PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project –...

78
© Port of Townsville Limited A.C.N. 130 077 673 Document Type Plan Document No. POT 2160 Only electronic copy on server is controlled. To ensure paper copy is current, check revision number against entry in Qudos ‐ Master Document List Revision 2 Date 29/01/2020 Page Page 1 of 78 POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port Expansion Channel Upgrade Project Construction Vessel Traffic Management Plan January 2020 PORT OF TOWNSVILLE LIMITED PORT EXPANSION PROJECT CHANNEL UPGRADE

Transcript of PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project –...

Page 1: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 1 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

   

Townsville Port Expansion Channel Upgrade Project 

Construction Vessel Traffic Management Plan 

January 2020

PORT OF TOWNSVILLE LIMITED PORT EXPANSION PROJECT CHANNEL UPGRADE

Page 2: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port
Page 3: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 3 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

GLOSSARY  AEIS  Townsville  Port  Expansion  Project:  Additional  Information  to  the 

Environmental Impact Statement ‐ Final (June 2017). 

AMSA  Australian Maritime Safety Authority (Commonwealth Government). 

Berth  Any  dock,  pier,  jetty,  quay,  wharf,  marine  terminal  or  similar  structure, (whether floating or not) connected to the shore, at which a ship may tie up, not  including  floating  plant,  jack‐up  barge,  or  other  similar  structure  not connected to the shore 

BHD  Backhoe Dredge 

Bunkers  Fuel such as oil stored in tanks and used to run vessel/ship's machinery 

Bunkering  The act of taking in fuel on board a vessel/ship 

Capital Dredge Material 

Material (clays, silts and sands) derived from capital dredging 

Capital Dredging  As defined in the NAGD, being 'dredging for navigation, to enlarge or deepen existing channels and port areas or to create new ones' 

CEMP  Construction Environmental Management Plan 

CU Project  Channel Upgrade Project 

Coastal waters  The coastal waters of the State of Queensland, including other waters within the limits of the State that are subject to the ebb and flow of the tide 

CSSPPP  Construction Ship‐Sourced Pollution Prevention Plan 

CVTMP  Construction Vessel Traffic Management Plan 

DES  Queensland Government Department of Environment and Science  

DMP  Dredge Management Plan 

Domestic Commercial Vessel 

Vessels  that  are  used  in  connection  with  a  commercial,  governmental  or research activity. A vessel is not a domestic commercial vessel if it is: 

a regulated Australian vessel, 

a foreign vessel,  

a defence vessel; or  

owned by a primary or secondary school or certain other community groups. 

DTMR  Queensland Government Department of Transport and Main Roads 

EIS  PEP Environmental Impact Statement 

EMS  Environmental Management System 

Emergency  Any  circumstance which  causes,  or  gives  rise  to  a  risk  of,  serious  injury  or damage to a person, property or the environment 

Extreme Weather Events 

Includes but not limited to periods of high rainfall, strong winds, very high tides and cyclones 

IALA  International  Association  of  Marine  Aids  to  Navigation  and  Lighthouse Authorities (formerly International Association of Lighthouse Authorities). 

Page 4: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 4 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

IMO  International Maritime Organisation 

Listed dolphin Species 

Australian  snubfin  dolphin  (Orcaella  heinsohm)  and  Indo‐Pacific  humpback dolphin (Sousa chinensis) 

Listed Turtle Species 

Green  turtle  (Chelonia  mydas),  hawksbill  turtle  (Eretmochelys  imbricate); flatback turtle (Natator depressus);  loggerhead turtle (Caretta caretta); olive ridley  turtle  (Lepidochelys  olivecee);  and  leatherback  turtle  (Dermochelys coriacea) 

Maintenance Dredging 

Dredging to ensure that channels, berths or other port areas are maintained at their designed dimensions 

Marine Megafauna 

Listed turtle species, Dugong (Dugong dugon),  listed dolphin species, and all other Cetaceans 

MARPOL  International Convention for the Prevention of Pollution from Ships 

Master  A person having command or charge of the vessel 

Mechanical Dredge 

A dredger that removes sediments via mechanical methods.  Can include grab dredges (clamshells and buckets) or backhoe dredges. 

MEMP  Marine Environmental Management Plan 

MSQ  Maritime Safety Queensland (Queensland Government) 

National Law  Commonwealth Marine Safety (Domestic Commercial Vessel) National Law Act 2012  

NtoM  Notice to Mariners, issued by the RHM 

PEP  Port Expansion Project  

POLREP  Marine Pollution Report 

POTL  Port of Townsville Limited 

QPWS  Queensland Parks and Wildlife Service (Queensland Government) 

RHM  Regional Harbour Master 

SDS  Safety Data Sheet 

Sewage treatment system 

A system, installed on a ship, for treating sewage that:  

Is able to reduce the levels of sewage quality characteristics in sewage to not more than the levels for treated sewage; and  

Conforms with the standard prescribed under a regulation  

Note:  A  sewage  treatment  system  that  has  an  IMO  type  approval  and  the relevant supporting documentation is deemed to comply with the Queensland requirements for a Grade A sewage treatment system 

Site  The new reclamation area (Lot 794 on SP308904) and the northern extent of the East Port Area at the Port of Townsville (Lot 791 on EP2348) 

SMS  Safety Management System, for a vessel. 

SROCP  Short Range Operators Certificate of Proficiency (Marine Radio Licence) 

TOMPA  Queensland Transport Operations (Marine Pollution) Regulation 2008 

Page 5: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 5 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

TSHD  Trailer Suction Hopper Dredge – a self‐propelled ship with a hold (hopper), and a dredging mechanism comprised of suction pipes connected to draghead(s), by which it can fill the hopper with dredge material 

Vessel  A Ship, as defined under the TOMPA and a Domestic Commercial Vessel, as defined under the “National Law” 

VTS  Vessel  Traffic  Service  –  marine  traffic  monitoring  system  operating  within Queensland ports, which may utilise radar, CCTV, AIS (automatic identification system) and VHF to monitor and to communicate with vessels within a pilotage area 

   

Page 6: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 6 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

TABLE OF CONTENTS  

1  Introduction .......................................................................................................................... 9 1.1  Scope ................................................................................................................................................ 9 

1.2  Purpose ............................................................................................................................................. 2 

1.3  Legislative Requirements ................................................................................................................. 3 

1.4  Structure of the CVTMP ................................................................................................................... 4 

2  Project Description and Vessels/Marine Plant ....................................................................... 5 2.1  Marine Construction Activities ......................................................................................................... 7 

2.2  Description of Vessels & Marine Plant ............................................................................................. 8 

3  Organisational Structure & Responsibilites ......................................................................... 10 

4  CVTMP Management Measures .......................................................................................... 15 4.1  Potential Vessel Interactions .......................................................................................................... 15 

4.2  Works Exclusion Zone ..................................................................................................................... 15 

4.3  Vessel Management Measures: ..................................................................................................... 16 

4.4  Hydrographic Survey works ............................................................................................................ 19 

4.5  Townsville Port Procedures ............................................................................................................ 19 

4.6  CVTMP Implementation ................................................................................................................. 19 

4.7  Communication .............................................................................................................................. 19 

4.8  Project Management reporting ...................................................................................................... 20 

4.9  Emergency Response Plans ............................................................................................................ 21 

4.9.1  Marine Incidents/Emergencies ............................................................................................ 21 

4.9.2  Marine incident reporting — Maritime Safety Queensland (MSQ) ..................................... 27 

4.9.3  Marine incident reporting — Australian Maritime Safety Authority (AMSA) ...................... 27 

4.10  Cyclone/Severe Weather Contingency Plan ................................................................................... 28 

5  Construction Ship Sourced Pollution Prevention Plan (CSSPPP) ........................................... 30 5.1  Purpose ........................................................................................................................................... 30 

5.2  Legislative Requirements ............................................................................................................... 30 

5.3  CSSPPP Pollution Management Measures ..................................................................................... 31 

5.3.1  Potential Pollution Sources .................................................................................................. 31 

5.3.2  Pollution Prevention Management Measures ..................................................................... 31 

5.3.3  Oil & Fuels ............................................................................................................................ 32 

5.3.4  Chemical and Chemical Residues ......................................................................................... 35 

5.3.5  Sewage ................................................................................................................................. 38 

5.3.6  Garbage ................................................................................................................................ 40 

5.4  Pollution Event Monitoring & Reporting ........................................................................................ 42 

5.5  Accidental Loss/Breakaway of Equipment ..................................................................................... 43 

Page 7: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 7 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

6  Aids to Navigation Plan ....................................................................................................... 44 6.1  Temporary Aids to Navigation ........................................................................................................ 44 

6.1.1  Construction Zone Extent .................................................................................................... 44 

6.1.2  Rockwall Construction.......................................................................................................... 44 

6.2  Permanent Navigation Aids ............................................................................................................ 46 

6.2.1  Rockwall extent .................................................................................................................... 46 

6.2.2  Shipping channel/Navigation Beacons ................................................................................. 46 

7  Action Program & Management Review ............................................................................. 47 7.1  Implementation .............................................................................................................................. 47 

7.2  Site Personnel Training, Awareness & Competence ...................................................................... 47 

7.3  Environmental Non‐Conformance & Preventative/Corrective Action ........................................... 47 

7.4  Continuous Improvement .............................................................................................................. 48 

7.5  Auditing .......................................................................................................................................... 48 

7.6  Records ........................................................................................................................................... 48 

7.7  Internal Communication ................................................................................................................ 49 

7.8  Community & Stakeholder Engagement ........................................................................................ 49 

7.9  Complaints Handling ...................................................................................................................... 49 

Appendix A .................................................................................................................................. 50 Contact Information ................................................................................................................................. 50 

Appendix B ................................................................................................................................... 52 AMSA Incident Alert Form – Form 18 ....................................................................................................... 52 

Appendix C ................................................................................................................................... 54 AMSA Incident Report Form – Form 19 .................................................................................................... 54 

Appendix D .................................................................................................................................. 58 Cyclone/Severe Weather Response Procedures ...................................................................................... 58 

Appendix E ................................................................................................................................... 64 Marine Pollution Report (POLREP) – F3968 ............................................................................................. 64 

Appendix F ................................................................................................................................... 66 Environmental Incident Written Notice Form .......................................................................................... 66 

 

   

Page 8: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 8 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

 

TABLES   Table 1:  Phases of CU Project & Associated Management Plans ........................................................................ 2 Table 2: References for Development Permit for Operational Works Conditions ............................................... 3 Table 3: Proposed Dredging Methods .................................................................................................................. 8 Table 4:  CU Project Vessels and Marine Plant ..................................................................................................... 9 Table 5:  CU Project Vessel Management Measures .......................................................................................... 17 Table 6:  Port of Townsville VHF Radio Channels (from Tsv Port Procedures and Information for Shipping) ... 20 Table 7:  CU Project Marine Incident response procedures ............................................................................... 22 Table 8: Response Plan for Loss or Breakaway of Equipment ............................................................................ 43  

FIGURES   Figure 1:  Locality Plan of the Port of Townsville Limited & CU Project ............................................................... 1 Figure 2: Site Plan for CU Project Rock Wall Construction & Reclamation Activities ........................................... 5 Figure 3:  Site Plan for CU Project Capital Dredging Activities –Platypus & Sea Channels ................................... 6 Figure 4:  CU Project Organisational Chart ......................................................................................................... 11 Figure 5:  Construction zone Special Mark Buoy locations (indicative locations) .............................................. 45  

   

Page 9: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 9 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

1 INTRODUCTION 

Port of Townsville Limited  (POTL)  is a Government Owned Corporation established under  the Government Owned  Corporations  Act  1993  which  manages  the  Port  of  Townsville  (the  Port).    The  Port  is  located  on Cleveland Bay, approximately three kilometres east of the city centre in Townsville, North Queensland (Figure 1).  It is a multi‐purpose port that handles predominantly bulk and general cargo with a land and sea jurisdiction in excess of 450 km2.  The Port is situated in the Great Barrier Reef World Heritage Area, outside of the Great Barrier Reef Marine Park.    Surrounding  the Port of Townsville  is Cleveland Bay and  the City of Townsville.  Townsville  is a  long‐established township with a history of urbanisation and industrial activities in the Ross River and Ross Creek drainage system.     The  Townsville  Port  Expansion  Channel  Upgrade  Project  (CU  Project)  is  Stage  1  of  POTL’s  long‐term  Port Expansion Project (PEP).  The PEP aims to create a series of strategic assets which will address current capacity constraints and accommodate future growth in trade over a planning horizon to 2040.  It includes development of port infrastructure, namely work to “top of wharf” facilities, capital dredging; reclamation; breakwaters and revetments;  berths;  access  roads;  rail  loop;  and  trunk  services  and  utilities.    It  does  not  include  the development  of  “above  wharf”  infrastructure  such  as  terminal  pavements;  ship‐loaders  and  unloaders; product  conveyors;  storage  buildings  for  products;  rail  loaders  and  unloaders;  stacking  and  reclaiming equipment; storage tanks; and pipelines, which will be subject to separate statutory assessment and approval requirements prior to the start of their operations.    

1.1 Scope 

The CU Project  involves  the  construction of  a  reclamation area;  capital dredging and placement of  capital dredge material at the Port.  The construction activities for the CU Project will be in the existing port limits, the designated waters in which navigation is under the control of the Regional Harbour Master (RHM).  This  Construction  Vessel  Traffic  Management  Plan  (CVTMP)  documents  the  vessel  traffic  management requirements for construction vessel movements during the project, considering the interactions and potential impacts between the construction activities,  continuing port operations and other existing vessel activities both commercial and recreational.  It seeks to address potential vessel traffic and safety issues identified in relation to vessel operations associated with the CU Project, because a vessel collision, grounding or sinking can potentially result in damage to human health and/or property; in unplanned emissions or other potential adverse consequences to the marine environment; and/or risk to safety and revenue.    The CVTMP also comprises the Construction Ship Sourced Pollution Prevention Plan (CSSPPP) and the Aids to Navigation Plan. These aspects will address pollution prevent and controls to be implemented throughout the project  and  the  plan  identifies  the  approach  to  be  implemented  to  protect  the  construction  works  from navigational issues associated with small watercraft movement.  This CVTMP is only one of several management plans being implemented in the CU Project as listed in Table 1. The  Construction  Environmental Management  Plan  (CEMP)  and Marine  Environmental Management  Plan (MEMP) will cover environmental aspects of construction of maritime structures such as breakwaters, marine pile  driving,  or  other  land‐based  aspects  of  the  reclamation  and  non‐dredging  related  in‐water  aspects (including non‐dredging construction vessel movements).    The Dredge Management Plan  (DMP) addresses environmental matters associated with capital dredging (and associated dredge vessels).  This CVTMP is focused on the rockwall and reclamation activities only – the plan will be revised and expanded with dredging related elements and controls prior to commencement of dredging activities. 

