3
Table Of ContentsEducational work
YMCA Camp Combe Master Plan ...... 4Albany Natatorium .....10
Solar building.....14Delhi Community center.....20
Bridge model.....24Subtracted Space.....25
Color copy.....26Shade and shadow.....27
Professional Work
30..... Main office 34..... Changing room
36......Maintenance building38......Tree house
40.....CONSTRUCTION PROJECTS
Documentation
42......Cover Letter 43......Resume
4YMCA Camp Combe Master PlanSUNY Delhi Spring 2012
YMCA Camp Combe is a summer day camp in Putnam NY. They are currently looking at a new property located right next to them to help expand the camp. I decided for my senior thesis to make a master plan for the new property and with that new plan design some facades of the some of the buildings to give a general feel for what the camp would look like. Working closely with the executive director and director of the camp I created a master plan that would fit the camp in the best way I thought possible.
Camp Combe
Living Springs
Secor LakeBryant Pond WO
OD
TAC
ON
IC S
TATE
PEEK
SKIL
LHOLL
OW
AGO
R
SECOR
RAM
P
BRYAN
T PON
D
BULL
ETHO
LE
BARG
ER
WICCOPEE
TOPL
AN
D
PAR
K
TOM
MY
LAK
ES
HO
RE
OSCA
WAN
A HE
IGHT
S
ALON
A
EMILY
OR
CH
AR
D
WOODS END
OAK
ELM
NEW HILL
SKY HIGH
CENTER
SC
OU
TH
ILL
BUTTER
FLY
IVY HILL
BIRCH
BOSW
ELL PAUL
BROOK
FOREST
EN
TRA
NC
E
SHERMAN
JEANNE
TINKER
WAL
NU
T
KENNETH
ALIS
ON
WILLOW
OVERLAND
NORTH
MEADOW
ARC
HER
CO
UN
TRY
KN
OLL
S
UNNAMED
MU
LLIN
S
CIRCLE
HILLSIDE VIEW
CROSSHILL
RICHARD
FERN
MA
RIO
N
BROOKDALE
SPRIN
GB
RO
OK
ALBERT
DANIELLA
CR
ES
CE
NT
SPARROW
TAC
ON
IC S
TATE
RA
MP
RAM
P
MEADOW
BULLET HOLE
63.-3-28
74.-1-35.1
63.-3-45
63.-3-52
PUTNAM VALLEY
CARMEL
Camp Combe Living Springs Neighboring Parcels 1 inch = 1,579 feet
Camp Combe and Living SpringsTown of Putnam Valley, Putnam County Existing Site Plan For Camp Combe
Existing Camp Combe “Valley Camp”• Current Property is at 79 Acres.• Day Camp• Currently
• ~500 Kids on property• ~60 Kids off property on rental location• ~120 staff
• At maximum capacity
Camp Combe “Hilltop Camp” (Proposed)• 4 Parcels of land totaling ~ 125 Acres• Day Camp Only• Proposed Maximum Capacity
• ~1500 Kids on property• ~360 staff
• Could Possibly used lowed parcels to expand Valley Camp
Proposed Master Plan
Existing Site Conditions
5Camp Combe Master Plan3-D Rendering
6
Main Lodge
The Main Lodge at a camp is on of the most important buildings. Its the place where you eat, have activities, hide from rain, and just sit around and talk. So the main challenge in designing the Lodge was adaptability. By creating a partly open floor plan, the building is able to change and adapt to any use it is needed for.
For the style of the Main Lodge, I went with a modern adirondack style. Trying to keep the feeling of being in the woods but having modern amenities, like large window sets, helps tie the building into the surrounds nearby
INTERIOR RENDERING
Front ELEVATION
Camp Combe Master Plan
7
DN DN
DN DN
949 SF
KITCHEN
195 SF
BATHROOM
195 SF
BATHROOM
200 SF
KITCHENSTORAGE
60 SF
STO.
386 SF
FIRST AID64 SF
BATHROOM
52 SF
STO.
BACK ELEVATION
RIGHT ELEVATION
LEFT ELEVATION
2ND floor plan Horizontal section
8
DN
DN
1403 SF
Open Space
63 SF
STO.
Specialties Cabins
The 5 Specialty Cabins are to provide indoor, covered space for the different areas of camp. These cabins will be a basic design interior design ,to accommodate the building for whatever the use might be. An open floor plan will also help the building adapt and change into whatever it might need to be. A double deck design, and large windows will allow the people inside to feel apart of the camp by not limiting there views and interaction with the other camp programs.
