POM_Company Presentation-2015
Transcript of POM_Company Presentation-2015
2005: Established POM Precision Mold factory.
2012: Established World Top Mould CO., LTD for Large Mold.
2011: UL Certified WTP for Inj. Molding & Assembly Dep.
2010: Established World Top Technology CO., LTD
1996: Establishment of Power On Mould in Dongguan.
About us
2013: Set-up Clean Room for Inj. Molding & Assembly.
2014: ISO 13485 : 2012 certified. Take application for TS16949.
Total Employees: 358
World Top Industrial Co., Ltd.
Power On Mould
Power On Mould:
Medium Size and prototype
Mold Factory
Power On Mould:
Precision mold factory
World Top Mould:
Large size mold factory
Bring your ideas to reality
3 Mould Factories
1 Plastic Injection Molding Factory
Materials:
PA6, PA66, PC, ABS, POM, PC/ABS, PP, PA+30GF/50GF,
PP+20Talc/40Talc, PBT+30%GF, PPS+40%GF, PEEK, LCP, etc.
Clean Room Injection Molding
Clean Room Assembly
Bring your ideas to reality
1.Medical Parts Assembly
2.Electronic Parts Assembly
3.Automotive Parts Assembly
Others
Sales 100% Exported Molds to Europe, North America etc.
60 sets molds can be produced per Month.
Capacity
Capacity
2K Injection Machines are available for Mold Trial and Production.
10K class Clean Room for Injection Molding.
100K Class Clean Room for Assembly.
Capacity
Capacity
3 Tooling Workshops.1 injection and assembly workshopCapacity
What we do
Business scopePlastic injection mould90%
Multi cavity mold 2K mold
Stack mold Multi-Hyd.Core pulls mold
Business scope
Die casting mould5% Silicone rubber mould5%
Business Categories
Automotive parts55%
Ventilator Mirror holder Fuel pipe
Blower WheelOthers GrilleGMT9XX Flange Cup
Business Categories
Medical parts15%
Medical consumables Medical Instrument
Medical Instrument Medical Instrument
Business Categories
Electronic parts15%
Business Categories
Home Appliances10%
Business Categories
Others Parts5%
Business Introduction
Turnover
0
2,000,000
2008 2009 2010 2011 2012 2013 2014
4,000,000
6,000,000
8,000,000
10,000,000
12,000,000
14,000,000
16,000,000
其中塑胶产品占80%
(USD)
70% for mold, 30% for plastic parts
2015
13M
8M
8.5M
10M
11
M
13M
15M
15.5
M
EST.
16M
Business Introduction
Marketing distribution
USA
Canada
Brazil
Peru
Japan
Sweden
Holland
DanmarkEngland
GermanyFrance
SwitzerlandSpain
Israel
Main Customer
Mercedes-Benz
BMW
Volkswagen
Ford
Dorel France
ATMOR
Leviton Mfg.
Roush Manufacturing
Interacoustics A/S
Tec Air
Engineer Department Power On Mould has a professional staff of 40 that have design & manufacturing
experience of moulds for exporting to Europe, USA, etc. POM has built a large
design and manufacturing database to ensure prompt, effective and accurate design
and manufacturing.
We use UG software and can
deal with STEP, Parasolid, IGES,
DWG, DXF, CADL, NFL, SAT
data etc.
Project Engineers---------------------1001
Mould designers-----------------------3002
CAM\CNC Programmers------------1003
Engineer Department
3D Product design
2D/3D Mould design
A good design is the heart of a
mould. Therefore, POM has
invested in both people and
technology to ensure that our
design meets your highest
expectation.
Manufacture Department
POM has been well-known in the
industry for capability to
manufacture simple and complex
moulds, as well as injection
molding. POM builds tools from
single cavity to 192 cavities.
POM’s continuous investment in
mould making facilities has kept
the company as a worldwide-
preferred mould supplier.
Precision Mold FactoryMedium-sized Mold Factory
Large Mold Factory
Large mould factory
Manufacture Department
Manufacture Department
Manufacture Department
Manufacture Department
Manufacture Department
Inj.Molding Department
Project Management
Power On Mould appoints a project
manager to each individual project and client.
The project manager is in charge of the entire
project from start to finish and provides
direct communication to the client.
All project management teams communicate
in English and are qualified engineers
Project Management
Flowchart
Project Management
Schedule & Dim Inspection Report
Q.C DepartmentQuality Assurance
Quality moulds yield quality parts. POM has a high degree of in-process
Control on mould manufacturing and final mould qualification.
Q.C DepartmentMain QC Procedure
1.Mold Design control
2.Steel Dimension Inspection
3.Electrodes inspection
4.Steel Hardness Checking
5.Mold Pre-Assembly inspection
6.Samples dimension and structure inspection
7.FAI/CPK/SPC Study, PPAP partially.
8.Mold Pre-shipment final Inspection
Q.C DepartmentQuality Facility
Customer Service
Quality requirements
On time delivery
Favorable Cost
Reliability
Total customer
satisfaction
Our product meets the
following criteria
Customer first,
Excellent in quality,
Delivery on time,
Competitive price.
Power On Mould will continue to meet and exceed our customers' expectations by seeking ways to improve our technology and process, by providing ongoing training for our employees, to ensure the high quality in our products and service!
Our service promises
Service tenet
Customer Service
Mold Inspection&Approval Report
Full 3D Mold Drawing
BOM
FAI
Steel Certification
Heat Treatment Certification
2D Assembly Mold Drawing
HRS Specification
Wiring Diagram
Service Menu
Contact us
E-Mail:
Sales: [email protected]
Engineer: [email protected]
Complaint: [email protected]
Tel&Fax:
Tel: +86 (769)-82068892 ext.68
Fax: +86 (769)-87735374
Address:
Address: Sha Ni Bridge, Qing Xi Town, Dongguan City,
Guangdong Province, China.
Qinghu Industrial Zone, Qingxi Town, Dongguan
City, Guangdong Province, China.
Website: www.poweron-mould.com
Thank you ^_^
Bring your ideas to reality