Port Way 2015 Trestle Repairs and Upgrades Addendum 4.pdf · 6.0 welding inspections 6.1 all...

7
PURCHASING DEPARTMENT REQUEST FOR TENDER No. 1679 Port Way 2015 Trestle Repairs and Upgrades Addendum No. 4 October 13, 2015 This addendum shall be read in conjunction with and considered as an integral part of the Request for Tender No. 1679. Revisions supersede the information contained in the original Request for Tender No. 1679 or previously issued Addendum. No consideration will be allowed for any extras due to any Proponent not being familiar with the contents of this Addendum. General Notes Remove: Pages 14 – 18 Drawings (5 pages) dated July 23, 2015 S01 – General Notes S02 – General Arrangement S03 – Pile Cap Reinforcement S04 – Column Repairs S05 – Typical Pier and Mudsill Repair Details Replace with: Drawings (5 pages) dated October 13, 2015 S01 – General Notes S02 – General Arrangement S03 – Pile Cap Reinforcement S04 – Column Repairs S05 – Typical Pier and Mudsill Repair Details See attached

Transcript of Port Way 2015 Trestle Repairs and Upgrades Addendum 4.pdf · 6.0 welding inspections 6.1 all...

Page 1: Port Way 2015 Trestle Repairs and Upgrades Addendum 4.pdf · 6.0 welding inspections 6.1 all inspections shall be performed by a company certified to all inspections shall be performed

PURCHASING DEPARTMENT

REQUEST FOR TENDER No. 1679

Port Way 2015 Trestle Repairs and Upgrades

Addendum No. 4

October 13, 2015

This addendum shall be read in conjunction with and considered as an integral part of the Request for Tender No. 1679. Revisions supersede the information contained in the original Request for Tender No. 1679 or previously issued Addendum. No consideration will be allowed for any extras due to any Proponent not being familiar with the contents of this Addendum. General Notes Remove: Pages 14 – 18 Drawings (5 pages) dated July 23, 2015 S01 – General Notes S02 – General Arrangement S03 – Pile Cap Reinforcement S04 – Column Repairs S05 – Typical Pier and Mudsill Repair Details

Replace with: Drawings (5 pages) dated October 13, 2015 S01 – General Notes S02 – General Arrangement S03 – Pile Cap Reinforcement S04 – Column Repairs S05 – Typical Pier and Mudsill Repair Details

See attached

Page 2: Port Way 2015 Trestle Repairs and Upgrades Addendum 4.pdf · 6.0 welding inspections 6.1 all inspections shall be performed by a company certified to all inspections shall be performed