Page 10: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 1 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

Figure 1:  Locality Plan of the Port of Townsville Limited & CU Project 

 

Page 11: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 2 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

Table 1:  Phases of CU Project & Associated Management Plans 

Phase  Management Plan  Description of Content 

Rock wall & Reclamation 

Offset Management Strategy (Reclamation) 

Outlines the offset management strategy for the construction of the rock wall 

Construction Environmental Management Plan (CEMP) 

Outlines the overview of the construction and reclamation activities and associated environmental management requirements and contingency plans for severe weather events 

Marine Environmental Management Plan (MEMP) 

Outlines the environmental management requirements for Matters of National Environmental Significance (MNES) from activities in the marine environment  

Construction Vessel Traffic Management Plan (CVTMP) 

Outlines the navigational safety and environmental requirements for all vessels during the construction activities   

Construction Ship‐Sourced Pollution Prevention Plan (CSSPPP) 

Outlines the environmental requirements to prevent pollution from vessels during the construction activities   

Inshore Dolphin Monitoring Plan  Outlines the monitoring program for the inshore dolphins 

Capital Dredging 

Offset Management Strategy (Dredging) 

Outlines the offset management strategy for the capital dredging 

Dredge Management Plan (DMP)  Outlines the overview of the capital dredging activities and associated environmental management requirements and contingency plans for severe weather events 

Updated Marine Environmental Management Plan (MEMP)  

Outlines the environmental management requirements for MNES in relation to the capital dredging activities  

Updated Construction Vessel Traffic Management Plan (CVTMP) 

Outlines the navigational safety and environmental requirements for all vessels during the capital dredging activities   

Updated Construction Ship‐Sourced Pollution Prevention Plan (CSSPPP) 

Outlines the environmental requirements to prevent pollution from vessels during the capital dredging activities   

Operations Operations Environmental Management Plan (OEMP) 

Outlines the environmental requirements for operational activities associated with the expanded future outer harbour operations 

 

1.2 Purpose 

The construction phase of the CU Project will generate vessel traffic that has the potential to impact on vessel and marine safety and obstruct the navigation of other vessels, including commercial trade vessels transiting into and out of the port.  The purpose of this CVTMP is to: 

Identify all construction related vessels and their operation/purpose in the project;  

construction vessel operator/contractor understating of regulatory requirements for operating in the development area  

manage navigational safety risk;  

maintain safe navigation and support efficient port operations;  

reduce disruption to all other vessel traffic;  

establish aids to navigation to be implemented to protect the construction site from non‐project vessels;  

Page 12: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 3 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

detail the vessel’s safety management system and method for handling emergencies to meet the requirements of applicable environmental legislation and approvals; and  

aid in achieving the requirements of both POTL and relevant regulators.    It describes vessel management measures to be implemented for monitoring and controlling vessel operations during the CU Project to achieve the following broad objectives:  

Provide practical and achievable plans for the management of construction vessel operations to preserve vessel  safety and prevent obstructing  the navigation of other marine  traffic  (such as shipping, commercial vessels, tugs, pilot boats, military vessels or recreational vessels);   

Provide POTL and regulators with a framework to confirm compliance with requirements; 

Provide a framework for the development of contractor specific vessel plans (where relevant); and  

Provide  the  community  with  evidence  that  the  management  of  construction  vessels  will  be conducted in a manner that supports safe navigation for recreation vessels.  

 

1.3 Legislative Requirements 

The PEP was the subject of an Environmental Impact Statement (EIS) and a further Additional Information to the  Environmental  Impact  Statement  (AEIS),  submitted  in  support  of  Commonwealth  and  State  project approval applications.  The  state  Co‐ordinator  General  Evaluation  Report  was  issued  in  September  2017  approving  the  PEP  and establishing the approval conditions that will be applied to the Development Permit for Operational Work – Tidal works within a coastal management district once issued.    These conditions have been incorporated into the Operational Works – Tidal Works Approval, DA0190/ SARA Ref 1905‐11091 SRA, issued on 25 June 2019.   Condition  9  of  the  SARA  1905‐11091  SRA  prescribes  conditions  relevant  to  the  development  and implementation of a CVTMP and CSSPPP, as outlined in Table 2.    

Table 2: References for Development Permit for Operational Works Conditions 

Cond. No. 

Condition Requirement 

Demonstration of how the plan addresses condition requirements and commitments made in the plan to address condition requirements 

9  Prior to the commencement of works, the proponent must inform the RHM of expected vessel types and activities.    The following plans must be developed in consultation with the RHM, and by a suitably qualified person if deemed necessary by the RHM: 

Construction vessel traffic management 

Construction ship sourced pollution prevention  Any plans must be developed to the satisfaction of the RHM.  Timing: Any plans must be in place one month prior to the commencement of each stage 

This Construction Vessel Traffic Management Plan, and its implementation, fulfils the requirements of this condition. 

Page 13: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 4 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

This CVTMP has been developed cognisant of  legislative requirements set out in Commonwealth and State Government  Acts  and  Regulations,  including  Acts  implementing  relevant  international  conventions where relevant.    Maritime Safety Queensland (MSQ) is the management authority for maritime and vessel navigational safety in  Queensland  and  publishes  port  procedures  (Port  Procedures  and  Information  for  Shipping  –  Port  of Townsville) (DTMR, 2012).  The Transport Operations (Marine Safety) Act 1994 (QLD) enables the RHM to give general directions to ship owners, ship masters, ships, other persons or matters for purposes of ensuring the safety, effectiveness and efficiency of the Queensland maritime industry.   The mandatory port procedures ensure marine safety as they relate to ship movements in the jurisdiction of the Townsville RHM, by whom they are regularly reviewed.     AMSA  is  the  National  Regulator  responsible  for  the  safety  of  domestic  commercial  vessels  and  seafarers operating  in  the  domestic  commercial  industry.  All  vessels  in  Australia  being  used  for  any  commercial, government or research activity must be compliant with Australian standards and regulations, with AMSA now the single regulator covering domestic commercial vessels.  AMSA has a lead role in promoting maritime safety, protection  of  the  marine  environment;  prevent  and  combat  ship‐sourced  pollution;  and  to  provide infrastructure to support safe navigation in Australian waters.  The following are the key legislative tools that govern the requirements for domestic commercial vessels: 

The National  Standard  for  Commercial  Vessels  (NSCV)  –  provides  standards  for  vessel  survey, construction,  equipment,  design,  operation  and  crew  competencies  for  domestic  commercial vessels; 

Marine Order 503 – Certificates of Survey; and  

Marine Order 504 – Certificate of operation and operation requirements. 

1.4 Structure of the CVTMP 

The CVTMP has been structured to address the construction vessel traffic operation requirements for the CU Project as follows:  

A  description  of  the  expected  vessels  and  marine  plant  that  will  be  used  for  CU  Project construction activities.  

A description of the roles and responsibilities for implementation of the CVTMP and CSSPPP.  

Vessel  traffic  management  measures  to  be  implemented  during  the  CU  Project  construction activities. 

Management controls for ship sourced pollution as detailed in the CSSPPP. 

A description of the aids to navigation to be implemented to protect navigational safety around the construction site. 

 Where contractors engaged for the CU Project use vessels or marine plant, as a part of their contracted work package they will be required to comply with this CVTMP/CSSPPP and will prepare specific procedures to meet the requirements of these plans.  Further, contractors will be required to also comply with any relevant state and Commonwealth Government approval permits and conditions, especially the operational requirements of POTL and the MSQ/RHM in terms of vessel movements and maritime safety.    

Page 14: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 5 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

2 PROJECT DESCRIPTION AND VESSELS/MARINE PLANT 

The CU Project primarily involves: 

Supply and haulage of marine‐grade armour rock required for rock walls and revetments at the Port;  

Creation  of  a  ~62  hectare  reclamation  area  (Figure  2)  via  the  construction  of  rock walls  and revetments forming initial settling ponds for beneficial re‐use of all capital dredge material from the channel widening works; 

Capital  dredging  works  of  approximately  3.9  million  cubic  metres  from  the  channels  using predominately a mechanical dredge, involving:  

▪ On its western side to widen the Platypus Channel (Figure 3) from 92 metres width to 180 metres (at the harbour entrance) tapering to 135 metres (at the seaward end); 

▪ On  its eastern side  to widen the Sea Channel  (Figure 3)  from 92 metres to 120 metres along its length;  

Installation of navigation aids in alignment with the new channel configuration; and  

Works may also require the installation of temporary unloading jetty structure to facilitate the reclamation works, this will be constructed only if required. 

 Figure 2: Site Plan for CU Project Rock Wall Construction & Reclamation Activities 

 

Page 15: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 6 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

Figure 3:  Site Plan for CU Project Capital Dredging Activities –Platypus & Sea Channels 

 

Page 16: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 7 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

2.1 Marine Construction Activities 

This section provides a high‐level overview of the marine construction activities associated with the CU Project.  This  is  not  intended  to  be  a  detailed  description  of  these  activities  –  the  Construction  Environmental Management  Plan  and  the  Dredge  Management  Plan  for  the  project  will  provide  detailed  methodology information.   ROCKWALL AND RECLAMATION

The CU Project will involve the construction of approximately 2.2km of rockwall on the North Eastern side of the existing port area. 

Rockwall construction will occur from the land side only, with articulated vehicles moving material into the leading area of the wall construction where bulldozers and excavators will place the rockwall material into the sea.  Construction of the rockwall will feature the following: 

Construction of the new rock wall will commence perpendicular to the existing reclamation wall with the interface being prepared by removing the existing primary armour only and retaining the existing core and secondary armour.   

The  eastern  most  wall  will  commence  first  (next  to  Ross  River),  as  this  wall  generally  fronts  the prevailing  swells  and  winds  and  will  generate  a  leeward  shelter  as  it  progresses.    In  parallel,  the construction teams will undertake the build of the western most rock wall following the same build sequencing as the Eastern rockwall. 

Heavy duty geotextile will be placed at the interface and wrapped on the inside between the new and existing walls to ensure continuity in the sedimentation control system for the new reclamation.  

Completion of rock wall works including the installation of geotextile and primary outside armour will be  completed  within  18  months.  Completion  of  the  rockwall  will  be  sequenced  in  with  the commencement of the capital dredge campaign. 

The toe lines of the rock wall will be surveyed and markers placed in the water to allow visual reference for the construction teams.   

Rock wall construction working hours will be Monday‐Sunday up to 12 hours per day dependent upon tidal ranges (may need to stand down for part of the day due to tide levels).  The site will be closed for Public Holidays and for short periods over the Easter and Christmas breaks.   

 All the capital dredge material from the project will be placed within the new reclamation area as part of land reclamation  activities.    Reclamation  activities  will  be  undertaken  24  hours  per  day,  seven  days  per  week sequenced in with the capital dredge activities.      CAPITAL DREDGING

The capital dredge campaign will  last approximately 2 ‐ 3 years and dredge approximately 3.9 million cubic metres from the channels predominantly using a mechanical backhoe dredge (BHD), with support from a trailer suction hopper dredge (TSHD) – see Table 3. At this time, the dredging program is still under development and this  CVTMP  will  be  updated  to  incorporate  details  regarding  the  capital  dredging  phase  prior  to commencement of the capital dredging campaign.      

Page 17: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 8 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

Table 3: Proposed Dredging Methods 

Proposed Dredging Method 

Location of dredging Sea bed material type  Proportion of dredging 

campaign / volume of material 

Backhoe Dredger (BHD) with barges and tugs 

 

Platypus Channel (western side) 

Stiff, very stiff to hard clays  90%  

~3.51mil m3 

Trailing Suction hopper dredger (TSHD) (small sized) 

Sea Channel (Eastern Side)  Soft sediments/clayey sands  10%  

~0.39mil m3 

Backhoe dredge (BHD): 

The BHD  is a mechanical dredger,  similar  to an excavator, which  is mounted on a barge.  It  is a  stationary dredger  anchored by  three  spud piles,  infrequently  repositioning  via  tug.    BHDs work by dredging  seabed material via the bucket at the end of the excavator arm and placing the dredged material into a hopper barge moored  alongside.    The  hopper  barges  will  be  moved  via  tug  boats  between  the  BHD  location  and  the offloading jetty. Crews will be transferred to and from the BHD barge via small vessel at the start and finish of each shift, with bunkering and stores transfer to also occur via tug boats or other small vessels. 

Trailer Suction Hopper dredge (TSHD): 

A TSHD  is  a  self‐propelled hydraulic dredger equipped with a hopper and dredging  installations  to  fill  and unload the hopper. The dredging takes place at the draghead on the seabed, which is connected to a suction pipe to fill the hopper. A typical TSHD has two sets of dragheads and pipes, one on each side of the vessel, with the  dredging  process  taking  place while  the  TSHD  is  underway  (non‐stationary).  The  trailing  speed  during dredging is typically around 1 to 2 knots. For the CU Project, once the TSHD hopper is full, it will maneuver to a temporary discharge pipeline location in the vicinity of the reclamation area where it will pump the capital dredge material into the reclamation area.  The TSHD will come alongside one of the port commercial wharves for bunkering and stores replenishment.   INSTALLATION OF NAVIGATIONAL AIDS

A key component of the CU Project works will be the installation of navigational aids. This will include: 

Installation of temporary navigational aids in and around the construction site; and  

re‐alignment  of  the  permanent  channel  marker  navigational  beacons  with  the  new  channel configuration. 

 The installation of these aids will be undertaken using approved installation techniques, incorporating piling and anchoring.  

2.2 Description of Vessels & Marine Plant 

During the CU Project, marine construction vessels and plant as detailed in Table 4 will be used for:  

Capital dredging and reclamation works;  

Construction of marine infrastructure such as revetment walls; and 

Monitoring activities.    

Page 18: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 9 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

While this provides a summary of the likely marine equipment expected to be deployed during the project, there is the potential for additional small vessels to be included in the project as required.  Where these vessels vary from the plant listed in Table 4, this CVTMP will be revised to incorporate the additional details.  Given the CU Project incorporate capital dredging activities only, it is likely that the TSHD ‘Brisbane’ will carry out maintenance dredging works of the port and its access channels prior to the capital dredging campaign commencing as part of the routine dredging program.  As per the project approvals, the maintenance dredging of the Port is not part of the CU Project and will not be subject of this CVTMP.  Table 4:  CU Project Vessels and Marine Plant 

Primary  Activity  Location  Indicative duration on site 

Capital Dredging Activities 

Large mechanical dredge  

Dredge soft marine sediments and relocate to new reclamation area 

Platypus Channel  2 – 3 years  

Small  trailer  suction dredge (TSHD) 

Dredge soft marine sediments and relocate to new reclamation area 

Sea Channels  3 months 

Construction Activities (including piling) 

3 x Hopper barges    Movement of capital dredge 

material from dredge location to reclamation area 

Capital dredging areas and new reclamation area 

2 – 3 years 

1 x Piling barge  Pile removal and driving for off loading jetty construction and navigational aids (if required). 

