Total Cargo 201 8
Total cargo processed at the port in 20] 8 totaled 1,284,692 metric tons and is the second highest year
on record for the port. Compared t0 2001 when the township first took over operations oi’the port,
cargo has increased from an average 0f 810,513 mt to 1,1 83,661 mL, an increase ofover 45% and the
trend continues t0 move in a positive direction.
Average Cargo 2001 to 2009 = 810,513 mtAverage Cargo 2009 to 2017 = 1,183,661 mtAn average increase of 373,148 mt (46%)
Total Cargo Trend
2001 -2018
1,600,000
1,400,w0
1,200,000 W1,ooo,wo [X800,000
A
600,000
400,000
200,000
‘I I I I I I I l l I l V l I I I I I
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018
Cargo Transportation Trends for 20 1 8
Cargo is received and shipped by three different transportation modes: marine, truck and rail. Marine
(65%) continues t0 lead the way as the mode of transport preferred for bulk products in and out 0fthe
port, followed by trucking (34%) and then rail (1%).
LGOOM
1,400,000
1,N0,W0
1mm
600M
200M
-‘I’mck
MI- Marin.
‘I'oul
Total Cargo Processed by Transport Mode2010 - 2018N\/
2010
463335
14,153
641,686
1,129,674
2011
402,515
29,151
560,957
992,623
2012
489,748
11,388
548,564
1,049,700
2013
440,723
30,857
689,233
1,160,813
2014
383,389
79,371
758,782
1,221,542
2015
468.182
191347
868,277
1,356,m
2017
415,793
5,557
788.053
1,209,403
2018
487,341
21412
795,123
1,284,876
1,000,000
900,000
800,000
700,000
600,000
500,000
400,000
300,000
200,000
100,000
Cargo by Tranport Mode2001-2018
2001 2002 2003 2004 2005 2006 2007 20m 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018
—Truck —Rall —-Maflne
Marine Business Report
Cargo
The Port recorded its second highest year with a total 0f 795, l 23 metric tons of cargo processed over
the docks. The Radcliffe R. Latimer owned by Algoma Central was the last vessel to arrive on
December 25, 2018 discharging a load ofsalt.
Marin. Cargo Broakdmn2010‘2018
1,000,000
900,000
800,000 \ ,— v
700,000/
.‘m.\600,000 th/500,000
400,000
300,000
200,000
100,000
’
2010 2011 2012 2013 2014 2015 2016 2017 2018
-Sa|t 310,069 339,721 379,642 519,679 527,678 565,903 454,880 574,047 520,501
-Grlln 214p51 152,129 134,370 142,502 170,377 240,567 260,929 200,416 252,431
-Awogau 117,566 69,063 34,552 - 50,019 51,651 - - -
- Calclun CH 5,053 7,903 10,147 8,893 8,532 16,484
-Pro)oct or Brnk Bdk Cargo 2,073 1,432 5,057 5,707
+Taul€argo 641,686 560,913 548,564 689,233 758,782 868,267 724,702 788,053 795,123
Vessel Traffic Summary
The port provided berthage for 55 vessels in total.
Salt — 25
Grain — 19
Calcium Chloride — 3
Project Cargo —1
Breakbulk Cargo —l
Cruise -1
Other — 5
Salt Shipments by Vessel
The total salt brought into the port was 520,43 I MT delivered by 25 vessels. It was a Challenging year
for salt owners as a shortage in domestic salt mining production necessitated the import ofsalt from
Chili and Egypt. In total, 5 vessels ofsalt were imported in 20] 8. These vessels do not have self-
unloaders and ship cranes are used with grabs 10 bucket out thc salt, a very labour intensive process.
While salt did not reach our record-breaking year reported in 20] 7, it (lid stay 0n par with our 5 year
average. Summary 0f salt vessels is below.
Date Vessel Commodity Qty (MT)
Apr 14 Algoma Niagara Salt 11,093
May 15 Henry Jackman Salt 10,254
May 27 CSL Baie Comeau Salt 29,031
June 1 CSL Baie Comeau Salt 29,162
June 14 Algoma Mariner Salt 25,249
June 20 CSL Baie Comeau Salt 29,110
June 25 CSL Baie Comeau Salt 29,049
July 4 Algoma Sault Salt 19,621
July 18 Algoma Buffalo Salt 17,947
July 26 Henry Jackman Salt 6,232
July 31 Algoma Sault Salt 18,443
Aug 13 Algoma Niagara Salt 8,709
Aug 27 CSI. Whitefish Bay Salt 29,034
Aug 28 Isolda *Salt 22,100
Aug 30 Algoma Sault Salt 2,018
Sept 7 Fedetal Cedar * Salt 21,000
Sept 17 Thunderbay Salt 28,887
Sept. 18 Federal Barents ‘ Salt 20,734
Oct. 13 Federal Nakawaga * Salt 23,988
Nov 6 Algoma Buffalo Salt 15,519
Nov 8 Maccoa * Salt 18,814
Nov 24 CSL Baie Comeau Salt 29,052
Dec 4 CSL Whitefish Bay Salt 26,083
Dec 10 CSL Whitefish Bay Salt 28,742
Dec 25 Algoma Radcliffe R. Latim Salt 20,561
Total (MT) 520,431‘ Salt Imported
Grain Shipments by Vessel
The Port had a very busy year in terms ofshipmenls by vessel with 252,430 MT loaded onto l9
vessels. lt was the second highest year for vessel shipments, bested by only 2016. Four 0fthe vessels
were direct export from the country. Thirteen vessels were domestic shipments that went to elevators
down river in order to be loaded 0n larger ocean-going vessels while two vessels went t0
Newfoundland. The size of these larger vessels prevents them from entering the locks of‘the Seawaysystem. A summary is shown below.