©

ENGINEERING LIMITEDHEROLD

PO

RT

W

AY

T

RE

ST

LE

2

01

5 R

EP

AIR

S A

ND

U

PG

RA

DE

S

PO

RT

O

F N

AN

AIM

O A

SS

EM

BL

Y W

HA

RF

NA

NA

IM

O, B

C

CIT

Y O

F N

AN

AIM

O

GENERAL

NOTES

S01

NOT FORCONSTRUCTIONISSUED FOR TENDER

AutoCAD SHX Text
GENERAL NOTES:
AutoCAD SHX Text
5.0 STEEL 5.1 ALL FABRICATED AND MISCELLANEOUS METAL TO BE GRADE 300W, ALL FABRICATED AND MISCELLANEOUS METAL TO BE GRADE 300W, UNCOATED. FIELD CUT AS REQUIRED TO FIT EXISTING STRUCTURE. 5.2BOLTED CONNECTIONS SHALL UTILIZE ASTM A307 GALVANIZED BOLTS BOLTED CONNECTIONS SHALL UTILIZE ASTM A307 GALVANIZED BOLTS COMPLETE WITH NUTS AND WASHERS, UNLESS OTHERWISE SHOWN ON DRAWINGS. 5.3 WHERE WELD SIZE NOT SHOWN, USE MINIMUM 6mm FILLET. WHERE WELD SIZE NOT SHOWN, USE MINIMUM 6mm FILLET. 5.4ALL WELDING SHALL BE IN ACCORDANCE WITH CSA W59 AND SHALL BE ALL WELDING SHALL BE IN ACCORDANCE WITH CSA W59 AND SHALL BE PERFORMED BY FABRICATORS FULLY APPROVED BY THE CANADIAN WELDING BUREAU UNDER CSA W55.3. FABRICATING SHOP TO HAVE A MINIMUM DIVISION 2.1 CERTIFICATION BY THE CANADIAN WELDING BUREAU TO THE REQUIREMENTS OF CSA W47.1 AND CSA W55.3 FOR RESISTANCE WELDING OF STRUCTURAL COMPONENTS. THE FABRICATOR SHALL SUBMIT PROOF OF CERTIFICATION PRIOR TO START OF WORK.
AutoCAD SHX Text
6.0 WELDING INSPECTIONS 6.1 ALL INSPECTIONS SHALL BE PERFORMED BY A COMPANY CERTIFIED TO ALL INSPECTIONS SHALL BE PERFORMED BY A COMPANY CERTIFIED TO CSA W178.1-02 FOR THE RELEVANT CLASS OF INSPECTION AND HEREAFTER REFERRED TO AS THE INSPECTOR. INSPECTION PROCEDURES SHALL BE AS OUTLINED BELOW. 6.2 ALL WELDS ARE TO BE VISUALLY INSPECTED BY AN APPROVED TESTING ALL WELDS ARE TO BE VISUALLY INSPECTED BY AN APPROVED TESTING COMPANY RETAINED BY THE CONTRACTOR. CP WELDS TO BE SUBJECTED TO NON DESTRUCTIVE TESTING METHODS TO CONFIRM SOUNDNESS. CONTRACTOR SHALL BE RESPONSIBLE FOR CO-ORDINATING INSPECTIONS AND PROVIDING SUITABLE AND SAFE ACCESS TO THE WORK BEING INSPECTED. 6.3 ALL FAILURES IDENTIFIED BY THE TESTING AND INSPECTIONS SHALL BE ALL FAILURES IDENTIFIED BY THE TESTING AND INSPECTIONS SHALL BE CORRECTED AT THE CONTRACTOR'S EXPENSE. COST OF ADDITIONAL TESTING TO CONFIRM CONFORMANCE WITH SPECIFICATIONS SHALL BE BORNE BY THE CONTRACTOR. 6.4 SUBMIT ALL TEST REPORTS TO THE ENGINEER FOR REVIEW. DO NOT SUBMIT ALL TEST REPORTS TO THE ENGINEER FOR REVIEW. DO NOT COVER MEMBERS AND THEIR CONNECTIONS WITHOUT THE APPROVAL OF THE ENGINEER.
AutoCAD SHX Text
1.0 GENERAL 1.1 WHERE REFERENCE IS MADE TO "THE ENGINEER" ON THESE DRAWINGS, IT WHERE REFERENCE IS MADE TO "THE ENGINEER" ON THESE DRAWINGS, IT SHALL BE TAKEN TO MEAN HEROLD ENGINEERING LIMITED 1.2CONDITION ASSESSMENT - THIS STRUCTURE IS ESTIMATED TO BE IN CONDITION ASSESSMENT - THIS STRUCTURE IS ESTIMATED TO BE IN EXCESS OF 60 YEARS OF AGE (WITH THE EXCEPTION OF CERTAIN COMPONENTS THAT HAVE BEEN ADDED OR REPAIRED DURING THE COURSE OF MAINTENANCE). DUE TO THE AGE AND CONDITION OF THE STRUCTURE, THE ENGINEER RECOMMENDS YEARLY CONDITION ASSESSMENTS COMPLETED BY A QUALIFIED PROFESSIONAL ENGINEER, IN ADDITION TO SEMI-ANNUAL ASSESSMENTS COMPLETED BY THE OWNER. 1.3DESIGN BASIS - THESE DRAWINGS ARE BASED UPON ROUGH FIELD DESIGN BASIS - THESE DRAWINGS ARE BASED UPON ROUGH FIELD MEASUREMENTS AND STRUCTURAL CONDITION ASSESSMENT OF AN EXISTING BRIDGE THAT WAS DESIGNED BY OTHERS. REPAIRS AND MODIFICATIONS TO THE EXISTING STRUCTURE SHOWN ON THESE DRAWINGS ARE INTENDED TO MAINTAIN THE EXISTING POSTED BRIDGE LOAD LIMIT. THE ENGINEER HAS NO KNOWLEDGE OF GEOTECHNICAL CONDITIONS ON THIS SITE, NOR OF THE CONDITION OF COMPONENTS THAT ARE BURIED OR OTHERWISE NOT VISIBLE. THE TARGET DESIGN LIFE FOR REPAIRS SHOWN ON THESE DRAWINGS IS 3 YEARS, WITH EXPECTED DECOMMISSIONING IN THE YEAR 2018. 1.4 DESIGN CODES - WHERE REPAIRS OR MODIFICATIONS HAVE BEEN DESIGN CODES - WHERE REPAIRS OR MODIFICATIONS HAVE BEEN PRESCRIBED, THEY HAVE BEEN DESIGNED FOR STRENGTH IN CONFORMANCE WITH THE CURRENT HIGHWAY BRIDGE DESIGN CODE CSA S6-06. CONFORMANCE OF OTHER BRIDGE COMPONENTS WITH THE CURRENT HIGHWAY BRIDGE DESIGN CODE IS NEITHER EXPRESSED NOR IMPLIED. WHERE CODES AND STANDARDS ARE LISTED ON THESE DRAWINGS, THEY SHALL BE TAKEN TO MEAN THE CURRENT VERSION LISTED IN CSA S6-06. 1.5DESIGN VEHICLES - THE APPROVED VEHICLE LOADINGS GIVEN ON THIS DESIGN VEHICLES - THE APPROVED VEHICLE LOADINGS GIVEN ON THIS DRAWING HAVE BEEN GENERATED BASED UPON A COMPARISON OF THEIR EFFECTS VERSUS THE POSTED DESIGN VEHICLE. VEHICLES WITH SHORTER AXLE SPACING OR FEWER AXLES MAY NOT BE BELOW THE POSTED BRIDGE LOAD RATING, EVEN IF THEY HAVE A SMALLER GVW. CONTACT THE BRIDGE ENGINEER FOR ASSESSMENT OF SPECIFIC VEHICLES.
