Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep...
Transcript of Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep...
![Page 1: Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep water quay • ICE Design and Construct • Value £8m • 64 week programme duration](https://reader034.fdocuments.net/reader034/viewer/2022042103/5e7ffbebac3cf37672273439/html5/thumbnails/1.jpg)
Poole Harbour – New South Quay
Richard Hayman
Contract Manager - Marine
![Page 2: Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep water quay • ICE Design and Construct • Value £8m • 64 week programme duration](https://reader034.fdocuments.net/reader034/viewer/2022042103/5e7ffbebac3cf37672273439/html5/thumbnails/2.jpg)
Poole Harbour – New South Quay
• New 200m x 40m deep water quay
• ICE Design and Construct
• Value £8m
• 64 week programme duration (inc design)
• Client
• Poole Harbour Commissioners (Principle Designer)
• Main Contractor
• Bam Nuttall
Designers/Subcontractors
• Byland Engineering Piling
• Norder Associates Pavement
• Rhode Nielsen Dredging Works
![Page 3: Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep water quay • ICE Design and Construct • Value £8m • 64 week programme duration](https://reader034.fdocuments.net/reader034/viewer/2022042103/5e7ffbebac3cf37672273439/html5/thumbnails/3.jpg)
Poole Harbour South Quay Design Phase
Insert GA
![Page 4: Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep water quay • ICE Design and Construct • Value £8m • 64 week programme duration](https://reader034.fdocuments.net/reader034/viewer/2022042103/5e7ffbebac3cf37672273439/html5/thumbnails/4.jpg)
Geotechnical Design – Site Investigation
• Site Specific SI
• 2no. BH
• 8no. SPT
• Historic SI
• BH of varying
depths and quality
• Side scan sonar
bathymetric survey
• Topo survey
![Page 5: Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep water quay • ICE Design and Construct • Value £8m • 64 week programme duration](https://reader034.fdocuments.net/reader034/viewer/2022042103/5e7ffbebac3cf37672273439/html5/thumbnails/5.jpg)
Geotechnical Design – Ground Model
Dredged sand
construction bund
Dense Sand bed of the
Oakdale Clay Member
Stiff Oakdale Clay
Dredged pocket prior to
sand placement
Alluvium
![Page 6: Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep water quay • ICE Design and Construct • Value £8m • 64 week programme duration](https://reader034.fdocuments.net/reader034/viewer/2022042103/5e7ffbebac3cf37672273439/html5/thumbnails/6.jpg)
Geotechnical Design – Analysis & Design Criteria
• Geotechnical analysis conducted using:
• WALLAP – Retaining Wall
• Oasys Pile – Axial Capacity
• Pdisp – Settlement
• Design Criteria
• 50year life for structure
• All elements have a sacrificial steel
allowance in lieu of coating
• Gottwald Dock Crane
• Berthing and fender loads
• Quay Surcharge of 50kPa
![Page 7: Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep water quay • ICE Design and Construct • Value £8m • 64 week programme duration](https://reader034.fdocuments.net/reader034/viewer/2022042103/5e7ffbebac3cf37672273439/html5/thumbnails/7.jpg)
Geotechnical Design
• HZ 880MA
• AZ13-70 10/10 Infills
• Anchor walls – reused
clients stock piles
• Rear wall – AZ sheets
reducing in size as the bed
level rises
![Page 8: Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep water quay • ICE Design and Construct • Value £8m • 64 week programme duration](https://reader034.fdocuments.net/reader034/viewer/2022042103/5e7ffbebac3cf37672273439/html5/thumbnails/8.jpg)
Poole Harbour South Quay
![Page 9: Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep water quay • ICE Design and Construct • Value £8m • 64 week programme duration](https://reader034.fdocuments.net/reader034/viewer/2022042103/5e7ffbebac3cf37672273439/html5/thumbnails/9.jpg)
Poole Harbour South Quay
![Page 10: Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep water quay • ICE Design and Construct • Value £8m • 64 week programme duration](https://reader034.fdocuments.net/reader034/viewer/2022042103/5e7ffbebac3cf37672273439/html5/thumbnails/10.jpg)
Poole Harbour South Quay
![Page 11: Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep water quay • ICE Design and Construct • Value £8m • 64 week programme duration](https://reader034.fdocuments.net/reader034/viewer/2022042103/5e7ffbebac3cf37672273439/html5/thumbnails/11.jpg)
Poole Harbour South Quay
![Page 12: Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep water quay • ICE Design and Construct • Value £8m • 64 week programme duration](https://reader034.fdocuments.net/reader034/viewer/2022042103/5e7ffbebac3cf37672273439/html5/thumbnails/12.jpg)
