Port of Durban....rary design basics for logistics warehouses and associated offices. With a track...
Transcript of Port of Durban....rary design basics for logistics warehouses and associated offices. With a track...
![Page 1: Port of Durban....rary design basics for logistics warehouses and associated offices. With a track record of developing logistics ware-housing over many years, JT Ross is able to deliver](https://reader034.fdocuments.net/reader034/viewer/2022051804/5ff1cb5aabbde814cf340042/html5/thumbnails/1.jpg)
Durban’s Premier Business and Logistics Park
![Page 2: Port of Durban....rary design basics for logistics warehouses and associated offices. With a track record of developing logistics ware-housing over many years, JT Ross is able to deliver](https://reader034.fdocuments.net/reader034/viewer/2022051804/5ff1cb5aabbde814cf340042/html5/thumbnails/2.jpg)
JT Ross Park Northfield is strategically located north of Durban in the Riverhorse Valley precinct. The development offers exceptional opportunity for exposure onto the N2 along with easy access off major routes leading to King Shaka International Airport, the N3 to Johannesburg and the Port of Durban.
The Park has been designed as a bespoke business and logistics hub where practical requirements of logistics opera-tors are taken into account. The secure 30 hectare develop-ment includes access control and 24 hour monitoring. JT Ross Park Northfield incorporates upmarket, contempo -rary design basics for logistics warehouses and associated offices. With a track record of developing logistics ware-housing over many years, JT Ross is able to deliver quality workmanship within challenging timelines.
1 ABOUT THE DEVELOPMENT LOCATION PARK DEVELOPMENT FRAMEWORK NEW OPPORTUNITIES BASELINE SPECIFICATIONS
www.jtrossgroup.com
ABOUT THE DEVELOPMENT
![Page 3: Port of Durban....rary design basics for logistics warehouses and associated offices. With a track record of developing logistics ware-housing over many years, JT Ross is able to deliver](https://reader034.fdocuments.net/reader034/viewer/2022051804/5ff1cb5aabbde814cf340042/html5/thumbnails/3.jpg)
2
Metro LocationJT Ross Park: Northfield is strategically located north of Riverhorse Valley, within 20km of King Shaka International Airport, and alongside the N2. It is ideally positioned between Durban and the North Coast, minutes from Cornubia, Umhlanga Ridge and Durban’s harbour further south.
North Durban LocationThe Park has been developed on one of the last remaining portions of vacant land adjoining the N2. It is located at the N2 interchange that leads to Glen Anil and Durban North with access from North Coast Road.
Destination KMs
24 kmMaydon Wharf
Cornubia
Pinetown
Riverhorse Valley
11 km
25 km
4.5 km
King Shaka International Airport 21 km
www.jtrossgroup.com
ABOUT THE DEVELOPMENT LOCATION PARK DEVELOPMENT FRAMEWORK NEW OPPORTUNITIES BASELINE SPECIFICATIONS
NATAL BAY
N2
UMGENI
INDIANOCEAN
TO CATO RIDGEPIETERMARITZBURG,AND JOHANNESBURG
20 mins to King Shaka
InternationalAirport
N2
DurbanHarbour
JT ROSS PARKNORTHFIELD
R102
M27
N2
M4
M13
N3
M21
M19
M1
M1
M34 M7
M7 M13
M4
GLEN ANILINDUSTRIAL
UMLH
AN
GA
ROC
KS D
R
KLOOF
PINETOWN
DURBAN CBD
LA LUCIARIDGE
KINGSMEAD
UMHLANGARIDGE
WESTVILLE
MORNINGSIDE
BEREA
POINT
PAPWASEWGOLUMGOLF CLUB
BAYHEAD
UNIVERSITY OFNATAL