AutoCAD SHX Text
1.6 READ STRUCTURAL DRAWINGS IN CONJUNCTION WITH ALL OTHER READ STRUCTURAL DRAWINGS IN CONJUNCTION WITH ALL OTHER CONTRACT DRAWINGS AND DOCUMENTS. REPORT ANY CONFLICTS TO THE BRIDGE ENGINEER BEFORE COMMENCING WORK. 1.7 VERIFY ALL DIMENSIONS AND ELEVATIONS PRIOR TO CONSTRUCTION. VERIFY ALL DIMENSIONS AND ELEVATIONS PRIOR TO CONSTRUCTION. 1.8 NOTIFY BRIDGE ENGINEER 48 HOURS IN ADVANCE FOR FIELD REVIEW OF NOTIFY BRIDGE ENGINEER 48 HOURS IN ADVANCE FOR FIELD REVIEW OF STRUCTURAL CONNECTIONS BEFORE COVERING UP. 1.9 THESE DRAWINGS SHOW COMPLETED STRUCTURAL COMPONENTS OF THE THESE DRAWINGS SHOW COMPLETED STRUCTURAL COMPONENTS OF THE BRIDGE. THE REQUIRED TEMPORARY BRACING AND SHORING TO PERFORM THE WORK SAFELY IS THE RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR IS ADVISED THAT CERTAIN COMPONENTS OF THIS BRIDGE ARE IN POOR SHAPE DUE TO ITS AGE. NOTIFY BRIDGE ENGINEER IF COMPONENTS OTHER THAN THOSE SHOWN ON THESE DRAWINGS ARE FOUND TO BE IN A DETERIORATED STATE. 1.10 ENVIRONMENTAL WORK PROCEDURES, TIMING, AND SPECIAL PRECAUTION ENVIRONMENTAL WORK PROCEDURES, TIMING, AND SPECIAL PRECAUTION SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS AND LIMITATIONS OF THE FEDERAL DEPARTMENT OF FISHERIES AND OCEANS, AND THE PROVINCIAL MINISTRY OF WATER, LAND AND AIR PROTECTION. 1.11 SUBMIT SHOP DRAWINGS FOR REVIEW PRIOR TO FABRICATION. SUBMIT SHOP DRAWINGS FOR REVIEW PRIOR TO FABRICATION. 1.12 ELEVATIONS ARE IN METRES AND DIMENSIONS ARE IN MILLIMETRES.ELEVATIONS ARE IN METRES AND DIMENSIONS ARE IN MILLIMETRES.
AutoCAD SHX Text
2.0 SCOPE OF WORK FOR REPAIRS 2.1 REPAIRS AND UPGRADES SHALL GENERALLY INCLUDE THE FOLLOWING ITEMS AS OUTLINED IN THESE DRAWINGS AS WELL AS OTHER ITEMS IDENTIFIED IN THE CONTRACT
AutoCAD SHX Text
4.0 CAST-IN-PLACE CONCRETE 4.1 ALL CONCRETE WORK SHALL CONFORM TO THE REQUIREMENTS OF ALL CONCRETE WORK SHALL CONFORM TO THE REQUIREMENTS OF CAN/CSA A23.1-06 AND A23.2-06. 4.2 CONCRETE MIXES SHALL CONFORM TO CAN/CSA A23.1-06 AND A23.2-06 CONCRETE MIXES SHALL CONFORM TO CAN/CSA A23.1-06 AND A23.2-06 AND SHALL HAVE THE FOLLOWING PROPERTIES: 4.3 CONCRETE TESTING SHALL BE CARRIED OUT IN ACCORDANCE WITH CONCRETE TESTING SHALL BE CARRIED OUT IN ACCORDANCE WITH CAN/CSA A23.1-06 AND A23.2-06. THE MINIMUM NUMBER OF TESTS PERFORMED SHALL BE AS PER CSA A23.2-06. ADDITIONAL TESTING SHALL BE PERFORMED AT THE DIRECTION OF THE ENGINEER. CONTRACTOR SHALL PROVIDE TESTING AGENCY WITH ADEQUATE NOTICE TO PROVIDE TESTING AS REQUIRED. 4.4 REINFORCING STEEL TO CONFORM TO CSA SPECIFICATION G30.18M, GRADE REINFORCING STEEL TO CONFORM TO CSA SPECIFICATION G30.18M, GRADE 400. 4.6 LAP OF BARS FOR SPLICES TO BE 40 x BAR DIAMETER, UNLESS NOTED LAP OF BARS FOR SPLICES TO BE 40 x BAR DIAMETER, UNLESS NOTED OTHERWISE. 4.8 CONCRETE FINISHES SHALL BE IN ACCORDANCE WITH CAN/CSA A23.1-06. CONCRETE FINISHES SHALL BE IN ACCORDANCE WITH CAN/CSA A23.1-06. 4.9 ALL CONCRETE CURING SHALL BE IN ACCORDANCE WITH CAN/CSA ALL CONCRETE CURING SHALL BE IN ACCORDANCE WITH CAN/CSA A23.1-06. SPECIAL PRECAUTIONS SHALL BE TAKEN AS NOTED IN CSA A23.1 FOR PLACING AND CURING CONCRETE ABOVE 27° C AND BELOW 5° C. 4.10 MINIMUM CONCRETE COVER TO REINFORCING SHALL BE 65mm, UNLESS NOTED OTHERWISE.
AutoCAD SHX Text
CLASS
AutoCAD SHX Text
28 DAY
AutoCAD SHX Text
MAXIMUM
AutoCAD SHX Text
AIR CONTENT
AutoCAD SHX Text
EXPOSURE
AutoCAD SHX Text
GENERAL
AutoCAD SHX Text
35 MPa
AutoCAD SHX Text
13mm
AutoCAD SHX Text
75mm
AutoCAD SHX Text
5% TO 7%
AutoCAD SHX Text
C-1
AutoCAD SHX Text
STRENGTH
AutoCAD SHX Text
AGGREGATE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SLUMP
AutoCAD SHX Text
6000 lbs (2720 kg)
AutoCAD SHX Text
24000 lbs (10885 kg)
AutoCAD SHX Text
CURRENT BRIDGE POSTING 56456 LB GVW HS-15 w/ REAR TANDEM 12000 kg
AutoCAD SHX Text
26456 lbs (12000 kg)
AutoCAD SHX Text
14600 lbs (6540 kg)
AutoCAD SHX Text
26200 lbs (11740 kg)
AutoCAD SHX Text
36' 2-AXLE TRANSIT BUS 40800 lb GVW (WITHIN POSTED LIMIT)
AutoCAD SHX Text
16500 lbs (7500 kg)
AutoCAD SHX Text
29700 lbs (13500 kg)
AutoCAD SHX Text
45' 3-AXLE TOUR BUS 46200 lb GVW (WITHIN POSTED LIMIT)
AutoCAD SHX Text
NOTE: REPAIR WORK TO BE COMPLETED WHILE BRIDGE IS OPEN TO TRAFFIC. CONTRACTOR TO PROVIDE TRAFFIC CONTROL AS REQUIRED.
AutoCAD SHX Text
COMPRESSIVE
AutoCAD SHX Text
6.0 DEMOLITION 6.1 ALL MATERIAL FROM EXISTING BRIDGE TO BE DISPOSED OF IN ACCORDANCE WITH ALL LOCAL, PROVINCIAL AND FEDERAL REGULATIONS. WITH ALL LOCAL, PROVINCIAL AND FEDERAL REGULATIONS. 6.2 DEMOLITION OF EXISTING STRUCTURE TO BE CARRIED OUT IN ACCORDANCE WITH CSA S350-M 1980, CODE OF PRACTICE FOR SAFETY IN DEMOLITION OF STRUCTURES.
