Port of Savannah MegaRail Project Christopher B. Novack, P.E. Senior Director of Engineering and Facilities Maintenance Georgia Ports Authority

Transcript of Port of Savannah MegaRail Projectaapa.files.cms-plus.com/2017Seminars/17Facilities/Chris...

Page 1: Port of Savannah MegaRail Projectaapa.files.cms-plus.com/2017Seminars/17Facilities/Chris Novack.pdfPort of Savannah MegaRail Project Christopher B. Novack, P.E. Senior Director of

Port of Savannah

MegaRail Project

Christopher B. Novack, P.E.Senior Director of Engineering and Facilities MaintenanceGeorgia Ports Authority

Page 2: Port of Savannah MegaRail Projectaapa.files.cms-plus.com/2017Seminars/17Facilities/Chris Novack.pdfPort of Savannah MegaRail Project Christopher B. Novack, P.E. Senior Director of

GARDEN CITY TERMINAL

Savannah River • Dedicated container facility

• Terminal area: 1,200 acres

• Berthing: 9 berths = 9,693 ft

• Covered storage: 1.19 m sf

• 2 on-terminal rail yards

• 26 STS cranes + 4 in Dec 2017

• 146 rubber tired gantry cranes

Mason ICTF (NS)

Chatham Rail Capacity:

180,000 Lifts

Mason Rail Capacity:

400,000 Lifts

Need to increase capacity

to 1 million lifts with the

ability to build 10,000 foot

unit trains

Page 3: Port of Savannah MegaRail Projectaapa.files.cms-plus.com/2017Seminars/17Facilities/Chris Novack.pdfPort of Savannah MegaRail Project Christopher B. Novack, P.E. Senior Director of
Page 4: Port of Savannah MegaRail Projectaapa.files.cms-plus.com/2017Seminars/17Facilities/Chris Novack.pdfPort of Savannah MegaRail Project Christopher B. Novack, P.E. Senior Director of

Mason ICTF

Garden City Terminal

SR 25

12

3

4

5

1 Mason ICTF track expansion with 8 RMGs

Multi-rail connection between Mason and Chatham2

SR 25 Overpass3

4 Rail crossings over Pipemakers Canal

5 Chatham ICTF track expansion

•$126.7 million project

•$44 million funded thru Federal Grant (FASTLANE)

•Completion at the end of 2020

FY18 FY19 FY20 Total

$25.0 M $61.0 M $40.7 M $126.7 M

MegaRail Scope and Funding

Page 5: Port of Savannah MegaRail Projectaapa.files.cms-plus.com/2017Seminars/17Facilities/Chris Novack.pdfPort of Savannah MegaRail Project Christopher B. Novack, P.E. Senior Director of

Year 2000 – 940,000 TEUs

5

Intermodal Tracks within Marine Terminal

Page 6: Port of Savannah MegaRail Projectaapa.files.cms-plus.com/2017Seminars/17Facilities/Chris Novack.pdfPort of Savannah MegaRail Project Christopher B. Novack, P.E. Senior Director of

Year 2003 – 1.5 Million TEUs

6

Mason ICTF served from Foundation Lead,Stub-ended Facility

Page 7: Port of Savannah MegaRail Projectaapa.files.cms-plus.com/2017Seminars/17Facilities/Chris Novack.pdfPort of Savannah MegaRail Project Christopher B. Novack, P.E. Senior Director of

Year 2012 – 2.9 Million TEUs

7

Bourne Ave Grade Separation + South End Ladder & Connection to Foundation Lead, Double-Ended Facility

Page 8: Port of Savannah MegaRail Projectaapa.files.cms-plus.com/2017Seminars/17Facilities/Chris Novack.pdfPort of Savannah MegaRail Project Christopher B. Novack, P.E. Senior Director of

Intermodal Demand

8

730-915k

lift potential

at buildout

Page 9: Port of Savannah MegaRail Projectaapa.files.cms-plus.com/2017Seminars/17Facilities/Chris Novack.pdfPort of Savannah MegaRail Project Christopher B. Novack, P.E. Senior Director of

Existing Conditions – 2016

CSX & NS train building

9

Page 10: Port of Savannah MegaRail Projectaapa.files.cms-plus.com/2017Seminars/17Facilities/Chris Novack.pdfPort of Savannah MegaRail Project Christopher B. Novack, P.E. Senior Director of
Page 11: Port of Savannah MegaRail Projectaapa.files.cms-plus.com/2017Seminars/17Facilities/Chris Novack.pdfPort of Savannah MegaRail Project Christopher B. Novack, P.E. Senior Director of

Existing Road Crossings

11

• Based on 1 train in and out, includes road blockage

only

Street Blockage Time

Crossgate Rd. 1:00:00

Grange Rd. 1:21:00 + 40 min (switching)

