POM1 LIST OF ATTEMPTED QUESTIONS AND ANSWERS...
Transcript of POM1 LIST OF ATTEMPTED QUESTIONS AND ANSWERS...
POM1
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/FalseQuestion It pays in the long run to inform the customer regarding
expected delays in the deliveries.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Fixed position layout is adopted whenCorrect Answer product is very heavy involving assembly of large
number of partsYour Answer product is very heavy involving assembly of large number of
parts
Select The BlankQuestion The ________ is the defect level for which lots are regarded
as bad lots.Correct Answer Lot Tolerance Percentage DefectiveYour Answer Lot Tolerance Percentage Defective
Multiple Choice Multiple AnswerQuestion Which are the advantages of suburban location?Correct Answer Avaialability of adequate land at lower cost , Both
skilled and unskilled labour can be available , Plant expansion is easier due toless or no restriction for building and constructionYour Answer Avaialability of adequate land at lower cost , Both skilled and
unskilled labour can be available , Plant expansion is easier due to less or norestriction for building and construction
Select The BlankQuestion One detachable ticket is prepared for each ________.Correct Answer OperationYour Answer Worker
Select The BlankQuestion A good maintenance system is not a luxary but a ________.Correct Answer NecessityYour Answer Necessity
Multiple Choice Multiple AnswerQuestion Following are some of the factors which influence process
planningCorrect Answer Order Quantity , Process capability of machine ,
Page 1
POM1Delivery DatesYour Answer Order Quantity , Delivery Dates , Plant layout
True/FalseQuestion Availability of training schools, colleges and management
institutes reduces the company's internal training needs.Correct Answer TrueYour Answer False
Multiple Choice Multiple AnswerQuestion Which of the following are examples of pure materials?Correct Answer Bakeries , Ice factories , WoolenYour Answer Bakeries , Ice factories , Lime stone
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Production Scheduling
Work Sampling Machine utilization Sampling Inspection
Gantt Chart Production Scheduling Charting technique
Match The FollowingQuestion Correct Answer Your Answer
Fixation of inventory level Reorder level Stock on hand
Symptom of ill planned purchasing Over ordering Over ordering
Factor influencing material planning Lead time Lead time
Net requirement of material under MRP Stock on hand Price of material
Multiple Choice Multiple AnswerQuestion Which of the following are steps to identify the critical path in
a small network?Correct Answer Compare the durations of all paths to identify the
longest path. , Sum up the durations of activities along each path. , Enumerateall paths in the network and list down activities on each path.Your Answer Compare the durations of all paths to identify the longest
path. , Sum up the durations of activities along each path. , Enumerate allpaths in the network and list down activities on each path.
Page 2
POM1
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality
lot may vary between ________.Correct Answer 0.01 to 10%Your Answer 0.01 to 10%
True/FalseQuestion Tool breakage has got nearly zero chances in case of eventual
breakdown.Correct Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Which are the three types of float?Correct Answer Total float , Independent float , Free floatYour Answer Total float , Dependent float , Free float
Multiple Choice Multiple AnswerQuestion Which of the following are major inputs to scheduling?Correct Answer Overlapping of operations , Effective Capacity per work
centre , Performance standardsYour Answer Effective Capacity per work centre , Ratio of skilled to
unskilled labour , Performance standards
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of
making any product/s is calledCorrect Answer FactoryYour Answer Factory
Select The BlankQuestion The ________ is the maximum percentage defective that for
the purpose of sampling inspection can be considered satisfactory as a processaverage.Correct Answer Acceptable quality levelYour Answer Lot Tolerance Percentage Defective
Select The BlankQuestion The ________ is the maintenance work initiated on a result
of knowledge of the condition of an item from routine or continuous checking.Correct Answer Condition monitoringYour Answer Overhauling
Page 3
POM1Select The BlankQuestion OC curve of ideal sampling plan suggests that all lots less than
3% defectives have the probability of acceptance of ________.Correct Answer OneYour Answer One
Multiple Choice Single AnswerQuestion How to calculate activity cost slope?Correct Answer Activity cost slope = ( Crash cost - Normal cost ) / (
Normal time - Crash time )Your Answer Activity cost slope = ( Normal cost - Crash cost ) / ( Normal
time - Crash time )
Multiple Choice Multiple AnswerQuestion Which of the following are minimum requirement for a good
quality of design?Correct Answer Resonable cost , Resonable procurement time ,
Resonable manufacturing timeYour Answer Resonable cost , Resonable procurement time , Resonable
manufacturing time
True/FalseQuestion In case of control chart, large smaples such as n=15 or 20
are used if the process standard deviation is small.Correct Answer FalseYour Answer True
Select The BlankQuestion Production control work is ________ in case of floor
inspection as compared with the centralised inspection.Correct Answer easierYour Answer labourious
Multiple Choice Single AnswerQuestion Production Planning includesCorrect Answer Predetermination of manufacturing requirementsYour Answer Predetermination of manufacturing requirements
Multiple Choice Single AnswerQuestion How does the control chart of statistical quality control helps
the operating personnel?Correct Answer Identify the presence of an assignable cause before it
developsYour Answer Reduces chances of rejections
Page 4
POM1Multiple Choice Single AnswerQuestion What can be the worst effect due to excessive vibration?Correct Answer BreakdownYour Answer Reduced salvage value of machine
Multiple Choice Single AnswerQuestion What do you understand by the metallergical aspects of
product which forms the vital part of engineering function?Correct Answer Material specificationsYour Answer Performance specifications
Multiple Choice Single AnswerQuestion Which of the following is a cause of plant breakdown?Correct Answer Overloading of machinesYour Answer Overloading of machines
Multiple Choice Multiple AnswerQuestion Which of the following possibilities can be explored by using
flow process chart?Correct Answer Eliminating the operations or combining the
operations with another , Reducing the distance traveled by the workmen ormaterials , Avoiding the waiting time and thereby reduce production lossesYour Answer Reducing the distance traveled by the workmen or materials ,
Reducing rejections drastically , Avoiding the waiting time and thereby reduceproduction losses
Multiple Choice Single AnswerQuestion Material Planning is an integral part ofCorrect Answer Production PlanningYour Answer Process Planning
True/FalseQuestion Dust gets mixed with lubricants, forms an abrasive substance
and causes pre-mature failure of machinery.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following activities are used while recording for
method study?Correct Answer Delay , Operation , InspectionYour Answer Operation , Inspection , Production
True/FalseQuestion In case of centralised inspection, inspection rooms generally
Page 5
POM1become bottleneck and cause delay in taking action regarding rejection orrework.Correct Answer TrueYour Answer True
Select The BlankQuestion The ________ advocates maintenance procedures whereby the
condition of the plant is constantly watched through systematic inspection tounearth unhealthy conditions and preventiveCorrect Answer Preventive MaintenanceYour Answer Preventive Maintenance
True/FalseQuestion The problems of congestion, bottlenecks and backtracking can
not be visualized by using templates and models.Correct Answer FalseYour Answer False
Multiple Choice Single AnswerQuestion Which varaible is taken along the abscissa or X axis?Correct Answer TimeYour Answer Quality
True/FalseQuestion Delay in completion of projects result in unwelcome additions
to the fixed manufacturing expenses.Correct Answer TrueYour Answer True
Select The BlankQuestion The term ________ emplies the foregone profit due to
inability of company to produce.Correct Answer Opportunity costYour Answer Idle wages
Multiple Choice Single AnswerQuestion Taxes / duties levied is one of the important determinant for
location decision as taxes/duties substantially influenceCorrect Answer Product costYour Answer Order procurement
Multiple Choice Multiple AnswerQuestion What are the uses of failure statistics analysis?Correct Answer To forecast the defect , To identify causes of major
repetative failures , To quantify the frequency of preventive inspection
Page 6
POM1Your Answer To forecast the defect , To identify causes of major repetative
failures , To quantify the frequency of preventive inspection
True/FalseQuestion Shop order is one of the subsidiary orderCorrect Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Which of the following is the most popular technique for
Project Production?Correct Answer PERT & CPMYour Answer PERT & CPM
Select The BlankQuestion The ________ is the probability that a good lot will be
rejected by the sampling plan.Correct Answer Producer's riskYour Answer Lot Tolerance Percentage Defective
True/FalseQuestion The component produced on completely automatic machines
may be subjected to sampling inspection while parts produced onsemi-automatic and completely manual operated machines require cent percentinspection.Correct Answer TrueYour Answer False
Multiple Choice Multiple AnswerQuestion In an organization there may not be a formal PPC department
ifCorrect Answer Work is highly repetitive in nature , Planning
activities are performed by the line staff , Number of workmen is not verylargeYour Answer Work is highly repetitive in nature , Planning activities are
performed by the line staff , Number of workmen is not very large
Multiple Choice Multiple AnswerQuestion Which of the following factors play important role while
selecting or rejecting a particular site from legislation and taxation point ofview?Correct Answer Labour laws , Building codes , Policies regarding issue
of licencesYour Answer Labour laws , Policies regarding issue of licences , Productivity
of labour
Page 7
POM1
Page 8
POM2LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/FalseQuestion Cent percent inspection is required on WIP prior to the key,
critical or costly operation.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following aspects are essential to ensure quality
of purchased items?Correct Answer Defining right quality for the job , Vendor
performance evaluation , Making sure that suppliers understand therequirementsYour Answer Vendor performance evaluation , Making sure that suppliers
understand the requirements , Defining right quality for the job
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of
making any product/s is calledCorrect Answer FactoryYour Answer Factory
Multiple Choice Single AnswerQuestion Which of the following technique is event oriented ?Correct Answer Project Evaluation & Review TechniqueYour Answer Project Evaluation & Review Technique
Select The BlankQuestion Work study is also called ________ studyCorrect Answer Time and MotionYour Answer Time and Motion
Multiple Choice Multiple AnswerQuestion Which of the following concepts must be understood for the
achievement of quality?Correct Answer Quality of conformance , Purpose of product , Quality
of designYour Answer Quality of conformance , Quality of design
Multiple Choice Multiple AnswerQuestion Following are some of the factors considered for evaluation of
alternative layoutsCorrect Answer Flow of Material , Equipment utilization , Ease of
supervision
Page 1
POM2Your Answer Flow of Material , Equipment utilization , Ease of supervision
Match The FollowingQuestion Correct Answer Your Answer
Toung Sweet Sweet
Eye Crack Crack
Nose Burnout Burnout
Ear Impact Impact
Multiple Choice Multiple AnswerQuestion Which of the following are important considerations concerning
activity times?Correct Answer Activity time should be obtained from the person
responsible for the completion of an activity , Activity time must beindependent of any influence which the preceding or succeeding activity mayhave on it. , Activity time may assume that just the normal quantity ofresources required to carry out the activity are available.Your Answer Activity time should be obtained from the person responsible
for the completion of an activity , Activity time must be independent of anyinfluence which the preceding or succeeding activity may have on it. , Activitytime may assume that just the normal quantity of resources required to carryout the activity are available.
Multiple Choice Multiple AnswerQuestion Which are the subtasks of the maintenance phase of the
method study?Correct Answer Monitoring and control , Performance appraisal ,
Audit on savingsYour Answer Monitoring and control , Performance appraisal , Audit on
savings
Multiple Choice Multiple AnswerQuestion Which of the following are characteristics of an operating
characteristics curve?Correct Answer Producer risk , Consumer Risk , Acceptable Quality
LevelYour Answer Producer risk , Consumer Risk , Acceptable Quality Level
Select The BlankQuestion The ________ breakdowns usually cost more, partly due to
damage done to the adjustment components and partly due to emergencyactions.
Page 2
POM2Correct Answer UnexpectedYour Answer Partial
Multiple Choice Single AnswerQuestion Why stores issue order should not be issued as soon as it is
prepared?Correct Answer Material may or may not be available at the time of
preparationYour Answer Inventory investment will increase
Multiple Choice Single AnswerQuestion What is the nature of the sampling plan for critical defects?Correct Answer TightYour Answer Tight
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality
lot may vary between ________.Correct Answer 0.01 to 10%Your Answer 0.01 to 10%
Multiple Choice Multiple AnswerQuestion Plant layout facilitates processing of products in most effective
manner through the followingCorrect Answer Shortest possible distance , Shortest processing time ,
Minimum movementYour Answer Shortest possible distance , Shortest processing time ,
Minimum movement
True/FalseQuestion After goods have been manufactured, route sheets and
operation layouts should not be collected back.Correct Answer FalseYour Answer False
Multiple Choice Single AnswerQuestion Process planning is the process ofCorrect Answer establishing shortest and most economic path of
productionYour Answer establishing shortest and most economic path of production
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding
some value to entity can be defined asCorrect Answer Operation
Page 3
POM2Your Answer Operation
Select The BlankQuestion The ________ is specified to indicate the maximum
permissible variability in the dimensions product or parts.Correct Answer ToleranceYour Answer Tolerance
Select The BlankQuestion Goods after final inspection should accompany ________to
enable dispatch department to identify and draw correct reference.Correct Answer Forwarding noteYour Answer Forwarding note
Select The BlankQuestion The ________ includes preventive maintenance activities whose
needs are identified through inspection which requires stoppage of machines.Correct Answer Shutdown MaintenanceYour Answer Shutdown Maintenance
True/FalseQuestion A load chart specifies the work to be carried out by each
person of company during shift hours.Correct Answer FalseYour Answer True
Select The BlankQuestion The easiest way to bring the delayed job within the promised
delivery time by using extra shift or weekly holiday is ________.Correct Answer Overtime workingYour Answer Overtime working
True/FalseQuestion Under MRP system for common items order for procurement
is placed based on requirement for each productCorrect Answer FalseYour Answer True
Multiple Choice Single AnswerQuestion What do you understand by the extent the products
manufactured conforms to the laid down design?Correct Answer Quality of conformanceYour Answer Quality of conformance
Page 4
POM2Select The BlankQuestion The ________ is necessary when the job requires detailed of
one or more of the job characteristics with the help of special equipmentwhich is not available at the producing company.Correct Answer Inspection orderYour Answer Job card
Multiple Choice Multiple AnswerQuestion Which of the following are the basic requirements of quality
standard?Correct Answer Deifinite , Undesrstandable , Economically viableYour Answer Deifinite , Undesrstandable , Economically viable
True/FalseQuestion In case of forward pass computation, the earliest event time
of the first event is zero.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which kind of possible defectives can be reduced due to first
off inspection?Correct Answer Due to mistakes in reading blue prints , Due to
errors in tooling , Due to wrong machine set upYour Answer Due to mistakes in reading blue prints , Due to errors in
tooling , Due to wrong machine set up , Due to purposely done mistakes byunsatisfied worker
True/FalseQuestion A sampling plan which perfectly discriminates will have
vertical OC curve.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following is a part of preparing manufacturing
order set as a primary function of dispatching?Correct Answer Operational layouts , Move orders , Pre-filled stores
issue ordersYour Answer Operational layouts , Rejection reports , Move orders ,
Pre-filled stores issue orders
Select The BlankQuestion An ________ history card is the record of all repairs,
replacements and engineering changes carried out in the equipment during it'speriod of service.
Page 5
POM2Correct Answer Equipment history cardYour Answer Equipment history card
True/FalseQuestion Specifications is the basic tool of inspection.Correct Answer TrueYour Answer True
Match The FollowingQuestion Correct Answer Your Answer
Forcasting requirement for indirect material Past consumption analysistechnique Economic order quantity
Inventory control by classification ABC Analysis ABC Analysis
Structure of the product BOM BOM
Material Planning for dependent demand MRP MRP
Multiple Choice Single AnswerQuestion The document raised by PPC which authorises different
functions to take action as per instruction is calledCorrect Answer Work OrderYour Answer Job Instructions
Multiple Choice Single AnswerQuestion Who prepares the daily production report?Correct Answer Shop SupervisorYour Answer Shop Supervisor
True/FalseQuestion A lot declared rejected in sampling inspection should not be
inspected 100% in any case.Correct Answer FalseYour Answer True
Multiple Choice Single AnswerQuestion How is the probability of acceptance in case of Acceptable
Quality Level (AQL )?Correct Answer Very highYour Answer Average
Multiple Choice Multiple Answer
Page 6
POM2Question Which are the different methods of recording actual progress
of work?Correct Answer Display boards , Progress cards , Network updatingYour Answer Display boards , Progress cards , Network updating
True/FalseQuestion The dispatching function is of very importance in flow and
mass production units.Correct Answer FalseYour Answer True
True/FalseQuestion Proper care and storage is not an essential part of a well
planned lubrication system.Correct Answer FalseYour Answer False
Select The BlankQuestion The ________ pertain to the climatic conditions which the
component , product or material should withstand.Correct Answer Environmental specificationsYour Answer Environmental specifications
Multiple Choice Single AnswerQuestion Which of the following is the most popular technique for
Project Production?Correct Answer PERT & CPMYour Answer PERT & CPM
Select The BlankQuestion Production Planning is a centralised activity which includes
functions such as ________Correct Answer SchedulingYour Answer Scheduling
Multiple Choice Single AnswerQuestion Which rule is used for numbering of events?Correct Answer Fulkerson's RuleYour Answer Fulkerson's Rule
Page 7
POM3ASSIGNMENT
Q.1) What is “Operations Management”? What are the objectives of OperationsManagement? Enlist key elements of Operations Management.
Answer.1)
An operation may be defined “as the process of changing inputs into outputsthereby adding value to some entity”.Right quality, right quantity, right timeand right price are the four basic requirements of the customers and assuch they determine the extent of customer satisfaction. And if these can beprovided at a minimum cost, then the value of goods produced or servicesrendered increases. Thus the objectives of production management are “toproduce goods and services of the right quality, in the right quantities,according to the time schedule and a minimum cost”.
Objectives of production management may be amplified as under:
• Producing the right kind of goods and services that satisfy customers’needs (effectiveness objective).
• Maximizing output of goods and services with minimum resource inputs(efficiency objective).
• Ensuring that goods and services produced conform to pre-set qualityspecifications (quality objective).
• Minimizing throughput-time- the time that elapses in the conversionprocess- by reducing delays, waiting time and idle time (lead time objective).
• Maximizing utilization of manpower, machines, etc. (Capacity utilizationobjective).
• Minimizing cost of producing goods or rendering a service (Costobjective).
Key elements of Operations Management
1. Product selection and design
The right kind of products and good designs of the products are crucial forthe success of an organizing. A wrong selection of the product and/or poordesign of the products can render the company’s operation ineffective andnon-competitive. Products/services, therefore, must be chosen after detailedevaluation of the product/services alternatives in conformity with theorganization’s objectives. Techniques like value engineering may be employed increating alternate designs, which are free from unnecessary features and meetthe intended functions at the lowest cost.
2. Process selection and planning
Page 1
POM3
Selection of the optimal “conversion system” is as important as choice ofproducts/services and their design. Process selection decisions includedecisions concerning choice of technology, Equipment, machines, materialhandling systems, mechanization and automation. Process planning involvesdetailing of processes if resource conversion required and their sequence.
3 Facilities (Plant) location
Plant location decisions are strategic decisions and once plant is set up at alocation, it is comparatively immobile and can be shifted later only at aconsiderable cost and interruption of production. Although problem of locationchoice does not fall within preview the production function and it occursinfrequently, yet it is of crucial importance because of its major effect on theperformance of every department including production. Therefore, it isimportant to choose the right location, which will minimize total “deliveredcustomer” cost (Production and distribution cost). Locational decisions involveevaluation of locational alternatives against multiplicity of relevant factorsconsidering their relative importance to the organization and selecting those,which are operationally advantageous to the organization.
4. Facilities (Plant) layout and materials handling
Plant layout is concerned with relative location of one department (Workcentre) with another in order to facilitate material flow and processing of aproduct in the most efficient manner through the shortest possible time. Agood layout reduces material handling cost, eliminates delays and congestion,improves co-ordination, provide good housekeeping etc. while a poor layoutresults in congestion, waste, frustration, inefficiency and loss of profit.
5. Capacity Planning
Capacity planning concerns determination and acquisition of productiveresource to ensure that their availability matches the demand. Capacitydecisions have a directInfluence on performance of production system in respect of both resourceproductivity and customer service (i.e. delivery performance). Excess capacityresults in low resource productivity while inadequate capacity leads to poorcustomer service. Capacity planning decisions can be short-term decisions.Long-term capacity planning decisions concern expansion/contraction of majorfacilities required in the conversion process, economics of multiple shiftoperation, development of vendors for major components etc. Short termcapacity planning decisions concern issues like overtime working,sub-contracting, shift adjustments etc. Break even analysis is a valuable toolfor capacity planning.
6. Production Planning and Control (PPC)
Production planning is the system for specifying the production procedure toobtain the desired output in a given time at optimum cost in conformance withspecified standard of quality, and control is essential to ensure that
Page 2
POM3manufacturing takes place in the manner stated in the plan.
7. Inventory control
Inventory control deals with determination of optimal inventory levels of rawmaterials, components, parts, tools; finished goods, spares and supplies toensure their availability with minimum capital lock up. Material requirementplanning (MRP) and just-in-Time (JIT) are the latest techniques that can helpthe firm to reduce inventory.
8. Quality assurance and control
Quality is an important aspect of production system and it must ensure thatservices and products produced by the company conform to the declaredquality standards at the minimum cost A total quality assurance systemincludes such aspects as setting standards of quality, inspection of purchasedand sub-contracted parts, control of quality during manufacture and inspectionof finished product including performance testing etc.
9. Work study and job design
Work-study, also called time and motion study, is concerned with improvementof productivity in the existing jobs and the maximization of productivity in thedesign of new jobs. Two principal component of work-study are:
(i) Method study(ii) Work measurement
Method study has been defined (BS 3138) as the systematic recording andcritical examination of the existing and proposed ways of doing work, as ameans of developing and applying easier and more effective methods andreducing costs. Method study when applied to production methods yields one ormore of the following benefits:
• Improved work environment• Improved facility layout• Better utilization of facilities• Greater safety• Lesser materials handling• Smooth production flow• Lower work-in-process• Higher earnings for the workmen
10. Maintenance and replacement
Maintenance and replacement involve selection of optimal maintenancePreventive and/or breakdown) policy to ensure higher equipment availability atminimum maintenance and repair cost. Preventive maintenance, which includes
Page 3
POM3preventive inspection, planned lubrication, periodic cleaning and upkeep, plannedreplacement of parts, condition monitoring of the equipment and machines, etc.is most appropriate for critical machines.
11. Cost reduction and cost control
Effective production management must ensure minimum cost of production andin this context cost reduction and cost control acquires significant importance.There are large number of tools and techniques available that can help tomake a heavy dent on the production cost.
Q.2) What is batch Production? What are its key characteristics? Compare thesecharacteristics with those of project production.
Answer.2)
Batch production is characterized by the manufacture of a limitednumber of a product (but many such quantities of different products)produced at periodic intervals and stocked in warehouses as finished goods(or finished parts) awaiting sales (or withdrawal for assembly). Typicalexamples of batch production are: process industries such as pharmaceuticals,paints, chemicals; medium and heavy engineering industry engaged in themanufacture of electric motors, switch gears, heavy motor vehicles, internalcombustion engines; manufacture of ready made garments; manufacture ofassembly shops such as machine tools; sub contractors which take on machiningof batches of components to the drawings of a large manufacture etc.
Characteristics of batch production
(a) Short runs:
Short production runs and frequent changes of set also characterizebatch production up. The equipment and the assembly set up is used for alimitednumber of parts or assemblies and is then changed to make a differentproduct. The production is generally made to stock.
(b) Skilled labour in specific trades:The labour force is expected to posses skill in one specific
manufacturing process, Turning, milling, drilling, welding, grinding, hobbing,fitting etc.
The operator may perform simpler machine set-ups but the separate machinetool setter performs those involving complex operations.
(c) Supervision to possess knowledge of a specific processThe supervision has considerable knowledge of a specific process.
Supervisor in the grinding section for example, may not expert in turning anddrilling work but s expected to possess a find of knowledge of different types ofgrinding operations.
Page 4
POM3
Similarly a supervisor in the gear shop is expected to have sound knowledge inworking of different types of gear cutting machines.
(d) Limited span of control:The amount of supervision required in batch production is lower than
that of jobbing production. The ration of direct workmen to supervisors ismore or less a function of batch size. The smaller the batches, the lower arethe ratio of direct workers to supervisors, and vice versa. This is becausesmaller lots require each supervisor to spend a great deal of his time inallocating new work, giving instructions, follow up on the shop floor for propermovement of materials from and to the machines, identifying delays andinterruptions, and arranging, in consultation with planning, work load in hissection to keep his men busy.
(e) General purpose machines and process type of layoutPlant and equipment is procured and arranged to
obtain maximum flexibility. General purpose machines and handling equipmentcapable of performing variety of operations with minimum set –up times areinstalled in lieu of variety of products. The machines are arranged to giveprocess layout-layout by function. Similar machines capable of doing similartypes of operations are grouped together and kept at one place. Presses forexample, are put together and kept at one place milling machines are placedtogether at another place, drilling machines are kept at the third place, gearcutting machines are located at the fourth place and so on. Each Group ofmachines is usually designated as a work centre or a section or a shop.
(f) Manual materials handling:Materials handling in batch production as compared to jobbing production aresmall. Individual components and parts are placed in trolleys and trays andare transported as unit loads. Materials handling may be mechanized bydeploying power driven trucks.
(g) Manufacturing cycle time affected due to queues:The manufacture cycle time is comparatively smaller than jobbing productionbut is much more than mass and flow production. The batches of work tendto queue up at different machines due to differing cycles times, batch sizes andsequence of operations.
(h) Large work-in-progress:Work in progress is comparatively large due to varying work content ofdifferent components, imbalance in manufacturing times, formation of queuesbetween the machines.
(i) Flexibility of production schedules:Disruptions due to machine breakdown or absenteeism do not seriously affectproduction as job can be shifted to another machine or another operator fromanother machine can be shifted.
(j) Need to have production planning and control:Functions of production planning and control in a batch production unit aremore complex than those in jobbing production or mass and flow production:
Page 5
POM3
• Materials control and tools control functions are important. Somekind of replenishment system needs to be used to ensure routinereplenishment
• Detailed operational layout and route sheets are prepared for eachpart of the product.
• Loading and scheduling needs to be more detailed and moresophisticated since every machine requires to be individually scheduled.
• Progressing function is very important to collect information onprogress of work. A separate progress card needs to be maintained to recordprogress of each component.
• Expediting is generally necessary since quite often jobs, due toimbalances in work content, tend to lag behind
Q.3) (a) Why are locational decisions important? What factors should be takeninto account while deciding location of a unit to manufacture washingmachines?
Answer.3a)
Locational decisions generally arise when:
• A new manufacturing (or servicing) unit is to be set up.• Existing plant operations are difficult to expand due to poor selectionof site earlier.• The growth of the business makes it advisable to establish additionalfacilities in new territories.• There is emergence of new social (chronic labour problems) political(political instability or economic conditions that suggest a change in thelocation of the existing plant.• The product development has over weighted the advantages of theexisting plant.• The changes in the industrial Policy of the Government, favoringdecentralizing and dispersal of industries to achieve overall development of thecountry, do not permit expansion of the existing plant
FACTORS GOVERNING PLANT LOCATION
Plant location studies are conducted in three phases:
(i) General territory selection(ii) Community selection, and(iii) Site selection
1. Proximity to market:
Page 6
POM3
Every company is in business to market and it can survive only if theirproduct reaches the consumers on time and at the competitive price. Theratio of selling costs to sales generally increases with distance. Therefore, inthe choice of location o the plant, the factor of “proximity to the market” isgiven the highest priority. Locating a plant nearer to the market is preferredif:
• The product is fragile.• The product is susceptible to spoilage.• The promptness of service is required.• The product is relatively inexpensive and transportation costs addsignificantly to the cost.
Bread, soap factories, etc. require the market to be nearby. If factory cannotbe started in Bombay, it may be started in Thane, Kalyan or Poona. If theproduct is exported, location near ports is desirable. This is particularlyimportant for producers who sell bulky commodities, which incur hightransportation costs
Nearness to market not only lowers transportation costs but also gives manyother benefits namely:
• A good many administrative problems, which cause perpetual headachesand add to costs, are avoided.• Liaison with dealers or whole sellers can be maintained economicallyand easily• Other costs such as commission to middlemen, which at times run ashigh as 20 to 50 percent can be reduced significantly.• Customer’s accounts do not remain outstanding for settlement. Thisrecovery is easy and less time saving which itself reduces selling costs.
2. Proximity to source of raw materials:
Since raw materials usually constitute 50 to 60 percent of the total productcost, it is important that the firm gets its requirements of raw materials atthe right time and at the reasonable price for which the plant must be locatedin the neighborhood of some source which can meet the raw materialsrequirement of the unit “Proximity to supply of raw materials” factor assumesstill greater importance if raw materials are of perishable nature or if theyare expensive to transport, or if their weight is substantially reduced byprocessing.
Proximity to sources of raw materials is equally important for small units.This is because usually small units are not considered important customers.
Page 7
POM3They get least priority and in the event of scarcity are the one to be struckoff first from the list. The availability of materials to small units to a largeextent thus depends on their follow up and personal visits to the supplier’splant which is possible only if the buyer’s plant is close by.
3. Infrastructural facilities:
Infrastructural facilities consider availability of utilities like power water,disposal of waste etc. These form the life-blood of many types of industrieswithout which there facilities may come to a stand still. Underestimating theneed of any one of the utilities can be extremely costly and inconvenient.
Certain industries, for example, aluminium, steel, etc are power intensive andmust be located close to the sites of power generation failing which theshortage of, or increase in cost of generating power may spell problems fortheir survival.
Similarly, chemical process industries like paper and pulp, cement, steel, sugarlaundries, metal plating, food preparation etc. requires perennial source ofwater. Mineral content of water may also be an important factor. Treatmentof water is an expense to be considered while comparing economics of differentlocations.
Drainage facilities are important for process industries otherwise disposal ofprocess waster can create lot of difficulties.
4. Transport facilities:
Transportation cost to the value added is a key determinant of the plantlocation. The structure of the transportation cost depends on (i)Characteristics of the commodity (ii) average distance of shipment (iii) mediumof shipment: rail, road, and air sea.
The need for transport arises because raw materials and fuel are to be movedto factory site and finished goods are to be transported from factory tomarkets. Other things being equal since transport cost has a major effect onproduct cost, the regions well served by transport facilities are most suitablefor industrial locations.
5. Labour and wages:
Plant location should be such that required labour is easily available in theneighbourhood. Importing labour from outside is usually costly and it causeslot of administrative problems. Availability of required labour locally is bettersince problem of arranging accommodation and other related problems do notarise. Since normally workers with specific skills are required, some sort oftraining facility should also be available in the neighborhood. Skilled employeesare easily available if ITI’s, or Engineering colleges are there in theneighbourhood.
6. Legislation and taxation:
Page 8
POM3The policies of the state Government and Local Bodies relating to issue oflicenses, building codes, labour laws, etc. are the factors in selecting/rejectinga particular community/site.
In order to disperse industries and ensure balanced economic growth, bothCentral and State government offer a package of incentives for setting upindustries in particular locations. Exemption from excise duty, sales tax andoctroi, soft loans from financial institutions, subsidy in electricity charges, etc.are some of the incentives offered.
Since taxes and duties levied by the State Government and Local bodiessubstantially influence product cost, the incidence of such taxes/levies must betaken into account while selecting a community/site.
7. Climatic conditions:
Climatic factors may not have a major influence these days because of modernair conditioning facilities available today. However, it may be important factorfor certain industries like textile mills, which require high humidity.
8. Industrial and labour attitudes:
Community attitudes towards supporting hostile trade union activities are animportant factor. Locating facilities in a certain region/community may not bedesirable as frequent labour problems and interruptions are harmful to theplant in the long run. Political situation in the state and attitude of thegovernment towards labour activities also influences selection of the site forthe plant.
9. Safety requirement:
Safety factor may be important for certain industries such as:
- Nuclear power plants- Explosive factoriesLocation of such industries close to border areas is undesirable.
10. Community facilities (or social infrastructure):
Community facilities imply accommodation, educational, entertainment andtransport facilities.
Accommodation is needed unless the employees are local residents.Accommodation should be easily available, comparatively cheap and near somepublic transport stop.The locational area should be fully developed, be accessible by road and shouldhave a convenient and efficient public transport system operating between thearea and the township to enable employees, officials, customers and suppliers tomake easy trips for their work
Page 9
POM3
11. Community attitudes:
Community attitudes towards work (i.e. whether the people in the location arehard working or otherwise) as well as their attitudes towards the incomingentrepreneurs (helpful and cooperative or otherwise) can make or mar anindustry. Locational decisions, therefore, must take such factors also intoaccount particularly while setting up labour intensive units.
12. Supporting industries and services:
Locational factors should also include proximity of services needed by the firm.A firm desirous of getting some or all parts made from outside or some ofthe operations done from outside must see that such sub-contractors arelocated in the neighbourhood. Getting a job done from units located at far offplaces will mean not only additional transportation cost but also timeconsuming and costly. Also if units are too far off, the control on quality ofwork done by them cannot be exercised.
13. Suitability of the land:
Site selection should also take into account topography and soil structure ofthe land. The soil structure must be capable of bearing loads of foundations.Though modern building techniques can overcome the limitations of the soil,but if considerable improvement is required then selection of a low cost andmay ultimately turn out to be expensive.
14. Availability and cost of the land:
Site size (Plot size) must be large enough to accommodate the presentproduction facilities, parking and access facilities but also leave sufficient roomfor future expansion. As a general rule, a site five times the actual plant sizeis considered minimum for all these things including future expansion.
ECONOMY SURVEY OF THE SITE SELECTION:
An ideal location is one where the cost of obtaining materials and processingthem into finished product plus the cost of distributing the finished product tocustomers is minimum.
Page 10
POM3One of the most commonly used approaches consists of following steps:
Step 1: Prepare a list of all relevant factors.
Step 2: Estimate expenses on materials, transport, wages, power etc for eachlocation on each of the above factors.
Step 3: Collect data on intangible factors like community facilities, communityattitudes etc.
Step 4: Analyse the tangible data for each location and calculate rate ofreturn on investment.
Step 5: Select provisionally a locational based on financial data.
Step 6: Compare the intangible data for the different locations and select theoptimal location considering intangible data.
Q.3) (b) What are objectives of a good layout? Discuss any six principles of agood layout?
Answer.3)(b)
OBJECTIVE OF A GOOD PLANT LAYOUT
Only through an efficient layout, the organization can attain the followingobjectives:
(i) Economy in handling of materials, work-in-process and finished goods.
(ii) Minimization of product delays.
(iii) Lesser work-in-progress and minimum manufacturing cycle time.
(iv) Efficient utilization of available space.
(v) Easy supervision and better production control.
(vi) Greater flexibility for changes in product design and for futureexpansion.
(vii) Better working conditions by eliminating causes of excessive noise,objectionable odor smoke etc.
PRINCIPLES OF A GOOD LAYOUT
(i) Overall integration of factors:A good layout is one that integrates men, materials, machines and supportingactivities and others in a way that the best compromise is obtained
No layout can satisfy each and every principle of a good layout. Some
Page 11
POM3criterion may conflict with some other criterion and as a result no layout canbe ideal it has to integrate all factors into the best possible compromise.
(ii) Minimum movement:A good layout is one that permits the minimum movement between theoperations.
The plant and machinery in case of product layout and departments incase of process layout should be arranged as per sequence of operations ofmost of the products.
? Since straight line is the shortest distance between any two points,men and materials as far as possible should be made to move along thestraight path
A door may be made in a wall or a hole may be drilled in a ceiling if thateliminates or reduces material handling in place of stairs or a distant door.
(iii) Uni-direction flow:A good layout is one that makes the materials move only in the forwarddirection, towards stage of completion, with any backtracking.
? Since straight line is the shortest distance between any two, points,materials as far as possible should be made to move on the principle ofstraight line flow. And when straight line flow is not possible, other flows likeU-shaped flow, circular flow or zig zag flow may be adopted, but the layoutmay ensure that materials move in the forward direction (Fig 4.1)
? To ensure forward flow, equipment if necessary may be duplicated.
(iv) Effective use of available space:A good layout is one that makes effective use of available space both horizontaland vertical
• Backtracking and duplicated movements consume more time, involveun-necessary materials handling, add to cost and lead to inefficiency.
• Raw materials, work-in-progress and finished goods should be piledvertically one above another rather than being strewn on the floor.
• Pallets or equivalents should be made use of to pile up several layersone above another
• Area below the work tables or in the cupboards built into the wall arewelcome since they reduce requirement of space
(v) Maximum visibility:A good layout is one that makes men, machines and materials ready observable
Page 12
POM3at all times.
• All departments should be smoothly integrated, convenient to serviceand easy to supervise
• Every piece of positioning or screening or partitioning should bescrutinized and carefully planned.
• Special cupboards, enclosures, offices, partitions etc. should be avoidedexcept when their utility is established beyond doubt.
(vi) Maximum accessibility:A good layout is one that makes all servicing and maintenance point readilyaccessible.
• Machines should be kept sufficiently apart and with reasonableclearance fromThe wall so that lubrication, adjustment and replacement of belts, removal ofparts at the time of repairs etc can be done conveniently by the maintenancestaff.
Area in front of electrical panels and fire extinguishers should be kept freefrom obstructions.
Q.4) How does production planning differ from production control? What arethe key functions of production planning and control?
Answer.4)Production planning versus production control.
Planning (Planning the work) Control (Working the Plan)Planning involves collection and maintenance of data regarding time standards,materials and their specifications, machines and their quantities, tools andtheir process capabilities, drawings and operational layouts etc.
Planning is seeing that requirements tool, machines, men, instructions,authorization and the like-will be available at the right time and in the rightquantities and are of proper quality.
Planning involves preparations of load charts and fitting various work ordersinto uncommitted time available on the company’s facilities (men or machines).
Planning involves preparation of all necessary forms and paper work.
Planning involves designing suitable feed back as to what may happen.
Planning involves forwarding thinking regarding the remedial action to be takenif the job falls behind schedule.
Planning therefore is a centralized
Page 13
POM3Activity (in the office) and includes such functions as materials control, toolscontrol, process planning and scheduling. Control involves dissemination of datapreparation of reports regarding output, machine and labour efficiency,percent defectives etc.
Control is seeing the requirements are actually made available at the rightplace and in the right quantities.
Control involves actual seeing that the jobs are started and completed as perschedule prepared by the scheduling cell of the PPC.
Control involves actual issue of forms and paper work.
Control involves keeping track of what is happening and collecting informationas to what has happened.
Control involves suggesting remedial action when the job is falling behindschedule.
Control is thus a diffused activity (in the shops) and includes functions such asdispatching, progressing and expediting.
FUNCTIONS OF PRODUCTION PLANNING AND CONTROL:
Production planning and control is normally assigned two sets of functions:(I)Regular functions and(ii) Optional functions.
(i) Regular functions are those, which are generally assigned to PPC inmost of the organizations through the importance of the function, may varyfrom industry to industry.
(ii) Optional functions are those, which may be assigned to PPC dependingupon policy of the management of the firm.
Page 14
POM3
Common (or Regular Functions) Optional Functions
Order Preparation includes activities like making of work orders, convertingwork orders to shop orders, preparing auxiliary orders and releasing suchorders to those concerned to authorize their activities
Materials control concerns preparations of materials estimates, indentingnon-stock materials, ascertaining availability of materials purchased to stock,continual follow-up with purchase and stores for timely receipt of materials,and advising stores to allocate required quantities or available materials(alternatively on their receipt) against specific shop orders.
Process planning or Routing concerns fixation of method of manufacture:operations and their sequence, machine tool for each operation, jigs andfixtures, measuring instruments and gauges etc. to enable shops to producegoods of the right quality at the lowest cost.
Tools control concerns preparations of estimates of cutting tools (Standards asweek As non-standards tools), gauges and measuring instruments, jigs andfixtures etc indenting non-stick tooling: follow up with tool room for timelymanufacture of jigs and fixtures; periodical replenishment ofworn-out-non-consumable tooling (e.g. work arbors, collets, copying masters,Allen keys, spanners, etc.
Scheduling concerns preparation of machine loads, fixation of calendar dates ofvarious operations to be performed on a job, coordination with sales toconfirm delivery dates of new items and periodical preparation of dispatchschedules of regular items.
Dispatching concerns preparation and distribution of shop orders andmanufacturing instructions to the concerned department as their authority toperform the work according to the predetermined schedule.
Progressing concerns collection of data from manufacturing shops, recording ofprogress of work, and comparing progress against the plan.
Expediting concerns intensive progress chasing to identify delays andinterruptions which may hold up production, devising cures from time to timeto keep rate of production in line with the schedule, communicating possiblefailure in delivery commitments to Sales Department.
Cost Estimation concerns preparations ofPreproduction cost estimates to be used by sales department for quotationpurposes (Alternatively this may be assigned to Costing Department OrIndustrial Engineering Department)
Page 15
POM3
Work measurement concern fixation of time to be allowed to a qualifiedworkman to carry out a specific task, under specified conditions and at thedefined level of performance. Work measurement employs scientific, well-knowntechniques like time study, work sampling standard data, production study,analytical estimating etc. (Alternatively, work measurement function may beassigned to Industrial Engineering department.Sub-Contract concerns offloading of certain work on outside vendors foreconomic reasons or to augment the existing manufacturing facilities(Sub-contract work alternatively) be handled by Materials/purchase Department)
Capacity planning concerns estimation of requirements of men and machines asthe basis of decision making to meet the firm’s increased volume of business(Some companies prefer to assign this function to Engineering department.
Demand forecasting concerns making projection of company’s product market.Though, long term forecasts are given by Sales Department but short termforecasts required for materials planning, machine loading, sub contracting etcmay be prepared by PPC department
Q.12 (a) What is critical path? What does it signify? How is it identified?
Answer.2)(a)
Critical path analysis, an important aid to planning, scheduling andcoordinating the activities if large scale projects. Is a synthesis of twoindependent techniques: Programme Evaluation and Review Technique (PERT)and Critical Path Method (CPM).Though the two techniques were developed independently, they are onlysuperficially different. The two method have many features in common andare now combined into a technique called Critical Path Analysis (CPA) orNetwork Analysis.
There are three basic different between a PERT network and CPM network:
• PERT is event oriented while CPM is activity oriented (i.e. PERTprepares network from events while CPM builds if from activities)
• PERT provides for an allowance for uncertainty while CPM does not (i.e.PERT makes three time estimates for each activity while CPM makes one timeestimate)
Page 16
POM3• Activity time in CPM technique are related to costs while it is not soin PERT since it is event oriented
Significance of critical path
Critical path analysis offers several advantages. It
(i) Forces through pre-planning. Each and every activity compromisingthe project is identified and recorded. Nothing is left to memory or chancewhich prevents crises in scheduling(ii) Increases coordination of tasks as technological relationship betweenthe activities suggests which activities can run simultaneously and which shouldsucceed others.(iii) Helps computations of different project duration’s for different level ofresources and thereby select a plan that minimizes total project cost.(iv) Indicates optimal start and finish times of each activity of the project.(v) Defines areas of responsibility of different departmental heads fortimely execution of the project.(vi) Facilitates progress reporting and limits unnecessary discussion at theprogress meetings.(vii) Identifies troubles spot often in advance and apply remedial measures.(viii) Enables the plan to be revised in accordance with changes/changingcircumstances.(ix) Helps to exercise “control by exception” and prevents cost overruns.
A Project comprises a series of activities and the identification of the individualactivities requires knowledge and experience of the men responsible for theplanning of the project. Even the preliminaries-mere listing of theactivities-make the operating personnel:
• Think of details about the project well in advance.
• Observe critically the way in which the various activities interact orcompete for scarce resources
• Improve upon the original plans even before network is formallydrawn and analyzed.
A project, therefore, must be torn into a set of identifiable activities. Thereare no set rules but general guidelines are as under:
• An activity should represent the smallest unit of the operation or setof operations over which management desires control.
• An activity should represent an operation or set of operations, whichcan be performed using a particular kind of equipment or a specialskill. For example in construction project, plumbing is considered as oneactivity while wiring can be considered as another activity since the firstactivity requires plumbers and the second activity needs electricians.
Page 17
POM3
Q.12) (b)
Activity Optimistic Most Likely Pessimistic1-2 02 03 101-3 02 04 061-4 02 06 102-5 01 01 013-5 04 05 124-5 02 03 044-6 02 05 085-6 03 05 13
Answer:
Page 18
POM3(a) Expected time of an activity can be obtained from the three time estimatesusing the formula:
te = a + 4m +b6
where a = Optimistic timem = most likely timeb = pessimistic time
For activity (1-2)a = 2m = 3b = 10
te = 2 + 4 x 3 + 106
te = 24 = 46
Expected times of all activities of the network, calculated on above lines, aretabulated below.
Activity Three time estimates Expected time1-2 02-03-10 41-3 02-04-06 41-4 02-06-10 62-5 01-01-01 13-5 04-05-12 64-5 02-03-04 34-6 02-05-08 55-6 03-05-13 6
5
6 36
4 6
4 1
Page 19
POM3Critical path is 1-3,3-5,5-6 and the duration for the project is 16 weeks(4+6+6)
Variance isVi = (b –a) X (b – a)
6 6
V1-3 = 49
V3-5 = 169
V5-6 = 259
V = V1-3 + V3-5 + V5-6
V = 5
Standard deviation Z = T - Tcp?
= 19 -16?5
= 32.236
= 1.34
The approximate probability value when Z = 1.34 is 0.9099
?The probability of completion of critical path by the schedule time of 19 weeks= 91%
Q.5) What is preventive maintenance? Why it is better than BreakdownMaintenance? What are the key activities of Preventive Maintenance?
Answer.5)
Preventive maintenance anticipates failures and adopts necessary actions tocheck failures before they occur. It includes activities like inspection,lubrication cleaning and unkeeps, minor adjustments and replacements foundnecessary at the time of inspection etc. Preventive maintenance can be either:running maintenance or “shut down maintenance”. Running maintenanceincludes maintenance activities (e.g. minor adjustments In machinesrevealed through inspections, lubrication, cleaning and unkeep etc.) Which arecarried out when the machine is still running. Shutdown maintenance includespreventive maintenance activities such as minor component replacement whoseneeds are identified through inspections, which require stoppage of Machines.
Page 20
POM3Preventive inspection is one of the key activities of preventive maintenancewhich is usually performed by making use of human senses – watch) eye),listen (ear), Touch (hand, leg, body) smell (nose) and taste (tongue) – but thetrend is Changing towards use of condition monitoring instruments. Suchmaintenance. Practice is known as predictive maintenance or condition basedmaintenance.
Q.10) (a) What are X-R Charts? How are they made and used in controlling aprocess?
Answer.10)
X-R chart is a pair of chart consisting of a average (called X chart) and arangeChart (called R chart) placed one below another on a piece of graph paper.The X chart is used to control the mean value of the characteristic anR-chart is used to restrict the range of variations in the values. X-R chartsare drawn when the characteristics are measurable. Each chart consists ofthree values: a central line, upper control limit and lower control limit. Thecentral line represents the arithmetic average of the sample means whichequals the mean of the population, u. The upper and lower control limits arelocated at three standard deviation on either side of the central line.Samples of fixed size are drawn at regular intervals and measurements aretaken. The samples wise values of the mean and range are plottedin their respective X and R charts.The spread of sample points in the charts is studied to decide the remedialaction (if any) to be taken. The X chart analyses whether or not the mean ofthe quality Characteristics is within control while R-chart analyses whether ornot the variability is within control.
STEPS TO PREPARE X-R CHART
A pre-requisite to the preparation of the chart is the decision on the followingaspects:
• Quality Characteristics refer to the property of the product, which isto be assessed. The quality characteristics must be capable of being measured.In case of more than quality characteristics, separate chart is made for eachquality characteristic.• Sample size refers to number of pieces comprising each sample.Sample size is an important decision. It is a common practice to use sampleof n = 4 or 5 to have low appraisal cost. Large samples such as n = 15 or20 are used if the process standard deviation is large.• Sample Population refers to the number of samples to be collected toconstruct a control chart. The number of samples must be sufficient.Usually, 20 samples each of size 4 or 5 are enough to have good estimates ofthe process average (X) and dispersion (R).• Time Interval measures the time gap between consecutive samples.Time interval, as a genera rule, should be proportional to the averagefrequency of out-of-control conditions. It is a fairly complex decision since anumber of factors such as cost economy, susceptibility of the process to
Page 21
POM3disturbances; convenience of the inspector etc. requires to be considered.
The making of X-R Charts involves the following Steps:
Step 1: Collect Data
(a) Collect sufficient samples spread over a reasonable period. Eachsample must be of equal size.(b) Measure each component comprising the sample for the given qualitycharacteristic(c) Record individual measurements on a work data sheet.
Step 2: Calculate mean (X) and Range (R) of each sample
A The mean which is written as X (X bar) is average of eachsample and isObtained by totaling the individual measurements of the units comprising thesample and dividing the total by the sample size (number of units in eachsample)B The range, which is written as R, is obtained as the difference betweenthe highest and the lowest measurement of a sample.C The values of X and R are recorded sample wise either on the extremeright of the individual measurements on the data sheet or in a separate table.
Step 3: Calculate grand Average (X) and mean Range (R)
A The grand average, which is written as, X (X double bar) is theaverage of the sample averages and is obtained by dividing the total of theaverages of all the samples by the total number of samples.B The mean range, which is written as, R (R bar) is the average of theranges and is obtained by dividing the total of the ranges of the samples bythe total number of samples.