AutoCAD SHX Text
DESIGN VEHICLES:
AutoCAD SHX Text
PROJECT LOCATION:
AutoCAD SHX Text
ITEM
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
8
AutoCAD SHX Text
9
AutoCAD SHX Text
10
AutoCAD SHX Text
11
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
MOBILIZATION / DEMOBILIZATION
AutoCAD SHX Text
TIGHTEN LOOSE BOLTS THROUGHOUT STRUCTURE
AutoCAD SHX Text
RE-SECURE GUARDRAIL POSTS (3 TOTAL)
AutoCAD SHX Text
INSTALL NEW COLUMN ON PIER P2, BETWEEN COLUMNS C1 AND C2
AutoCAD SHX Text
INSTALL NEW COLUMN ON PIER P4, BESIDE COLUMN C2
AutoCAD SHX Text
INSTALL NEW COLUMN ON PIER P5, BESIDE COLUMN C3
AutoCAD SHX Text
INSTALL NEW COLUMN ON PIER P13, BESIDE COLUMN C4
AutoCAD SHX Text
REPLACE MUDSILL ON PIER P4, BENEATH COLUMN C4
AutoCAD SHX Text
REPLACE MUDSILL ON PIER P7, BENEATH COLUMN C2
AutoCAD SHX Text
PILE CAP REINFORCEMENT ON PIER P6
AutoCAD SHX Text
NOTE: DESIGN SPEED IS 20 km/hr AS POSTED ON BRIDGE
AutoCAD SHX Text
5.0 TIMBER 5.1ALL TIMBER SHALL BE AS INDICATED ON THE STRUCTURAL DRAWINGS ALL TIMBER SHALL BE AS INDICATED ON THE STRUCTURAL DRAWINGS AND COMPLY WITH CAN/CSA-O86-01. 5.2ALL TIMBER TO BE ROUGH SAWN, D-FIR #2 OR BETTER UNLESS NOTED ALL TIMBER TO BE ROUGH SAWN, D-FIR #2 OR BETTER UNLESS NOTED OTHERWISE, BEARING THE GRADE STAMP OF AN AGENCY CERTIFIED BY THE CANADIAN LUMBER STANDARDS ACCREDITATION BOARD. 5.3ACQ (AMINE COPPER QUAT) OR CCA (CHROMATED COPPER ARSENATE) ACQ (AMINE COPPER QUAT) OR CCA (CHROMATED COPPER ARSENATE) PRESSURE TREATED WOOD SHALL BE USED. CUT SURFACES OF TREATED TIMBER ARE TO RECEIVE A BRUSH APPLIED COAT OF COLOURED PRESERVATIVE. WORK SHALL BE IN ACCORDANCE WITH CSA-080.15. TREATED WOOD PRODUCTS SHALL BEAR THE STAMP OF THE CANADIAN THE STAMP OF THE CANADIAN WOOD PRESERVERS BUREAU (CWPB). 5.4FASTENERS FOR USE WITH TREATED TIMBER SHALL BE HOT DIP FASTENERS FOR USE WITH TREATED TIMBER SHALL BE HOT DIP GALVANIZED IN ACCORDANCE WITH ASTM A153, CONNECTORS SHALL HAVE A G185 GALVANIZED DESIGNATION OR MEET ASTM A653. REFER TO THE PRESERVATIVE MANUFACTURER'S WRITTEN RECOMMENDATIONS.
AutoCAD SHX Text
12
AutoCAD SHX Text
13
AutoCAD SHX Text
PILE CAP REINFORCEMENT ON PIER P7
AutoCAD SHX Text
PILE CAP REINFORCEMENT ON PIER P10
AutoCAD SHX Text
7
AutoCAD SHX Text
INSTALL NEW COLUMN ON PIER P9, BESIDE COLUMN C3
AutoCAD SHX Text
5.0 MECHANICAL AND ADHESIVE ANCHORS 1.ALL ANCHORS ARE TO BE INSTALLED IN STRICT ACCORDANCE WITH THE ALL ANCHORS ARE TO BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S WRITTEN INSTRUCTIONS. 2.UNLESS NOTED OTHERWISE ADHESIVE ANCHORS SHALL BE HILTI 'HAS-E' OR UNLESS NOTED OTHERWISE ADHESIVE ANCHORS SHALL BE HILTI 'HAS-E' OR 'HIT-Z' ROD. 3.INSTALLERS OF HILTI PRODUCTS SHALL HAVE RECEIVED TRAINING BY HILTI INSTALLERS OF HILTI PRODUCTS SHALL HAVE RECEIVED TRAINING BY HILTI (CANADA) CORP. IN THE USE OF THE SPECIFIED PRODUCTS. THE GENERAL CONTRACTOR SHALL PROVIDE THE DESIGN ENGINEER WITH A LETTER STATING THAT THIS TRAINING HAS BEEN COMPLETED.
AutoCAD SHX Text
NOTE:STRUCTURE HAS NOT BEEN SURVEYED. DRAWINGS ARE STRUCTURE HAS NOT BEEN SURVEYED. DRAWINGS ARE BASED ON APPROXIMATE MEASUREMENTS. CONTRACTOR SHALL CONFIRM DIMENSIONS PRIOR TO INSTALLATION.
AutoCAD SHX Text
PROJECT No.
AutoCAD SHX Text
ENGINEERS SEAL
AutoCAD SHX Text
No.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
ISSUED FOR
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DESIGN REVIEW
AutoCAD SHX Text
DRAFTED
AutoCAD SHX Text
DRAFTING REVIEW
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REV
AutoCAD SHX Text
DRAWING No.
AutoCAD SHX Text
YYYY.MM.DD
AutoCAD SHX Text
Copyright reserved. This drawing remains the exclusive property of Herold Engineering Limited and may not be reused or reproduced without written consent of Herold Engineering Limited.
AutoCAD SHX Text
3701 Shenton Rd, Nanaimo, BC V9T 2H1 Tel: 250-751-8558 Fax: 250-751-8559 Email: [email protected]
AutoCAD SHX Text
Consulting Engineers
AutoCAD SHX Text
0017-283
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
2015/10/13
AutoCAD SHX Text
EML
AutoCAD SHX Text
TMW
AutoCAD SHX Text
EML/TMW
AutoCAD SHX Text
SJS
AutoCAD SHX Text
C
AutoCAD SHX Text
1 of 5
AutoCAD SHX Text
A
AutoCAD SHX Text
2015.07.23
AutoCAD SHX Text
CLIENT REVIEW
AutoCAD SHX Text
B
AutoCAD SHX Text
2015.09.16
AutoCAD SHX Text
TENDER
AutoCAD SHX Text
C
AutoCAD SHX Text
2015.10.13
AutoCAD SHX Text
TENDER
AutoCAD SHX Text
BRIDGE LOCATION
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
C
Page 3: Port Way 2015 Trestle Repairs and Upgrades Addendum 4.pdf · 6.0 welding inspections 6.1 all inspections shall be performed by a company certified to all inspections shall be performed