Date Vessel Commodity Qty (MT)
9-Apr Evans Spirit Soybean 11,773
1-May Federal Hudson * Soybean 15,444
14—May Isabelle G * Soybean 21,160
10-Jun Algoma Discovery HRS / Soy 2,049
28-Sep ONEGO Rotterdam * Soybean 6,757
S-Oct Acadia Desgagnes Soybean 9,000
6-Oct Ojibway Soybean 15,181
10-Oct ONEGO Rio * Soybean 6,901
11-Oct Evans Spirit Soybean 11,828
12-Oct Acadia Desgagnes Corn 8,768
23-Oct Kaministiqua Soybean 25,497
31-Oct Kaministiqua Soybean 25,519
11-Nov Ojibway Soybean 15,913
13-Nov Charles A Desgagnes SRW/ Corn 8,181
16-N0v Miena Desgagnes Soybean 9,363
17-Nov Thunder Bay Soybean 7,827
22-Nov Welland Soybean 30,664
29-Nov Ojibway Soybean 15,728
16-Dec Acadia Desgagnes Corn 4,877
Total (MT) 252,430
* Export vessel
Grain Business Report
20 l 8 was a very successful year for grain handling at the Port. The yield concerns due 10 a dry, hot
summer were quickly put lo rest once the harvest started. The overall volume 0f grain handled through
the elevator was 742,81 8 MT. This is the second largest volume of grain handled at the Port andrepresents a 19.1% increase in volume over 2017. The highlights 0f201 8:
The most grain ever received at the Port in a single year: 390,526 MTThe first-time soybean receipts at harvest were over 200,000 MT: 205,924 MTThe first-time annual soybean receipts were over 200,000 MT: 232,992 MTWheat receipts at harvest were up by 65% compared lo 20 I 7
Corn receipts (luring harvest were up by l l 1% compared to 201 7
The soybean harvest started two weeks earlier than usual due t0 the hot, dry summer. However, the
dry weather did not last, and the harvest was slowed due t0 the cool, wet weather that arrived towards
the end 0f September and lasted into November.
The chart below highlights the volume of grain handled per month (receipts and shipments) over the
last four years.
275,000
250,000
225,000
200,000
175,000
150,000 n 2015
I 201s
125,000 I 2017
I 201a100,000
75,000
50,000
25,000
Grain Handling per Month (2014 to 2018) (MT)
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
The following charts show the mode oftransport used for receiving and shipping grain at the port.
Graln Receiving byTransport Mode2010 - 2018
450/000
400,0N
350,000
300,0”
250,0”
200m
150,0“
100,0”
50M
2010
299351
11,527
43,330
354,124
2011
240,199
24,216
26,274
290,150
2012
313,935
2fl64
315,999
2013
310,116
3,193
2014
253,665
34,059
9’91
297,615
2015
300,9”
11.9w
75,542
scum
2016
378,392
9A”
337,”!
2017
274,386
5,394
25,789
305,568
2018
388,113
2‘12
390,525313,909
Grain Shipping by Transport Mode2010 - 2018
450,000
m /\mm \/\/"“’ \/ZSOAOO
200,0“
150,000
2010
164,469
12,526
110,721
351,519
zou
162,316
4.81s
125,399
291,503
2012
175,813
9,324
134,370
323,408
201a
130,603
21.053
142,502
301,937
2014
129,724
45,312
160,486
3 37,098
2015
167,N0
7,961
164,725
342,385
2016
127,105
7,724
260,929
398,201
201 7
141,408
163
114,628
3 18,304
2018
99,228
252,431
352,293
-‘l'm¢k
- Rail-—Tota|
The chart below illustrates the volume 0f each commodity handled by the Port. The highest volume
crop handled by the Port continues t0 be soybeans.
Percentage of Each Commodlty Handled In 2018
Other0.4%
The chart below shows the total volume handled of each commodity handled per year. The interesting
trend to note is the decline of wheat and increase in soybeans over the years.