New reclamation area and Platypus and Sea Channel. 

3 months (may not be consecutive) 

1 x support barge  Support barge for piling works (i.e. delivery of piles) 

New reclamation area and Platypus and Sea Channel. 

3 months (may not be consecutive) 

Ancillary Vessels 

Survey Craft  Hydrographic survey  Capital dredging areas and new reclamation area 

3 – 4 years 

Personnel  Transfer vessel 

Transfer of personnel to and from the dredging platform 

Capital Dredging   2 – 3 years 

Small Tugs  Support for mechanical dredge and hopper barges; support for piling barge 

Capital dredging areas and new reclamation area 

2 – 3 years 

Work Boat(s)  Support for all craft, positioning of rockwall construction aids 

Capital dredging areas and new reclamation area 

3 – 4 years  

Small craft(s)  Monitoring activities  Capital dredging areas, new reclamation area and monitoring sites in Cleveland and Halifax Bays 

4 – 5 years  

    

Page 19: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 10 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

3 ORGANISATIONAL STRUCTURE & RESPONSIBILITES 

A clear organisational structure for the CU Project, including key responsibilities and reporting lines (Figure 4), will  be  implemented  to  achieve  the  over‐arching  objective  of  sound  operational  and  environmental management at the site with the least possible impacts on the environment.  Authorities and responsibilities for the relevant construction activities are defined and communicated in Position Descriptions and CU Project documentation. The key responsibilities and authorities are included below.  

 

Project Management 

The Project Director CU’s key responsibilities are to: 

Manage  the  CU  Project  and  its  execution,  including  providing  adequate  resources  for  vessel management requirements;  

Ensure that project responsibilities and authorities are define and communicated; 

Approve the CVTMP, the CSSPPP and all project documentation; 

Report  to  senior  POTL  management  on  the  performance  of  the  project  and operational/navigational issues; and 

  The Manager Environment CU’s key responsibilities are to: 

Ensure  that  all  relevant  licenses  /  permits  /  approvals  are  in  place  prior  to  any  works  being undertaken; 

Ensure  that  all  CU  Project  personnel,  including  contractors,  are  familiar  with  the  Safety Management Plan,  this CVTMP,  this CSSPPP,  statutory approvals and  legislative  requirements, Australian Standards and any relevant Code of Practice and/or Industry Standard and are aware of all requirements and their responsibilities; 

Review and authorise environmental procedures under the CSSPPP; 

Take  action  to  resolve  navigational  safety  or  ship  sourced  pollution  non‐conformances  and incidents; 

Report to the General Manager Infrastructure & Environment (GM I&E) on the performance of the project and technical, environmental and quality non‐conformances etc; and   

Liaise with regulators,  in coordination with the Environmental Advisors CU, including reporting navigational  or marine  based  incidents  and  complaints  to  the  relevant  regulator(s)  (AMSA  & MSQ). 

Page 20: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 11 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

Figure 4:  CU Project Organisational Chart 

POTL Board

Project Steering Committee

Chief Financial Officer

Industrial Relations

Public Relations

Finance

Chief Operating Officer

Safety

General Manager Infrastructure and 

Environment

Project Director CU

Engineering

Quantity Survey

Administration

Manager Environment CU

Environmental Advisor

Environmental Advisor

Third Party Contractors

Stockpile Management

Rockwall Construction

Dredging

Reclamation

Page 21: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 12 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

The Environmental Advisor CU’s key responsibilities are to: 

Support the CU Project Team in day‐to‐day management of environmental performance; 

Verify that this CVTMP and CSSPPP is effectively established, implemented and maintained; 

Review  compliance  with  all  environmental  legislative  requirements,  approvals,  permits  and management plans and liaise with relevant regulators; 

Conduct inspections and audits and report to the Manager Environment CU on the environmental performance and improvement opportunities; 

Conduct  compliance  monitoring  as  required  by  the  CVTMP  and  CSSPPP  ensuring  that environmental controls are adequate and materials and equipment are maintained; 

Monitor,  investigate  and  report  on  environmental  performance,  environmental  incidents, pollution and navigational safety  incidents, environmental complaints and environmental non‐conformances and ensure corrective actions are implemented within reasonable timeframes; and  

Verify that environmental non‐conformances, incidents and complaints are recorded and written reports provided and liaise with the Construction Manager to confirm the nature and adequacy of any corrective actions required.   

The Project Engineer CU’s key responsibilities are to: 

Oversee day‐to‐day the construction and reclamation activities under the direction of the Project Director CU, including providing sufficient resources to ensure the CVTMP and CSSPPP controls are implemented effectively; 

Ensure that all CU Project personnel operate in accordance with the Safety Management Plan, this CVTMP, the CSSPPP, statutory approvals and legislative requirements, Australian Standards and any relevant Code of Practice and/or Industry Standard; 

Ensure all CU Project personnel under their direction are appropriately qualified and trained; 

Provide up to date documentation for Vessel Masters and Owners including necessary field charts and other relevant documentation;  

Report  all  navigational  safety non‐conformances and  incidents  to  the Project Director CU and facilitate any investigations; 

Coordinate  the  response  to  non‐conformances,  incidents  and  complaints  through implementation of corrective actions, where necessary; and  

Must not pressure any Master to undertake any action which, in his professional judgement, may compromise the vessel, other assets or any personnel.         

 

Page 22: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 13 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

The key responsibilities of all Vessel Masters, including contractors/ sub‐contractors are to: 

The master must hold the appropriate qualification for the size and class of the vessel, including a Pilot Exemption Certificate (where required). 

Must be familiar with Townsville Harbour. and have completed the following: 

• have successfully completed a local knowledge induction with MSQ Townsville. 

• demonstrate that all crew have been inducted in the operation of basic emergency marine radio communication skills on the vessel in case of an emergency. 

Communicate the work scope to vessel;  

Ensure that all officers, crew and all other personnel onboard are aware of the relevant contents of this CVTMP and CSSPPP;  

Are at all times responsible for safety of their crews, vessels and cargo and marine environment protection;  

Manage all vessel operations and manning ensuring:  

• the vessel is appropriately and competently manned and equipped for the intended work scope;  

• A common working language is used on the vessel;  

• An overall operational plan is prepared for all anticipated onboard operations and services provided by the vessel; 

• Prepare for operational conditions for vessels (requirements for safe operation of vessels under  all  conditions,  and  any  vessel  limitations  due  to  e.g.  due  to  a  lack  of  technical redundancy, etc);  

• Ensure incidents, accidents and safety observations are recorded, assessed and handled in accordance with an established reporting system;  

• Ensure  vessel  and  other  relevant  marine  plant  is  maintained  and  a  program  of preventative maintenance is undertaken; and 

• Protection of the marine environment in all circumstances. 

Ensure an up‐to‐date copy of the CVTMP/CSSPPP is kept on board and ensure the Master, officers and crew are familiar with the relevant contents; and 

Ensure that any non‐conformances identified during any inspections associated with a charterer’s quality assurance programme are closed out in a timely manner.  

Ensure that all onshore personnel, including representatives of the base operators, are aware of the appropriate point(s) of contact on the vessel in relation to any activities being undertaken on board;  

Approve loading plans before cargo (both bulk and deck cargo) is loaded on board the vessel;  

Inspect and approve sea fastening of cargo;  

Ensure that berth to berth passage plans are prepared for each voyage; 

Ensure all applicable field charts and relevant documents are on board; and 

Report incidents and non‐conformances to the Project Director CU and VTS.   The Master always has the authority to stop any operation which they consider a threat to the safety of the vessel, other assets or any personnel.  Other pressures must not interfere with their professional judgement and they must inform any relevant parties of conflicts of interest arising from the actions of others. 

Page 23: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 14 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

The key responsibilities of all Vessel crews, including contractors/ sub‐contractors, are to: 

Crew members must hold the appropriate qualification for their role onboard the vessel, including at a minimum: 

marine OHS training or equivalent (i.e. Shipboard Safety Skills Set – MARSS00008); 

Hold a marine recreational boat licence; 

Hold a current first aid certificate; 

Hold SROCP  licence or equivalent  radio qualification  (i.e. MARC044 – Transmit and  receive information  by marine  VHF  radio  or MROVCP  –  Certification  of  Proficiency  for  VHF  Radio Operations); and  

Are in‐house competency trained to operate the vessel in emergency situations including radio communications (i.e. through POTL Marine Services “in‐house” Deckhand Training Package). 

Ensure they are familiar with the relevant contents of this CVTMP and CSSPPP;  

Are at all times responsible for safety of their crewmates and vessels, including marine environment and fauna protection;  

Report any incidents, accidents and safety observations in accordance with an established reporting system (i.e. to the vessel master);  

Implement  relevant  aspects  of  the  operational  plan  and  this  CVTMP  and CSSPPP  during  on  board operations; and  

Ensure  they  are  aware  of  all  emergency  procedures  applicable  for  the  operation  including communication protocols and requirements. 

  A list of key contacts for vessel traffic management and responsibility for the CU project is in Appendix A.     

Page 24: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 15 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

4 CVTMP MANAGEMENT MEASURES 

4.1 Potential Vessel Interactions 

During  the CU Project,  construction  vessel  traffic will  be  generated,  particularly by  capital  dredging works adjacent  to  the  Platypus  and  Sea  Channels,  which will  increase  the  potential  for  vessel  interactions  with commercial shipping and recreational vessel use.  Potential vessel interactions will occur in existing navigation areas in the port, new reclamation areas developed by the CU Project, and in the construction areas under development at the time of the project.  The main potential vessel interactions have been identified as follows:  

Capital dredging adjacent to the Platypus and Sea Channels by mechanical dredge and TSHD which could interact with shipping movements in the channels;  

Transporting capital dredge material by TSHD or hopper barges from capital dredge areas in the Platypus and Sea Channels to the new reclamation area and returning empty to the capital dredge areas;  

Transporting personnel, vessel supplies and materials by work boats to the dredging plant and barges;  

Manoeuvring dredging plant and barges using tugs;  

Bunkering and re‐fuelling of dredging and construction vessels;  

Piling barge movement and operations when relocating channel navigational beacons; 

Small craft in support of rockwall construction activities (e.g. Navigational and construction aid deployment and movement, emergency response craft); 

Hydrographic survey of capital dredge areas using survey craft;  

Monitoring activities associated with the project around work locations and monitoring locations in Cleveland and Halifax Bays using small craft; and  

Mooring of vessels at existing port facilities, temporary structures or anchorage areas.   

4.2 Works Exclusion Zone  

During  rockwall  construction,  a  number  of  zones  will  be  established  to  protect  the  worksite  from  vessel interference or impact.  These zones will include:  Rockwall Construction area: the rockwall construction area will be established through a Notice to Mariners issued by the RHM, and will be demarcated by the use of construction navigational aids.  This will establish the restricted area for vessel traffic around the construction activities and any applicable navigational hazards.  Marine Exclusion Zone: a minimum 30 m exclusion zone will be applied around the marine construction works area. Any vessels entering the area will result in immediate suspension of construction works until the vessels and  wave  movement  has  cleared,  unless  it  is  a  work  vessel  associated  with  the  project  and  is  assisting construction activities.    No Wake/Wash  Zone:  For  commercial  vessel movements  (i.e.  ship movements,  large  barge movements), construction works  in  the marine environment may be suspended without breach of  the Marine Exclusion Zone where wake  from  the  vessel movement may  cause  a work  hazard.    The  Contractor will  direct work activities that require this ‘no wake’ conditions.  

Page 25: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 16 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

4.3 Vessel Management Measures: 

The key management measures identified in Table 5 address the potential impacts of construction on vessel operations  and  navigation.  These  measures  would  be  implemented  through  the  CVTMP  by  POTL  and contractors in consultation with MSQ and the RHM.      

Page 26: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 17 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

Table 5:  CU Project Vessel Management Measures 

Activity  Hazard  Management Measures 

Safe vessel navigation 

Accident or collisions  Disruption  to  commercial shipping  

All construction works and vessels are to not impede commercial shipping activities or other port operations. Implement vessel communication practices as per Section 4.7.  Implement the safety management system (SMS) for all plant/vessels to ensure the safety of all plant and personnel at 

all times  Ensure construction vessels, dredge vessels, floating plant, floating equipment and support craft are appropriately sized, 

surveyed and licensed for undertaking marine construction in a safe manner  Crew all vessels with suitably qualified personnel  Confirm capital dredging is achieving design depths using bathymetric surveys to MSQ standards  Apply controls and measures to adequately manage risk for recreational boating and commercial craft using Cleveland 

Bay in and around the construction area, including establishing aids to navigation and the issuing of Notice to Mariners. 

Vessel traffic management 

Disruption  to  commercial shipping 

Implement communication protocols to prevent disruption to shipping movements as per Section 4.7. Schedule capital dredging works around shipping movements so that commercial shipping movements are not impacted 

by construction activities.  Adhere to Port Procedures and POTL Port requirements in all stages 

  

Recreational boating and commercial craft 

Recreational and commercial craft  enter  the  construction zone  

Install the aids to navigation plan as per Section 6 to: o Ensure lighting on breakwaters and seawalls make work area extent visible by recreational craft at night o Install temporary aids to navigation to demarcate relevant marine construction areas o Request the issuing of Notices to Mariners (NtoM) of construction activities and any resultant changes to vessel 

navigation areas and access o Ensure all marine plant and equipment remaining at sea overnight have the required navigational  lighting to 

ensure visibility to all craft at night. o Consult with the recreational boating community 

  

Aids to navigation 

Recreational and commercial craft  enter  the  construction zone 

Install the aids to navigation plan as per Section 6 to: Ensure lighting on new breakwaters and edge structures make work area extent visible at night  Install temporary aids to navigation to support safe navigation around construction areas and to demarcate vessel 

exclusion areas (where necessary)   

Mooring  Vessels  and  plant  are  not secured  Unsecured  plant/vessels become navigational hazards 

Ensure mooring arrangements are adequate to provide secure mooring of construction vessels, dredge vessels, floating plant and floating equipment 

Construct  temporary mooring structures,  to be approved by  relevant authorities,  to ensure marine vessel and plant safety and security. 