Step 4: Set up Control chart for the average
A Set up a control chart with the central line drawn at X (X doublebar), upper control limit located X + A2R (R bar) and the lower control limitset up at X-A2R.B Plot the averages to see whether the process was under control whensamples were drawn.C If all points fall within the control limits, the process is said to beunder controlD If process is not under control (indicated by some points fallingoutside the control limits), eliminate points outside the control limits andcompute new trial control limits for the remaining points.E Repeat step 4 (d) until all points fall within the control limitsF Control limits in a particular situation should be revised from time totime as additional data is accumulated.
Step 5: Calculate control limits of the range chart
Page 22
POM3
A The control chart for range chart is set up with central line as R,upper control limit (UCLR) located at D4R above the central line and lowercontrol limit (LCL) at D3R below the central lineB Plot the value of the range of each sample.C If all points fall within the control limits no modification is necessaryunless it is desired to reduce the process dispersionD if range chart exhibits lack of control indicated by some points fallingoutside the control limits, eliminate those points out of control and computenew trial control limitsE Repeat step 5 (d) until all points fall within the control limits.F Control limits in a practical situation should be revised time to timeas additional data is accumulated.
Step 6: Use control chart
A Collect samples of fixed size at specified intervals of time.B Measure each unit of the sample for the quality characteristics,calculate mean and the range of each sample.
C Plot the values of X and R of each sample in their respectivechartsD Study the trend of the points to interpret and suggest remedialaction
Q10 (b) ABC company produces a solvent, which must contain 3 percent ofalcohol. It tries to maintain the actual percentage at 3 + 0.3 percent. It testshourly in samples of five. The following table shows the results of last fivesamples. Set up a control chart for mean and examine whether the process isunder control.
A) Solution:(i) Collect data(ii) Calculate mean (X bar) and range(R bar)
Page 23
POM3Sample No. Arithmetic Mean (X bar) Range(R)
1 2.92 0.32 2.98 0.13 3.06 0.14 3 05 3 0.2
(iii) Calculate grand average and the mean range
X(X bar) = 2.92 + 2.98 + 3.06 + 3 + 35
= 2.992
R = 0.3 + 0.1 + 0.1 + 0 + 0.25
= 0.14
(iv) Set Up control chart for the average
Central Line = CLx = X(X bar) = 2.992
Upper Control Limit = UCLx = X (X bar) + A2.R(R bar)
= 2.992 + 0.5768 x 0.14
= 3.476
Lower Control Limit = UCLx = X (X bar) - A2.R(R bar)
= 2.992 - 0.5768 x 0.14
= 2.507
(v) Set up a range chart
Central line CLR = R(R bar) = 0.14
Lower control limit = LCLR = D3.R (Rbar)
= 0 x 0.14
Page 24
POM3= 0
Lower control limit = UCLR = D4.R (Rbar)
= 2.114 x 0.14
= 0.29596
Q.6) What is method study? Describe the procedural steps to develop easier andeffective methods.
Answer.6)
Method study is the systematic recording and critical examination of existingand proposed ways of doing work, as a means of developing and applying easierand more effective methods and reducing costs.
Method study is an organized approach and its investigation rests on thefollowing six basic steps outlined in the block diagram• Select the work to be analyzed.• Record all facts relating to the existing method.• Examine the recorded facts critically but impartially.• Develop the most economical method commensurate with plantRequirements• Install the new method as standard practice.• Maintain the new method.
Selection of the job
Selections of the jobs to be studied for methods improvement by the methodstudy practioner is a managerial responsibility and it (selection) may be basedon economic technical or human consideration. Economic considerationjustifies selection based on the economic worth (i.e. money saving potential) ofthe job.Technical consideration identifies jobs, which require studies to overcomemanufacturing difficulties (excessive rejection, relaxation in prefixedperformance standards, inability if the shops to stick to specified machiningparameters such as speeds, feeds, depth of cut etc., inconsistent quality etc.)Human consideration in job selection is usually given weightage whileintroducing method study practices for the first time.
Recording of facts
Systematic recording is the most crucial step in method improvement. Sincerecording by long hand (or by descriptive method) has its limitations, it is notrecommended for use in method study. Instead, five symbols and eightcharting conventions are used to record facts relating to the job under study.
Page 25
POM3Five typical symbols are O, ||, ?, D and V and eight charting conventionsconcern composition of the chart, reject, rework, repletion, change of state,introducing of new material, combined events and numbering of events. Thedocument on which details of the process are recorded by the above referredsymbols and conventions is called chart. There are four basic types of chart:(i) operation process chart (ii) Flow process chart (iii) multiple activity chartsand (iv) two handed process chart.
Besides charts, two types of diagrams-flow diagram and string diagram aredrawn when recording details of an existing layout. Travel chart is anothertypical chart, which is used to record frequency of movements (weight xdistance) between work centres/departments.
Repetitive short cycle operation which involves quick hand/feel motions (i.e.microscopic motions) may be studied with micro motion study. Glibreth,founder father of micro motion study, also developed photographic techniquescalled cyclograph and chronocylegraph to record path of the motions of themembers of the body.
Critical examination
Critical examination aims to analyze the facts critically and thereby give riseto alternatives, which form the basis of selection and development of easier,and effective methods.
Critical examination is conducted through a systematic and methodicalquestioning process. Each activity recorded on the chart, whether it relates toprocessing or inspection, or material handling, or to any other aspect, ispicked up one at a time and is examined minutely. The questioning process isconsidered under five major heads, namely the purpose, the place, thesequence, the person and the means. These five aspects in critical examinationare referred to as five governing considerations.
Development and selection:
Development and selection stage concerns short listing of ideas generated at thecritical examination stage, testing each short listed idea for its technical andeconomic feasibility, and making selection among the alternatives whereverchoice exists. To develop ideas and to ascertain their technical and economicalfeasibility, the method study practioner needs to solicit the cooperation ofpersonnel from different departments of the company. Various techniquesavailable for the development and selection purpose are: cost benefit analysis,break even analysis, investment analysis and critical path analysis.
Installation
‘Installation’ (or implementation) of the proposed method involves preparationof project report on recommendations making oral presentation to the top
Page 26
POM3management, securing approval of the decision maker, assisting linemanagement during implementation, arranging training of workmen, and gettingjobs (operations) retime after implementation, arranging training of workmen,and getting jobs (operations) retimed after implementation.
Maintenance
“ Maintenance” phase is the follow up phase after implementation, which servesas a monitoring and control mechanism. It helps to ensure that the revisedmethods are set into concrete and workmen do not revert back to oldmethods. It also provides an opportunity to the practitioner to assess theeffectiveness of the approach followed by him and makes changes in themethodology (if required).
Q.9) (a) What desirable conditions need to be present to be present toguarantee success of an incentive scheme?
Answer.9)
A good wage incentive plan should have the following characteristics.
• Administrative simplicity:The incentive system should be simple and must be easily understood by theworkers and their representatives. An incentives scheme, which can beunderstood, only by engineers and mathematicians or a scheme which involvesthe use of complex formulate or references and cross-references is sure tofail. The incentive scheme should be such that workmen can calculate theirown earnings easily and quickly.
• Minimum clerical work:The system should fit into existing system of production and cost control. Itshould not involve any significant addition to the clerical work.
• Maximum coverage:The system should cover as many workmen as possible. A scheme if applied toa few workmen creates a demoralizing effect on the morale of those notcovered by the scheme.
• DirectIncentive payments should increase at least in direct proportion to the increasein output by the operator. There are two reasons:Firstly because it is more difficult to producer extra units and secondlybecause saving in the overheads are far greater at higher levels of production.
• Period of PaymentThe period of payment should be as short as possible
• Adequate guaranteed minimum hourly rateThe scheme must ensure adequate guaranteed minimum hourly rate to all
Page 27
POM3incentive workers regardless of their output. Such an hourly guaranteed rateis normally referred to as the guaranteed base rate.The guaranteed base rate must be realistic and should be at least equal to thehourly rate payable to a non-incentive worker doing similar job in theindustry. Incentive earnings of the workers should never be regarded as asubstitute for poor wages.
• Accurate and yet attainable performance standardsPerformance standards should be set through systematic work measurementstudies. The experts to that there is no dispute or malpractice and yet thestandards are attainable so that a worker working at normal pace can attainthem should base the standards of measurement on the assessment.
Further the incentive plan should be such that it provides an opportunity toall average workers to earn reasonable earnings.
• Consistency of the standardsStandards once fixed should not be changed unless there is a permanentchange in methods, or change in equipment, or change in material and planshould provide for the provisions to modify the performance standards.
• Inbuilt check on process rejectionsA good incentive scheme should exercise a check on the operator againstachieving higher bonus by poor workmanship. Payment should be made onlyfor pieces declared acceptable by the inspection department and a workmanconstantly producing substandard pieces should be liable for disciplinary action.
• Payment of partially completed jobsThe problem of payment for the incomplete work arises only in case of longcycle jobs. Situations do arise when the jobs are of very long cycle durationand cannot be finished within the bonus period. Similarly, a semi-finished jobmay require to be handed over by one operator to another at the end of shift,or prior to having a holiday. The scheme should clearly spell out as howassessment of work done by the workmen on the same job will be carried outand how disputes arising out of such assessment would be resolved.
• Payment of Idle TimeAdequate safeguards must be provided to compensate the operator for the timelost due to reasons beyond his control. A good incentive scheme should ensurethat an operator does not suffer financial loss for reasons attributable to themanagerial weakness, e.g.: lack of material due to bad buying, breakdowns ofthe machines due to poor maintenance practices, non-availability of work etc.Thus an operator rendered idle because of factors attributable to themanagement should be given a lieu bonus.
Page 28
POM3• SafeguardsThe scheme should be fair not only to the employees but also to the employer.Safeguarding clauses as under should be incorporated to protect.
a. Management’s right to change a standard when there are changes inmethods. Materials and machinesb. Management’s right to withdraw or discontinue temporarily a schemeduring bad period.c. Management’s right to initiate disciplinary action against operators whocontinually produce sub-standard articles.d. Management’s right to initiate disciplinary action against employeeswho, time and again, do not achieve minimum standard of production even inthe presence of fair and accurate standards.e. Management’s right to initiate disciplinary action against employeeswho, time and again are found using speeds and feeds higher than thoserecommended in the process sheet (or operational layouts)
• Maximum ceiling on the earningsThe system should have built-in-control against higher earnings beyond acertain limit. Firstly, the system should discourage workers to work beyond acertain limit otherwise too attractive an incentive scheme may induce theworker to work more and more and thereby adversely affect his health.Secondly, the system should ensure that in case of loose standards the companydoes not lose financially.
• Consistency of PlanThe plan should be consistent over a period of time. Frequent changes in theplan make it’s functioning difficult. Faith in plan is lost if there are frequentrevisions.
• Acceptance of Labour BodyThe scheme should finally have acceptance of the labour body. The body ofworkers’ representatives to prevent any misunderstanding and ill-feeling lateron must accept the basic incentive plan and its provisions.
• Continuous UseThe scheme should be in continuous use. The temporary use of the scheme ingood times and its discontinuation in bad times makes it’s functioning difficult.
• Define End ResultsThe plan must result in reduction in per unit labor cost.
Page 29
POM3
Q 13)Answer 13)
i) Average Cycle time = 0.22 + 0.24 + 0.28 + 0.26 + 0.255
= 0.25
Normal Time = Observed time x Rating100
= 0.25 x 80100
= 0.2
Similarly, average cycle time and normal time for all the elements arecalculated and tabulated as below
Element Avg. cycle time Rating Normal timeA 0.25 80 0.2B 0.15 100 0.15C 0.35 120 0.42D 0.102 90 0.0918E 0.12 100 0.12
Total Normal time = 0.2 + 0.15 + 0.42 + 0.0918 +
Page 30
POM30.12
Total Normal time = 0.9818
ii) Relaxation Allowance = 15 x 0.9818100
= 0.1473
Contingency Allowance = 5 x 0.9818100
?Standard time = 0.0491
Normal time + Relaxation Allowance + Contingency Allowance
= 0.9818 + 0.1473 + 0.0491
?Standard time = 1.1782
Page 31
POM4
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple AnswerQuestion Which of the following aspects are essential to ensure quality
of purchased items?Correct Answer Defining right quality for the job , Vendor
performance evaluation , Making sure that suppliers understand therequirementsYour Answer Defining right quality for the job , Vendor performance
evaluation , Making sure that suppliers understand the requirements
Select The BlankQuestion The ________ breakdowns usually cost more, partly due to
damage done to the adjustment components and partly due to emergencyactions.Correct Answer UnexpectedYour Answer Unexpected
True/FalseQuestion After goods have been manufactured, route sheets and
operation layouts should not be collected back.Correct Answer FalseYour Answer False
True/FalseQuestion In case of centralised inspection, inspection rooms generally
become bottleneck and cause delay in taking action regarding rejection orrework.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion MRP is based on the concept of inventory demand which is of
following typeCorrect Answer Dependent and independentYour Answer Dependent and independent
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of
making any product/s is calledCorrect Answer FactoryYour Answer Factory
Multiple Choice Multiple Answer
Page 1
POM4Question Components of Production Management includeCorrect Answer Capacity Planning , Job Design , Production PlanningYour Answer Capacity Planning , Job Design , Production Planning
Multiple Choice Single AnswerQuestion Which of the following is the criteria for the percentage
defectives in the zone of the indecision?Correct Answer Lots having the percentage defective more than AQL
but less than LPTDYour Answer Lots having the percentage defective more than AQL but less
than LPTD
Multiple Choice Multiple AnswerQuestion Which of the following are examples of addition during
recording for method study?Correct Answer Brazing , Welding , RivetingYour Answer Brazing , Welding , Riveting
Select The BlankQuestion The easiest way to bring the delayed job within the promised
delivery time by using extra shift or weekly holiday is ________.Correct Answer Overtime workingYour Answer Overtime working
Select The BlankQuestion An Ideal OC curve is ________ shaped curve that accpets all
the lots with quality equal to or better than AQL .Correct Answer RectangularYour Answer Rectangular
Multiple Choice Multiple AnswerQuestion Which of the following causes can be responsible for derailing
the production schedule in a factory?Correct Answer Errors in drawings , Delay in receipt of material
from vendor , Excessive absenteeismYour Answer Errors in drawings , Delay in receipt of material from vendor
, Excessive absenteeism
Multiple Choice Multiple AnswerQuestion Which of the following situations demand the economic
consideration while selecting a job for method study?Correct Answer Unorderly movement of men and materials , Excessive
process defectives , Too many suggestions received for improvement from adepartment or sectionYour Answer Unorderly movement of men and materials , Excessive process
defectives , Inconsistent quality
Page 2
POM4
True/FalseQuestion During set up of X bar-R control chart, control limts should
be practically revised from time to time as additional data is accumulated.Correct Answer TrueYour Answer False
Multiple Choice Multiple AnswerQuestion Which of the following are the basic requirements of quality
standard?Correct Answer Deifinite , Undesrstandable , Economically viableYour Answer Absolute uniformity , Undesrstandable , Economically viable
Match The FollowingQuestion Correct Answer Your Answer
Toung Sweet Sweet
Eye Crack Crack
Nose Burnout Burnout
Ear Impact Roughness
Select The BlankQuestion The ________ is the defect level for which lots are regarded
as bad lots.Correct Answer Lot Tolerance Percentage DefectiveYour Answer Acceptable quality level
True/FalseQuestion Floor inspection delays the identification of faults which can
not be rectified immediately before large lots are spoiled.Correct Answer FalseYour Answer False
True/FalseQuestion Cent percent inspection is required on WIP prior to the key,
critical or costly operation.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion The document which incorporates details of process planning
Page 3
POM4for a job is calledCorrect Answer Route SheetYour Answer Route Sheet
True/FalseQuestion Repetitive movements between work stations which are difficult
to be traced on string diagrams can be conveniently shown on flow diagrams.Correct Answer FalseYour Answer True
Multiple Choice Single AnswerQuestion Which of the following is the most popular technique for
Project Production?Correct Answer PERT & CPMYour Answer PERT & CPM
Multiple Choice Single AnswerQuestion Technique of Value Engineering can be effectively employed in
design of a product toCorrect Answer To meet the intended function at lowest costYour Answer To meet the intended function at lowest cost
Multiple Choice Single AnswerQuestion What can be the worst effect due to excessive vibration?Correct Answer BreakdownYour Answer Breakdown
Multiple Choice Single AnswerQuestion What is the relation between duration of an activity and length
of an arrow?Correct Answer No relationYour Answer No relation
Multiple Choice Single AnswerQuestion What is the nature of the sampling plan for critical defects?Correct Answer TightYour Answer Tight
Select The BlankQuestion The ________ is the maintenance work initiated on a result
of knowledge of the condition of an item from routine or continuous checking.Correct Answer Condition monitoringYour Answer Condition monitoring
Page 4
POM4Multiple Choice Multiple AnswerQuestion Which of the following are important considerations concerning
activity times?Correct Answer Activity time should be obtained from the person
responsible for the completion of an activity , Activity time must beindependent of any influence which the preceding or succeeding activity mayhave on it. , Activity time may assume that just the normal quantity ofresources required to carry out the activity are available.Your Answer Activity time should be obtained from the person responsible
for the completion of an activity , Activity time must be independent of anyinfluence which the preceding or succeeding activity may have on it. , Activitytime may assume that just the normal quantity of resources required to carryout the activity are available.
Multiple Choice Single AnswerQuestion Which of the following techniques is used by industrial
engineering department to obtain the utilisation index?Correct Answer Work Sampling StudiesYour Answer Break Even Analysis
Multiple Choice Multiple AnswerQuestion Which of the following factors play important role while
selecting or rejecting a particular site from legislation and taxation point ofview?Correct Answer Labour laws , Building codes , Policies regarding issue
of licencesYour Answer Labour laws , Building codes , Policies regarding issue of
licences
Multiple Choice Multiple AnswerQuestion Which of the following cases can be referred as operation in
method study recording?Correct Answer Change in physical characteristic , Consumption of
physical effort , Change in chemical characteristicYour Answer Change in physical characteristic , Consumption of physical
effort , Movement of material
True/FalseQuestion An activity can share the same tail event and same head event
with any other activity.Correct Answer FalseYour Answer True
Select The BlankQuestion The ________ must ensure that the product satisfy the
functional requirements of it's usage.Correct Answer Quality of design
Page 5
POM4Your Answer Quality of design
Multiple Choice Multiple AnswerQuestion Which of the following are examples of pure materials?Correct Answer Bakeries , Ice factories , WoolenYour Answer Bakeries , Ice factories , Woolen
Select The BlankQuestion The ________ are the definitions of the measurable as well
as nonmeasurable characteristics of the product.Correct Answer SpecificationsYour Answer Specifications
Multiple Choice Single AnswerQuestion Site factors for plant location includeCorrect Answer Suitability of landYour Answer Suitability of land
Select The BlankQuestion The ________ is the probability that a good lot will be
rejected by the sampling plan.Correct Answer Producer's riskYour Answer Producer's risk
Multiple Choice Multiple AnswerQuestion Which of the following defects can be observed during
preventive inspection by using human senses?Correct Answer Deviation from normal sound , Excessive Vibration ,
Leakage of a gasYour Answer Deviation from normal sound , Excessive Vibration , Leakage of
a gas
Select The BlankQuestion The ________ includes preventive maintenance activities whose
needs are identified through inspection which requires stoppage of machines.Correct Answer Shutdown MaintenanceYour Answer Working Maintenance
True/FalseQuestion Independent float either affects the float of preceding activities
or that of succeeding activities.Correct Answer FalseYour Answer False
Page 6
POM4Multiple Choice Multiple AnswerQuestion Lack of material planning results in the followingCorrect Answer Over ordering , under ordering , stockoutsYour Answer Over ordering , under ordering , stockouts
True/FalseQuestion F W Taylor devised a system for classifying motions into basic
divisions called TherbligsCorrect Answer FalseYour Answer False
Select The BlankQuestion Work study is also called ________ studyCorrect Answer Time and MotionYour Answer Time and Motion
Match The FollowingQuestion Correct Answer Your Answer
Factor Analysis Method to evaluate layouts Technique for evolving andanalysis of layouts
Minimization of production delays Objective of good layout Objective of goodlayout
Maximum visibility Principles of good layout Principles of good layout
Scale model Layout analysis Method to evaluate layouts
Multiple Choice Single AnswerQuestion Following is one of the techniques used for Material Planning
for high value materialCorrect Answer MRPYour Answer MRP
Multiple Choice Single AnswerQuestion What do you understand by totality of features and
characteristics of a product or service that bears on it's ability to satisfy thecustomer?Correct Answer QualityYour Answer Quality
Select The BlankQuestion One detachable ticket is prepared for each ________.Correct Answer Operation
Page 7
POM4Your Answer Worker
Page 8
POM5
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single AnswerQuestion One of the sophisticated operations research techniques used
in material planning isCorrect Answer Dynamic programmingYour Answer Dynamic programming
True/FalseQuestion Job life is one of the factors that influence Process PlanningCorrect Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Following are some of the Principles of Management advocated
by F W TaylorCorrect Answer Selection of best worker for each particular task ,
Division of work between worker and management , Training and developmentof the workmenYour Answer Selection of best worker for each particular task , Division of
work between worker and management , Training and development of theworkmen
Multiple Choice Single AnswerQuestion Product layout is employed for manufacturing following
productsCorrect Answer refrigiratorsYour Answer ships
Select The BlankQuestion Work study is also called ________ studyCorrect Answer Time and MotionYour Answer Job
Multiple Choice Multiple AnswerQuestion Which of the following situations demand the technical
consideration while selecting a job for method study?Correct Answer Jobs having inconsistent quality , Operations inviting
frequent requests from supervisors for relaxation in allowed time because ofvariations in materials and tool performance , Jobs in which too manyman-hours are spend in checking and rechecking workYour Answer Jobs having inconsistent quality , Operations inviting frequent
requests from supervisors for relaxation in allowed time because of variationsin materials and tool performance , Jobs in which too many man-hours arespend in checking and rechecking work
Page 1
POM5
True/FalseQuestion Quality control determines what, when, and how much to
inspect while inspection actually conducts examination of goods.Correct Answer TrueYour Answer True
Select The BlankQuestion The ________ is the maximum percentage defective that for
the purpose of sampling inspection can be considered satisfactory as a processaverage.Correct Answer Acceptable quality levelYour Answer Producer's risk
Select The BlankQuestion The term ________ emplies the foregone profit due to
inability of company to produce.Correct Answer Opportunity costYour Answer Opportunity cost
True/FalseQuestion All activities must not be tied up into the networkCorrect Answer FalseYour Answer False
True/FalseQuestion F W Taylor devised a system for classifying motions into basic
divisions called TherbligsCorrect Answer FalseYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following may be the objectives of project
crashing?Correct Answer To achieve uniformity in requirement of resources ,
To complete the project in the least possible time , To reduce project costbelow it's normal costYour Answer To complete the project in the least possible time , To achieve
uniformity in requirement of resources , To improve the labour efficiency
Multiple Choice Multiple AnswerQuestion What is indicated by the hugging points lying close to mean of
the process in X bar-R- control chart?Correct Answer Biases in measurements , Recording done without
actual measurements , Improper selection of samples
Page 2
POM5Your Answer Recording done without actual measurements , Improper
selection of samples
Multiple Choice Single AnswerQuestion Following is one of the techniques used for Material Planning
for high value materialCorrect Answer MRPYour Answer MRP
Select The BlankQuestion The ________ is the probability that a good lot will be
rejected by the sampling plan.Correct Answer Producer's riskYour Answer Producer's risk
Multiple Choice Single AnswerQuestion One of the characterstic of layout is about the flow of
material / personnel. In a good layout the flow should beCorrect Answer UnidirectionalYour Answer Unidirectional
True/FalseQuestion The event numbers as far as possible reflect the logical
relationships of the activities.Correct Answer TrueYour Answer False
Multiple Choice Multiple AnswerQuestion Material Requirement Planning is very useful in following
situationsCorrect Answer Long Lead time for procurement , Several levels of
assemblies in product , Long manufacturing cycleYour Answer Long Lead time for procurement , Several levels of assemblies
in product , Long manufacturing cycle
True/FalseQuestion Cent percent inspection is often more practical and economical
than sampling inspection.Correct Answer FalseYour Answer False
Select The BlankQuestion The ________ must ensure that the product satisfy the
functional requirements of it's usage.Correct Answer Quality of design
Page 3
POM5Your Answer Quality of conformance
True/FalseQuestion Both, preventive and breakdown maintenance work must be
assigned to the same team.Correct Answer FalseYour Answer False
Multiple Choice Single AnswerQuestion Following is one of the tasks of Production ControlCorrect Answer Actual issue of forms and documentsYour Answer Actual issue of forms and documents
Multiple Choice Single AnswerQuestion Process Engineer does not get sufficient time for designing
tooling for most economic production run whenCorrect Answer Delivery time is lessYour Answer Delivery time is less
Multiple Choice Multiple AnswerQuestion Components of Production Management includeCorrect Answer Capacity Planning , Job Design , Production PlanningYour Answer Capacity Planning , Production Planning , Manpower Planning
Multiple Choice Multiple AnswerQuestion Which of the following products should be produced by using
mass production?Correct Answer Refrigerator , Tyre for automobile , Television SetYour Answer Refrigerator , Tyre for automobile , Television Set
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding
some value to entity can be defined asCorrect Answer OperationYour Answer Manufacturing
Select The BlankQuestion A good maintenance system is not a luxary but a ________.Correct Answer NecessityYour Answer Necessity
Multiple Choice Single AnswerQuestion What is the specific name for the Gantt chart when it shows
at a glance the scheduling of various operations involved in a job?
Page 4
POM5Correct Answer Job ScheduleYour Answer Load Chart
Select The BlankQuestion A set of activities to keep an equipment in the specified
condition is called as ________.Correct Answer MaintenanceYour Answer Maintenance
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to
complete an activity within it's crashed time?Correct Answer Crash costYour Answer Crash cost
Multiple Choice Multiple AnswerQuestion Which of the following factors decide the choice between the
cent percent and sampling inspection?Correct Answer Nature of inspection , Natural tolerance versus design
tolerance , Vendor's quality ratingYour Answer Nature of inspection , Natural tolerance versus design
tolerance , Vendor's quality rating
Select The BlankQuestion The ________ is the maintenance work initiated on a result
of knowledge of the condition of an item from routine or continuous checking.Correct Answer Condition monitoringYour Answer Condition monitoring
Multiple Choice Multiple AnswerQuestion Which of the following are examples of attributes?Correct Answer Cracks , Burrs , TextureYour Answer Cracks , Burrs , Texture
Multiple Choice Single AnswerQuestion Which of the following is the criteria for the percentage
defectives in the zone of the indecision?Correct Answer Lots having the percentage defective more than AQL
but less than LPTDYour Answer Lots having the percentage defective more than AQL but less
than LPTD
Multiple Choice Single AnswerQuestion In mass/batch production organizations where goods are
produced for stocking, Work Order is raised on the basis of
Page 5
POM5Correct Answer Sales ProgrammeYour Answer Sales Order
Match The FollowingQuestion Correct Answer Your Answer
Fixed Position Layout Project Layout Functional Layout
Product Layout Line Layout Project Layout
Process Layout Functional Layoutjob layout
Combined Layout Mixed Layout Mixed Layout
Multiple Choice Single AnswerQuestion What do you understand by the measurement of work to
establish allowed time for a job for the defined method?Correct Answer Work measurementYour Answer Work measurement
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality
lot may vary between ________.Correct Answer 0.01 to 10%Your Answer 0.01 to 10%
True/FalseQuestion Objective of Work Study is to improve ProductivityCorrect Answer TrueYour Answer False
Multiple Choice Multiple AnswerQuestion Which are the distinct functions of scientific quality control?Correct Answer Acceptance function , Preventive function , Assurance
functionYour Answer Acceptance function , Feedback function , Preventive function
Match The FollowingQuestion Correct Answer Your Answer
Interruption for machine utilisation Preventive maintenance Preventivemaintenance
Input for scheduling Overlapping of operations Strings
Page 6
POM5Technique of scheduling Critical Path Analysis Critical Path Analysis
Scheduling DeviceStrings Blackboard
Select The BlankQuestion An Ideal OC curve is ________ shaped curve that accpets all
the lots with quality equal to or better than AQL .Correct Answer RectangularYour Answer Rectangular
True/FalseQuestion Breakdown of machines, absenteeism of worker does not
dislocate the manufacturing activity in process layoutCorrect Answer TrueYour Answer True
True/FalseQuestion Since value of c can never be negativee, hence" if LCLp works
out to be negative, it is taken as zero."Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Who prepares the daily production report?Correct Answer Shop SupervisorYour Answer Worker
True/FalseQuestion The dispatching function is of very importance in flow and
mass production units.Correct Answer FalseYour Answer True
Multiple Choice Multiple AnswerQuestion Which are major benefits of identifying the critical path?Correct Answer It helps to identify the set of activities and events
which are critical and as such must be carefully controlled and monitored , Itidentifies activities to be given preference in allocation of resources. , It helpsto exercise "control by exception".Your Answer It helps to identify the set of activities and events which are
critical and as such must be carefully controlled and monitored , It helps toexercise "control by exception".
Page 7
POM6
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Select The BlankQuestion A ________ is another form of subcontracting.Correct Answer Hiring capacityYour Answer Open purchase order
True/FalseQuestion An ideal OC curve is never possible only with cent percent
inspection.Correct Answer FalseYour Answer True
Match The FollowingQuestion Correct Answer Your Answer
Table lubrication Weekly Six monthly
Draining and refilling of oil reserviors of plunger pump Yearly Yearly
Parts lubricated with oil nipple Daily Weekly
Tools and slideways two to three times a day Daily
True/FalseQuestion The operator should not stop production if first piece is not
approved by the inspector.Correct Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Which of the following causes can be responsible for derailing
the production schedule in a factory?Correct Answer Errors in drawings , Delay in receipt of material
from vendor , Excessive absenteeismYour Answer Errors in drawings , Delay in receipt of material from vendor
, Excessive absenteeism
True/FalseQuestion For p-chart, the central line of fraction defectives is
determined by average percentage defectives.Correct Answer TrueYour Answer True
Page 1
POM6
Multiple Choice Multiple AnswerQuestion Expediting function is concerned with following activitiesCorrect Answer Progress chasing to identify delays which may hold up
production , Communicating possible delays in delivery date commitment tosales department , Devising cures to keep rate of production in line withscheduleYour Answer Recording progress of work , Communicating possible delays in
delivery date commitment to sales department , Devising cures to keep rate ofproduction in line with schedule
Multiple Choice Single AnswerQuestion When should operator or supervisor is supposed to sign the
perforated route sheet?Correct Answer After completion of operationYour Answer After completion of operation
Select The BlankQuestion The ________ is necessary when the job requires detailed of
one or more of the job characteristics with the help of special equipmentwhich is not available at the producing company.Correct Answer Inspection orderYour Answer Move order
Multiple Choice Multiple AnswerQuestion What are the benefits of reconditioning?Correct Answer Eliminates problems and frequent breakdowns ,
Increases life of an equipment , It helps to plan requirement of replacementsparesYour Answer Eliminates problems and frequent breakdowns , Increases life
of an equipment , It helps to plan requirement of replacement spares
Multiple Choice Multiple AnswerQuestion Which of the following processes or activities are denoted by
using symbols while recording in method study?Correct Answer Transport , Delay , StorageYour Answer Transport , Rejection , Storage
Multiple Choice Single AnswerQuestion Which is the zone beyond LTPD in case of Oc curve of a
general plan?Correct Answer Zone of rejectionYour Answer Zone of rejection
True/FalseQuestion A properly designed sampling plan can control sampling
Page 2
POM6errors and completely eliminate them.Correct Answer FalseYour Answer True
Select The BlankQuestion The ________ includes preventive maintenance activities whose
needs are identified through inspection which requires stoppage of machines.Correct Answer Shutdown MaintenanceYour Answer Shutdown Maintenance
Select The BlankQuestion The ________ pertain to the climatic conditions which the
component , product or material should withstand.Correct Answer Environmental specificationsYour Answer Environmental specifications
True/FalseQuestion Grouping of machines gives a lot of flexibility in loading and
schedulingCorrect Answer TrueYour Answer True
True/FalseQuestion A lot declared rejected in sampling inspection should not be
inspected 100% in any case.Correct Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Which of the following are the basic requirements of quality
standard?Correct Answer Deifinite , Undesrstandable , Economically viableYour Answer Absolute uniformity , Undesrstandable , Economically viable
True/FalseQuestion The plotting of activities - critical, non-critical and dummy
activities- is strictly according to their precedence relationship.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following are activities of corrective maintenance?Correct Answer Modifications and improvements , Overhauling ,
Emergency repairsYour Answer Modifications and improvements , Overhauling , Lubrication as
Page 3
POM6per schedule
Multiple Choice Single AnswerQuestion Following is not a function of PPCCorrect Answer Product PlanningYour Answer Order Processing
Multiple Choice Multiple AnswerQuestion Which of the following three methods used to select the
qualified supplier?Correct Answer By vendor plant surveys , By reputation , By
experienceYour Answer By vendor plant surveys , By the perofrmance of first lot , By
experience
Select The BlankQuestion The ________ is the watch dog which ensures that every
element of production and activities which could affect the quality of endproduct are regulated to the extent desirable.Correct Answer Quality controlYour Answer Quality control
Match The FollowingQuestion Correct Answer Your Answer
Pessimistic time b p
Expected time Te Te
Optimistic time a o
Most likely time m m
Multiple Choice Multiple AnswerQuestion Which are the different methods of recording actual progress
of work?Correct Answer Display boards , Progress cards , Network updatingYour Answer Display boards , Job cards , Progress cards
Multiple Choice Single AnswerQuestion One of the characterstic of layout is about the flow of
material / personnel. In a good layout the flow should beCorrect Answer UnidirectionalYour Answer Unidirectional
Page 4
POM6
Multiple Choice Multiple AnswerQuestion What is indicated by the hugging points lying close to mean of
the process in X bar-R- control chart?Correct Answer Biases in measurements , Recording done without
actual measurements , Improper selection of samplesYour Answer Biases in measurements , Recording done without actual
measurements , Improper selection of samples
Multiple Choice Multiple AnswerQuestion Operation Layout generally contains following informationCorrect Answer Part Sketch , Standard Time , Jigs and fixturesYour Answer Sequence of operations , Standard Time , Jigs and fixtures
Multiple Choice Single AnswerQuestion What do you mean by the graphical representation of the
project which is composed as series of connected arrows and circles todescribe the interrelationship of the activities involved?Correct Answer NetworkYour Answer Flow chart
Multiple Choice Single AnswerQuestion Where does the SPC exercises the control to prevent the
occurances of defectives?Correct Answer On manufacturing processYour Answer On manufacturing process
Multiple Choice Single AnswerQuestion Which photographic technique is used to record path of
motions of the members of the body during method study?Correct Answer CyclographYour Answer Pictograph
Select The BlankQuestion An Ideal OC curve is ________ shaped curve that accpets all
the lots with quality equal to or better than AQL .Correct Answer RectangularYour Answer Bell
True/FalseQuestion In Gantt Chart, the horizontal lines devide vertical lines into
sections which represents either operations or work centres.Correct Answer TrueYour Answer True
Page 5
POM6Select The BlankQuestion Goods after final inspection should accompany ________to
enable dispatch department to identify and draw correct reference.Correct Answer Forwarding noteYour Answer Forwarding note
Select The BlankQuestion Capacity decisions have a direct influence on performance of
production system in respect of ________Correct Answer Delivery performanceYour Answer Quality
True/FalseQuestion Floor inspection promotes tendency of machines to drift out of
limits and produce defectives.Correct Answer FalseYour Answer False
True/FalseQuestion A sampling plan which perfectly discriminates will have
vertical OC curve.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding
some value to entity can be defined asCorrect Answer OperationYour Answer Manufacturing
Multiple Choice Multiple AnswerQuestion Which are the different methods to record details of the
existing method during method study?Correct Answer Charts , Diagrams , Templates or modelsYour Answer Control plans , Charts , Templates or models
Select The BlankQuestion The ________ breakdowns usually cost more, partly due to
damage done to the adjustment components and partly due to emergencyactions.Correct Answer UnexpectedYour Answer Unexpected
Multiple Choice Single AnswerQuestion Gross requirement of products is determined on the basis of
Page 6
POM6Correct Answer Both forecast and pending ordersYour Answer Past sales
Select The BlankQuestion The ________ is the probability that a bad lot will be
accepted by the sampling plan.Correct Answer Consumer's riskYour Answer Acceptable quality level
Select The BlankQuestion The easiest way to bring the delayed job within the promised
delivery time by using extra shift or weekly holiday is ________.Correct Answer Overtime workingYour Answer Overtime working
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to
complete an activity within it's normal time?Correct Answer Normal costYour Answer Normal cost
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to
complete an activity within it's crashed time?Correct Answer Crash costYour Answer Total cost
Multiple Choice Single AnswerQuestion What do you understand by the extent the products
manufactured conforms to the laid down design?Correct Answer Quality of conformanceYour Answer Quality of design
Multiple Choice Multiple AnswerQuestion Which kind of possible defectives can be reduced due to first
off inspection?Correct Answer Due to mistakes in reading blue prints , Due to
errors in tooling , Due to wrong machine set upYour Answer Due to mistakes in reading blue prints , Due to errors in
tooling , Due to wrong machine set up
Page 7
POM7
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Select The BlankQuestion A ________ is another form of subcontracting.Correct Answer Hiring capacityYour Answer Open purchase order
True/FalseQuestion An ideal OC curve is never possible only with cent percent
inspection.Correct Answer FalseYour Answer True
Match The FollowingQuestion Correct Answer Your Answer
Table lubrication Weekly Six monthly
Draining and refilling of oil reserviors of plunger pump Yearly Yearly
Parts lubricated with oil nipple Daily Weekly
Tools and slideways two to three times a day Daily
True/FalseQuestion The operator should not stop production if first piece is not
approved by the inspector.Correct Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Which of the following causes can be responsible for derailing
the production schedule in a factory?Correct Answer Errors in drawings , Delay in receipt of material
from vendor , Excessive absenteeismYour Answer Errors in drawings , Delay in receipt of material from vendor
, Excessive absenteeism
True/FalseQuestion For p-chart, the central line of fraction defectives is
determined by average percentage defectives.Correct Answer TrueYour Answer True
Page 1
POM7
Multiple Choice Multiple AnswerQuestion Expediting function is concerned with following activitiesCorrect Answer Progress chasing to identify delays which may hold up
production , Communicating possible delays in delivery date commitment tosales department , Devising cures to keep rate of production in line withscheduleYour Answer Recording progress of work , Communicating possible delays in
delivery date commitment to sales department , Devising cures to keep rate ofproduction in line with schedule
Multiple Choice Single AnswerQuestion When should operator or supervisor is supposed to sign the
perforated route sheet?Correct Answer After completion of operationYour Answer After completion of operation
Select The BlankQuestion The ________ is necessary when the job requires detailed of
one or more of the job characteristics with the help of special equipmentwhich is not available at the producing company.Correct Answer Inspection orderYour Answer Move order
Multiple Choice Multiple AnswerQuestion What are the benefits of reconditioning?Correct Answer Eliminates problems and frequent breakdowns ,
Increases life of an equipment , It helps to plan requirement of replacementsparesYour Answer Eliminates problems and frequent breakdowns , Increases life
of an equipment , It helps to plan requirement of replacement spares
Multiple Choice Multiple AnswerQuestion Which of the following processes or activities are denoted by
using symbols while recording in method study?Correct Answer Transport , Delay , StorageYour Answer Transport , Rejection , Storage
Multiple Choice Single AnswerQuestion Which is the zone beyond LTPD in case of Oc curve of a
general plan?Correct Answer Zone of rejectionYour Answer Zone of rejection
True/FalseQuestion A properly designed sampling plan can control sampling
Page 2
POM7errors and completely eliminate them.Correct Answer FalseYour Answer True
Select The BlankQuestion The ________ includes preventive maintenance activities whose
needs are identified through inspection which requires stoppage of machines.Correct Answer Shutdown MaintenanceYour Answer Shutdown Maintenance
Select The BlankQuestion The ________ pertain to the climatic conditions which the
component , product or material should withstand.Correct Answer Environmental specificationsYour Answer Environmental specifications
True/FalseQuestion Grouping of machines gives a lot of flexibility in loading and
schedulingCorrect Answer TrueYour Answer True
True/FalseQuestion A lot declared rejected in sampling inspection should not be
inspected 100% in any case.Correct Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Which of the following are the basic requirements of quality
standard?Correct Answer Deifinite , Undesrstandable , Economically viableYour Answer Absolute uniformity , Undesrstandable , Economically viable
True/FalseQuestion The plotting of activities - critical, non-critical and dummy
activities- is strictly according to their precedence relationship.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following are activities of corrective maintenance?Correct Answer Modifications and improvements , Overhauling ,
Emergency repairsYour Answer Modifications and improvements , Overhauling , Lubrication as
Page 3
POM7per schedule
Multiple Choice Single AnswerQuestion Following is not a function of PPCCorrect Answer Product PlanningYour Answer Order Processing
Multiple Choice Multiple AnswerQuestion Which of the following three methods used to select the
qualified supplier?Correct Answer By vendor plant surveys , By reputation , By
experienceYour Answer By vendor plant surveys , By the perofrmance of first lot , By
experience
Select The BlankQuestion The ________ is the watch dog which ensures that every
element of production and activities which could affect the quality of endproduct are regulated to the extent desirable.Correct Answer Quality controlYour Answer Quality control
Match The FollowingQuestion Correct Answer Your Answer
Pessimistic time b p
Expected time Te Te
Optimistic time a o
Most likely time m m
Multiple Choice Multiple AnswerQuestion Which are the different methods of recording actual progress
of work?Correct Answer Display boards , Progress cards , Network updatingYour Answer Display boards , Job cards , Progress cards
Multiple Choice Single AnswerQuestion One of the characterstic of layout is about the flow of
material / personnel. In a good layout the flow should beCorrect Answer UnidirectionalYour Answer Unidirectional
Page 4
POM7
Multiple Choice Multiple AnswerQuestion What is indicated by the hugging points lying close to mean of
the process in X bar-R- control chart?Correct Answer Biases in measurements , Recording done without
actual measurements , Improper selection of samplesYour Answer Biases in measurements , Recording done without actual
measurements , Improper selection of samples
Multiple Choice Multiple AnswerQuestion Operation Layout generally contains following informationCorrect Answer Part Sketch , Standard Time , Jigs and fixturesYour Answer Sequence of operations , Standard Time , Jigs and fixtures
Multiple Choice Single AnswerQuestion What do you mean by the graphical representation of the
project which is composed as series of connected arrows and circles todescribe the interrelationship of the activities involved?Correct Answer NetworkYour Answer Flow chart
Multiple Choice Single AnswerQuestion Where does the SPC exercises the control to prevent the
occurances of defectives?Correct Answer On manufacturing processYour Answer On manufacturing process
Multiple Choice Single AnswerQuestion Which photographic technique is used to record path of
motions of the members of the body during method study?Correct Answer CyclographYour Answer Pictograph
Select The BlankQuestion An Ideal OC curve is ________ shaped curve that accpets all
the lots with quality equal to or better than AQL .Correct Answer RectangularYour Answer Bell
True/FalseQuestion In Gantt Chart, the horizontal lines devide vertical lines into
sections which represents either operations or work centres.Correct Answer TrueYour Answer True
Page 5
POM7Select The BlankQuestion Goods after final inspection should accompany ________to
enable dispatch department to identify and draw correct reference.Correct Answer Forwarding noteYour Answer Forwarding note
Select The BlankQuestion Capacity decisions have a direct influence on performance of
production system in respect of ________Correct Answer Delivery performanceYour Answer Quality
True/FalseQuestion Floor inspection promotes tendency of machines to drift out of
limits and produce defectives.Correct Answer FalseYour Answer False
True/FalseQuestion A sampling plan which perfectly discriminates will have
vertical OC curve.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding
some value to entity can be defined asCorrect Answer OperationYour Answer Manufacturing
Multiple Choice Multiple AnswerQuestion Which are the different methods to record details of the
existing method during method study?Correct Answer Charts , Diagrams , Templates or modelsYour Answer Control plans , Charts , Templates or models
Select The BlankQuestion The ________ breakdowns usually cost more, partly due to
damage done to the adjustment components and partly due to emergencyactions.Correct Answer UnexpectedYour Answer Unexpected
Multiple Choice Single AnswerQuestion Gross requirement of products is determined on the basis of
Page 6
POM7Correct Answer Both forecast and pending ordersYour Answer Past sales
Select The BlankQuestion The ________ is the probability that a bad lot will be
accepted by the sampling plan.Correct Answer Consumer's riskYour Answer Acceptable quality level
Select The BlankQuestion The easiest way to bring the delayed job within the promised
delivery time by using extra shift or weekly holiday is ________.Correct Answer Overtime workingYour Answer Overtime working
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to
complete an activity within it's normal time?Correct Answer Normal costYour Answer Normal cost
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to
complete an activity within it's crashed time?Correct Answer Crash costYour Answer Total cost
Multiple Choice Single AnswerQuestion What do you understand by the extent the products
manufactured conforms to the laid down design?Correct Answer Quality of conformanceYour Answer Quality of design
Multiple Choice Multiple AnswerQuestion Which kind of possible defectives can be reduced due to first
off inspection?Correct Answer Due to mistakes in reading blue prints , Due to
errors in tooling , Due to wrong machine set upYour Answer Due to mistakes in reading blue prints , Due to errors in
tooling , Due to wrong machine set up
Page 7
POM8
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/FalseQuestion Floor inspection delays the identification of faults which can
not be rectified immediately before large lots are spoiled.Correct Answer FalseYour Answer False
Multiple Choice Single AnswerQuestion Management often fails to realize the importance of efficient
layout due to following reasonCorrect Answer losses resulting from poor layout are not directly
shown in the financial statementsYour Answer losses resulting from poor layout are not directly shown in
the financial statements
Select The BlankQuestion The ________ is the defect level for which lots are regarded
as bad lots.Correct Answer Lot Tolerance Percentage DefectiveYour Answer Lot Tolerance Percentage Defective
Multiple Choice Single AnswerQuestion Which method of critical path determination begins with the
end event and moves backward to the start event of the project network?Correct Answer Backward pass computationYour Answer Backward pass computation
True/FalseQuestion Complexity and difficulty of Planning is influenced by types of
layoutCorrect Answer TrueYour Answer False
True/FalseQuestion For p-chart, p bar is the ratio of total number of units
inspected to the total number of units defectives.Correct Answer FalseYour Answer True
Multiple Choice Single AnswerQuestion What is represented by an arrow in a network?Correct Answer ActivityYour Answer Activity
Page 1
POM8
Multiple Choice Multiple AnswerQuestion MRP utilises the following informationCorrect Answer Master production schedule , Product structure , Lead
time for procurement/manufacturingYour Answer Master production schedule , Lead time for
procurement/manufacturing , list of machines
Multiple Choice Single AnswerQuestion Which is the ideal place to write a description of an activity
in a network?Correct Answer Above the arrowYour Answer Above the arrow
Select The BlankQuestion The ________ breakdowns usually cost more, partly due to
damage done to the adjustment components and partly due to emergencyactions.Correct Answer UnexpectedYour Answer Unexpected
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of
making any product/s is calledCorrect Answer FactoryYour Answer Factory
True/FalseQuestion Systematic maintenance system can completely eliminate the
wear and tear of machines.Correct Answer FalseYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following are types of non-destructive testing?Correct Answer Visual Testing , Eddy current , Magnetic flow detectors
Your Answer Visual Testing , Eddy current , Magnetic flow detectors
Select The BlankQuestion Work study is also called ________ studyCorrect Answer Time and MotionYour Answer Time and Motion
Page 2
POM8Multiple Choice Single AnswerQuestion Providing flexibility in plant layout meansCorrect Answer Layout can be changed without much cost if requiredYour Answer Layout can be changed without much cost if required
Multiple Choice Multiple AnswerQuestion Which of the following aspects are essential to ensure quality
of purchased items?Correct Answer Defining right quality for the job , Vendor
performance evaluation , Making sure that suppliers understand therequirementsYour Answer Defining right quality for the job , Vendor performance
evaluation , Making sure that suppliers understand the requirements
Multiple Choice Multiple AnswerQuestion Which of the following are scheduling techniques?Correct Answer Critical Path Analysis , Index Method , Johnson's two
machine algorithmYour Answer Critical Path Analysis , Index Method , Johnson's two machine
algorithm
Select The BlankQuestion The ________ advocates maintenance procedures whereby the
condition of the plant is constantly watched through systematic inspection tounearth unhealthy conditions and preventiveCorrect Answer Preventive MaintenanceYour Answer Preventive Maintenance
True/FalseQuestion A network should be progression of activities always moving
forward.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion In an organization there may not be a formal PPC department
ifCorrect Answer Work is highly repetitive in nature , Planning
activities are performed by the line staff , Number of workmen is not verylargeYour Answer Work is highly repetitive in nature , Planning activities are
performed by the line staff , Number of workmen is not very large
Select The BlankQuestion The ________ is necessary when the job requires detailed of
one or more of the job characteristics with the help of special equipment
Page 3
POM8which is not available at the producing company.Correct Answer Inspection orderYour Answer Inspection order
Multiple Choice Multiple AnswerQuestion Order preparation process for products manufatured to order
requires following documentsCorrect Answer Sales Order , Work order , Shop orderYour Answer Sales Order , Work order , Shop order
Multiple Choice Single AnswerQuestion What do you understand by the selection of the job for the
method study on the basis of money saving potential of the job?Correct Answer Economic considerationYour Answer Economic consideration
Select The BlankQuestion Production Planning is a centralised activity which includes
functions such as ________Correct Answer SchedulingYour Answer Scheduling
Multiple Choice Multiple AnswerQuestion Scale model used for layout analysis have following advantagesCorrect Answer Nontechnical person finds it easy to comprehend ,
Ovehead facilities can be shown , Models can be shifted easilyYour Answer Nontechnical person finds it easy to comprehend , Ovehead
facilities can be shown , Models can be shifted easily
Multiple Choice Single AnswerQuestion Which is the ideal place to inspect jigs and fixtures in a mass
manufacturing unit?Correct Answer Separate inspection roomYour Answer Separate inspection room
Multiple Choice Single AnswerQuestion How to reveal the capability of the sampling plan to
discriminate between good lots and bad lots?Correct Answer Operating characteristics curve ( OC )Your Answer Operating characteristics curve ( OC )
True/FalseQuestion It would not affect the project completion time if non-critical
activities take little loner time than planned.Correct Answer True
Page 4
POM8Your Answer True
Select The BlankQuestion The ________ includes preventive maintenance activities whose
needs are identified through inspection which requires stoppage of machines.Correct Answer Shutdown MaintenanceYour Answer Shutdown Maintenance
Match The FollowingQuestion Correct Answer Your Answer
Forcasting requirement for indirect material Past consumption analysistechnique Past consumption analysis technique
Inventory control by classification ABC Analysis ABC Analysis
Structure of the product BOM BOM
Material Planning for dependent demand MRP MRP
True/FalseQuestion The dispatching function is of very importance in flow and
mass production units.Correct Answer FalseYour Answer True
Multiple Choice Multiple AnswerQuestion Which features should be covered by the specifications of
materials while defining the qualitative requirement?Correct Answer Material composition , Dimensions , Any heat
treatment if requiredYour Answer Material composition , Dimensions , Cost of material
Select The BlankQuestion The ________ is the maintenance work initiated on a result
of knowledge of the condition of an item from routine or continuous checking.Correct Answer Condition monitoringYour Answer Condition monitoring
Select The BlankQuestion One detachable ticket is prepared for each ________.Correct Answer OperationYour Answer Operation
Page 5
POM8Multiple Choice Single AnswerQuestion Which of the following is the most popular technique for
Project Production?Correct Answer PERT & CPMYour Answer PERT & CPM
Select The BlankQuestion A good maintenance system is not a luxary but a ________.Correct Answer NecessityYour Answer Necessity
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding
some value to entity can be defined asCorrect Answer OperationYour Answer Operation
True/FalseQuestion An activity should represent an operation or set of operations
which can be performed using a particular kind of equipment or a specialskill.Correct Answer TrueYour Answer False
Multiple Choice Multiple AnswerQuestion Which of the following are types of sampling plan?Correct Answer Single sampling plan , Double sampling plan , Multiple
sampling planYour Answer Single sampling plan , Double sampling plan , Multiple sampling
plan
True/FalseQuestion In case of forward pass computation, the earliest event time
of a plain event equals the earliest event time of the preceding event plusduration of activity emanating from the preceding event.Correct Answer TrueYour Answer False
Multiple Choice Multiple AnswerQuestion Which of the following are ideal situations for the preventive
inspection?Correct Answer Weekly off and holidays , Non-production hours ,
Stand-up equipmentYour Answer Weekly off and holidays , Non-production hours , Stand-up
equipment
Page 6
POM8
Multiple Choice Single AnswerQuestion What do you mean by the chart on which the major activities
and entry points of materials are recorded to have graphic view of operationsand inspections involved in the process?Correct Answer Operation process chartYour Answer Flow Process chart
Match The FollowingQuestion Correct Answer Your Answer
Fixation of inventory level Reorder level Reorder level
Symptom of ill planned purchasing Over ordering Over ordering
Factor influencing material planning Lead time Lead time
Net requirement of material under MRP Stock on hand Stock on hand
Multiple Choice Single AnswerQuestion Taxes / duties levied is one of the important determinant for
location decision as taxes/duties substantially influenceCorrect Answer Product costYour Answer Product cost
Multiple Choice Single AnswerQuestion Which kind of gauge consists of electrical contacts operating a
series of colloured signal lamps which indicate whether the dimension iscorrect, oversize or undersize?Correct Answer Multiple gaugingYour Answer Multiple gauging
Multiple Choice Multiple AnswerQuestion Which of the following are minimum requirement for a good
quality of design?Correct Answer Resonable cost , Resonable procurement time ,
Resonable manufacturing timeYour Answer Resonable cost , Resonable procurement time , Resonable
manufacturing time
Select The BlankQuestion OC curve of ideal sampling plan suggests that all lots less than
3% defectives have the probability of acceptance of ________.Correct Answer OneYour Answer One
Page 7
POM8
Page 8
POM9
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single AnswerQuestion MRP is based on the concept of inventory demand which is of
following typeCorrect Answer Dependent and independentYour Answer Dependent and independent
Multiple Choice Single AnswerQuestion Main objective of a good plant layout isCorrect Answer Reduce material handling costYour Answer Reduce material handling cost
True/FalseQuestion As a general rule, the number of tail event of an activity is
more than that of it's head event.Correct Answer FalseYour Answer False
Select The BlankQuestion The ________ is the probability that a good lot will be
rejected by the sampling plan.Correct Answer Producer's riskYour Answer Producer's risk
Multiple Choice Multiple AnswerQuestion Which of the following are important considerations concerning
activity times?Correct Answer Activity time should be obtained from the person
responsible for the completion of an activity , Activity time must beindependent of any influence which the preceding or succeeding activity mayhave on it. , Activity time may assume that just the normal quantity ofresources required to carry out the activity are available.Your Answer Activity time should be obtained from the person responsible
for the completion of an activity , Activity time must be independent of anyinfluence which the preceding or succeeding activity may have on it. , Activitytime may assume that just the normal quantity of resources required to carryout the activity are available.
