portafoli

19
ARCHITECTURE PORTFOLIO RAMON MIARNAU SERRANO

description

Treballs i projectes realitzats al llarg dels meus estudis d'arquitectura.

Transcript of portafoli

Page 1: portafoli

ARCHITECTURE PORTFOLIO

RAMON MIARNAU SERRANO

Page 2: portafoli

CURRICULUM VITAENAME_ Ramon Miarnau SerranoBIRTHDATE_ 11 / 05 / 1988TLF_ Aut. +43 699 10161585 Esp. +34 650 297 639E-MAIL_ [email protected]

ACADEMIC_Arquitecture student_ETSAV (Escola Técnica Superior d’Arquitectura del Vallés)Erasmus exchange program_TU WIEIN (Technische Universität Wien)

WORK_Summer 2011_ Architect Assistant in the structure design at the company SimsaGroupSummer 2010_ Technical drawer at the studio Beatriu Llobet Sans - Miquel Planas AlsinaMarch 2010 to July 2010_ Technical drawer at the studio Boreal Arquitectura e Ingenieria S.LJune 2009 to June 2010_ Scholarship holder in student delegation at the ETSAVJune 2008 to June 2009_ Scholarship holder in Calcul Center LAIA at the ETSAVJune 2007 to June 2008_ Assistant of Technical Architect at the studio PlaatSummer 2006_ Technical drawer at the company SimsaGroupSummers 2004 & 2005_ Assembler of electrical components at the company SimsaGroup

KNOWLEDGE_AUTOCAD_ADOBE PHOTOSHOP_ILUSTRATOR_SKETCHUP_3DMAX_WINEVA

MORE_Languages_ Catalan / Spanish / EnglishDriving Licence_ C

ARCHITECTURE PORTFOLIO RAMON MIARNAU SERRANO

INDEX URBANISM_______________________STRUCTURES______________________PROJECTS___________________________________________REALIZED_________________________________________

URB.6 TAP.6 UUD EST.6 CNT.8 EST.M TAP.3 TAP.A TAP.C TAP.E KN.SP 2009 2009 2010 2011 2008/11

Page 3: portafoli

URB.6URBANISTICA_6Modification of Existing Tissue.

TAP.6TALLER D’ARQUITECTURA I PROJECTES_6Neighborhood between the city and the land.

UUDUNPLANED URBAN DEVELOPMENT_Living Project in Ciudad Bolívar, Bogotá.

URBANISM

URB.6 TAP.6 UUD EST.6 CNT.8 EST.M TAP.3 TAP.A TAP.C TAP.E KN.SP 2009 2009 2010 2011 2008/11

Page 4: portafoli

URB.6 TAP.6 UUD EST.6 CNT.8 EST.M TAP.3 TAP.A TAP.C TAP.E KN.SP 2009 2009 2010 2011 2008/11

URB.6URBANISTICA_6

Modification of Existing Tissue.The project took place in Reus city center. There was an existing urbanistic plan that we tried to develop.

In a previous work, we analized the actual situation of the place, and studied the purpose of the urbanistic plan, and the regulations pf the law.

After this work,we launched a proposal trying to combine the new developed design parameters acording with the existing requirements and caracteristics of the place.

Existing heights Ground floor uses Grade of Condition Actual Plan Modification Height Differences Resistance to the Transformation

Page 5: portafoli

URB.6 TAP.6 UUD EST.6 CNT.8 EST.M TAP.3 TAP.A TAP.C TAP.E KN.SP 2009 2009 2010 2011 2008/11

TAP.6TALLER D’ARQUITECTURA I PROJECTES_6

Neighborhood between the city and the land.The existing extension of the city of “Prat del Llobregat”currently ends in a completely drastic way in high contrast with the enviroment. The land is next to a group of high scale housing settlements.

The design of the new neighborhood is adapted to the law regulations defining the densities and the percentage of privat and public space, as three public equipments.

The project tries to work as a filter, in order to open the public space of the city to the land. The strenghts, the size, and the power of the buildings decreases when we get closer to the land.

At the same time that I try to design a filter, I try to give to the neighborhood its own character with the cration of small public squares in contact with the equipaments and giving them a commercial use.

Page 6: portafoli

Unplaned Urban DevelopmentThe Living Project in Ciudad Bolívar, Bogotá, consists in design-ing a small community of houses with a civic center, in one of the informal settlements of the city.

The project creates a central corridor of semi-public space with diferent terraces available from every family in diferent ways.

The design of the houses intends to be as versatile as possible, and easily modificable depending on the changing needs of the families.

URB.6 TAP.6 UUD EST.6 CNT.8 EST.M TAP.3 TAP.A TAP.C TAP.E KN.SP 2009 2009 2010 2011 2008/11

UUDUNPLANED URBAN DEVELOPMENT

Page 7: portafoli

EST.6ESTRUCTURES_6Structural Analysis of the Cathedral Santa Maria del mar.

CNT.8CONSTRUCCIO_8Calcul & Design of an abatement of a structural wall.

EST.MESTRUCTURES METAL.LIQUESStructural Analysis of a disused Concrete Factory.