Volume of Each Main Commodity (MT)250,000
200,w0
150,000
100,000
QUANTITY
(MT)
50,0m
02006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018
lWheaHMT) 104,252 97,280 108,442 69,878 69,025 55,382 64,767 65,833 44,044 50,895 51,359 263% 44,330
ISoybean(MT) 43,371 56,279 43,582 78,187 91,181 90,999 181,606 113,954 105,715 152,374 199,313 180,098 232,992
ICorn(MT) 49,521 48,653 117,941 72,415 189,226 141,568 114,780 130,318 145,225 181,462 130,486 97,023 109,050
The wheat handled at the Port was up in 201 8 compared to the previous year. The volume handled was44,330 MT which was an increase 0f 17,526 MT over 201 7. The hot, dry summer had a positive
impact the wheat yields from thc previous year where the cool, wet weather negatively impacted
yields.
The amount 0f com received in 2018 was also up compared to the previous year. The amount 0f corn
received at harvest (Oct, Nov, Dec) was 77,734 MT which was an increase 0f40,855 MT compared to
2017. The Port started receiving dry corn on October 30'“. The lack 0f storage space in the main
building delayed receiving wet corn until the end ofNovember.
Receipts ofnon-GMO corn increased in 201 8 t0 19,218 MT which is up by 2,347 MT from the
receipts in 201 7. The customer was satisfied with the way their corn was handled and with the level of
service provided to the point where they expressed an interest in an expanded storage agreement t0
secure additional space at the Port.
Soybean volume was also up in 201 8. In fact, 201 8 was the first year where the volume of soybeans
exceeded 200,000 MT. The volume received at harvest (Sept, Oct, Nov, Dec) was 205,924 MT while
the total received throughout the year was 232,992 MT. At one point in time, the Port had over 88,000
MT 0f soybeans in stores waiting for the arrival of several vessels. This did require the filling of one
ofthe Annex bins in order to keep receiving. The vessel delays also necessitated the reduction in
delivery appointments from October 29‘“ t0 November l1‘“.
Dally Receipt Volume vs Inventory Level
8000 160000
7ooo 140000
6000 fly 120000
E r‘P
05000i
100000:0E >3
80000 304000> 2‘
E é33000 60000 v° >-g c”2000 40000
1000
ll
20000
o h.ooa$~b~¢qmbaabwe%~aoa$ab~uq’xxxxmmo,oxxxmx'bppbrsmnrvabbrbmohm» 93¢eer¢6¢¢§wg¢v~>-o¢¢999999wwmx xxxxxxxxxxxxxxxxmmmmx
— Daily Qty (MT) —lnventory level (MT)
10
Maintenance
The maintenance department was busy during the year with many tasks in order to keep the elevator
running smoothly. This includes annual inspections and preventative maintenance tasks as well as
completing projects to obtain improvements geared towards efficiency and reliability. Anabbrexiated summary of the activities in the maintenance department this year is shown below.
Maintenance — Electrical
0 Installed new soft Starts for the bin floor conveyors 5A, 6A, 7A as well as #6 and #8 receiving
conveyors. This will reduce the stress 0n the motor and belt ofeach lol‘ter during start-up.
o Made repairs and alterations t0 our existing fire alarm system in order t0 receive our Certificate 0f
Inspection. Some Ofthe work involved included replacing malfunctioning manual pull stations as well
as relocating inaccessible pull stations to accessible locations.
0 Completed improvements t0 #7 lripper proximity sensor mounting arrangements. This will improve
function and prevent the sensors from getting broken.
o Repaired malfunctioning electrical interlocks 0f conveyors #2 and #3A.
o Replaced conduit and wires to #8 loading spout control station on ship loading berth. The conduit had
filled \Vith water, frozen and destroyed the wires.
o Replaced approximately 200’ of Cat 6 cable to one of thc roofmounted security cameras.
0 Completed install 0f 20 hp motor and input pulley 0n #6 receiving conveyor. The increase in
horsepower and pulley size increases the speed of the conveyor by 21%.
o Annual inspection and servicing of GSI grain dlycr and associated equipment.
0 Completed LED lighting retrofit in substation, (lrive\\'ay and vessel loading berth.
o Replaced 5 hp motor on A2 (lust system air pump. The motor \Vas showing signs ofpotcntial bearing
failure.
o Replaced S H.P. motor on dust system BI air pump. This motor was still functioning properly but a
noticeable vibration indicated a bearing was going.
o Replaced Clock drive motor of #5 garner alarm.
0 Completed the installation and commissioning of Phase 2 of the temperature monitoring system.
Maintenance - Mechanical
o Serviced the valves and pulley’s (approx. 1500) at the basement level. These valves and
pulley’s are the ones that allow grain to flow onto the basement conveyor bells.
o Replaced broken internal support rods in scales #4, #6 and #8.