Select The BlankQuestion The ________ pertain to the climatic conditions which the
component , product or material should withstand.Correct Answer Environmental specificationsYour Answer Environmental specifications
Page 1
POM9
Multiple Choice Multiple AnswerQuestion Following are some of the factors considered for evaluation of
alternative layoutsCorrect Answer Flow of Material , Equipment utilization , Ease of
supervisionYour Answer Flow of Material , Ease of supervision , Delivery performance
Multiple Choice Multiple AnswerQuestion Which of the following are assignable cause?Correct Answer Large varaitions in hardness of material , Tool wear ,
Errors in settingYour Answer Large varaitions in hardness of material , Tool wear , Errors
in setting
True/FalseQuestion All activities must not be tied up into the networkCorrect Answer FalseYour Answer False
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality
lot may vary between ________.Correct Answer 0.01 to 10%Your Answer 0.01 to 10%
True/FalseQuestion In case of X bar, if the process is not under control indicated
by some points falling outside the control limits, such points outside thecontrol limits are eliminated and new trial control limits for the remainingpoints are computed.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion What is the base for considering activity time as single time
estimate or three time estimate?Correct Answer Level of uncertaintyYour Answer Availability of labour
Select The BlankQuestion The ________ is the maximum percentage defective that for
the purpose of sampling inspection can be considered satisfactory as a processaverage.Correct Answer Acceptable quality levelYour Answer Acceptable quality level
Page 2
POM9
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to
complete an activity within it's normal time?Correct Answer Normal costYour Answer Normal cost
Select The BlankQuestion A good maintenance system is not a luxary but a ________.Correct Answer NecessityYour Answer Necessity
Select The BlankQuestion A ________helps to avoid crowding of jobs at a particular
machine by change of route of some of the jobs or by diverting work to othermachine.Correct Answer Control boardYour Answer Move order
Select The BlankQuestion The ________ is the watch dog which ensures that every
element of production and activities which could affect the quality of endproduct are regulated to the extent desirable.Correct Answer Quality controlYour Answer Quality control
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of
making any product/s is calledCorrect Answer FactoryYour Answer Factory
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Machine utilization
Gantt Chart Production Scheduling Production Scheduling
Select The Blank
Page 3
POM9Question A ________ is another form of subcontracting.Correct Answer Hiring capacityYour Answer Hiring capacity
Multiple Choice Multiple AnswerQuestion In an organization there may not be a formal PPC department
ifCorrect Answer Work is highly repetitive in nature , Planning
activities are performed by the line staff , Number of workmen is not verylargeYour Answer Work is highly repetitive in nature , Planning activities are
performed by the line staff , Number of workmen is not very large
Multiple Choice Multiple AnswerQuestion Which of the following cases can be treated as delay during
recording of method study?Correct Answer Operators awaiting instructions from supervisor ,
Worker waiting for his turn at tools stores , Jobs awaiting at the machines fortheir turnYour Answer Operators awaiting instructions from supervisor , Worker
waiting for his turn at tools stores , Jobs awaiting at the machines for theirturn
True/FalseQuestion Inspection order is must even for simple jobs which can be
inspected by shop inspector with the tooling available on shop.Correct Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Order preparation process for products manufatured to order
requires following documentsCorrect Answer Sales Order , Work order , Shop orderYour Answer Sales Order , Work order , Purchase order
Multiple Choice Single AnswerQuestion Technique of Value Engineering can be effectively employed in
design of a product toCorrect Answer To meet the intended function at lowest costYour Answer Reduce lead time
True/FalseQuestion Cent percent inspection is often more practical and economical
than sampling inspection.Correct Answer FalseYour Answer False
Page 4
POM9
Multiple Choice Multiple AnswerQuestion Scale model used for layout analysis have following advantagesCorrect Answer Nontechnical person finds it easy to comprehend ,
Ovehead facilities can be shown , Models can be shifted easilyYour Answer Nontechnical person finds it easy to comprehend , Ovehead
facilities can be shown , Models can be shifted easily
Multiple Choice Single AnswerQuestion Which of the following technique is event oriented ?Correct Answer Project Evaluation & Review TechniqueYour Answer Project Evaluation & Review Technique
Multiple Choice Single AnswerQuestion What is the meaning of " Product features" according to
J.M.Juran?Correct Answer Quality of designYour Answer Quality of design
Match The FollowingQuestion Correct Answer Your Answer
Crash cost of an activity Cc Cc
Normal time of an activity Tn Tn
Crash time of activity Tc Tc
Normal cost of an activity Cn Cn
Multiple Choice Multiple AnswerQuestion What are uses of diagrams in method study?Correct Answer Study different plant layouts and select the most
optimum one , Study the extent of traffic over the different routes of theplant , Identify the extent of backtracking, cross traffic and obstaclesencountered during the movement of material.Your Answer Study different plant layouts and select the most optimum one
, Study the extent of traffic over the different routes of the plant , Identifythe extent of backtracking, cross traffic and obstacles encountered during themovement of material.
True/FalseQuestion A load chart specifies the work to be carried out by each
person of company during shift hours.Correct Answer False
Page 5
POM9Your Answer True
Multiple Choice Multiple AnswerQuestion Route Sheet generally contains following informationCorrect Answer Material Specification , Sequence of operation , Skill
of LabourYour Answer Material Specification , Sequence of operation , Skill of Labour
True/FalseQuestion Cellular layout is based on the concept of Group TechnologyCorrect Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Which varaible is taken along the abscissa or X axis?Correct Answer TimeYour Answer Standard deviation
Multiple Choice Multiple AnswerQuestion Which are the advantages of suburban location?Correct Answer Avaialability of adequate land at lower cost , Both
skilled and unskilled labour can be available , Plant expansion is easier due toless or no restriction for building and constructionYour Answer Avaialability of adequate land at lower cost , Both skilled and
unskilled labour can be available , Plant expansion is easier due to less or norestriction for building and construction
Select The BlankQuestion The ________ is the maintenance work initiated on a result
of knowledge of the condition of an item from routine or continuous checking.Correct Answer Condition monitoringYour Answer Condition monitoring
Multiple Choice Multiple AnswerQuestion Expediting function is concerned with following activitiesCorrect Answer Progress chasing to identify delays which may hold up
production , Communicating possible delays in delivery date commitment tosales department , Devising cures to keep rate of production in line withscheduleYour Answer Recording progress of work , Progress chasing to identify
delays which may hold up production , Communicating possible delays indelivery date commitment to sales department
Select The Blank
Page 6
POM9Question Production control work is ________ in case of floor
inspection as compared with the centralised inspection.Correct Answer easierYour Answer time consuming
Select The BlankQuestion The easiest way to bring the delayed job within the promised
delivery time by using extra shift or weekly holiday is ________.Correct Answer Overtime workingYour Answer Overtime working
True/FalseQuestion In case of forward pass computation, the earliest event time
of the first event is zero.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion What is represented by an arrow in a network?Correct Answer ActivityYour Answer Activity
True/FalseQuestion As a general rule, a site five times the actual plant size is
considered minimum for parking, access facilities and future expansion.Correct Answer TrueYour Answer True
True/FalseQuestion Independent float either affects the float of preceding activities
or that of succeeding activities.Correct Answer FalseYour Answer False
Multiple Choice Single AnswerQuestion The document raised by PPC which authorises different
functions to take action as per instruction is calledCorrect Answer Work OrderYour Answer Work Order
Multiple Choice Single AnswerQuestion A good layout makes effective use of space. Utilization of space
for a department like Stores can be measured byCorrect Answer Proportion of Cubic volume space utilizedYour Answer Ratio of area utilised to area available
Page 7
POM9
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding
some value to entity can be defined asCorrect Answer OperationYour Answer Operation
Page 8
POM10
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/FalseQuestion Site selection should also take into account topography and
soil structure of the land.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Which manufacturing method is ideal for the use of air gauges
as inspection device?Correct Answer MassYour Answer Batch
True/FalseQuestion Kanban system is essentially a computer based system for
production scheduling and controlCorrect Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Which are three different bases to establish an activity time?Correct Answer Past experience , Judgement , Historical dataYour Answer Past experience , Judgement , Historical data
True/FalseQuestion Inspection order is must even for simple jobs which can be
inspected by shop inspector with the tooling available on shop.Correct Answer FalseYour Answer False
Multiple Choice Single AnswerQuestion Which of the following policies is advisable in case of low
product variety and large volumes?Correct Answer Low Skilled Labour & Special Purpose MachinesYour Answer Semiskilled Labour & General Purpose Machines
Select The BlankQuestion Capacity decisions have a direct influence on performance of
production system in respect of ________Correct Answer Delivery performanceYour Answer Delivery performance
Page 1
POM10True/FalseQuestion In case of X bar, if the process is not under control indicated
by some points falling outside the control limits, such points outside thecontrol limits are eliminated and new trial control limits for the remainingpoints are computed.Correct Answer TrueYour Answer True
Select The BlankQuestion The ________ pertain to the climatic conditions which the
component , product or material should withstand.Correct Answer Environmental specificationsYour Answer Environmental specifications
Select The BlankQuestion The ________ is necessary when the job requires detailed of
one or more of the job characteristics with the help of special equipmentwhich is not available at the producing company.Correct Answer Inspection orderYour Answer Job card
Match The FollowingQuestion Correct Answer Your Answer
Crash cost of an activity Cc Cc
Normal time of an activity Tn Cn
Crash time of activity Tc Tc
Normal cost of an activity Cn Tn
True/FalseQuestion Lubrication survey should never be done for a new machine.Correct Answer FalseYour Answer False
Multiple Choice Single AnswerQuestion A good plant layout helps inCorrect Answer Reducing handling costsYour Answer Reducing handling costs
Multiple Choice Single AnswerQuestion Out of two basic criteria for the selection of a manufacturing
method, one is, it must be able to meet the specifications of final product and
Page 2
POM10the other is, it must beCorrect Answer Cost effective methodYour Answer Cost effective method
Multiple Choice Multiple AnswerQuestion Which of the following is a part of preparing manufacturing
order set as a primary function of dispatching?Correct Answer Operational layouts , Move orders , Pre-filled stores
issue ordersYour Answer Operational layouts , Move orders , Pre-filled stores issue
orders
Select The BlankQuestion A ________ is another form of subcontracting.Correct Answer Hiring capacityYour Answer Hiring capacity
Multiple Choice Multiple AnswerQuestion Which are the major types of defects?Correct Answer Minor , Major , CriticalYour Answer Minor , Critical , General
Multiple Choice Single AnswerQuestion Which kind of labour force is required in case of Jobbing
Production?Correct Answer Highly SkilledYour Answer Highly Skilled
Multiple Choice Multiple AnswerQuestion Which are the sources of information to update the progress
card daily?Correct Answer Detachable ticket , Daily production report , Job Card
Your Answer Detachable ticket , Daily production report , Job Card
True/FalseQuestion In case of forward pass computation, the earliest event time
of the first event is zero.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which are the distinct functions of scientific quality control?Correct Answer Acceptance function , Preventive function , Assurance
function
Page 3
POM10Your Answer Acceptance function , Preventive function , Assurance function
Multiple Choice Multiple AnswerQuestion Which of the following are examples of specifications?Correct Answer Commercial standards , Assembly and testing
instructions , Bill of materialYour Answer Production schedule , Commercial standards , Bill of material
Multiple Choice Single AnswerQuestion Technique which can help an organization to reduce inventory
is calledCorrect Answer MRPYour Answer MRP
Multiple Choice Single AnswerQuestion In case of Batch Production which kind of labour is expected?Correct Answer Skilled in one specific Manufacturing ProcessYour Answer Semiskilled
Multiple Choice Multiple AnswerQuestion Major contributors in the development of Control Charts,
Sampling plan areCorrect Answer F H Dodge , H G Roming , Walter SchewhartYour Answer F H Dodge , H G Roming , Walter Schewhart
Multiple Choice Single AnswerQuestion What is represented by an arrow in a network?Correct Answer ActivityYour Answer Event
True/FalseQuestion Feasibility of time schedule requires that an activity be
scheduled before any of it's predecessors are scheduled.Correct Answer FalseYour Answer True
Multiple Choice Single AnswerQuestion Which method of critical path determination begins with the
end event and moves backward to the start event of the project network?Correct Answer Backward pass computationYour Answer Backward pass computation
True/FalseQuestion Operation process charts though indicates the sequence of
Page 4
POM10events but do not show movements.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Which kind of relationship exists between those activities which
can be carried out simultaneously and both activities require definite time tofinish?Correct Answer Concurrent activitiesYour Answer Concurrent activities
True/FalseQuestion One major difference between CPM and PERT is the former's
adaptability for the projects where high degree of uncertainty prevails andactivity times during performance are expected to vary considerably forcertain activities.Correct Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Following are some of the Principles of Management advocated
by F W TaylorCorrect Answer Selection of best worker for each particular task ,
Division of work between worker and management , Training and developmentof the workmenYour Answer Selection of best worker for each particular task , Division of
work between worker and management , Training and development of theworkmen
Multiple Choice Single AnswerQuestion Inadequate production capacity ultimately leads toCorrect Answer Poor Customer ServiceYour Answer Poor Machine Utilization
Multiple Choice Multiple AnswerQuestion Which of the following schedules are recommended to prepare
and follow as a part of preventive maintenance system?Correct Answer Preventive inspection schedule , Cleaning and upkeep
schedule , Lubrication scheduleYour Answer Preventive inspection schedule , Cleaning and upkeep schedule ,
Lubrication schedule
Multiple Choice Single AnswerQuestion What is the reason of fluctuations, if the control chart
evaluates that the process is in a state of statistical control?Correct Answer Random variability
Page 5
POM10Your Answer Random variability
True/FalseQuestion Even in a small set up wherein maintenance of a machine is
looked after by a mechanic cum worker, he should report directly to theperson responsible for the manufacturing operations.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion What do you mean by the chart on which the major activities
and entry points of materials are recorded to have graphic view of operationsand inspections involved in the process?Correct Answer Operation process chartYour Answer Operation process chart
Multiple Choice Single AnswerQuestion Plant Layout decisions are considered to beCorrect Answer StrategicYour Answer Strategic
Multiple Choice Multiple AnswerQuestion What are the uses of the instruction manual provided by the
manufacturer of a machine?Correct Answer It gives instructions regarding installation and
operation of the equipment , It contains note on common troubles with causesand remedies for troubleshooting , It enlists points, frequency and type oflubricationYour Answer It gives instructions regarding installation and operation of
the equipment , It contains note on common troubles with causes and remediesfor troubleshooting , It enlists points, frequency and type of lubrication
Multiple Choice Single AnswerQuestion When should operator or supervisor is supposed to sign the
perforated route sheet?Correct Answer After completion of operationYour Answer After completion of operation
Multiple Choice Multiple AnswerQuestion Which of the following situations demand that the human
consideration should be given preference over other considerations?Correct Answer Inconsistent earnings where the earnings are tied to
output , Poor morale evidenced by petty or trivial complaints , Repeated casesof accidents and health hazardsYour Answer Excessive rejections , Poor morale evidenced by petty or
trivial complaints , Repeated cases of accidents and health hazards
Page 6
POM10
True/FalseQuestion A network can have more than one starting event but
completion event must be only one.Correct Answer FalseYour Answer True
Multiple Choice Single AnswerQuestion Which is the ideal place to write a description of an activity
in a network?Correct Answer Above the arrowYour Answer Above the arrow
Multiple Choice Multiple AnswerQuestion Which features should be covered by the specifications of
materials while defining the qualitative requirement?Correct Answer Material composition , Dimensions , Any heat
treatment if requiredYour Answer Material composition , Dimensions , Any heat treatment if
required
Match The FollowingQuestion Correct Answer Your Answer
When to inspect Stages of inspection Stages of inspection
What to inspect Specification Specification
How to inspect Inspection devices Inspection devices
How much to inspect Sampling or cent percent inspection Sampling orcent percent inspection
Multiple Choice Multiple AnswerQuestion How the concept of float is helpful to planners?Correct Answer To decide priorities in allocation of resources , To
minimize the requirement of resources , To prevent peaks and valleys inrequirement of resourcesYour Answer To decide priorities in allocation of resources , To minimize
the requirement of resources , To prevent peaks and valleys in requirement ofresources
Page 7
POM11
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/FalseQuestion It pays in the long run to inform the customer regarding
expected delays in the deliveries.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Fixed position layout is adopted whenCorrect Answer product is very heavy involving assembly of large
number of partsYour Answer product is very heavy involving assembly of large number of
parts
Select The BlankQuestion The ________ is the defect level for which lots are regarded
as bad lots.Correct Answer Lot Tolerance Percentage DefectiveYour Answer Lot Tolerance Percentage Defective
Multiple Choice Multiple AnswerQuestion Which are the advantages of suburban location?Correct Answer Avaialability of adequate land at lower cost , Both
skilled and unskilled labour can be available , Plant expansion is easier due toless or no restriction for building and constructionYour Answer Avaialability of adequate land at lower cost , Both skilled and
unskilled labour can be available , Plant expansion is easier due to less or norestriction for building and construction
Select The BlankQuestion One detachable ticket is prepared for each ________.Correct Answer OperationYour Answer Worker
Select The BlankQuestion A good maintenance system is not a luxary but a ________.Correct Answer NecessityYour Answer Necessity
Multiple Choice Multiple AnswerQuestion Following are some of the factors which influence process
planningCorrect Answer Order Quantity , Process capability of machine ,
Page 1
POM11Delivery DatesYour Answer Order Quantity , Delivery Dates , Plant layout
True/FalseQuestion Availability of training schools, colleges and management
institutes reduces the company's internal training needs.Correct Answer TrueYour Answer False
Multiple Choice Multiple AnswerQuestion Which of the following are examples of pure materials?Correct Answer Bakeries , Ice factories , WoolenYour Answer Bakeries , Ice factories , Lime stone
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Production Scheduling
Work Sampling Machine utilization Sampling Inspection
Gantt Chart Production Scheduling Charting technique
Match The FollowingQuestion Correct Answer Your Answer
Fixation of inventory level Reorder level Stock on hand
Symptom of ill planned purchasing Over ordering Over ordering
Factor influencing material planning Lead time Lead time
Net requirement of material under MRP Stock on hand Price of material
Multiple Choice Multiple AnswerQuestion Which of the following are steps to identify the critical path in
a small network?Correct Answer Compare the durations of all paths to identify the
longest path. , Sum up the durations of activities along each path. , Enumerateall paths in the network and list down activities on each path.Your Answer Compare the durations of all paths to identify the longest
path. , Sum up the durations of activities along each path. , Enumerate allpaths in the network and list down activities on each path.
Page 2
POM11
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality
lot may vary between ________.Correct Answer 0.01 to 10%Your Answer 0.01 to 10%
True/FalseQuestion Tool breakage has got nearly zero chances in case of eventual
breakdown.Correct Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Which are the three types of float?Correct Answer Total float , Independent float , Free floatYour Answer Total float , Dependent float , Free float
Multiple Choice Multiple AnswerQuestion Which of the following are major inputs to scheduling?Correct Answer Overlapping of operations , Effective Capacity per work
centre , Performance standardsYour Answer Effective Capacity per work centre , Ratio of skilled to
unskilled labour , Performance standards
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of
making any product/s is calledCorrect Answer FactoryYour Answer Factory
Select The BlankQuestion The ________ is the maximum percentage defective that for
the purpose of sampling inspection can be considered satisfactory as a processaverage.Correct Answer Acceptable quality levelYour Answer Lot Tolerance Percentage Defective
Select The BlankQuestion The ________ is the maintenance work initiated on a result
of knowledge of the condition of an item from routine or continuous checking.Correct Answer Condition monitoringYour Answer Overhauling
Page 3
POM11Select The BlankQuestion OC curve of ideal sampling plan suggests that all lots less than
3% defectives have the probability of acceptance of ________.Correct Answer OneYour Answer One
Multiple Choice Single AnswerQuestion How to calculate activity cost slope?Correct Answer Activity cost slope = ( Crash cost - Normal cost ) / (
Normal time - Crash time )Your Answer Activity cost slope = ( Normal cost - Crash cost ) / ( Normal
time - Crash time )
Multiple Choice Multiple AnswerQuestion Which of the following are minimum requirement for a good
quality of design?Correct Answer Resonable cost , Resonable procurement time ,
Resonable manufacturing timeYour Answer Resonable cost , Resonable procurement time , Resonable
manufacturing time
True/FalseQuestion In case of control chart, large smaples such as n=15 or 20
are used if the process standard deviation is small.Correct Answer FalseYour Answer True
Select The BlankQuestion Production control work is ________ in case of floor
inspection as compared with the centralised inspection.Correct Answer easierYour Answer labourious
Multiple Choice Single AnswerQuestion Production Planning includesCorrect Answer Predetermination of manufacturing requirementsYour Answer Predetermination of manufacturing requirements
Multiple Choice Single AnswerQuestion How does the control chart of statistical quality control helps
the operating personnel?Correct Answer Identify the presence of an assignable cause before it
developsYour Answer Reduces chances of rejections
Page 4
POM11Multiple Choice Single AnswerQuestion What can be the worst effect due to excessive vibration?Correct Answer BreakdownYour Answer Reduced salvage value of machine
Multiple Choice Single AnswerQuestion What do you understand by the metallergical aspects of
product which forms the vital part of engineering function?Correct Answer Material specificationsYour Answer Performance specifications
Multiple Choice Single AnswerQuestion Which of the following is a cause of plant breakdown?Correct Answer Overloading of machinesYour Answer Overloading of machines
Multiple Choice Multiple AnswerQuestion Which of the following possibilities can be explored by using
flow process chart?Correct Answer Eliminating the operations or combining the
operations with another , Reducing the distance traveled by the workmen ormaterials , Avoiding the waiting time and thereby reduce production lossesYour Answer Reducing the distance traveled by the workmen or materials ,
Reducing rejections drastically , Avoiding the waiting time and thereby reduceproduction losses
Multiple Choice Single AnswerQuestion Material Planning is an integral part ofCorrect Answer Production PlanningYour Answer Process Planning
True/FalseQuestion Dust gets mixed with lubricants, forms an abrasive substance
and causes pre-mature failure of machinery.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following activities are used while recording for
method study?Correct Answer Delay , Operation , InspectionYour Answer Operation , Inspection , Production
True/FalseQuestion In case of centralised inspection, inspection rooms generally
Page 5
POM11become bottleneck and cause delay in taking action regarding rejection orrework.Correct Answer TrueYour Answer True
Select The BlankQuestion The ________ advocates maintenance procedures whereby the
condition of the plant is constantly watched through systematic inspection tounearth unhealthy conditions and preventiveCorrect Answer Preventive MaintenanceYour Answer Preventive Maintenance
True/FalseQuestion The problems of congestion, bottlenecks and backtracking can
not be visualized by using templates and models.Correct Answer FalseYour Answer False
Multiple Choice Single AnswerQuestion Which varaible is taken along the abscissa or X axis?Correct Answer TimeYour Answer Quality
True/FalseQuestion Delay in completion of projects result in unwelcome additions
to the fixed manufacturing expenses.Correct Answer TrueYour Answer True
Select The BlankQuestion The term ________ emplies the foregone profit due to
inability of company to produce.Correct Answer Opportunity costYour Answer Idle wages
Multiple Choice Single AnswerQuestion Taxes / duties levied is one of the important determinant for
location decision as taxes/duties substantially influenceCorrect Answer Product costYour Answer Order procurement
Multiple Choice Multiple AnswerQuestion What are the uses of failure statistics analysis?Correct Answer To forecast the defect , To identify causes of major
repetative failures , To quantify the frequency of preventive inspection
Page 6
POM11Your Answer To forecast the defect , To identify causes of major repetative
failures , To quantify the frequency of preventive inspection
True/FalseQuestion Shop order is one of the subsidiary orderCorrect Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Which of the following is the most popular technique for
Project Production?Correct Answer PERT & CPMYour Answer PERT & CPM
Select The BlankQuestion The ________ is the probability that a good lot will be
rejected by the sampling plan.Correct Answer Producer's riskYour Answer Lot Tolerance Percentage Defective
True/FalseQuestion The component produced on completely automatic machines
may be subjected to sampling inspection while parts produced onsemi-automatic and completely manual operated machines require cent percentinspection.Correct Answer TrueYour Answer False
Multiple Choice Multiple AnswerQuestion In an organization there may not be a formal PPC department
ifCorrect Answer Work is highly repetitive in nature , Planning
activities are performed by the line staff , Number of workmen is not verylargeYour Answer Work is highly repetitive in nature , Planning activities are
performed by the line staff , Number of workmen is not very large
Multiple Choice Multiple AnswerQuestion Which of the following factors play important role while
selecting or rejecting a particular site from legislation and taxation point ofview?Correct Answer Labour laws , Building codes , Policies regarding issue
of licencesYour Answer Labour laws , Policies regarding issue of licences , Productivity
of labour
Page 7
POM11
Page 8
pom 12LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/FalseQuestion Kanban system is essentially a computer based system for
production scheduling and controlCorrect Answer FalseYour Answer False
Select The BlankQuestion The ________ is one of the best known statistical relationship
regarding process control.Correct Answer Normal distributionYour Answer Normal distribution
True/FalseQuestion Floor inspection promotes tendency of machines to drift out of
limits and produce defectives.Correct Answer FalseYour Answer False
True/FalseQuestion In case of two handed process chart, inspection symbol is used
when check by touch or feel is involved.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which are reason due to which the progress of work is rarely in
line with it's plan?Correct Answer Absenteeism , Machine breakdowns , Substandard
performance against prefixed production standardsYour Answer Absenteeism , Change in operation sequence , Machine
breakdowns
Multiple Choice Single AnswerQuestion Which rule is used for numbering of events?Correct Answer Fulkerson's RuleYour Answer Fulkerson's Rule
Match The FollowingQuestion Correct Answer Your Answer
Combined Layout Mixed Layout Mixed Layout
Fixed Position Layout Project Layout Project Layout
Product Layout Line Layout Line Layout
Process Layout Functional Layout Functional Layout
Multiple Choice Single Answer
Page 1
pom 12Question What does the points falling outside the control limits indicate?Correct Answer Presence of assignable causesYour Answer Presence of assignable causes
Multiple Choice Single AnswerQuestion A good plant layout helps inCorrect Answer Reducing handling costsYour Answer Reducing handling costs
Multiple Choice Multiple AnswerQuestion Which of the following cases can be treated as delay during
recording of method study?Correct Answer Operators awaiting instructions from supervisor , Worker
waiting for his turn at tools stores , Jobs awaiting at the machines for theirturnYour Answer Operators awaiting instructions from supervisor , Worker
waiting for his turn at tools stores , Jobs awaiting at the machines for theirturn
Multiple Choice Multiple AnswerQuestion Material Requirement Planning is very useful in following
situationsCorrect Answer Long Lead time for procurement , Several levels of
assemblies in product , Long manufacturing cycleYour Answer Long Lead time for procurement , Several levels of assemblies
in product , Long manufacturing cycle
Select The BlankQuestion Principle underlying the Moving Average mrthod is that future
demand shall be ________ past demand.Correct Answer Average ofYour Answer Higher than
Multiple Choice Single AnswerQuestion The ratio of output to input of a production system is commonly
known asCorrect Answer ProductivityYour Answer Productivity
True/FalseQuestion Complexity and difficulty of Planning is influenced by types of
layoutCorrect Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Which phase of method study is concerned with analyzing the facts
critically, generating alternatives which form the basis for selection anddevelopment of improved methods?Correct Answer Critical examinationYour Answer Development and selection
Page 2
pom 12Multiple Choice Multiple AnswerQuestion Which of the following is a part of preparing manufacturing
order set as a primary function of dispatching?Correct Answer Operational layouts , Move orders , Pre-filled stores issue
ordersYour Answer Operational layouts , Move orders , Pre-filled stores issue
orders
Select The BlankQuestion The wage payable to the workman is calculated by ________ the
quantity produced by him by the specified rate per piece, in the straight piecerate method.Correct Answer MultiplyingYour Answer Dividing
True/FalseQuestion F W Taylor devised a system for classifying motions into basic
divisions called TherbligsCorrect Answer FalseYour Answer False
Multiple Choice Single AnswerQuestion How to reveal the capability of the sampling plan to discriminate
between good lots and bad lots?Correct Answer Operating characteristics curve ( OC )Your Answer Operating characteristics curve ( OC )
Multiple Choice Single AnswerQuestion Technique which can help an organization to reduce inventory is
calledCorrect Answer MRPYour Answer MRP
Multiple Choice Multiple AnswerQuestion Which of the following are examples of addition during recording
for method study?Correct Answer Brazing , Welding , RivetingYour Answer Brazing , Welding , Riveting
Multiple Choice Multiple AnswerQuestion Which are the subtasks of the maintenance phase of the method
study?Correct Answer Monitoring and control , Performance appraisal , Audit on
savingsYour Answer Monitoring and control , Performance appraisal , Audit on
savings
True/FalseQuestion Only skilled worker can use the fixed limit gauge.Correct Answer FalseYour Answer False
Page 3
pom 12Multiple Choice Multiple AnswerQuestion Which of the following are steps to identify the critical path in a
small network?Correct Answer Compare the durations of all paths to identify the longest
path. , Sum up the durations of activities along each path. , Enumerate allpaths in the network and list down activities on each path.Your Answer Compare the durations of all paths to identify the longest
path. , Sum up the durations of activities along each path. , Enumerate allpaths in the network and list down activities on each path.
Multiple Choice Single AnswerQuestion What do you understand by the metallergical aspects of product
which forms the vital part of engineering function?Correct Answer Material specificationsYour Answer Material specifications
Select The BlankQuestion We can say that ________ occurs when there is a distinct change
in the physical or chemical characteristic of an object.Correct Answer OperationYour Answer Manufacturing
True/FalseQuestion There is no need for progressing when the customers do the
follow-up on their own to know the status of their jobs.Correct Answer FalseYour Answer False
True/FalseQuestion The component produced on completely automatic machines may
be subjected to sampling inspection while parts produced on semi-automaticand completely manual operated machines require cent percent inspection.Correct Answer TrueYour Answer True
True/FalseQuestion In case of two handed process chart, the simultaneous activities of
both hands are recorded opposite to each other on the chart.Correct Answer TrueYour Answer False
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some
value to entity can be defined asCorrect Answer OperationYour Answer Operation
Multiple Choice Single AnswerQuestion Material control function of PPC is concerned withCorrect Answer Preparation of material estimatesYour Answer indenting all required material
Page 4
pom 12Multiple Choice Multiple AnswerQuestion Order preparation process for products manufatured to order
requires following documentsCorrect Answer Sales Order , Work order , Shop orderYour Answer Sales Order , Work order , Shop order
Select The BlankQuestion The ________ is necessary when the job requires detailed of one
or more of the job characteristics with the help of special equipment which isnot available at the producing company.Correct Answer Inspection orderYour Answer Inspection order
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Machine utilization
Gantt Chart Production Scheduling Production Scheduling
Multiple Choice Multiple AnswerQuestion Which of the following are examples of specifications?Correct Answer Commercial standards , Assembly and testing instructions ,
Bill of materialYour Answer Commercial standards , Assembly and testing instructions ,
Bill of material
Multiple Choice Multiple AnswerQuestion Route Sheet generally contains following informationCorrect Answer Material Specification , Sequence of operation , Skill of
LabourYour Answer Material Specification , Sequence of operation , Skill of Labour
Select The BlankQuestion The design of any layout is governed by large number of factors
and the best layout is expected to ________ all these factors.Correct Answer OptimiseYour Answer Consider
Multiple Choice Single AnswerQuestion How should a dummy activity be represented in a network?Correct Answer By dotted lineYour Answer By circle
Select The BlankQuestion Production Planning is a centralised activity which includes
Page 5
pom 12functions such as ________Correct Answer SchedulingYour Answer Scheduling
Multiple Choice Single AnswerQuestion Technique of Value Engineering can be effectively employed in
design of a product toCorrect Answer To meet the intended function at lowest costYour Answer To meet the intended function at lowest cost
True/FalseQuestion Cellular layout is based on the concept of Group TechnologyCorrect Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following are types of sampling plan?Correct Answer Single sampling plan , Double sampling plan , Multiple
sampling planYour Answer Single sampling plan , Double sampling plan , Multiple
sampling plan
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of
making any product/s is calledCorrect Answer FactoryYour Answer Factory
Multiple Choice Single AnswerQuestion What is the base for considering activity time as single time
estimate or three time estimate?Correct Answer Level of uncertaintyYour Answer Level of uncertainty
Select The BlankQuestion In Gantt Chart, the vertical lines devide horizontal lines into
small squares which represents ________.Correct Answer Units of measurementYour Answer No. of Jobs
Select The BlankQuestion Activities comprising of a project are of two types, deterministic
and ________.Correct Answer VariableYour Answer Variable
Select The BlankQuestion A ________ is another form of subcontracting.Correct Answer Hiring capacityYour Answer Hiring capacity
Page 6
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/FalseQuestion It pays in the long run to inform the customer regarding expected delays in the deliveries.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Fixed position layout is adopted whenCorrect Answer product is very heavy involving assembly of large number of partsYour Answer product is very heavy involving assembly of large number of parts
Select The BlankQuestion The ________ is the defect level for which lots are regarded as bad lots.Correct Answer Lot Tolerance Percentage DefectiveYour Answer Lot Tolerance Percentage Defective
Multiple Choice Multiple AnswerQuestion Which are the advantages of suburban location?Correct Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available ,
Plant expansion is easier due to less or no restriction for building and constructionYour Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant
expansion is easier due to less or no restriction for building and construction
Select The BlankQuestion One detachable ticket is prepared for each ________.Correct Answer OperationYour Answer Worker
Select The BlankQuestion A good maintenance system is not a luxary but a ________.Correct Answer NecessityYour Answer Necessity
Multiple Choice Multiple AnswerQuestion Following are some of the factors which influence process planningCorrect Answer Order Quantity , Process capability of machine , Delivery DatesYour Answer Order Quantity , Delivery Dates , Plant layout
True/FalseQuestion Availability of training schools, colleges and management institutes reduces the company's internal training
needs.
Correct Answer TrueYour Answer False
Multiple Choice Multiple AnswerQuestion Which of the following are examples of pure materials?Correct Answer Bakeries , Ice factories , WoolenYour Answer Bakeries , Ice factories , Lime stone
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Production Scheduling
Work Sampling Machine utilization Sampling Inspection
Gantt Chart Production Scheduling Charting technique
Match The FollowingQuestion Correct Answer Your Answer
Fixation of inventory level Reorder level Stock on hand
Symptom of ill planned purchasing Over ordering Over ordering
Factor influencing material planning Lead time Lead time
Net requirement of material under MRP Stock on hand Price of material
Multiple Choice Multiple AnswerQuestion Which of the following are steps to identify the critical path in a small network?Correct Answer Compare the durations of all paths to identify the longest path. , Sum up the durations of activities
along each path. , Enumerate all paths in the network and list down activities on each path.Your Answer Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along
each path. , Enumerate all paths in the network and list down activities on each path.
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.Correct Answer 0.01 to 10%Your Answer 0.01 to 10%
True/False
Question Tool breakage has got nearly zero chances in case of eventual breakdown.Correct Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Which are the three types of float?Correct Answer Total float , Independent float , Free floatYour Answer Total float , Dependent float , Free float
Multiple Choice Multiple AnswerQuestion Which of the following are major inputs to scheduling?Correct Answer Overlapping of operations , Effective Capacity per work centre , Performance standardsYour Answer Effective Capacity per work centre , Ratio of skilled to unskilled labour , Performance standards
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any product/s is calledCorrect Answer FactoryYour Answer Factory
Select The BlankQuestion The ________ is the maximum percentage defective that for the purpose of sampling inspection can be
considered satisfactory as a process average.Correct Answer Acceptable quality levelYour Answer Lot Tolerance Percentage Defective
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from
routine or continuous checking.Correct Answer Condition monitoringYour Answer Overhauling
Select The BlankQuestion OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of
acceptance of ________.Correct Answer OneYour Answer One
Multiple Choice Single AnswerQuestion How to calculate activity cost slope?Correct Answer Activity cost slope = ( Crash cost - Normal cost ) / ( Normal time - Crash time )Your Answer Activity cost slope = ( Normal cost - Crash cost ) / ( Normal time - Crash time )
Multiple Choice Multiple Answer
Question Which of the following are minimum requirement for a good quality of design?Correct Answer Resonable cost , Resonable procurement time , Resonable manufacturing timeYour Answer Resonable cost , Resonable procurement time , Resonable manufacturing time
True/FalseQuestion In case of control chart, large smaples such as n=15 or 20 are used if the process standard deviation is
small.Correct Answer FalseYour Answer True
Select The BlankQuestion Production control work is ________ in case of floor inspection as compared with the centralised inspection.Correct Answer easierYour Answer labourious
Multiple Choice Single AnswerQuestion Production Planning includesCorrect Answer Predetermination of manufacturing requirementsYour Answer Predetermination of manufacturing requirements
Multiple Choice Single AnswerQuestion How does the control chart of statistical quality control helps the operating personnel?Correct Answer Identify the presence of an assignable cause before it developsYour Answer Reduces chances of rejections
Multiple Choice Single AnswerQuestion What can be the worst effect due to excessive vibration?Correct Answer BreakdownYour Answer Reduced salvage value of machine
Multiple Choice Single AnswerQuestion What do you understand by the metallergical aspects of product which forms the vital part of engineering
function?Correct Answer Material specificationsYour Answer Performance specifications
Multiple Choice Single AnswerQuestion Which of the following is a cause of plant breakdown?Correct Answer Overloading of machinesYour Answer Overloading of machines
Multiple Choice Multiple AnswerQuestion Which of the following possibilities can be explored by using flow process chart?
Correct Answer Eliminating the operations or combining the operations with another , Reducing the distance traveled bythe workmen or materials , Avoiding the waiting time and thereby reduce production losses
Your Answer Reducing the distance traveled by the workmen or materials , Reducing rejections drastically , Avoiding thewaiting time and thereby reduce production losses
Multiple Choice Single AnswerQuestion Material Planning is an integral part ofCorrect Answer Production PlanningYour Answer Process Planning
True/FalseQuestion Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure of machinery.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following activities are used while recording for method study?Correct Answer Delay , Operation , InspectionYour Answer Operation , Inspection , Production
True/FalseQuestion In case of centralised inspection, inspection rooms generally become bottleneck and cause delay in taking
action regarding rejection or rework.Correct Answer TrueYour Answer True
Select The BlankQuestion The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched
through systematic inspection to unearth unhealthy conditions and preventiveCorrect Answer Preventive MaintenanceYour Answer Preventive Maintenance
True/FalseQuestion The problems of congestion, bottlenecks and backtracking can not be visualized by using templates and models.Correct Answer FalseYour Answer False
Multiple Choice Single AnswerQuestion Which varaible is taken along the abscissa or X axis?Correct Answer TimeYour Answer Quality
True/False
Question Delay in completion of projects result in unwelcome additions to the fixed manufacturing expenses.Correct Answer TrueYour Answer True
Select The BlankQuestion The term ________ emplies the foregone profit due to inability of company to produce.Correct Answer Opportunity costYour Answer Idle wages
Multiple Choice Single AnswerQuestion Taxes / duties levied is one of the important determinant for location decision as taxes/duties substantially
influenceCorrect Answer Product costYour Answer Order procurement
Multiple Choice Multiple AnswerQuestion What are the uses of failure statistics analysis?Correct Answer To forecast the defect , To identify causes of major repetative failures , To quantify the frequency of
preventive inspectionYour Answer To forecast the defect , To identify causes of major repetative failures , To quantify the frequency of
preventive inspection
True/FalseQuestion Shop order is one of the subsidiary orderCorrect Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Which of the following is the most popular technique for Project Production?Correct Answer PERT & CPMYour Answer PERT & CPM
Select The BlankQuestion The ________ is the probability that a good lot will be rejected by the sampling plan.Correct Answer Producer's riskYour Answer Lot Tolerance Percentage Defective
True/FalseQuestion The component produced on completely automatic machines may be subjected to sampling inspection while parts
produced on semi-automatic and completely manual operated machines require cent percent inspection.Correct Answer TrueYour Answer False
Multiple Choice Multiple AnswerQuestion In an organization there may not be a formal PPC department ifCorrect Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of
workmen is not very largeYour Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen
is not very large
Multiple Choice Multiple AnswerQuestion Which of the following factors play important role while selecting or rejecting a particular site from
legislation and taxation point of view?Correct Answer Labour laws , Building codes , Policies regarding issue of licencesYour Answer Labour laws , Policies regarding issue of licences , Productivity of labour
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/FalseQuestion It pays in the long run to inform the customer regarding expected delays in the deliveries.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Fixed position layout is adopted whenCorrect Answer product is very heavy involving assembly of large number of partsYour Answer product is very heavy involving assembly of large number of parts
Select The BlankQuestion The ________ is the defect level for which lots are regarded as bad lots.Correct Answer Lot Tolerance Percentage DefectiveYour Answer Lot Tolerance Percentage Defective
Multiple Choice Multiple AnswerQuestion Which are the advantages of suburban location?Correct Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available ,
Plant expansion is easier due to less or no restriction for building and constructionYour Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant
expansion is easier due to less or no restriction for building and construction
Select The BlankQuestion One detachable ticket is prepared for each ________.Correct Answer OperationYour Answer Worker
Select The Blank
Question A good maintenance system is not a luxary but a ________.Correct Answer NecessityYour Answer Necessity
Multiple Choice Multiple AnswerQuestion Following are some of the factors which influence process planningCorrect Answer Order Quantity , Process capability of machine , Delivery DatesYour Answer Order Quantity , Delivery Dates , Plant layout
True/FalseQuestion Availability of training schools, colleges and management institutes reduces the company's internal training
needs.Correct Answer TrueYour Answer False
Multiple Choice Multiple AnswerQuestion Which of the following are examples of pure materials?Correct Answer Bakeries , Ice factories , WoolenYour Answer Bakeries , Ice factories , Lime stone
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Production Scheduling
Work Sampling Machine utilization Sampling Inspection
Gantt Chart Production Scheduling Charting technique
Match The FollowingQuestion Correct Answer Your Answer
Fixation of inventory level Reorder level Stock on hand
Symptom of ill planned purchasing Over ordering Over ordering
Factor influencing material planning Lead time Lead time
Net requirement of material under MRP Stock on hand Price of material
Multiple Choice Multiple Answer
Question Which of the following are steps to identify the critical path in a small network?Correct Answer Compare the durations of all paths to identify the longest path. , Sum up the durations of activities
along each path. , Enumerate all paths in the network and list down activities on each path.Your Answer Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along
each path. , Enumerate all paths in the network and list down activities on each path.