STRUCTURES

URB.6 TAP.6 UUD EST.6 CNT.8 EST.M TAP.3 TAP.A TAP.C TAP.E KN.SP 2009 2009 2010 2011 2008/11

Page 8: portafoli

URB.6 TAP.6 UUD EST.6 CNT.8 EST.M TAP.3 TAP.A TAP.C TAP.E KN.SP 2009 2009 2010 2011 2008/11

EST.6ESTRUCTURES_6

Structural Analysis of the Cathedral Santa Maria del marThis work was a study of the structural stability of the Cathedral Sta. Maria del Mar, a Catalan Gothic basilica. Consisted on the calculation of all the loads through the dimensions and the densities. Find the vertical and hori-zontal reactions. And by using a graphical method iden-tify the excentricity of the total load on the pillars.

Identifying that the load passes inside the middle third of the column section, so all the section it's under com-pression, and finding the optimal design of the arc acording with the trajectory of the load.

Calcul & Design of an abatementof a structurall wall.

The project consists in unifying differents locals into one single space, destroying a structural wall made from bricks.

The work involves all the calculations of the loads, the calculation and the design of the constructive solution, as well as the complete explanation of the building process.

CNT.8CONSTRUCCIO_8

Page 9: portafoli

Structural Analysis of a Disused FactoryThis study is an analysis of the steel structural state of the old disused concrete factory Asland, in Clot del Moro. The building have a important architertural and historical interest, and nowadays is on a critical state of descomposition.

The analysis started with the understanding of how the structure works, making a reproduction of the studied module with a 3D program, then we introduce de parameters and the loads into a calcul program (wineva)

The results that we find, show us the way that the forces are distributed through the structure, after that, we test the diferent elements and conections between them to check where the problem comes from, and find the critical profiles.

The results that we get are explaining the reality in a really accurate way.

URB.6 TAP.6 UUD EST.6 CNT.8 EST.M TAP.3 TAP.A TAP.C TAP.E KN.SP 2009 2009 2010 2011 2008/11

EST.MESTRUCTURES_METAL.LIQUES

Page 10: portafoli

TAP.3TALLER D’ARQUITECTURA I PROJECTES_3Multiuses Pavilion.

TAP.ATALLER D’ARQUITECTURA I PROJECTES_ALibrary in Prat del Llobregat.

TAP.CTALLER D’ARQUITECTURA I PROJECTES_CLibrary & Commercial Locals in a disused prison in Mataró.

TAP.ETALLER D’ARQUITECTURA I PROJECTES_EEco-Hostel in a disused Concrete Factory in Clot del Moro.

KN.SPKINEMATIC SPACE STRUCTURETextile Frames in the courdiard of the TU Wien.

PROJECTS

URB.6 TAP.6 UUD EST.6 CNT.8 EST.M TAP.3 TAP.A TAP.C TAP.E KN.SP 2009 2009 2010 2011 2008/11

Page 11: portafoli

TAP.3TALLER D’ARQUITECTURA I PROJECTES_3

Multiuses PavilionThe aim of the course was to project a multiuse pavilion focusing the atention on the design of the Roof.

Using simples shapes, with a clear geometry, I tried to create a game of triangular plans intersecting them leav-ing in between space for the obertures.

It’s a clear structure that creates a caotic sensation from the inside point of view, with the intention to impress the viewer.

LibraryThe project take place in a residencial area in Prat del Llobregat, between a police office and a free space.

The design cares about the easy connection of all the spaces of the library with the reception, without creating sound conflicts between the diferent uses. Intermidium spaces are created to control the privacy by the circulation.Uses & Spaces like filters acording to the requirements. The roof let get inside, all the light from the Nord, and just the reflected from the South. Protecting the inner space from the direct radiation from the Sun.

URB.6 TAP.6 UUD EST.6 CNT.8 EST.M TAP.3 TAP.A TAP.C TAP.E KN.SP 2009 2009 2010 2011 2008/11

TAP.ATALLER D’ARQUITECTURA I PROJECTES_A

Page 12: portafoli

TAP.CTALLER D’ARQUITECTURA I PROJECTES_C

Library & Commercial LocalsThe project take place in a old and disused prison in Mataró.The prison is sorrounded by a group of houses with different heights and widths disposed without following any rule.

The intervention tries to respect as much as posible the image of the old building, and preserve its value, integrating the caotic image of the sorrounding buildings tho the complete image of the project.

Inside the prison and in the building on its side are disposed all the comercial locals and the restaurant. The public space is divided in two diferent levels and the longest building is the library.

URB.6 TAP.6 UUD EST.6 CNT.8 EST.M TAP.3 TAP.A TAP.C TAP.E KN.SP 2009 2009 2010 2011 2008/11

Page 13: portafoli

TAP.ETALLER D’ARQUITECTURA I PROJECTES_E

Eco-Hostel

The rest of the factory, under non-habitable condi-tions, have diferent patologies,ones easyer to solve that oders, and we tryed to adequate our intervention to the cost of rehabilitation of the space in relation with the requirements of the new use.

In the fround floor, in direct relation with the open space and the forest, there’s the restaurant.In the higher level, with privacy and the best views, the rooms. And in the lateral, where less intervention is needed the spaces for the activities of the Hostel.

