7/17/2019 Portfolio Activity http://slidepdf.com/reader/full/portfolio-activity 1/1 Purchase in charge Following Purchases were made for IEDC 1) 3 D Printer 2) Solar Panel 3) PLC Electrical Engg dept had prepared a La re!uirement proposal " in#iting !uotation from different #endors for $ th  and % th  sem& 'e!uirement& (he re!uirement also included E!uipment for Protection and switchgear engg& nd La#iew software for Pro*ect Purpose +ased on 'e!uirements recei#ed from Facult" memers four different proposals were made& ,ut of which following items were sanctioned 1) PLC (raining -its .Siemens) (his PLC is widel" used in Industr" 2) La E!uipment for Dri#es la . Deli#er" e/pected in 3 rd  wee- of Sept 201) e ha#e recei#ed PLC (raining -its and La e!uipment are e/pected this wee-& Industrial Visit Industrial isit for 2 nd  and 3 rd  4ear student planned on 10 th  ,ct& Second "ear students ha#e a theor" su*ect Con#entional and non con#entional power generation& (he" stud" (hermal Power Plant& So5 #isit to Dahanu (hermal Power Plant will help them understand this important topic& (hird "ear students ha#e a su*ect Protection and Switchgear Engineering& (he o*ecti#e of the course is o#erall understanding of protection s"stem& Detailed understanding of protection to (ransmission5 6eneration5 7otor 5 (ransformer etc& (his #isit will help them in this domain& e are arranging a us for this purpose and tas- is going on& e need permission from Principal sir5 this is under process

description

1

Transcript of Portfolio Activity

7/17/2019 Portfolio Activity

http://slidepdf.com/reader/full/portfolio-activity 1/1

Purchase in charge

Following Purchases were made for IEDC

1) 3 D Printer 2) Solar Panel

3) PLC

Electrical Engg dept had prepared a La re!uirement proposal " in#iting !uotation from

different #endors for $th and %th sem& 'e!uirement& (he re!uirement also included E!uipment for 

Protection and switchgear engg& nd La#iew software for Pro*ect Purpose

+ased on 'e!uirements recei#ed from Facult" memers four different proposals were made&

,ut of which following items were sanctioned

1) PLC (raining -its .Siemens) (his PLC is widel" used in Industr"2) La E!uipment for Dri#es la . Deli#er" e/pected in 3rd wee- of Sept 201)

e ha#e recei#ed PLC (raining -its and La e!uipment are e/pected this wee-&

Industrial Visit

Industrial isit for 2nd and 3rd 4ear student planned on 10th  ,ct&

Second "ear students ha#e a theor" su*ect Con#entional and non con#entional power 

generation& (he" stud" (hermal Power Plant& So5 #isit to Dahanu (hermal Power Plant will help

them understand this important topic&

(hird "ear students ha#e a su*ect Protection and Switchgear Engineering& (he o*ecti#e of the

course is o#erall understanding of protection s"stem& Detailed understanding of protection to

(ransmission5 6eneration5 7otor 5 (ransformer etc& (his #isit will help them in this domain&

e are arranging a us for this purpose and tas- is going on&

e need permission from Principal sir5 this is under process