©

ENGINEERING LIMITEDHEROLD

PO

RT

W

AY

T

RE

ST

LE

2

01

5 R

EP

AIR

S A

ND

U

PG

RA

DE

S

PO

RT

O

F N

AN

AIM

O A

SS

EM

BL

Y W

HA

RF

NA

NA

IM

O, B

C

CIT

Y O

F N

AN

AIM

O

GENERAL

ARRANGEMENT

S02

NOT FORCONSTRUCTIONISSUED FOR TENDER

AutoCAD SHX Text
P1
AutoCAD SHX Text
P2
AutoCAD SHX Text
P3
AutoCAD SHX Text
P4
AutoCAD SHX Text
P5
AutoCAD SHX Text
P6
AutoCAD SHX Text
P7
AutoCAD SHX Text
P8
AutoCAD SHX Text
P9
AutoCAD SHX Text
P10
AutoCAD SHX Text
P11
AutoCAD SHX Text
P12
AutoCAD SHX Text
P13
AutoCAD SHX Text
P14
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
1:150
AutoCAD SHX Text
APPROXIMATE
AutoCAD SHX Text
WEST ABUTMENT
AutoCAD SHX Text
EAST ABUTMENT
AutoCAD SHX Text
SOUTH ELEVATION
AutoCAD SHX Text
1:150
AutoCAD SHX Text
A
AutoCAD SHX Text
S04
AutoCAD SHX Text
B
AutoCAD SHX Text
S04
AutoCAD SHX Text
C
AutoCAD SHX Text
S04
AutoCAD SHX Text
D
AutoCAD SHX Text
S03
AutoCAD SHX Text
E
AutoCAD SHX Text
S03
AutoCAD SHX Text
F
AutoCAD SHX Text
S04
AutoCAD SHX Text
H
AutoCAD SHX Text
S04
AutoCAD SHX Text
G
AutoCAD SHX Text
S03
AutoCAD SHX Text
APPROXIMATE LOCATION OF 3 GUARDRAIL POSTS TO BE RE-SECURED. REMOVE AND REPLACE CONNECTION HARDWARE IN KIND.
AutoCAD SHX Text
NOTE:STRUCTURE HAS NOT BEEN SURVEYED. DRAWINGS ARE STRUCTURE HAS NOT BEEN SURVEYED. DRAWINGS ARE BASED ON APPROXIMATE MEASUREMENTS. CONTRACTOR SHALL CONFIRM DIMENSIONS PRIOR TO INSTALLATION.
AutoCAD SHX Text
PROJECT No.
AutoCAD SHX Text
ENGINEERS SEAL
AutoCAD SHX Text
No.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
ISSUED FOR
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DESIGN REVIEW
AutoCAD SHX Text
DRAFTED
AutoCAD SHX Text
DRAFTING REVIEW
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REV
AutoCAD SHX Text
DRAWING No.
AutoCAD SHX Text
YYYY.MM.DD
AutoCAD SHX Text
Copyright reserved. This drawing remains the exclusive property of Herold Engineering Limited and may not be reused or reproduced without written consent of Herold Engineering Limited.
AutoCAD SHX Text
3701 Shenton Rd, Nanaimo, BC V9T 2H1 Tel: 250-751-8558 Fax: 250-751-8559 Email: [email protected]
AutoCAD SHX Text
Consulting Engineers
AutoCAD SHX Text
0017-283
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
2015/10/13
AutoCAD SHX Text
EML
AutoCAD SHX Text
TMW
AutoCAD SHX Text
EML/TMW
AutoCAD SHX Text
SJS
AutoCAD SHX Text
C
AutoCAD SHX Text
2 of 5
AutoCAD SHX Text
A
AutoCAD SHX Text
2015.07.23
AutoCAD SHX Text
CLIENT REVIEW
AutoCAD SHX Text
B
AutoCAD SHX Text
2015.09.16
AutoCAD SHX Text
TENDER
AutoCAD SHX Text
C
AutoCAD SHX Text
2015.10.13
AutoCAD SHX Text
TENDER
AutoCAD SHX Text
C
AutoCAD SHX Text
C
Page 4: Port Way 2015 Trestle Repairs and Upgrades Addendum 4.pdf · 6.0 welding inspections 6.1 all inspections shall be performed by a company certified to all inspections shall be performed