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.Correct Answer 0.01 to 10%Your Answer 0.01 to 10%
True/FalseQuestion Tool breakage has got nearly zero chances in case of eventual breakdown.Correct Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Which are the three types of float?Correct Answer Total float , Independent float , Free floatYour Answer Total float , Dependent float , Free float
Multiple Choice Multiple AnswerQuestion Which of the following are major inputs to scheduling?Correct Answer Overlapping of operations , Effective Capacity per work centre , Performance standardsYour Answer Effective Capacity per work centre , Ratio of skilled to unskilled labour , Performance standards
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any product/s is calledCorrect Answer FactoryYour Answer Factory
Select The BlankQuestion The ________ is the maximum percentage defective that for the purpose of sampling inspection can be
considered satisfactory as a process average.Correct Answer Acceptable quality levelYour Answer Lot Tolerance Percentage Defective
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from
routine or continuous checking.Correct Answer Condition monitoringYour Answer Overhauling
Select The BlankQuestion OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of
acceptance of ________.Correct Answer OneYour Answer One
Multiple Choice Single AnswerQuestion How to calculate activity cost slope?Correct Answer Activity cost slope = ( Crash cost - Normal cost ) / ( Normal time - Crash time )Your Answer Activity cost slope = ( Normal cost - Crash cost ) / ( Normal time - Crash time )
Multiple Choice Multiple AnswerQuestion Which of the following are minimum requirement for a good quality of design?Correct Answer Resonable cost , Resonable procurement time , Resonable manufacturing timeYour Answer Resonable cost , Resonable procurement time , Resonable manufacturing time
True/FalseQuestion In case of control chart, large smaples such as n=15 or 20 are used if the process standard deviation is
small.Correct Answer FalseYour Answer True
Select The BlankQuestion Production control work is ________ in case of floor inspection as compared with the centralised inspection.Correct Answer easierYour Answer labourious
Multiple Choice Single AnswerQuestion Production Planning includesCorrect Answer Predetermination of manufacturing requirementsYour Answer Predetermination of manufacturing requirements
Multiple Choice Single AnswerQuestion How does the control chart of statistical quality control helps the operating personnel?Correct Answer Identify the presence of an assignable cause before it developsYour Answer Reduces chances of rejections
Multiple Choice Single AnswerQuestion What can be the worst effect due to excessive vibration?Correct Answer BreakdownYour Answer Reduced salvage value of machine
Multiple Choice Single Answer
Question What do you understand by the metallergical aspects of product which forms the vital part of engineeringfunction?
Correct Answer Material specificationsYour Answer Performance specifications
Multiple Choice Single AnswerQuestion Which of the following is a cause of plant breakdown?Correct Answer Overloading of machinesYour Answer Overloading of machines
Multiple Choice Multiple AnswerQuestion Which of the following possibilities can be explored by using flow process chart?Correct Answer Eliminating the operations or combining the operations with another , Reducing the distance traveled by
the workmen or materials , Avoiding the waiting time and thereby reduce production lossesYour Answer Reducing the distance traveled by the workmen or materials , Reducing rejections drastically , Avoiding the
waiting time and thereby reduce production losses
Multiple Choice Single AnswerQuestion Material Planning is an integral part ofCorrect Answer Production PlanningYour Answer Process Planning
True/FalseQuestion Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure of machinery.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following activities are used while recording for method study?Correct Answer Delay , Operation , InspectionYour Answer Operation , Inspection , Production
True/FalseQuestion In case of centralised inspection, inspection rooms generally become bottleneck and cause delay in taking
action regarding rejection or rework.Correct Answer TrueYour Answer True
Select The BlankQuestion The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched
through systematic inspection to unearth unhealthy conditions and preventiveCorrect Answer Preventive MaintenanceYour Answer Preventive Maintenance
True/FalseQuestion The problems of congestion, bottlenecks and backtracking can not be visualized by using templates and models.Correct Answer FalseYour Answer False
Multiple Choice Single AnswerQuestion Which varaible is taken along the abscissa or X axis?Correct Answer TimeYour Answer Quality
True/FalseQuestion Delay in completion of projects result in unwelcome additions to the fixed manufacturing expenses.Correct Answer TrueYour Answer True
Select The BlankQuestion The term ________ emplies the foregone profit due to inability of company to produce.Correct Answer Opportunity costYour Answer Idle wages
Multiple Choice Single AnswerQuestion Taxes / duties levied is one of the important determinant for location decision as taxes/duties substantially
influenceCorrect Answer Product costYour Answer Order procurement
Multiple Choice Multiple AnswerQuestion What are the uses of failure statistics analysis?Correct Answer To forecast the defect , To identify causes of major repetative failures , To quantify the frequency of
preventive inspectionYour Answer To forecast the defect , To identify causes of major repetative failures , To quantify the frequency of
preventive inspection
True/FalseQuestion Shop order is one of the subsidiary orderCorrect Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Which of the following is the most popular technique for Project Production?Correct Answer PERT & CPMYour Answer PERT & CPM
Select The BlankQuestion The ________ is the probability that a good lot will be rejected by the sampling plan.Correct Answer Producer's riskYour Answer Lot Tolerance Percentage Defective
True/FalseQuestion The component produced on completely automatic machines may be subjected to sampling inspection while parts
produced on semi-automatic and completely manual operated machines require cent percent inspection.Correct Answer TrueYour Answer False
Multiple Choice Multiple AnswerQuestion In an organization there may not be a formal PPC department ifCorrect Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of
workmen is not very largeYour Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen
is not very large
Multiple Choice Multiple AnswerQuestion Which of the following factors play important role while selecting or rejecting a particular site from
legislation and taxation point of view?Correct Answer Labour laws , Building codes , Policies regarding issue of licencesYour Answer Labour laws , Policies regarding issue of licences , Productivity of labour
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/FalseQuestion Cent percent inspection is required on WIP prior to the key, critical or costly operation.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following aspects are essential to ensure quality of purchased items?Correct Answer Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers
understand the requirementsYour Answer Vendor performance evaluation , Making sure that suppliers understand the requirements , Defining right
quality for the job
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any product/s is calledCorrect Answer FactoryYour Answer Factory
Multiple Choice Single AnswerQuestion Which of the following technique is event oriented ?Correct Answer Project Evaluation & Review TechniqueYour Answer Project Evaluation & Review Technique
Select The BlankQuestion Work study is also called ________ studyCorrect Answer Time and MotionYour Answer Time and Motion
Multiple Choice Multiple AnswerQuestion Which of the following concepts must be understood for the achievement of quality?Correct Answer Quality of conformance , Purpose of product , Quality of designYour Answer Quality of conformance , Quality of design
Multiple Choice Multiple AnswerQuestion Following are some of the factors considered for evaluation of alternative layoutsCorrect Answer Flow of Material , Equipment utilization , Ease of supervisionYour Answer Flow of Material , Equipment utilization , Ease of supervision
Match The FollowingQuestion Correct Answer Your Answer
Toung Sweet Sweet
Eye Crack Crack
Nose Burnout Burnout
Ear Impact Impact
Multiple Choice Multiple AnswerQuestion Which of the following are important considerations concerning activity times?Correct Answer Activity time should be obtained from the person responsible for the completion of an activity ,
Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity timemay assume that just the normal quantity of resources required to carry out the activity are available.
Your Answer Activity time should be obtained from the person responsible for the completion of an activity , Activitytime must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assumethat just the normal quantity of resources required to carry out the activity are available.
Multiple Choice Multiple AnswerQuestion Which are the subtasks of the maintenance phase of the method study?Correct Answer Monitoring and control , Performance appraisal , Audit on savingsYour Answer Monitoring and control , Performance appraisal , Audit on savings
Multiple Choice Multiple AnswerQuestion Which of the following are characteristics of an operating characteristics curve?Correct Answer Producer risk , Consumer Risk , Acceptable Quality LevelYour Answer Producer risk , Consumer Risk , Acceptable Quality Level
Select The BlankQuestion The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly
due to emergency actions.Correct Answer UnexpectedYour Answer Partial
Multiple Choice Single AnswerQuestion Why stores issue order should not be issued as soon as it is prepared?Correct Answer Material may or may not be available at the time of preparationYour Answer Inventory investment will increase
Multiple Choice Single AnswerQuestion What is the nature of the sampling plan for critical defects?Correct Answer TightYour Answer Tight
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.Correct Answer 0.01 to 10%Your Answer 0.01 to 10%
Multiple Choice Multiple AnswerQuestion Plant layout facilitates processing of products in most effective manner through the followingCorrect Answer Shortest possible distance , Shortest processing time , Minimum movementYour Answer Shortest possible distance , Shortest processing time , Minimum movement
True/FalseQuestion After goods have been manufactured, route sheets and operation layouts should not be collected back.Correct Answer FalseYour Answer False
Multiple Choice Single AnswerQuestion Process planning is the process ofCorrect Answer establishing shortest and most economic path of productionYour Answer establishing shortest and most economic path of production
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to entity can be defined asCorrect Answer OperationYour Answer Operation
Select The BlankQuestion The ________ is specified to indicate the maximum permissible variability in the dimensions product or parts.Correct Answer ToleranceYour Answer Tolerance
Select The BlankQuestion Goods after final inspection should accompany ________to enable dispatch department to identify and draw
correct reference.Correct Answer Forwarding noteYour Answer Forwarding note
Select The BlankQuestion The ________ includes preventive maintenance activities whose needs are identified through inspection which
requires stoppage of machines.Correct Answer Shutdown MaintenanceYour Answer Shutdown Maintenance
True/FalseQuestion A load chart specifies the work to be carried out by each person of company during shift hours.Correct Answer FalseYour Answer True
Select The BlankQuestion The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly
holiday is ________.Correct Answer Overtime workingYour Answer Overtime working
True/FalseQuestion Under MRP system for common items order for procurement is placed based on requirement for each productCorrect Answer FalseYour Answer True
Multiple Choice Single AnswerQuestion What do you understand by the extent the products manufactured conforms to the laid down design?Correct Answer Quality of conformanceYour Answer Quality of conformance
Select The BlankQuestion The ________ is necessary when the job requires detailed of one or more of the job characteristics with the
help of special equipment which is not available at the producing company.Correct Answer Inspection orderYour Answer Job card
Multiple Choice Multiple AnswerQuestion Which of the following are the basic requirements of quality standard?Correct Answer Deifinite , Undesrstandable , Economically viableYour Answer Deifinite , Undesrstandable , Economically viable
True/FalseQuestion In case of forward pass computation, the earliest event time of the first event is zero.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which kind of possible defectives can be reduced due to first off inspection?Correct Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set upYour Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up , Due to
purposely done mistakes by unsatisfied worker
True/FalseQuestion A sampling plan which perfectly discriminates will have vertical OC curve.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following is a part of preparing manufacturing order set as a primary function of dispatching?Correct Answer Operational layouts , Move orders , Pre-filled stores issue ordersYour Answer Operational layouts , Rejection reports , Move orders , Pre-filled stores issue orders
Select The BlankQuestion An ________ history card is the record of all repairs, replacements and engineering changes carried out in
the equipment during it's period of service.Correct Answer Equipment history cardYour Answer Equipment history card
True/FalseQuestion Specifications is the basic tool of inspection.Correct Answer TrueYour Answer True
Match The FollowingQuestion Correct Answer Your Answer
Forcasting requirement for indirect material Past consumption analysis technique Economic order quantity
Inventory control by classification ABC Analysis ABC Analysis
Structure of the product BOM BOM
Material Planning for dependent demand MRP MRP
Multiple Choice Single AnswerQuestion The document raised by PPC which authorises different functions to take action as per instruction is calledCorrect Answer Work OrderYour Answer Job Instructions
Multiple Choice Single AnswerQuestion Who prepares the daily production report?Correct Answer Shop SupervisorYour Answer Shop Supervisor
True/FalseQuestion A lot declared rejected in sampling inspection should not be inspected 100% in any case.Correct Answer FalseYour Answer True
Multiple Choice Single AnswerQuestion How is the probability of acceptance in case of Acceptable Quality Level (AQL )?Correct Answer Very highYour Answer Average
Multiple Choice Multiple AnswerQuestion Which are the different methods of recording actual progress of work?Correct Answer Display boards , Progress cards , Network updatingYour Answer Display boards , Progress cards , Network updating
True/FalseQuestion The dispatching function is of very importance in flow and mass production units.Correct Answer FalseYour Answer True
True/FalseQuestion Proper care and storage is not an essential part of a well planned lubrication system.
Correct Answer FalseYour Answer False
Select The BlankQuestion The ________ pertain to the climatic conditions which the component , product or material should withstand.Correct Answer Environmental specificationsYour Answer Environmental specifications
Multiple Choice Single AnswerQuestion Which of the following is the most popular technique for Project Production?Correct Answer PERT & CPMYour Answer PERT & CPM
Select The BlankQuestion Production Planning is a centralised activity which includes functions such as ________Correct Answer SchedulingYour Answer Scheduling
Multiple Choice Single AnswerQuestion Which rule is used for numbering of events?Correct Answer Fulkerson's RuleYour Answer Fulkerson's Rule
ASSIGNMENT
Q.1) What is “Operations Management”? What are the objectives of Operations Management? Enlist key elements of OperationsManagement.
Answer.1)
An operation may be defined “as the process of changing inputs into outputs thereby adding value to some entity”.Right quality,right quantity, right time and right price are the four basic requirements of the customers and as such they determine theextent of customer satisfaction. And if these can be provided at a minimum cost, then the value of goods produced or servicesrendered increases. Thus the objectives of production management are “to produce goods and services of the right quality, inthe right quantities, according to the time schedule and a minimum cost”.
Objectives of production management may be amplified as under:
• Producing the right kind of goods and services that satisfy customers’ needs (effectiveness objective).
• Maximizing output of goods and services with minimum resource inputs (efficiency objective).
• Ensuring that goods and services produced conform to pre-set quality specifications (quality objective).
• Minimizing throughput-time- the time that elapses in the conversion process- by reducing delays, waiting time and idletime (lead time objective).
• Maximizing utilization of manpower, machines, etc. (Capacity utilization objective).
• Minimizing cost of producing goods or rendering a service (Cost objective).
Key elements of Operations Management
1. Product selection and design
The right kind of products and good designs of the products are crucial for the success of an organizing. A wrong selection ofthe product and/or poor design of the products can render the company’s operation ineffective and non-competitive.Products/services, therefore, must be chosen after detailed evaluation of the product/services alternatives in conformity withthe organization’s objectives. Techniques like value engineering may be employed in creating alternate designs, which are freefrom unnecessary features and meet the intended functions at the lowest cost.
2. Process selection and planning
Selection of the optimal “conversion system” is as important as choice of products/services and their design. Processselection decisions include decisions concerning choice of technology, Equipment, machines, material handling systems,mechanization and automation. Process planning involves detailing of processes if resource conversion required and theirsequence.
3 Facilities (Plant) location
Plant location decisions are strategic decisions and once plant is set up at a location, it is comparatively immobile and canbe shifted later only at a considerable cost and interruption of production. Although problem of location choice does not fallwithin preview the production function and it occurs infrequently, yet it is of crucial importance because of its major effecton the performance of every department including production. Therefore, it is important to choose the right location, whichwill minimize total “delivered customer” cost (Production and distribution cost). Locational decisions involve evaluation oflocational alternatives against multiplicity of relevant factors considering their relative importance to the organization andselecting those, which are operationally advantageous to the organization.
4. Facilities (Plant) layout and materials handling
Plant layout is concerned with relative location of one department (Work centre) with another in order to facilitate materialflow and processing of a product in the most efficient manner through the shortest possible time. A good layout reducesmaterial handling cost, eliminates delays and congestion, improves co-ordination, provide good housekeeping etc. while a poorlayout results in congestion, waste, frustration, inefficiency and loss of profit.
5. Capacity Planning
Capacity planning concerns determination and acquisition of productive resource to ensure that their availability matches thedemand. Capacity decisions have a directInfluence on performance of production system in respect of both resource productivity and customer service (i.e. deliveryperformance). Excess capacity results in low resource productivity while inadequate capacity leads to poor customer service.Capacity planning decisions can be short-term decisions. Long-term capacity planning decisions concern expansion/contractionof major facilities required in the conversion process, economics of multiple shift operation, development of vendors for major
components etc. Short term capacity planning decisions concern issues like overtime working, sub-contracting, shiftadjustments etc. Break even analysis is a valuable tool for capacity planning.
6. Production Planning and Control (PPC)
Production planning is the system for specifying the production procedure to obtain the desired output in a given time atoptimum cost in conformance with specified standard of quality, and control is essential to ensure that manufacturing takesplace in the manner stated in the plan.
7. Inventory control
Inventory control deals with determination of optimal inventory levels of raw materials, components, parts, tools; finishedgoods, spares and supplies to ensure their availability with minimum capital lock up. Material requirement planning (MRP) andjust-in-Time (JIT) are the latest techniques that can help the firm to reduce inventory.
8. Quality assurance and control
Quality is an important aspect of production system and it must ensure that services and products produced by the companyconform to the declared quality standards at the minimum cost A total quality assurance system includes such aspects assetting standards of quality, inspection of purchased and sub-contracted parts, control of quality during manufacture andinspection of finished product including performance testing etc.
9. Work study and job design
Work-study, also called time and motion study, is concerned with improvement of productivity in the existing jobs and themaximization of productivity in the design of new jobs. Two principal component of work-study are:
(i) Method study(ii) Work measurement
Method study has been defined (BS 3138) as the systematic recording and critical examination of the existing and proposedways of doing work, as a means of developing and applying easier and more effective methods and reducing costs. Method studywhen applied to production methods yields one or more of the following benefits:
• Improved work environment• Improved facility layout• Better utilization of facilities• Greater safety• Lesser materials handling• Smooth production flow• Lower work-in-process• Higher earnings for the workmen
10. Maintenance and replacement
Maintenance and replacement involve selection of optimal maintenance Preventive and/or breakdown) policy to ensure higherequipment availability at minimum maintenance and repair cost. Preventive maintenance, which includes preventive inspection,
planned lubrication, periodic cleaning and upkeep, planned replacement of parts, condition monitoring of the equipment andmachines, etc. is most appropriate for critical machines.
11. Cost reduction and cost control
Effective production management must ensure minimum cost of production and in this context cost reduction and cost controlacquires significant importance. There are large number of tools and techniques available that can help to make a heavy denton the production cost.
Q.2) What is batch Production? What are its key characteristics? Compare these characteristics with those of projectproduction.
Answer.2)
Batch production is characterized by the manufacture of a limited number of a product (but many such quantities ofdifferent products) produced at periodic intervals and stocked in warehouses as finished goods (or finished parts) awaitingsales (or withdrawal for assembly). Typical examples of batch production are: process industries such as pharmaceuticals,paints, chemicals; medium and heavy engineering industry engaged in the manufacture of electric motors, switch gears, heavymotor vehicles, internal combustion engines; manufacture of ready made garments; manufacture of assembly shops such as machinetools; sub contractors which take on machining of batches of components to the drawings of a large manufacture etc.
Characteristics of batch production
(a) Short runs:Short production runs and frequent changes of set also characterize batch production up. The equipment and the assembly
set up is used for a limitednumber of parts or assemblies and is then changed to make a different product. The production is generally made to stock.
(b) Skilled labour in specific trades:The labour force is expected to posses skill in one specific manufacturing process, Turning, milling, drilling, welding,
grinding, hobbing, fitting etc.
The operator may perform simpler machine set-ups but the separate machine tool setter performs those involving complexoperations.
(c) Supervision to possess knowledge of a specific processThe supervision has considerable knowledge of a specific process. Supervisor in the grinding section for example, may
not expert in turning and drilling work but s expected to possess a find of knowledge of different types of grindingoperations.
Similarly a supervisor in the gear shop is expected to have sound knowledge in working of different types of gear cuttingmachines.
(d) Limited span of control:The amount of supervision required in batch production is lower than that of jobbing production. The ration of direct
workmen to supervisors is more or less a function of batch size. The smaller the batches, the lower are the ratio of directworkers to supervisors, and vice versa. This is because smaller lots require each supervisor to spend a great deal of his timein allocating new work, giving instructions, follow up on the shop floor for proper movement of materials from and to the
machines, identifying delays and interruptions, and arranging, in consultation with planning, work load in his section to keephis men busy.
(e) General purpose machines and process type of layoutPlant and equipment is procured and arranged to obtain maximum flexibility. General purpose machines
and handling equipment capable of performing variety of operations with minimum set –up times are installed in lieu of varietyof products. The machines are arranged to give process layout-layout by function. Similar machines capable of doing similartypes of operations are grouped together and kept at one place. Presses for example, are put together and kept at one placemilling machines are placed together at another place, drilling machines are kept at the third place, gear cutting machines arelocated at the fourth place and so on. Each Group of machines is usually designated as a work centre or a section or a shop.
(f) Manual materials handling:Materials handling in batch production as compared to jobbing production are small. Individual components and parts are placedin trolleys and trays and are transported as unit loads. Materials handling may be mechanized by deploying power driventrucks.
(g) Manufacturing cycle time affected due to queues:The manufacture cycle time is comparatively smaller than jobbing production but is much more than mass and flow production.The batches of work tend to queue up at different machines due to differing cycles times, batch sizes and sequence ofoperations.
(h) Large work-in-progress:Work in progress is comparatively large due to varying work content of different components, imbalance in manufacturing times,formation of queues between the machines.
(i) Flexibility of production schedules:Disruptions due to machine breakdown or absenteeism do not seriously affect production as job can be shifted to another machineor another operator from another machine can be shifted.
(j) Need to have production planning and control:Functions of production planning and control in a batch production unit are more complex than those in jobbing production ormass and flow production:
• Materials control and tools control functions are important. Some kind of replenishment system needs to be used toensure routine replenishment
• Detailed operational layout and route sheets are prepared for each part of the product.
• Loading and scheduling needs to be more detailed and more sophisticated since every machine requires to be individuallyscheduled.
• Progressing function is very important to collect information on progress of work. A separate progress card needs to bemaintained to record progress of each component.
• Expediting is generally necessary since quite often jobs, due to imbalances in work content, tend to lag behind
Q.3) (a) Why are locational decisions important? What factors should be taken into account while deciding location of a unitto manufacture washing machines?
Answer.3a)
Locational decisions generally arise when:
• A new manufacturing (or servicing) unit is to be set up.• Existing plant operations are difficult to expand due to poor selection of site earlier.• The growth of the business makes it advisable to establish additional facilities in new territories.• There is emergence of new social (chronic labour problems) political (political instability or economic conditions thatsuggest a change in the location of the existing plant.• The product development has over weighted the advantages of the existing plant.• The changes in the industrial Policy of the Government, favoring decentralizing and dispersal of industries to achieveoverall development of the country, do not permit expansion of the existing plant
FACTORS GOVERNING PLANT LOCATION
Plant location studies are conducted in three phases:
(i) General territory selection(ii) Community selection, and(iii) Site selection
1. Proximity to market:
Every company is in business to market and it can survive only if their product reaches the consumers on time and at thecompetitive price. The ratio of selling costs to sales generally increases with distance. Therefore, in the choice oflocation o the plant, the factor of “proximity to the market” is given the highest priority. Locating a plant nearer to themarket is preferred if:
• The product is fragile.• The product is susceptible to spoilage.• The promptness of service is required.• The product is relatively inexpensive and transportation costs add significantly to the cost.
Bread, soap factories, etc. require the market to be nearby. If factory cannot be started in Bombay, it may be started inThane, Kalyan or Poona. If the product is exported, location near ports is desirable. This is particularly important forproducers who sell bulky commodities, which incur high transportation costs
Nearness to market not only lowers transportation costs but also gives many other benefits namely:
• A good many administrative problems, which cause perpetual headaches and add to costs, are avoided.• Liaison with dealers or whole sellers can be maintained economically and easily• Other costs such as commission to middlemen, which at times run as high as 20 to 50 percent can be reduced significantly.
• Customer’s accounts do not remain outstanding for settlement. This recovery is easy and less time saving which itselfreduces selling costs.
2. Proximity to source of raw materials:
Since raw materials usually constitute 50 to 60 percent of the total product cost, it is important that the firm gets itsrequirements of raw materials at the right time and at the reasonable price for which the plant must be located in theneighborhood of some source which can meet the raw materials requirement of the unit “Proximity to supply of raw materials”factor assumes still greater importance if raw materials are of perishable nature or if they are expensive to transport, or iftheir weight is substantially reduced by processing.
Proximity to sources of raw materials is equally important for small units. This is because usually small units are notconsidered important customers. They get least priority and in the event of scarcity are the one to be struck off first fromthe list. The availability of materials to small units to a large extent thus depends on their follow up and personal visitsto the supplier’s plant which is possible only if the buyer’s plant is close by.
3. Infrastructural facilities:
Infrastructural facilities consider availability of utilities like power water, disposal of waste etc. These form the life-blood of many types of industries without which there facilities may come to a stand still. Underestimating the need of anyone of the utilities can be extremely costly and inconvenient.
Certain industries, for example, aluminium, steel, etc are power intensive and must be located close to the sites of powergeneration failing which the shortage of, or increase in cost of generating power may spell problems for their survival.
Similarly, chemical process industries like paper and pulp, cement, steel, sugar laundries, metal plating, food preparationetc. requires perennial source of water. Mineral content of water may also be an important factor. Treatment of water is anexpense to be considered while comparing economics of different locations.
Drainage facilities are important for process industries otherwise disposal of process waster can create lot of difficulties.
4. Transport facilities:
Transportation cost to the value added is a key determinant of the plant location. The structure of the transportation costdepends on (i) Characteristics of the commodity (ii) average distance of shipment (iii) medium of shipment: rail, road, and airsea.
The need for transport arises because raw materials and fuel are to be moved to factory site and finished goods are to betransported from factory to markets. Other things being equal since transport cost has a major effect on product cost, theregions well served by transport facilities are most suitable for industrial locations.
5. Labour and wages:
Plant location should be such that required labour is easily available in the neighbourhood. Importing labour from outside isusually costly and it causes lot of administrative problems. Availability of required labour locally is better since problemof arranging accommodation and other related problems do not arise. Since normally workers with specific skills are required,some sort of training facility should also be available in the neighborhood. Skilled employees are easily available if ITI’s,or Engineering colleges are there in the neighbourhood.
6. Legislation and taxation:
The policies of the state Government and Local Bodies relating to issue of licenses, building codes, labour laws, etc. are thefactors in selecting/rejecting a particular community/site.
In order to disperse industries and ensure balanced economic growth, both Central and State government offer a package ofincentives for setting up industries in particular locations. Exemption from excise duty, sales tax and octroi, soft loansfrom financial institutions, subsidy in electricity charges, etc. are some of the incentives offered.
Since taxes and duties levied by the State Government and Local bodies substantially influence product cost, the incidence ofsuch taxes/levies must be taken into account while selecting a community/site.
7. Climatic conditions:
Climatic factors may not have a major influence these days because of modern air conditioning facilities available today.However, it may be important factor for certain industries like textile mills, which require high humidity.
8. Industrial and labour attitudes:
Community attitudes towards supporting hostile trade union activities are an important factor. Locating facilities in acertain region/community may not be desirable as frequent labour problems and interruptions are harmful to the plant in thelong run. Political situation in the state and attitude of the government towards labour activities also influences selectionof the site for the plant.
9. Safety requirement:
Safety factor may be important for certain industries such as:
- Nuclear power plants- Explosive factoriesLocation of such industries close to border areas is undesirable.
10. Community facilities (or social infrastructure):
Community facilities imply accommodation, educational, entertainment and transport facilities.
Accommodation is needed unless the employees are local residents. Accommodation should be easily available, comparativelycheap and near some public transport stop.The locational area should be fully developed, be accessible by road and should have a convenient and efficient publictransport system operating between the area and the township to enable employees, officials, customers and suppliers to makeeasy trips for their work
11. Community attitudes:
Community attitudes towards work (i.e. whether the people in the location are hard working or otherwise) as well as theirattitudes towards the incoming entrepreneurs (helpful and cooperative or otherwise) can make or mar an industry. Locationaldecisions, therefore, must take such factors also into account particularly while setting up labour intensive units.
12. Supporting industries and services:
Locational factors should also include proximity of services needed by the firm. A firm desirous of getting some or all partsmade from outside or some of the operations done from outside must see that such sub-contractors are located in theneighbourhood. Getting a job done from units located at far off places will mean not only additional transportation cost butalso time consuming and costly. Also if units are too far off, the control on quality of work done by them cannot beexercised.
13. Suitability of the land:
Site selection should also take into account topography and soil structure of the land. The soil structure must be capable ofbearing loads of foundations. Though modern building techniques can overcome the limitations of the soil, but if considerableimprovement is required then selection of a low cost and may ultimately turn out to be expensive.
14. Availability and cost of the land:
Site size (Plot size) must be large enough to accommodate the present production facilities, parking and access facilities butalso leave sufficient room for future expansion. As a general rule, a site five times the actual plant size is consideredminimum for all these things including future expansion.
ECONOMY SURVEY OF THE SITE SELECTION:
An ideal location is one where the cost of obtaining materials and processing them into finished product plus the cost ofdistributing the finished product to customers is minimum.
One of the most commonly used approaches consists of following steps:
Step 1: Prepare a list of all relevant factors.
Step 2: Estimate expenses on materials, transport, wages, power etc for each location on each of the above factors.
Step 3: Collect data on intangible factors like community facilities, community attitudes etc.
Step 4: Analyse the tangible data for each location and calculate rate of return on investment.
Step 5: Select provisionally a locational based on financial data.
Step 6: Compare the intangible data for the different locations and select the optimal location considering intangibledata.
Q.3) (b) What are objectives of a good layout? Discuss any six principles of a good layout?
Answer.3)(b)
OBJECTIVE OF A GOOD PLANT LAYOUT
Only through an efficient layout, the organization can attain the following objectives:
(i) Economy in handling of materials, work-in-process and finished goods.
(ii) Minimization of product delays.
(iii) Lesser work-in-progress and minimum manufacturing cycle time.
(iv) Efficient utilization of available space.
(v) Easy supervision and better production control.
(vi) Greater flexibility for changes in product design and for future expansion.
(vii) Better working conditions by eliminating causes of excessive noise, objectionable odor smoke etc.
PRINCIPLES OF A GOOD LAYOUT
(i) Overall integration of factors:A good layout is one that integrates men, materials, machines and supporting activities and others in a way that the bestcompromise is obtained
No layout can satisfy each and every principle of a good layout. Some criterion may conflict with some other criterion and asa result no layout can be ideal it has to integrate all factors into the best possible compromise.
(ii) Minimum movement:A good layout is one that permits the minimum movement between the operations.
The plant and machinery in case of product layout and departments in case of process layout should be arranged as persequence of operations of most of the products.
? Since straight line is the shortest distance between any two points, men and materials as far as possible should be madeto move along the straight path
A door may be made in a wall or a hole may be drilled in a ceiling if that eliminates or reduces material handling in place ofstairs or a distant door.
(iii) Uni-direction flow:A good layout is one that makes the materials move only in the forward direction, towards stage of completion, with anybacktracking.
? Since straight line is the shortest distance between any two, points, materials as far as possible should be made to moveon the principle of straight line flow. And when straight line flow is not possible, other flows like U-shaped flow, circularflow or zig zag flow may be adopted, but the layout may ensure that materials move in the forward direction (Fig 4.1)
? To ensure forward flow, equipment if necessary may be duplicated.
(iv) Effective use of available space:A good layout is one that makes effective use of available space both horizontal and vertical
• Backtracking and duplicated movements consume more time, involve un-necessary materials handling, add to cost and lead toinefficiency.
• Raw materials, work-in-progress and finished goods should be piled vertically one above another rather than being strewnon the floor.
• Pallets or equivalents should be made use of to pile up several layers one above another
• Area below the work tables or in the cupboards built into the wall are welcome since they reduce requirement of space
(v) Maximum visibility:A good layout is one that makes men, machines and materials ready observable at all times.
• All departments should be smoothly integrated, convenient to service and easy to supervise
• Every piece of positioning or screening or partitioning should be scrutinized and carefully planned.
• Special cupboards, enclosures, offices, partitions etc. should be avoided except when their utility is established beyonddoubt.
(vi) Maximum accessibility:A good layout is one that makes all servicing and maintenance point readily accessible.
• Machines should be kept sufficiently apart and with reasonable clearance fromThe wall so that lubrication, adjustment and replacement of belts, removal of parts at the time of repairs etc can be doneconveniently by the maintenance staff.
Area in front of electrical panels and fire extinguishers should be kept free from obstructions.
Q.4) How does production planning differ from production control? What are the key functions of production planning andcontrol?
Answer.4)Production planning versus production control.
Planning (Planning the work) Control (Working the Plan)Planning involves collection and maintenance of data regarding time standards, materials and their specifications, machines andtheir quantities, tools and their process capabilities, drawings and operational layouts etc.
Planning is seeing that requirements tool, machines, men, instructions, authorization and the like-will be available at theright time and in the right quantities and are of proper quality.
Planning involves preparations of load charts and fitting various work orders into uncommitted time available on the company’sfacilities (men or machines).
Planning involves preparation of all necessary forms and paper work.
Planning involves designing suitable feed back as to what may happen.
Planning involves forwarding thinking regarding the remedial action to be taken if the job falls behind schedule.
Planning therefore is a centralizedActivity (in the office) and includes such functions as materials control, tools control, process planning and scheduling.
Control involves dissemination of data preparation of reports regarding output, machine and labour efficiency, percentdefectives etc.
Control is seeing the requirements are actually made available at the right place and in the right quantities.
Control involves actual seeing that the jobs are started and completed as per schedule prepared by the scheduling cell of thePPC.
Control involves actual issue of forms and paper work.
Control involves keeping track of what is happening and collecting information as to what has happened.
Control involves suggesting remedial action when the job is falling behind schedule.
Control is thus a diffused activity (in the shops) and includes functions such as dispatching, progressing and expediting.
FUNCTIONS OF PRODUCTION PLANNING AND CONTROL:
Production planning and control is normally assigned two sets of functions:
(I)Regular functions and(ii) Optional functions.
(i) Regular functions are those, which are generally assigned to PPC in most of the organizations through the importance ofthe function, may vary from industry to industry.
(ii) Optional functions are those, which may be assigned to PPC depending upon policy of the management of the firm.
Common (or Regular Functions) Optional Functions
Order Preparation includes activities like making of work orders, converting work orders to shop orders, preparing auxiliaryorders and releasing such orders to those concerned to authorize their activities
Materials control concerns preparations of materials estimates, indenting non-stock materials, ascertaining availability ofmaterials purchased to stock, continual follow-up with purchase and stores for timely receipt of materials, and advising storesto allocate required quantities or available materials (alternatively on their receipt) against specific shop orders.
Process planning or Routing concerns fixation of method of manufacture: operations and their sequence, machine tool for eachoperation, jigs and fixtures, measuring instruments and gauges etc. to enable shops to produce goods of the right quality atthe lowest cost.
Tools control concerns preparations of estimates of cutting tools (Standards as week As non-standards tools), gauges andmeasuring instruments, jigs and fixtures etc indenting non-stick tooling: follow up with tool room for timely manufacture ofjigs and fixtures; periodical replenishment of worn-out-non-consumable tooling (e.g. work arbors, collets, copying masters,Allen keys, spanners, etc.
Scheduling concerns preparation of machine loads, fixation of calendar dates of various operations to be performed on a job,coordination with sales to confirm delivery dates of new items and periodical preparation of dispatch schedules of regularitems.
Dispatching concerns preparation and distribution of shop orders and manufacturing instructions to the concerned department astheir authority to perform the work according to the predetermined schedule.
Progressing concerns collection of data from manufacturing shops, recording of progress of work, and comparing progress againstthe plan.
Expediting concerns intensive progress chasing to identify delays and interruptions which may hold up production, devisingcures from time to time to keep rate of production in line with the schedule, communicating possible failure in deliverycommitments to Sales Department.
Cost Estimation concerns preparations ofPreproduction cost estimates to be used by sales department for quotation purposes (Alternatively this may be assigned toCosting Department Or Industrial Engineering Department)
Work measurement concern fixation of time to be allowed to a qualified workman to carry out a specific task, under specifiedconditions and at the defined level of performance. Work measurement employs scientific, well-known techniques like timestudy, work sampling standard data, production study, analytical estimating etc. (Alternatively, work measurement function maybe assigned to Industrial Engineering department.Sub-Contract concerns offloading of certain work on outside vendors for economic reasons or to augment the existingmanufacturing facilities (Sub-contract work alternatively) be handled by Materials/purchase Department)
Capacity planning concerns estimation of requirements of men and machines as the basis of decision making to meet the firm’sincreased volume of business (Some companies prefer to assign this function to Engineering department.
Demand forecasting concerns making projection of company’s product market. Though, long term forecasts are given by SalesDepartment but short term forecasts required for materials planning, machine loading, sub contracting etc may be prepared byPPC department
Q.12 (a) What is critical path? What does it signify? How is it identified?
Answer.2)(a)
Critical path analysis, an important aid to planning, scheduling and coordinating the activities if large scale projects. Is asynthesis of two independent techniques: Programme Evaluation and Review Technique (PERT) and Critical Path Method (CPM).Though the two techniques were developed independently, they are only superficially different. The two method have manyfeatures in common and are now combined into a technique called Critical Path Analysis (CPA) or Network Analysis.
There are three basic different between a PERT network and CPM network:
• PERT is event oriented while CPM is activity oriented (i.e. PERT prepares network from events while CPM builds if fromactivities)
• PERT provides for an allowance for uncertainty while CPM does not (i.e. PERT makes three time estimates for each activitywhile CPM makes one time estimate)
• Activity time in CPM technique are related to costs while it is not so in PERT since it is event oriented
Significance of critical path
Critical path analysis offers several advantages. It
(i) Forces through pre-planning. Each and every activity compromising the project is identified and recorded. Nothing isleft to memory or chance which prevents crises in scheduling(ii) Increases coordination of tasks as technological relationship between the activities suggests which activities can runsimultaneously and which should succeed others.
(iii) Helps computations of different project duration’s for different level of resources and thereby select a plan thatminimizes total project cost.(iv) Indicates optimal start and finish times of each activity of the project.(v) Defines areas of responsibility of different departmental heads for timely execution of the project.(vi) Facilitates progress reporting and limits unnecessary discussion at the progress meetings.(vii) Identifies troubles spot often in advance and apply remedial measures.(viii) Enables the plan to be revised in accordance with changes/changing circumstances.(ix) Helps to exercise “control by exception” and prevents cost overruns.
A Project comprises a series of activities and the identification of the individual activities requires knowledge andexperience of the men responsible for the planning of the project. Even the preliminaries-mere listing of the activities-makethe operating personnel:
• Think of details about the project well in advance.
• Observe critically the way in which the various activities interact or compete for scarce resources
• Improve upon the original plans even before network is formally drawn and analyzed.
A project, therefore, must be torn into a set of identifiable activities. There are no set rules but general guidelines are asunder:
• An activity should represent the smallest unit of the operation or set of operations over which management desirescontrol.
• An activity should represent an operation or set of operations, which can be performed using a particular kind ofequipment or a special skill. For example in construction project, plumbing is considered as one activity while wiring can beconsidered as another activity since the first activity requires plumbers and the second activity needs electricians.
Q.12) (b)
Activity Optimistic Most Likely Pessimistic1-2 02 03 101-3 02 04 061-4 02 06 102-5 01 01 013-5 04 05 124-5 02 03 044-6 02 05 085-6 03 05 13
Answer:
(a) Expected time of an activity can be obtained from the three time estimates using the formula:
te = a + 4m +b6
where a = Optimistic timem = most likely timeb = pessimistic time
For activity (1-2)a = 2m = 3b = 10
te = 2 + 4 x 3 + 106
te = 24 = 46
Expected times of all activities of the network, calculated on above lines, are tabulated below.
Activity Three time estimates Expected time1-2 02-03-10 41-3 02-04-06 41-4 02-06-10 62-5 01-01-01 13-5 04-05-12 64-5 02-03-04 34-6 02-05-08 55-6 03-05-13 6
5
6 36
4 6
4 1
Critical path is 1-3,3-5,5-6 and the duration for the project is 16 weeks (4+6+6)
Variance isVi = (b –a) X (b – a)
6 6
V1-3 = 49
V3-5 = 169
V5-6 = 259
V = V1-3 + V3-5 + V5-6
V = 5
Standard deviation Z = T - Tcp?
= 19 -16?5
= 32.236
= 1.34
The approximate probability value when Z = 1.34 is 0.9099
?The probability of completion of critical path by the schedule time of 19 weeks = 91%
Q.5) What is preventive maintenance? Why it is better than Breakdown Maintenance? What are the key activities of PreventiveMaintenance?
Answer.5)
Preventive maintenance anticipates failures and adopts necessary actions to check failures before they occur. It includesactivities like inspection, lubrication cleaning and unkeeps, minor adjustments and replacements found necessary at the time ofinspection etc. Preventive maintenance can be either: running maintenance or “shut down maintenance”. Running maintenanceincludes maintenance activities (e.g. minor adjustments In machines revealed through inspections, lubrication, cleaning andunkeep etc.) Which are carried out when the machine is still running. Shutdown maintenance includes preventivemaintenance activities such as minor component replacement whose needs are identified through inspections, which requirestoppage of Machines. Preventive inspection is one of the key activities of preventive maintenance which is usuallyperformed by making use of human senses – watch) eye), listen (ear), Touch (hand, leg, body) smell (nose) and taste (tongue) –but the trend is Changing towards use of condition monitoring instruments. Such maintenance. Practice is known as predictivemaintenance or condition based maintenance.
Q.10) (a) What are X-R Charts? How are they made and used in controlling a process?
Answer.10)
X-R chart is a pair of chart consisting of a average (called X chart) and a rangeChart (called R chart) placed one below another on a piece of graph paper. The X chart is used to control the mean value ofthe characteristic an R-chart is used to restrict the range of variations in the values. X-R charts are drawn when thecharacteristics are measurable. Each chart consists of three values: a central line, upper control limit and lower controllimit. The central line represents the arithmetic average of the sample means which equals the mean of the population, u. Theupper and lower control limits are located at three standard deviation on either side of the central line.Samples of fixed size are drawn at regular intervals and measurements are taken. The samples wise values of the meanand range are plotted in their respective X and R charts.The spread of sample points in the charts is studied to decide the remedial action (if any) to be taken. The X chart analyseswhether or not the mean of the quality Characteristics is within control while R-chart analyses whether or not the variabilityis within control.
STEPS TO PREPARE X-R CHART
A pre-requisite to the preparation of the chart is the decision on the following aspects:
• Quality Characteristics refer to the property of the product, which is to be assessed. The quality characteristics mustbe capable of being measured. In case of more than quality characteristics, separate chart is made for each qualitycharacteristic.• Sample size refers to number of pieces comprising each sample. Sample size is an important decision. It is a commonpractice to use sample of n = 4 or 5 to have low appraisal cost. Large samples such as n = 15 or 20 are used if the processstandard deviation is large.• Sample Population refers to the number of samples to be collected to construct a control chart. The number of samplesmust be sufficient. Usually, 20 samples each of size 4 or 5 are enough to have good estimates of the process average (X) anddispersion (R).• Time Interval measures the time gap between consecutive samples. Time interval, as a genera rule, should be proportionalto the average frequency of out-of-control conditions. It is a fairly complex decision since a number of factors such as costeconomy, susceptibility of the process to disturbances; convenience of the inspector etc. requires to be considered.
The making of X-R Charts involves the following Steps:
Step 1: Collect Data
(a) Collect sufficient samples spread over a reasonable period. Each sample must be of equal size.(b) Measure each component comprising the sample for the given quality characteristic(c) Record individual measurements on a work data sheet.
Step 2: Calculate mean (X) and Range (R) of each sample
A The mean which is written as X (X bar) is average of each sample and isObtained by totaling the individual measurements of the units comprising the sample and dividing the total by the sample size(number of units in each sample)B The range, which is written as R, is obtained as the difference between the highest and the lowest measurement of asample.C The values of X and R are recorded sample wise either on the extreme right of the individual measurements on the datasheet or in a separate table.
Step 3: Calculate grand Average (X) and mean Range (R)
A The grand average, which is written as, X (X double bar) is the average of the sample averages and is obtained bydividing the total of the averages of all the samples by the total number of samples.B The mean range, which is written as, R (R bar) is the average of the ranges and is obtained by dividing the total of theranges of the samples by the total number of samples.
Step 4: Set up Control chart for the average
A Set up a control chart with the central line drawn at X (X double bar), upper control limit located X + A2R (R bar) andthe lower control limit set up at X-A2R.B Plot the averages to see whether the process was under control when samples were drawn.C If all points fall within the control limits, the process is said to be under controlD If process is not under control (indicated by some points falling outside the control limits), eliminate points outsidethe control limits and compute new trial control limits for the remaining points.E Repeat step 4 (d) until all points fall within the control limitsF Control limits in a particular situation should be revised from time to time as additional data is accumulated.
Step 5: Calculate control limits of the range chart
A The control chart for range chart is set up with central line as R, upper control limit (UCLR) located at D4R above thecentral line and lower control limit (LCL) at D3R below the central lineB Plot the value of the range of each sample.C If all points fall within the control limits no modification is necessary unless it is desired to reduce the processdispersionD if range chart exhibits lack of control indicated by some points falling outside the control limits, eliminate thosepoints out of control and compute new trial control limitsE Repeat step 5 (d) until all points fall within the control limits.F Control limits in a practical situation should be revised time to time as additional data is accumulated.
Step 6: Use control chart
A Collect samples of fixed size at specified intervals of time.B Measure each unit of the sample for the quality characteristics, calculate mean and the range of each sample.
C Plot the values of X and R of each sample in their respective chartsD Study the trend of the points to interpret and suggest remedial action
Q10 (b) ABC company produces a solvent, which must contain 3 percent of alcohol. It tries to maintain the actual percentage at3 + 0.3 percent. It tests hourly in samples of five. The following table shows the results of last five samples. Set up acontrol chart for mean and examine whether the process is under control.
A) Solution:(i) Collect data(ii) Calculate mean (X bar) and range(R bar)
Sample No. Arithmetic Mean (X bar) Range(R)
1 2.92 0.32 2.98 0.13 3.06 0.1
4 3 05 3 0.2
(iii) Calculate grand average and the mean range
X(X bar) = 2.92 + 2.98 + 3.06 + 3 + 35
= 2.992
R = 0.3 + 0.1 + 0.1 + 0 + 0.25
= 0.14
(iv) Set Up control chart for the average
Central Line = CLx = X(X bar) = 2.992
Upper Control Limit = UCLx = X (X bar) + A2.R(R bar)
= 2.992 + 0.5768 x 0.14
= 3.476
Lower Control Limit = UCLx = X (X bar) - A2.R(R bar)
= 2.992 - 0.5768 x 0.14
= 2.507
(v) Set up a range chart
Central line CLR = R(R bar) = 0.14
Lower control limit = LCLR = D3.R (R bar)
= 0 x 0.14
= 0
Lower control limit = UCLR = D4.R (R bar)
= 2.114 x 0.14
= 0.29596
Q.6) What is method study? Describe the procedural steps to develop easier and effective methods.
Answer.6)
Method study is the systematic recording and critical examination of existing and proposed ways of doing work, as a means ofdeveloping and applying easier and more effective methods and reducing costs.
Method study is an organized approach and its investigation rests on the following six basic steps outlined in the blockdiagram• Select the work to be analyzed.• Record all facts relating to the existing method.• Examine the recorded facts critically but impartially.• Develop the most economical method commensurate with plant Requirements• Install the new method as standard practice.• Maintain the new method.
Selection of the job
Selections of the jobs to be studied for methods improvement by the method study practioner is a managerial responsibility andit (selection) may be based on economic technical or human consideration. Economic consideration justifies selection based onthe economic worth (i.e. money saving potential) of the job.Technical consideration identifies jobs, which require studies to overcome manufacturing difficulties (excessive rejection,relaxation in prefixed performance standards, inability if the shops to stick to specified machining parameters such as speeds,feeds, depth of cut etc., inconsistent quality etc.) Human consideration in job selection is usually given weightage whileintroducing method study practices for the first time.
Recording of facts
Systematic recording is the most crucial step in method improvement. Since recording by long hand (or by descriptive method)has its limitations, it is not recommended for use in method study. Instead, five symbols and eight charting conventions areused to record facts relating to the job under study. Five typical symbols are O, ||, ?, D and V and eight chartingconventions concern composition of the chart, reject, rework, repletion, change of state, introducing of new material, combinedevents and numbering of events. The document on which details of the process are recorded by the above referred symbols andconventions is called chart. There are four basic types of chart: (i) operation process chart (ii) Flow process chart (iii)multiple activity charts and (iv) two handed process chart.
Besides charts, two types of diagrams-flow diagram and string diagram are drawn when recording details of an existing layout.Travel chart is another typical chart, which is used to record frequency of movements (weight x distance) between workcentres/departments.
Repetitive short cycle operation which involves quick hand/feel motions (i.e. microscopic motions) may be studied with micromotion study. Glibreth, founder father of micro motion study, also developed photographic techniques called cyclograph andchronocylegraph to record path of the motions of the members of the body.
Critical examination
Critical examination aims to analyze the facts critically and thereby give rise to alternatives, which form the basis ofselection and development of easier, and effective methods.
Critical examination is conducted through a systematic and methodical questioning process. Each activity recorded on thechart, whether it relates to processing or inspection, or material handling, or to any other aspect, is picked up one at a timeand is examined minutely. The questioning process is considered under five major heads, namely the purpose, the place, thesequence, the person and the means. These five aspects in critical examination are referred to as five governingconsiderations.