Implement emergency procedures, including mooring arrangements, for inclement weather and cyclones as outlined in Section 4.9. 

Page 27: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 18 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

Activity  Hazard  Management Measures 

Pilotage resources during construction 

Vessel  navigation  incidents due  to  untrained  vessel control 

Plan resourcing to address construction requirements to ensure adequate pilotage or pilot exemption. Obtain pilot exemption certificates for construction vessel movements (where necessary)  Engage with POTL Pilot Unit on a regular basis (minimum quarterly) to ensure clear understanding of project works, 

status and potential impacts on shipping movements.

Bunkering and refueling 

Fuel  spills  cause  safety  and environmental impacts 

Ensure that refueling is undertaken safely and measures are in place to manage risk of spills  Place adequate spill response kits on all construction vessels, or at refueling locations.  Implement spill response plan if incidents occur  Implement pollution management measures identified in the Ship Sourced Pollution Prevention Plan (section 0). 

Emergency management 

Emergency  events  are controlled  and  reported  to minimize  impact  on  port operations  and  the environment. 

 

Vessels and plant are secured in  the  event  of  extreme weather to project personnel, plant and the environment 

 

Review and update port wide emergency management procedures for cyclones and extreme weather events to cater for construction vessels, dredge vessels, floating plant, floating equipment and support craft. 

Implement emergency response plans,  including  identification of equipment and personnel  resources during marine construction activities as detailed in Section 4.9. 

Ensure the development and implementation of emergency management procedures for contractor vessel for cyclones and extreme weather events in compliance with this CVTMP. 

Establish adequate mooring and sheltering arrangements for all plant and equipment in the event of an extreme weather event.  

Establish clear reporting requirements for emergency events as detailed in Section 4.9.  

Port security  A  breach  of  port  security leading  to  raised  security level  or  Regulator  focus  on POTL 

Comply with relevant aspects of the Maritime Security Plan for Port of Townsville during the construction activities.  

 

Page 28: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 19 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

4.4 Hydrographic Survey works 

All  hydrographic  survey  operations  shall  be  conducted  in  accordance  with  the  POTL  hydrographic  survey procedures and vessel SMS requirements.   All coxswains or Masters of vessels engaged in Survey operations shall have a valid small vessel induction.   Survey operations will not impact scheduled shipping movements.    

4.5 Townsville Port Procedures  

MSQ defines the standard procedures to be followed  in key pilotage areas associated with specified ports.  These are documented in the Port Procedures and Information for Shipping – Port of Townsville (MSQ).  The mandatory port procedures ensure marine safety as they relate to ship movements in the jurisdiction of the RHM Townsville and are regularly reviewed.  The Transport Operations (Marine Safety) Act 1994 enables the RHM to give a general direction to ship owners, ship masters, ships, other persons or matters for purposes of ensuring safety and the effectiveness and efficiency of the Queensland maritime industry.   The RHM will issue Notice to Mariners (NtoM) to notify all mariners, organisations and other interested parties of marine safety information.  NtoMs will be issued for all relevant aspects of the project, particularly to notify of construction areas and the location of navigation aids once erected.   

4.6 CVTMP Implementation  

Contractors engaged to perform dredging or construction of infrastructure (using vessels, dredging or marine plant), as a part of their contracted work package, will be required to prepare specific procedures for each stage to meet this CVTMP, as well as any applicable State and Commonwealth Government approval permits and conditions. In addition to the legislative and statutory requirements, contractors shall also have regard for the operational requirements of POTL and the RHM in terms of vessel movements and maritime safety.   Each contractor involved with dredging or construction of infrastructure, using vessels or marine plant will be responsible for:  

liaising with vessel crews to implement and monitor the contract specific CVTMP;  

complying with provisions of the contract specific CVTMP as applicable; and  

regularly inspecting and monitoring activities for adherence to proper marine safety measures. This will  include  routine  inspection  of  the works,  reports  and  correspondence  relating  to  vessel  safety management issues. 

 

4.7 Communication 

The following communication protocol will be implemented by all vessels operating within the CU Project to ensure safety of all vessels.  It is mandatory for all construction vessels to establish and maintain radio communications with Townsville VTS and POTL Duty Officer on VHF Ch12 or Ch16, advising of departure point and intended destination. Vessels are not to commence moving within the pilotage area prior to establishing radio communications regarding the intended movement.  At least one person on board each vessel and plant is to monitor VHF Ch12/16 at all times. 

Page 29: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 20 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

Communications shall be initiated and VTS informed in the following cases:  

Any movement within Townsville port or pilotage area that involves an Exempt pilot movement or may impact on commercial port operations and vessel movements, including departing berth, on scene of works, nil wash requests, departing works site and arrival at berth; 

If the vessel requires to report any incident that may affect the Townsville pilotage area;  

If the vessel runs aground; 

If the vessel is involved in a collision with any port facility, vessel or construction plant;  

If the vessel is in distress or requires assistance; and 

If the vessel can be of assistance to VTS with hazards within the Townsville pilotage area.   Small vessel movements that will not affect commercial port operations do not need to be notified to VTS.  Table 6 details the radio channels used in the Port of Townsville and the service each channel provides.   Table 6:  Port of Townsville VHF Radio Channels (from Tsv Port Procedures and Information for Shipping) 

VHF Channel  Call sign  Service 

VHF 16  Townsville VTS/ Port Control  Distress and initial calling 

VHF 12  Townsville VTS / Port Control  Mandatory  reporting,  vessel  traffic management, port working channel 

VHF 6  User  Pilot and tugs 

VHF 8  User  Pilot and Tugs 

VHF 13  User  Pilot and Tugs 

VHF 67  User  Small craft  

  Standard communications are to be in the following example format. 

“Townsville VTS this is Night Hawk, departing from Ross River for Western break wall.  Intend 

carrying out piling operations.  Request no wash”. 

Construction vessels must utilise UHF radio for communicating between individual operations (for example, a tug and its barge) and in‐house communications.   Movements of the vessel shall be recorded in the vessels log for auditing purposes.    POTL, or its contractors, will ensure all personnel operating radio communication equipment on board vessels are duly trained, hold a marine radio qualification and authorised as necessary.   

4.8 Project Management reporting 

The master of the vessel will report to the Project Director CU through the usual internal communication procedures (e.g. phone, email etc.).   

Page 30: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 21 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

There must be a passenger number verification procedure carried on board. This procedure should ensure all persons on board can be accounted for and should include requirements for crew lists and passenger manifests.    A count of all persons on board shall be made and  recorded when a ship  is used  to  transport passengers. Confirmation of this check must be noted in the ship’s log book/diary (passenger and crew numbers at the top of each diary page).    Before the ship departs any berth mooring or anchorage, the master must ensure a crew member:   

counts all persons boarding or leaving a vessel  

makes a written record of the count  

makes a written record of the number of persons currently on board  

verifies the count by signing the written record.   

4.9 Emergency Response Plans 

The following emergency response plans will be implemented as part of the CU Project. 

 

4.9.1 Marine Incidents/Emergencies 

Emergency response procedures  for marine  incidents and emergencies will be contained within  the vessel Safety Management System (SMS).    The information in Table 7 provide CU Project marine incident response procedure which supplements the Emergency  Response  Procedure  contained  within  each  vessel’s  Safety Management  System  that  may  be tailored for the specific vessel or plant characteristics:  

Page 31: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 22 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

Table 7:  CU Project Marine Incident response procedures 

Incident Type  Applicable Vessel  Response procedure 

Collision or grounding  TSHD BHD Barges Tugs Support vessel 

In the event of a collision the following procedure is to be implemented along with any other task relevant to the situation  A collision can be with another vessel or object  

1. Brace for impact  2. Put engine to neutral  3. Check all personnel for injuries, including other vessel if applicable and render assistance 

or apply first aid as required.  4. Check all compartments for damage and water leaks.  

If damage is minor and no assistance is required,  1. Notify Townsville VTS and Townsville Port Control via phone ,informing them of the 

situation and have them inform Mechanical Supervisor and or Maintenance Manager. 2. Return to port; have the vessel inspected for serviceability.  

3. Get other vessel particulars if applicable 

If damage is major to any vessel, when the vessel or crew are in imminent danger 1. Broadcast MAYDAY on channel 16.  2. Control flooding where possible set up bilge pumps to affected area.  3. Assist other vessel/s if applicable.  4. Control and report any pollution 5. Maintain radio contact at all times.  6. If able return to port.  7. If sinking and unlikely to reach port, beach vessel at nearest point – outside of the main 

navigation channels/swing basin where possible. If vessel is likely to break up and time is available isolate fuel tanks remove any oil and salvage all possible equipment. If possible one person is to remain with the vessel to act as sentry.  

8. If vessel is likely to sink before beaching and time is available shut down engines, isolate fuel,  drop  anchor  and  prepare  to  abandon  ship.    Anchor  outside  of  main  navigation channels/swing basin were possible. 

9. Record in vessel log 

Page 32: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 23 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

Incident Type  Applicable Vessel  Response procedure 

10. Submit Notice of a Marine Incident as per requirements in Sections 4.9.2 and 4.9.3 (where required). 

Engine Break down  TSHD BHD Barges Tugs Support vessel 

1. Turn off engine if not already. 2. Check all personnel for injuries and render assistance or apply first aid as required.  3. Notify VTS of breakdown via VHF Ch 16, particularly if potential to affect commercial 

shipping operations. 4. If vessel is in danger of drifting into shipping channel or near to other vessels, deploy 

anchor to remain outside of the main navigation channels and swing basin. 5. If the vessel is inside the shipping channel/swing basin, call for assistance on VHF Ch 16 to 

tow clear of the shipping channel/swing basin. 6. Inspect engine and begin repairs if possible.   7. Make radio call as necessary, particularly to request assistance or towing of the vessel to 

mooring location.  8. Once returned to port; have the vessel inspected for serviceability or to affect repairs. 9. Record in vessel log. 

 

Flooding of vessel  TSHD BHD Barges Tugs 

Support vessel 

1. If breach is dangerous raise alarm and position of the flood (bilge alarm may sound if fitted), shout: “flood, flood!”  

2. Broadcast “MAYDAY” on VHF Ch 16. 3. Muster crew at emergency stations and head count.  4. Muster passengers and head count.  5. Rescue any people from the flooded areas.  6. Isolate area and shut all bulkheads watertight doors and hatches.  7. Consider life saving appliance deployment.  8. Start pumping or shoring.  9. Begin repairs if possible.  10. Position vessel to reduce stress.  11. If sinking and unlikely to reach port, beach vessel at nearest point – outside of the main 

navigation channels/swing basin where possible. If vessel is likely to break up and time is available isolate fuel tanks remove any oil and salvage all possible equipment. If possible one person is to remain with the vessel to act as sentry.  

Page 33: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 24 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

Incident Type  Applicable Vessel  Response procedure 

12. If vessel is likely to sink before beaching and time is available shut down engines, isolate fuel, drop anchor and prepare to abandon ship. 

13. Monitor stability action to correct may be required. 14. Record in vessel log. 

 

Fire on‐board  TSHD BHD Barges Tugs 

Support vessel 

On seeing or smelling smoke on or near the outboard motor/engine:   

1. Put gear to neutral  2. The master to evaluate the situation, deckhand issues life jackets and musters passengers 

in amidships deck then gather the fire extinguishers.  3. If there is smoke turn the bow to the wind and shut down the engine and isolate the fuel. 

The master to give orders to attempt to extinguish the fire.  4. If there is still fire after the fire extinguishers are emptied, Broadcast a MAYDAY on 

channel 16.  5. Drop anchor – outside of the main navigation channels/swing basin where possible. 6. Prepare to abandon ship 7. Record in vessel log 8. Submit Notice of a Marine Incident as per requirements in Sections 4.9.2 and 4.9.3. 

 

Person overboard  TSHD BHD Barges Tugs 

Support vessel 

In the event of a “Man over Board”:  1. The person raising the alarm is to shout “MAN OVER BOARD” and attract the attention of 

the master whilst pointing to the person in the water – keep person overboard in view at all times.  

2. Deploy life buoy/marker. 3. The Master is to reduce the vessel’s speed and alter course to place the vessel in a 

position to safely recover the “Man over Board”.  4. Broadcast on VHF Ch 16 (using “MAY DAY” or “PAN PAN” as appropriate) to notify 

Townsville VTS, Townsville Port Control and other water way users of the “Man over Board” giving time, position, and any additional information required.  

The deckhand responding shall:  1. Secure the safety line from themself to the vessel’s safety rail.  2. Lower the boarding ladder (if fitted) situated on the transom on the port side  

Page 34: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 25 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

Incident Type  Applicable Vessel  Response procedure 

3. Locate and make ready the recovery hook (if fitted).  4. When the vessel is in a position to recover the “Man over Board,” if the person is unable 

to reach the recovery ladder on their own, place the recovery hook around the person and pull the person into the lowered recovery ladder and shut the engine to ‘Neutral’.  

5. Recover the person onboard and administer any appropriate required first aid.  6. After the “Man over Board” is on board the master is to inform Townsville Port Control that 

the “Man over Board” has been recovered. 7. Record in vessel log. 8. Submit Notice of a Marine Incident as per requirements in Sections 4.9.2 and 4.9.3. 

 

Personal injury/medical emergency 

TSHD BHD Barges Tugs 

Support vessel 

1. First person on the scene — apply first aid including notifying other crew or Master of the injury. 

2. Ascertain if there is a trained medical person on board, or in the vicinity and is able to help.   

3. If an emergency, make emergency radio call on channel 16 — “pan pan”.  4. Notify Port Control/VTS of injury and if appropriate, arrange for ambulance to respond. 5. Proceed back to shore asap or arrange to evacuate injured person or persons by 

helicopter or another ship. 6. Where relevant, advise next of kin of the situation.  7. Log all actions in the ship’s log. 8. Submit Notice of a Marine Incident as per requirements in Sections 4.9.2 and 4.9.3. 

 

Abandon Ship  TSHD BHD Barges Tugs Support vessel 

1. Broadcast a MAYDAY on channel 16. Give details of emergency problem, position, passenger numbers and intentions.  

2. Activate EPIRB.  3. The vessel master will instruct all personnel to put on life jackets, if not already wearing a 

life jacket/PFD as an operational requirement for the vessel as described in the vessel’s SMS. 

4. Assist injured personnel into water first.  5. Take safety equipment container, first aid kit, and all life jackets, torches, EPIRB and 

portable radio if possible.  6. All personnel swim away from vessel then group together in a huddle formation. 