©

ENGINEERING LIMITEDHEROLD

PO

RT

W

AY

T

RE

ST

LE

2

01

5 R

EP

AIR

S A

ND

U

PG

RA

DE

S

PO

RT

O

F N

AN

AIM

O A

SS

EM

BL

Y W

HA

RF

NA

NA

IM

O, B

C

CIT

Y O

F N

AN

AIM

O

PILE CAP

REINFORCEMENT

S03

NOT FORCONSTRUCTIONISSUED FOR TENDER

AutoCAD SHX Text
E
AutoCAD SHX Text
S02
AutoCAD SHX Text
PIER P7 - PILE CAP REPAIRS
AutoCAD SHX Text
1:50
AutoCAD SHX Text
1
AutoCAD SHX Text
-
AutoCAD SHX Text
SEE DETAIL
AutoCAD SHX Text
TYP
AutoCAD SHX Text
D
AutoCAD SHX Text
S02
AutoCAD SHX Text
PIER P6 - PILE CAP REPAIRS
AutoCAD SHX Text
1:50
AutoCAD SHX Text
2
AutoCAD SHX Text
-
AutoCAD SHX Text
SEE DETAIL
AutoCAD SHX Text
~
AutoCAD SHX Text
1
AutoCAD SHX Text
-
AutoCAD SHX Text
SEE DETAIL
AutoCAD SHX Text
TYP
AutoCAD SHX Text
G
AutoCAD SHX Text
S02
AutoCAD SHX Text
PIER P10 - PILE CAP REPAIRS
AutoCAD SHX Text
1:50
AutoCAD SHX Text
1
AutoCAD SHX Text
-
AutoCAD SHX Text
SEE DETAIL
AutoCAD SHX Text
TYP
AutoCAD SHX Text
MUDSILL REPAIRS REQUIRED. REFER TO S05
AutoCAD SHX Text
8 - 25 DIA A307 BOLTS. ARRANGE TO AVOID EXISTING BOLTS, TYP.
AutoCAD SHX Text
TRIM CROSS-BRACING END TO AVOID CONFLICT WITH C310x31
AutoCAD SHX Text
16 THK TOP PLATE
AutoCAD SHX Text
C310x31 EA. SIDE
AutoCAD SHX Text
RESECURE EXISTING CROSS-BRACING TO ADJACENT COLUMN
AutoCAD SHX Text
B
AutoCAD SHX Text
-
AutoCAD SHX Text
SECTION
AutoCAD SHX Text
1:20
AutoCAD SHX Text
EXISTING BRIDGE STRINGER
AutoCAD SHX Text
STEEL SHIMS
AutoCAD SHX Text
C310x31 EA. SIDE C/W 12 - 25 DIA A307 BOLTS AS SHOWN
AutoCAD SHX Text
16 THK TOP PLATE
AutoCAD SHX Text
EXISTING BRIDGE STRINGER
AutoCAD SHX Text
C310x31 EA. SIDE
AutoCAD SHX Text
B
AutoCAD SHX Text
-
AutoCAD SHX Text
2
AutoCAD SHX Text
-
AutoCAD SHX Text
TYPICAL CAP REPAIR DETAIL - CLADDING ON EAST-WEST COLUMN FACES
AutoCAD SHX Text
1:20
AutoCAD SHX Text
A
AutoCAD SHX Text
-
AutoCAD SHX Text
1
AutoCAD SHX Text
-
AutoCAD SHX Text
TYPICAL CAP REPAIR DETAIL - CLADDING ON NORTH-SOUTH COLUMN FACES
AutoCAD SHX Text
1:20
AutoCAD SHX Text
A
AutoCAD SHX Text
-
AutoCAD SHX Text
SECTION
AutoCAD SHX Text
1:20
AutoCAD SHX Text
EXISTING BRIDGE STRINGER
AutoCAD SHX Text
STEEL SHIMS
AutoCAD SHX Text
C310x31 EA. SIDE C/W 12 - 25 DIA A307 BOLTS AS SHOWN
AutoCAD SHX Text
16 THK TOP PLATE
AutoCAD SHX Text
EXISTING BRIDGE STRINGER
AutoCAD SHX Text
C310x31 EA. SIDE
AutoCAD SHX Text
8 - 25 DIA A307 BOLTS. ARRANGE TO AVOID EXISTING BOLTS, TYP.
AutoCAD SHX Text
NOTE:STRUCTURE HAS NOT BEEN SURVEYED. DRAWINGS ARE STRUCTURE HAS NOT BEEN SURVEYED. DRAWINGS ARE BASED ON APPROXIMATE MEASUREMENTS. CONTRACTOR SHALL CONFIRM DIMENSIONS PRIOR TO INSTALLATION.
AutoCAD SHX Text
PROJECT No.
AutoCAD SHX Text
ENGINEERS SEAL
AutoCAD SHX Text
No.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
ISSUED FOR
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DESIGN REVIEW
AutoCAD SHX Text
DRAFTED
AutoCAD SHX Text
DRAFTING REVIEW
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REV
AutoCAD SHX Text
DRAWING No.
AutoCAD SHX Text
YYYY.MM.DD
AutoCAD SHX Text
Copyright reserved. This drawing remains the exclusive property of Herold Engineering Limited and may not be reused or reproduced without written consent of Herold Engineering Limited.
AutoCAD SHX Text
3701 Shenton Rd, Nanaimo, BC V9T 2H1 Tel: 250-751-8558 Fax: 250-751-8559 Email: [email protected]
AutoCAD SHX Text
Consulting Engineers
AutoCAD SHX Text
0017-283
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
2015/10/13
AutoCAD SHX Text
EML
AutoCAD SHX Text
TMW
AutoCAD SHX Text
EML/TMW
AutoCAD SHX Text
SJS
AutoCAD SHX Text
C
AutoCAD SHX Text
3 of 5
AutoCAD SHX Text
A
AutoCAD SHX Text
2015.07.23
AutoCAD SHX Text
CLIENT REVIEW
AutoCAD SHX Text
B
AutoCAD SHX Text
2015.09.16
AutoCAD SHX Text
TENDER
AutoCAD SHX Text
C
AutoCAD SHX Text
2015.10.13
AutoCAD SHX Text
TENDER
AutoCAD SHX Text
C
Page 5: Port Way 2015 Trestle Repairs and Upgrades Addendum 4.pdf · 6.0 welding inspections 6.1 all inspections shall be performed by a company certified to all inspections shall be performed