0 Completed the overhaul orgallery dust fan #9A.
o Installed fan silencers (4) on aeration fans of annex bins 7 and 8.
o Replaced the worn steel liner with a wear resistant urethane liner from #4A conveyor into #2
loftcr and from #4 conveyor into #3 lol‘ler.
o Replaced the buckets 0n #8 lofler.
o Collect oil samples from lofter and conveyor speed reducers. These samples will be sent 10 a
laboratory and analyzed.
o Made several metal patches 0n thc loading spouts and the chutes going t0 the loading spouts.
H
Maintenance - Mechanical Cont’d.
Replaced broken support pins in #8, #1 l and #1 5 ship loading spouts. These pins break
periodically as a result of raising the spout too high in order t0 get it 0n ocean going vessels for
loading.
Serviced 175 cl‘m air compressor. This compressor had not been used in approximately 15
years but can now be used for the cleaning of annex equipment before the handling 0f non
GMO com.
Completed the annual maintenance and greasing ofthc grain trippers and conveyor belts.
Preseason inspection and maintenance of all grain handling equipment at the annex.
Performed annual maintenance ol’crosscut grain samplers. These samplers take samples 0f
grain for inspection while ship loading.
Annual change out 0f dust socks was completed.
Completed the annual servicing ofmarinc gallery trippers. One Ofthc eight main bearings on
(ripper 9A was found t0 bc questionable and was changed.
Fabricated and installed steel racking along north and south walls Ofthe bin floor. This racking
provides safe storage 0f bin covers.
Fabricated 64’ ofshoring for the off-loading of road salt. This will bc used when salt is being
clammcd offofships, t0 prevent salt from getting into the river.
Inspected all cables ofship loading spout winches.
Replace damaged or missing clock timbers.
Replaced hydraulic hoses 0n truck probe.
Took 4’out ofconvcyor 8A, spliced and adjusted tension and tracking accordingly. Tracking
may have t0 be adjusted during loading oflhe next ship.
Replaced drive chain of Carter Day machine in grading office.
Pumped water from low lying area ol‘ salt dock to retention pond, to prevent water migration
into the salt piles.
Weekly, monthly and quarterly (lust system inspections and maintenance.
12
Capital Projects
The total spent 0n capital projects in 20] 8 was $1 ,558,598 million dollars that covered a variety 0f
projects. A summary oflhose projects for the grain operations is shown below. ll should be noted that
three projects (loading spouts, transfers chute and the dust system) were not completed as it was
determined further work 0r study was required before proceeding. These projects will carry over to
20] 9.
The following is a list of projects that were completed t0 improve operations at the Port in 201 8:
o Rail repair t0 replace rail ties that no longer met the load capacity oflhe rail line.
o New fire alarm system which replaced an outdated fire pane] that was no longer supported.
o Roofrcpair — part ofa regular preventative maintenance 0n the roofwhich eliminated areas
that were leaking.
o Grain spouting in building to replace the spouting that was worn out.
o Dust system improvements to increase its efficiency and safety.
o Replaced a gear box which was the last 0f the 85-year-old gear boxes.
o New spouting for dryer bins 10 improve efficiency and increase the storage space for dry grain
from the dryer.
o Grain temperature monitoring system - Phase 2 which added an additional 9O temperatures
cables. This brings to total numbers of bins under surveillance to 204.
o Install an airline the length ofbuilding on the bin floor to facilitate the sweeping ofbins using
compressed air. This method eliminated the need for a confined space entry to clean the bins.
o Installed new steel plating in lofter pit #2 to eliminate a water leakage issue.
o Hydraulic pump system for marine to replace a leaking system.
o Ncw gas monitors l0 replace units that had become unreliable. These monitors are required for
confined space entries and the fumigation program.
o LED lighting upgrade for the main entrance and the vessel loading area.
0 Additional 292 m of railings for thc elevator roof. Thc main roofarca is now completely
enclosed with railings.
o Replacement 0f acrators t0 deal with 35 year-old acrators that have stopped functioning
properly.
o Replace the soft starts for the east end bin floor conveyors as well as the receiving belts. The
result is less stress 0n the equipment at start up.
o Installed a new AC and heat system for annex office t0 improve conditions for the operators.
o Walk behind brush hog was purchased to reduce exposure t0 poison parsnip.
o An intrinsically safe industrial vacuum cleaner was purchased to help with cleaning hard to
reach areas in the elevator.
o Modified five conveyors at the annex to improve efficiency and aid in housekeeping efforts.