Camp Combe Master Plan
9
Entry Pavilion The first thing any parent is going to see when entering the camp is the rides in/ rides out space. This is one of the most complicated procedures for the camp. Moving kids from huddles to their car or bus. With this layout of pavilions and walkways kids should always be able to see their car. Dude to the sheer size of the camp the loading and unloading zone is elongated to about 200+ feet. Also being only 4 car widths wide, provides easier loading and reduces the pedestrian, vehicle crossing zones.
Camp Combe Master Plan
10
Albany NatatoriumSUNY Delhi Fall 2011
The Main goal in this project was to design a com-munity building near the Washington Avenue Armory in Albany, NY. Located near the armory is two parking lots. So for my project I decided to look at what Albany doesn’t have. After looking all around I come to the conclusion that Albany has everything Except a Natatorium. So when I designed this project, it was all about involving the com-munity. By having a Natatorium I could involve the local community with some retail space, a lecture hall, and con-cession stands.
Rear Exterior Perspective
Front Exterior Perspective
Rear Exterior Perspective
11
UP UP
DN
DN
DN
MECHANICAL &STORAGE
LIFEGARD LIFEGARD
CHE. IN
FEMALE CHANGE
MALE CHANGE
MECH.
OFFICE SPACE
STO.
MECH.
LECTURE HALL
UP UP
DN
DN
DN
MECHANICAL &STORAGE
LIFEGARD LIFEGARD
CHE. IN
FEMALE CHANGE
MALE CHANGE
MECH.
OFFICE SPACE
STO.
MECH.
LECTURE HALL
Floor Plan Level 0
Floor Plan Level 2
Floor Plan Level 1
12
Section Model
13
14
Solar BuildingSUNY Delhi Spring 11 The design of this office building was to completely use the sun in the most effective way possible. The shape of the building is directly connected to the different angles of the sun. For winter the building allows more light to enter into the building. The low angle of the sun helps sunlight get into the building. For summer the high angle of the sun reflects off the upper portions of the building helping to keep it cooler.
UP
Open Office Space
R 41' - 10 1/4"
N
232 SF
Mechanical
3/32" = 1'-0"1 Level 1
UP DN
MECH.
3246 SF
Open Office Space
R 35' - 9"
3/32" = 1'-0"1 Level 2
First Floor rendering
First Floor plan Second Floor plan
15
DN
MECH.
R 32' - 2"
2536 SF
OPEN FLOOR PLAN
N
3/32" = 1'-0"1 Level 3R
31' -
1011
/16"
3/32" = 1'-0"1 Level Roof
0' - 0"
12' - 0"
24' - 0"
36' - 0"
0' - 0"
12' - 0"
24' - 0"
36' - 0"
0' - 0"
12' - 0"
24' - 0"
36' - 0"
0' - 0"
12' - 0"
24' - 0"
36' - 0"
1 East2 North
3 West 4 South
Third Floor plan Roof plan
Elevation
Elevation Elevation
Elevation
16
2 Level 2
3 Level 3
1 Level 1
Level 10' - 0"
Level 212' - 0"
Level 324' - 0"
Roof36' - 0"
39' - 0"
12' -
0"
12' -
0"
12' -
0"
9' -
6"
Level 10' - 0"
Level 212' - 0"
Level 324' - 0"
Roof36' - 0"
L5 PA39' - 0"
Reflected Ceiling plans
Longitudinal Section Horizontal Section
17
Level 10' - 0"
Level 212' - 0"
Level 324' - 0"
Level Roof36' - 0"
L5 PA39' - 0"
Level 10' - 0"
Level 212' - 0"
Level 324' - 0"
Level Roof36' - 0"
L5 PA39' - 0"
3d section summer
3d section winter
Summer light section
Winter light section
18
Summer light section and thermal heat diagram analysis
Winter light section and thermal heat diagram
analysis
19
3d section floor renderings
Second floor night rendering Third floor winter day rendering
20
Delhi Community CenterSUNY Delhi Spring 11 The Delhi Community Center was a group project in which the group had to design a space for the Delhi Community. The main focus I had in the community center was the Bowl-ing Ally and Bar building. Designed to resemble a rehabbed factory building, and blend into the semi french look of the town.