©

ENGINEERING LIMITEDHEROLD

PO

RT

W

AY

T

RE

ST

LE

2

01

5 R

EP

AIR

S A

ND

U

PG

RA

DE

S

PO

RT

O

F N

AN

AIM

O A

SS

EM

BL

Y W

HA

RF

NA

NA

IM

O, B

C

CIT

Y O

F N

AN

AIM

O

COLUMN REPAIRS

S04

NOT FORCONSTRUCTIONISSUED FOR TENDER

AutoCAD SHX Text
NOTE:STRUCTURE HAS NOT BEEN SURVEYED. DRAWINGS ARE STRUCTURE HAS NOT BEEN SURVEYED. DRAWINGS ARE BASED ON APPROXIMATE MEASUREMENTS. CONTRACTOR SHALL CONFIRM DIMENSIONS PRIOR TO INSTALLATION.
AutoCAD SHX Text
A
AutoCAD SHX Text
S02
AutoCAD SHX Text
PIER P2 - NEW COLUMN INSTALLATION
AutoCAD SHX Text
1:50
AutoCAD SHX Text
NEW 305x305 TIMBER PILE BETWEEN C1 AND C2
AutoCAD SHX Text
C1
AutoCAD SHX Text
C2
AutoCAD SHX Text
C3
AutoCAD SHX Text
C4
AutoCAD SHX Text
C5
AutoCAD SHX Text
C6
AutoCAD SHX Text
C7
AutoCAD SHX Text
B
AutoCAD SHX Text
S02
AutoCAD SHX Text
PIER P4 - NEW COLUMN INSTALLATION
AutoCAD SHX Text
1:50
AutoCAD SHX Text
NEW 305x305 TIMBER PILE NEXT TO C2, SPACED TO ALLOW FOR ADEQUATE INSTALLATION CLEARANCE OF TOP CONNECTION.
AutoCAD SHX Text
C1
AutoCAD SHX Text
C2
AutoCAD SHX Text
C3
AutoCAD SHX Text
C4
AutoCAD SHX Text
C5
AutoCAD SHX Text
SECURE NEW COLUMN TO EXISTING LATERAL BRACING WITH 25 DIA A307 BOLTS C/W WASHER, TYP.
AutoCAD SHX Text
SECURE NEW COLUMN TO EXISTING LATERAL BRACES WITH 25 DIA A307 BOLTS C/W WASHER, TYP.
AutoCAD SHX Text
MUDSILL REPAIRS REQUIRED BENEATH C4. REFER TO S05
AutoCAD SHX Text
COLUMN BASE CONNECTION TO BE INSTALLED AS PER TYPICAL EXISTING CONNECTION AND APPROVED BY ENGINEER.
AutoCAD SHX Text
COLUMN TOP CONNECTION TO BE INSTALLED AS PER TYPICAL EXISTING CONNECTION AND APPROVED BY ENGINEER.
AutoCAD SHX Text
COLUMN BASE CONNECTION TO BE INSTALLED AS PER TYPICAL EXISTING CONNECTION AND APPROVED BY ENGINEER.
AutoCAD SHX Text
COLUMN TOP CONNECTION TO BE INSTALLED AS PER TYPICAL EXISTING CONNECTION AND APPROVED BY ENGINEER.
AutoCAD SHX Text
C
AutoCAD SHX Text
S02
AutoCAD SHX Text
PIER P5 - NEW COLUMN INSTALLATION
AutoCAD SHX Text
1:50
AutoCAD SHX Text
C1
AutoCAD SHX Text
C3
AutoCAD SHX Text
C4
AutoCAD SHX Text
C2
AutoCAD SHX Text
C5
AutoCAD SHX Text
C6
AutoCAD SHX Text
C7
AutoCAD SHX Text
NEW 305x305 TIMBER PILE NEXT TO C3
AutoCAD SHX Text
SECURE NEW COLUMN TO EXISTING LATERAL BRACING WITH 25 DIA A307 BOLTS C/W WASHER, TYP.
AutoCAD SHX Text
COLUMN BASE CONNECTION TO BE INSTALLED AS PER TYPICAL EXISTING CONNECTION AND APPROVED BY ENGINEER.
AutoCAD SHX Text
COLUMN TOP CONNECTION TO BE INSTALLED AS PER TYPICAL EXISTING CONNECTION AND APPROVED BY ENGINEER.
AutoCAD SHX Text
F
AutoCAD SHX Text
S02
AutoCAD SHX Text
PIER P9 - NEW COLUMN INSTALLATION
AutoCAD SHX Text
1:50
AutoCAD SHX Text
COLUMN TOP CONNECTION TO BE INSTALLED AS PER TYPICAL EXISTING CONNECTION AND APPROVED BY ENGINEER.
AutoCAD SHX Text
H
AutoCAD SHX Text
S02
AutoCAD SHX Text
PIER P13 - NEW COLUMN INSTALLATION
AutoCAD SHX Text
1:50
AutoCAD SHX Text
C1
AutoCAD SHX Text
C3
AutoCAD SHX Text
C4
AutoCAD SHX Text
C2
AutoCAD SHX Text
C5
AutoCAD SHX Text
C6
AutoCAD SHX Text
C7
AutoCAD SHX Text
NEW 305x305 TIMBER PILE NEXT TO C4
AutoCAD SHX Text
SECURE NEW COLUMN TO EXISTING LATERAL BRACING WITH 25 DIA A307 BOLTS C/W WASHER, TYP.
AutoCAD SHX Text
COLUMN BASE CONNECTION TO BE INSTALLED AS PER TYPICAL EXISTING CONNECTION AND APPROVED BY ENGINEER.
AutoCAD SHX Text
COLUMN TOP CONNECTION TO BE INSTALLED AS PER TYPICAL EXISTING CONNECTION AND APPROVED BY ENGINEER.
AutoCAD SHX Text
NEW 305x305 TIMBER PILE NEXT TO C3, SPACED TO ALLOW FOR ADEQUATE INSTALLATION CLEARANCE OF TOP CONNECTION.
AutoCAD SHX Text
C1
AutoCAD SHX Text
C2
AutoCAD SHX Text
C3
AutoCAD SHX Text
C4
AutoCAD SHX Text
C5
AutoCAD SHX Text
SECURE NEW COLUMN TO EXISTING LATERAL BRACING WITH 25 DIA A307 BOLTS C/W WASHER, TYP.
AutoCAD SHX Text
COLUMN BASE CONNECTION TO BE INSTALLED AS PER TYPICAL EXISTING CONNECTION AND APPROVED BY ENGINEER.
AutoCAD SHX Text
COLUMN TOP CONNECTION TO BE INSTALLED AS PER TYPICAL EXISTING CONNECTION (CLADDING ON EAST-WEST SIDES) AND APPROVED BY ENGINEER.
AutoCAD SHX Text
WHERE APPLICABLE, PROVIDE TEMPORARY SHORING DURING COLUMN INSTALLATION AND MUDSILL REPAIR AS SHOWN. TEMPORARY SHORING TO BE CAPABLE OF SUPPORTING THE FOLLOWING LOADS: UNFACTORED DEAD LOAD = 200 kN UNFACTORED LIVE LOAD = 45 kN
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
TEMPORARY SHORING REQUIREMENT DETAILS
AutoCAD SHX Text
1:50
AutoCAD SHX Text
PROJECT No.
AutoCAD SHX Text
ENGINEERS SEAL
AutoCAD SHX Text
No.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
ISSUED FOR
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DESIGN REVIEW
AutoCAD SHX Text
DRAFTED
AutoCAD SHX Text
DRAFTING REVIEW
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REV
AutoCAD SHX Text
DRAWING No.
AutoCAD SHX Text
YYYY.MM.DD
AutoCAD SHX Text
Copyright reserved. This drawing remains the exclusive property of Herold Engineering Limited and may not be reused or reproduced without written consent of Herold Engineering Limited.
AutoCAD SHX Text
3701 Shenton Rd, Nanaimo, BC V9T 2H1 Tel: 250-751-8558 Fax: 250-751-8559 Email: [email protected]
AutoCAD SHX Text
Consulting Engineers
AutoCAD SHX Text
0017-283
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
2015/10/13
AutoCAD SHX Text
EML
AutoCAD SHX Text
TMW
AutoCAD SHX Text
EML/TMW
AutoCAD SHX Text
SJS
AutoCAD SHX Text
C
AutoCAD SHX Text
4 of 5
AutoCAD SHX Text
A
AutoCAD SHX Text
2015.07.23
AutoCAD SHX Text
CLIENT REVIEW
AutoCAD SHX Text
B
AutoCAD SHX Text
2015.09.16
AutoCAD SHX Text
TENDER
AutoCAD SHX Text
C
AutoCAD SHX Text
2015.10.13
AutoCAD SHX Text
TENDER
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
C
Page 6: Port Way 2015 Trestle Repairs and Upgrades Addendum 4.pdf · 6.0 welding inspections 6.1 all inspections shall be performed by a company certified to all inspections shall be performed