UNIVERSITY OFDURBAN WESTVILLE
KLOOFGOLF CLUB
ROYALDURBAN
GOLF CLUB
DURBANCOUNTRY
CLUB
ATHLONE / WINDSOR
BEACHWOODGOLFCLUB
M10
M7
M41
R102
R102
VIRGINIA
PAVILLIONCENTRE
UMBILO
CONGELLA
MAYDONWHARF
NEW GERMANY
MARIANNINDUSTRIAL
ROSSBURGH
MAHOGANYRIDGE
WESTMEAD
RED HILL
BRIARDENEINDUSTRIAL
PARKSPRINGFIELD
FLATS
PHOENIX
MOUNT EDGECOMBE
OLD MILL
MAXMEAD
WESTGATEINDUSTRIAL
PARK
SURPRISEFARM
UMGENI
UMGENI PARK
RIVERHORSEVALLEY
NO
RTH
DR TSA
OC
NORTH
CO
AST R
OAD
UMG
ENI
HAN
S D
ETM
AN
DERBYDOWNS
ESSEXTERRACE
WESTWAYOFFICE PK
M13
CORNUBIA
N2
R102
N2
R102
JT ROSS PARK RIVERSIDEJT ROSS PARK NORTHFIELD
JT ROSS PARK RIVERSIDE
JT ROSS PARK RIVERSIDE
OUR LOCATION > macro / north durban
JT ROSS PARK NORTHFIELD
![Page 4: Port of Durban....rary design basics for logistics warehouses and associated offices. With a track record of developing logistics ware-housing over many years, JT Ross is able to deliver](https://reader034.fdocuments.net/reader034/viewer/2022051804/5ff1cb5aabbde814cf340042/html5/thumbnails/4.jpg)
3
www.jtrossgroup.com
Lorem ipsum
Available February 2019Available February 2019
Phase of Development: Phase 1
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
Available February 2019
Phase of Development: Phase 1
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
Available February 2019
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
Available February 2019
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
Available February 2019
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
Available February 2019
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
Available February 2019
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Currently under development
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
Phase of Development: Phase 1
Available February 2019
Currently under development
5.5 hectaresm2
5.5 hectaresm2
Platform 1: 8 hectaresm2
Platform 2: 12.7 hectaresm2
Available March 2019
Phase 2
Currently under development
Available 2020
Phase 3
Development proposals currently being considered
ABOUT THE DEVELOPMENT LOCATION PARK DEVELOPMENT FRAMEWORK NEW OPPORTUNITIES BASELINE SPECIFICATIONS
Phase of DevelopmentPhase 1
5.3 hectaresm2
Servicing Completed
Buildings Completed
5.0 hectaresm2
Servicing Completed
Phase 2
Last Building Under Development
Lower Platform: 7.9 hectaresm2
Upper Platform: 11.8 hectaresm2
Available August 2020
Phase 3
Development proposals currently being considered
PHASE 3
UPPER PLATFORM
LOWER PLATFORM
PHASE 1
PHASE 2
PARK DEVELOPMENT FRAMEWORK > phasing
![Page 5: Port of Durban....rary design basics for logistics warehouses and associated offices. With a track record of developing logistics ware-housing over many years, JT Ross is able to deliver](https://reader034.fdocuments.net/reader034/viewer/2022051804/5ff1cb5aabbde814cf340042/html5/thumbnails/5.jpg)
4
www.jtrossgroup.com
ABOUT THE DEVELOPMENT LOCATION PARK DEVELOPMENT FRAMEWORK NEW OPPORTUNITIES BASELINE SPECIFICATIONS
Building StatusCOMPLETED BUILDINGS
FUTURE BUILDINGS
COMPLETED BUILDINGS GLAm2
DEVELOPMENT 1 14 500
DEVELOPMENT 2 15 000
DEVELOPMENT 3 6 500
DEVELOPMENT 4 8 000
FUTURE BUILDINGS
DEVELOPMENT C 9 399.3
DEVELOPMENT D 9 074.8
DEVELOPMENT E 4 354.3
DEVELOPMENT F 54 129.0
VACANT BUILDING GLAm2
DEVELOPMENT 5 3 400
DEVELOPMENT G 10 916.0
DEVELOPMENT H 3 902.0
DEVELOPMENT 5 13 000
