15 dBMURET EXISTANT

-7 dB

Page 47: PORTFOLIO Anna Legrand

TOUTE LES EAUX

EAUX PRÉTRAITÉES

EAUX ÉPURÉES

EAUX ÉPURÉESTOUTE LES EAUX

BASSIN TAMPONSTOCKAGE ET RÉGULATIONDES EAUX USÉES ENTRANTES

LE TAMIS RETIENT LES DECHETSSUPÉRIEURS A 1 mm

ELIMINATION DU PHOSPHORE ETDÉNITRIFIVATION

ELIMINATION DE LA POLLUTION CARBONÉE ET NITRIFICATION

BASSIN TAMPON BASSIN TAMPON BASSIN TAMPON

PAROI VÉGÉTALE

-15 dBMURET EXISTANT

-7 dB

TOUTE LES EAUX

EAUX PRÉTRAITÉES

EAUX ÉPURÉES

EAUX ÉPURÉESTOUTE LES EAUX

BASSIN TAMPONSTOCKAGE ET RÉGULATIONDES EAUX USÉES ENTRANTES

LE TAMIS RETIENT LES DECHETSSUPÉRIEURS A 1 mm

ELIMINATION DU PHOSPHORE ETDÉNITRIFIVATION

ELIMINATION DE LA POLLUTION CARBONÉE ET NITRIFICATION

BASSIN TAMPON BASSIN TAMPON BASSIN TAMPON

PAROI VÉGÉTALE

-15 dBMURET EXISTANT

-7 dB

TOUTE LES EAUX

EAUX PRÉTRAITÉES

EAUX ÉPURÉES

EAUX ÉPURÉESTOUTE LES EAUX

BASSIN TAMPONSTOCKAGE ET RÉGULATIONDES EAUX USÉES ENTRANTES

LE TAMIS RETIENT LES DECHETSSUPÉRIEURS A 1 mm

ELIMINATION DU PHOSPHORE ETDÉNITRIFIVATION

ELIMINATION DE LA POLLUTION CARBONÉE ET NITRIFICATION

BASSIN TAMPON BASSIN TAMPON BASSIN TAMPON

PAROI VÉGÉTALE

-15 dBMURET EXISTANT

-7 dB

PRODUCTION AREA

HOUSING BLOCK TYPE

URBAN BREAKTHROUGH

Page 48: PORTFOLIO Anna Legrand

+ + +

LOGEMENT

TYPOLOGIE BARRE TYPOLOGIE MAISONETTE + + ANNEXE

?$ !!

?

?

LOGEMENT

TYPOLOGIE BARRE TYPOLOGIE MAISONETTE + + ANNEXE

?$ !!

?

?