(Carry ovcr from the 201 7 bin project)
2018 CAPITAL BUDGET SUMMARY Jan. 16, 2019
Project Name 2018 Budget Amount Actual Status
1 Rail Repair S 50,000 S 46,455 Completed
2 Connecting Concourse for Administration Buildings $ 100,000 s 63,217 Completed
3 Develop West Uplands S 610,000 s 595,865 Completed
4 Roof Repair s 175,000 5 169,692 Completed
5 Grain spouting In building 5 75,000 s 17,676 Completed
6 Gear Box in Rail s 60,000 s 56,205 Completed
7 New spouting for dryer bins s 40,000 s 30,800 Completed
8 Grain Temperature monitoring system - Phase 2 s 90,000 s 89,535 Completed
9 Install Air Line length of building $ 40,000 s 38,824 Completed
10 Seal Iofter pitfiz $ 65,000 $ 57,400 Completed
11 Hydraulic pump system for marine s 20,000 s 7,600 Completed
12 tofter belt for rail Iofters 5 15,000 s 15,445 Completed
13 New gas monitors s 7,500 s 5,774 Completed
14 LED lighting upgrade s 35,000 s 24,055 Completed
15 Roof Railings $ 30,000 5 29,906 Completed
16 Replacement ofAcrators s 25,000 s 7,707 Completed
17 Soft starts for Iofters conveyors s 12,500 $ 9,247 Completed
18 Bin floor spouts (20) s 10,000 s 9,977 Completed
19 AC and heat system for Annex office s 9,000 $ 5,800 Completed
20 Walk behind brush hog $ 8,000 s 4,400 Complded
21 Industrial vacuum cleaner (IS) s 20,000 s 6,915 Completed
22 Multifunction Photocopier 5 10,000 s 8335 Completed
23 NewGrain bins (cam; over) s 70,000 s 75,644 Completed
24 Township Truck Exchange Program $ 42,500 S 42,127 Completed
Total Capital Budget / Actual s 1,519,500 s 1,419,100
Under] Over Budget 3 (ZOOAOO)
25 Repaits to CN bridge on County Road 2 s 35,000 s 14,444 Work in progress
26 Loading Spouts 5 250,000 S 10,160 Work in progress
27 New Fire Alarm System $ 290,000 s 101,016 Work in progress
28 Dust system 5 120,000 $ 13,877 Work in progress
29 Transfer chutes for west end of Elevator s 210,000 Work in Progress
Total Capital Projects In ngress Budget / Actual s 905,000 s 139,498
Potentia! Canyovel for 2019 3 765,502
30 Paving Projects 5 150,000 Reevaluating for 2019
31 Dock Fendels for Unloading Slip s 250,000 Rrevaluating for 2019
32 New tractor 5 25,000 Recwaluating for 2019
33 NewGrain Program - computer software $ 110,000 Removed
Total Capital Budget - projects ve-cval/temoved s 535,000
[Total Capital Budget Approved / Actual 2018| s 3,059,500
| s 1,558,597I
Health and Safety / Training / Environment
Health and Safety continues lo be a priority at the port with consultant John McGeough from
Prevention and Regulatory Solutions completing valuable training in the following areas:
RRS
Port H&S rules and Port Security
Marine Security
Respect in the Workplace
Respirator safety
Confined Space Permit training
Prevention and RegulatorySolutions Ltd.
HEALTN - SAFITV - ENVIQOHM‘NT
Below is a summary of the health and safety program activities for the 2018 year that were assisted byPrevention and Regulatory Solutions Ltd.
Management Support
Met with Operations Manager regularly t0 identify short and longer-tcrm areas 0f program
development and training.
Updated the hazard pre\"ention program (HPP) for 2018, including newly identified risks and
prevention programs over the previous year, and updates t0 the detailed risk assessment.
Reviewed with management and safety committee, then finalized.
Updated and reissued thc main health and safety policy.
In conjunction with Bill Byker, developed and delivered training sessions covering respect in
the workplace. These sessions expanded on \\'0rkplace violence and harassment programs bypresenting situations that required personnel to recognize unacceptable workplace behaviours
and to properly respond t0 them.
Participated in a site visit and program review by inspectors from the federal government’s
Labour Program. Overall, they wcrc quite impressed with the l’ort’s program and issued minor
findings in the form 0f an Assurance 0f Voluntary Compliance. An action plan was prepared
and submitted by the Port.
Prepared a full update 0f the substance use program. It now incorporates separate policy and
program sections, and expansions to include safely—sensitive functions, fit for duly
requirements, and testing protocols for various situations. The draft program was revimved bymanagement, Port legal, and safety committee. A draft training program was also developed
by not yet delivered.
Updated the employer health and safely responsibilities training program and conducted
training for supervisor/managemem slal‘l‘.
Updated and issued the injury/hazardous occurrence reporting procedure.
Replaced an orientation procedure with a broader procedure covering all health and safety
training. After reviewing the draft procedure with management and the safety committee, it
was finalized and issued.
General H&S SupportReviewed and updated H&S and security rules document and training program. Reviewed these with
management and safety committee, then conducted training sessions for all available personnel.
Reviewed and updated changes to the emergency contact list.
Assisted the safety committee with a WHMIS training assessment. Based on the results, WHMISlraining was deemed t0 be not required for 2018.
Wrote a draft safety checklist for use before boat loading and circulated for comments.