Development and selection:
Development and selection stage concerns short listing of ideas generated at the critical examination stage, testing each shortlisted idea for its technical and economic feasibility, and making selection among the alternatives wherever choice exists. Todevelop ideas and to ascertain their technical and economical feasibility, the method study practioner needs to solicit thecooperation of personnel from different departments of the company. Various techniques available for the development andselection purpose are: cost benefit analysis, break even analysis, investment analysis and critical path analysis.
Installation
‘Installation’ (or implementation) of the proposed method involves preparation of project report on recommendations making oralpresentation to the top management, securing approval of the decision maker, assisting line management during implementation,arranging training of workmen, and getting jobs (operations) retime after implementation, arranging training of workmen, andgetting jobs (operations) retimed after implementation.
Maintenance
“ Maintenance” phase is the follow up phase after implementation, which serves as a monitoring and control mechanism. It helpsto ensure that the revised methods are set into concrete and workmen do not revert back to old methods. It also provides anopportunity to the practitioner to assess the effectiveness of the approach followed by him and makes changes in themethodology (if required).
Q.9) (a) What desirable conditions need to be present to be present to guarantee success of an incentive scheme?
Answer.9)
A good wage incentive plan should have the following characteristics.
• Administrative simplicity:The incentive system should be simple and must be easily understood by the workers and their representatives. An incentivesscheme, which can be understood, only by engineers and mathematicians or a scheme which involves the use of complex formulateor references and cross-references is sure to fail. The incentive scheme should be such that workmen can calculate their ownearnings easily and quickly.
• Minimum clerical work:The system should fit into existing system of production and cost control. It should not involve any significant addition tothe clerical work.
• Maximum coverage:The system should cover as many workmen as possible. A scheme if applied to a few workmen creates a demoralizing effect on themorale of those not covered by the scheme.
• DirectIncentive payments should increase at least in direct proportion to the increase in output by the operator. There are tworeasons:Firstly because it is more difficult to producer extra units and secondly because saving in the overheads are far greater athigher levels of production.
• Period of PaymentThe period of payment should be as short as possible
• Adequate guaranteed minimum hourly rateThe scheme must ensure adequate guaranteed minimum hourly rate to all incentive workers regardless of their output. Such anhourly guaranteed rate is normally referred to as the guaranteed base rate.The guaranteed base rate must be realistic and should be at least equal to the hourly rate payable to a non-incentive workerdoing similar job in the industry. Incentive earnings of the workers should never be regarded as a substitute for poor wages.
• Accurate and yet attainable performance standardsPerformance standards should be set through systematic work measurement studies. The experts to that there is no dispute ormalpractice and yet the standards are attainable so that a worker working at normal pace can attain them should base thestandards of measurement on the assessment.
Further the incentive plan should be such that it provides an opportunity to all average workers to earn reasonable earnings.
• Consistency of the standardsStandards once fixed should not be changed unless there is a permanent change in methods, or change in equipment, or change inmaterial and plan should provide for the provisions to modify the performance standards.
• Inbuilt check on process rejectionsA good incentive scheme should exercise a check on the operator against achieving higher bonus by poor workmanship. Paymentshould be made only for pieces declared acceptable by the inspection department and a workman constantly producing substandardpieces should be liable for disciplinary action.
• Payment of partially completed jobsThe problem of payment for the incomplete work arises only in case of long cycle jobs. Situations do arise when the jobs areof very long cycle duration and cannot be finished within the bonus period. Similarly, a semi-finished job may require to behanded over by one operator to another at the end of shift, or prior to having a holiday. The scheme should clearly spell out
as how assessment of work done by the workmen on the same job will be carried out and how disputes arising out of suchassessment would be resolved.
• Payment of Idle TimeAdequate safeguards must be provided to compensate the operator for the time lost due to reasons beyond his control. A goodincentive scheme should ensure that an operator does not suffer financial loss for reasons attributable to the managerialweakness, e.g.: lack of material due to bad buying, breakdowns of the machines due to poor maintenance practices, non-availability of work etc. Thus an operator rendered idle because of factors attributable to the management should be given alieu bonus.
• SafeguardsThe scheme should be fair not only to the employees but also to the employer. Safeguarding clauses as under should beincorporated to protect.
a. Management’s right to change a standard when there are changes in methods. Materials and machinesb. Management’s right to withdraw or discontinue temporarily a scheme during bad period.c. Management’s right to initiate disciplinary action against operators who continually produce sub-standard articles.d. Management’s right to initiate disciplinary action against employees who, time and again, do not achieve minimum standardof production even in the presence of fair and accurate standards.e. Management’s right to initiate disciplinary action against employees who, time and again are found using speeds and feedshigher than those recommended in the process sheet (or operational layouts)
• Maximum ceiling on the earningsThe system should have built-in-control against higher earnings beyond a certain limit. Firstly, the system should discourageworkers to work beyond a certain limit otherwise too attractive an incentive scheme may induce the worker to work more and moreand thereby adversely affect his health. Secondly, the system should ensure that in case of loose standards the company doesnot lose financially.
• Consistency of PlanThe plan should be consistent over a period of time. Frequent changes in the plan make it’s functioning difficult. Faith inplan is lost if there are frequent revisions.
• Acceptance of Labour BodyThe scheme should finally have acceptance of the labour body. The body of workers’ representatives to prevent anymisunderstanding and ill-feeling later on must accept the basic incentive plan and its provisions.
• Continuous UseThe scheme should be in continuous use. The temporary use of the scheme in good times and its discontinuation in bad timesmakes it’s functioning difficult.
• Define End ResultsThe plan must result in reduction in per unit labor cost.
Q 13)Answer 13)
i) Average Cycle time = 0.22 + 0.24 + 0.28 + 0.26 + 0.255
= 0.25
Normal Time = Observed time x Rating100
= 0.25 x 80100
= 0.2
Similarly, average cycle time and normal time for all the elements are calculated and tabulated as below
Element Avg. cycle time Rating Normal timeA 0.25 80 0.2B 0.15 100 0.15C 0.35 120 0.42D 0.102 90 0.0918E 0.12 100 0.12
Total Normal time = 0.2 + 0.15 + 0.42 + 0.0918 + 0.12
Total Normal time = 0.9818
ii) Relaxation Allowance = 15 x 0.9818100
= 0.1473
Contingency Allowance = 5 x 0.9818100
?Standard time = 0.0491
Normal time + Relaxation Allowance + Contingency Allowance
= 0.9818 + 0.1473 + 0.0491
?Standard time = 1.1782
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple AnswerQuestion Which of the following aspects are essential to ensure quality of purchased items?Correct Answer Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers
understand the requirementsYour Answer Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers understand
the requirements
Select The BlankQuestion The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly
due to emergency actions.Correct Answer UnexpectedYour Answer Unexpected
True/FalseQuestion After goods have been manufactured, route sheets and operation layouts should not be collected back.Correct Answer FalseYour Answer False
True/FalseQuestion In case of centralised inspection, inspection rooms generally become bottleneck and cause delay in taking
action regarding rejection or rework.Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion MRP is based on the concept of inventory demand which is of following typeCorrect Answer Dependent and independentYour Answer Dependent and independent
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any product/s is calledCorrect Answer FactoryYour Answer Factory
Multiple Choice Multiple AnswerQuestion Components of Production Management includeCorrect Answer Capacity Planning , Job Design , Production PlanningYour Answer Capacity Planning , Job Design , Production Planning
Multiple Choice Single AnswerQuestion Which of the following is the criteria for the percentage defectives in the zone of the indecision?Correct Answer Lots having the percentage defective more than AQL but less than LPTDYour Answer Lots having the percentage defective more than AQL but less than LPTD
Multiple Choice Multiple AnswerQuestion Which of the following are examples of addition during recording for method study?Correct Answer Brazing , Welding , RivetingYour Answer Brazing , Welding , Riveting
Select The BlankQuestion The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly
holiday is ________.Correct Answer Overtime workingYour Answer Overtime working
Select The BlankQuestion An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL
.Correct Answer RectangularYour Answer Rectangular
Multiple Choice Multiple AnswerQuestion Which of the following causes can be responsible for derailing the production schedule in a factory?Correct Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeismYour Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism
Multiple Choice Multiple AnswerQuestion Which of the following situations demand the economic consideration while selecting a job for method study?Correct Answer Unorderly movement of men and materials , Excessive process defectives , Too many suggestions received
for improvement from a department or sectionYour Answer Unorderly movement of men and materials , Excessive process defectives , Inconsistent quality
True/FalseQuestion During set up of X bar-R control chart, control limts should be practically revised from time to time as
additional data is accumulated.Correct Answer TrueYour Answer False
Multiple Choice Multiple AnswerQuestion Which of the following are the basic requirements of quality standard?Correct Answer Deifinite , Undesrstandable , Economically viableYour Answer Absolute uniformity , Undesrstandable , Economically viable
Match The FollowingQuestion Correct Answer Your Answer
Toung Sweet Sweet
Eye Crack Crack
Nose Burnout Burnout
Ear Impact Roughness
Select The BlankQuestion The ________ is the defect level for which lots are regarded as bad lots.Correct Answer Lot Tolerance Percentage DefectiveYour Answer Acceptable quality level
True/FalseQuestion Floor inspection delays the identification of faults which can not be rectified immediately before large lots
are spoiled.Correct Answer FalseYour Answer False
True/FalseQuestion Cent percent inspection is required on WIP prior to the key, critical or costly operation.Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion The document which incorporates details of process planning for a job is calledCorrect Answer Route SheetYour Answer Route Sheet
True/FalseQuestion Repetitive movements between work stations which are difficult to be traced on string diagrams can be
conveniently shown on flow diagrams.Correct Answer FalseYour Answer True
Multiple Choice Single AnswerQuestion Which of the following is the most popular technique for Project Production?Correct Answer PERT & CPMYour Answer PERT & CPM
Multiple Choice Single AnswerQuestion Technique of Value Engineering can be effectively employed in design of a product toCorrect Answer To meet the intended function at lowest costYour Answer To meet the intended function at lowest cost
Multiple Choice Single AnswerQuestion What can be the worst effect due to excessive vibration?Correct Answer BreakdownYour Answer Breakdown
Multiple Choice Single AnswerQuestion What is the relation between duration of an activity and length of an arrow?Correct Answer No relationYour Answer No relation
Multiple Choice Single AnswerQuestion What is the nature of the sampling plan for critical defects?Correct Answer TightYour Answer Tight
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from
routine or continuous checking.Correct Answer Condition monitoringYour Answer Condition monitoring
Multiple Choice Multiple AnswerQuestion Which of the following are important considerations concerning activity times?Correct Answer Activity time should be obtained from the person responsible for the completion of an activity ,
Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity timemay assume that just the normal quantity of resources required to carry out the activity are available.
Your Answer Activity time should be obtained from the person responsible for the completion of an activity , Activitytime must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assumethat just the normal quantity of resources required to carry out the activity are available.
Multiple Choice Single AnswerQuestion Which of the following techniques is used by industrial engineering department to obtain the utilisation
index?Correct Answer Work Sampling StudiesYour Answer Break Even Analysis
Multiple Choice Multiple AnswerQuestion Which of the following factors play important role while selecting or rejecting a particular site from
legislation and taxation point of view?Correct Answer Labour laws , Building codes , Policies regarding issue of licencesYour Answer Labour laws , Building codes , Policies regarding issue of licences
Multiple Choice Multiple AnswerQuestion Which of the following cases can be referred as operation in method study recording?Correct Answer Change in physical characteristic , Consumption of physical effort , Change in chemical characteristicYour Answer Change in physical characteristic , Consumption of physical effort , Movement of material
True/FalseQuestion An activity can share the same tail event and same head event with any other activity.Correct Answer FalseYour Answer True
Select The BlankQuestion The ________ must ensure that the product satisfy the functional requirements of it's usage.Correct Answer Quality of designYour Answer Quality of design
Multiple Choice Multiple AnswerQuestion Which of the following are examples of pure materials?Correct Answer Bakeries , Ice factories , WoolenYour Answer Bakeries , Ice factories , Woolen
Select The Blank
Question The ________ are the definitions of the measurable as well as nonmeasurable characteristics of the product.Correct Answer SpecificationsYour Answer Specifications
Multiple Choice Single AnswerQuestion Site factors for plant location includeCorrect Answer Suitability of landYour Answer Suitability of land
Select The BlankQuestion The ________ is the probability that a good lot will be rejected by the sampling plan.Correct Answer Producer's riskYour Answer Producer's risk
Multiple Choice Multiple AnswerQuestion Which of the following defects can be observed during preventive inspection by using human senses?Correct Answer Deviation from normal sound , Excessive Vibration , Leakage of a gasYour Answer Deviation from normal sound , Excessive Vibration , Leakage of a gas
Select The BlankQuestion The ________ includes preventive maintenance activities whose needs are identified through inspection which
requires stoppage of machines.Correct Answer Shutdown MaintenanceYour Answer Working Maintenance
True/FalseQuestion Independent float either affects the float of preceding activities or that of succeeding activities.Correct Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Lack of material planning results in the followingCorrect Answer Over ordering , under ordering , stockoutsYour Answer Over ordering , under ordering , stockouts
True/FalseQuestion F W Taylor devised a system for classifying motions into basic divisions called TherbligsCorrect Answer FalseYour Answer False
Select The BlankQuestion Work study is also called ________ studyCorrect Answer Time and Motion
Your Answer Time and Motion
Match The FollowingQuestion Correct Answer Your Answer
Factor Analysis Method to evaluate layouts Technique for evolving and analysis of layouts
Minimization of production delays Objective of good layout Objective of good layout
Maximum visibility Principles of good layout Principles of good layout
Scale model Layout analysis Method to evaluate layouts
Multiple Choice Single AnswerQuestion Following is one of the techniques used for Material Planning for high value materialCorrect Answer MRPYour Answer MRP
Multiple Choice Single AnswerQuestion What do you understand by totality of features and characteristics of a product or service that bears on it's
ability to satisfy the customer?Correct Answer QualityYour Answer Quality
Select The BlankQuestion One detachable ticket is prepared for each ________.Correct Answer OperationYour Answer Worker
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single AnswerQuestion One of the sophisticated operations research techniques used in material planning isCorrect Answer Dynamic programmingYour Answer Dynamic programming
True/FalseQuestion Job life is one of the factors that influence Process PlanningCorrect Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Following are some of the Principles of Management advocated by F W TaylorCorrect Answer Selection of best worker for each particular task , Division of work between worker and management ,
Training and development of the workmenYour Answer Selection of best worker for each particular task , Division of work between worker and management , Training
and development of the workmen
Multiple Choice Single AnswerQuestion Product layout is employed for manufacturing following productsCorrect Answer refrigiratorsYour Answer ships
Select The BlankQuestion Work study is also called ________ studyCorrect Answer Time and MotionYour Answer Job
Multiple Choice Multiple AnswerQuestion Which of the following situations demand the technical consideration while selecting a job for method study?Correct Answer Jobs having inconsistent quality , Operations inviting frequent requests from supervisors for
relaxation in allowed time because of variations in materials and tool performance , Jobs in which too many man-hours are spendin checking and rechecking work
Your Answer Jobs having inconsistent quality , Operations inviting frequent requests from supervisors for relaxation inallowed time because of variations in materials and tool performance , Jobs in which too many man-hours are spend in checkingand rechecking work
True/FalseQuestion Quality control determines what, when, and how much to inspect while inspection actually conducts examination
of goods.Correct Answer TrueYour Answer True
Select The BlankQuestion The ________ is the maximum percentage defective that for the purpose of sampling inspection can be
considered satisfactory as a process average.Correct Answer Acceptable quality levelYour Answer Producer's risk
Select The BlankQuestion The term ________ emplies the foregone profit due to inability of company to produce.Correct Answer Opportunity costYour Answer Opportunity cost
True/False
Question All activities must not be tied up into the networkCorrect Answer FalseYour Answer False
True/FalseQuestion F W Taylor devised a system for classifying motions into basic divisions called TherbligsCorrect Answer FalseYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following may be the objectives of project crashing?Correct Answer To achieve uniformity in requirement of resources , To complete the project in the least possible time
, To reduce project cost below it's normal costYour Answer To complete the project in the least possible time , To achieve uniformity in requirement of resources , To
improve the labour efficiency
Multiple Choice Multiple AnswerQuestion What is indicated by the hugging points lying close to mean of the process in X bar-R- control chart?Correct Answer Biases in measurements , Recording done without actual measurements , Improper selection of samplesYour Answer Recording done without actual measurements , Improper selection of samples
Multiple Choice Single AnswerQuestion Following is one of the techniques used for Material Planning for high value materialCorrect Answer MRPYour Answer MRP
Select The BlankQuestion The ________ is the probability that a good lot will be rejected by the sampling plan.Correct Answer Producer's riskYour Answer Producer's risk
Multiple Choice Single AnswerQuestion One of the characterstic of layout is about the flow of material / personnel. In a good layout the flow
should beCorrect Answer UnidirectionalYour Answer Unidirectional
True/FalseQuestion The event numbers as far as possible reflect the logical relationships of the activities.Correct Answer TrueYour Answer False
Multiple Choice Multiple Answer
Question Material Requirement Planning is very useful in following situationsCorrect Answer Long Lead time for procurement , Several levels of assemblies in product , Long manufacturing cycleYour Answer Long Lead time for procurement , Several levels of assemblies in product , Long manufacturing cycle
True/FalseQuestion Cent percent inspection is often more practical and economical than sampling inspection.Correct Answer FalseYour Answer False
Select The BlankQuestion The ________ must ensure that the product satisfy the functional requirements of it's usage.Correct Answer Quality of designYour Answer Quality of conformance
True/FalseQuestion Both, preventive and breakdown maintenance work must be assigned to the same team.Correct Answer FalseYour Answer False
Multiple Choice Single AnswerQuestion Following is one of the tasks of Production ControlCorrect Answer Actual issue of forms and documentsYour Answer Actual issue of forms and documents
Multiple Choice Single AnswerQuestion Process Engineer does not get sufficient time for designing tooling for most economic production run whenCorrect Answer Delivery time is lessYour Answer Delivery time is less
Multiple Choice Multiple AnswerQuestion Components of Production Management includeCorrect Answer Capacity Planning , Job Design , Production PlanningYour Answer Capacity Planning , Production Planning , Manpower Planning
Multiple Choice Multiple AnswerQuestion Which of the following products should be produced by using mass production?Correct Answer Refrigerator , Tyre for automobile , Television SetYour Answer Refrigerator , Tyre for automobile , Television Set
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to entity can be defined asCorrect Answer OperationYour Answer Manufacturing
Select The BlankQuestion A good maintenance system is not a luxary but a ________.Correct Answer NecessityYour Answer Necessity
Multiple Choice Single AnswerQuestion What is the specific name for the Gantt chart when it shows at a glance the scheduling of various operations
involved in a job?Correct Answer Job ScheduleYour Answer Load Chart
Select The BlankQuestion A set of activities to keep an equipment in the specified condition is called as ________.Correct Answer MaintenanceYour Answer Maintenance
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to complete an activity within it's crashed time?Correct Answer Crash costYour Answer Crash cost
Multiple Choice Multiple AnswerQuestion Which of the following factors decide the choice between the cent percent and sampling inspection?Correct Answer Nature of inspection , Natural tolerance versus design tolerance , Vendor's quality ratingYour Answer Nature of inspection , Natural tolerance versus design tolerance , Vendor's quality rating
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from
routine or continuous checking.Correct Answer Condition monitoringYour Answer Condition monitoring
Multiple Choice Multiple AnswerQuestion Which of the following are examples of attributes?Correct Answer Cracks , Burrs , TextureYour Answer Cracks , Burrs , Texture
Multiple Choice Single AnswerQuestion Which of the following is the criteria for the percentage defectives in the zone of the indecision?Correct Answer Lots having the percentage defective more than AQL but less than LPTDYour Answer Lots having the percentage defective more than AQL but less than LPTD
Multiple Choice Single AnswerQuestion In mass/batch production organizations where goods are produced for stocking, Work Order is raised on the
basis ofCorrect Answer Sales ProgrammeYour Answer Sales Order
Match The FollowingQuestion Correct Answer Your Answer
Fixed Position Layout Project Layout Functional Layout
Product Layout Line Layout Project Layout
Process Layout Functional Layout job layout
Combined Layout Mixed Layout Mixed Layout
Multiple Choice Single AnswerQuestion What do you understand by the measurement of work to establish allowed time for a job for the defined method?Correct Answer Work measurementYour Answer Work measurement
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.Correct Answer 0.01 to 10%Your Answer 0.01 to 10%
True/FalseQuestion Objective of Work Study is to improve ProductivityCorrect Answer TrueYour Answer False
Multiple Choice Multiple AnswerQuestion Which are the distinct functions of scientific quality control?Correct Answer Acceptance function , Preventive function , Assurance functionYour Answer Acceptance function , Feedback function , Preventive function
Match The FollowingQuestion Correct Answer Your Answer
Interruption for machine utilisation Preventive maintenance Preventive maintenance
Input for scheduling Overlapping of operations Strings
Technique of scheduling Critical Path Analysis Critical Path Analysis
Scheduling Device Strings Blackboard
Select The BlankQuestion An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL
.Correct Answer RectangularYour Answer Rectangular
True/FalseQuestion Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity in process layoutCorrect Answer TrueYour Answer True
True/FalseQuestion Since value of c can never be negativee, hence" if LCLp works out to be negative, it is taken as zero."Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Who prepares the daily production report?Correct Answer Shop SupervisorYour Answer Worker
True/FalseQuestion The dispatching function is of very importance in flow and mass production units.Correct Answer FalseYour Answer True
Multiple Choice Multiple AnswerQuestion Which are major benefits of identifying the critical path?Correct Answer It helps to identify the set of activities and events which are critical and as such must be carefully
controlled and monitored , It identifies activities to be given preference in allocation of resources. , It helps to exercise"control by exception".
Your Answer It helps to identify the set of activities and events which are critical and as such must be carefullycontrolled and monitored , It helps to exercise "control by exception".
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Select The BlankQuestion A ________ is another form of subcontracting.Correct Answer Hiring capacityYour Answer Open purchase order
True/FalseQuestion An ideal OC curve is never possible only with cent percent inspection.Correct Answer FalseYour Answer True
Match The FollowingQuestion Correct Answer Your Answer
Table lubrication Weekly Six monthly
Draining and refilling of oil reserviors of plunger pump Yearly Yearly
Parts lubricated with oil nipple Daily Weekly
Tools and slideways two to three times a day Daily
True/FalseQuestion The operator should not stop production if first piece is not approved by the inspector.Correct Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Which of the following causes can be responsible for derailing the production schedule in a factory?Correct Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeismYour Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism
True/FalseQuestion For p-chart, the central line of fraction defectives is determined by average percentage defectives.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Expediting function is concerned with following activitiesCorrect Answer Progress chasing to identify delays which may hold up production , Communicating possible delays in
delivery date commitment to sales department , Devising cures to keep rate of production in line with scheduleYour Answer Recording progress of work , Communicating possible delays in delivery date commitment to sales department ,
Devising cures to keep rate of production in line with schedule
Multiple Choice Single AnswerQuestion When should operator or supervisor is supposed to sign the perforated route sheet?Correct Answer After completion of operationYour Answer After completion of operation
Select The BlankQuestion The ________ is necessary when the job requires detailed of one or more of the job characteristics with the
help of special equipment which is not available at the producing company.Correct Answer Inspection orderYour Answer Move order
Multiple Choice Multiple AnswerQuestion What are the benefits of reconditioning?Correct Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan
requirement of replacement sparesYour Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement
of replacement spares
Multiple Choice Multiple AnswerQuestion Which of the following processes or activities are denoted by using symbols while recording in method study?Correct Answer Transport , Delay , StorageYour Answer Transport , Rejection , Storage
Multiple Choice Single AnswerQuestion Which is the zone beyond LTPD in case of Oc curve of a general plan?Correct Answer Zone of rejectionYour Answer Zone of rejection
True/FalseQuestion A properly designed sampling plan can control sampling errors and completely eliminate them.Correct Answer FalseYour Answer True
Select The BlankQuestion The ________ includes preventive maintenance activities whose needs are identified through inspection which
requires stoppage of machines.Correct Answer Shutdown MaintenanceYour Answer Shutdown Maintenance
Select The BlankQuestion The ________ pertain to the climatic conditions which the component , product or material should withstand.Correct Answer Environmental specificationsYour Answer Environmental specifications
True/FalseQuestion Grouping of machines gives a lot of flexibility in loading and schedulingCorrect Answer TrueYour Answer True
True/FalseQuestion A lot declared rejected in sampling inspection should not be inspected 100% in any case.Correct Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Which of the following are the basic requirements of quality standard?Correct Answer Deifinite , Undesrstandable , Economically viableYour Answer Absolute uniformity , Undesrstandable , Economically viable
True/FalseQuestion The plotting of activities - critical, non-critical and dummy activities- is strictly according to their
precedence relationship.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following are activities of corrective maintenance?Correct Answer Modifications and improvements , Overhauling , Emergency repairsYour Answer Modifications and improvements , Overhauling , Lubrication as per schedule
Multiple Choice Single AnswerQuestion Following is not a function of PPCCorrect Answer Product PlanningYour Answer Order Processing
Multiple Choice Multiple AnswerQuestion Which of the following three methods used to select the qualified supplier?Correct Answer By vendor plant surveys , By reputation , By experienceYour Answer By vendor plant surveys , By the perofrmance of first lot , By experience
Select The BlankQuestion The ________ is the watch dog which ensures that every element of production and activities which could
affect the quality of end product are regulated to the extent desirable.Correct Answer Quality controlYour Answer Quality control
Match The FollowingQuestion Correct Answer Your Answer
Pessimistic time b p
Expected time Te Te
Optimistic time a o
Most likely time m m
Multiple Choice Multiple AnswerQuestion Which are the different methods of recording actual progress of work?Correct Answer Display boards , Progress cards , Network updatingYour Answer Display boards , Job cards , Progress cards
Multiple Choice Single AnswerQuestion One of the characterstic of layout is about the flow of material / personnel. In a good layout the flow
should beCorrect Answer UnidirectionalYour Answer Unidirectional
Multiple Choice Multiple AnswerQuestion What is indicated by the hugging points lying close to mean of the process in X bar-R- control chart?Correct Answer Biases in measurements , Recording done without actual measurements , Improper selection of samplesYour Answer Biases in measurements , Recording done without actual measurements , Improper selection of samples
Multiple Choice Multiple AnswerQuestion Operation Layout generally contains following informationCorrect Answer Part Sketch , Standard Time , Jigs and fixturesYour Answer Sequence of operations , Standard Time , Jigs and fixtures
Multiple Choice Single AnswerQuestion What do you mean by the graphical representation of the project which is composed as series of connected
arrows and circles to describe the interrelationship of the activities involved?Correct Answer NetworkYour Answer Flow chart
Multiple Choice Single AnswerQuestion Where does the SPC exercises the control to prevent the occurances of defectives?Correct Answer On manufacturing processYour Answer On manufacturing process
Multiple Choice Single AnswerQuestion Which photographic technique is used to record path of motions of the members of the body during method
study?Correct Answer CyclographYour Answer Pictograph
Select The BlankQuestion An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL
.Correct Answer RectangularYour Answer Bell
True/FalseQuestion In Gantt Chart, the horizontal lines devide vertical lines into sections which represents either operations
or work centres.Correct Answer TrueYour Answer True
Select The BlankQuestion Goods after final inspection should accompany ________to enable dispatch department to identify and draw
correct reference.Correct Answer Forwarding noteYour Answer Forwarding note
Select The BlankQuestion Capacity decisions have a direct influence on performance of production system in respect of ________Correct Answer Delivery performanceYour Answer Quality
True/FalseQuestion Floor inspection promotes tendency of machines to drift out of limits and produce defectives.Correct Answer FalseYour Answer False
True/FalseQuestion A sampling plan which perfectly discriminates will have vertical OC curve.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to entity can be defined asCorrect Answer OperationYour Answer Manufacturing
Multiple Choice Multiple AnswerQuestion Which are the different methods to record details of the existing method during method study?Correct Answer Charts , Diagrams , Templates or modelsYour Answer Control plans , Charts , Templates or models
Select The BlankQuestion The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly
due to emergency actions.Correct Answer UnexpectedYour Answer Unexpected
Multiple Choice Single AnswerQuestion Gross requirement of products is determined on the basis ofCorrect Answer Both forecast and pending ordersYour Answer Past sales
Select The BlankQuestion The ________ is the probability that a bad lot will be accepted by the sampling plan.Correct Answer Consumer's riskYour Answer Acceptable quality level
Select The BlankQuestion The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly
holiday is ________.Correct Answer Overtime workingYour Answer Overtime working
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to complete an activity within it's normal time?Correct Answer Normal costYour Answer Normal cost
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to complete an activity within it's crashed time?Correct Answer Crash costYour Answer Total cost
Multiple Choice Single AnswerQuestion What do you understand by the extent the products manufactured conforms to the laid down design?Correct Answer Quality of conformanceYour Answer Quality of design
Multiple Choice Multiple AnswerQuestion Which kind of possible defectives can be reduced due to first off inspection?Correct Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set upYour Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Select The BlankQuestion A ________ is another form of subcontracting.Correct Answer Hiring capacityYour Answer Open purchase order
True/FalseQuestion An ideal OC curve is never possible only with cent percent inspection.Correct Answer FalseYour Answer True
Match The FollowingQuestion Correct Answer Your Answer
Table lubrication Weekly Six monthly
Draining and refilling of oil reserviors of plunger pump Yearly Yearly
Parts lubricated with oil nipple Daily Weekly
Tools and slideways two to three times a day Daily
True/FalseQuestion The operator should not stop production if first piece is not approved by the inspector.Correct Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Which of the following causes can be responsible for derailing the production schedule in a factory?Correct Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeismYour Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism
True/FalseQuestion For p-chart, the central line of fraction defectives is determined by average percentage defectives.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Expediting function is concerned with following activitiesCorrect Answer Progress chasing to identify delays which may hold up production , Communicating possible delays in
delivery date commitment to sales department , Devising cures to keep rate of production in line with scheduleYour Answer Recording progress of work , Communicating possible delays in delivery date commitment to sales department ,
Devising cures to keep rate of production in line with schedule
Multiple Choice Single AnswerQuestion When should operator or supervisor is supposed to sign the perforated route sheet?Correct Answer After completion of operationYour Answer After completion of operation
Select The BlankQuestion The ________ is necessary when the job requires detailed of one or more of the job characteristics with the
help of special equipment which is not available at the producing company.Correct Answer Inspection orderYour Answer Move order
Multiple Choice Multiple AnswerQuestion What are the benefits of reconditioning?Correct Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan
requirement of replacement sparesYour Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement
of replacement spares
Multiple Choice Multiple AnswerQuestion Which of the following processes or activities are denoted by using symbols while recording in method study?Correct Answer Transport , Delay , StorageYour Answer Transport , Rejection , Storage
Multiple Choice Single AnswerQuestion Which is the zone beyond LTPD in case of Oc curve of a general plan?Correct Answer Zone of rejectionYour Answer Zone of rejection
True/FalseQuestion A properly designed sampling plan can control sampling errors and completely eliminate them.Correct Answer FalseYour Answer True
Select The BlankQuestion The ________ includes preventive maintenance activities whose needs are identified through inspection which
requires stoppage of machines.
Correct Answer Shutdown MaintenanceYour Answer Shutdown Maintenance
Select The BlankQuestion The ________ pertain to the climatic conditions which the component , product or material should withstand.Correct Answer Environmental specificationsYour Answer Environmental specifications
True/FalseQuestion Grouping of machines gives a lot of flexibility in loading and schedulingCorrect Answer TrueYour Answer True
True/FalseQuestion A lot declared rejected in sampling inspection should not be inspected 100% in any case.Correct Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Which of the following are the basic requirements of quality standard?Correct Answer Deifinite , Undesrstandable , Economically viableYour Answer Absolute uniformity , Undesrstandable , Economically viable
True/FalseQuestion The plotting of activities - critical, non-critical and dummy activities- is strictly according to their
precedence relationship.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following are activities of corrective maintenance?Correct Answer Modifications and improvements , Overhauling , Emergency repairsYour Answer Modifications and improvements , Overhauling , Lubrication as per schedule
Multiple Choice Single AnswerQuestion Following is not a function of PPCCorrect Answer Product PlanningYour Answer Order Processing
Multiple Choice Multiple AnswerQuestion Which of the following three methods used to select the qualified supplier?Correct Answer By vendor plant surveys , By reputation , By experienceYour Answer By vendor plant surveys , By the perofrmance of first lot , By experience
Select The BlankQuestion The ________ is the watch dog which ensures that every element of production and activities which could
affect the quality of end product are regulated to the extent desirable.Correct Answer Quality controlYour Answer Quality control
Match The FollowingQuestion Correct Answer Your Answer
Pessimistic time b p
Expected time Te Te
Optimistic time a o
Most likely time m m
Multiple Choice Multiple AnswerQuestion Which are the different methods of recording actual progress of work?Correct Answer Display boards , Progress cards , Network updatingYour Answer Display boards , Job cards , Progress cards
Multiple Choice Single AnswerQuestion One of the characterstic of layout is about the flow of material / personnel. In a good layout the flow
should beCorrect Answer UnidirectionalYour Answer Unidirectional
Multiple Choice Multiple AnswerQuestion What is indicated by the hugging points lying close to mean of the process in X bar-R- control chart?Correct Answer Biases in measurements , Recording done without actual measurements , Improper selection of samplesYour Answer Biases in measurements , Recording done without actual measurements , Improper selection of samples
Multiple Choice Multiple AnswerQuestion Operation Layout generally contains following informationCorrect Answer Part Sketch , Standard Time , Jigs and fixturesYour Answer Sequence of operations , Standard Time , Jigs and fixtures
Multiple Choice Single AnswerQuestion What do you mean by the graphical representation of the project which is composed as series of connected
arrows and circles to describe the interrelationship of the activities involved?Correct Answer Network
Your Answer Flow chart
Multiple Choice Single AnswerQuestion Where does the SPC exercises the control to prevent the occurances of defectives?Correct Answer On manufacturing processYour Answer On manufacturing process
Multiple Choice Single AnswerQuestion Which photographic technique is used to record path of motions of the members of the body during method
study?Correct Answer CyclographYour Answer Pictograph
Select The BlankQuestion An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL
.Correct Answer RectangularYour Answer Bell
True/FalseQuestion In Gantt Chart, the horizontal lines devide vertical lines into sections which represents either operations
or work centres.Correct Answer TrueYour Answer True
Select The BlankQuestion Goods after final inspection should accompany ________to enable dispatch department to identify and draw
correct reference.Correct Answer Forwarding noteYour Answer Forwarding note
Select The BlankQuestion Capacity decisions have a direct influence on performance of production system in respect of ________Correct Answer Delivery performanceYour Answer Quality
True/FalseQuestion Floor inspection promotes tendency of machines to drift out of limits and produce defectives.Correct Answer FalseYour Answer False
True/FalseQuestion A sampling plan which perfectly discriminates will have vertical OC curve.
Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to entity can be defined asCorrect Answer OperationYour Answer Manufacturing
Multiple Choice Multiple AnswerQuestion Which are the different methods to record details of the existing method during method study?Correct Answer Charts , Diagrams , Templates or modelsYour Answer Control plans , Charts , Templates or models
Select The BlankQuestion The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly
due to emergency actions.Correct Answer UnexpectedYour Answer Unexpected
Multiple Choice Single AnswerQuestion Gross requirement of products is determined on the basis ofCorrect Answer Both forecast and pending ordersYour Answer Past sales
Select The BlankQuestion The ________ is the probability that a bad lot will be accepted by the sampling plan.Correct Answer Consumer's riskYour Answer Acceptable quality level
Select The BlankQuestion The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly
holiday is ________.Correct Answer Overtime workingYour Answer Overtime working
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to complete an activity within it's normal time?Correct Answer Normal costYour Answer Normal cost
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to complete an activity within it's crashed time?Correct Answer Crash cost
Your Answer Total cost
Multiple Choice Single AnswerQuestion What do you understand by the extent the products manufactured conforms to the laid down design?Correct Answer Quality of conformanceYour Answer Quality of design
Multiple Choice Multiple AnswerQuestion Which kind of possible defectives can be reduced due to first off inspection?Correct Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set upYour Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/FalseQuestion Floor inspection delays the identification of faults which can not be rectified immediately before large lots
are spoiled.Correct Answer FalseYour Answer False
Multiple Choice Single AnswerQuestion Management often fails to realize the importance of efficient layout due to following reasonCorrect Answer losses resulting from poor layout are not directly shown in the financial statementsYour Answer losses resulting from poor layout are not directly shown in the financial statements
Select The BlankQuestion The ________ is the defect level for which lots are regarded as bad lots.Correct Answer Lot Tolerance Percentage DefectiveYour Answer Lot Tolerance Percentage Defective
Multiple Choice Single AnswerQuestion Which method of critical path determination begins with the end event and moves backward to the start event
of the project network?Correct Answer Backward pass computationYour Answer Backward pass computation
True/FalseQuestion Complexity and difficulty of Planning is influenced by types of layoutCorrect Answer TrueYour Answer False
True/False
Question For p-chart, p bar is the ratio of total number of units inspected to the total number of units defectives.Correct Answer FalseYour Answer True
Multiple Choice Single AnswerQuestion What is represented by an arrow in a network?Correct Answer ActivityYour Answer Activity
Multiple Choice Multiple AnswerQuestion MRP utilises the following informationCorrect Answer Master production schedule , Product structure , Lead time for procurement/manufacturingYour Answer Master production schedule , Lead time for procurement/manufacturing , list of machines
Multiple Choice Single AnswerQuestion Which is the ideal place to write a description of an activity in a network?Correct Answer Above the arrowYour Answer Above the arrow
Select The BlankQuestion The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly
due to emergency actions.Correct Answer UnexpectedYour Answer Unexpected
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any product/s is calledCorrect Answer FactoryYour Answer Factory
True/FalseQuestion Systematic maintenance system can completely eliminate the wear and tear of machines.Correct Answer FalseYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following are types of non-destructive testing?Correct Answer Visual Testing , Eddy current , Magnetic flow detectorsYour Answer Visual Testing , Eddy current , Magnetic flow detectors
Select The BlankQuestion Work study is also called ________ studyCorrect Answer Time and Motion
Your Answer Time and Motion
Multiple Choice Single AnswerQuestion Providing flexibility in plant layout meansCorrect Answer Layout can be changed without much cost if requiredYour Answer Layout can be changed without much cost if required
Multiple Choice Multiple AnswerQuestion Which of the following aspects are essential to ensure quality of purchased items?Correct Answer Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers
understand the requirementsYour Answer Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers understand
the requirements
Multiple Choice Multiple AnswerQuestion Which of the following are scheduling techniques?Correct Answer Critical Path Analysis , Index Method , Johnson's two machine algorithmYour Answer Critical Path Analysis , Index Method , Johnson's two machine algorithm
Select The BlankQuestion The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched
through systematic inspection to unearth unhealthy conditions and preventiveCorrect Answer Preventive MaintenanceYour Answer Preventive Maintenance
True/FalseQuestion A network should be progression of activities always moving forward.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion In an organization there may not be a formal PPC department ifCorrect Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of
workmen is not very largeYour Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen
is not very large
Select The BlankQuestion The ________ is necessary when the job requires detailed of one or more of the job characteristics with the
help of special equipment which is not available at the producing company.Correct Answer Inspection orderYour Answer Inspection order
Multiple Choice Multiple AnswerQuestion Order preparation process for products manufatured to order requires following documentsCorrect Answer Sales Order , Work order , Shop orderYour Answer Sales Order , Work order , Shop order
Multiple Choice Single AnswerQuestion What do you understand by the selection of the job for the method study on the basis of money saving
potential of the job?Correct Answer Economic considerationYour Answer Economic consideration
Select The BlankQuestion Production Planning is a centralised activity which includes functions such as ________Correct Answer SchedulingYour Answer Scheduling
Multiple Choice Multiple AnswerQuestion Scale model used for layout analysis have following advantagesCorrect Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be
shifted easilyYour Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted
easily
Multiple Choice Single AnswerQuestion Which is the ideal place to inspect jigs and fixtures in a mass manufacturing unit?Correct Answer Separate inspection roomYour Answer Separate inspection room
Multiple Choice Single AnswerQuestion How to reveal the capability of the sampling plan to discriminate between good lots and bad lots?Correct Answer Operating characteristics curve ( OC )Your Answer Operating characteristics curve ( OC )
True/FalseQuestion It would not affect the project completion time if non-critical activities take little loner time than
planned.Correct Answer TrueYour Answer True
Select The BlankQuestion The ________ includes preventive maintenance activities whose needs are identified through inspection which
requires stoppage of machines.Correct Answer Shutdown MaintenanceYour Answer Shutdown Maintenance
Match The FollowingQuestion Correct Answer Your Answer
Forcasting requirement for indirect material Past consumption analysis technique Past consumption analysis technique
Inventory control by classification ABC Analysis ABC Analysis
Structure of the product BOM BOM
Material Planning for dependent demand MRP MRP
True/FalseQuestion The dispatching function is of very importance in flow and mass production units.Correct Answer FalseYour Answer True
Multiple Choice Multiple AnswerQuestion Which features should be covered by the specifications of materials while defining the qualitative
requirement?Correct Answer Material composition , Dimensions , Any heat treatment if requiredYour Answer Material composition , Dimensions , Cost of material
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from
routine or continuous checking.Correct Answer Condition monitoringYour Answer Condition monitoring
Select The BlankQuestion One detachable ticket is prepared for each ________.Correct Answer OperationYour Answer Operation
Multiple Choice Single AnswerQuestion Which of the following is the most popular technique for Project Production?Correct Answer PERT & CPMYour Answer PERT & CPM
Select The BlankQuestion A good maintenance system is not a luxary but a ________.Correct Answer NecessityYour Answer Necessity
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to entity can be defined asCorrect Answer OperationYour Answer Operation
True/FalseQuestion An activity should represent an operation or set of operations which can be performed using a particular kind
of equipment or a special skill.Correct Answer TrueYour Answer False
Multiple Choice Multiple AnswerQuestion Which of the following are types of sampling plan?Correct Answer Single sampling plan , Double sampling plan , Multiple sampling planYour Answer Single sampling plan , Double sampling plan , Multiple sampling plan
True/FalseQuestion In case of forward pass computation, the earliest event time of a plain event equals the earliest event time
of the preceding event plus duration of activity emanating from the preceding event.Correct Answer TrueYour Answer False
Multiple Choice Multiple AnswerQuestion Which of the following are ideal situations for the preventive inspection?Correct Answer Weekly off and holidays , Non-production hours , Stand-up equipmentYour Answer Weekly off and holidays , Non-production hours , Stand-up equipment
Multiple Choice Single AnswerQuestion What do you mean by the chart on which the major activities and entry points of materials are recorded to
have graphic view of operations and inspections involved in the process?Correct Answer Operation process chartYour Answer Flow Process chart
Match The FollowingQuestion Correct Answer Your Answer
Fixation of inventory level Reorder level Reorder level
Symptom of ill planned purchasing Over ordering Over ordering
Factor influencing material planning Lead time Lead time
Net requirement of material under MRP Stock on hand Stock on hand
Multiple Choice Single AnswerQuestion Taxes / duties levied is one of the important determinant for location decision as taxes/duties substantially
influenceCorrect Answer Product costYour Answer Product cost
Multiple Choice Single AnswerQuestion Which kind of gauge consists of electrical contacts operating a series of colloured signal lamps which
indicate whether the dimension is correct, oversize or undersize?Correct Answer Multiple gaugingYour Answer Multiple gauging
Multiple Choice Multiple AnswerQuestion Which of the following are minimum requirement for a good quality of design?Correct Answer Resonable cost , Resonable procurement time , Resonable manufacturing timeYour Answer Resonable cost , Resonable procurement time , Resonable manufacturing time
Select The BlankQuestion OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of
acceptance of ________.Correct Answer OneYour Answer One
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single AnswerQuestion MRP is based on the concept of inventory demand which is of following typeCorrect Answer Dependent and independentYour Answer Dependent and independent
Multiple Choice Single AnswerQuestion Main objective of a good plant layout isCorrect Answer Reduce material handling costYour Answer Reduce material handling cost
True/FalseQuestion As a general rule, the number of tail event of an activity is more than that of it's head event.Correct Answer FalseYour Answer False
Select The BlankQuestion The ________ is the probability that a good lot will be rejected by the sampling plan.Correct Answer Producer's riskYour Answer Producer's risk
Multiple Choice Multiple AnswerQuestion Which of the following are important considerations concerning activity times?Correct Answer Activity time should be obtained from the person responsible for the completion of an activity ,
Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity timemay assume that just the normal quantity of resources required to carry out the activity are available.
Your Answer Activity time should be obtained from the person responsible for the completion of an activity , Activitytime must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assumethat just the normal quantity of resources required to carry out the activity are available.
Select The BlankQuestion The ________ pertain to the climatic conditions which the component , product or material should withstand.Correct Answer Environmental specificationsYour Answer Environmental specifications
Multiple Choice Multiple AnswerQuestion Following are some of the factors considered for evaluation of alternative layoutsCorrect Answer Flow of Material , Equipment utilization , Ease of supervisionYour Answer Flow of Material , Ease of supervision , Delivery performance
Multiple Choice Multiple AnswerQuestion Which of the following are assignable cause?Correct Answer Large varaitions in hardness of material , Tool wear , Errors in settingYour Answer Large varaitions in hardness of material , Tool wear , Errors in setting
True/FalseQuestion All activities must not be tied up into the networkCorrect Answer FalseYour Answer False
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.Correct Answer 0.01 to 10%Your Answer 0.01 to 10%
True/FalseQuestion In case of X bar, if the process is not under control indicated by some points falling outside the control
limits, such points outside the control limits are eliminated and new trial control limits for the remaining points arecomputed.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion What is the base for considering activity time as single time estimate or three time estimate?Correct Answer Level of uncertaintyYour Answer Availability of labour
Select The BlankQuestion The ________ is the maximum percentage defective that for the purpose of sampling inspection can be
considered satisfactory as a process average.Correct Answer Acceptable quality levelYour Answer Acceptable quality level
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to complete an activity within it's normal time?Correct Answer Normal costYour Answer Normal cost
Select The BlankQuestion A good maintenance system is not a luxary but a ________.Correct Answer NecessityYour Answer Necessity
Select The BlankQuestion A ________helps to avoid crowding of jobs at a particular machine by change of route of some of the jobs or
by diverting work to other machine.Correct Answer Control boardYour Answer Move order
Select The BlankQuestion The ________ is the watch dog which ensures that every element of production and activities which could
affect the quality of end product are regulated to the extent desirable.Correct Answer Quality controlYour Answer Quality control
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any product/s is calledCorrect Answer FactoryYour Answer Factory
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Machine utilization
Gantt Chart Production Scheduling Production Scheduling
Select The BlankQuestion A ________ is another form of subcontracting.Correct Answer Hiring capacityYour Answer Hiring capacity
Multiple Choice Multiple AnswerQuestion In an organization there may not be a formal PPC department ifCorrect Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of
workmen is not very largeYour Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen
is not very large
Multiple Choice Multiple AnswerQuestion Which of the following cases can be treated as delay during recording of method study?Correct Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs
awaiting at the machines for their turnYour Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting
at the machines for their turn
True/FalseQuestion Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling
available on shop.Correct Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Order preparation process for products manufatured to order requires following documentsCorrect Answer Sales Order , Work order , Shop orderYour Answer Sales Order , Work order , Purchase order
Multiple Choice Single AnswerQuestion Technique of Value Engineering can be effectively employed in design of a product toCorrect Answer To meet the intended function at lowest costYour Answer Reduce lead time
True/FalseQuestion Cent percent inspection is often more practical and economical than sampling inspection.Correct Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Scale model used for layout analysis have following advantagesCorrect Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be
shifted easilyYour Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted
easily
Multiple Choice Single AnswerQuestion Which of the following technique is event oriented ?Correct Answer Project Evaluation & Review TechniqueYour Answer Project Evaluation & Review Technique
Multiple Choice Single AnswerQuestion What is the meaning of " Product features" according to J.M.Juran?Correct Answer Quality of designYour Answer Quality of design
Match The FollowingQuestion Correct Answer Your Answer
Crash cost of an activity Cc Cc
Normal time of an activity Tn Tn
Crash time of activity Tc Tc
Normal cost of an activity Cn Cn
Multiple Choice Multiple AnswerQuestion What are uses of diagrams in method study?Correct Answer Study different plant layouts and select the most optimum one , Study the extent of traffic over the
different routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during themovement of material.
Your Answer Study different plant layouts and select the most optimum one , Study the extent of traffic over thedifferent routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during themovement of material.
True/FalseQuestion A load chart specifies the work to be carried out by each person of company during shift hours.