Front perspective
North Elevation
21
UP
5A111
CL
4A111
N
FIRST FLOOR PLAN
SECOND FLOOR PLAN
22
Level 10' - 0"
Level 212' - 6"
Level 325' - 0"
Level 427' - 0"
Level 10' - 0"
Level 212' - 6"
Level 325' - 0"
Level 427' - 0"
SITE PLANCROSS SECTION
23
Level 10' - 0"
Level 212' - 6"
Level 325' - 0"
Level 427' - 0"
LONGITUDINAL SECTION
NIGHT RENDERING
DAYTIME PERSPECTIVE RENDERING
24
Bridge ModelSUNY Delhi Fall 10
For a structural theory class, we had to design a replacement bridge for the SUNY Delhi golf course. The new bridge had to accom-modate a golf cart and people walking across it to get over the stream. Also the bridge had to be made so it can withstand floods that oc-casionally happen to the golf course. Since I decided to make a wood bridge, it would be possible for the construction management kids at Delhi to make the bridge for the school. The Bridge is a simple arched design with tension rods connected to the deck to support the deck.
25
Subtracted SpaceSUNY Delhi Spring 09
In Architectural fundamentals we had to create space by staring with a cube and just sub-tracting space. For my model I decided to have 3 levels of spaces. The bottom space was more of a individual space. The middle was suppose to be a gathering/community space. And finally the top was suppose to be more of a private public space. By creating a model of the project it really helped show how all the spaces worked.
NORTH-EAST ELEVATIONSOUTH-WEST ELEVATIONSOUTH-WEST SECTION
FLOOR 2
SOUTH-WEST SECTIONFLOOR 1
26
Color CopySUNY Delhi Fall 09 This project was to create an original copy of a picture from a textbook using construction paper, then cre-ate a color copy of the original
27
Shade and ShadowSUNY Delhi Fall 09 Simple project that shows shade and shadow using different lines only
Professional Work
30
Main Office Conceptual DesignYMCA Camp Combe, Facility Development Intern The YMCA Camp Combe’s Main Of-fice is in desperate need of a new office build-ing. As part of the Master Plan work on the current property, A new office building is a key part of the Camp. With that in mind, I camp up with a set design and location, and kept developing it through meetings with the Facility Comity and the directors. As it stands the building is still going through phases.
-Layout 1.. Location going off hillside. Office top floor and changing rooms with exercise room bottom floor
-Layout 3.. Location going into hillside. Bot-tom floor multi purpose and nurse office. Top floor Office
-Layout 6.. Location going into hillside. Bot-tom floor Office, nurse, bathrooms. Top floor Multi-Purpose and Inclusion
-Layout 8.. Location flat. First Floor office, Nurse, Inclusion, Bathrooms. Upstairs has file storage. Basement is Mechanical space
123456789101112131415161718
123456789101112131415161718
123456789101112131415161718
40'-8
" Work Out Room
Changing room
Changing room
AquaticsOffice
123456789101112131415161718
123456789101112131415161718
Waiting Room
Conf RoomExctive office Exctive office
Office Office
Office
Office
Enclosed Deck
DECK020
A: 3,064.22 sq ft<floor type>
H: 8.86'
Layout 1 First Floor Plan
Second Floor Plan
31
UP
-
-
201 SF
Nurse
147 SF
Bathroom
140 SF
Bathroom
68 SF
Bathroom
63 SF
Office70 SF
BR
50 SF
Bathroom
132 SF
Storage/Mech
2064 SF
Multi-Pur.
DN
251 SF
Waiting Room
172 SF
Inclusion
44 SF
BR
68 SF
BATHROOM
44 SF
CL
258 SF
DIRECTOR
228 SF
DIRECTOR
291 SF
Conference
92 SF
Office
92 SF
Office
92 SF
Office
117 SF
Office
UP
UP
175 SF
THAD
162 SF
MARY
307 SF
CONFERENCE
636 SF
OFFICE SPACE
477 SF
WAITING
84 SF
NURSE OFF.
296 SF
NURSE
72 SF
BATH72 SF
BATH
140 SF
BATHROOM
140 SFBATHROOM
118 SF
MECH.
56 SF
BATH.
49 SFSTORAGE
DN
180 SF
INCLUSION
105 SF
INC. OFF.