Updated the respiratory hazard assessment, the respiratory protection procedure, and training program.
Reviewed programs with safely committee and conducted training for all available personnel.
Arranged for SCBA respirator training by M&L Supply.
Updated confined space entry (CSE) assessments and permit forms for new and changed spaces, classes
A, B, and E. Reviewed with safely committee and conducted training for all available personnel.
Delivered orientation training for new employees and included existing employees for some topics as
required. Subjects included H&S policies, H&S rules, lockout, protection against noise exposure,
respiratory protection, violence and harassment, WHMIS, Port security, working from heights, CSEhazards and prevention, CSE class assessments and permits, and Ontario accessibility modules.
2018 Health and Safety Metrics
The following metrics were provided by the Port Admin. Assist/Health and Safety Co-ordinator who is also a
nwmber 0fthe safety committee.
Regular safety committee meetings l I
Special safety committee meetings 6
Workplace Inspections conducted l l
Incident or safety investigations conducted 8
Safety complaints filed 0
Work refusals filed 0
Accidents resulting in medical aid only 2
Accidents resulting in lost work days l
Lost work days due to accidents 4
Total training hours by PandRS 44
Other Training/ Workshops
The following training was conducted by outside contractors that specialize in the required training.
o First Aid Training
o Track Mobile operation and Rail Safety training
Other training included the addition 01‘ Bill Byker, Human Resources Consultant who helped t0
facilitate several workshops.
o Standard Operating Procedures ~ worked with management and union stat‘fto create SOPs for
the business. Mr. Byker helped mentor management staffon facilitating these workshops so
that port staffcould take this over in the future. This work continues.
o Respect in the Workplace — Mr. Byker and Mr. McGeough teamed together t0 present this
information session.
o Management sessions to discuss business challenges and how we can involve our employees in
workshops to get their ideas and work towards improving overall morale.
o Code ofConduct — reviewed current information. This will continue in 20] 9.
Frank McAuley also took part in workshops 0n PEST and SWOT analysis. This involved both
management and union staff and was successful in building a vision that will lead to future strategic
planning for the port.
Employee Wellness
As part of the ports ongoing efforts t0 provide wellness initiatives for their employees, the port is now
providing all employees access l0 the Employee and Family Assistance Program through Shepell. This
service offers a broad range of support for both managers and employees and is totally confidential
between the individual and the service provider.
Dr. Lydia Lo was also contracted by the Port to provide support in dealing with employee issues such
as high absenteeism. Some oflhe services offered by Dr. 1-0 are listed below.
o Immunization (vaccine) review and flu shot administration
Smoking cessation counseling
Mental Health and addictions services counseling
o Weight reduction and nutrition services counseling
o Chronic Disease (cg. diabetes, cardiac, arthritis) management counseling
o Caregiver stress counseling
o Ergonomics counseling
o Preventive Health counseling
o Prescription and over-the—counter medication counseling
o I~Icallhcare services navigation counseling
l7
FINANCE REPORT
The Port 0f Jolmstown, a division oflhe Township 0f Edwardsburgh Cardinal, has completed another
very successful year. As detailed in the information below, we have finished 201 8 with the highest
revenues since the township acquired the port. The overall surplus has increased 9.7% over 201 7 and
has moved in a positive direction over the past 4 years.