Correct Answer FalseYour Answer True
Multiple Choice Multiple AnswerQuestion Route Sheet generally contains following informationCorrect Answer Material Specification , Sequence of operation , Skill of LabourYour Answer Material Specification , Sequence of operation , Skill of Labour
True/FalseQuestion Cellular layout is based on the concept of Group TechnologyCorrect Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Which varaible is taken along the abscissa or X axis?Correct Answer TimeYour Answer Standard deviation
Multiple Choice Multiple AnswerQuestion Which are the advantages of suburban location?Correct Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available ,
Plant expansion is easier due to less or no restriction for building and constructionYour Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant
expansion is easier due to less or no restriction for building and construction
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from
routine or continuous checking.Correct Answer Condition monitoringYour Answer Condition monitoring
Multiple Choice Multiple AnswerQuestion Expediting function is concerned with following activitiesCorrect Answer Progress chasing to identify delays which may hold up production , Communicating possible delays in
delivery date commitment to sales department , Devising cures to keep rate of production in line with scheduleYour Answer Recording progress of work , Progress chasing to identify delays which may hold up production , Communicating
possible delays in delivery date commitment to sales department
Select The BlankQuestion Production control work is ________ in case of floor inspection as compared with the centralised inspection.Correct Answer easierYour Answer time consuming
Select The BlankQuestion The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly
holiday is ________.Correct Answer Overtime workingYour Answer Overtime working
True/FalseQuestion In case of forward pass computation, the earliest event time of the first event is zero.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion What is represented by an arrow in a network?Correct Answer ActivityYour Answer Activity
True/FalseQuestion As a general rule, a site five times the actual plant size is considered minimum for parking, access
facilities and future expansion.Correct Answer TrueYour Answer True
True/FalseQuestion Independent float either affects the float of preceding activities or that of succeeding activities.Correct Answer FalseYour Answer False
Multiple Choice Single AnswerQuestion The document raised by PPC which authorises different functions to take action as per instruction is calledCorrect Answer Work OrderYour Answer Work Order
Multiple Choice Single AnswerQuestion A good layout makes effective use of space. Utilization of space for a department like Stores can be measured
byCorrect Answer Proportion of Cubic volume space utilizedYour Answer Ratio of area utilised to area available
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to entity can be defined asCorrect Answer OperationYour Answer Operation
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/FalseQuestion Site selection should also take into account topography and soil structure of the land.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Which manufacturing method is ideal for the use of air gauges as inspection device?Correct Answer MassYour Answer Batch
True/FalseQuestion Kanban system is essentially a computer based system for production scheduling and controlCorrect Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Which are three different bases to establish an activity time?Correct Answer Past experience , Judgement , Historical dataYour Answer Past experience , Judgement , Historical data
True/FalseQuestion Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling
available on shop.Correct Answer FalseYour Answer False
Multiple Choice Single AnswerQuestion Which of the following policies is advisable in case of low product variety and large volumes?Correct Answer Low Skilled Labour & Special Purpose MachinesYour Answer Semiskilled Labour & General Purpose Machines
Select The BlankQuestion Capacity decisions have a direct influence on performance of production system in respect of ________Correct Answer Delivery performanceYour Answer Delivery performance
True/FalseQuestion In case of X bar, if the process is not under control indicated by some points falling outside the control
limits, such points outside the control limits are eliminated and new trial control limits for the remaining points arecomputed.
Correct Answer True
Your Answer True
Select The BlankQuestion The ________ pertain to the climatic conditions which the component , product or material should withstand.Correct Answer Environmental specificationsYour Answer Environmental specifications
Select The BlankQuestion The ________ is necessary when the job requires detailed of one or more of the job characteristics with the
help of special equipment which is not available at the producing company.Correct Answer Inspection orderYour Answer Job card
Match The FollowingQuestion Correct Answer Your Answer
Crash cost of an activity Cc Cc
Normal time of an activity Tn Cn
Crash time of activity Tc Tc
Normal cost of an activity Cn Tn
True/FalseQuestion Lubrication survey should never be done for a new machine.Correct Answer FalseYour Answer False
Multiple Choice Single AnswerQuestion A good plant layout helps inCorrect Answer Reducing handling costsYour Answer Reducing handling costs
Multiple Choice Single AnswerQuestion Out of two basic criteria for the selection of a manufacturing method, one is, it must be able to meet the
specifications of final product and the other is, it must beCorrect Answer Cost effective methodYour Answer Cost effective method
Multiple Choice Multiple AnswerQuestion Which of the following is a part of preparing manufacturing order set as a primary function of dispatching?Correct Answer Operational layouts , Move orders , Pre-filled stores issue orders
Your Answer Operational layouts , Move orders , Pre-filled stores issue orders
Select The BlankQuestion A ________ is another form of subcontracting.Correct Answer Hiring capacityYour Answer Hiring capacity
Multiple Choice Multiple AnswerQuestion Which are the major types of defects?Correct Answer Minor , Major , CriticalYour Answer Minor , Critical , General
Multiple Choice Single AnswerQuestion Which kind of labour force is required in case of Jobbing Production?Correct Answer Highly SkilledYour Answer Highly Skilled
Multiple Choice Multiple AnswerQuestion Which are the sources of information to update the progress card daily?Correct Answer Detachable ticket , Daily production report , Job CardYour Answer Detachable ticket , Daily production report , Job Card
True/FalseQuestion In case of forward pass computation, the earliest event time of the first event is zero.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which are the distinct functions of scientific quality control?Correct Answer Acceptance function , Preventive function , Assurance functionYour Answer Acceptance function , Preventive function , Assurance function
Multiple Choice Multiple AnswerQuestion Which of the following are examples of specifications?Correct Answer Commercial standards , Assembly and testing instructions , Bill of materialYour Answer Production schedule , Commercial standards , Bill of material
Multiple Choice Single AnswerQuestion Technique which can help an organization to reduce inventory is calledCorrect Answer MRPYour Answer MRP
Multiple Choice Single AnswerQuestion In case of Batch Production which kind of labour is expected?Correct Answer Skilled in one specific Manufacturing ProcessYour Answer Semiskilled
Multiple Choice Multiple AnswerQuestion Major contributors in the development of Control Charts, Sampling plan areCorrect Answer F H Dodge , H G Roming , Walter SchewhartYour Answer F H Dodge , H G Roming , Walter Schewhart
Multiple Choice Single AnswerQuestion What is represented by an arrow in a network?Correct Answer ActivityYour Answer Event
True/FalseQuestion Feasibility of time schedule requires that an activity be scheduled before any of it's predecessors are
scheduled.Correct Answer FalseYour Answer True
Multiple Choice Single AnswerQuestion Which method of critical path determination begins with the end event and moves backward to the start event
of the project network?Correct Answer Backward pass computationYour Answer Backward pass computation
True/FalseQuestion Operation process charts though indicates the sequence of events but do not show movements.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Which kind of relationship exists between those activities which can be carried out simultaneously and both
activities require definite time to finish?Correct Answer Concurrent activitiesYour Answer Concurrent activities
True/FalseQuestion One major difference between CPM and PERT is the former's adaptability for the projects where high degree of
uncertainty prevails and activity times during performance are expected to vary considerably for certain activities.Correct Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Following are some of the Principles of Management advocated by F W TaylorCorrect Answer Selection of best worker for each particular task , Division of work between worker and management ,
Training and development of the workmenYour Answer Selection of best worker for each particular task , Division of work between worker and management , Training
and development of the workmen
Multiple Choice Single AnswerQuestion Inadequate production capacity ultimately leads toCorrect Answer Poor Customer ServiceYour Answer Poor Machine Utilization
Multiple Choice Multiple AnswerQuestion Which of the following schedules are recommended to prepare and follow as a part of preventive maintenance
system?Correct Answer Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication scheduleYour Answer Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication schedule
Multiple Choice Single AnswerQuestion What is the reason of fluctuations, if the control chart evaluates that the process is in a state of
statistical control?Correct Answer Random variabilityYour Answer Random variability
True/FalseQuestion Even in a small set up wherein maintenance of a machine is looked after by a mechanic cum worker, he should
report directly to the person responsible for the manufacturing operations.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion What do you mean by the chart on which the major activities and entry points of materials are recorded to
have graphic view of operations and inspections involved in the process?Correct Answer Operation process chartYour Answer Operation process chart
Multiple Choice Single AnswerQuestion Plant Layout decisions are considered to beCorrect Answer StrategicYour Answer Strategic
Multiple Choice Multiple AnswerQuestion What are the uses of the instruction manual provided by the manufacturer of a machine?
Correct Answer It gives instructions regarding installation and operation of the equipment , It contains note oncommon troubles with causes and remedies for troubleshooting , It enlists points, frequency and type of lubrication
Your Answer It gives instructions regarding installation and operation of the equipment , It contains note on commontroubles with causes and remedies for troubleshooting , It enlists points, frequency and type of lubrication
Multiple Choice Single AnswerQuestion When should operator or supervisor is supposed to sign the perforated route sheet?Correct Answer After completion of operationYour Answer After completion of operation
Multiple Choice Multiple AnswerQuestion Which of the following situations demand that the human consideration should be given preference over other
considerations?Correct Answer Inconsistent earnings where the earnings are tied to output , Poor morale evidenced by petty or trivial
complaints , Repeated cases of accidents and health hazardsYour Answer Excessive rejections , Poor morale evidenced by petty or trivial complaints , Repeated cases of accidents and
health hazards
True/FalseQuestion A network can have more than one starting event but completion event must be only one.Correct Answer FalseYour Answer True
Multiple Choice Single AnswerQuestion Which is the ideal place to write a description of an activity in a network?Correct Answer Above the arrowYour Answer Above the arrow
Multiple Choice Multiple AnswerQuestion Which features should be covered by the specifications of materials while defining the qualitative
requirement?Correct Answer Material composition , Dimensions , Any heat treatment if requiredYour Answer Material composition , Dimensions , Any heat treatment if required
Match The FollowingQuestion Correct Answer Your Answer
When to inspect Stages of inspection Stages of inspection
What to inspect Specification Specification
How to inspect Inspection devices Inspection devices
How much to inspect Sampling or cent percent inspection Sampling or cent percent inspection
Multiple Choice Multiple AnswerQuestion How the concept of float is helpful to planners?Correct Answer To decide priorities in allocation of resources , To minimize the requirement of resources , To prevent
peaks and valleys in requirement of resourcesYour Answer To decide priorities in allocation of resources , To minimize the requirement of resources , To prevent peaks
and valleys in requirement of resources
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/FalseQuestion It pays in the long run to inform the customer regarding expected delays in the deliveries.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Fixed position layout is adopted whenCorrect Answer product is very heavy involving assembly of large number of partsYour Answer product is very heavy involving assembly of large number of parts
Select The BlankQuestion The ________ is the defect level for which lots are regarded as bad lots.Correct Answer Lot Tolerance Percentage DefectiveYour Answer Lot Tolerance Percentage Defective
Multiple Choice Multiple AnswerQuestion Which are the advantages of suburban location?Correct Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available ,
Plant expansion is easier due to less or no restriction for building and constructionYour Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant
expansion is easier due to less or no restriction for building and construction
Select The BlankQuestion One detachable ticket is prepared for each ________.Correct Answer OperationYour Answer Worker
Select The BlankQuestion A good maintenance system is not a luxary but a ________.Correct Answer NecessityYour Answer Necessity
Multiple Choice Multiple AnswerQuestion Following are some of the factors which influence process planningCorrect Answer Order Quantity , Process capability of machine , Delivery DatesYour Answer Order Quantity , Delivery Dates , Plant layout
True/FalseQuestion Availability of training schools, colleges and management institutes reduces the company's internal training
needs.Correct Answer TrueYour Answer False
Multiple Choice Multiple AnswerQuestion Which of the following are examples of pure materials?Correct Answer Bakeries , Ice factories , WoolenYour Answer Bakeries , Ice factories , Lime stone
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Production Scheduling
Work Sampling Machine utilization Sampling Inspection
Gantt Chart Production Scheduling Charting technique
Match The FollowingQuestion Correct Answer Your Answer
Fixation of inventory level Reorder level Stock on hand
Symptom of ill planned purchasing Over ordering Over ordering
Factor influencing material planning Lead time Lead time
Net requirement of material under MRP Stock on hand Price of material
Multiple Choice Multiple AnswerQuestion Which of the following are steps to identify the critical path in a small network?Correct Answer Compare the durations of all paths to identify the longest path. , Sum up the durations of activities
along each path. , Enumerate all paths in the network and list down activities on each path.Your Answer Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along
each path. , Enumerate all paths in the network and list down activities on each path.
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.Correct Answer 0.01 to 10%Your Answer 0.01 to 10%
True/FalseQuestion Tool breakage has got nearly zero chances in case of eventual breakdown.Correct Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Which are the three types of float?Correct Answer Total float , Independent float , Free floatYour Answer Total float , Dependent float , Free float
Multiple Choice Multiple AnswerQuestion Which of the following are major inputs to scheduling?Correct Answer Overlapping of operations , Effective Capacity per work centre , Performance standardsYour Answer Effective Capacity per work centre , Ratio of skilled to unskilled labour , Performance standards
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any product/s is calledCorrect Answer FactoryYour Answer Factory
Select The BlankQuestion The ________ is the maximum percentage defective that for the purpose of sampling inspection can be
considered satisfactory as a process average.Correct Answer Acceptable quality levelYour Answer Lot Tolerance Percentage Defective
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from
routine or continuous checking.Correct Answer Condition monitoringYour Answer Overhauling
Select The BlankQuestion OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of
acceptance of ________.Correct Answer OneYour Answer One
Multiple Choice Single AnswerQuestion How to calculate activity cost slope?Correct Answer Activity cost slope = ( Crash cost - Normal cost ) / ( Normal time - Crash time )Your Answer Activity cost slope = ( Normal cost - Crash cost ) / ( Normal time - Crash time )
Multiple Choice Multiple AnswerQuestion Which of the following are minimum requirement for a good quality of design?Correct Answer Resonable cost , Resonable procurement time , Resonable manufacturing timeYour Answer Resonable cost , Resonable procurement time , Resonable manufacturing time
True/FalseQuestion In case of control chart, large smaples such as n=15 or 20 are used if the process standard deviation is
small.Correct Answer FalseYour Answer True
Select The BlankQuestion Production control work is ________ in case of floor inspection as compared with the centralised inspection.Correct Answer easierYour Answer labourious
Multiple Choice Single AnswerQuestion Production Planning includesCorrect Answer Predetermination of manufacturing requirementsYour Answer Predetermination of manufacturing requirements
Multiple Choice Single AnswerQuestion How does the control chart of statistical quality control helps the operating personnel?Correct Answer Identify the presence of an assignable cause before it developsYour Answer Reduces chances of rejections
Multiple Choice Single AnswerQuestion What can be the worst effect due to excessive vibration?Correct Answer BreakdownYour Answer Reduced salvage value of machine
Multiple Choice Single AnswerQuestion What do you understand by the metallergical aspects of product which forms the vital part of engineering
function?Correct Answer Material specificationsYour Answer Performance specifications
Multiple Choice Single AnswerQuestion Which of the following is a cause of plant breakdown?Correct Answer Overloading of machinesYour Answer Overloading of machines
Multiple Choice Multiple AnswerQuestion Which of the following possibilities can be explored by using flow process chart?Correct Answer Eliminating the operations or combining the operations with another , Reducing the distance traveled by
the workmen or materials , Avoiding the waiting time and thereby reduce production lossesYour Answer Reducing the distance traveled by the workmen or materials , Reducing rejections drastically , Avoiding the
waiting time and thereby reduce production losses
Multiple Choice Single AnswerQuestion Material Planning is an integral part ofCorrect Answer Production PlanningYour Answer Process Planning
True/FalseQuestion Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure of machinery.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following activities are used while recording for method study?Correct Answer Delay , Operation , InspectionYour Answer Operation , Inspection , Production
True/FalseQuestion In case of centralised inspection, inspection rooms generally become bottleneck and cause delay in taking
action regarding rejection or rework.Correct Answer TrueYour Answer True
Select The BlankQuestion The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched
through systematic inspection to unearth unhealthy conditions and preventiveCorrect Answer Preventive MaintenanceYour Answer Preventive Maintenance
True/FalseQuestion The problems of congestion, bottlenecks and backtracking can not be visualized by using templates and models.Correct Answer FalseYour Answer False
Multiple Choice Single AnswerQuestion Which varaible is taken along the abscissa or X axis?Correct Answer TimeYour Answer Quality
True/FalseQuestion Delay in completion of projects result in unwelcome additions to the fixed manufacturing expenses.Correct Answer TrueYour Answer True
Select The BlankQuestion The term ________ emplies the foregone profit due to inability of company to produce.Correct Answer Opportunity costYour Answer Idle wages
Multiple Choice Single AnswerQuestion Taxes / duties levied is one of the important determinant for location decision as taxes/duties substantially
influenceCorrect Answer Product costYour Answer Order procurement
Multiple Choice Multiple AnswerQuestion What are the uses of failure statistics analysis?Correct Answer To forecast the defect , To identify causes of major repetative failures , To quantify the frequency of
preventive inspectionYour Answer To forecast the defect , To identify causes of major repetative failures , To quantify the frequency of
preventive inspection
True/FalseQuestion Shop order is one of the subsidiary orderCorrect Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Which of the following is the most popular technique for Project Production?Correct Answer PERT & CPMYour Answer PERT & CPM
Select The BlankQuestion The ________ is the probability that a good lot will be rejected by the sampling plan.Correct Answer Producer's riskYour Answer Lot Tolerance Percentage Defective
True/FalseQuestion The component produced on completely automatic machines may be subjected to sampling inspection while parts
produced on semi-automatic and completely manual operated machines require cent percent inspection.Correct Answer TrueYour Answer False
Multiple Choice Multiple AnswerQuestion In an organization there may not be a formal PPC department ifCorrect Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of
workmen is not very largeYour Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen
is not very large
Multiple Choice Multiple AnswerQuestion Which of the following factors play important role while selecting or rejecting a particular site from
legislation and taxation point of view?Correct Answer Labour laws , Building codes , Policies regarding issue of licencesYour Answer Labour laws , Policies regarding issue of licences , Productivity of labour
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/FalseQuestion Kanban system is essentially a computer based system for production scheduling and
controlCorrect Answer FalseYour Answer False
Select The BlankQuestion The ________ is one of the best known statistical relationship regarding process
control.Correct Answer Normal distributionYour Answer Normal distribution
True/FalseQuestion Floor inspection promotes tendency of machines to drift out of limits and produce
defectives.Correct Answer FalseYour Answer False
True/FalseQuestion In case of two handed process chart, inspection symbol is used when check by touch
or feel is involved.
Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which are reason due to which the progress of work is rarely in line with it's plan?Correct Answer Absenteeism , Machine breakdowns , Substandard performance against prefixed
production standardsYour Answer Absenteeism , Change in operation sequence , Machine breakdowns
Multiple Choice Single AnswerQuestion Which rule is used for numbering of events?Correct Answer Fulkerson's RuleYour Answer Fulkerson's Rule
Match The FollowingQuestion Correct Answer Your Answer
Combined Layout Mixed Layout Mixed Layout
Fixed Position Layout Project Layout Project Layout
Product Layout Line Layout Line Layout
Process Layout Functional Layout Functional Layout
Multiple Choice Single AnswerQuestion What does the points falling outside the control limits indicate?Correct Answer Presence of assignable causesYour Answer Presence of assignable causes
Multiple Choice Single AnswerQuestion A good plant layout helps inCorrect Answer Reducing handling costsYour Answer Reducing handling costs
Multiple Choice Multiple AnswerQuestion Which of the following cases can be treated as delay during recording of method
study?Correct Answer Operators awaiting instructions from supervisor , Worker waiting for his turn
at tools stores , Jobs awaiting at the machines for their turnYour Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at
tools stores , Jobs awaiting at the machines for their turn
Multiple Choice Multiple AnswerQuestion Material Requirement Planning is very useful in following situations
Correct Answer Long Lead time for procurement , Several levels of assemblies in product ,
Long manufacturing cycleYour Answer Long Lead time for procurement , Several levels of assemblies in product , Long
manufacturing cycle
Select The BlankQuestion Principle underlying the Moving Average mrthod is that future demand shall be
________ past demand.Correct Answer Average ofYour Answer Higher than
Multiple Choice Single AnswerQuestion The ratio of output to input of a production system is commonly known asCorrect Answer ProductivityYour Answer Productivity
True/FalseQuestion Complexity and difficulty of Planning is influenced by types of layoutCorrect Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Which phase of method study is concerned with analyzing the facts critically,
generating alternatives which form the basis for selection and development of improved methods?Correct Answer Critical examinationYour Answer Development and selection
Multiple Choice Multiple AnswerQuestion Which of the following is a part of preparing manufacturing order set as a primary
function of dispatching?Correct Answer Operational layouts , Move orders , Pre-filled stores issue ordersYour Answer Operational layouts , Move orders , Pre-filled stores issue orders
Select The BlankQuestion The wage payable to the workman is calculated by ________ the quantity produced by
him by the specified rate per piece, in the straight piece rate method.Correct Answer MultiplyingYour Answer Dividing
True/FalseQuestion F W Taylor devised a system for classifying motions into basic divisions called TherbligsCorrect Answer FalseYour Answer False
Multiple Choice Single Answer
Question How to reveal the capability of the sampling plan to discriminate between good lots
and bad lots?Correct Answer Operating characteristics curve ( OC )Your Answer Operating characteristics curve ( OC )
Multiple Choice Single AnswerQuestion Technique which can help an organization to reduce inventory is calledCorrect Answer MRPYour Answer MRP
Multiple Choice Multiple AnswerQuestion Which of the following are examples of addition during recording for method study?Correct Answer Brazing , Welding , RivetingYour Answer Brazing , Welding , Riveting
Multiple Choice Multiple AnswerQuestion Which are the subtasks of the maintenance phase of the method study?Correct Answer Monitoring and control , Performance appraisal , Audit on savingsYour Answer Monitoring and control , Performance appraisal , Audit on savings
True/FalseQuestion Only skilled worker can use the fixed limit gauge.Correct Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Which of the following are steps to identify the critical path in a small network?Correct Answer Compare the durations of all paths to identify the longest path. , Sum up the
durations of activities along each path. , Enumerate all paths in the network and list down
activities on each path.Your Answer Compare the durations of all paths to identify the longest path. , Sum up the
durations of activities along each path. , Enumerate all paths in the network and list down
activities on each path.
Multiple Choice Single AnswerQuestion What do you understand by the metallergical aspects of product which forms the vital
part of engineering function?Correct Answer Material specificationsYour Answer Material specifications
Select The BlankQuestion We can say that ________ occurs when there is a distinct change in the physical or
chemical characteristic of an object.Correct Answer Operation
Your Answer Manufacturing
True/FalseQuestion There is no need for progressing when the customers do the follow-up on their own
to know the status of their jobs.Correct Answer FalseYour Answer False
True/FalseQuestion The component produced on completely automatic machines may be subjected to
sampling inspection while parts produced on semi-automatic and completely manual operated
machines require cent percent inspection.Correct Answer TrueYour Answer True
True/FalseQuestion In case of two handed process chart, the simultaneous activities of both hands are
recorded opposite to each other on the chart.Correct Answer TrueYour Answer False
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to entity can
be defined asCorrect Answer OperationYour Answer Operation
Multiple Choice Single AnswerQuestion Material control function of PPC is concerned withCorrect Answer Preparation of material estimatesYour Answer indenting all required material
Multiple Choice Multiple AnswerQuestion Order preparation process for products manufatured to order requires following
documentsCorrect Answer Sales Order , Work order , Shop orderYour Answer Sales Order , Work order , Shop order
Select The BlankQuestion The ________ is necessary when the job requires detailed of one or more of the job
characteristics with the help of special equipment which is not available at the producing company.Correct Answer Inspection orderYour Answer Inspection order
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Machine utilization
Gantt Chart Production Scheduling Production Scheduling
Multiple Choice Multiple AnswerQuestion Which of the following are examples of specifications?Correct Answer Commercial standards , Assembly and testing instructions , Bill of materialYour Answer Commercial standards , Assembly and testing instructions , Bill of material
Multiple Choice Multiple AnswerQuestion Route Sheet generally contains following informationCorrect Answer Material Specification , Sequence of operation , Skill of LabourYour Answer Material Specification , Sequence of operation , Skill of Labour
Select The BlankQuestion The design of any layout is governed by large number of factors and the best layout
is expected to ________ all these factors.Correct Answer OptimiseYour Answer Consider
Multiple Choice Single AnswerQuestion How should a dummy activity be represented in a network?Correct Answer By dotted lineYour Answer By circle
Select The BlankQuestion Production Planning is a centralised activity which includes functions such as
________Correct Answer SchedulingYour Answer Scheduling
Multiple Choice Single AnswerQuestion Technique of Value Engineering can be effectively employed in design of a product toCorrect Answer To meet the intended function at lowest costYour Answer To meet the intended function at lowest cost
True/FalseQuestion Cellular layout is based on the concept of Group TechnologyCorrect Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following are types of sampling plan?Correct Answer Single sampling plan , Double sampling plan , Multiple sampling planYour Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any product/s is
calledCorrect Answer FactoryYour Answer Factory
Multiple Choice Single AnswerQuestion What is the base for considering activity time as single time estimate or three time
estimate?Correct Answer Level of uncertaintyYour Answer Level of uncertainty
Select The BlankQuestion In Gantt Chart, the vertical lines devide horizontal lines into small squares which
represents ________.Correct Answer Units of measurementYour Answer No. of Jobs
Select The BlankQuestion Activities comprising of a project are of two types, deterministic and ________.Correct Answer VariableYour Answer Variable
Select The BlankQuestion A ________ is another form of subcontracting.Correct Answer Hiring capacityYour Answer Hiring capacity
POM assgn : Parmeet
True/FalseQuestion Objective of Work Study is to improve Productivity
Correct Answer True
Your Answer True
True/FalseQuestion After goods have been manufactured, route sheets and operation layouts
should not be collected back.Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion How is the probability of acceptance in case of Acceptable Quality Level
(AQL )?Correct Answer Very high
Your Answer Very high
True/FalseQuestion For p-chart, p bar is the ratio of total number of units inspected to the total
number of units defectives.Correct Answer False
Your Answer False
Select The BlankQuestion The ________ is specified to indicate the maximum permissible variability in
the dimensions product or parts.Correct Answer Tolerance
Your Answer Tolerance
Multiple Choice Single AnswerQuestion Which varaible is taken along the abscissa or X axis?
Correct Answer Time
Your Answer Time
Multiple Choice Single AnswerQuestion Which kind of labour force is required in case of Jobbing Production?
Correct Answer Highly Skilled
Your Answer Highly Skilled
Multiple Choice Multiple Answer
Question Which are the general principles underlying probability aspects of projectplanning?
Correct Answer Statistically three time estimate of an activity conform to Beta distribution. ,Expected time divides the area under the curve into two equal parts. ,Expected time of an activity is located at one third of the distance between"m" and mid-range { (a+b)/2 } away from the most likely time.
Your Answer Statistically three time estimate of an activity conform to Beta distribution. ,Expected time divides the area under the curve into two equal parts. ,Expected time of an activity is located at one third of the distance between"m" and mid-range { (a+b)/2 } away from the most likely time.
Select The BlankQuestion A ________ is another form of subcontracting.
Correct Answer Hiring capacity
Your Answer Hiring capacity
Select The BlankQuestion The ________ pertain to the climatic conditions which the component ,
product or material should withstand.Correct Answer Environmental specifications
Your Answer Environmental specifications
Match The FollowingQuestion Correct Answer Your Answer
Bottom compartment of controlboard
Bunch of work orders arranged ina sequence in which they are tobe processed.
Bunch of work orders arranged in asequence in which they are to beprocessed.
Control board Pictorial view of machine loadingactivity
Pictorial view of machine loadingactivity
Top compartment of control board Work order of item currentlybeing worked on the machine
Work order of item currently beingworked on the machine
Middle compartment of controlboard
Work order of item to beprocessed next on the machine
Work order of item to be processednext on the machine
Select The BlankQuestion OC curve of ideal sampling plan suggests that all lots less than 3%
defectives have the probability of acceptance of ________.Correct Answer One
Your Answer One
Multiple Choice Single AnswerQuestion Which is the right time to prepare stores issue order?
Correct Answer When route sheet is ready
Your Answer When route sheet is ready
Multiple Choice Single Answer
Question What is the reason of excessive friction between parts?
Correct Answer Improper or lack of lubrication
Your Answer Improper or lack of lubrication
True/FalseQuestion Cellular layout is based on the concept of Group Technology
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion How does the control chart of statistical quality control helps the operating
personnel?Correct Answer Identify the presence of an assignable cause before it develops
Your Answer Identify the presence of an assignable cause before it develops
Multiple Choice Multiple AnswerQuestion Which are different ways to show critical path in a network?
Correct Answer Thick Line , Red Line , Double Line
Your Answer Thick Line , Double Line
True/FalseQuestion The control chart for number of defectives is more convenient to make than
control chart for fraction defectives sincethe fugure of number of defectivesunits can be directly taken from the inspection report.
Correct Answer True
Your Answer True
Select The BlankQuestion The ________ is the maximum percentage defective that for the purpose of
sampling inspection can be considered satisfactory as a process average.Correct Answer Acceptable quality level
Your Answer Acceptable quality level
Multiple Choice Multiple AnswerQuestion Order preparation process for products manufatured to order requires
following documentsCorrect Answer Sales Order , Work order , Shop order
Your Answer Sales Order , Work order , Shop order
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to
entity can be defined as
Correct Answer Operation
Your Answer Operation
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any
product/s is calledCorrect Answer Factory
Your Answer Factory
Multiple Choice Single AnswerQuestion Inherent Safety' is one of the principle of good layout. In context of layout,
this can be achieved by the followingCorrect Answer Clear gangway, location of material and material handling system
Your Answer Safety training
Match The FollowingQuestion Correct Answer Your Answer
Toung Sweet Sweet
Eye Crack Crack
Nose Burnout Burnout
Ear Impact Impact
Multiple Choice Single AnswerQuestion How much time does the dummy activity take?
Correct Answer Zero Time
Your Answer Zero Time
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of
the condition of an item from routine or continuous checking.Correct Answer Condition monitoring
Your Answer Condition monitoring
Multiple Choice Single AnswerQuestion What does tail of an arrow represent?
Correct Answer Start of an activity
Your Answer Start of an activity
Select The Blank
Question The ________ is the probability that a good lot will be rejected by thesampling plan.
Correct Answer Producer's risk
Your Answer Producer's risk
Select The BlankQuestion The ________ is the probability that a bad lot will be accepted by the
sampling plan.Correct Answer Consumer's risk
Your Answer Consumer's risk
Multiple Choice Multiple AnswerQuestion Which of the following are the most suitable cases where we can use CPA as
effective technique of scheduling?Correct Answer Overhauling of a CNC machine , Purchase and installation of a newly
imported special purpose machine , Design, production and testing ofprototype of a fighter aircraft.
Your Answer Overhauling of a CNC machine , Purchase and installation of a newlyimported special purpose machine , Design, production and testing ofprototype of a fighter aircraft.
Multiple Choice Single AnswerQuestion Which kind of relationship exists between those activities which can be
carried out simultaneously and both activities require definite time to finish?Correct Answer Concurrent activities
Your Answer Concurrent activities
Select The BlankQuestion The ________ are the definitions of the measurable as well as
nonmeasurable characteristics of the product.Correct Answer Specifications
Your Answer Specifications
Select The BlankQuestion Goods after final inspection should accompany ________to enable dispatch
department to identify and draw correct reference.Correct Answer Forwarding note
Your Answer Forwarding note
True/FalseQuestion The steeper the OC curve, the better is the discrimination between good and
bad lots.Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question Which of the following are types of non-destructive testing?
Correct Answer Visual Testing , Eddy current , Magnetic flow detectors
Your Answer Visual Testing , Eddy current , Magnetic flow detectors
Multiple Choice Multiple AnswerQuestion Which are the different types of flow process charts used for method study?
Correct Answer Equipment type , Man type , Material type
Your Answer Equipment type , Man type , Material type
Multiple Choice Single AnswerQuestion Which photographic technique is used to record path of motions of the
members of the body during method study?Correct Answer Cyclograph
Your Answer Cyclograph
Multiple Choice Multiple AnswerQuestion Which of the following is not the characteristic of Project Production?
Correct Answer Continuous flow of material , Highly mechanised material handling , Virtuallyzero manufacturing cycle time
Your Answer Continuous flow of material , Highly mechanised material handling , Virtuallyzero manufacturing cycle time
True/FalseQuestion Use of accurate measuring instruments and better supervision for inspectors
is not possible in case of floor inspection as compared to centralisedinspection system.
Correct Answer True
Your Answer True
True/FalseQuestion Dust gets mixed with lubricants, forms an abrasive substance and causes
pre-mature failure of machinery.Correct Answer True
Your Answer True
Select The BlankQuestion The ________ is the watch dog which ensures that every element of
production and activities which could affect the quality of end product areregulated to the extent desirable.
Correct Answer Quality control
Your Answer Quality control
Multiple Choice Multiple Answer
Question Which of the following aspects are essential to ensure quality of purchaseditems?
Correct Answer Defining right quality for the job , Vendor performance evaluation , Makingsure that suppliers understand the requirements
Your Answer Defining right quality for the job , Vendor performance evaluation , Makingsure that suppliers understand the requirements
True/FalseQuestion Process Planning is concerned with decisions regarding requirement of
machines and manpower for meeting customer demandCorrect Answer False
Your Answer True
True/FalseQuestion All activities lying on the non-critical paths must have total float and free
float.Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Which of the following method can be adopted to overcome the problem of
rushing up a job for it's timely completion?Correct Answer Use of optimum speeds and feeds , Subcontracting , Job splitting
Your Answer Use of optimum speeds and feeds , Subcontracting , Job splitting
Multiple Choice Single AnswerQuestion Which of the following data is unnecessary for scheduling process?
Correct Answer Cost breakup of products
Your Answer Cost breakup of products
Multiple Choice Multiple AnswerQuestion Which of the following are the major steps of making of the X bar-R control
chart?Correct Answer Collection of data , Claculation of mean,range,grand average and mean
range , Set up control chart for average and calculate control limits of rangechart
Your Answer Collection of data , Claculation of mean,range,grand average and meanrange , Set up control chart for average and calculate control limits of rangechart
POM assgn : Parmeet
Multiple Choice Multiple AnswerQuestion What is indicated by the hugging points lying close to mean of the process
in X bar-R- control chart?Correct Answer Recording done without actual measurements , Improper selection of
samples , Biases in measurementsYour Answer Improper selection of samples , Biases in measurements , Recording done
without actual measurements
Multiple Choice Multiple AnswerQuestion Which of the following are the basic requirements of quality standard?
Correct Answer Deifinite , Undesrstandable , Economically viable
Your Answer Deifinite , Undesrstandable , Economically viable
Match The FollowingQuestion Correct Answer Your Answer
Fixation of inventory level Reorder level Reorder level
Symptom of ill plannedpurchasing
Over ordering Over ordering
Factor influencing materialplanning
Lead time Lead time
Net requirement of material underMRP
Stock on hand Stock on hand
Multiple Choice Multiple AnswerQuestion What are the benefits of inspection and quality control?
Correct Answer Adequate maintenance of quality , Ensures parts are within specified limitsof accuracy , Gives economy in production through reduction of defectivework
Your Answer Adequate maintenance of quality , Ensures parts are within specified limitsof accuracy , Gives economy in production through reduction of defectivework
Select The BlankQuestion The ________ advocates maintenance procedures whereby the condition of
the plant is constantly watched through systematic inspection to unearthunhealthy conditions and preventive
Correct Answer Preventive Maintenance
Your Answer Preventive Maintenance
Multiple Choice Single AnswerQuestion What do you mean by design modifications made to reduce time and effort
required in carrying out maintenance work ?Correct Answer Design-in Maintenance
Your Answer Design-in Maintenance
True/False
Question Even in a small set up wherein maintenance of a machine is looked after bya mechanic cum worker, he should report directly to the person responsiblefor the manufacturing operations.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion Which of the following technique makes three time estimates for each
activity?Correct Answer Project Evaluation & Review Technique
Your Answer Project Evaluation & Review Technique
Select The BlankQuestion A set of activities to keep an equipment in the specified condition is called
as ________.Correct Answer Maintenance
Your Answer Maintenance
Multiple Choice Multiple AnswerQuestion Which of the following are characteristics of an operating characteristics
curve?Correct Answer Producer risk , Consumer Risk , Acceptable Quality Level
Your Answer Producer risk , Consumer Risk , Acceptable Quality Level
Multiple Choice Multiple AnswerQuestion Which three of the following are causes of continuous upward pattern of
Xbar-R control chart?Correct Answer Wear of tool , Abnormal rise in temperature , Accumulation of dirt
Your Answer Wear of tool , Untrained operator , Abnormal rise in temperature
True/FalseQuestion Inspection should be conducted on all incoming materials, semifinished
items, bought out components, subcontract items prior to any operation,assembly.
Correct Answer True
Your Answer True
Select The BlankQuestion The ________ is necessary when the job requires detailed of one or more
of the job characteristics with the help of special equipment which is notavailable at the producing company.
Correct Answer Inspection order
Your Answer Inspection order
Multiple Choice Multiple Answer
Question Lack of material planning results in the following
Correct Answer Over ordering , under ordering , stockouts
Your Answer Over ordering , under ordering , stockouts
True/FalseQuestion Since value of c can never be negativee, hence" if LCLp works out to be
negative, it is taken as zero."Correct Answer True
Your Answer False
Multiple Choice Single AnswerQuestion What do you understand by the quality specified by the designer on behalf
the customer?Correct Answer Quality of design
Your Answer Quality of design
Select The BlankQuestion The easiest way to bring the delayed job within the promised delivery time
by using extra shift or weekly holiday is ________.Correct Answer Overtime working
Your Answer Overtime working
Select The BlankQuestion Work study is also called ________ study
Correct Answer Time and Motion
Your Answer Time and Motion
True/FalseQuestion Maintenance function must be decentralised apart from a size of a
manufacturing organisation for it's better functioning.Correct Answer False
Your Answer False
True/FalseQuestion Repetitive movements between work stations which are difficult to be
traced on string diagrams can be conveniently shown on flow diagrams.Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion Which method is used to trace especially those movements which are too
fast for human eye to pursue?
Correct Answer Cyclegraph
Your Answer Cyclegraph
Match The FollowingQuestion Correct Answer Your Answer
Template Two dimensional cutouts Two dimensional cutouts
REL chart Degree of closeness Degree of closeness
Flow diagram Tracing movements Tracing movements
Travel chart Distance and frequency ofmovements
Distance and frequency ofmovements
Select The BlankQuestion An Ideal OC curve is ________ shaped curve that accpets all the lots with
quality equal to or better than AQL .Correct Answer Rectangular
Your Answer Rectangular
Multiple Choice Single AnswerQuestion What does the points falling outside the control limits indicate?
Correct Answer Presence of assignable causes
Your Answer Presence of chance causes
Multiple Choice Multiple AnswerQuestion Which information is recorded in an equipment card?
Correct Answer Date of commissioning , Equipment specifications , Name and address ofmanufacturer
Your Answer Date of commissioning , Equipment specifications , Name and address ofmanufacturer
True/FalseQuestion Inspection should be avoided prior to long run of a manufacturing stage as
it becomes duplication of work and cost.Correct Answer False
Your Answer False
True/FalseQuestion Delay in completion of projects result in unwelcome additions to the fixed
manufacturing expenses.Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion Material Planning is an integral part of
Correct Answer Production Planning
Your Answer Production Planning
Multiple Choice Single AnswerQuestion Which of the following policies is advisable in case of low product variety
and large volumes?Correct Answer Low Skilled Labour & Special Purpose Machines
Your Answer Low Skilled Labour & Special Purpose Machines
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot may vary
between ________.Correct Answer 0.01 to 10%
Your Answer 0.01 to 10%
Multiple Choice Single AnswerQuestion MRP is based on the concept of inventory demand which is of following type
Correct Answer Dependent and independent
Your Answer Dependent and independent
True/FalseQuestion In case of X bar, if the process is not under control indicated by some
points falling outside the control limits, such points outside the control limitsare eliminated and new trial control limits for the remaining points arecomputed.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Plant Layout is concerned with optimum arrangement of the following
Correct Answer Storage space , Machines , Material Handling Equipment
Your Answer Storage space , Machines , Material Handling Equipment
Multiple Choice Single AnswerQuestion What is the location of upper control limit in the X bar-R control chart?
Correct Answer 3 standard deviations above central line
Your Answer 3 standard deviations above central line
Select The Blank
Question The ________ is the defect level for which lots are regarded as bad lots.
Correct Answer Lot Tolerance Percentage Defective
Your Answer Lot Tolerance Percentage Defective
True/FalseQuestion While numbering as per Fulkerson's rule, arrows emerging from the initial
event are deleted so as to create one or more initial events.Correct Answer True
Your Answer False
Multiple Choice Single AnswerQuestion Why stores issue order should not be issued as soon as it is prepared?
Correct Answer Material may or may not be available at the time of preparation
Your Answer Material may or may not be available at the time of preparation
Multiple Choice Single AnswerQuestion Which characteristics are verified in cent percent sampling?
Correct Answer All important characteristics
Your Answer Only characteristics related to performance
Select The BlankQuestion An ________ history card is the record of all repairs, replacements and
engineering changes carried out in the equipment during it's period ofservice.
Correct Answer Equipment history card
Your Answer Equipment history card
Multiple Choice Multiple AnswerQuestion Features of Cellular layout are
Correct Answer It is a type of mixed layout , Uses concept of Group Technology , Facilitiesare grouped in to cells
Your Answer It is a type of mixed layout , Uses concept of Group Technology , Facilitiesare grouped in to cells
Multiple Choice Single AnswerQuestion Inadequate production capacity ultimately leads to
Correct Answer Poor Customer Service
Your Answer Poor Customer Service
Multiple Choice Multiple AnswerQuestion Which of the following factors affect the quality control function?
Correct Answer Quality of workmanship , Production aids , Manufacturing facilities
Your Answer Quality of workmanship , Competitive prices , Manufacturing facilities
Multiple Choice Multiple AnswerQuestion Which of the following situations demand the economic consideration while
selecting a job for method study?Correct Answer Unorderly movement of men and materials , Excessive process defectives ,
Too many suggestions received for improvement from a department orsection
Your Answer Unorderly movement of men and materials , Excessive process defectives ,Too many suggestions received for improvement from a department orsection
True/FalseQuestion Systematic maintenance system can completely eliminate the wear and tear
of machines.Correct Answer False
Your Answer False
Select The BlankQuestion Capacity decisions have a direct influence on performance of production
system in respect of ________Correct Answer Delivery performance
Your Answer Delivery performance
Select The BlankQuestion The ________ must ensure that the product satisfy the functional
requirements of it's usage.Correct Answer Quality of design
Your Answer Quality of design
Multiple Choice Multiple AnswerQuestion Which of the following can be subtypes of corrective maintenance?
Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Your Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single AnswerQuestion Where does the central line is located in case of p-chart?Correct Answer at p barYour Answer at p bar
Multiple Choice Single AnswerQuestion The product layout has following disadvantageCorrect Answer Layout is not flexibleYour Answer Layout is not flexible
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding
some value to entity can be defined asCorrect Answer OperationYour Answer Production
Select The BlankQuestion Production Planning is a centralised activity which
includes functions such as ________Correct Answer SchedulingYour Answer Scheduling
Select The BlankQuestion OC curve of ideal sampling plan suggests that all lots
less than 3% defectives have the probability of acceptance of ________.Correct Answer OneYour Answer One
Multiple Choice Single AnswerQuestion The document which incorporates details of process
planning for a job is calledCorrect Answer Route SheetYour Answer Route Sheet
Multiple Choice Multiple AnswerQuestion Which of the following are types of non-destructive
testing?Correct Answer Visual Testing , Eddy current , Magnetic flow
detectorsYour Answer Visual Testing , Eddy current , Magnetic flow detectors
Multiple Choice Single AnswerQuestion What do you understand by the difference between the
specification limits within which manufacturing process is expected toproduce?
Correct Answer Design toleranceYour Answer Design tolerance
Multiple Choice Single AnswerQuestion Technique of Value Engineering can be effectively employed
in design of a product toCorrect Answer To meet the intended function at lowest costYour Answer To meet the intended function at lowest cost
True/FalseQuestion Inspection Order can be a verbal orderCorrect Answer TrueYour Answer False
Multiple Choice Single AnswerQuestion The ratio of output to input of a production system is
commonly known asCorrect Answer ProductivityYour Answer Productivity
True/FalseQuestion The plotting of activities - critical, non-critical and
dummy activities- is strictly according to their precedencerelationship.
Correct Answer TrueYour Answer False
Select The BlankQuestion A ________ is another form of subcontracting.Correct Answer Hiring capacityYour Answer Hiring capacity
Multiple Choice Single AnswerQuestion A good plant layout helps inCorrect Answer Reducing handling costsYour Answer Reducing handling costs
Match The FollowingQuestion Correct Answer Your Answer
Combined Layout Mixed Layout Mixed Layout
Fixed Position Layout Project Layout Project Layout
Product Layout Line Layout Line Layout
Process Layout Functional Layout Functional Layout
Select The BlankQuestion A set of activities to keep an equipment in the specified
condition is called as ________.Correct Answer MaintenanceYour Answer Maintenance
Multiple Choice Single AnswerQuestion How to claculate the producer risk in the OC Curve?Correct Answer Probability that a good lot will be rejected by the
samplingYour Answer Probability that a good lot will be rejected by the
sampling
Multiple Choice Single AnswerQuestion How non-critical activities are shown in the time chart
during project scheduling?Correct Answer Thin linesYour Answer Thin lines
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of
making any product/s is calledCorrect Answer FactoryYour Answer Factory
True/FalseQuestion Fixed cost is lower in case of continuous production than
intermittent production.Correct Answer FalseYour Answer False
Multiple Choice Single AnswerQuestion Inadequate production capacity ultimately leads toCorrect Answer Poor Customer ServiceYour Answer Low Productivity
True/FalseQuestion Floor inspection promotes tendency of machines to drift
out of limits and produce defectives.
Correct Answer FalseYour Answer False
Select The BlankQuestion Capacity decisions have a direct influence on performance
of production system in respect of ________Correct Answer Delivery performanceYour Answer Delivery performance
Multiple Choice Single AnswerQuestion Technique which can help an organization to reduce
inventory is calledCorrect Answer MRPYour Answer MRP
Select The BlankQuestion The ________ is the watch dog which ensures that every
element of production and activities which could affect the quality ofendproduct are regulated to the extent desirable.
Correct Answer Quality controlYour Answer Quality control
Match The FollowingQuestion Correct Answer Your Answer
Temperature of motor Body Body
Exhaust gas Smell Smell
Air leakage Listen Listen
Corrosion Watch Watch
Multiple Choice Single AnswerQuestion Which characteristics are verified in cent percent
sampling?Correct Answer All important characteristicsYour Answer All important characteristics
Multiple Choice Multiple AnswerQuestion What are the benefits of inspection and quality control?Correct Answer Gives economy in production through reduction of
defective work , Adequate maintenance of quality , Ensures parts are
within specified limits of accuracyYour Answer Adequate maintenance of quality , Ensures parts are
within specified limits of accuracy , Gives economy in productionthroughreduction of defective work
Multiple Choice Single AnswerQuestion In mass/batch production organizations where goods are
produced for stocking, Work Order is raised on the basis ofCorrect Answer Sales ProgrammeYour Answer Sales Programme
True/FalseQuestion While making X bar-R-chart, values of X bar and R are
recoded samplewise either on the extreme right of the individualmeasurements on the data sheet or in a separate sheet.
Correct Answer TrueYour Answer False
Multiple Choice Single AnswerQuestion What is the meaning of surplus material in context with
stores issue order?Correct Answer Materials issued are not fully consumedYour Answer Materials issued are not fully consumed
True/FalseQuestion Cent percent inspection is often more practical and
economical than sampling inspection.Correct Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion What are the benefits of reconditioning?Correct Answer Eliminates problems and frequent breakdowns ,
Increases life of an equipment , It helps to plan requirement ofreplacementspares
Your Answer Eliminates problems and frequent breakdowns , Increaseslife of an equipment , It helps to plan requirement of replacementspares
Select The BlankQuestion Work study is also called ________ studyCorrect Answer Time and MotionYour Answer Time and Motion
True/FalseQuestion In case of X bar, if the process is not under control
indicated by some points falling outside the control limits, suchpointsoutside the control limits are eliminated and new trial control limitsfor the remaining points are computed.
Correct Answer TrueYour Answer False
Select The BlankQuestion The easiest way to bring the delayed job within the
promised delivery time by using extra shift or weekly holiday is________.
Correct Answer Overtime workingYour Answer Overtime working
True/FalseQuestion A sampling plan which perfectly discriminates will have
vertical OC curve.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Which of the following is the most popular technique for
Project Production?Correct Answer PERT & CPMYour Answer PERT & CPM
Multiple Choice Multiple AnswerQuestion Which of the following are the most suitable cases where
we can use CPA as effective technique of scheduling?Correct Answer Overhauling of a CNC machine , Purchase and
installation of a newly imported special purpose machine , Design,productionand testing of prototype of a fighter aircraft.
Your Answer Overhauling of a CNC machine , Purchase andinstallation of a newly imported special purpose machine , Design,production andtesting of prototype of a fighter aircraft.