Page 35: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 26 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

Incident Type  Applicable Vessel  Response procedure 

7. Submit Notice of a Marine Incident as per requirements in Sections 4.9.2 and 4.9.3.  

Marine Mega Fauna Interaction 

TSHD BHD Barges Tugs 

Support vessel 

1. Reduce speed if animal sighted in vicinity of vessel 2. Crew in secure positions prepared for an urgent stop / evasive maneuverer   3. Observe clearance regulations: 

caution zone (100 ‐ 300 m to side of fauna) ‐ 6 knots or less and no wake 

no approach zone (within 100m of side or 300 m in front or behind) 

stop if megafauna enters no approach zone. 4. Stop engines to minimise further impact on Marine Fauna 5. In event of collision with marine megafauna (such as dugongs, sharks, crocodiles, turtles, 

whales, dolphin), follow collision procedures. 6. Record and report immediately any incident involving marine fauna interactions (marine 

animal strike, marine stranding or an injured, sick or dead turtle, dugong, dolphin or whale) will be reported to the Qld Department of Environment and Sciences (DES) on 1300 130 372 and to Townsville VTS via 1300 721 263. 

7. Liaise with DES or other relevant body (i.e. QPWS) immediately to identify rescue options and develop future corrective actions if injury to marine megafauna occurs. 

8. Assist in capture of injured animals following advice from regulators. 9. Compile an incident report of all the details of any incident involving marine megafauna.  10. Inform regulators in a timely manner in the event of a significant marine megafauna 

issue.  The following information is required when reporting an interaction: 

location (GPS coordinates if possible) 

a description of what is wrong with the animal (e.g. stranded on beach, injuries, entangled in a net, injured) 

a description of the animal (type of animal—dugong, turtle, whale, dolphin; condition; size and any identifying tags) 

photos (if available) 

your contact details. 

 

Page 36: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 27 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

Emergency Plan — Emergency Stations for Crew Reference Material G.3

4.9.2 Marine incident reporting — Maritime Safety Queensland (MSQ) 

As per  Transport Operations  (Marine  Safety) Act  1994  requirements,  all marine  incidents  occurring  in  the project area will be  reported  to  the RHM, via  reporting  to Townsville VTS and POTL Port Control.   Marine incidents should be reported as soon as practicable to VTS and must be completed within four (4) hours of the incident occurring (to meet section 4.9.3 requirements). For incidents requiring urgent notification, contact Townsville VTS on VHF Ch 16.  For non‐urgent reports, contact with VTS should be via phone on1300 721 263.  Marine incidents to be reported include: 

the loss of a person from a ship 

the death of, or grievous bodily harm to, a person caused by a ship's operations 

the loss or presumed loss or abandonment of a ship 

a collision with a ship 

the stranding of a ship 

material damage to a ship 

material damage caused by a ship's operations including breaking mooring or rafting lines 

danger to a person caused by a ship's operations 

danger of serious damage to a ship 

danger of serious damage to a structure caused by a ship's operations. 

Damage to navigational aids.  Following verbal reporting to Townsville VTS, all marine  incidents are also to be reported on the approved Marine Incident Report form.     For  the  CU  Project,  the  RHM  has  approved  the  use  of  AMSA  form  19  for  this  reporting  (Appendix  C)  to streamline reporting. This form will be used to report all incidents, irrespective of the type of vessel involved.   

4.9.3 Marine incident reporting — Australian Maritime Safety Authority (AMSA) 

As per Marine Safety (Domestic Commercial Vessel) National Law Act 2012 requirements, all marine incidents involving a Domestic Commercial Vessel occurring in the project area will be reported to the National Regulator (AMSA) as soon as reasonably practicable after the master becomes aware of the incident, having regard to the circumstances of the incident.  Marine incidents to be reported mean any of the following: 

a. a death of, or injury to, a person associated with the operation or navigation of a domestic commercial vessel; 

b. the loss or presumed loss of a domestic commercial vessel; 

c. a collision of a domestic commercial vessel with another vessel; 

d. a collision by a domestic commercial vessel with an object; 

e. the grounding, sinking, flooding or capsizing of a domestic commercial vessel; 

f. a fire on board a domestic commercial vessel; 

g. a loss of stability of a domestic commercial vessel that affects the safety of the vessel; 

h.  the structural failure of a domestic commercial vessel; 

i. a close quarters situation; 

j. an event that results in, or could have resulted in: 

Page 37: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 28 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

(i) the death of, or injury to, a person on board a domestic commercial vessel; or 

(ii) the loss of a person from a domestic commercial vessel; or 

(iii) a domestic commercial vessel becoming disabled and requiring assistance; 

k. the fouling or damaging by a domestic commercial vessel of: 

(i) any pipeline or submarine cable; or 

(ii) any aid to navigation within the meaning of the Navigation Act 2012 of the Commonwealth; 

l. a prescribed incident involving a domestic commercial vessel. 

 

Reporting to AMSA is required as per the following: 

1. An Incident Alert (Form 18) within four hours of the incident occurring (see Appendix B); and  2. A detailed incident report (Form 19) within 72 hours of the incident occurring (see Appendix C). 

 Incident Alert notification can be achieved through the reporting to Townsville VTS under section 4.9.2, as Townsville VTS will notify other relevant agencies on receipt of an incident notification.    Confirmation with Townsville VTS that the incident will be reported to AMSA should occur when making the incident notification.  Reports are to be submitted by email: [email protected] .  

4.10 Cyclone/Severe Weather Contingency Plan 

As per the CU Project Emergency Response Plan, the Project will manage cyclone preparedness and response in accordance with Port of Townsville Emergency Response Plan ‐Cyclone Emergency Procedure (POT 609).  Response to any adverse or extreme weather event will follow this procedure, including the securing of small craft.  The Project Engineer CU, vessel masters and other relevant staff will monitor the regional weather throughout each day to identify any possible weather events that may cause risk to the Project activities. Where a weather event lesser than a cyclone is possible, the Project Director CU must provide regular updates to Construction Contractors and GM I&E and where staff or equipment are at risk, works will cease for the duration of, and a safe time after, the event has occurred.  Due to the location and exposed nature of the Project site, the Project, where possible will enact Condition Orange tasks in Condition Yellow status. All other direction for the site will be under the direction of the Project Director CU.  All project staff and contractors will be made aware of the project requirements for cyclone preparedness.  This will be achieved via safety alerts / toolbox talks / memos. All directions must be followed immediately with the priority on the safety of all Project staff and Contractors.  As part of POTL Cyclone Emergency Procedure, key items addressed include:  

Port condition status, related to the status of the weather event and outlook for impact on the port; 

Port, and Project, related actions to be undertaken at each condition status and responsibilities for undertaking these actions; 

Page 38: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 29 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

Plant and vessel mooring location(s), including mooring arrangements; and  

Communication channels and required notifications.  As vessels of different classes and sizes have differing maximum weather conditions (i.e. wind strength and wave heights), each vessel SMS will detail the maximum weather conditions for that vessel which establishes the timing of completion of severe weather preparations.  Appendix D details the CU project specific cyclone/severe weather management arrangements.  It is recognized that while the Project will be enacting these procedures under the POTL management arrangements, engagement with VTS and meeting any MSQ requirements will also be incorporated into the response procedures.  RHM actions regarding Port closure are included in Appendix D.    

Page 39: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 30 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

5 CONSTRUCTION SHIP SOURCED POLLUTION PREVENTION PLAN (CSSPPP) 

5.1 Purpose 

The construction phase of the CU Project will generate vessel traffic that has the potential to create marine pollution.    The  purpose  of  this  CSSPPP  is  to  document  procedures  to minimize  and  prevent  ship  sourced pollution of the marine environment, demonstrating compliance with requirements for the handling of oil, chemicals, sewage and garbage and to provide guidance on the safe transfer of bunkers in Queensland coastal waters.  This is because vessel pollution can result in unplanned emissions or other potential consequences on marine environmental qualities and/or damage to property and human health and risk to safety and revenue.  

5.2 Legislative Requirements 

This CSSPPP has been developed cognisant of  legislative requirements set out in Commonwealth and State Government Acts and Regulations, including Acts implementing international conventions where relevant.     The Transport Operations (Marine Safety) Act 1994 enables the RHM to give general directions to ship owners, ship masters, ships, other persons or matters for purposes of ensuring the safety, effectiveness and efficiency of the Queensland maritime industry.   The mandatory port procedures ensure marine safety as they relate to ship movements in the jurisdiction of the Townsville RHM, by whom they are regularly reviewed.     The Transport Operations (Marine Pollution) Act 1995 (TOMPA) and Transport Operations (Marine Pollution) Regulation  2008  outline  the  requirements  for  ship  sourced  pollution management  in  Queensland  coastal waters.  This legislation also implements the International Convention for the Prevention of Pollution from Ships (MARPOL).  The ship‐sourced pollutants covered by this legislation are oil, noxious liquid substances (in bulk), packaged harmful  substances,  sewage and garbage.    For  commercial  ships  in Queensland,  the major  ship‐sourced pollutants, from an operational perspective, are: 

Oil and oily residues or mixtures (including diesel fuel, petrol and oil products);  

Chemicals and chemical residues; 

Sewage; and  

Garbage (including food wastes, paper products, rags, glass, metal, bottles, crockery, fishing gear, nets, bait boxes, deck sweepings, paints, wood products and all plastics).  

 It is an offence to discharge pollutants (either deliberately or negligently) into Queensland coastal waters and severe penalties apply.  All pollution incidents must, by law, be reported to Maritime Safety Queensland (MSQ), as soon as practicable, to ensure the response will minimise the effects of the pollutant.    MSQ is the management authority for maritime pollution and vessel safety in Queensland and publishes port procedures (Port Procedures and Information for Shipping – Port of Townsville).  Where contractors engaged for the CU Project use vessels or marine plant, as a part of their contracted work package they will be required to comply with this CSSPPP and will prepare specific procedures to meet the requirements of this CSSPPP.  Further, contractors will be required to also comply with any relevant state and Commonwealth  Government  approval  permits  and  conditions,  especially  the  operational  requirements  of POTL and the MSQ/RHM in terms of vessel movements and maritime safety.  

Page 40: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 31 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

5.3 CSSPPP Pollution Management Measures 

5.3.1 Potential Pollution Sources 

During the CU Project, significant construction traffic will be generated, particularly by capital dredging works in the Platypus and Sea Channels, which includes on‐shore placement of capital dredge material in the new reclamation area.  The following pollution items will be generated by the construction vessels: 

Oils and fuels; 

Chemicals and chemical residues; 

Sewage; and  

Garbage, including lost cargo.   

5.3.2 Pollution Prevention Management Measures 

This section details the pollution prevention management measures to be implemented for each ship sourced pollution item. For each source, management measures are described to address the issue along with overall associated performance objectives, performance criteria, monitoring, reporting and corrective actions.      

Page 41: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 32 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

5.3.3 Oil & Fuels 

Element  Oils and Fuels 

Objective  Minimise pollution of  the marine environment  through  the use and handling of oils and fuels, including bunkering and re‐fuelling operations.   

Activities  

– Incorrect storage and handling of oil and fuels on vessels may result in contamination of the marine environment.  

– Incorrect handling and transfer of fuel may result in the introduction of fuels into the marine environment. 

– Spills or leakage of fuel/oil may cause contamination of the marine environment. 

– Incidents may occur whereby contaminants are accidentally released which may adversely impact the surrounding marine environment 

– Discharge of contaminated bilge water to the marine environment can cause contamination. 

 

Performance Indicators/Criteria  

– All works are managed in accordance with the relevant management plans, the Environmental Protection Act 1994 and the Environmental Protection (Water) Policy 2008 and any other relevant approvals, standards, guidelines and statutory requirements. 

– Fuel and oil storage are secure, bunded where possible and any spills are adequately contained and cleaned up. 

– No marine contamination from leaks and spills on land or on‐board vessels. 

– No impacts from pollution in the receiving environment as a result of construction vessels. 

 

Mitigation  

– Undertake storage and transport of chemicals, fuel/oil, hazardous/dangerous goods in accordance with relevant manufacturer’s instructions, Australian standards, guidelines and legislation, including: 

o AS1940 The Storage and Handling of Flammable and Combustible Liquids; 

o AS4452 The Storage and Handling of Toxic Substances; and 

o Dangerous Goods Safety Management Act 2001 and other legislative requirements.

Responsibility  

Contractor/ Vessel Master 

 

– Ensure  storage  areas  include  appropriate  bunding  to  contain  spillages  in accordance with applicable standards and are covered to prevent rain/wave infiltration.  

Contractor/ Vessel Master 

 

– Maintain records on oil and fuels used during construction activities as required by SDSs. 

Contractor/ Vessel Master 

 

– Keep SDSs for hazardous materials readily available in a prominent location, including on‐board vessels.    

Contractor/ Vessel Master 

 

– Minimise the risk of fuel/oil spills by undertaking regular inspections and maintenance of plant and equipment at or above manufacturers requirements, including: 

Contractor/ Vessel Master 

 

Page 42: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 33 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

Element  Oils and Fuels 

o Daily inspection of plant and vessels using predeveloped vessel maintenance check lists);  

o Maintenance of site plant and equipment in accordance with manufacturer’s recommendations; and  

o Ensuring service records are up to date and the equipment has the applicable permits, licences and insurances. 

– Conduct plant and equipment maintenance and refuelling only in designated areas. 

Contractor/ Vessel Master 

– Ensure vessel crews are advised of bilge water management requirements   Contractor/ Vessel Master 

– Wash bilges with biodegradable degreasers or detergents and dispose of any cleaning residue ashore.   

Vessel Master 

– Maintain bilge pumps and systems to ensure they are functioning and bilge water can be retained if contaminated.

Vessel Master 

– Maintain an appropriate spill kit, personal protective equipment and relevant operator instructions / emergency procedures for the management of hazardous materials on all vessels, in a conveniently location so that spills can be quickly responded to. 

Contractor/ Vessel Master 

Fuel Bunkering on vessels: 

– Use a licensed contractor for fuel bunkering. 

 

Contractor/ Vessel Master

– Monitor fuel levels by both the licensed contractor and the dredge crew.  Contractor/ Vessel Master 

– Minimise the risk of fuel spills by:  

o Developing and implementing fuel bunkering procedures;  

o Implementing emergency response procedures;  

o Undertaking spill response training for staff; and 

o Providing  spill  control  materials  including  booms  and  absorbent materials in the event of any spills. 

Contractor/ Vessel Master 

– If oil does spill into the water, use absorbent pads to mop it up or boom to contain the spill and let the RHM or port authority know so that  it can be cleaned up as soon as possible.  

Note: Do not use dispersants or other cleaning chemicals on oil in the water because they can increase the toxic effects of oil spills. 