Port Finances - 2018 {Audited-EBITM
9.000.000
BflOQOOO
LOOQOOO
aOOQOOO
QOOQOOO
4fi0&000
lOOQOOO
ZfiOQOOO
1fl0Q000
2010 2011 2012 2013 2014 2015
-0-Revenue 7 157 56 03 .299 6 27 7 7
-I-E es 11 177 4 37 1 79
*Nu 26 173,262 2.061368 1 27 2,1 30
201 6
22
62
7
2
2017
27
777 23
03
7
201 8
59
7
951 12
18
2018 BUDGET SUMMARYREVENUES - *EBITDA Jan 8, 2019
HARBOUR SERVICES 2017 ACTUAL 201s BUDGET 2018 ACTUAL Var «A Actuals
BERTHAGE 124,180 95,000 162,874 31%GRAIN WHARFAGE 100,203 110,000 126,215 26%OPEN STORAGE WHARFAGE 716,923 662,000 677,990 -5%
MARINE SECURITY 88,234 35,000 71,424 49%TOTAL 1,029,591 902,000 1,038,505 1%
GRAIN SERVICESSTORAGE 2,144.856 1,975,000 1,905,601 41%AERATION 34,537 105,000 98,717 17%LABTESHNG 2,370 2,000 5,711 141%RECEIVING - VESSELs 120,803 — - 400%RECEIVING - RAILS 25,532 25,000 13,554 47%RECEIVING - TRUCK 1,460,163 1,575,000 2,096,546 44%DEUVERING-VESSELS 590,051 725,000 884,337 50%DELIVERING - RAIL 491 5,000 1,674 241%DELIVERING - TRUCKS 458,723 475,000 359,581 -22%
DELIVERING - MILL 5,247 5,250 2,161 69%(TOTALIN/oun 2,661,026 2,810,250 3,357,354 26%CLEANING 33,063 25,000 5,738 .85%
GRAN DRYING 154,739 250,000 107,528 31%SOYBEAN DRYING 760,529 600,000 725,970 5%
GRADING 150 - 60 40%PROTEIN ANALYsss 4,470 4,500 3,373 25%CUSISERVICE/FUMIGAHON 232.676 250.000 303,254 30%SCREENINGS 12,924 5,000 - 400%
TOTAL 6,096,344 6,026,750 6,514,805 mRENTALSBUSINESS PROPERTY LEASES 67,002 63,120 59,130 42%CARGO STORAGE LEASES 164,469 165,000 156,484 -5%
LICENSE AGREEMENTS 12,502 12,600 13,035 4%COTTAGE LEASES 44,223 44,800 43,037 -3%
TOTAL 238,200'
290,520 271,737 5%
SHIPPING SERVICES OTHERSALE 0F GRAIN (DRYING REV) - - 11,198 0%SALE ELECTRICITY 1,516 1,500 1,506 4%MISCELLANEOUS 18,376 - 4,708 -74%
TOTAL 19,892 1,500 17,412 -1253
TOTAL REVENUES 7.434.027 7,220,770 7.842.459 5%
Comgared t0 2017
Total revenues increased $408,432 (5.5%)Grain revenues increased $418,461 (6.8500)
o Increased grain through put resulting in higher grain services revenues of $322,183
o Increase in grain tariffs of 1.5% resulting in an additional $96,278.
2018 BUDGET SUMMARYEXPENSES - EBITDA
2017 ACTUAL 2018 BUDGET 201s ACTUAL Var 94 Actual;
LABOUR REG 1,516,262 1,615,000 1,506,593 4%LABOUR 0T 154,523 175,000 195,620 19%BENEFrrs 844,831 867,000 900,028 7%LABOUR TOTAL 2,525,666
'2,651,000 2,602,246 3%
ELECTRICITY 359,760 300,000 317,129 42%GAS 62,343 70,000 51,755 47%EQUIPMENT FUEL 2,689 4,000 15,602 480%UTILITIES 424,792
'374,000 384,485 .995
OUTSIDE SERVICES 436,937 495,100 374,630 -1454
MATERIALS AND SUPPLIES 114,514 183,450 122,814 7%
ADVERTISING I DONATIONS!sponsonsmps I MEMBERSHIPS 61,411 85,000 59,491 .394
ARENA CONTRIBUTION 88,000 69,000 69,000 .2254
RENTALS 9,111 22,000 23,332 155%
BUSINESS TRAVEL 3,913 17,500 9,449 6%
OFFICE ADMINISTRATION 34.100 53,125 52,461 54%
INSURANCE 231,611 235,000 214,505 .795
MUNICIPAL HONORARIUM 17,400 11,400 15,600 40%
MUNICIPAL ADMIN FEES 758,340 158,340 158,340 0%
GRAIN HANDLING Losses 65,555 150,000 204,493 207%
TOTAL OPERATING IADMIN EXPENSES 1,826,955 2,035,915 1,904,115 4%
TOTAL EXPEN ses 4,771,423 5,116,915 4,890,847 2%
201 8 BUDGET SUMMARYNET SURPLUS - EB|TDA
2017 ACTUAL 2018 BUDGET 2018 BUDGET Var 9s Actual;
TOTAL REVENUES 7,434,027 7,220,770 7,842,459 5%TOTAL EXPEN SES 4,777,423 5,1 16,91 5 4,890,847 2%TOTAL NET SURPLUS 2,656,603 2,103,855 2,951,612 11%
'Eamings before interest,(axes,depreciafion and amortization
Compared t0 2017
Expenses increased Sl l3, 424 (2.4%)o Wage increase of 1.5% additional cost of $38,456
0 Increased overtime costs 0f $31,096
o 5-year wheat inventory was carried out resulting in grain handling losses
(shrinkage) of8137,937.
o Electrical costs were lower by $39,632
0 Overall Operational costs were lower by $60,787
20
2018 Budget - Revenues / Expenses by QuarterJan. 8 2019
FYE 2018 BUDGET 1ST QTR 2ND QTR 3RD QTR TH QTR
AV,I
., . ,. . .. .‘...1,.__1.5o_ .81.
,.