True/FalseQuestion Sample sizes for the construction of p-chart are typicaly
larger that for Xbar-R-charts.Correct Answer True
Your Answer True
Select The BlankQuestion The ________ advocates maintenance procedures whereby the
condition of the plant is constantly watched through systematicinspection to unearth unhealthy conditions and preventive
Correct Answer Preventive MaintenanceYour Answer Preventive Maintenance
True/FalseQuestion It would not affect the project completion time if
non-critical activities take little loner time than planned.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following are the basic requirements of
quality standard?Correct Answer Deifinite , Undesrstandable , Economically viableYour Answer Deifinite , Undesrstandable , Economically viable
Multiple Choice Single AnswerQuestion What is the location of lower control limit in the X bar-R
control chart?Correct Answer 3 standard deviations below central lineYour Answer 3 standard deviations below central line
Multiple Choice Multiple AnswerQuestion Which of the following is not the characteristic of
Project Production?Correct Answer Continuous flow of material , Highly mechanised
material handling , Virtually zero manufacturing cycle timeYour Answer Continuous flow of material , Highly mechanised
material handling , Virtually zero manufacturing cycle time
Multiple Choice Multiple AnswerQuestion Which of the following may be the objectives of project
crashing?Correct Answer To complete the project in the least possible time ,
To reduce project cost below it's normal cost , To achieve uniformityin requirement of resources
Your Answer To complete the project in the least possible time , Toreduce project cost below it's normal cost , To achieve uniformity inrequirement of resources
Multiple Choice Single AnswerQuestion What is the basic philosophy of statistical process
control?Correct Answer Prevention is better than cureYour Answer Prevention is better than cure
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple AnswerQuestion Which of the following concepts must be understood for the
achievement of quality?Correct Answer Quality of design , Quality of conformance , Purpose of product
Your Answer Quality of conformance , Quality of design
Multiple Choice Single AnswerQuestion What do you mean by the graphical representation of the project
which is composed as series of connected arrows and circles todescribe the interrelationship of the activities involved?
Correct Answer Network
Your Answer Network
Multiple Choice Multiple AnswerQuestion Which of the following cases indicates change in physical
characteristic?Correct Answer Turning , Grinding , Drilling
Your Answer Turning , Grinding , Drilling
Multiple Choice Single AnswerQuestion What do you mean by the verification of object against
predetermined standards of quality or quantity or both?Correct Answer Inspection
Your Answer Quality assurance
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of
making any product/s is calledCorrect Answer Factory
Your Answer Factory
Select The BlankQuestion The ________ advocates maintenance procedures whereby the
condition of the plant is constantly watched through systematicinspection to unearth unhealthy conditions and preventive
Correct Answer Preventive Maintenance
Your Answer Preventive Maintenance
Select The BlankQuestion The ________ is the defect level for which lots are regarded as
bad lots.Correct Answer Lot Tolerance Percentage Defective
Your Answer Lot Tolerance Percentage Defective
Multiple Choice Single AnswerQuestion How non-critical activities are shown in the time chart during
project scheduling?Correct Answer Thin lines
Your Answer Thin lines
Select The BlankQuestion An ________ history card is the record of all repairs,
replacements and engineering changes carried out in theequipment during it's period of service.
Correct Answer Equipment history card
Your Answer Equipment history card
Multiple Choice Single AnswerQuestion Who prepares the daily production report?
Correct Answer Shop Supervisor
Your Answer Shop Supervisor
Select The BlankQuestion Work study is also called ________ study
Correct Answer Time and Motion
Your Answer Motion
True/False
Question Every network does not necessarily have a critical path.
Correct Answer False
Your Answer False
Select The BlankQuestion Production Planning is a centralised activity which includes
functions such as ________Correct Answer Scheduling
Your Answer Scheduling
Multiple Choice Single AnswerQuestion Which method of critical path determination begins with the end
event and moves backward to the start event of the projectnetwork?
Correct Answer Backward pass computation
Your Answer Backward pass computation
True/FalseQuestion Scrap allowance is added to net requirement of material while
ordering for materialCorrect Answer True
Your Answer True
True/FalseQuestion Dust gets mixed with lubricants, forms an abrasive substance
and causes pre-mature failure of machinery.Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion A good plant layout helps in
Correct Answer Reducing handling costs
Your Answer Reducing handling costs
True/FalseQuestion It would not affect the project completion time if non-critical
activities take little loner time than planned.Correct Answer True
Your Answer True
Select The BlankQuestion The ________ is the process of withdrawing the equipment from
the production line, dismantling it unitwise, visualising defects,effecting adjustments, replacing worn-out parts and finallybuilding it up to get desired accuracies.
Correct Answer Reconditioning
Your Answer Reconditioning
True/FalseQuestion Flow process charts do record movements as well as visual
pictures.Correct Answer False
Your Answer False
True/FalseQuestion Process Planning is concerned with decisions regarding
requirement of machines and manpower for meeting customerdemand
Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion What is the meaning of " Product features" according to
J.M.Juran?Correct Answer Quality of design
Your Answer Quality of design
Multiple Choice Single AnswerQuestion Technique which can help an organization to reduce inventory is
calledCorrect Answer MRP
Your Answer MRP
Multiple Choice Multiple AnswerQuestion Which of the following are examples of consumption of physical
effort during recording for method study?Correct Answer Bending , Positioning , Unloading
Your Answer Bending , Positioning , Drilling
True/FalseQuestion Objective of Work Study is to improve Productivity
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Which three of the following options can be used to reduce the
duration of activity during project crashing?Correct Answer Allocating more manpower and machines than originally planned
for. , Working additional shifts or overtime. , Awarding work tovendors who charge extra but expedite deliveries.
Your Answer Allocating more manpower and machines than originally plannedfor. , Working additional shifts or overtime. , Awarding work tovendors who charge extra but expedite deliveries.
Multiple Choice Single AnswerQuestion Which is the next stage to the inspection based quality control in
the historical development of quality management.Correct Answer Quality assurance
Your Answer Quality assurance
Match The FollowingQuestion Correct Answer Your Answer
Bottom compartment ofcontrol board
Bunch of work ordersarranged in a sequence inwhich they are to beprocessed.
Bunch of work ordersarranged in a sequence inwhich they are to beprocessed.
Control board Pictorial view of machineloading activity
Pictorial view of machineloading activity
Top compartment ofcontrol board
Work order of itemcurrently being worked onthe machine
Work order of itemcurrently being worked onthe machine
Middle compartment ofcontrol board
Work order of item to beprocessed next on themachine
Work order of item to beprocessed next on themachine
Select The BlankQuestion The ________ is the maintenance work initiated on a result of
knowledge of the condition of an item from routine or continuouschecking.
Correct Answer Condition monitoring
Your Answer Condition monitoring
Select The BlankQuestion The easiest way to bring the delayed job within the promised
delivery time by using extra shift or weekly holiday is ________.Correct Answer Overtime working
Your Answer Overtime working
Multiple Choice Multiple AnswerQuestion Following are some of the Principles of Management advocated
by F W TaylorCorrect Answer Selection of best worker for each particular task , Division of
work between worker and management , Training anddevelopment of the workmen
Your Answer Selection of best worker for each particular task , Division ofwork between worker and management , Training anddevelopment of the workmen
Multiple Choice Multiple AnswerQuestion How the concept of float is helpful to planners?
Correct Answer To decide priorities in allocation of resources , To minimize therequirement of resources , To prevent peaks and valleys inrequirement of resources
Your Answer To decide priorities in allocation of resources , To minimize therequirement of resources
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding
some value to entity can be defined asCorrect Answer Operation
Your Answer Operation
Multiple Choice Single AnswerQuestion Which kind of defect can be called as minor defect?
Correct Answer Which does not reduce the usability of the product for itsintended use
Your Answer Which does not reduce the usability of the product for itsintended use
Select The BlankQuestion The ________ is specified to indicate the maximum permissible
variability in the dimensions product or parts.Correct Answer Tolerance
Your Answer Tolerance
True/FalseQuestion Sampling inspection is best suited when cost of inspection is
much higher than the loss arising from the acceptance of adefective part.
Correct Answer True
Your Answer False
Multiple Choice Single AnswerQuestion Which element of a network represents a task which has got a
definite beginning and definite end?Correct Answer Activity
Your Answer Activity
Multiple Choice Multiple AnswerQuestion Following are the commonly used factors considered for
evaluation of layout in factor analysis methodCorrect Answer Flow of material , Equipment utilization , Working condition
Your Answer Flow of material , Equipment utilization , Working condition
Select The BlankQuestion A good maintenance system is not a luxary but a ________.
Correct Answer Necessity
Your Answer Necessity
Select The BlankQuestion The ________ are the definitions of the measurable as well as
nonmeasurable characteristics of the product.Correct Answer Specifications
Your Answer Standards
Multiple Choice Multiple AnswerQuestion Which features should be covered by the specifications of
materials while defining the qualitative requirement?Correct Answer Material composition , Dimensions , Any heat treatment if
requiredYour Answer Material composition , Dimensions , Any heat treatment if
required
Multiple Choice Single AnswerQuestion The ratio of output to input of a production system is commonly
known as
Correct Answer Productivity
Your Answer Productivity
True/FalseQuestion F W Taylor devised a system for classifying motions into basic
divisions called TherbligsCorrect Answer False
Your Answer False
Multiple Choice Single AnswerQuestion Which portion of the perforated route sheet should be signed by
the operator or supervisor?Correct Answer Lower portion
Your Answer Lower portion
True/FalseQuestion In case of X bar, if the process is not under control indicated by
some points falling outside the control limits, such points outsidethe control limits are eliminated and new trial control limits for theremaining points are computed.
Correct Answer True
Your Answer True
Match The FollowingQuestion Correct Answer Your Answer
Scale model Layout analysis Modelling approach tolayouts
Factor Analysis Method to evaluatelayouts
Technique for evolving andanalysis of layouts
Minimization of productiondelays
Objective of good layout Objective of good layout
Maximum visibility Principles of good layout Principles of good layout
True/FalseQuestion Maintenance function must be decentralised apart from a size of
a manufacturing organisation for it's better functioning.Correct Answer False
Your Answer True
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/FalseQuestion Process Sheets for parts in batch production are not maintained
as standard process sheetCorrect Answer False
Your Answer False
True/FalseQuestion Theoretical capacity equals number of normal working hours of
that machine.Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Which are the basic requirements of the " Quality of Design "?
Correct Answer Identification of right product , Selection of appropriate features ,Ensure that product renders satisfactory service to customer
Your Answer Identification of right product , Selection of appropriate features ,Ensure that product renders satisfactory service to customer
Match The FollowingQuestion Correct Answer Your Answer
Change in chemicalcharacteristic
Chemical reaction Chemical reaction
Consumption of effort Posting a ledger Welding
Information given Giving directions orinstructions
Posting a ledger
Subtraction Removal of worn-out partfrom a machine
Removal of worn-out partfrom a machine
Multiple Choice Multiple AnswerQuestion Which of the following aspects are essential to ensure quality of
purchased items?Correct Answer Defining right quality for the job , Vendor performance evaluation
, Making sure that suppliers understand the requirementsYour Answer Defining right quality for the job , Vendor performance evaluation
, Making sure that suppliers understand the requirements
Select The BlankQuestion The ________ is necessary when the job requires detailed of
one or more of the job characteristics with the help of special
equipment which is not available at the producing company.
Correct Answer Inspection order
Your Answer Move order
Select The BlankQuestion The term ________ emplies the foregone profit due to inability of
company to produce.Correct Answer Opportunity cost
Your Answer Idle wages
Multiple Choice Multiple AnswerQuestion Which of the following factors play important role while selecting
or rejecting a particular site from legislation and taxation point ofview?
Correct Answer Labour laws , Building codes , Policies regarding issue oflicences
Your Answer Labour laws , Policies regarding issue of licences
True/FalseQuestion Skill of labour force in a product type layout is usually higher
than in the process type of layoutCorrect Answer False
Your Answer False
Multiple Choice Single AnswerQuestion What is the base for considering activity time as single time
estimate or three time estimate?Correct Answer Level of uncertainty
Your Answer Level of uncertainty
Multiple Choice Single AnswerQuestion Product layout is employed for manufacturing following products
Correct Answer refrigirators
Your Answer automobile components
True/FalseQuestion Diversified labour is adequately available in rural area as
compared to urban area.Correct Answer False
Your Answer False
Match The FollowingQuestion Correct Answer Your Answer
Fixation of inventory level Reorder level Single source of supply
Symptom of ill plannedpurchasing
Over ordering Over ordering
Factor influencing materialplanning
Lead time Reorder level
Net requirement ofmaterial under MRP
Stock on hand Stock on hand
True/FalseQuestion In case of backward pass computation, the latest event time of
the end event equals to the earliest event time minus duration ofthat activity.
Correct Answer False
Your Answer True
Select The BlankQuestion The ________ is the probability that a good lot will be rejected
by the sampling plan.Correct Answer Producer's risk
Your Answer Producer's risk
Multiple Choice Single AnswerQuestion Which of the following technique makes three time estimates for
each activity?Correct Answer Project Evaluation & Review Technique
Your Answer Project Evaluation & Review Technique
True/FalseQuestion Suburban location provides the compromise netween rural and
urban locations.Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion Which time is determined by the backward pass computation
method of determination of critical path ?Correct Answer Latest allowable time for each event
Your Answer Latest allowable time for each event
Multiple Choice Single AnswerQuestion What do you understand by the measurement of work to
establish allowed time for a job for the defined method?Correct Answer Work measurement
Your Answer Motion economy
True/FalseQuestion Even in a small set up wherein maintenance of a machine is
looked after by a mechanic cum worker, he should report directlyto the person responsible for the manufacturing operations.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion Out of two basic criteria for the selection of a manufacturing
method, one is, it must be able to meet the specifications of finalproduct and the other is, it must be
Correct Answer Cost effective method
Your Answer Cost effective method
True/FalseQuestion Kanban system is essentially a computer based system for
production scheduling and controlCorrect Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Which of the following symbols are used in flow process chart
but not used in operation process chart?Correct Answer Storage , Delay , Transport
Your Answer Storage , Delay
Multiple Choice Single AnswerQuestion In case of Batch Production which kind of labour is expected?
Correct Answer Skilled in one specific Manufacturing Process
Your Answer Skilled in one specific Manufacturing Process
Multiple Choice Multiple Answer
Question Which of the following are the major steps of making of the Xbar-R control chart?
Correct Answer Collection of data , Claculation of mean,range,grand averageand mean range , Set up control chart for average and calculatecontrol limits of range chart
Your Answer Claculation of mean,range,grand average and mean range , Setup control chart for average and calculate control limits of rangechart , Calculate the coefficient of deviation
True/FalseQuestion For p-chart, p bar is the ratio of total number of units inspected to
the total number of units defectives.Correct Answer False
Your Answer True
Multiple Choice Single AnswerQuestion Which of the following is the most popular technique for Project
Production?Correct Answer PERT & CPM
Your Answer Break Even Analysis
Multiple Choice Single AnswerQuestion Which kind of preventive inspection detects some maintenance
related characteristics by making use of human senses, whenequipment is in operation?
Correct Answer Extrernal inspection
Your Answer Internal inspection
Multiple Choice Single AnswerQuestion Process Engineer does not get sufficient time for designing
tooling for most economic production run whenCorrect Answer Delivery time is less
Your Answer Delivery time is less
Multiple Choice Single AnswerQuestion How dummy activities are shown in the time chart during project
scheduling?Correct Answer Vertical lines
Your Answer Dotted lines
True/FalseQuestion The control chart for number of defectives is more convenient to
make than control chart for fraction defectives sincethe fugure of
number of defectives units can be directly taken from theinspection report.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Which are the advantages of suburban location?
Correct Answer Avaialability of adequate land at lower cost , Both skilled andunskilled labour can be available , Plant expansion is easier dueto less or no restriction for building and construction
Your Answer Avaialability of adequate land at lower cost , Both skilled andunskilled labour can be available , Availability of excellenttransportation and communication facilities
Multiple Choice Multiple AnswerQuestion Which utilities are considered as infrastructural requirements?
Correct Answer Disposal of waste , Power , Water
Your Answer Power , Labour , Water
Multiple Choice Single AnswerQuestion What do you understand by the timeframe for the maintenance
needs of the equipment?Correct Answer Maintenance inspection schedule
Your Answer Maintenance inspection schedule
Multiple Choice Multiple AnswerQuestion Which of the following are assignable cause?
Correct Answer Large varaitions in hardness of material , Tool wear , Errors insetting
Your Answer Large varaitions in hardness of material , Tool wear , Errors insetting
Multiple Choice Single AnswerQuestion Which of the following policies is advisable in case of low
product variety and large volumes?Correct Answer Low Skilled Labour & Special Purpose Machines
Your Answer Low Skilled Labour & Special Purpose Machines
Multiple Choice Single AnswerQuestion Which phase of method study is concerned with analyzing the
facts critically, generating alternatives which form the basis forselection and development of improved methods?
Correct Answer Critical examination
Your Answer Critical examination
Select The BlankQuestion A ________ is another form of subcontracting.
Correct Answer Hiring capacity
Your Answer Collaboration
Select The BlankQuestion The ________ must ensure that the product satisfy the
functional requirements of it's usage.Correct Answer Quality of design
Your Answer Quality of conformance
Multiple Choice Multiple AnswerQuestion Gross requirement of finished product is determined on the basis
of followingCorrect Answer Forecasted sales , Pending sales order , Management decision
to stockYour Answer Pending sales order , Management decision to stock , Gross
Market requirement
Select The BlankQuestion The ________ includes preventive maintenance activities whose
needs are identified through inspection which requires stoppageof machines.
Correct Answer Shutdown Maintenance
Your Answer Working Maintenance
Select The BlankQuestion A set of activities to keep an equipment in the specified condition
is called as ________.Correct Answer Maintenance
Your Answer Maintenance
Multiple Choice Single AnswerQuestion Which kind of labour force is required in case of Jobbing
Production?Correct Answer Highly Skilled
Your Answer Highly Skilled
Select The BlankQuestion One detachable ticket is prepared for each ________.
Correct Answer Operation
Your Answer Operation
Select The BlankQuestion The ________ is the watch dog which ensures that every
element of production and activities which could affect the qualityof end product are regulated to the extent desirable.
Correct Answer Quality control
Your Answer Quality control
Select The BlankQuestion The ________ is the maximum percentage defective that for the
purpose of sampling inspection can be considered satisfactoryas a process average.
Correct Answer Acceptable quality level
Your Answer Lot Tolerance Percentage Defective
Multiple Choice Multiple AnswerQuestion Which of the following products should be produced by using
mass production?Correct Answer Refrigerator , Tyre for automobile , Television Set
Your Answer Refrigerator , Tyre for automobile , Television Set
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/FalseQuestion Flow process charts do record movements as well as visual
pictures.Correct Answer False
Your Answer False
True/FalseQuestion The OC curve is based on the assumption that if the lot is large
in comparison to the sample, the probabilities of the OC curvewill follow a poisson distribution.
Correct Answer False
Your Answer True
Multiple Choice Single AnswerQuestion The ratio of output to input of a production system is commonly
known asCorrect Answer Productivity
Your Answer Productivity
Multiple Choice Multiple AnswerQuestion Order preparation process for products manufatured to order
requires following documentsCorrect Answer Sales Order , Work order , Shop order
Your Answer Work order , Purchase order
Select The BlankQuestion The ________ is the maintenance work initiated on a result of
knowledge of the condition of an item from routine or continuouschecking.
Correct Answer Condition monitoring
Your Answer Preventive maintenance
Match The FollowingQuestion Correct Answer Your Answer
Scheduling of interrelatedactivities of small projectswith consideration ofuncertainty of duration ofactivities.
Critical Path Analysis Critical Path Analysis
Two machines &processing time dependson sequence of jobloading
Johnson's Two MachineAlgorithm
Johnson's Two MachineAlgorithm
Sufficient orders andresonable choice ofmachines
Index Method Index Method
Time relationship betweenwhen a product isrequired and when it canbe made available
Critical Ratio Scheduling Time series
Select The BlankQuestion Production control work is ________ in case of floor inspection
as compared with the centralised inspection.Correct Answer easier
Your Answer easier
Match The FollowingQuestion Correct Answer Your Answer
When to inspect Stages of inspection Specification
What to inspect Specification Standard
How to inspect Inspection devices Tools & Jigs
How much to inspect Sampling or cent percentinspection
Stages of inspection
Multiple Choice Single AnswerQuestion Material Planning is an integral part of
Correct Answer Production Planning
Your Answer Process Planning
Select The BlankQuestion An Ideal OC curve is ________ shaped curve that accpets all
the lots with quality equal to or better than AQL .Correct Answer Rectangular
Your Answer Rectangular
Multiple Choice Single AnswerQuestion Technique of Value Engineering can be effectively employed in
design of a product toCorrect Answer To meet the intended function at lowest cost
Your Answer Reduce lead time
Multiple Choice Single AnswerQuestion Material control function of PPC is concerned with
Correct Answer Preparation of material estimates
Your Answer Preparation of material estimates
Multiple Choice Single AnswerQuestion Main objective of a good plant layout is
Correct Answer Reduce material handling cost
Your Answer Reduce material handling cost
True/FalseQuestion In case of X bar-R charts, statistical limits are calculated from
averages of samples of n (4,5,…) instead of single sample oflarge size to reduce the spread of natural variability.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Which of the following is not the characteristic of Project
Production?Correct Answer Continuous flow of material , Highly mechanised material
handling , Virtually zero manufacturing cycle timeYour Answer Fixed position layout , Virtually zero manufacturing cycle time
Multiple Choice Single AnswerQuestion A good plant layout helps in
Correct Answer Reducing handling costs
Your Answer Reducing handling costs
Multiple Choice Single Answer
Question Inadequate production capacity ultimately leads to
Correct Answer Poor Customer Service
Your Answer Low Productivity
Select The BlankQuestion Production Planning is a centralised activity which includes
functions such as ________Correct Answer Scheduling
Your Answer Scheduling
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of
making any product/s is calledCorrect Answer Factory
Your Answer Factory
Multiple Choice Multiple AnswerQuestion What are the uses of the instruction manual provided by the
manufacturer of a machine?Correct Answer It gives instructions regarding installation and operation of the
equipment , It contains note on common troubles with causesand remedies for troubleshooting , It enlists points, frequencyand type of lubrication
Your Answer It gives instructions regarding installation and operation of theequipment , It contains note on common troubles with causesand remedies for troubleshooting
Multiple Choice Multiple AnswerQuestion MRP utilises the following information
Correct Answer Master production schedule , Product structure , Lead time forprocurement/manufacturing
Your Answer Master production schedule , Product structure , Lead time forprocurement/manufacturing
Select The BlankQuestion A good maintenance system is not a luxary but a ________.
Correct Answer Necessity
Your Answer Necessity
True/FalseQuestion Shape od an OC curve is a function of sample size and the
acceptance number.
Correct Answer True
Your Answer False
Multiple Choice Multiple AnswerQuestion Which of the following can be subtypes of corrective
maintenance?Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in
MaintenanceYour Answer Predictive Maintenance , Shutdown Maintenance
True/FalseQuestion For p-chart, "Inspection by variables" is much faster than
"Inspection by attributes"Correct Answer False
Your Answer True
Multiple Choice Single AnswerQuestion Site factors for plant location include
Correct Answer Suitability of land
Your Answer Suitability of land
Select The BlankQuestion The ________ breakdowns usually cost more, partly due to
damage done to the adjustment components and partly due toemergency actions.
Correct Answer Unexpected
Your Answer Partial
True/FalseQuestion Cent percent inspection is a must if the inspection is of
destructive nature.Correct Answer False
Your Answer False
True/FalseQuestion Since value of p can never be positive, hence" if LCLp works out
to be positive, it is taken as zero."Correct Answer False
Your Answer True
Multiple Choice Single AnswerQuestion Which varaible is taken along the abscissa or X axis?
Correct Answer Time
Your Answer Standard deviation
Multiple Choice Multiple AnswerQuestion Which of the following are examples of specifications?
Correct Answer Commercial standards , Assembly and testing instructions , Billof material
Your Answer Production schedule , Commercial standards , Assembly andtesting instructions
Multiple Choice Multiple AnswerQuestion Which of the following products should be produced by using
mass production?Correct Answer Refrigerator , Tyre for automobile , Television Set
Your Answer Refrigerator , Tyre for automobile , Television Set
Multiple Choice Single AnswerQuestion Which of the following techniques is used by industrial
engineering department to obtain the utilisation index?Correct Answer Work Sampling Studies
Your Answer Method Study
True/FalseQuestion An ideal OC curve is never possible only with cent percent
inspection.Correct Answer False
Your Answer False
Select The BlankQuestion The ________ is the probability that a bad lot will be accepted
by the sampling plan.Correct Answer Consumer's risk
Your Answer Producer's risk
Select The BlankQuestion The easiest way to bring the delayed job within the promised
delivery time by using extra shift or weekly holiday is ________.
Correct Answer Overtime working
Your Answer Overtime working
True/FalseQuestion The operator should not stop production if first piece is not
approved by the inspector.Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding
some value to entity can be defined asCorrect Answer Operation
Your Answer Conversion
Multiple Choice Single AnswerQuestion Which kind of relationship exists between those activities which
can be carried out simultaneously and both activities requiredefinite time to finish?
Correct Answer Concurrent activities
Your Answer Concurrent activities
Multiple Choice Multiple AnswerQuestion Which are different ways to show critical path in a network?
Correct Answer Thick Line , Red Line , Double Line
Your Answer Dotted line
Select The BlankQuestion A ________helps to avoid crowding of jobs at a particular
machine by change of route of some of the jobs or by divertingwork to other machine.
Correct Answer Control board
Your Answer Control board
Multiple Choice Single AnswerQuestion What do you understand by PERT ?
Correct Answer Project Evaluation & Review Technique
Your Answer Project Evaluation & Review Technique
Multiple Choice Multiple AnswerQuestion Which of the following factors play important role while selecting
or rejecting a particular site from legislation and taxation point ofview?
Correct Answer Labour laws , Building codes , Policies regarding issue oflicences
Your Answer Labour laws , Policies regarding issue of licences
Multiple Choice Multiple AnswerQuestion Which of the following concepts must be understood for the
achievement of quality?Correct Answer Quality of conformance , Purpose of product , Quality of design
Your Answer Purpose of product , Process specifications , Quality of design
Select The BlankQuestion The ________ is the probability that a good lot will be rejected
by the sampling plan.Correct Answer Producer's risk
Your Answer Producer's risk
Multiple Choice Single AnswerQuestion What do you mean by the project duration for which the total
cost is minimum?Correct Answer Optimum duration
Your Answer Optimum duration
True/FalseQuestion Originating process of raw material influence Process Planning
Correct Answer True
Your Answer True
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single AnswerQuestion Which phase of method study is concerned with analyzing the
facts critically, generating alternatives which form the basis forselection and development of improved methods?
Correct Answer Critical examination
Your Answer Development and selection
Select The BlankQuestion The ________ advocates maintenance procedures whereby the
condition of the plant is constantly watched through systematicinspection to unearth unhealthy conditions and preventive
Correct Answer Preventive Maintenance
Your Answer Design-in Maintenance
Select The BlankQuestion The term ________ emplies the foregone profit due to inability
of company to produce.Correct Answer Opportunity cost
Your Answer Down time cost
True/FalseQuestion A network should employ only those dummy activities which are
absolutely necessary.Correct Answer True
Your Answer True
Select The BlankQuestion A set of activities to keep an equipment in the specified
condition is called as ________.Correct Answer Maintenance
Your Answer Maintenance
True/FalseQuestion While making X bar-R-chart, values of X bar and R are recoded
samplewise either on the extreme right of the individualmeasurements on the data sheet or in a separate sheet.
Correct Answer True
Your Answer False
Select The BlankQuestion The ________ must ensure that the product satisfy the
functional requirements of it's usage.Correct Answer Quality of design
Your Answer Quality of inspection
True/FalseQuestion Even if any activity on the critical path is delayed, project
completes on the scheduled time.Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion Which is the alternative way of indicating the load other than
numerical way, in case of Gantt chart ?Correct Answer Graphical approach
Your Answer Symbolic pproach
Multiple Choice Multiple AnswerQuestion Which of the following are types of sampling plan?
Correct Answer Single sampling plan , Double sampling plan , Multiple samplingplan
Your Answer Single sampling plan , Double sampling plan , Multiple samplingplan
Multiple Choice Multiple AnswerQuestion Which of the following are major inputs to scheduling?
Correct Answer Overlapping of operations , Effective Capacity per work centre ,Performance standards
Your Answer Overlapping of operations , Effective Capacity per work centre ,Performance standards
Select The BlankQuestion The ________ is necessary when the job requires detailed of
one or more of the job characteristics with the help of specialequipment which is not available at the producing company.
Correct Answer Inspection order
Your Answer Stores issue order
Select The BlankQuestion The ________ is the maintenance work initiated on a result of
knowledge of the condition of an item from routine or continuouschecking.
Correct Answer Condition monitoring
Your Answer Condition monitoring
True/FalseQuestion Diversified labour is adequately available in rural area as
compared to urban area.Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Which of the following cases indicated that the operation has
occurred?Correct Answer Movement of components to assembly section , Raw material
movement , A worker's trip to grinder to sharpen the toolsYour Answer Movement of components to assembly section , A worker's trip
to grinder to sharpen the tools , Tools kept in rack of tool crib
Multiple Choice Single AnswerQuestion What is the reason of fluctuations, if the control chart evaluates
that the process is in a state of statistical control?Correct Answer Random variability
Your Answer Set up variability
Select The BlankQuestion The ________ is the maximum percentage defective that for the
purpose of sampling inspection can be considered satisfactoryas a process average.
Correct Answer Acceptable quality level
Your Answer Acceptable quality level
Multiple Choice Single AnswerQuestion Product layout is suitable when
Correct Answer Products have reasonable stable demand
Your Answer Products are not required in large quantities
Multiple Choice Multiple AnswerQuestion Which of the following charts are used for the recording of data
during the method study?Correct Answer Operation process chart , Multiple activity chart , Flow process
chartYour Answer Operation process chart , Multiple activity chart , Flow process
chart
True/FalseQuestion The operator should not stop production if first piece is not
approved by the inspector.Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion Need for change in layout can occur due to following reason
Correct Answer introduction of new product
Your Answer introduction of new product
Multiple Choice Single AnswerQuestion What do you mean by a single event which represents the joint
completion of more than one activities?Correct Answer Merge event
Your Answer Merge event
True/FalseQuestion The control chart for number of defectives is more convenient to
make than control chart for fraction defectives sincethe fugure ofnumber of defectives units can be directly taken from theinspection report.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion Which rule is used for numbering of events?
Correct Answer Fulkerson's Rule
Your Answer Juran's Rule
True/FalseQuestion In case of two handed process chart, the simultaneous activities
of both hands are recorded opposite to each other on the chart.Correct Answer True
Your Answer True
True/FalseQuestion All activities lying on the non-critical paths must have total float
and free float.Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Which of the following is not the characteristic of Project
Production?Correct Answer Continuous flow of material , Highly mechanised material
handling , Virtually zero manufacturing cycle timeYour Answer Continuous flow of material , Highly mechanised material
handling , Virtually zero manufacturing cycle time
Multiple Choice Multiple AnswerQuestion Which of the following is not the characteristic of Project
Production?Correct Answer Continuous flow of material , Highly mechanised material
handling , Virtually zero manufacturing cycle timeYour Answer Fixed position layout
Select The BlankQuestion The ________ are the definitions of the measurable as well as
nonmeasurable characteristics of the product.Correct Answer Specifications
Your Answer Specifications
Multiple Choice Single AnswerQuestion How industry has responded to the fact of existence of inherant
variability of the manufacturing process?Correct Answer Inclusion of certain tolerance on the basic dimensions in the
drawingYour Answer Inclusion of certain tolerance on the basic dimensions in the
drawing
Select The BlankQuestion Work study is also called ________ study
Correct Answer Time and Motion
Your Answer Time and Motion
Multiple Choice Multiple AnswerQuestion Which are the different methods of recording actual progress of
work?Correct Answer Display boards , Progress cards , Network updating
Your Answer Job cards , Progress cards , Network updating
True/FalseQuestion In case of backward pass computation, the latest event time of
the end event equals to the earliest event time minus duration of
that activity.
Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Which of the following products should be produced by using
mass production?Correct Answer Refrigerator , Tyre for automobile , Television Set
Your Answer Refrigerator , Tyre for automobile , Television Set
Multiple Choice Multiple AnswerQuestion Which of the following are examples of attributes?
Correct Answer Cracks , Burrs , Texture
Your Answer Cracks , Burrs , Texture
Match The FollowingQuestion Correct Answer Your Answer
Scheduling Device Strings Strings
Interruption for machineutilisation
Preventive maintenance Preventive maintenance
Input for scheduling Overlapping of operations Critical Path Analysis
Technique of scheduling Critical Path Analysis JIT
Multiple Choice Multiple AnswerQuestion Which are the three distinct parts of the chart?
Correct Answer Summary , Introduction , Body
Your Answer Summary , Introduction , Analysis
Match The FollowingQuestion Correct Answer Your Answer
Combined Layout Mixed Layout Mixed Layout
Fixed Position Layout Project Layout Project Layout
Product Layout Line Layout Line Layout
Process Layout Functional Layout Functional Layout
Multiple Choice Multiple AnswerQuestion Following are the commonly used factors considered for
evaluation of layout in factor analysis methodCorrect Answer Flow of material , Equipment utilization , Working condition
Your Answer Flow of material , Equipment utilization , Working condition
Multiple Choice Single AnswerQuestion Fixed position layout is adopted when
Correct Answer product is very heavy involving assembly of large number ofparts
Your Answer product is very heavy involving assembly of large number ofparts
Select The BlankQuestion The ________ is the defect level for which lots are regarded as
bad lots.Correct Answer Lot Tolerance Percentage Defective
Your Answer Acceptable quality level
Multiple Choice Multiple AnswerQuestion Which of the following are examples of specifications?
Correct Answer Commercial standards , Assembly and testing instructions , Billof material
Your Answer Commercial standards , Assembly and testing instructions , Billof material
Multiple Choice Single AnswerQuestion Process Engineer does not get sufficient time for designing
tooling for most economic production run whenCorrect Answer Delivery time is less
Your Answer Delivery time is less
Multiple Choice Single AnswerQuestion What do you mean by the graphical representation of the project
which is composed as series of connected arrows and circles todescribe the interrelationship of the activities involved?
Correct Answer Network
Your Answer Flow chart
True/False
Question Latest finishing date is the latest event time of the tail event.
Correct Answer False
Your Answer True
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of
making any product/s is calledCorrect Answer Factory
Your Answer Factory
Select The BlankQuestion The ________ is the probability that a bad lot will be accepted
by the sampling plan.Correct Answer Consumer's risk
Your Answer Consumer's risk
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple AnswerQuestion Why graphical method of recording is preferred over the descriptive method
during method study?Correct Answer It segregates effective part form ineffective parts , It reduces effort
involved in writing , Critical examinations easier and more effectiveYour Answer Critical examinations easier and more effective , It segregates effective
part form ineffective parts , It reduces effort involved in writing
Multiple Choice Multiple AnswerQuestion Which are the subfactors of community facilities or social infrastructure?Correct Answer Accomodation , Educational , EntertainmentYour Answer Accomodation , Educational , Entertainment
Select The BlankQuestion The ________ is the probability that a bad lot will be accepted by the
sampling plan.Correct Answer Consumer's riskYour Answer Consumer's risk
Multiple Choice Multiple AnswerQuestion Which of the following are examples of consumption of physical effort
during recording for method study?Correct Answer Bending , Positioning , UnloadingYour Answer Bending , Positioning , Unloading
Multiple Choice Single AnswerQuestion How to claculate the producer risk in the OC Curve?Correct Answer Probability that a good lot will be rejected by the samplingYour Answer Probability that a good lot will be rejected by the sampling
Select The BlankQuestion The ________ are the definitions of the measurable as well as nonmeasurable
characteristics of the product.Correct Answer SpecificationsYour Answer Specifications
Select The BlankQuestion The ________ is the watch dog which ensures that every element of
production and activities which could affect the quality of end product are regulated tothe extent desirable.
Correct Answer Quality controlYour Answer Quality control
True/False
Question Expediting action is necessary if the delays and interruptions are abnormaland hence any subsequent delay is bound to extend the promised delivery date.
Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Process Engineer does not get sufficient time for designing tooling for most
economic production run whenCorrect Answer Delivery time is lessYour Answer Delivery time is less
Select The BlankQuestion The ________ includes preventive maintenance activities whose needs are
identified through inspection which requires stoppage of machines.Correct Answer Shutdown MaintenanceYour Answer Shutdown Maintenance
True/FalseQuestion Breakdown of machines, absenteeism of worker does not dislocate the
manufacturing activity in process layoutCorrect Answer TrueYour Answer True
Select The BlankQuestion The ________ is the maximum percentage defective that for the purpose of
sampling inspection can be considered satisfactory as a process average.Correct Answer Acceptable quality levelYour Answer Acceptable quality level
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to complete an
activity within it's crashed time?Correct Answer Crash costYour Answer Crash cost
Multiple Choice Multiple AnswerQuestion Which are the first three steps of Critical Path Analysis technique?Correct Answer Activity relationships , Activity identification , Network constructionYour Answer Activity relationships , Activity identification , Network construction
True/FalseQuestion Dust gets mixed with lubricants, forms an abrasive substance and causes pre-
mature failure of machinery.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following can be subtypes of corrective maintenance?Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in
MaintenanceYour Answer Shutdown Maintenance , Design-out Maintenance , Design-in
Maintenance
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of
the condition of an item from routine or continuous checking.Correct Answer Condition monitoringYour Answer Condition monitoring
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to
entity can be defined asCorrect Answer OperationYour Answer Production
Match The FollowingQuestion Correct Answer Your Answer
Toung Sweet Sweet
Eye Crack Crack
Nose Burnout Burnout
Ear Impact Impact
Select The BlankQuestion The ________ is a set of tools and techniques by which products are made to
comply with the specifications at minimum cost to the firm.Correct Answer Quality control systemYour Answer Quality control system
Multiple Choice Single AnswerQuestion What is the meaning of " Product features" according to J.M.Juran?Correct Answer Quality of designYour Answer Quality of design
Multiple Choice Multiple AnswerQuestion Which of the following method can be used to record the facts during the
method study?Correct Answer Micromotion study , Cyclegraph , Chronocyclegraph
Your Answer Micromotion study , Photograph , Cyclegraph , Chronocyclegraph
True/FalseQuestion All activities must not be tied up into the networkCorrect Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Which of the following are types of sampling plan?Correct Answer Single sampling plan , Double sampling plan , Multiple sampling planYour Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Multiple Choice Multiple AnswerQuestion How many of the following are types of specification?Correct Answer Material specifications , Dimensional specifications , Performance
specificationsYour Answer Material specifications , Dimensional specifications , Performance
specifications
Multiple Choice Multiple AnswerQuestion Plant layout facilitates processing of products in most effective manner
through the followingCorrect Answer Shortest possible distance , Shortest processing time , Minimum
movementYour Answer Shortest possible distance , Minimum movement
Select The BlankQuestion Work study is also called ________ studyCorrect Answer Time and MotionYour Answer Time and Motion
True/FalseQuestion Operation Process Chart provides information on time and distancesCorrect Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Plant Layout is concerned with optimum arrangement of the followingCorrect Answer Storage space , Machines , Material Handling EquipmentYour Answer Storage space , Machines , Sequence of operation
Multiple Choice Single AnswerQuestion Management often fails to realize the importance of efficient layout due to
following reasonCorrect Answer losses resulting from poor layout are not directly shown in the
financial statements
Your Answer losses resulting from poor layout are not directly shown in the financialstatements
True/FalseQuestion Inspection order is must even for simple jobs which can be inspected by shop
inspector with the tooling available on shop.Correct Answer FalseYour Answer True
True/FalseQuestion Feasibility of time schedule requires that an activity be scheduled before any
of it's predecessors are scheduled.Correct Answer FalseYour Answer True
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any
product/s is calledCorrect Answer FactoryYour Answer Factory
True/FalseQuestion Planned lubrication is said to be the nervous system of the equipment.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion What is the basic philosophy of statistical process control?Correct Answer Prevention is better than cureYour Answer Prevention is better than cure
Multiple Choice Single AnswerQuestion How does the control chart of statistical quality control helps the operating
personnel?Correct Answer Identify the presence of an assignable cause before it developsYour Answer Identify the presence of an assignable cause before it develops
Multiple Choice Single AnswerQuestion Where does the central line is located in case of p-chart?Correct Answer at p barYour Answer at p bar
Multiple Choice Multiple AnswerQuestion Which of the following may be the objectives of project crashing?Correct Answer To complete the project in the least possible time , To reduce project
cost below it's normal cost , To achieve uniformity in requirement of resources
Your Answer To complete the project in the least possible time , To reduce project costbelow it's normal cost , To achieve uniformity in requirement of resources
Select The BlankQuestion The ________ advocates maintenance procedures whereby the condition of
the plant is constantly watched through systematic inspection to unearth unhealthyconditions and preventive
Correct Answer Preventive MaintenanceYour Answer Preventive Maintenance
True/FalseQuestion A network should be progression of activities always moving forward.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Which is the ideal place to write a description of an activity in a network?Correct Answer Above the arrowYour Answer Above the arrow
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot may vary
between ________.Correct Answer 0.01 to 10%Your Answer 0.01 to 10%
True/FalseQuestion For p-chart, the central line of fraction defectives is determined by average
percentage defectives.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Which phase of method study is concerned with analyzing the facts critically,
generating alternatives which form the basis for selection and development of improvedmethods?
Correct Answer Critical examinationYour Answer Critical examination
Multiple Choice Single AnswerQuestion Which of the following policies is advisable in case of low product variety
and large volumes?Correct Answer Low Skilled Labour & Special Purpose MachinesYour Answer Low Skilled Labour & Special Purpose Machines
Multiple Choice Single Answer
Question Which kind of inspection is followed in case of product layout?Correct Answer Pilot inspectionYour Answer Pilot inspection
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Sampling Inspection
Gantt Chart Production Scheduling Production Scheduling
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple AnswerQuestion Why graphical method of recording is preferred over the descriptive method
during method study?Correct Answer It segregates effective part form ineffective parts , It reduces effort
involved in writing , Critical examinations easier and more effectiveYour Answer Critical examinations easier and more effective , It segregates effective
part form ineffective parts , It reduces effort involved in writing
Multiple Choice Multiple AnswerQuestion Which are the subfactors of community facilities or social infrastructure?Correct Answer Accomodation , Educational , EntertainmentYour Answer Accomodation , Educational , Entertainment
Select The BlankQuestion The ________ is the probability that a bad lot will be accepted by the
sampling plan.Correct Answer Consumer's riskYour Answer Consumer's risk
Multiple Choice Multiple AnswerQuestion Which of the following are examples of consumption of physical effort
during recording for method study?Correct Answer Bending , Positioning , UnloadingYour Answer Bending , Positioning , Unloading
Multiple Choice Single AnswerQuestion How to claculate the producer risk in the OC Curve?Correct Answer Probability that a good lot will be rejected by the samplingYour Answer Probability that a good lot will be rejected by the sampling
Select The BlankQuestion The ________ are the definitions of the measurable as well as nonmeasurable
characteristics of the product.Correct Answer SpecificationsYour Answer Specifications
Select The BlankQuestion The ________ is the watch dog which ensures that every element of
production and activities which could affect the quality of end product are regulated tothe extent desirable.
Correct Answer Quality controlYour Answer Quality control
True/False
Question Expediting action is necessary if the delays and interruptions are abnormaland hence any subsequent delay is bound to extend the promised delivery date.
Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Process Engineer does not get sufficient time for designing tooling for most
economic production run whenCorrect Answer Delivery time is lessYour Answer Delivery time is less
Select The BlankQuestion The ________ includes preventive maintenance activities whose needs are
identified through inspection which requires stoppage of machines.Correct Answer Shutdown MaintenanceYour Answer Shutdown Maintenance
True/FalseQuestion Breakdown of machines, absenteeism of worker does not dislocate the
manufacturing activity in process layoutCorrect Answer TrueYour Answer True
Select The BlankQuestion The ________ is the maximum percentage defective that for the purpose of
sampling inspection can be considered satisfactory as a process average.Correct Answer Acceptable quality levelYour Answer Acceptable quality level
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to complete an
activity within it's crashed time?Correct Answer Crash costYour Answer Crash cost
Multiple Choice Multiple AnswerQuestion Which are the first three steps of Critical Path Analysis technique?Correct Answer Activity relationships , Activity identification , Network constructionYour Answer Activity relationships , Activity identification , Network construction
True/FalseQuestion Dust gets mixed with lubricants, forms an abrasive substance and causes pre-
mature failure of machinery.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following can be subtypes of corrective maintenance?Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in
MaintenanceYour Answer Shutdown Maintenance , Design-out Maintenance , Design-in
Maintenance
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of
the condition of an item from routine or continuous checking.Correct Answer Condition monitoringYour Answer Condition monitoring
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to
entity can be defined asCorrect Answer OperationYour Answer Production
Match The FollowingQuestion Correct Answer Your Answer
Toung Sweet Sweet
Eye Crack Crack
Nose Burnout Burnout
Ear Impact Impact
Select The BlankQuestion The ________ is a set of tools and techniques by which products are made to
comply with the specifications at minimum cost to the firm.Correct Answer Quality control systemYour Answer Quality control system
Multiple Choice Single AnswerQuestion What is the meaning of " Product features" according to J.M.Juran?Correct Answer Quality of designYour Answer Quality of design
Multiple Choice Multiple AnswerQuestion Which of the following method can be used to record the facts during the
method study?Correct Answer Micromotion study , Cyclegraph , Chronocyclegraph
Your Answer Micromotion study , Photograph , Cyclegraph , Chronocyclegraph
True/FalseQuestion All activities must not be tied up into the networkCorrect Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Which of the following are types of sampling plan?Correct Answer Single sampling plan , Double sampling plan , Multiple sampling planYour Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Multiple Choice Multiple AnswerQuestion How many of the following are types of specification?Correct Answer Material specifications , Dimensional specifications , Performance
specificationsYour Answer Material specifications , Dimensional specifications , Performance
specifications
Multiple Choice Multiple AnswerQuestion Plant layout facilitates processing of products in most effective manner
through the followingCorrect Answer Shortest possible distance , Shortest processing time , Minimum
movementYour Answer Shortest possible distance , Minimum movement
Select The BlankQuestion Work study is also called ________ studyCorrect Answer Time and MotionYour Answer Time and Motion
True/FalseQuestion Operation Process Chart provides information on time and distancesCorrect Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Plant Layout is concerned with optimum arrangement of the followingCorrect Answer Storage space , Machines , Material Handling EquipmentYour Answer Storage space , Machines , Sequence of operation
Multiple Choice Single AnswerQuestion Management often fails to realize the importance of efficient layout due to
following reasonCorrect Answer losses resulting from poor layout are not directly shown in the
financial statements
Your Answer losses resulting from poor layout are not directly shown in the financialstatements
True/FalseQuestion Inspection order is must even for simple jobs which can be inspected by shop
inspector with the tooling available on shop.Correct Answer FalseYour Answer True
True/FalseQuestion Feasibility of time schedule requires that an activity be scheduled before any
of it's predecessors are scheduled.Correct Answer FalseYour Answer True
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any
product/s is calledCorrect Answer FactoryYour Answer Factory
True/FalseQuestion Planned lubrication is said to be the nervous system of the equipment.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion What is the basic philosophy of statistical process control?Correct Answer Prevention is better than cureYour Answer Prevention is better than cure
Multiple Choice Single AnswerQuestion How does the control chart of statistical quality control helps the operating
personnel?Correct Answer Identify the presence of an assignable cause before it developsYour Answer Identify the presence of an assignable cause before it develops
Multiple Choice Single AnswerQuestion Where does the central line is located in case of p-chart?Correct Answer at p barYour Answer at p bar
Multiple Choice Multiple AnswerQuestion Which of the following may be the objectives of project crashing?Correct Answer To complete the project in the least possible time , To reduce project
cost below it's normal cost , To achieve uniformity in requirement of resources
Your Answer To complete the project in the least possible time , To reduce project costbelow it's normal cost , To achieve uniformity in requirement of resources
Select The BlankQuestion The ________ advocates maintenance procedures whereby the condition of
the plant is constantly watched through systematic inspection to unearth unhealthyconditions and preventive
Correct Answer Preventive MaintenanceYour Answer Preventive Maintenance
True/FalseQuestion A network should be progression of activities always moving forward.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Which is the ideal place to write a description of an activity in a network?Correct Answer Above the arrowYour Answer Above the arrow
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot may vary
between ________.Correct Answer 0.01 to 10%Your Answer 0.01 to 10%
True/FalseQuestion For p-chart, the central line of fraction defectives is determined by average
percentage defectives.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Which phase of method study is concerned with analyzing the facts critically,
generating alternatives which form the basis for selection and development of improvedmethods?
Correct Answer Critical examinationYour Answer Critical examination
Multiple Choice Single AnswerQuestion Which of the following policies is advisable in case of low product variety
and large volumes?Correct Answer Low Skilled Labour & Special Purpose MachinesYour Answer Low Skilled Labour & Special Purpose Machines
Multiple Choice Single Answer
Question Which kind of inspection is followed in case of product layout?Correct Answer Pilot inspectionYour Answer Pilot inspection
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Sampling Inspection
Gantt Chart Production Scheduling Production Scheduling
POM assgn
Multiple Choice Single AnswerQuestion Which phase of method study is concerned with analyzing the facts critically,
generating alternatives which form the basis for selection and development ofimproved methods?