203 SF
CUBICALS
140 SFBATHROOM
139 SFBATHROOM
53 SFSTO.
83 SFSTO.
759 SF
MULTI-PURPOSE
750 SF
MULTI-PURPOSE
Layout 3 First Floor Plan
Second Floor Plan
Layout 6 First Floor Plan
Second Floor Plan
32
UP
FD
FD
FD FD
DN
50' -
10
1/4"
80' - 0"
172 SF
Thad
173 SF
Mary
375 SF
Waiting
1014 SF
Main Office
362 SF
Conference
122 SF
Office
68 SF
BR
70 SF
BR
148 SF
Inclusion
81 SF
Inclusion Office
79 SF
Bath & Shower
611 SF
Nurse
76 SF
Bathroom
1A103
1A103.1
85 SF
Office
88 SF
Office
DN
862 SF
Storage
261 SF
File Storage
1A103
1A103.1
Level 10' - 0"
Level 212' - 0"
Level 323' - 3 3/4"
Level 0-10' - 0"
Level 10' - 0"
Level 212' - 0"
Level 323' - 3 3/4"
Level 0-10' - 0"
Layout 8 First Floor Plan Second Floor Plan
LONGITUDINAL SECTION HORIZONTAL SECTION
33
EXTERIOR PERSPECTIVE
EXTERIOR PERSPECTIVEINTERIOR PERSPECTIVE
Layout 8
34
Changing Room Conceptual Design50' - 0"
40' -
0"
714 SF
Boys
723 SF
Girls
112 SF
Auq. Office
124 SF
First Aid
140 SF
Storage
38 SF
Mech
YMCA Camp Combe, Facility Development Intern One of the main parts of the YMCA Camp Combe is the Main Pool which services about 500 kids per day. The key to having every kid swim is fast changing times. The current changing rooms are not meet-ing the needs of the pool. A new changing room building will provide about double the change space as the current changing rooms. The new building will also have room for Aquatics office, First Aid, and Pool Storage. The unique design of having a part open roof helps the changing rooms stay dry, but the sur-round roofs have to help hid the kids changing, since the building is lower then the main parking lot.
FLOOR PLAN
35
FLOOR PLAN
ScaleDrawn By: Daniel Dahlstrom
8/22
/201
1 11
:02:
56 A
M
YMCA CAMP COMBEBATH HOUSE
ScaleDrawn By: Daniel Dahlstrom
8/22
/201
1 11
:02:
57 A
M
EXTERIOR PERSPECTIVES
36
Maintenance Building Conceptual DesignYMCA Camp Combe, Facility Development Intern A key part to any facility to run functionally is a Mainte-nance building. Currently the Camp does not have a mainte-nance building.
For the design I at-tempted to try and keep and older look. The Barn look is a great way to get a lot of room in 2 floors and keep a building looking older. With a simple 2 car garage space with work area downstairs. I was able to place upstairs and office and a lot of storage space.
UP
WH
who
le g
uard
35'
50'
DN
FIRSTFLOOR PLAN
SECONDFLOOR PLAN
37ScaleDrawn By: Daniel Dahlstrom 12" = 1'-0"
8/22
/201
1 11
:09:
03 A
M
YMCA CAMP COMBEMAINTENANCE BUILDINGHORIZONTAL SECTION
EXTERIOR PERSPECTIVE
INTERIOR PERSPECTIVE
38
Tree House Conceptual DesignYMCA Camp Combe, Facility Development Intern In Honer of a staff mem-ber who tragically lost her life during a summer, Camp Combe raised money and built a tree house in memory of her.
The plans of the Tree House was drawn by and archi-tect that happily volunteered her time to the design of it.
My part was to take the 2D CAD plans and make 3D ren-derings of it to help raise money for the construction of the tree house. I also worked with the architect to redesign the stairs to the current design. During the construction I was one of four people to build the structure.
PROPOSED RENDERINGS WITH STAIRCASE
39
CURRENT RENDERINGS WITH NEW STAIR-CASE AND DIFFERENT ROOF DESIGNS
CURRENT CONSTRUCTION PHOTO
40
Construction PhotosYMCA Camp Combe, Facility De-velopment Intern, Maintenance A small sample of photos from different construction projects I have worked on around camp.
Instillation of a new door where existing window use to be.
Re-Shingle Roof and Porch roof on many cabins on the camp property. This roof I was in charge of doing it with one other
helper
Small pool side deck. I designed and lead a group of volunteers to build this deck
Assisted in placing a new floor down in one of the buildings
Assisted in constructing a new Boccie Ball court next to the pool
41
Assisted in constructing of a triple set of tree houses at the camp
Assisted in constructing of a Haunted Mine for the camps Fall Festival 2011
New Haunted House for the camps 2012 Fall Festival. Was one of two people in the design and construction of the Haunted
House
Assisted in constructing of 6 decks that were additions to cabins
42
43