    

Contractor/ Vessel Master 

Monitoring / Auditing 

– Undertake  inspections  to monitor vessels  for compliance with oil and fuel handling  and  storage  requirements,  including  maintenance  of  spill  kits, checking for leaks, spillage and damage to bunded/storage/refuelling areas and plant and equipment. 

Responsibility  

Contractor 

Environmental Advisor CU 

– Undertake visual inspections of fuel transferring equipment and surrounding water during and after fuel transfer.  

Contractor 

Environmental Advisor CU 

– Inspect the SDS register regularly for currency and completeness.  Environmental Advisor CU/ Safety Officer CU 

– Undertake checks of compliance against this CVTMP and CSSPPP.  Environmental Advisor CU 

Page 43: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 34 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

Element  Oils and Fuels 

Corrective Actions 

– Implement control measures as soon as practical where pollution issues are identified or have the potential to occur in the future. 

– Investigate all incidents in relation to oil/fuel pollution promptly and undertaken appropriate actions, as required to render the area safe and avoid or minimise environmental harm. 

– Investigate all complaints in relation to pollution promptly and rectify legitimate problems. 

– Review fuelling practices and rectify immediately if an unintentional release or spill occurs.  

– Revise CSSPPP and implement further controls where investigations show unacceptable pollution issues. 

– Implement corrective actions to meet required outcomes of regulators. 

 

Reporting  

– The Contractor will maintain a site activity log, recording the type of activities occurring during various times of the day to assist with the retrospective investigation of any incidents / complaints. 

– All CU Project personnel will inform the Manager Environment CU and Project Director CU as soon as possible in the event of a significant pollution issue.  

– The Manager Environment CU will inform the regulators in a timely manner in the event of a significant pollution issue from construction vessels. 

– Provide  incident reports detailing any spills or  incidents  involving hazardous waste,  fuel bunkering and clean‐up operations as per Environmental Incident procedures.

Adaptive Management Program 

- The Manager Environment CU will ensure new data/information is collected and incorporated into this 

plan, as a result of implementing this plan and new information from external sources (e.g. academic 

literature, EPBC policy statements);  

- The Environmental Advisor CU will effectively coordinate, schedule and/or trigger monitoring, risk 

management, auditing and reporting activities in association with this aspect; 

- The Manager Environment CU will periodically (min 6 monthly) review the effectiveness of management 

measures with relatively long implementation timeframes, significant levels of uncertainty and upon 

which the plan is highly dependent; 

- The Manager Environment CU will address the consequences of significant environmental incidents 

(planned and unanticipated); and 

- The Manager Environment CU will review the plan under the following circumstances: 

performance reports indicate performance targets/indicators may not be achieved; 

according to approved timeframes; or the impacts of significant environmental incidents. 

    

Page 44: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 35 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

5.3.4 Chemical and Chemical Residues 

Element  Chemical and Chemical Residues 

Objective  Minimise pollution of the marine environment through the use and handling of chemicals and chemical residues.   

Activities  

– Incorrect storage and handling of chemicals/chemical residues on vessels may result in contamination of the marine environment.  

– Spills or leakage of chemicals/chemical residues may cause contamination of the marine environment. 

– Discharge of contaminated bilge water to the marine environment can cause contamination. 

– Incidents may occur whereby contaminants are accidentally released which may adversely impact the surrounding marine environment. 

  

Performance Indicators/Criteria  

– All works are managed in accordance with the relevant management plans, the Environmental Protection Act 1994 and the Environmental Protection (Water) Policy 2008 and any other relevant approvals, standards, guidelines and statutory requirements. 

– Chemical storage is secure, bunded where possible and any spills are adequately contained/ cleaned up. 

– No marine contamination from leaks and spills on land or on‐board vessels. 

– No impacts from pollution in the receiving environment as a result of construction vessels.   

Mitigation  

– Undertake storage and transport of chemicals and hazardous/dangerous goods in accordance with relevant manufacturer’s instructions, Australian standards, guidelines and legislation, including: 

o AS1940 The Storage and Handling of Flammable and Combustible Liquids; 

o AS4452 The Storage and Handling of Toxic Substances; and 

o Dangerous Goods Safety Management Act 2001 and other legislative requirements. 

Responsibility  

Contractor/ Vessel Master 

 

– Ensure  storage  areas  include  appropriate  bunding  to  contain spillages  in  accordance  with  applicable  standards  and  are covered to prevent rain/wave infiltration.  

Contractor/ Vessel Master 

 

– Maintain records on chemicals used during construction activities as required by SDSs. 

Contractor/ Vessel Master 

 

– Keep SDSs for hazardous materials readily available in a prominent location, including on‐board vessels.    

Contractor/ Vessel Master 

 

– Minimise the risk of chemical spills by undertaking regular inspections and maintenance of plant, equipment and storage containers, at or above manufacturers requirements, including: 

o Daily inspection of plant and vessels using predeveloped vessel maintenance check lists;  

Contractor/ Vessel Master 

 

Page 45: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 36 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

Element  Chemical and Chemical Residues 

o Maintenance of site plant and equipment in accordance with manufacturer’s recommendations; and  

o Ensuring  service  records  are  up  to  date  and  the equipment  has  the  applicable  permits,  licences  and insurances. 

– Conduct plant and equipment maintenance only in designated areas. 

Contractor/ Vessel Master 

– Ensure  vessel  crews  are  advised  of  bilge  water  management requirements  

Contractor/ Vessel Master 

– Wash bilges with biodegradable degreasers or detergents and dispose of any cleaning residue ashore.  

Vessel Master 

– Maintain  bilge  pumps  and  systems  to  ensure  they  are functioning and bilge water can be retained if contaminated.

Vessel Master 

– Maintain an appropriate spill kit, personal protective equipment and relevant operator instructions / emergency procedures for the management of hazardous materials on all vessels, in a conveniently location so that spills can be quickly responded to. 

Contractor/ Vessel Master 

– If chemicals are spilt into the water, use absorbent pads to mop it  up  or  boom  to  contain  the  spill  and  let  the  RHM  or  port authority know so that it can be cleaned up as soon as possible. 

Note: Do not use dispersants or other chemicals in the water because they can increase the toxic effects of oil spills. 

Contractor/ Vessel Master 

Monitoring / Auditing 

– Undertake  inspections  to monitor  vessels  for  compliance with chemical  handling  and  storage  requirements,  including maintenance of spill kits, checking for leaks, spillage and damage to bunded/storage areas and plant and equipment. 

Responsibility  

Contractor 

Environmental Advisor CU 

– Inspect the SDS register regularly for currency and completeness. 

Environmental  Advisor  CU/  Safety Officer CU 

– Undertake  checks  of  compliance  against  this  CVTMP  and CSSPPP.   

Environmental Advisor CU 

Corrective Actions 

– Implement control measures as soon as practical where pollution issues are identified or have the potential to occur in the future. 

– Investigate all incidents in relation to chemical pollution promptly and undertake appropriate actions, as required to render the area safe and avoid or minimise environmental harm. 

– Investigate all complaints in relation to pollution promptly and rectify legitimate problems. 

– Revise CSSPPP and implement further controls where investigations show unacceptable pollution issues. 

– Implement corrective actions to meet required outcomes of regulators 

 

 

Page 46: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 37 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

Element  Chemical and Chemical Residues 

Reporting  

– The Contractor will maintain a site activity log, recording the type of activities occurring during various times of the day to assist with the retrospective investigation of any incidents / complaints. 

– All CU Project personnel will inform the Manager Environment CU and Project Director CU as soon as possible in the event of a significant pollution issue. 

– The Manager Environment CU will inform the regulators in a timely manner in the event of a significant pollution issue from construction vessels. 

– Provide incident reports detailing any spills or  incidents  involving hazardous waste, fuel bunkering and clean‐up operations as per Environmental Incident procedures.

Adaptive Management Program 

- The Manager Environment CU will ensure new data/information is collected and incorporated into this 

plan, as a result of implementing this plan and new information from external sources (e.g. academic 

literature, EPBC policy statements);  

- The Environmental Advisor CU will effectively coordinate, schedule and/or trigger monitoring, risk 

management, auditing and reporting activities in association with this aspect; 

- The Manager Environment CU will periodically (min 6 monthly) review the effectiveness of management 

measures with relatively long implementation timeframes, significant levels of uncertainty and upon 

which the plan is highly dependent; 

- The Manager Environment CU will address the consequences of significant environmental incidents 

(planned and unanticipated); and 

- The Manager Environment CU will review the plan under the following circumstances: 

performance reports indicate performance targets/indicators may not be achieved; 

according to approved timeframes; or the impacts of significant environmental incidents. 

    

Page 47: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 38 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

5.3.5 Sewage 

Element  Sewage 

Objective  Ensure sewage from vessels is not discharged to prohibited discharge waters.   Minimise pollution of the marine environment from sewage discharge from vessels.   

Activities  

– Discharge of un‐treated sewage in prohibited discharge waters or in areas close to sensitive areas can cause human health or marine environment impacts. 

– Incidents may occur whereby sewage and sewage contaminants are accidentally released which may adversely impact the surrounding marine environment. 

  

Performance Indicators/Criteria  

– All works are managed in accordance with the relevant management plans, Transport Operations (Marine Pollution) Act 1995/Transport Operations (Marine Pollution) Regulation 2018, the Environmental Protection Act 1994 and the Environmental Protection (Water) Policy 2008 and any other relevant approvals, standards, guidelines and statutory requirements. 

– All sewage treatment systems are maintained and compliant with legislative requirements. 

– No marine contamination from sewage discharge from the construction vessels. 

– No impacts from pollution in the receiving environment as a result of construction vessels.   

Mitigation  

– All vessels to be fitted with an appropriately sized sewage holding or treatment systems in accordance with the Transport Operations (Marine Pollution) Regulation 2008 (where required). 

Responsibility  

Contractor/ Vessel Master 

– No sewage to be discharged within the Prohibited Discharge Waters of Townsville Harbour. 

Contractor/ Vessel Master 

– Untreated sewage (sewage that has not passed through a certified sewage treatment system) will not be discharged in prohibited discharge waters, designated smooth waters, rivers and creeks.  

Contractor/ Vessel Master 

– Treated sewage will only be discharged to waters where the discharge is in compliance with the Transport Operations (Marine Pollution) Act 1995 and the Transport Operations (Marine Pollution) Regulation 2018. 

  

Contractor/ Vessel Master 

Monitoring / Auditing 

– Conduct visual monitoring for marine pollution to identity the need for additional measures and the effectiveness of measures undertaken.   

Responsibility  

Contractor 

Environmental Advisor CU 

– Conduct marine monitoring programs and analyse results in comparison to identified trigger levels and the requirements of the Environmental Protection (Water) Policy 2008. 

Environmental Advisor CU 

– Undertake compliance checks against this CVTMP and CSSPPP.  Environmental Advisor CU 

– Undertake  checks  and  audits  of  sewage  treatment  system maintenance and operations log books. 

Environmental Advisor CU 

Page 48: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 39 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

Element  Sewage 

Corrective Actions 

– Implement control measures as soon as practical where pollution issues are identified or have the potential to occur in the future. 

– Investigate all incidents in relation to inappropriate sewage discharge or pollution promptly and undertaken appropriate actions, as required to render the area safe and avoid or minimise environmental harm. 

– Investigate all complaints in relation to pollution promptly and rectify legitimate problems. 

– Revise CSSPPP and implement further controls where investigations show unacceptable pollution issues. 

– Implement corrective actions to meet required outcomes of regulators. 

 

Reporting  

– The Contractor will maintain a site activity log, recording the type of activities occurring during various times of the day to assist with the retrospective investigation of any incidents / complaints. 

– All CU Project personnel will inform the Manager Environment CU and Project Director CU as soon as possible in the event of a significant pollution issue. 

– The Manager Environment CU will inform the regulators in a timely manner in the event of a significant pollution issue from construction vessels. 

– Provide incident reports detailing any spills or  incidents  involving hazardous waste, fuel bunkering and clean‐up operations as per Environmental Incident procedures.

Adaptive Management Program 

- The Manager Environment CU will ensure new data/information is collected and incorporated into this 

plan, as a result of implementing this plan and new information from external sources (e.g. academic 

literature, EPBC policy statements);  

- The Environmental Advisor CU will effectively coordinate, schedule and/or trigger monitoring, risk 

management, auditing and reporting activities in association with this aspect; 

- The Manager Environment CU will periodically (min 6 monthly) review the effectiveness of management 

measures with relatively long implementation timeframes, significant levels of uncertainty and upon 

which the plan is highly dependent; 

- The Manager Environment CU will address the consequences of significant environmental incidents 

(planned and unanticipated); and 

- The Manager Environment CU will review the plan under the following circumstances: 

performance reports indicate performance targets/indicators may not be achieved; 

according to approved timeframes; or the impacts of significant environmental incidents. 

    

Page 49: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 40 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

5.3.6 Garbage 

Element  Garbage 

Objective  To  appropriately  handle,  store,  recycle  and  dispose  of  all  waste  and  waste  materials generated during vessel operations. 

 

To prevent litter or waste generated on board vessels from causing a hazard or nuisance. 

Activities  

– Vessel operations will generate garbage and wastes (i.e. packaging, general waste). 

– Incorrect handling and storage of garbage and waste may result in the introduction of wastes into the marine environment. 

  

Performance Indicators/Criteria  

– All works are managed in accordance with the relevant management plans, the Environmental Protection Act 1994 and any other relevant approvals, standards, guidelines and statutory requirements. 

– No impact to the marine environment as a result of waste generated from vessel operations. 

– No loss of solid waste material overboard during collection or transfer.  

– No complaints are received from regulators or the community in relation to waste issues.    

Mitigation  

– Adopt the waste management hierarchy where practicable (i.e. avoid, re‐use, recycle, energy recover and dispose). 

Responsibility  

Contractor/ Vessel Master 

 

– Avoid by: 

o Minimising the amount of any materials required to be brought and stored on vessels; and 

o Implementing  options  to  reduce  the  amount  of packaging on procured goods.  

Contractor/ Vessel Master 

 

– Collect and remove all wastes  from work sites  regularly by an appropriately licensed (as required) contractor. 

Contractor/ Vessel Master 

 

– Retrieve any garbage lost overboard where safe to do so.  Vessel Master 

 

– Secure waste disposal bins and fit with secure lids to prevent waste material being blown overboard or into the marine environment during storage or handling.   

Contractor/ Vessel Master 

 

Monitoring / Auditing 

– Undertake regular visual inspections of on‐deck waste disposal bins to ensure all waste is being stored, handled, disposed and transported in accordance with regulations. 