1v
.11 5'2-...‘1-1
.................................................15-5110
I
'1 ‘-1 I
2-2017 Actuals 151 QTR 2ND 01R 3RD QTR om. 789 1 062-
"17 3759 1. '74
'
7v . 1118 01: 1066-194 ‘1 r --1 v
16 REVENUE 920 382 1 305 343 1 347 954 4 133 144 7 706 822
16 OPERATING EXP. 1 065 614 1 089 587 1 154 851 1 947 007 5 osoET 4s 21 755 102 136 136 762
‘
.668: 1
'
'1'
.1~ a'
:7
15. EXP; ‘
7 856 .1 054 1'5
5 NET s'
1‘-
'
51 1v
14 REVENUE 900 941 1 444 1 374 870 3 073 567 6 569 827
14 OPERAHNG EXP. 1 ooo 915 1 075 992 1 1 17 1 545 4 621 769
14 NET SURPLUS 144 1 1 m3 9‘16 s76 sos ’ 3 .6 493‘
13 .-
‘
61"
1
3 NH suRPLus 33‘
‘ '1“
2012 REVENUE 1 oo1 076 1 195 2 561 625 s 424
2012 OPERAnNG exp. 344 654 1 021 032 1 966 4 1 036
2012 NH sunpws 1 152 1 173
2011 -
1 10 10 1 ‘
- "7‘7 1'6
2011,. exp. '851 9767‘
'‘
.4-78‘1
2011'
v SURPLUS 1
‘’
.
785‘‘
' ‘ ‘
.
'
. 1 V151'
2010REVENUE 936 698 1026 oo4 821 71 oao
2010 OPERATING exp. e40 675 922 544 392 464 4 zos 619
2010 NH suRPLus 103 357 2 953 1
2009 7842' 33
'
092>
.
v 6-»
2009 exp. 839 961 ass'
=1 106 a 939619
200‘s uersmwws' '
1 641 138 1‘
'
‘
#131
2008 REVENUE 930 317 1 ass 1 951 963 136 174 6 302 5
zoos OPERAnNG exp. 761 9 796 528 1 161 453 1 122 049 3 861
zoos NH suanus 149 431 58 790 sos 1 4 125 1 7
21
7,000,000.00
6,000,000.00
5,000,000.00
4,000,000.w
3,000,000.00
2,000,000.00
1,000,000.w
am
Total Revenues
2012 2013 2014 2015
IGRAN SERVES l STORAGE n INIOUT DRYING/SALE GRAIN
2016 2017 2018
I 01H“ I HARMUR SERVICES
1,800,M0.00
1,600,000.00
1,400,000.00
1,200,000.00
1,000,000,00
800,00000
600,000.00
40090000
200,00000
0.00
Total Expenses
2012 201 3 201 4 201 5
I LABOUR - MGULAR I MUNICIPALALLOCATDN I EMPLOYEE BENEFITS I ELECTRICITY
" El H ~ .3
I
r
Eé
‘
a3
‘1
2016 201 7 2018
HNSURANCE IOUTSDE SERVICES I MATER‘ALAND SUPPLIES
Other Activities
Port Day
'l‘hc port held its annual port day 0n Saturday June 16‘“. This year the port was joined by Giant Tiger
as a major sponsor ofthe cvcnt providing food and the Giant Tiger tour train. The kids’ section was a
major hit as face painting and port related activities were 0n hand t0 grcct the many little ones that
attended. Sons ofGords, a local popular band provided the entertainment while Bruce Burrows,
president ofChamber of Marine Commerce was our VIP speaker.
o Approximately 500 people attended the event
o Grain elevator tours - 100 people
o Dock tours via conveyance with - 350 people
0 8 display booths with grain brokers, stevedores and conservation authorities.
It takes a lot ofeffort by port slafl‘to put this event together including a host ofvolunteers that help
with our dock tours, parking and kid’s activities. Thank you to all.
Grain Elevator Tours and Presentations
o C and M seeds presentations in Carp and Winchester — P011 Staff
o Brockville ship museum — Mayor Pat Sayeau
o Students from 'l‘agwi High School presentation and tour — Port Staff
o United Counties Economic Summit 201 8 — Frank McAuley
o 4H group from Leeds and Grenville — Port Staff
o 4H group from Lennox and Addington — P011 Staff
o Queen University students/ Sandra Lawn — Port staffand Mayor Pat Sayeau
Christmas Lunch Event
On December 21, Port staffand committee members were provided with a nice Christmas lunch at the
Prescott Goll‘course in appreciation for ajob well done in 201 8.
General Manager Summary
In 201 8, The Port 0f.lohnst0\\-'n continued investments towards infrastructure t0 ensure sustainability
0f the t0\\-‘nship’s growing operation. Thc port also continues t0 invest in their employees through
training and various “orkshops. Health and Safety is always a main focus for thc port, while ongoing
efforts to update our strategic plan through analyzing our mission and vision statements will continue
into 2019.
Our past investments towards expansion ofboth the marine and grain sectors oi‘the business continue
t0 result with increased revenues. We cannot predict thc weather, global politics and other potential
impacts to our business, however, we can ensure that we provide improved services, flexibility and
increased capacities for our customers current and future needs.
Again, thank you to our elected officials, members ol‘the public, and our staff for their contributions
towards another terrific year.