Poole Harbour South Quay
![Page 13: Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep water quay • ICE Design and Construct • Value £8m • 64 week programme duration](https://reader034.fdocuments.net/reader034/viewer/2022042103/5e7ffbebac3cf37672273439/html5/thumbnails/13.jpg)
Poole Harbour South Quay
![Page 14: Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep water quay • ICE Design and Construct • Value £8m • 64 week programme duration](https://reader034.fdocuments.net/reader034/viewer/2022042103/5e7ffbebac3cf37672273439/html5/thumbnails/14.jpg)
Poole Harbour South Quay
• 1800t HZM Sheet Pile
• 75,000m3 Dredged Fill
• 400m Capping Beam
• 40m Tie Rods
• 2 No Crane Barges
![Page 15: Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep water quay • ICE Design and Construct • Value £8m • 64 week programme duration](https://reader034.fdocuments.net/reader034/viewer/2022042103/5e7ffbebac3cf37672273439/html5/thumbnails/15.jpg)
Poole Harbour South Quay
• Piling Gate - Design Strategy
– Ease of installation
– Ability to pitch I beams and infill sheets in a single set up
– Maintain gauge at all times
– Supported off previously driven piles
– Drive piles to finished level with without stripping the gate
– Maximum number of piles in a single gate set up v Weight of
gate
– Accommodate different hammer set ups
– Safe Access
![Page 16: Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep water quay • ICE Design and Construct • Value £8m • 64 week programme duration](https://reader034.fdocuments.net/reader034/viewer/2022042103/5e7ffbebac3cf37672273439/html5/thumbnails/16.jpg)
Poole Harbour South Quay
![Page 17: Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep water quay • ICE Design and Construct • Value £8m • 64 week programme duration](https://reader034.fdocuments.net/reader034/viewer/2022042103/5e7ffbebac3cf37672273439/html5/thumbnails/17.jpg)
Poole Harbour South Quay
![Page 18: Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep water quay • ICE Design and Construct • Value £8m • 64 week programme duration](https://reader034.fdocuments.net/reader034/viewer/2022042103/5e7ffbebac3cf37672273439/html5/thumbnails/18.jpg)
Poole Harbour South Quay
![Page 19: Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep water quay • ICE Design and Construct • Value £8m • 64 week programme duration](https://reader034.fdocuments.net/reader034/viewer/2022042103/5e7ffbebac3cf37672273439/html5/thumbnails/19.jpg)
Poole Harbour South Quay Spud Pile Installation
![Page 20: Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep water quay • ICE Design and Construct • Value £8m • 64 week programme duration](https://reader034.fdocuments.net/reader034/viewer/2022042103/5e7ffbebac3cf37672273439/html5/thumbnails/20.jpg)
Poole Harbour South Quay King Piles
![Page 21: Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep water quay • ICE Design and Construct • Value £8m • 64 week programme duration](https://reader034.fdocuments.net/reader034/viewer/2022042103/5e7ffbebac3cf37672273439/html5/thumbnails/21.jpg)
Poole Harbour South Quay
Infill Sheet Piles
![Page 22: Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep water quay • ICE Design and Construct • Value £8m • 64 week programme duration](https://reader034.fdocuments.net/reader034/viewer/2022042103/5e7ffbebac3cf37672273439/html5/thumbnails/22.jpg)
Poole Harbour South Quay
Corner Piles
![Page 23: Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep water quay • ICE Design and Construct • Value £8m • 64 week programme duration](https://reader034.fdocuments.net/reader034/viewer/2022042103/5e7ffbebac3cf37672273439/html5/thumbnails/23.jpg)
Poole Harbour South Quay Gate Number King Piles Date Installed Date Removed Days Worked Hours Worked Notes
1 25-32 18/02/2017 28/02/2017 SSMTWTMT 84 25/02/2017 and 26/02/17
Temp Goal Posts set up
2 33-40 01/03/2017 06/03/2017 WTFSSM 62 05/03/17 Unable to pile
due to mix of
winds/breakdowns/Sunda
y working restrictions
3 41-48 07/03/2017 09/03/2017 TWT 33 07/03/17 Gate moved AM
4 49-56 13/03/2017 15/03/2017 MTW 25
5 57-64 15/03/2017 16/03/2017 WT 19
6 65-72 17/03/2017 20/03/2017 FSSM 40 17/03/17 Barge move, AM
20/03/17 Unable to work
AM due to high winds
7 73-80 21/03/2017 22/03/2017 TW 19 21/03/17 Unable to use
crane between 12:00 and
17:30
8 81-88 22/03/2017 28/03/2017 WTMT 40 27/03/2017 Shaun off sick
so no crane works
9 89-96 29/03/2017 30/03/2017 WT 22 29/03/17 Barge move AM
10 97-104 31/03/2017 01/04/2017 FS 20
11 105-112 02/04/2017 03/04/2017 SM 20