Page 49: PORTFOLIO Anna Legrand

ANS

CENTRALITE

TOUTE LES EAUX

EAUX PRÉTRAITÉES

EAUX ÉPURÉES

EAUX ÉPURÉESTOUTE LES EAUX

BASSIN TAMPONSTOCKAGE ET RÉGULATIONDES EAUX USÉES ENTRANTES

LE TAMIS RETIENT LES DECHETSSUPÉRIEURS A 1 mm

ELIMINATION DU PHOSPHORE ETDÉNITRIFIVATION

ELIMINATION DE LA POLLUTION CARBONÉE ET NITRIFICATION

BASSIN TAMPON BASSIN TAMPON BASSIN TAMPON PAROI VÉGÉTALE-15 dB

MURET -7 dB

LOGEMENT

LES HALLES DU COIN

CHEZ PAULETTE

GARE DE ANS

CHEMINEMENT PRINCIPAL

CHEMINEMENT SECONDAIRE

TROTTOIR

CHEMIN VERT

CIRCULATION AUTOMOBILE

TRANSPORT EN COMMUN

GARE GARE

CHEMINEMENT VEGETATION

AXE URBAIN

PARC INDUSTRIEL

MASSE VEGETALE ENVIRONNANTE

MASSE VEGETALE INTEGRE

AUTOROUTE

ANS

CENTRALITE

TOUTE LES EAUX

EAUX PRÉTRAITÉES

EAUX ÉPURÉES

EAUX ÉPURÉESTOUTE LES EAUX

BASSIN TAMPONSTOCKAGE ET RÉGULATIONDES EAUX USÉES ENTRANTES

LE TAMIS RETIENT LES DECHETSSUPÉRIEURS A 1 mm

ELIMINATION DU PHOSPHORE ETDÉNITRIFIVATION

ELIMINATION DE LA POLLUTION CARBONÉE ET NITRIFICATION

BASSIN TAMPON BASSIN TAMPON BASSIN TAMPON PAROI VÉGÉTALE-15 dB

MURET -7 dB

LOGEMENT

LES HALLES DU COIN

CHEZ PAULETTE

GARE DE ANS

CHEMINEMENT PRINCIPAL

CHEMINEMENT SECONDAIRE

TROTTOIR

CHEMIN VERT

CIRCULATION AUTOMOBILE

TRANSPORT EN COMMUN

GARE GARE

CHEMINEMENT VEGETATION

AXE URBAIN

PARC INDUSTRIEL

MASSE VEGETALE ENVIRONNANTE

MASSE VEGETALE INTEGRE

AUTOROUTE

ANS

CENTRALITE

TOUTE LES EAUX

EAUX PRÉTRAITÉES

EAUX ÉPURÉES

EAUX ÉPURÉESTOUTE LES EAUX

BASSIN TAMPONSTOCKAGE ET RÉGULATIONDES EAUX USÉES ENTRANTES

LE TAMIS RETIENT LES DECHETSSUPÉRIEURS A 1 mm

ELIMINATION DU PHOSPHORE ETDÉNITRIFIVATION

ELIMINATION DE LA POLLUTION CARBONÉE ET NITRIFICATION

BASSIN TAMPON BASSIN TAMPON BASSIN TAMPON PAROI VÉGÉTALE-15 dB

MURET -7 dB

LOGEMENT

LES HALLES DU COIN

CHEZ PAULETTE

GARE DE ANS

CHEMINEMENT PRINCIPAL

CHEMINEMENT SECONDAIRE

TROTTOIR

CHEMIN VERT

CIRCULATION AUTOMOBILE

TRANSPORT EN COMMUN

GARE GARE

CHEMINEMENT VEGETATION

AXE URBAIN

PARC INDUSTRIEL

MASSE VEGETALE ENVIRONNANTE

MASSE VEGETALE INTEGRE

AUTOROUTE

PATHWAY

VEGETATION

Page 50: PORTFOLIO Anna Legrand

O6 - CERTOSA DI FERRARA

FERRARE

CERTOSA DI FERRARA

Page 51: PORTFOLIO Anna Legrand

O6 - CERTOSA DI FERRARA

FERRARE

CERTOSA DI FERRARA

TYPE: RESTORATION

COORDINATORS: F.MORENNO

YEAR: 2013 (MA2)

SITE: CERATOSA DI FERRARA, FERRARE, ITALY

PROGRAM: BUILDING RESTORATION

SITE DESCRIPTION: The project is located on a parcel of land of the Chartreuse of Ferrara of the XIIth century.It was restored several times, especially in the XVth and XIXth century, and the surface was ex-panded.Nowadays, the brick chartreuse covers more than 31000 m2.

Le projet est situé sur une parcelle de la char-treuse de Ferrare daté du XIIème siècle.Celle-ci a été agrandie et restaurée à plusieurs reprises, notamment au XVéme et au XIXème siècle.La chartreuse de brique s’étend aujourd’hui sur plus de 31000 m2.

O6 - CERTOSA DI FERRARA

Page 52: PORTFOLIO Anna Legrand

For this project, we first had to make a very precise survey sketch of the parcel to restore.Once the computer transcription of these data was completed, we were able to examine every square inch of this parcel to determine the existing conditions of the building portion. Finally we determined the restoration areas and methods to be used for each of those areas.

Pour ce projet, nous avons dû, dans un pre-mier temps, faire un relevé très précis de la parcelle à restaurer.Une fois la retranscription informatique, de ces données, achevée, nous avons pu examin-er chaque centimètre carré de cette parcelle afin de déterminer les pathologies existantes de cette parcelle d’édifice. Enfin nous avons déterminé des zones de restauration et les méthodes à mettre en oeuvre pour chacune de ces zones.

Page 53: PORTFOLIO Anna Legrand
Page 54: PORTFOLIO Anna Legrand
Page 55: PORTFOLIO Anna Legrand

To conclude this restoration, we have created a small development project to adapt the site to current standards and uses.For this, the public transport services of the site have been redesigned at the urban scale. At the local level, meditation spaces, Infor-mation points on the history of the building and ramps for disabled persons have been designed.

Pour conclure cette restauration nous avons imaginé un projet d’aménagement minime pour adapter le site aux normes et usages ac-tuels du site.Pour cela la desserte du site a été repensée à l’échelle urbaine. À l’échelle locale, des es-paces de recueil, des points d’information sur l’histoire de l’édifice et des rampes handica-pés ont été projetées.

Page 56: PORTFOLIO Anna Legrand

O7 - WORKSHOPAIR SNAIL

In the context of the Biennale of architecture and design, AGORA 2006, I participated in a student workshop, coordinated by the Ger-man architect Hans Walter Muller, to design an inflatable exhibition space.The latter, located at the entrance of the Bi-ennale, made the facade of the event.We have designed a space of three adjoining volumes in the direction of the adjacent river.To do this, we had, in just one month, to de-sign, develop a model and build ourselves this translucent snail.

Dans le cadre de la biennale d’architecture et de design AGORA 2006, j’ai participé à un workshop étudiant sous la coordination de l’architecte allemand Hans Walter Muller, afin de projeter un espace d’exposition gonflable.Celui-ci, situé à l’entrée de la biennale, con-stitué la façade de l’événement.Nous avons ainsi imaginé un espace composé de trois volumes en enfilade en direction du fleuve adjacent.Pour cela, nous avons dû, en l’espace d’un mois, concevoir, modéliser, et construire par nous-mêmes cet escargot translucide.

Page 57: PORTFOLIO Anna Legrand
Page 58: PORTFOLIO Anna Legrand

O8 - WORKSHOPMUSEOLOGIA

For this workshop, located in the Archaeolog-ical Museum of Ferrara, I had to do a museum scenographic job. Not only did I have to con-ceive the disposition of the works but also to design the exhibition stands and the lighting systems. I therefore chose 4 particular works to expose and reflect with intercalated mir-rors, in a semi-outdoor space.

Pour ce workshop, situé dans le musée ar-chéologique de Ferrare, j’ai dû effectuer un travail de scénographie muséologique. Pour cela, j’ai dû imaginer non seulement la dispo-sition des oeuvres mais aussi le design des so-cles d’exposition et des dispositifs lumineux. J’ai ainsi choisi 4 oeuvres en particulier à ex-poser et refléter à l’aide de miroirs intercalés , dans un espace semi-extérieur.

Page 59: PORTFOLIO Anna Legrand
Page 60: PORTFOLIO Anna Legrand

OO32 (O)483 2O7933

[email protected]

ANNA LEGRAND