Smith Ave. 0:35:00

Azalea Ave. 0:31:42

Herty Dr. 0:22:18

Rommel Ave. 0:21:24

SR 25 3:40:00

Page 12: Port of Savannah MegaRail Projectaapa.files.cms-plus.com/2017Seminars/17Facilities/Chris Novack.pdfPort of Savannah MegaRail Project Christopher B. Novack, P.E. Senior Director of

Existing Site Plan

12

Page 13: Port of Savannah MegaRail Projectaapa.files.cms-plus.com/2017Seminars/17Facilities/Chris Novack.pdfPort of Savannah MegaRail Project Christopher B. Novack, P.E. Senior Director of

Project Site Plan

13

Page 14: Port of Savannah MegaRail Projectaapa.files.cms-plus.com/2017Seminars/17Facilities/Chris Novack.pdfPort of Savannah MegaRail Project Christopher B. Novack, P.E. Senior Director of

Project Overall Site Plan

14

Page 15: Port of Savannah MegaRail Projectaapa.files.cms-plus.com/2017Seminars/17Facilities/Chris Novack.pdfPort of Savannah MegaRail Project Christopher B. Novack, P.E. Senior Director of

8 RMGs

15

Page 16: Port of Savannah MegaRail Projectaapa.files.cms-plus.com/2017Seminars/17Facilities/Chris Novack.pdfPort of Savannah MegaRail Project Christopher B. Novack, P.E. Senior Director of
Page 17: Port of Savannah MegaRail Projectaapa.files.cms-plus.com/2017Seminars/17Facilities/Chris Novack.pdfPort of Savannah MegaRail Project Christopher B. Novack, P.E. Senior Director of

Proposed Road Crossings

17

Removed with

Brampton

Connector

4 Intermodal Crossings

Eliminated

Street Blockage Time

Crossgate Rd. 0:21:15

Grange Rd. 0:21:15

Smith Ave. 0:00:00

Azalea Ave. 0:00:00

Herty Dr. 0:00:00

Rommel Ave. 0:00:00

SR 25 0:21:15

* Based on 1 train in and out, includes road blockage

only

Page 18: Port of Savannah MegaRail Projectaapa.files.cms-plus.com/2017Seminars/17Facilities/Chris Novack.pdfPort of Savannah MegaRail Project Christopher B. Novack, P.E. Senior Director of

Schedule & Key Milestones

18

1a

3

4

5

1 2

Critical Path & Milestones

1b

2a

2b

Page 19: Port of Savannah MegaRail Projectaapa.files.cms-plus.com/2017Seminars/17Facilities/Chris Novack.pdfPort of Savannah MegaRail Project Christopher B. Novack, P.E. Senior Director of

Existing Terminal (Nov 17)

19

Page 20: Port of Savannah MegaRail Projectaapa.files.cms-plus.com/2017Seminars/17Facilities/Chris Novack.pdfPort of Savannah MegaRail Project Christopher B. Novack, P.E. Senior Director of

3 NS Tracks in Mason (Aug 18)

20

1a

Page 21: Port of Savannah MegaRail Projectaapa.files.cms-plus.com/2017Seminars/17Facilities/Chris Novack.pdfPort of Savannah MegaRail Project Christopher B. Novack, P.E. Senior Director of

NS West Bundle (Sept 19)

21

2

Page 22: Port of Savannah MegaRail Projectaapa.files.cms-plus.com/2017Seminars/17Facilities/Chris Novack.pdfPort of Savannah MegaRail Project Christopher B. Novack, P.E. Senior Director of

CSX Tail Track & SR 25 (Dec 19)

22

3

Page 23: Port of Savannah MegaRail Projectaapa.files.cms-plus.com/2017Seminars/17Facilities/Chris Novack.pdfPort of Savannah MegaRail Project Christopher B. Novack, P.E. Senior Director of

CSX East Bundle (Sept 20)

23

4

Page 24: Port of Savannah MegaRail Projectaapa.files.cms-plus.com/2017Seminars/17Facilities/Chris Novack.pdfPort of Savannah MegaRail Project Christopher B. Novack, P.E. Senior Director of

Connector & Tie-In (May 21)

24

5

Page 25: Port of Savannah MegaRail Projectaapa.files.cms-plus.com/2017Seminars/17Facilities/Chris Novack.pdfPort of Savannah MegaRail Project Christopher B. Novack, P.E. Senior Director of

Maximum Train Lengths

25

CSX 10,000’

NS 10,000’

Page 26: Port of Savannah MegaRail Projectaapa.files.cms-plus.com/2017Seminars/17Facilities/Chris Novack.pdfPort of Savannah MegaRail Project Christopher B. Novack, P.E. Senior Director of

Georgia Ports Authority

Discussion and Questions