12 113-120 04/04/2017 05/04/2017 TW 22 04/04/17 Barge Move AM
13 121-123 06/04/2017 06/06/2017 T 10 06/04/17 1 hr AM setting
up temp pile for gate 14,
Spill drill PM, only 3 KP in
gate
14 126-133 08/04/2017 10/04/2017 WTSSM 24 07/04/17 Barge move and
reorganisation, Temp
Spud piles pitched on
05/04/17 and 06/04/17
along side setting up gate
13, Temp goal post beam
set up 07/04/17
15 134-141 10/04/2017 11/04/2017 MT 18 11/04/17 Watson
Hillhouse fitter on site
16 142-143 11/04/2017 12/04/2017 TW 11 Only 2 KP in gate
17 124-125 18/04/2017 20/04/2017 TWT 25
18 146-153 20/04/2017 23/04/2017 TFSS 26 20/04/17 goal post piles
set up, 21/04/17 Barge
move AM
19 154-161 23/04/2017 24/04/2017 SM 16
20 162-169
21 144-145 25/04/2017
22 170-175
Ave 28 hours/gate
![Page 24: Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep water quay • ICE Design and Construct • Value £8m • 64 week programme duration](https://reader034.fdocuments.net/reader034/viewer/2022042103/5e7ffbebac3cf37672273439/html5/thumbnails/24.jpg)
Poole Harbour South Quay Marine Plant
![Page 25: Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep water quay • ICE Design and Construct • Value £8m • 64 week programme duration](https://reader034.fdocuments.net/reader034/viewer/2022042103/5e7ffbebac3cf37672273439/html5/thumbnails/25.jpg)
Poole Harbour South Quay Marine Plant
![Page 26: Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep water quay • ICE Design and Construct • Value £8m • 64 week programme duration](https://reader034.fdocuments.net/reader034/viewer/2022042103/5e7ffbebac3cf37672273439/html5/thumbnails/26.jpg)
Poole Harbour South Quay
![Page 27: Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep water quay • ICE Design and Construct • Value £8m • 64 week programme duration](https://reader034.fdocuments.net/reader034/viewer/2022042103/5e7ffbebac3cf37672273439/html5/thumbnails/27.jpg)
Poole Harbour South Quay
![Page 28: Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep water quay • ICE Design and Construct • Value £8m • 64 week programme duration](https://reader034.fdocuments.net/reader034/viewer/2022042103/5e7ffbebac3cf37672273439/html5/thumbnails/28.jpg)
Poole Harbour South Quay
• Dredging Works (3 Phase Operation)
1st Phase – Initial Dredge, remove peat/silt
and place 38,000m3 to create construction
bund
2nd Phase – 55,000m3 Fill to Tie Rod Level
3rd Phase – 17,000m3 Fill to Pavement level
![Page 29: Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep water quay • ICE Design and Construct • Value £8m • 64 week programme duration](https://reader034.fdocuments.net/reader034/viewer/2022042103/5e7ffbebac3cf37672273439/html5/thumbnails/29.jpg)
Poole Harbour South Quay
![Page 30: Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep water quay • ICE Design and Construct • Value £8m • 64 week programme duration](https://reader034.fdocuments.net/reader034/viewer/2022042103/5e7ffbebac3cf37672273439/html5/thumbnails/30.jpg)
Poole Harbour South Quay
![Page 31: Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep water quay • ICE Design and Construct • Value £8m • 64 week programme duration](https://reader034.fdocuments.net/reader034/viewer/2022042103/5e7ffbebac3cf37672273439/html5/thumbnails/31.jpg)
Poole Harbour South Quay
![Page 32: Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep water quay • ICE Design and Construct • Value £8m • 64 week programme duration](https://reader034.fdocuments.net/reader034/viewer/2022042103/5e7ffbebac3cf37672273439/html5/thumbnails/32.jpg)
Poole Harbour South Quay
![Page 33: Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep water quay • ICE Design and Construct • Value £8m • 64 week programme duration](https://reader034.fdocuments.net/reader034/viewer/2022042103/5e7ffbebac3cf37672273439/html5/thumbnails/33.jpg)
Poole Harbour South Quay
Anodes
![Page 34: Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep water quay • ICE Design and Construct • Value £8m • 64 week programme duration](https://reader034.fdocuments.net/reader034/viewer/2022042103/5e7ffbebac3cf37672273439/html5/thumbnails/34.jpg)
Poole Harbour South Quay Remaining Works
• Capping Beam
• Tie Rods
• Vibro Compaction
• CP/Annode Install
• Pavement Works
• Fenders
• Quay Furniture
![Page 35: Poole Harbour New South Quay - PIANC · Poole Harbour – New South Quay • New 200m x 40m deep water quay • ICE Design and Construct • Value £8m • 64 week programme duration](https://reader034.fdocuments.net/reader034/viewer/2022042103/5e7ffbebac3cf37672273439/html5/thumbnails/35.jpg)
Poole Harbour South Quay