Port of Durban....rary design basics for logistics warehouses and associated offices. With a track...

8
Durban’s Premier Business and Logistics Park

Transcript of Port of Durban....rary design basics for logistics warehouses and associated offices. With a track...

Page 1: Port of Durban....rary design basics for logistics warehouses and associated offices. With a track record of developing logistics ware-housing over many years, JT Ross is able to deliver

Durban’s Premier Business and Logistics Park

Page 2: Port of Durban....rary design basics for logistics warehouses and associated offices. With a track record of developing logistics ware-housing over many years, JT Ross is able to deliver

JT Ross Park Northfield is strategically located north of Durban in the Riverhorse Valley precinct. The development offers exceptional opportunity for exposure onto the N2 along with easy access off major routes leading to King Shaka International Airport, the N3 to Johannesburg and the Port of Durban.

The Park has been designed as a bespoke business and logistics hub where practical requirements of logistics opera-tors are taken into account. The secure 30 hectare develop-ment includes access control and 24 hour monitoring. JT Ross Park Northfield incorporates upmarket, contempo -rary design basics for logistics warehouses and associated offices. With a track record of developing logistics ware-housing over many years, JT Ross is able to deliver quality workmanship within challenging timelines.

1 ABOUT THE DEVELOPMENT LOCATION PARK DEVELOPMENT FRAMEWORK NEW OPPORTUNITIES BASELINE SPECIFICATIONS

www.jtrossgroup.com

ABOUT THE DEVELOPMENT

Page 3: Port of Durban....rary design basics for logistics warehouses and associated offices. With a track record of developing logistics ware-housing over many years, JT Ross is able to deliver

2

Metro LocationJT Ross Park: Northfield is strategically located north of Riverhorse Valley, within 20km of King Shaka International Airport, and alongside the N2. It is ideally positioned between Durban and the North Coast, minutes from Cornubia, Umhlanga Ridge and Durban’s harbour further south.

North Durban LocationThe Park has been developed on one of the last remaining portions of vacant land adjoining the N2. It is located at the N2 interchange that leads to Glen Anil and Durban North with access from North Coast Road.

Destination KMs

24 kmMaydon Wharf

Cornubia

Pinetown

Riverhorse Valley

11 km

25 km

4.5 km

King Shaka International Airport 21 km

www.jtrossgroup.com

ABOUT THE DEVELOPMENT LOCATION PARK DEVELOPMENT FRAMEWORK NEW OPPORTUNITIES BASELINE SPECIFICATIONS

NATAL BAY

N2

UMGENI

INDIANOCEAN

TO CATO RIDGEPIETERMARITZBURG,AND JOHANNESBURG

20 mins to King Shaka

InternationalAirport

N2

DurbanHarbour

JT ROSS PARKNORTHFIELD

R102

M27

N2

M4

M13

N3

M21

M19

M1

M1

M34 M7

M7 M13

M4

GLEN ANILINDUSTRIAL

UMLH

AN

GA

ROC

KS D

R

KLOOF

PINETOWN

DURBAN CBD

LA LUCIARIDGE

KINGSMEAD

UMHLANGARIDGE

WESTVILLE

MORNINGSIDE

BEREA

POINT

PAPWASEWGOLUMGOLF CLUB

BAYHEAD

UNIVERSITY OFNATAL

UNIVERSITY OFDURBAN WESTVILLE

KLOOFGOLF CLUB

ROYALDURBAN

GOLF CLUB

DURBANCOUNTRY

CLUB

ATHLONE / WINDSOR

BEACHWOODGOLFCLUB

M10

M7

M41

R102

R102

VIRGINIA

PAVILLIONCENTRE

UMBILO

CONGELLA

MAYDONWHARF

NEW GERMANY

MARIANNINDUSTRIAL

ROSSBURGH

MAHOGANYRIDGE

WESTMEAD

RED HILL

BRIARDENEINDUSTRIAL

PARKSPRINGFIELD

FLATS

PHOENIX

MOUNT EDGECOMBE

OLD MILL

MAXMEAD

WESTGATEINDUSTRIAL

PARK

SURPRISEFARM

UMGENI

UMGENI PARK

RIVERHORSEVALLEY

NO

RTH

DR TSA

OC

NORTH

CO

AST R

OAD

UMG

ENI

HAN

S D

ETM

AN

DERBYDOWNS

ESSEXTERRACE

WESTWAYOFFICE PK

M13

CORNUBIA

N2

R102

N2

R102

JT ROSS PARK RIVERSIDEJT ROSS PARK NORTHFIELD

JT ROSS PARK RIVERSIDE

JT ROSS PARK RIVERSIDE

OUR LOCATION > macro / north durban

JT ROSS PARK NORTHFIELD

Page 4: Port of Durban....rary design basics for logistics warehouses and associated offices. With a track record of developing logistics ware-housing over many years, JT Ross is able to deliver