©

ENGINEERING LIMITEDHEROLD

PO

RT

W

AY

T

RE

ST

LE

2

01

5 R

EP

AIR

S A

ND

U

PG

RA

DE

S

PO

RT

O

F N

AN

AIM

O A

SS

EM

BL

Y W

HA

RF

NA

NA

IM

O, B

C

CIT

Y O

F N

AN

AIM

O

TYPICAL PIER

AND MUDSILL

REPAIR DETAILS

S05

NOT FORCONSTRUCTIONISSUED FOR TENDER

AutoCAD SHX Text
102x254 TIMBER LONGITUDINAL CROSS BRACE, SEE PLAN FOR LOCATIONS
AutoCAD SHX Text
305x305 TIMBER COLUMN
AutoCAD SHX Text
102x254 TIMBER LATERAL CROSS BRACE
AutoCAD SHX Text
102x254 TIMBER HORIZ. BRACE
AutoCAD SHX Text
200x356 TIMBER SLEEPER
AutoCAD SHX Text
CONCRETE FOOTING
AutoCAD SHX Text
TYPICAL EXISTING PIER AND MUDSILL REPAIR DETAILS
AutoCAD SHX Text
1:25
AutoCAD SHX Text
CUT OUT ROTTEN TIMBER MUDSILL AND REPLACE WITH CREOSOTE TREATED TIMBER TO MATCH
AutoCAD SHX Text
A
AutoCAD SHX Text
-
AutoCAD SHX Text
DEPTH
AutoCAD SHX Text
DEPTH
AutoCAD SHX Text
DEPTH
AutoCAD SHX Text
DEPTH
AutoCAD SHX Text
DEPTH
AutoCAD SHX Text
DEPTH
AutoCAD SHX Text
DEPTH
AutoCAD SHX Text
DEPTH
AutoCAD SHX Text
DEPTH
AutoCAD SHX Text
DEPTH
AutoCAD SHX Text
DEPTH
AutoCAD SHX Text
MUDSILL EXPECTED 200x356
AutoCAD SHX Text
550
AutoCAD SHX Text
550
AutoCAD SHX Text
550
AutoCAD SHX Text
CONCRETE FOOTING
AutoCAD SHX Text
A
AutoCAD SHX Text
-
AutoCAD SHX Text
SECTION
AutoCAD SHX Text
1:25
AutoCAD SHX Text
1400
AutoCAD SHX Text
1400
AutoCAD SHX Text
1400
AutoCAD SHX Text
NOTE:GENERAL LAYOUT SHOWN ONLY. DIMENSIONS AND GENERAL LAYOUT SHOWN ONLY. DIMENSIONS AND DETAILS VARY BETWEEN PIERS.
AutoCAD SHX Text
NOTE:STRUCTURE HAS NOT BEEN SURVEYED. DRAWINGS ARE STRUCTURE HAS NOT BEEN SURVEYED. DRAWINGS ARE BASED ON APPROXIMATE MEASUREMENTS. CONTRACTOR SHALL CONFIRM DIMENSIONS PRIOR TO INSTALLATION.
AutoCAD SHX Text
PROJECT No.
AutoCAD SHX Text
ENGINEERS SEAL
AutoCAD SHX Text
No.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
ISSUED FOR
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DESIGN REVIEW
AutoCAD SHX Text
DRAFTED
AutoCAD SHX Text
DRAFTING REVIEW
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REV
AutoCAD SHX Text
DRAWING No.
AutoCAD SHX Text
YYYY.MM.DD
AutoCAD SHX Text
Copyright reserved. This drawing remains the exclusive property of Herold Engineering Limited and may not be reused or reproduced without written consent of Herold Engineering Limited.
AutoCAD SHX Text
3701 Shenton Rd, Nanaimo, BC V9T 2H1 Tel: 250-751-8558 Fax: 250-751-8559 Email: [email protected]
AutoCAD SHX Text
Consulting Engineers
AutoCAD SHX Text
0017-283
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
2015/10/13
AutoCAD SHX Text
EML
AutoCAD SHX Text
TMW
AutoCAD SHX Text
EML/TMW
AutoCAD SHX Text
SJS
AutoCAD SHX Text
C
AutoCAD SHX Text
5 of 5
AutoCAD SHX Text
A
AutoCAD SHX Text
2015.07.23
AutoCAD SHX Text
CLIENT REVIEW
AutoCAD SHX Text
B
AutoCAD SHX Text
2015.09.16
AutoCAD SHX Text
TENDER
AutoCAD SHX Text
C
AutoCAD SHX Text
2015.10.13
AutoCAD SHX Text
TENDER
AutoCAD SHX Text
C
Page 7: Port Way 2015 Trestle Repairs and Upgrades Addendum 4.pdf · 6.0 welding inspections 6.1 all inspections shall be performed by a company certified to all inspections shall be performed

End of Addendum 4