23 September 2011 Port Infrastructure Planning DRYPORT ANNUAL CONFERENCE 2011 Jane Stanbridge

Transcript of Port Infrastructure Planning - Dryport.org · Port Infrastructure Planning. ... Port Container...

23 September 2011

Port Infrastructure PlanningDRYPORT ANNUAL CONFERENCE 2011

Jane Stanbridge

23 September 2011

Port infrastructure planning

Today’s presentation …

• Legislation• Environmental impact• Consultation

• Ship dimensions

23 September 2011

To what extent do existing powers allow implementation?:

• Acts

• Permissions

• Orders

• Permitted development

• Harbour Authority powers

To what extent do existing powers allow implementation?:

• Acts

• Permissions

• Orders

• Permitted development

• Harbour Authority powers

Consents required?

• Marine consents

• Land consents

• Compulsory acquisition powers

• SAM consent

Consents required?

• Marine consents

• Land consents

• Compulsory acquisition powers

• SAM consent

CONSENT with conditions / s106CONSENT with conditions / s106

Requirement for EIARequirement for EIA

• Submit to relevant Authority: MMO / LPA / IPC / DfT …

• Submit to relevant Authority: MMO / LPA / IPC / DfT …

YES

• Preparation of EIA & consultation

YES

• Preparation of EIA & consultation

• Statutory advertisements & objection period

• Statutory advertisements & objection period

• Additional consultation & removal of objections

• Additional consultation & removal of objections • Determination of

application • Determination of

application

• Public Inquiry• Public Inquiry

• Determination of application by Authority

• Determination of application by Authority

YESYES

NONO

• Inspector's Report• Inspector's Report

YESYES NONO

Implement projectImplement project

• ‘Called-in’ for Public Inquiry

• ‘Called-in’ for Public Inquiry

YESYES NONO

Project inception, outline design, alternatives &

feasibility

Project inception, outline design, alternatives &

feasibility

NONO

9 - 18 months 6 – 18 months 6 - 24 months

Port infrastructure planning

23 September 2011

Legislation: Planning Act & Localism

Localism Bill 2011 – House of Lords

This Bill will shift power from central government back into the hands of individuals, communities and councils; the six actions of decentralisation that underpin the Government's approach to decentralisation. The Localism Bill includes a number of important packages:

• Community Empowerment

• A radical re-boot of the planning system

23 September 2011

Marine & Coastal Access Act 2009

A new system of marine planningThe Act will help achieve clean, healthy, safe, productive and biologically diverse oceans and seas; it will provide better protection for our marine environment; sustainable use of our marine resources; an integrated planning system for managing our seas, coasts and estuaries; a robust legal framework for decision-making; streamlined regulation and enforcement; and access to the coast.

• CPA, FEPA, HRO: to Marine Management Organisation

• Planning Act thresholds (500k TEU, 250k ro/ro units, greater than 5 million tonnes); rail terminals.

23 September 2011

Trinity III Extension

Felixstowe South Reconfiguration

Harwich International Port Container Terminal

4 M TEU

2 M TEU2 M TEU

8 M TEU

The Haven solution

23 September 2011

Port Chalmers Otago

New Zealand

Our environment …

23 September 2011

Our environment …

23 September 2011

Our environment …

23 September 2011

A ‘Duty’ to consult

23 September 2011

Managing relationships

23 September 2011

Infrastructure planning

23 September 2011

Vessel dimensions

California Star

1st Vessel on Trinity Terminal 1986

189m LOA 26m Beam

Emma Maersk

Biggest Vessel on Trinity Terminal 2006

398m LOA 56m Beam

This class of vessel currently has a weekly call at Felixstowe.

23 September 2011

14%

28%

5%

0%

5%

10%

15%

20%

25%

30%

35%

2005 2006 2007 2008 2009 2010 2011 2012

% V

ls 8

000+

TEU

% Fxt Vsls 8000+ TEU % Fxt Vsls 8000+ TEU Forecast

Deepwater analysis

14% +8k TEU=

37% Throughput

28% +8k TEU=

?? % Throughput

23 September 2011

Quay crane dimensions 1985 - 2011

35m

46.5m

24 Containers

30m

30m

16 Containers

23 September 201119 February 2011 – 13,600 TEUThe only UK port able to service …

23 September 2011

worldslargestship.com

23 September 2011

Infrastructure planning conclusions

• Change – EIA case law, well tested, developer comfortable with outcomes

• MMO/IPC – not tested, risk & uncertainty, high cost of applications, legal challenge

• Consultation “duty”: statutory requirements for regulators to engage but developer confidence

• Government consultation on regs, policy statements, Acts - overload

23 September 2011