3

www.jtrossgroup.com

Lorem ipsum

Available February 2019Available February 2019

Phase of Development: Phase 1

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

Available February 2019

Phase of Development: Phase 1

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

Available February 2019

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

Available February 2019

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

Available February 2019

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

Available February 2019

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

Available February 2019

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Currently under development

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

Phase of Development: Phase 1

Available February 2019

Currently under development

5.5 hectaresm2

5.5 hectaresm2

Platform 1: 8 hectaresm2

Platform 2: 12.7 hectaresm2

Available March 2019

Phase 2

Currently under development

Available 2020

Phase 3

Development proposals currently being considered

ABOUT THE DEVELOPMENT LOCATION PARK DEVELOPMENT FRAMEWORK NEW OPPORTUNITIES BASELINE SPECIFICATIONS

Phase of DevelopmentPhase 1

5.3 hectaresm2

Servicing Completed

Buildings Completed

5.0 hectaresm2

Servicing Completed

Phase 2

Last Building Under Development

Lower Platform: 7.9 hectaresm2

Upper Platform: 11.8 hectaresm2

Available August 2020

Phase 3

Development proposals currently being considered

PHASE 3

UPPER PLATFORM

LOWER PLATFORM

PHASE 1

PHASE 2

PARK DEVELOPMENT FRAMEWORK > phasing

Page 5: Port of Durban....rary design basics for logistics warehouses and associated offices. With a track record of developing logistics ware-housing over many years, JT Ross is able to deliver

4

www.jtrossgroup.com

ABOUT THE DEVELOPMENT LOCATION PARK DEVELOPMENT FRAMEWORK NEW OPPORTUNITIES BASELINE SPECIFICATIONS

Building StatusCOMPLETED BUILDINGS

FUTURE BUILDINGS

COMPLETED BUILDINGS GLAm2

DEVELOPMENT 1 14 500

DEVELOPMENT 2 15 000

DEVELOPMENT 3 6 500

DEVELOPMENT 4 8 000

FUTURE BUILDINGS

DEVELOPMENT C 9 399.3

DEVELOPMENT D 9 074.8

DEVELOPMENT E 4 354.3

DEVELOPMENT F 54 129.0

VACANT BUILDING GLAm2

DEVELOPMENT 5 3 400

DEVELOPMENT G 10 916.0

DEVELOPMENT H 3 902.0

DEVELOPMENT 5 13 000

VACANT BUILDING

GLAm2

DEVELOPMENT A 8 203.1

DEVELOPMENT B 8 386.3

DEVELOPMENT 2 5 000

4

B A

D

F

G

21

C

E

PARK DEVELOPMENT FRAMEWORK

3H

5

5

Page 6: Port of Durban....rary design basics for logistics warehouses and associated offices. With a track record of developing logistics ware-housing over many years, JT Ross is able to deliver

www.jtrossgroup.com

6

www.jtrossgroup.com

5 ABOUT THE DEVELOPMENT LOCATION PARK DEVELOPMENT FRAMEWORK NEW OPPORTUNITIES BASELINE SPECIFICATIONS

DEVELOPMENT A.1 3 420.7

DEVELOPMENT B 8 386.3

DEVELOPMENT C.1 3 396.1

DEVELOPMENT D.1 5 088.3

DEVELOPMENT E 4 354.3

FUTURE BUILDINGS

DEVELOPMENT A.2 4 782.4

DEVELOPMENT C.2 6 003.2

DEVELOPMENT D.2 3 986.5

GLAm2

DEVELOPMENT A.1 4 009.1

DEVELOPMENT A.2 3 520.1

NEW OPPORTUNITIES > phase 3 lower platform

A

E

1

22

D

1 2

1

C

B

Page 7: Port of Durban....rary design basics for logistics warehouses and associated offices. With a track record of developing logistics ware-housing over many years, JT Ross is able to deliver

6

Building Baseline SpecificationsJT Ross Park Northfield comprises of a number of warehousing opportunities to suit market demand. From 2 500m2 premises adapted to suit unique business requirements, to 50 000m2 warehousing and distribution facilities, all of our proposed premises offer:

Our business is about understanding the unique business needs of the logistics tenant and our significant exposure to logistics warehousing developments affords us the experience, skills and resources to develop bespoke, sustainable facilities within outstanding timescales.

www.jtrossgroup.com

ABOUT THE DEVELOPMENT LOCATION PARK DEVELOPMENT FRAMEWORK NEW OPPORTUNITIES BASELINE SPECIFICATIONS

Warehouses with extra eave height (12 -15m) suitable for racking and storage

FM 2 floors with a loading capacity of 6 tons per square meter EDL

Dock levelers and sectional sliding doors are incorporated where appropriate - generally one RSD and dock / 2500m2

Generous yard area allowing for efficient truck circulation, off-loading and parking

LED lighting to all warehouse and office areas Associated offices form part of development

Secure fencing to each new development

Centralised sprinkler facility to the Park

Landscaped Park environment

Gated Park with controlled access

BUILDING BASELINE SPECIFICATIONS

Page 8: Port of Durban....rary design basics for logistics warehouses and associated offices. With a track record of developing logistics ware-housing over many years, JT Ross is able to deliver

JT Ross was established in 1902. The company remains family owned and has evolved into a significant property investment and development business with an international footprint. The company ethos is built around long standing relationships, quality and team work.

For more infomation about our history, project portfolio and people, visit www.jtrossgroup.com

ContactJT ROSS PARK NORTHFIELDGrant Smithtel +27 83 448 7683 | email [email protected]

Roxanne Gillespie tel +27 83 575 1598 | email [email protected]

About Us