Responsibility  

Contractor Environmental Advisor CU 

– Undertake regular visual inspections of waste storage containers to determine their integrity and identify if any spills or leakage has or is occurring.  

Contractor  Environmental Advisor CU 

– Undertake  checks  of  compliance  against  the  relevant management plan by the vessel crews. 

Environmental Advisor CU 

Page 50: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 41 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

Element  Garbage 

Corrective Actions 

– Implement control measures as soon as practical where pollution issues are identified or have the potential to occur in the future. 

– Investigate all incidents in relation to waste management promptly and undertake appropriate actions. 

– Investigate all complaints in relation to pollution promptly and rectify legitimate problems. 

– Revise CSSPPP and implement further controls where investigations show unacceptable pollution issues. 

– Implement corrective actions to meet required outcomes of regulators. 

 

Reporting  

– The Contractor will maintain a waste tracking system, recording the movement of waste to assist with the retrospective investigation of any incidents / complaints. 

– All CU Project personnel will inform the Manager Environment CU and Project Director CU as soon as possible in the event of a significant waste management issue. 

– The Manager Environment CU will inform the regulators in a timely manner in the event of a significant waste management incident from construction vessels. 

Adaptive Management Program 

- The Manager Environment CU will ensure new data/information is collected and incorporated into this 

plan, as a result of implementing this plan and new information from external sources (e.g. academic 

literature, EPBC policy statements);  

- The Environmental Advisor CU will effectively coordinate, schedule and/or trigger monitoring, risk 

management, auditing and reporting activities in association with this aspect; 

- The Manager Environment CU will periodically (min 6 monthly) review the effectiveness of management 

measures with relatively long implementation timeframes, significant levels of uncertainty and upon 

which the plan is highly dependent; 

- The Manager Environment CU will address the consequences of significant environmental incidents 

(planned and unanticipated); and 

- The Manager Environment CU will review the plan under the following circumstances: 

performance reports indicate performance targets/indicators may not be achieved; 

according to approved timeframes; or the impacts of significant environmental incidents. 

     

Page 51: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 42 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

5.4 Pollution Event Monitoring & Reporting 

It is the responsibility of each crew member and all CU Project personnel to be aware of ship‐sourced Pollution and to be vigilant in recognizing marine pollution.   All vessel inductions undertaken will address the potential sources of ship‐based pollution and the measures to be implemented to mitigate pollution occurring.  All marine pollution incidents are to be Notified to MSQ (as the regulating Authority), via a PolREP, 24 hours a day on VHF radio Channel 12 or 16, 1300 721 263.  After initial verbal notification, the following details should be provided in a report of marine pollution (POLREP) to [email protected] using the form at Appendix E.  Key details to be recorded for inclusion in the incident report include: 

Date/time and Location (latitude, longitude and/or physical site) of incident; 

Report source and contact number; 

Nature, extent and estimated quantity of spill; spill and movement and speed; 

Spill source and point of discharge from source; 

Identity and position of nearby ships or name of alleged polluter; 

Local weather/tide/sea conditions;  

Whether a sample of the substance spilled has been collected; and  

Any additional information that relates to the spill.    Additionally,  all  site  personnel  will  report  all  environmental  incidents  and  near  misses  to  the  Manager Environment  CU  who,  with  the  aid  of  the  Environmental  Advisor,  will  coordinate  an  investigation  of  the incident. Examples of environmental incidents include Fuel/Chemical spills and garbage release from vessels.   The Environmental Advisor CU is responsible for maintaining a Register of Incidents;  investigating incidents and near misses; maintaining  records of  incident and near miss  investigations,  including corrective actions undertaken and persons/regulators notified.    As part of the reporting process, all pollution incidents are to be reported to the Department of Environment and Sciences (DES) by contacting, as soon as practicable, the 24/7 Pollution Hotline ‐ 1300 130 372 (option 2).  Key details to be requested by the Pollution Hotline include:  

Your details (name, phone, address, email);  Alleged offender’s details (name, business name, phone, address, email, website, number plate);  Time and date of incident or activity;  Location of incident or activity;  Description of incident or activity; and  Description of environmental values being affected. 

 The Manager Environment CU will provide an Environmental Incident Written Notice Form (Appendix F) to the appropriate regulator within 24 hours of any significant incident.   

Page 52: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 43 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

5.5 Accidental Loss/Breakaway of Equipment 

In the event of equipment or project related navigational aids becoming lost in the water or breaking free of moorings, the following response plan will be implemented with key responsibilities detailed in Table 8.  Key Actions: 

1. Maritime Safety Queensland (VTS) and Port Control will be immediately notified of the breakaway/loss by the responsible person (Vessel Master or their delegate).  This information must include details of the equipment, likely position, perceived hazard and plan to recover; 

2. The Project Director CU or delegate will take action to safely and expeditiously recover the equipment to a safe location; and  

3. Any breakaway will be  investigated and a formal report will be prepared. This will  include, but not limited to: 

– The assessed cause(s) of the breakaway/loss; 

– Corrective actions to manage future risk; and  

– Timeline for implementation of corrective actions.   Table 8: Response Plan for Loss or Breakaway of Equipment 

Recovery Team (Master/Coxswain)  All Crew  Construction Manager 

Assess situation 

Notify appropriate authorities (i.e. Maritime Safety Queensland, Port of Townsville Limited) 

o What equipment 

o Likely Position 

o If it is a perceived hazard 

o Recovery plan 

In charge of recovery activities 

Assess damage 

Inform Marine Operations Manager of situation 

Recover equipment and move to safe location 

Inform construction crew of any identified issues 

Assist in recovery activities 

Coordinate recovery operations 

Record the incident as soon as practicable 

Record and prepare incident report 

 

 

Page 53: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 44 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

6 AIDS TO NAVIGATION PLAN 

6.1 Temporary Aids to Navigation 

6.1.1 Construction Zone Extent 

During  the construction phase,  the whole Construction Area  for  the  rockwall works will be marked out by Special mark buoys as shown on Figure 5.  These will be set approximately 50m from the North Eastern and North Western extremities of the rockwall.    Special marks are yellow and have a yellow X as the top mark; at night, the flashing light is yellow.  This will be communicated via the issuing of NtoM notices and the advertising to the local commercial and recreational boating industry as part of the Community and Stakeholder engagement (Section 7.8). 

6.1.2 Rockwall Construction  

Given the rockwall construction will be incremental heading into the bay, in addition to the Special Marks for the entire construction area, Cardinal Mark buoys will be installed to identify the alignment of the rock wall.  During construction of the rockwall, there will be periods when the rock wall will be below the high tide level and will present a navigational hazard to small and medium sized vessels.  To ensure this construction zone is identified, East, West and North Cardinal Mark buoys will be installed at set intervals running parallel to the rockwall construction path.  Markers will be installed between 40 and 50 m from the rock wall toe, remaining outside of the Ross River Channel.  The general arrangement for these buoys is shown on Figure 5.  Cardinal marks show there is safe water to the relevant direction from the mark. At night, these marks have lights that flash at different frequency to denote the relevant direction of safe water. 

 Special Mark Buoy Top Mark “X” shape Light   Colour “Yellow” Flashing Yellow ‐ 2.5secs or 4 secs 

All buoys will be IALA compliant and Spar Buoys.  They will be anchored by a single anchor and straps will be shackled to join to the buoy.   

Page 54: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 45 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

Figure 5:  Construction zone Special Mark Buoy locations (indicative locations) 

       

          Lights once construction complete 

          Special mark buoy – extent of area 

         Cardinal Mark buoy during construction 

          Starboard marker – once completed 

          Restricted access signage 

 

Page 55: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 46 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

Signage and Lighting 

Additional signage and lighting will be put in place in association with the rockwall construction works.    For signage, signage regarding “Construction site – Restricted access” will be positioned on the southern reach of the rockwall construction area facing upstream for traffic moving downstream out of Ross River. If required, similar signage will be placed on the Northern Rockwall facing seaward, to the west of the western rockwall construction zone.  Where necessary, additional no wash signs or other navigational signage will be erected.   The rockwall construction works will have lights installed as per the following: 

At completion: o lights will be erected on the north eastern and north western corners of the rock wall to signify 

the extent of the rockwall; o a Light will be positioned at the half way point along the ‘new’ northern rockwall (i.e. approx. 

550m from corner lights); and  o a light will be positioned at the junction of the old and new rockwalls alongside Ross River. 

During works: 

o Temporary lights to be erected on the northern extent of the rockwall construction fronts to signify  the  current  extent  of  the  works  and  location  of  the  rockwall,  if  required.  A  risk assessment will be conducted on commencement of  the rockwall construction activities  to determine the need and extent of such lighting. 

 All lights erected will be designed to ensure limited light ‘spray’ to minimise the attraction of bait fish and other marine fauna to the construction work areas.  Additionally, all lights will be orientated or shielded to ensure they do not pose any navigational safety concerns (i.e. not shining towards the main harbour and shipping channel).  Works  planning  and  requirements will  also  be  communicated  via  advertising  to  the  local  commercial  and recreational boating industry as part of the Community and Stakeholder engagement (Section 7.8). This will include sign boards at key boat ramps (Coast Guard, Ross River boating Park) and opportunistically at other key boating and fishing locations (i.e. chandleries, yacht club, tackle stores etc.).  

6.2 Permanent Navigation Aids 

6.2.1 Rockwall extent 

At the completion of the rockwall construction, permanent navigational aids will be installed at the north eastern corner of the reclamation area.  The North Eastern corner will have a Starboard marker erected, signifying the starboard alignment of the Ross River entrance.    All buoys/beacons will be IALA compliant and agreed with the RHM prior to installation.  

6.2.2 Shipping channel/Navigation Beacons 

This section will be completed as part of the dredging construction works updated Plans. 

Page 56: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 47 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

7 ACTION PROGRAM & MANAGEMENT REVIEW 

7.1 Implementation 

A copy of the latest approved CVTMP, CSSPPP and any contractor‐specific procedures will be kept on‐site for the duration of the works and be easily accessible.  This CVTMP/CSSPPP will not be implemented or amended in any way that contravenes any conditions of any development approval / permit or environmental authority.    The Project Director CU must ensure that all measures necessary to ensure compliance with any conditions of any  development  approval  /  permit  or  environmental  authority  are  taken  /  installed  /  maintained  and operated.     

7.2 Site Personnel Training, Awareness & Competence  

All site personnel will attend a compulsory Project specific induction prior to commencing work at the site.  The environmental component of the induction will include, but not be limited to: 

All site personnel will be made aware of their General Environmental Duty and Duty to Notify responsibilities and the implications of failing to fulfil these duties; 

All site personnel will be made aware of their environmental responsibilities under the CVTMP in relation  to  implementing  mitigation  measures  and  corrective  actions  and  to  reporting environmental incidents and complaints; 

All site personnel will be instructed in environmental emergency response procedures (i.e. spill kit locations) and trained in the use of this equipment; and 

All site personnel will be instructed that all external communication pertaining to environmental management is to be conducted by the Manager Environment CU. 

 All  site  personnel  attending  the  induction will  be mentored  to  support  the  implementation  of mitigation measures and corrective actions.   

7.3 Environmental Non‐Conformance & Preventative/Corrective Action 

Non‐conformances include: 

An incident or near miss with potential or actual environmental impact; 

Reasonable and justifiable complaints regarding the construction activities; 

Not meeting an objective or performance criteria in the CVTMP/CSSPPP; and 

Environmental inspections not undertaken within the nominated timeframe.  The  Manager  Environment  CU  is  responsible  for  identifying  and  implementing  any  preventative  and/or corrective actions  in  response  to any non‐conformances.   New preventative and  corrective actions will be incorporated into the CVTMP where appropriate.  

Page 57: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 48 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

7.4 Continuous Improvement  

This CVTMP is a “living document” which will undergo formal review annually during the construction phase.  During delivery, review and amendment will occur as necessary via adaptive management actions to allow new or changing environmental risks, mitigation measures and corrective actions to be addressed and to reflect knowledge gained and  changing  community  standards  (values).    Feedback  systems will be  in place  for  the duration of the CU Project to enable this CVTMP to be updated and responsive to learning from any incidents, complaints and ongoing monitoring results.   Other triggers for CVTMP review may include:  

Changes to organisational structure, roles and responsibilities;  

Changes in environmental legislation and/or policies; and 

New technologies / innovation relevant to applied methods and mitigation measures that provide innovative means of executing activities in order to meet performance criteria. 

 Changes  to  the  CVTMP may  be  developed  and  implemented  in  consultation with  relevant  regulators  and stakeholders over time.  All changes are to maintain the approval conditions and be approved by the Project Manager and Technical Manager (if applicable), before implementation.    

7.5 Auditing  

Aspects with a potential for environmental impact will be subject to general environmental audits scheduled and  conducted  in  accordance with  the  Port’s  EMS  requirements.    The  audit’s  objectives  will  be  to  verify compliance with this CVTMP, applicable Commonwealth, State and Local government environmental permits, approvals and regulations.  Auditing of the requirements of the CVTMP will occur as a minimum annually, with specific aspects of these plans to be audited as required in response to specific risks, incidents of concerns being identified. Audits will be undertaken within the POTL Quality Management Framework.  Records  of  on‐going  site  monitoring,  inspections  etc.  will  be maintained  for  possible  audit  by  regulators.  Permanent records will be kept on site and updated regularly, to enable audit/review.  

7.6 Records  

During construction activities, CVTMP records will be maintained as objective evidence of compliance with environmental requirements.  All records will be maintained according to POTL’s Record Keeping Procedures and be kept for a minimum of five (5) years after the completion of the project or as required by the legislative conditions.  All CVTMP records will be retained electronically, including but not limited to:  

Induction and any specific environmental training records; 

CVTMP management meeting agendas and minutes;  

Monitoring  data  sheets,  calibration  records,  results  and  internal  and  external  environmental reports; and 

Environmental incidents, complaints and non‐conformance and corrective action reports.   

Records will allow auditing and encourage the use of preventative action, as well as corrective action following any non‐conformances.   Records will be made available to the regulators as requested. 

Page 58: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 49 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

7.7 Internal Communication 

CVTMP/CSSPPP requirements will be included in daily “tool box” meetings, which are to be performed prior to undertaking work.  As part of this meeting, the proposed activities will be reviewed with consideration given to changes in conditions such as weather, which may increase the potential for environmental impacts.  