VACANT BUILDING
GLAm2
DEVELOPMENT A 8 203.1
DEVELOPMENT B 8 386.3
DEVELOPMENT 2 5 000
4
B A
D
F
G
21
C
E
PARK DEVELOPMENT FRAMEWORK
3H
5
5
![Page 6: Port of Durban....rary design basics for logistics warehouses and associated offices. With a track record of developing logistics ware-housing over many years, JT Ross is able to deliver](https://reader034.fdocuments.net/reader034/viewer/2022051804/5ff1cb5aabbde814cf340042/html5/thumbnails/6.jpg)
www.jtrossgroup.com
6
www.jtrossgroup.com
5 ABOUT THE DEVELOPMENT LOCATION PARK DEVELOPMENT FRAMEWORK NEW OPPORTUNITIES BASELINE SPECIFICATIONS
DEVELOPMENT A.1 3 420.7
DEVELOPMENT B 8 386.3
DEVELOPMENT C.1 3 396.1
DEVELOPMENT D.1 5 088.3
DEVELOPMENT E 4 354.3
FUTURE BUILDINGS
DEVELOPMENT A.2 4 782.4
DEVELOPMENT C.2 6 003.2
DEVELOPMENT D.2 3 986.5
GLAm2
DEVELOPMENT A.1 4 009.1
DEVELOPMENT A.2 3 520.1
NEW OPPORTUNITIES > phase 3 lower platform
A
E
1
22
D
1 2
1
C
B
![Page 7: Port of Durban....rary design basics for logistics warehouses and associated offices. With a track record of developing logistics ware-housing over many years, JT Ross is able to deliver](https://reader034.fdocuments.net/reader034/viewer/2022051804/5ff1cb5aabbde814cf340042/html5/thumbnails/7.jpg)
6
Building Baseline SpecificationsJT Ross Park Northfield comprises of a number of warehousing opportunities to suit market demand. From 2 500m2 premises adapted to suit unique business requirements, to 50 000m2 warehousing and distribution facilities, all of our proposed premises offer:
Our business is about understanding the unique business needs of the logistics tenant and our significant exposure to logistics warehousing developments affords us the experience, skills and resources to develop bespoke, sustainable facilities within outstanding timescales.
www.jtrossgroup.com
ABOUT THE DEVELOPMENT LOCATION PARK DEVELOPMENT FRAMEWORK NEW OPPORTUNITIES BASELINE SPECIFICATIONS
Warehouses with extra eave height (12 -15m) suitable for racking and storage
FM 2 floors with a loading capacity of 6 tons per square meter EDL
Dock levelers and sectional sliding doors are incorporated where appropriate - generally one RSD and dock / 2500m2
Generous yard area allowing for efficient truck circulation, off-loading and parking
LED lighting to all warehouse and office areas Associated offices form part of development
Secure fencing to each new development
Centralised sprinkler facility to the Park
Landscaped Park environment
Gated Park with controlled access
BUILDING BASELINE SPECIFICATIONS
![Page 8: Port of Durban....rary design basics for logistics warehouses and associated offices. With a track record of developing logistics ware-housing over many years, JT Ross is able to deliver](https://reader034.fdocuments.net/reader034/viewer/2022051804/5ff1cb5aabbde814cf340042/html5/thumbnails/8.jpg)
JT Ross was established in 1902. The company remains family owned and has evolved into a significant property investment and development business with an international footprint. The company ethos is built around long standing relationships, quality and team work.
For more infomation about our history, project portfolio and people, visit www.jtrossgroup.com
ContactJT ROSS PARK NORTHFIELDGrant Smithtel +27 83 448 7683 | email [email protected]
Roxanne Gillespie tel +27 83 575 1598 | email [email protected]
About Us