The project consist on design an Eological Hostel and a Restaurant, in a destroyed and desused concrete factory in the midle of the mountains.

We made an analysis about the conservation state of all the place. Nowadays, the entrance and some modules are already rehabilitated, and there is a museum there.

URB.6 TAP.6 UUD EST.6 CNT.8 EST.M TAP.3 TAP.A TAP.C TAP.E KN.SP 2009 2009 2010 2011 2008/11

Page 14: portafoli

The caracter of the project respects the existing inherent qualities of the space, and adapt our intervention to the scale of the place without loosing the contact with the human scale. The design pretends to give the sensation of lightness and movement in itself. The structure works in a clear geometrical way to create diferents relations between the stripes in a really simply and clear form.

Symmetrizing the structure modul and changing the direction of the stripes we leave huge empty spaces, at the same time that generate a organic sistem, that tries to remember the waves flow.

KN.SPKINEMATIC SPACE STRUCTURE

URB.6 TAP.6 UUD EST.6 CNT.8 EST.M TAP.3 TAP.A TAP.C TAP.E KN.SP 2009 2009 2010 2011 2008/11

Textile Frames

Page 15: portafoli

2009WORKSHOP IN IRELANDTectonics in Building Culture: Textile Blocks.

2009SANT CUGAT DEL VALLES_ETSAVModules of investigation & development of Facades.

2010SANT CUGAT DEL VALLES_ETSAVClimbing Wall

2011WORKSHOP IN BELGIUMStructures in Building Culture: Textonical shapes of wood.

2008/11SANT CUGAT DEL VALLES_ETSAVGreenhouse_ Facades Research + Work & Folk spaces

REALIZED

URB.6 TAP.6 UUD EST.6 CNT.8 EST.M TAP.3 TAP.A TAP.C TAP.E KN.SP 2009 2009 2010 2011 2008/11

Page 16: portafoli

Tectonics in Building Culture:Textile BlocksWe were a group of architecture students from all europe travelling across Ireland, learning about the traditional construction techniques with dry stone, by the hand from some teachers and a stone mason.

The project took place in the courtyard of a school of carpenters. There was a existing sculpture made from wood with a small bench in one side.

We designed a staggered pavement to rest and be used it as a bench. We tryed to make from two different interventions one together. We played with the dimension from the top view and the feelings of light and heavy, and the contrast of the cualities and posibilities of that two different materials apparently opposites.

2009WORKSHOP IN IRELAND

URB.6 TAP.6 UUD EST.6 CNT.8 EST.M TAP.3 TAP.A TAP.C TAP.E KN.SP 2009 2009 2010 2011 2008/11

Page 17: portafoli

2010SANT CUGAT DEL VALLES_ETSAV

Climbing WallA group of climbing enthusiastic friends involved on the student delegation of the university (ETSAV) started with the idea to build a free and opened climbing wall.

We got the money from the University by doing some maintenance works through the students delegation, and we start building it in our free time.

Many people in university took to climb since we built it.

2009 SANT CUGAT DEL VALLES_ETSAV

Modules of investigation & development of facades

URB.6 TAP.6 UUD EST.6 CNT.8 EST.M TAP.3 TAP.A TAP.C TAP.E KN.SP 2009 2009 2010 2011 2008/11

sThis project was a collaboration with a teacher thesis to compare different isolation solutions. A group of students built isolated modules to get concrete results of the variations of the inner conditions depending on the construc-tive solutions used in the following façades.

Page 18: portafoli

Structures in Building Culture: Textonical shapes of wood.2011WORKSHOP IN BELGIUM

URB.6 TAP.6 UUD EST.6 CNT.8 EST.M TAP.3 TAP.A TAP.C TAP.E KN.SP 2009 2009 2010 2011 2008/11

The intention of this workshop was to learn to work with wood and discover the possibilities and the limitations of OSB and plywood. And the goal was to create a group of provisional sculptures for an exhibition arround a rehabilitation school, in a old church and a monastery.

We started working with OSB that brokes easyly if the strenght don’t go in the main direction of the fibers, and we developed a simple cell with conections at 45 degrees, that allowed us to creeate a hexagonal module, strong and light.

The final structure was a organic path that tried to change the perception of the space and the height of the viewer.

Page 19: portafoli

This project started with a group of teachers and students from PAuS, that had the idea of reutilize the material from a stand in a temporal exposition called constru-mat realized every 4 years in Barcelona.

The idea developed as a subject called 1:1, where the students learn how to build working together. I have been involved in all the process of construction.

The greenhouse have two uses, the ground floor is for the stock and the modules of investigation and development of facades. The first floor is divided in 5 diferents spaces, every one destinated to create a diferent environment. The students will be able to use it as a place for studying or chilling, in front of the terrace of the bar.

Greenhouse_ Facades Research + Work & Folk spaces.2008/11SANT CUGAT DEL VALLES_ETSAV

URB.6 TAP.6 UUD EST.6 CNT.8 EST.M TAP.3 TAP.A TAP.C TAP.E KN.SP 2009 2009 2010 2011 2008/11