7.8 Community & Stakeholder Engagement  

Contact details for the CU Project are:  

Telephone:  1800 531 561 

Email:  [email protected]

Address:  PO Box 1031, Townsville QLD 4810  Contact  can  also  be  made  electronically  via  POTL’s  website  “Contact  Us”  page  (https://www.townsville‐port.com.au/contact/).    A Community and Stakeholder Engagement Plan has been developed which details the engagement methods which  will  be  used  during  the  CU  Project.    This  document  is  published  on  POTL’s  website (https://www.townsville‐port.com.au/channel‐upgrade/project‐schedule/).  Project  related  information  will  be  circulated  via  a  range  of  avenues,  well  in  advance  of  undertaking construction  works  to  keep  the  community  well  informed.    Such  avenues  may  include  communications regarding:  

Transport and safety issues to nearby residents and the general community;  

Entry restrictions, POTL plans for maritime activity and temporary signage at boat ramps in Ross Creek and Ross River (where deemed required); and  

PEP stages and potential effects on recreational and other boating into Cleveland Bay from Ross River and Ross Creek to the boating community and other organisations.  

 

7.9 Complaints Handling 

Complaints represent an opportunity for improvement and enhancement of environmental performance.  All complaints relating to the construction activities of the CU Project, including those from members of the public, stakeholder groups and regulators, will be investigated and responded to in accordance with the complaints process  detailed  in  the  CU  Project’s  Community  and  Stakeholder  Engagement  Plan.    Complaints  received directly by the Public Relations Officer CU must be recorded, including investigations undertaken, conclusions formed and actions taken.  Complaints can be made verbally, via email or via the “Complaint Lodgment Form”  http://www.townsvilleport.com.au/complaint_form on POTL’s website.  The Public Relations Officer CU will notify  the  CU  Project  Team  Line  Managers  who  will  assign  a  lead  (pending  on  nature  of  complaint),  to investigate and insert corrective measures where required.    The  Public  Relations  Officer  CU  is  responsible  for  maintaining  the  Register  of  Complaints.    Notification regarding the complaint and any associated response will be provided to POTL Management in a timely fashion and all outcomes of complaint(s) will be communicated to POTL Management for further review.  The outcome of the investigation and corrective actions, where required, will be communicated to the complainant to close out the issues raised.   

Page 59: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 50 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

 

APPENDIX A 

     

Contact Information 

    

Page 60: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 51 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

Key contacts for Vessel traffic management and responsibility 

 

CU Project 

Position Name  Phone Numbers  Email 

General Manager Infrastructure and Environment 

Marissa Wise  07 4781 1643  mwise@townsville‐port.com.au 

Project Director CU  c/‐ Marissa Wise  07 4781 1643  mwise@townsville‐port.com.au  

Manager Environment CU  Melinda Louden  07 4781 1619 

0418 759 913 

mlouden@townsville‐port.com.au  

Project Engineer CU  Damian Dryden  07 4781 1637 

0436‐925‐649 

DDryden@townsville‐port.com.au  

Environmental Advisor CU  Tim Smith  07 4781 1502 

0417 081 352 

tsmith@townsville‐port.com.au  

Environmental Advisor CU  Alana O’Brien  07 4421 5679 

0448 510 089 

aobrien@townsville‐port.com.au  

Safety Advisor CU  tba  0436 812 884   

CU Site Guard Hut  Manned on a roster basis 

07 4781 1665  cupgate@townsville‐port.com.au 

  

Contact  Contact Details  Why Contact 

Regional Harbour Master, MSQ 

Phone:   07 4421 8100 

Email:    [email protected] 

Operational maritime questions, marine incidents, pollution, pilotage, buoy moorings, navigation aids, towage requirements and ship traffic scheduling 

VTS Centre, MSQ 

Phone:          1300 721 263 

Email:            [email protected] 

VHF radio:    VHF channels 12 and 16 

Call sign         “Townsville VTS” 

 

24 hour, seven days a week 

Ship traffic scheduling, pollution incidents and reporting defective navigation aids 

In the event of an emergency, VTS is the key notification and communications facility that will activate the appropriate response agencies.  

Ship traffic movements may be accessed on the QSHIPS website 

POTL Duty Officer 

Phone:        07 4781 1684 

Email:          duty@townsville‐port.com.au 

VHF radio:   VHF channels 8, 12 and 16 

Call sign       “Marine Services” 

 

24 hour, seven days a week 

Operation of facilities and services within the port and levels of safety and security  

 

Port Maritime control 

 

Page 61: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 52 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

APPENDIX B 

     

 

AMSA Incident Alert Form – Form 18 

      

Page 62: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 53 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

   

Page 63: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 54 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

 

APPENDIX C 

     

AMSA Incident Report Form – Form 19 

      

Page 64: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 55 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

 

Page 65: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 56 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

   

Page 66: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 57 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

 

Page 67: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 58 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

 

APPENDIX D 

     

Cyclone/Severe Weather Response Procedures 

 

Extract from Port of Townsville Emergency Response Plan ‐Cyclone Emergency Procedure (POT 609)  

Page 68: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 59 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

Condition Green (Extreme weather event watch – Prevention)

ACTION  RESPONSIBLE OFFICER  DELEGATE / BACKUP  STATUS 

Small vessels to be prepared for potential cyclone mooring, with plans reviewed and consideration given to equipment required to secure vessels for cyclone.   

Contractor  

Project Director CU  

Review weather forecast and confirm cyclone mooring arrangements for each vessel  

Contractor  Project Engineer CU   

Check and replace  (if necessary) mooring  lines,  fenders, anchor chains,  shackles and anchor warps  for  the anticipated mooring arrangements for each vessel   

Contractor   Project Engineer CU   

 

Condition Yellow (Extreme weather event warning – Preparedness) 

Action  Responsible Officer Delegate/ 

Backup  Status 

All contractors to implement cyclone procedures and actions to finalise preparations   

Project Engineer CU  

Project Director CU 

 

Ensure CU employees are fully briefed on current situation and requirements prior to and following cyclone.  Project Director CU  GM I&E   

All Heavy plant and equipment to be removed to a safe place above likely storm surge (i.e. Sandspit Drive)  Contractor   Project Engineer CU 

 

 

Where practical and safe, perform a final inspection of facilities and moorings (if relevant).  Report to GM I&E and Chief Operating Officer and coordinate actions 

Project Engineer CU   

Project Director CU    

Secure or remove all equipment, signs and aids in place on revetment walls (light towers etc).  Inspector CU   Project Engineer CU    

Vessels to be brought ashore and stored with other project plant and equipment or moored at cyclone mooring locations (as identified by POTL). 

Contractor   Vessel Masters   

Where  vessels  are  to  be moored  during  the  event,  ensure  cyclone mooring  arrangements  are  applied  and mooring lines doubled.  Vessels are to be cleared of all equipment from the decks.  Vessels are to be moored bow to sea 

Contractor   Vessel Masters   

Where vessels are brought ashore, they are to be placed head to the wind if possible; wheels are to be chocked, trailer brakes applied and trailer to be tied to the nearest strong point(s) if possible. 

Contractor   Vessel Masters   

 

Page 69: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 60 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

Condition Orange – Extreme Weather Event Warning ‐ Response 

Action RESPONSIBLE 

OFFICER DELEGATE / BACKUP  

STATUS 

Ensure the site office and construction site preparations are complete  Project Director CU   Project Engineer CU    

Evacuate the site as instructed or where conditions require the site to be evacuated. 

Project Director CU   Project Engineer CU  

 

Notify GM I&E of completion of all site preparations and evacuation of construction site  

Project Director CU   Project Engineer CU  

 

 

Condition Red Cyclone Response Procedure ‐ EvacuationACTION  RESPONSIBLE OFFICER DELEGATE / BACKUP  STATUS 

 

Nil actions 

Page 70: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 61 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

Condition Green Cyclone Response Procedure – Recovery ACTION 

RESPONSIBLE OFFICER DELEGATE / BACKUP  

STATUS 

When advised access to port is available, attend site and undertake review of CU site area for general site impact and damage  

Project Director CU  

GM I&E   

Call in employees, construction employees and available contractors in accordance with Damage Response Plan for safety and power up works  

Project Director CU  

  

Start check of all areas and assets CU are responsible for inspecting and signing off buildings. Plant and equipment in a fit for purpose state  

Project Director CU  

Project Engineer CU   

Contact remainder of workforce check all okay and are in a fit state to resume work.  

Project Director CU  

Senior Site Administrator  

 

Following damage and safety inspections Managers will call upon employees to attend as required and safe to do so.    

Project Director CU  

Project Engineer CU   

Once all clear is provided by RHM and GM I&E, return vessels to water or remove cyclone mooring arrangements.  Confirm vessels are seaworthy and engines operable.   If necessary, removal from cyclone moorings may need to await sounding of mooring pockets and channels.  

Vessel Masters 

 Contractor 

 

Replace any equipment, signs and aids that were removed prior to the event.  Navigational aids/lights to be replaced ASAP.  

Project Engineer CU   

 

Inspect all project related navigational aids, beacons and lights for position, damage and functionality.  

Project Director CU  

Project Engineer CU   

 

 

Page 71: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 62 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

SUMMARY OF MSQ’S EXTREME WEATHER EVENT CONTINGENCY PLAN – TOWNSVILLE

The Regional Harbour Master will enact the following procedures: 

Restrict movement of vessels if necessary 

Direct and oversee the evacuation of the port or specific areas of the port 

Close and reopen the port if necessary 

Advise mariners of relevant warnings and response requirements  Four distinct phases and the appropriate responses are as follows:  Phase 1: Extreme Weather event – Prevention 

Start monitoring when a  low‐pressure system occurs  in  the Coral Sea. Bureau of Meteorology (BOM) will issue a cyclone watch 

Triggered by Cyclone Watch status 

Mariners to maintain listening watch on VHF channels 12 and 16 

Master and owners of small vessels are to review cyclone plans and ensure vessels are prepared for severe weather event. 

All smaller vessels to move to their planned severe weather moorings.  Phase 2: Extreme Weather event – Preparedness 

Extreme weather event occurring within 24 hours 

Triggered by Cyclone Warning status 

Mariners to maintain listening watch on VHF channels 12 and 16 

Cyclone  plan  to  be  actioned  in  an  orderly manner  –  small  vessels  should  be moored  in  their planned cyclone mooring and final preparations and securing completed.  

 Phase 3: Actual Extreme Weather event – Response 

Vessels to have enacted their Cyclone Contingency Plans 

Mariners to maintain listening watch on VHF channels 12 and 16 

Monitoring BOM and mainstream media for updates 

Actions should be directed towards your own safety  Phase 4: After the Extreme Weather event has passed – Recovery 

Vessels are not to leave their cyclone mooring until official all clear has been given by the Regional Harbour Master 

Mariners to maintain listening watch on VHF channels 12 and 16 

Aids to navigation may be affected by the extreme weather event – masters to refer to Notice to Mariners for the latest updates. 

  

Page 72: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 63 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

Port Closure (Code Blue)  In extreme weather events, the Regional Harbour Master may effectively close the port, wholly or in part, by giving general or particular direction to restrict the:  

entering or leaving of vessels in or out of a pilotage area; and/or  

movement of vessels within a pilotage area.   Such direction will be appropriate with the threat to the safety of shipping or the environment and may occur at any time prior to the event.  Any closure of the port or restriction on vessel movements will, as far as practical, be implemented in a timely manner in order to minimise risks.   Reopening of the port  A pilotage area may be effectively re‐opened by the Regional Harbour Master following direction to allow the entering or leaving of ships in and out of a pilotage area, or movement of vessels within a pilotage area. Such direction will be provided:  

when satisfied that all danger has passed, and the pilotage area is safe for vessels to re‐enter or leave; and  

following  inspections  and  surveys  to  critical maritime  infrastructure  (for  example navigational aids, wharves) as well as clearance of navigational hazards.  

 The Vessel Traffic Services Centre will coordinate the safe movement of vessels following the opening of the pilotage area in accordance with normal practice.   Communication  The successful implementation of this plan relies on high quality communication of information and directions.   The Vessel Traffic Services Centre will implement the extreme weather event contingency plan on behalf of the Regional Harbour Master by acting as the central communications point for the duration and aftermath of the extreme weather event. The Vessel Maritime Control Centre call sign is Townsville VTS. VHF channels 16, 12, 11 and 14 will be continuously monitored before and during the extreme weather event. Extreme weather watches, warnings and any directions will be issued on these channels. If the plan requires for actions such as port evacuation or closure will be coordinated by the Townsville VTS.      

Page 73: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 64 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

 

APPENDIX E 

     

Marine Pollution Report (POLREP) – F3968 

      

Page 74: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 65 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

 

Page 75: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 66 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

 

APPENDIX F 

     

Environmental Incident Written Notice Form 

   

Page 76: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 67 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

 

 ENVIRONMENTAL INCIDENT 

WRITTEN NOTICE 

Date of Incident  ………./………./……….  

Time of Incident 

……….:………. am / pm 

Location of Incident 

 

 

Incident Details  Describe  clearly  and  in  detail  the  circumstances  leading  to  the  incident.    As  far  as possible, verify the facts recorded and identify witnesses. 

 

 

 

 

 

 

 

Quantity and type of substance released, if applicable. 

 

 

Site personnel involved (operator, driver, including their approval / registration number and any others). 

 

 

 

Vehicle and registration details, if applicable. 

 

 

 

Suspected Cause of Incident 

 

 

 

 

 

 

 

Sampling Results 

Results of any sampling performed in relation to the incident, if applicable. 

 

 

Page 77: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port

©  Port of Townsville Limited   A.C.N. 130 077 673 

Document Type   Plan  Document No.  POT 2160 

Only  electronic  copy on  server  is  controlled.  To  ensure paper  copy  is  current,  check revision number against entry in Qudos ‐ Master Document List 

Revision  2 

Date  29/01/2020 

Page   Page 68 of 78 

  

POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan 

 

 ENVIRONMENTAL INCIDENT 

WRITTEN NOTICE 

 

 

 

Corrective Actions  

Actions taken to mitigate any environmental harm caused by the incident. 

 

 

 

 

 

 

Preventative Actions 

Proposed actions to prevent a recurrence of the incident. 

 

 

 

 

 

Date of Notice  ………./………./……….  

Time of Notice  ……….:………. am / pm 

Designated Contact Details 

 

Name ….……………………………………………………………………………..……………………………………….. 

 

Ph No. ……………………………………………………………………………………………………..………………….. 

 

Email …………………………………………………………………………………………………..……………………….

Signed (Manager Environment CUP)  

 

 

………………………………….….………………………………………………………………………………………   

Page 78: PORT OF TOWNSVILLE LIMITED PORT EXPANSION ......2020/02/04  · POTL Channel Upgrade Project – DA0190/ 1905 – 11091 SRA Construction Vessel Traffic Management Plan Townsville Port