Correct Answer Critical examination
Your Answer Development and selection
Select The BlankQuestion The ________ advocates maintenance procedures whereby the condition of the plant
is constantly watched through systematic inspection to unearth unhealthy conditionsand preventive
Correct Answer Preventive Maintenance
Your Answer Design-in Maintenance
Select The BlankQuestion The term ________ emplies the foregone profit due to inability of company to
produce.Correct Answer Opportunity cost
Your Answer Down time cost
True/FalseQuestion A network should employ only those dummy activities which are absolutely necessary.
Correct Answer True
Your Answer True
Select The BlankQuestion A set of activities to keep an equipment in the specified condition is called as
________.Correct Answer Maintenance
Your Answer Maintenance
True/FalseQuestion While making X bar-R-chart, values of X bar and R are recoded samplewise either on
the extreme right of the individual measurements on the data sheet or in a separatesheet.
Correct Answer True
Your Answer False
Select The BlankQuestion The ________ must ensure that the product satisfy the functional requirements of it's
usage.Correct Answer Quality of design
Your Answer Quality of inspection
True/FalseQuestion Even if any activity on the critical path is delayed, project completes on the scheduled
time.Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion Which is the alternative way of indicating the load other than numerical way, in case of
Gantt chart ?Correct Answer Graphical approach
Your Answer Symbolic pproach
Multiple Choice Multiple AnswerQuestion Which of the following are types of sampling plan?
Correct Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Your Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Multiple Choice Multiple AnswerQuestion Which of the following are major inputs to scheduling?
Correct Answer Overlapping of operations , Effective Capacity per work centre , Performance standards
Your Answer Overlapping of operations , Effective Capacity per work centre , Performance standards
Select The BlankQuestion The ________ is necessary when the job requires detailed of one or more of the job
characteristics with the help of special equipment which is not available at theproducing company.
Correct Answer Inspection order
Your Answer Stores issue order
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of the
condition of an item from routine or continuous checking.Correct Answer Condition monitoring
Your Answer Condition monitoring
True/FalseQuestion Diversified labour is adequately available in rural area as compared to urban area.
Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Which of the following cases indicated that the operation has occurred?
Correct Answer Movement of components to assembly section , Raw material movement , A worker'strip to grinder to sharpen the tools
Your Answer Movement of components to assembly section , A worker's trip to grinder to sharpenthe tools , Tools kept in rack of tool crib
Multiple Choice Single AnswerQuestion What is the reason of fluctuations, if the control chart evaluates that the process is in a
state of statistical control?Correct Answer Random variability
Your Answer Set up variability
Select The BlankQuestion The ________ is the maximum percentage defective that for the purpose of sampling
inspection can be considered satisfactory as a process average.Correct Answer Acceptable quality level
Your Answer Acceptable quality level
Multiple Choice Single AnswerQuestion Product layout is suitable when
Correct Answer Products have reasonable stable demand
Your Answer Products are not required in large quantities
Multiple Choice Multiple AnswerQuestion Which of the following charts are used for the recording of data during the method
study?Correct Answer Operation process chart , Multiple activity chart , Flow process chart
Your Answer Operation process chart , Multiple activity chart , Flow process chart
True/FalseQuestion The operator should not stop production if first piece is not approved by the inspector.
Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion Need for change in layout can occur due to following reason
Correct Answer introduction of new product
Your Answer introduction of new product
Multiple Choice Single AnswerQuestion What do you mean by a single event which represents the joint completion of more
than one activities?Correct Answer Merge event
Your Answer Merge event
True/FalseQuestion The control chart for number of defectives is more convenient to make than control
chart for fraction defectives sincethe fugure of number of defectives units can bedirectly taken from the inspection report.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion Which rule is used for numbering of events?
Correct Answer Fulkerson's Rule
Your Answer Juran's Rule
True/FalseQuestion In case of two handed process chart, the simultaneous activities of both hands are
recorded opposite to each other on the chart.Correct Answer True
Your Answer True
True/FalseQuestion All activities lying on the non-critical paths must have total float and free float.
Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Which of the following is not the characteristic of Project Production?
Correct Answer Continuous flow of material , Highly mechanised material handling , Virtually zeromanufacturing cycle time
Your Answer Continuous flow of material , Highly mechanised material handling , Virtually zeromanufacturing cycle time
Multiple Choice Multiple AnswerQuestion Which of the following is not the characteristic of Project Production?
Correct Answer Continuous flow of material , Highly mechanised material handling , Virtually zeromanufacturing cycle time
Your Answer Fixed position layout
Select The BlankQuestion The ________ are the definitions of the measurable as well as nonmeasurable
characteristics of the product.Correct Answer Specifications
Your Answer Specifications
Multiple Choice Single AnswerQuestion How industry has responded to the fact of existence of inherant variability of the
manufacturing process?
Correct Answer Inclusion of certain tolerance on the basic dimensions in the drawing
Your Answer Inclusion of certain tolerance on the basic dimensions in the drawing
Select The BlankQuestion Work study is also called ________ study
Correct Answer Time and Motion
Your Answer Time and Motion
Multiple Choice Multiple AnswerQuestion Which are the different methods of recording actual progress of work?
Correct Answer Display boards , Progress cards , Network updating
Your Answer Job cards , Progress cards , Network updating
True/FalseQuestion In case of backward pass computation, the latest event time of the end event equals to
the earliest event time minus duration of that activity.Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Which of the following products should be produced by using mass production?
Correct Answer Refrigerator , Tyre for automobile , Television Set
Your Answer Refrigerator , Tyre for automobile , Television Set
Multiple Choice Multiple AnswerQuestion Which of the following are examples of attributes?
Correct Answer Cracks , Burrs , Texture
Your Answer Cracks , Burrs , Texture
Match The FollowingQuestion Correct Answer Your Answer
Scheduling Device Strings Strings
Interruption for machineutilisation
Preventive maintenance Preventive maintenance
Input for scheduling Overlapping of operations Critical Path Analysis
Technique of scheduling Critical Path Analysis JIT
Multiple Choice Multiple AnswerQuestion Which are the three distinct parts of the chart?
Correct Answer Summary , Introduction , Body
Your Answer Summary , Introduction , Analysis
Match The FollowingQuestion Correct Answer Your Answer
Combined Layout Mixed Layout Mixed Layout
Fixed Position Layout Project Layout Project Layout
Product Layout Line Layout Line Layout
Process Layout Functional Layout Functional Layout
Multiple Choice Multiple AnswerQuestion Following are the commonly used factors considered for evaluation of layout in factor
analysis methodCorrect Answer Flow of material , Equipment utilization , Working condition
Your Answer Flow of material , Equipment utilization , Working condition
Multiple Choice Single AnswerQuestion Fixed position layout is adopted when
Correct Answer product is very heavy involving assembly of large number of parts
Your Answer product is very heavy involving assembly of large number of parts
Select The BlankQuestion The ________ is the defect level for which lots are regarded as bad lots.
Correct Answer Lot Tolerance Percentage Defective
Your Answer Acceptable quality level
Multiple Choice Multiple AnswerQuestion Which of the following are examples of specifications?
Correct Answer Commercial standards , Assembly and testing instructions , Bill of material
Your Answer Commercial standards , Assembly and testing instructions , Bill of material
Multiple Choice Single AnswerQuestion Process Engineer does not get sufficient time for designing tooling for most economic
production run whenCorrect Answer Delivery time is less
Your Answer Delivery time is less
Multiple Choice Single AnswerQuestion What do you mean by the graphical representation of the project which is composed as
series of connected arrows and circles to describe the interrelationship of the activities
involved?
Correct Answer Network
Your Answer Flow chart
True/FalseQuestion Latest finishing date is the latest event time of the tail event.
Correct Answer False
Your Answer True
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any product/s is
calledCorrect Answer Factory
Your Answer Factory
Select The BlankQuestion The ________ is the probability that a bad lot will be accepted by the sampling plan.
Correct Answer Consumer's risk
Your Answer Consumer's risk
POM assgn
True/FalseQuestion Flow process charts do record movements as well as visual pictures.
Correct Answer False
Your Answer False
True/FalseQuestion The OC curve is based on the assumption that if the lot is large in comparison to
the sample, the probabilities of the OC curve will follow a poisson distribution.Correct Answer False
Your Answer True
Multiple Choice Single AnswerQuestion The ratio of output to input of a production system is commonly known as
Correct Answer Productivity
Your Answer Productivity
Multiple Choice Multiple AnswerQuestion Order preparation process for products manufatured to order requires following
documentsCorrect Answer Sales Order , Work order , Shop order
Your Answer Work order , Purchase order
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of the
condition of an item from routine or continuous checking.Correct Answer Condition monitoring
Your Answer Preventive maintenance
Match The FollowingQuestion Correct Answer Your Answer
Scheduling of interrelatedactivities of small projects withconsideration of uncertainty ofduration of activities.
Critical Path Analysis Critical Path Analysis
Two machines & processing timedepends on sequence of jobloading
Johnson's Two Machine Algorithm Johnson's Two Machine Algorithm
Sufficient orders and resonablechoice of machines
Index Method Index Method
Time relationship between when aproduct is required and when itcan be made available
Critical Ratio Scheduling Time series
Select The BlankQuestion Production control work is ________ in case of floor inspection as compared with
the centralised inspection.Correct Answer easier
Your Answer easier
Match The FollowingQuestion Correct Answer Your Answer
When to inspect Stages of inspection Specification
What to inspect Specification Standard
How to inspect Inspection devices Tools & Jigs
How much to inspect Sampling or cent percentinspection
Stages of inspection
Multiple Choice Single AnswerQuestion Material Planning is an integral part of
Correct Answer Production Planning
Your Answer Process Planning
Select The BlankQuestion An Ideal OC curve is ________ shaped curve that accpets all the lots with quality
equal to or better than AQL .Correct Answer Rectangular
Your Answer Rectangular
Multiple Choice Single AnswerQuestion Technique of Value Engineering can be effectively employed in design of a product
toCorrect Answer To meet the intended function at lowest cost
Your Answer Reduce lead time
Multiple Choice Single AnswerQuestion Material control function of PPC is concerned with
Correct Answer Preparation of material estimates
Your Answer Preparation of material estimates
Multiple Choice Single AnswerQuestion Main objective of a good plant layout is
Correct Answer Reduce material handling cost
Your Answer Reduce material handling cost
True/FalseQuestion In case of X bar-R charts, statistical limits are calculated from averages of
samples of n (4,5,…) instead of single sample of large size to reduce the spread ofnatural variability.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Which of the following is not the characteristic of Project Production?
Correct Answer Continuous flow of material , Highly mechanised material handling , Virtually zeromanufacturing cycle time
Your Answer Fixed position layout , Virtually zero manufacturing cycle time
Multiple Choice Single AnswerQuestion A good plant layout helps in
Correct Answer Reducing handling costs
Your Answer Reducing handling costs
Multiple Choice Single AnswerQuestion Inadequate production capacity ultimately leads to
Correct Answer Poor Customer Service
Your Answer Low Productivity
Select The BlankQuestion Production Planning is a centralised activity which includes functions such as
________Correct Answer Scheduling
Your Answer Scheduling
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any product/s
is calledCorrect Answer Factory
Your Answer Factory
Multiple Choice Multiple AnswerQuestion What are the uses of the instruction manual provided by the manufacturer of a
machine?Correct Answer It gives instructions regarding installation and operation of the equipment , It
contains note on common troubles with causes and remedies for troubleshooting ,It enlists points, frequency and type of lubrication
Your Answer It gives instructions regarding installation and operation of the equipment , Itcontains note on common troubles with causes and remedies for troubleshooting
Multiple Choice Multiple AnswerQuestion MRP utilises the following information
Correct Answer Master production schedule , Product structure , Lead time forprocurement/manufacturing
Your Answer Master production schedule , Product structure , Lead time forprocurement/manufacturing
Select The BlankQuestion A good maintenance system is not a luxary but a ________.
Correct Answer Necessity
Your Answer Necessity
True/FalseQuestion Shape od an OC curve is a function of sample size and the acceptance number.
Correct Answer True
Your Answer False
Multiple Choice Multiple AnswerQuestion Which of the following can be subtypes of corrective maintenance?
Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Your Answer Predictive Maintenance , Shutdown Maintenance
True/FalseQuestion For p-chart, "Inspection by variables" is much faster than "Inspection by
attributes"Correct Answer False
Your Answer True
Multiple Choice Single AnswerQuestion Site factors for plant location include
Correct Answer Suitability of land
Your Answer Suitability of land
Select The BlankQuestion The ________ breakdowns usually cost more, partly due to damage done to the
adjustment components and partly due to emergency actions.Correct Answer Unexpected
Your Answer Partial
True/FalseQuestion Cent percent inspection is a must if the inspection is of destructive nature.
Correct Answer False
Your Answer False
True/FalseQuestion Since value of p can never be positive, hence" if LCLp works out to be positive, it
is taken as zero."Correct Answer False
Your Answer True
Multiple Choice Single AnswerQuestion Which varaible is taken along the abscissa or X axis?
Correct Answer Time
Your Answer Standard deviation
Multiple Choice Multiple AnswerQuestion Which of the following are examples of specifications?
Correct Answer Commercial standards , Assembly and testing instructions , Bill of material
Your Answer Production schedule , Commercial standards , Assembly and testing instructions
Multiple Choice Multiple AnswerQuestion Which of the following products should be produced by using mass production?
Correct Answer Refrigerator , Tyre for automobile , Television Set
Your Answer Refrigerator , Tyre for automobile , Television Set
Multiple Choice Single AnswerQuestion Which of the following techniques is used by industrial engineering department to
obtain the utilisation index?Correct Answer Work Sampling Studies
Your Answer Method Study
True/FalseQuestion An ideal OC curve is never possible only with cent percent inspection.
Correct Answer False
Your Answer False
Select The BlankQuestion The ________ is the probability that a bad lot will be accepted by the sampling
plan.
Correct Answer Consumer's risk
Your Answer Producer's risk
Select The BlankQuestion The easiest way to bring the delayed job within the promised delivery time by
using extra shift or weekly holiday is ________.Correct Answer Overtime working
Your Answer Overtime working
True/FalseQuestion The operator should not stop production if first piece is not approved by the
inspector.Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to entity
can be defined asCorrect Answer Operation
Your Answer Conversion
Multiple Choice Single AnswerQuestion Which kind of relationship exists between those activities which can be carried out
simultaneously and both activities require definite time to finish?Correct Answer Concurrent activities
Your Answer Concurrent activities
Multiple Choice Multiple AnswerQuestion Which are different ways to show critical path in a network?
Correct Answer Thick Line , Red Line , Double Line
Your Answer Dotted line
Select The BlankQuestion A ________helps to avoid crowding of jobs at a particular machine by change of
route of some of the jobs or by diverting work to other machine.Correct Answer Control board
Your Answer Control board
Multiple Choice Single AnswerQuestion What do you understand by PERT ?
Correct Answer Project Evaluation & Review Technique
Your Answer Project Evaluation & Review Technique
Multiple Choice Multiple AnswerQuestion Which of the following factors play important role while selecting or rejecting a
particular site from legislation and taxation point of view?Correct Answer Labour laws , Building codes , Policies regarding issue of licences
Your Answer Labour laws , Policies regarding issue of licences
Multiple Choice Multiple AnswerQuestion Which of the following concepts must be understood for the achievement of
quality?Correct Answer Quality of conformance , Purpose of product , Quality of design
Your Answer Purpose of product , Process specifications , Quality of design
Select The BlankQuestion The ________ is the probability that a good lot will be rejected by the sampling
plan.Correct Answer Producer's risk
Your Answer Producer's risk
Multiple Choice Single AnswerQuestion What do you mean by the project duration for which the total cost is minimum?
Correct Answer Optimum duration
Your Answer Optimum duration
True/FalseQuestion Originating process of raw material influence Process Planning
Correct Answer True
Your Answer True
POM assgnMultiple Choice Multiple AnswerQuestion Why graphical method of recording is preferred over the descriptive method during method
study?Correct Answer It segregates effective part form ineffective parts , It reduces effort involved in writing ,
Critical examinations easier and more effectiveYour Answer Critical examinations easier and more effective , It segregates effective part form
ineffective parts , It reduces effort involved in writing
Multiple Choice Multiple AnswerQuestion Which are the subfactors of community facilities or social infrastructure?Correct Answer Accomodation , Educational , EntertainmentYour Answer Accomodation , Educational , Entertainment
Select The BlankQuestion The ________ is the probability that a bad lot will be accepted by the sampling plan.Correct Answer Consumer's riskYour Answer Consumer's risk
Multiple Choice Multiple AnswerQuestion Which of the following are examples of consumption of physical effort during recording for
method study?Correct Answer Bending , Positioning , UnloadingYour Answer Bending , Positioning , Unloading
Multiple Choice Single AnswerQuestion How to claculate the producer risk in the OC Curve?Correct Answer Probability that a good lot will be rejected by the samplingYour Answer Probability that a good lot will be rejected by the sampling
Select The BlankQuestion The ________ are the definitions of the measurable as well as nonmeasurable characteristics
of the product.Correct Answer SpecificationsYour Answer Specifications
Select The BlankQuestion The ________ is the watch dog which ensures that every element of production and activities
which could affect the quality of end product are regulated to the extent desirable.Correct Answer Quality controlYour Answer Quality control
True/FalseQuestion Expediting action is necessary if the delays and interruptions are abnormal and hence any
subsequent delay is bound to extend the promised delivery date.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Process Engineer does not get sufficient time for designing tooling for most economic
production run whenCorrect Answer Delivery time is lessYour Answer Delivery time is less
Select The BlankQuestion The ________ includes preventive maintenance activities whose needs are identified through
inspection which requires stoppage of machines.Correct Answer Shutdown MaintenanceYour Answer Shutdown Maintenance
True/FalseQuestion Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity
in process layoutCorrect Answer TrueYour Answer True
Select The BlankQuestion The ________ is the maximum percentage defective that for the purpose of sampling
inspection can be considered satisfactory as a process average.Correct Answer Acceptable quality levelYour Answer Acceptable quality level
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to complete an activity within it's
crashed time?Correct Answer Crash costYour Answer Crash cost
Multiple Choice Multiple AnswerQuestion Which are the first three steps of Critical Path Analysis technique?Correct Answer Activity relationships , Activity identification , Network constructionYour Answer Activity relationships , Activity identification , Network construction
True/FalseQuestion Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure
of machinery.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following can be subtypes of corrective maintenance?Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in MaintenanceYour Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of the condition of
an item from routine or continuous checking.Correct Answer Condition monitoringYour Answer Condition monitoring
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to entity can be
defined asCorrect Answer OperationYour Answer Production
Match The FollowingQuestion Correct Answer Your Answer
Toung Sweet Sweet
Eye Crack Crack
Nose Burnout Burnout
Ear Impact Impact
Select The BlankQuestion The ________ is a set of tools and techniques by which products are made to comply with the
specifications at minimum cost to the firm.Correct Answer Quality control systemYour Answer Quality control system
Multiple Choice Single AnswerQuestion What is the meaning of " Product features" according to J.M.Juran?Correct Answer Quality of designYour Answer Quality of design
Multiple Choice Multiple AnswerQuestion Which of the following method can be used to record the facts during the method study?Correct Answer Micromotion study , Cyclegraph , ChronocyclegraphYour Answer Micromotion study , Photograph , Cyclegraph , Chronocyclegraph
True/FalseQuestion All activities must not be tied up into the networkCorrect Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Which of the following are types of sampling plan?Correct Answer Single sampling plan , Double sampling plan , Multiple sampling planYour Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Multiple Choice Multiple AnswerQuestion How many of the following are types of specification?Correct Answer Material specifications , Dimensional specifications , Performance specificationsYour Answer Material specifications , Dimensional specifications , Performance specifications
Multiple Choice Multiple AnswerQuestion Plant layout facilitates processing of products in most effective manner through the followingCorrect Answer Shortest possible distance , Shortest processing time , Minimum movementYour Answer Shortest possible distance , Minimum movement
Select The BlankQuestion Work study is also called ________ studyCorrect Answer Time and MotionYour Answer Time and Motion
True/FalseQuestion Operation Process Chart provides information on time and distancesCorrect Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Plant Layout is concerned with optimum arrangement of the followingCorrect Answer Storage space , Machines , Material Handling EquipmentYour Answer Storage space , Machines , Sequence of operation
Multiple Choice Single AnswerQuestion Management often fails to realize the importance of efficient layout due to following reasonCorrect Answer losses resulting from poor layout are not directly shown in the financial statementsYour Answer losses resulting from poor layout are not directly shown in the financial statements
True/FalseQuestion Inspection order is must even for simple jobs which can be inspected by shop inspector with
the tooling available on shop.
Correct Answer FalseYour Answer True
True/FalseQuestion Feasibility of time schedule requires that an activity be scheduled before any of it's
predecessors are scheduled.Correct Answer FalseYour Answer True
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any product/s is calledCorrect Answer FactoryYour Answer Factory
True/FalseQuestion Planned lubrication is said to be the nervous system of the equipment.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion What is the basic philosophy of statistical process control?Correct Answer Prevention is better than cureYour Answer Prevention is better than cure
Multiple Choice Single AnswerQuestion How does the control chart of statistical quality control helps the operating personnel?Correct Answer Identify the presence of an assignable cause before it developsYour Answer Identify the presence of an assignable cause before it develops
Multiple Choice Single AnswerQuestion Where does the central line is located in case of p-chart?Correct Answer at p barYour Answer at p bar
Multiple Choice Multiple AnswerQuestion Which of the following may be the objectives of project crashing?Correct Answer To complete the project in the least possible time , To reduce project cost below it's
normal cost , To achieve uniformity in requirement of resourcesYour Answer To complete the project in the least possible time , To reduce project cost below it's
normal cost , To achieve uniformity in requirement of resources
Select The BlankQuestion The ________ advocates maintenance procedures whereby the condition of the plant is
constantly watched through systematic inspection to unearth unhealthy conditions and preventiveCorrect Answer Preventive MaintenanceYour Answer Preventive Maintenance
True/FalseQuestion A network should be progression of activities always moving forward.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Which is the ideal place to write a description of an activity in a network?Correct Answer Above the arrowYour Answer Above the arrow
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.
Correct Answer 0.01 to 10%Your Answer 0.01 to 10%
True/FalseQuestion For p-chart, the central line of fraction defectives is determined by average percentage
defectives.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Which phase of method study is concerned with analyzing the facts critically, generating
alternatives which form the basis for selection and development of improved methods?Correct Answer Critical examinationYour Answer Critical examination
Multiple Choice Single AnswerQuestion Which of the following policies is advisable in case of low product variety and large volumes?Correct Answer Low Skilled Labour & Special Purpose MachinesYour Answer Low Skilled Labour & Special Purpose Machines
Multiple Choice Single AnswerQuestion Which kind of inspection is followed in case of product layout?Correct Answer Pilot inspectionYour Answer Pilot inspection
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Sampling Inspection
Gantt Chart Production Scheduling Production Scheduling
POM assgn
Multiple Choice Single AnswerQuestion MRP is based on the concept of inventory demand which is of following type
CorrectAnswer
Dependent and independent
Your Answer Dependent and independent
Multiple Choice Single AnswerQuestion Main objective of a good plant layout is
CorrectAnswer
Reduce material handling cost
Your Answer Reduce material handling cost
True/FalseQuestion As a general rule, the number of tail event of an activity is more than that of it's head
event.Correct
AnswerFalse
Your Answer False
Select The BlankQuestion The ________ is the probability that a good lot will be rejected by the sampling plan.
CorrectAnswer
Producer's risk
Your Answer Producer's risk
Multiple Choice Multiple AnswerQuestion Which of the following are important considerations concerning activity times?
CorrectAnswer
Activity time should be obtained from the person responsible for the completion of anactivity , Activity time must be independent of any influence which the preceding orsucceeding activity may have on it. , Activity time may assume that just the normalquantity of resources required to carry out the activity are available.
Your Answer Activity time should be obtained from the person responsible for the completion of anactivity , Activity time must be independent of any influence which the preceding orsucceeding activity may have on it. , Activity time may assume that just the normalquantity of resources required to carry out the activity are available.
Select The BlankQuestion The ________ pertain to the climatic conditions which the component , product or
material should withstand.Correct
AnswerEnvironmental specifications
Your Answer Environmental specifications
Multiple Choice Multiple AnswerQuestion Following are some of the factors considered for evaluation of alternative layouts
CorrectAnswer
Flow of Material , Equipment utilization , Ease of supervision
Your Answer Flow of Material , Ease of supervision , Delivery performance
Multiple Choice Multiple AnswerQuestion Which of the following are assignable cause?
CorrectAnswer
Large varaitions in hardness of material , Tool wear , Errors in setting
Your Answer Large varaitions in hardness of material , Tool wear , Errors in setting
True/FalseQuestion All activities must not be tied up into the network
CorrectAnswer
False
Your Answer False
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot may vary between
________.Correct
Answer0.01 to 10%
Your Answer 0.01 to 10%
True/FalseQuestion In case of X bar, if the process is not under control indicated by some points falling
outside the control limits, such points outside the control limits are eliminated and newtrial control limits for the remaining points are computed.
CorrectAnswer
True
Your Answer True
Multiple Choice Single AnswerQuestion What is the base for considering activity time as single time estimate or three time
estimate?Correct
AnswerLevel of uncertainty
Your Answer Availability of labour
Select The BlankQuestion The ________ is the maximum percentage defective that for the purpose of sampling
inspection can be considered satisfactory as a process average.Correct
AnswerAcceptable quality level
Your Answer Acceptable quality level
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to complete an activity within
it's normal time?Correct
AnswerNormal cost
Your Answer Normal cost
Select The BlankQuestion A good maintenance system is not a luxary but a ________.
CorrectAnswer
Necessity
Your Answer Necessity
Select The BlankQuestion A ________helps to avoid crowding of jobs at a particular machine by change of route of
some of the jobs or by diverting work to other machine.Correct
AnswerControl board
Your Answer Move order
Select The BlankQuestion The ________ is the watch dog which ensures that every element of production and
activities which could affect the quality of end product are regulated to the extentdesirable.
CorrectAnswer
Quality control
Your Answer Quality control
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any product/s is
calledCorrect
AnswerFactory
Your Answer Factory
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Machine utilization
Gantt Chart Production Scheduling Production Scheduling
Select The BlankQuestion A ________ is another form of subcontracting.
CorrectAnswer
Hiring capacity
Your Answer Hiring capacity
Multiple Choice Multiple Answer
Question In an organization there may not be a formal PPC department if
CorrectAnswer
Work is highly repetitive in nature , Planning activities are performed by the line staff ,Number of workmen is not very large
Your Answer Work is highly repetitive in nature , Planning activities are performed by the line staff ,Number of workmen is not very large
Multiple Choice Multiple AnswerQuestion Which of the following cases can be treated as delay during recording of method study?
CorrectAnswer
Operators awaiting instructions from supervisor , Worker waiting for his turn at toolsstores , Jobs awaiting at the machines for their turn
Your Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at toolsstores , Jobs awaiting at the machines for their turn
True/FalseQuestion Inspection order is must even for simple jobs which can be inspected by shop inspector
with the tooling available on shop.Correct
AnswerFalse
Your Answer False
Multiple Choice Multiple AnswerQuestion Order preparation process for products manufatured to order requires following
documentsCorrect
AnswerSales Order , Work order , Shop order
Your Answer Sales Order , Work order , Purchase order
Multiple Choice Single AnswerQuestion Technique of Value Engineering can be effectively employed in design of a product to
CorrectAnswer
To meet the intended function at lowest cost
Your Answer Reduce lead time
True/FalseQuestion Cent percent inspection is often more practical and economical than sampling inspection.
CorrectAnswer
False
Your Answer False
Multiple Choice Multiple AnswerQuestion Scale model used for layout analysis have following advantages
CorrectAnswer
Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown ,Models can be shifted easily
Your Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown ,Models can be shifted easily
Multiple Choice Single AnswerQuestion Which of the following technique is event oriented ?
CorrectAnswer
Project Evaluation & Review Technique
Your Answer Project Evaluation & Review Technique
Multiple Choice Single AnswerQuestion What is the meaning of " Product features" according to J.M.Juran?
CorrectAnswer
Quality of design
Your Answer Quality of design
Match The FollowingQuestion Correct Answer Your Answer
Crash cost of an activity Cc Cc
Normal time of an activity Tn Tn
Crash time of activity Tc Tc
Normal cost of an activity Cn Cn
Multiple Choice Multiple AnswerQuestion What are uses of diagrams in method study?
CorrectAnswer
Study different plant layouts and select the most optimum one , Study the extent oftraffic over the different routes of the plant , Identify the extent of backtracking, crosstraffic and obstacles encountered during the movement of material.
Your Answer Study different plant layouts and select the most optimum one , Study the extent oftraffic over the different routes of the plant , Identify the extent of backtracking, crosstraffic and obstacles encountered during the movement of material.
True/FalseQuestion A load chart specifies the work to be carried out by each person of company during shift
hours.Correct
AnswerFalse
Your Answer True
Multiple Choice Multiple AnswerQuestion Route Sheet generally contains following information
CorrectAnswer
Material Specification , Sequence of operation , Skill of Labour
Your Answer Material Specification , Sequence of operation , Skill of Labour
True/FalseQuestion Cellular layout is based on the concept of Group Technology
CorrectAnswer
True
Your Answer True
Multiple Choice Single AnswerQuestion Which varaible is taken along the abscissa or X axis?
CorrectAnswer
Time
Your Answer Standard deviation
Multiple Choice Multiple AnswerQuestion Which are the advantages of suburban location?
CorrectAnswer
Avaialability of adequate land at lower cost , Both skilled and unskilled labour can beavailable , Plant expansion is easier due to less or no restriction for building andconstruction
Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can beavailable , Plant expansion is easier due to less or no restriction for building andconstruction
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of the
condition of an item from routine or continuous checking.Correct
AnswerCondition monitoring
Your Answer Condition monitoring
Multiple Choice Multiple AnswerQuestion Expediting function is concerned with following activities
CorrectAnswer
Progress chasing to identify delays which may hold up production , Communicatingpossible delays in delivery date commitment to sales department , Devising cures tokeep rate of production in line with schedule
Your Answer Recording progress of work , Progress chasing to identify delays which may hold upproduction , Communicating possible delays in delivery date commitment to salesdepartment
Select The BlankQuestion Production control work is ________ in case of floor inspection as compared with the
centralised inspection.Correct
Answereasier
Your Answer time consuming
Select The BlankQuestion The easiest way to bring the delayed job within the promised delivery time by using extra
shift or weekly holiday is ________.Correct
AnswerOvertime working
Your Answer Overtime working
True/FalseQuestion In case of forward pass computation, the earliest event time of the first event is zero.
CorrectAnswer
True
Your Answer True
Multiple Choice Single AnswerQuestion What is represented by an arrow in a network?
CorrectAnswer
Activity
Your Answer Activity
True/FalseQuestion As a general rule, a site five times the actual plant size is considered minimum for
parking, access facilities and future expansion.Correct
AnswerTrue
Your Answer True
True/FalseQuestion Independent float either affects the float of preceding activities or that of succeeding
activities.Correct
AnswerFalse
Your Answer False
Multiple Choice Single AnswerQuestion The document raised by PPC which authorises different functions to take action as per
instruction is calledCorrect
AnswerWork Order
Your Answer Work Order
Multiple Choice Single AnswerQuestion A good layout makes effective use of space. Utilization of space for a department like
Stores can be measured byCorrect
AnswerProportion of Cubic volume space utilized
Your Answer Ratio of area utilised to area available
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to entity can be
defined asCorrect
AnswerOperation
Your Answer Operation
POM assgn
Multiple Choice Single AnswerQuestion MRP is based on the concept of inventory demand which is of following type
Correct Answer Dependent and independent
Your Answer Dependent and independent
Multiple Choice Single AnswerQuestion Main objective of a good plant layout is
Correct Answer Reduce material handling cost
Your Answer Reduce material handling cost
True/FalseQuestion As a general rule, the number of tail event of an activity is more than that of it's
head event.Correct Answer False
Your Answer False
Select The BlankQuestion The ________ is the probability that a good lot will be rejected by the sampling plan.
Correct Answer Producer's risk
Your Answer Producer's risk
Multiple Choice Multiple AnswerQuestion Which of the following are important considerations concerning activity times?
Correct Answer Activity time should be obtained from the person responsible for the completion of anactivity , Activity time must be independent of any influence which the preceding orsucceeding activity may have on it. , Activity time may assume that just the normalquantity of resources required to carry out the activity are available.
Your Answer Activity time should be obtained from the person responsible for the completion of anactivity , Activity time must be independent of any influence which the preceding orsucceeding activity may have on it. , Activity time may assume that just the normalquantity of resources required to carry out the activity are available.
Select The BlankQuestion The ________ pertain to the climatic conditions which the component , product or
material should withstand.Correct Answer Environmental specifications
Your Answer Environmental specifications
Multiple Choice Multiple AnswerQuestion Following are some of the factors considered for evaluation of alternative layouts
Correct Answer Flow of Material , Equipment utilization , Ease of supervision
Your Answer Flow of Material , Ease of supervision , Delivery performance
Multiple Choice Multiple AnswerQuestion Which of the following are assignable cause?
Correct Answer Large varaitions in hardness of material , Tool wear , Errors in setting
Your Answer Large varaitions in hardness of material , Tool wear , Errors in setting
True/FalseQuestion All activities must not be tied up into the network
Correct Answer False
Your Answer False
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot may vary between
________.Correct Answer 0.01 to 10%
Your Answer 0.01 to 10%
True/FalseQuestion In case of X bar, if the process is not under control indicated by some points falling
outside the control limits, such points outside the control limits are eliminated andnew trial control limits for the remaining points are computed.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion What is the base for considering activity time as single time estimate or three time
estimate?Correct Answer Level of uncertainty
Your Answer Availability of labour
Select The BlankQuestion The ________ is the maximum percentage defective that for the purpose of sampling
inspection can be considered satisfactory as a process average.Correct Answer Acceptable quality level
Your Answer Acceptable quality level
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to complete an activity
within it's normal time?Correct Answer Normal cost
Your Answer Normal cost
Select The BlankQuestion A good maintenance system is not a luxary but a ________.
Correct Answer Necessity
Your Answer Necessity
Select The BlankQuestion A ________helps to avoid crowding of jobs at a particular machine by change of
route of some of the jobs or by diverting work to other machine.Correct Answer Control board
Your Answer Move order
Select The BlankQuestion The ________ is the watch dog which ensures that every element of production and
activities which could affect the quality of end product are regulated to the extentdesirable.
Correct Answer Quality control
Your Answer Quality control
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any product/s is
calledCorrect Answer Factory
Your Answer Factory
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Machine utilization
Gantt Chart Production Scheduling Production Scheduling
Select The BlankQuestion A ________ is another form of subcontracting.
Correct Answer Hiring capacity
Your Answer Hiring capacity
Multiple Choice Multiple AnswerQuestion In an organization there may not be a formal PPC department if
Correct Answer Work is highly repetitive in nature , Planning activities are performed by the line staff, Number of workmen is not very large
Your Answer Work is highly repetitive in nature , Planning activities are performed by the line staff, Number of workmen is not very large
Multiple Choice Multiple AnswerQuestion Which of the following cases can be treated as delay during recording of method
study?Correct Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools
stores , Jobs awaiting at the machines for their turnYour Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools
stores , Jobs awaiting at the machines for their turn
True/FalseQuestion Inspection order is must even for simple jobs which can be inspected by shop
inspector with the tooling available on shop.Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Order preparation process for products manufatured to order requires following
documentsCorrect Answer Sales Order , Work order , Shop order
Your Answer Sales Order , Work order , Purchase order
Multiple Choice Single AnswerQuestion Technique of Value Engineering can be effectively employed in design of a product to
Correct Answer To meet the intended function at lowest cost
Your Answer Reduce lead time
True/FalseQuestion Cent percent inspection is often more practical and economical than sampling
inspection.Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Scale model used for layout analysis have following advantages
Correct Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown ,Models can be shifted easily
Your Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown ,Models can be shifted easily
Multiple Choice Single AnswerQuestion Which of the following technique is event oriented ?
Correct Answer Project Evaluation & Review Technique
Your Answer Project Evaluation & Review Technique
Multiple Choice Single AnswerQuestion What is the meaning of " Product features" according to J.M.Juran?
Correct Answer Quality of design
Your Answer Quality of design
Match The FollowingQuestion Correct Answer Your Answer
Crash cost of an activity Cc Cc
Normal time of an activity Tn Tn
Crash time of activity Tc Tc
Normal cost of an activity Cn Cn
Multiple Choice Multiple AnswerQuestion What are uses of diagrams in method study?
Correct Answer Study different plant layouts and select the most optimum one , Study the extent oftraffic over the different routes of the plant , Identify the extent of backtracking,cross traffic and obstacles encountered during the movement of material.
Your Answer Study different plant layouts and select the most optimum one , Study the extent oftraffic over the different routes of the plant , Identify the extent of backtracking,cross traffic and obstacles encountered during the movement of material.
True/FalseQuestion A load chart specifies the work to be carried out by each person of company during
shift hours.Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Route Sheet generally contains following information
Correct Answer Material Specification , Sequence of operation , Skill of Labour
Your Answer Material Specification , Sequence of operation , Skill of Labour
True/FalseQuestion Cellular layout is based on the concept of Group Technology
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Which varaible is taken along the abscissa or X axis?
Correct Answer Time
Your Answer Standard deviation
Multiple Choice Multiple AnswerQuestion Which are the advantages of suburban location?
Correct Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can beavailable , Plant expansion is easier due to less or no restriction for building andconstruction
Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can beavailable , Plant expansion is easier due to less or no restriction for building andconstruction
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of the
condition of an item from routine or continuous checking.Correct Answer Condition monitoring
Your Answer Condition monitoring
Multiple Choice Multiple AnswerQuestion Expediting function is concerned with following activities
Correct Answer Progress chasing to identify delays which may hold up production , Communicatingpossible delays in delivery date commitment to sales department , Devising cures tokeep rate of production in line with schedule
Your Answer Recording progress of work , Progress chasing to identify delays which may hold upproduction , Communicating possible delays in delivery date commitment to salesdepartment
Select The BlankQuestion Production control work is ________ in case of floor inspection as compared with the
centralised inspection.Correct Answer easier
Your Answer time consuming
Select The BlankQuestion The easiest way to bring the delayed job within the promised delivery time by using
extra shift or weekly holiday is ________.Correct Answer Overtime working
Your Answer Overtime working
True/FalseQuestion In case of forward pass computation, the earliest event time of the first event is zero.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion What is represented by an arrow in a network?
Correct Answer Activity
Your Answer Activity
True/FalseQuestion As a general rule, a site five times the actual plant size is considered minimum for
parking, access facilities and future expansion.Correct Answer True
Your Answer True
True/FalseQuestion Independent float either affects the float of preceding activities or that of succeeding
activities.Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion The document raised by PPC which authorises different functions to take action as
per instruction is calledCorrect Answer Work Order
Your Answer Work Order
Multiple Choice Single AnswerQuestion A good layout makes effective use of space. Utilization of space for a department like
Stores can be measured byCorrect Answer Proportion of Cubic volume space utilized
Your Answer Ratio of area utilised to area available
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to entity can
be defined asCorrect Answer Operation
Your Answer Operation
POM - AishLIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single AnswerQuestion What do you mean by the project duration for which the total
cost is minimum?Correct Answer Optimum durationYour Answer Optimum duration
Multiple Choice Multiple AnswerQuestion Lack of material planning results in the followingCorrect Answer Over ordering , under ordering , stockoutsYour Answer under ordering , stockouts , Over ordering
Multiple Choice Single AnswerQuestion Which kind of defect can be called as minor defect?Correct Answer Which does not reduce the usability of the product
for its intended useYour Answer Which does not reduce the usability of the product for its
intended use
Multiple Choice Single AnswerQuestion What does CPA stand for?Correct Answer Critical Path AnalysisYour Answer Critical Project Analysis
True/FalseQuestion Grouping of machines gives a lot of flexibility in loading and
schedulingCorrect Answer TrueYour Answer True
True/FalseQuestion Fixed cost is lower in case of continuous production than
intermittent production.Correct Answer FalseYour Answer False
Select The BlankQuestion Function concerned with fixation of time allowed to qualified
worker for a job is called ________.Correct Answer Work MeasurementYour Answer Time Measurement
Select The Blank
Page 1
POM - AishQuestion The design of any layout is governed by large number of
factors and the best layout is expected to ________ all these factors.Correct Answer OptimiseYour Answer Consider
Multiple Choice Multiple AnswerQuestion Which of the following is not the characteristic of Project
Production?Correct Answer Continuous flow of material , Highly mechanised
material handling , Virtually zero manufacturing cycle timeYour Answer Continuous flow of material , Highly mechanised material
handling , Virtually zero manufacturing cycle time
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding
some value to entity can be defined asCorrect Answer OperationYour Answer Operation
Multiple Choice Multiple AnswerQuestion Which of the following cases can be treated as delay during
recording of method study?Correct Answer Operators awaiting instructions from supervisor ,
Worker waiting for his turn at tools stores , Jobs awaiting at the machines fortheir turnYour Answer Operators awaiting instructions from supervisor , Worker
waiting for his turn at tools stores , Jobs awaiting at the machines for theirturn
True/FalseQuestion Root cause of most of the breakdowns is failure of the
lubrication system.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following are steps to identify the critical path in
a small network?Correct Answer Compare the durations of all paths to identify the
longest path. , Sum up the durations of activities along each path. , Enumerateall paths in the network and list down activities on each path.Your Answer Compare the durations of all paths to identify the longest
path. , Sum up the durations of activities along each path. , Enumerate allpaths in the network and list down activities on each path.
Match The Following
Page 2
POM - AishQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Machine utilization
Gantt Chart Production Scheduling Production Scheduling
Multiple Choice Multiple AnswerQuestion What are the benefits of overhauling?Correct Answer It increases useful life of an equipment and it's parts
, Advance planning allows to attend equipment without disturbing the productionprogramme , Advance planning allows to prepare and keep ready the list ofreplacement sparesYour Answer It increases useful life of an equipment and it's parts ,
Advance planning allows to attend equipment without disturbing the productionprogramme , Advance planning allows to prepare and keep ready the list ofreplacement spares
True/FalseQuestion The event numbers as far as possible reflect the logical
relationships of the activities.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Technique of Value Engineering can be effectively employed in
design of a product toCorrect Answer To meet the intended function at lowest costYour Answer To meet the intended function at lowest cost
True/FalseQuestion Proper care and storage is not an essential part of a well
planned lubrication system.Correct Answer FalseYour Answer False
Multiple Choice Single AnswerQuestion A good plant layout helps inCorrect Answer Reducing handling costsYour Answer Reducing handling costs
Multiple Choice Multiple Answer
Page 3
POM - AishQuestion Scale model used for layout analysis have following advantagesCorrect Answer Nontechnical person finds it easy to comprehend ,
Ovehead facilities can be shown , Models can be shifted easilyYour Answer Nontechnical person finds it easy to comprehend , Ovehead
facilities can be shown , Models can be shifted easily
Multiple Choice Single AnswerQuestion The ratio of output to input of a production system is
commonly known asCorrect Answer ProductivityYour Answer Productivity
Multiple Choice Multiple AnswerQuestion Which of the following products should be produced by using
mass production?Correct Answer Refrigerator , Tyre for automobile , Television SetYour Answer Refrigerator , Tyre for automobile , Television Set
True/FalseQuestion Theoretical capacity equals number of normal working hours
of that machine.Correct Answer TrueYour Answer True
True/FalseQuestion It is not necessary to know spare time available on the
non-critical path to allow a little delay for noncritical activity.Correct Answer FalseYour Answer False
Select The BlankQuestion Production Planning is a centralised activity which includes
functions such as ________Correct Answer SchedulingYour Answer Scheduling
True/FalseQuestion In case of X bar-R charts,it is ensured that the assignable
causes are detected before the tolerances are violated, upper and lowerstatistical limits are worked out and inserted into a chart.Correct Answer TrueYour Answer True
Select The BlankQuestion The ________ is the process of assigning calender dates to
Page 4
POM - Aishthe various operations of a job.Correct Answer SchedulingYour Answer Scheduling
Select The BlankQuestion An Ideal OC curve is ________ shaped curve that accpets all
the lots with quality equal to or better than AQL .Correct Answer RectangularYour Answer Rectangular
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of
making any product/s is calledCorrect Answer FactoryYour Answer Factory
Multiple Choice Multiple AnswerQuestion Which of the following cases indicates change in physical
characteristic?Correct Answer Turning , Grinding , DrillingYour Answer Turning , Grinding , Drilling
Match The FollowingQuestion Correct Answer Your Answer
Combined Layout Mixed Layout Mixed Layout
Fixed Position Layout Project Layout Project Layout
Product Layout Line Layout Line Layout
Process Layout Functional LayoutFunctional Layout
Select The BlankQuestion Two welknown timing methods are cumulative method and
________.Correct Answer Fly back methodYour Answer Continuous method
Multiple Choice Single AnswerQuestion How many types of charts are used for the purpose of method
study?Correct Answer FourYour Answer Eight
Page 5
POM - Aish
True/FalseQuestion Sampling inspection suffice to check the work of line
inspectors and stage inspectors.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Where the ignorance towards the degradation of machine leads
to?Correct Answer Eventual breakdownYour Answer Eventual breakdown
Multiple Choice Single AnswerQuestion One of the sophisticated operations research techniques used
in material planning isCorrect Answer Dynamic programmingYour Answer Dynamic programming
Multiple Choice Single AnswerQuestion Which of the following policies is advisable in case of low
product variety and large volumes?Correct Answer Low Skilled Labour & Special Purpose MachinesYour Answer Low Skilled Labour & Special Purpose Machines
True/FalseQuestion It pays in the long run to inform the customer regarding
expected delays in the deliveries.Correct Answer TrueYour Answer True
Select The BlankQuestion The ________ is a set of tools and techniques by which
products are made to comply with the specifications at minimum cost to thefirm.Correct Answer Quality control systemYour Answer Quality control system
Select The BlankQuestion A ________ is another typical chart which is used to record
frequency of movements between work centers.Correct Answer Travel chartYour Answer Frequency chart
True/False
Page 6
POM - AishQuestion Cent percent inspection does not mean inspection of
component for 100% quality characteristics.Correct Answer TrueYour Answer False
Multiple Choice Multiple AnswerQuestion Route Sheet generally contains following informationCorrect Answer Material Specification , Sequence of operation , Skill
of LabourYour Answer Material Specification , Sequence of operation , Skill of Labour
Select The BlankQuestion Any incentive scheme must achieve the ________ of the
organisation.Correct Answer ObjectivesYour Answer Tax goals
Multiple Choice Single AnswerQuestion Document raised by Sales department for goods manufactured
to stock is calledCorrect Answer Shipment orderYour Answer Stock order
Multiple Choice Single AnswerQuestion What do you understand by the timeframe for the
maintenance needs of the equipment?Correct Answer Maintenance inspection scheduleYour Answer Maintenance inspection schedule
True/FalseQuestion Three time estimates are transformed into expected time
before using it into a network.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion What do you mean by planned corrective manitenance which
provides an opportunity to undertake design modifications in the equipment toeliminate or reduce frequency of breakdowns.Correct Answer Design-out MaintenanceYour Answer Design-in Maintenance
Page 7
POM assgn : Mayur
True/FalseQuestion For p-chart, fraction defective units in each sample is calculated by dividing
number of defectives by the number of pieces in the sample.Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Which of the following possibilities can be explored by using flow process
chart?Correct Answer Eliminating the operations or combining the operations with another ,
Reducing the distance traveled by the workmen or materials , Avoiding thewaiting time and thereby reduce production losses
Your Answer Reducing the distance traveled by the workmen or materials , Avoiding thewaiting time and thereby reduce production losses , Eliminating theoperations or combining the operations with another
Select The BlankQuestion The ________ is specified to indicate the maximum permissible variability
in the dimensions product or parts.Correct Answer Tolerance
Your Answer Tolerance
Multiple Choice Multiple AnswerQuestion Which of the following can be subtypes of corrective maintenance?
Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Your Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Multiple Choice Single AnswerQuestion Technique of Value Engineering can be effectively employed in design of a
product toCorrect Answer To meet the intended function at lowest cost
Your Answer To meet the intended function at lowest cost
Multiple Choice Single AnswerQuestion A good plant layout helps in
Correct Answer Reducing handling costs
Your Answer Reducing handling costs
Select The BlankQuestion The ________ is the probability that a bad lot will be accepted by the
sampling plan.Correct Answer Consumer's risk
Your Answer Consumer's risk
Multiple Choice Single AnswerQuestion Which element of a network represents a task which has got a definite
beginning and definite end?Correct Answer Activity
Your Answer Activity
Multiple Choice Single AnswerQuestion Inadequate production capacity ultimately leads to
Correct Answer Poor Customer Service
Your Answer Poor Customer Service
Multiple Choice Multiple AnswerQuestion Which are the advantages of suburban location?
Correct Answer Avaialability of adequate land at lower cost , Both skilled and unskilledlabour can be available , Plant expansion is easier due to less or norestriction for building and construction
Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilledlabour can be available , Plant expansion is easier due to less or norestriction for building and construction
Select The BlankQuestion The ________ are the definitions of the measurable as well as
nonmeasurable characteristics of the product.Correct Answer Specifications
Your Answer Specifications
Multiple Choice Multiple AnswerQuestion Which are the first three steps of Critical Path Analysis technique?
Correct Answer Activity relationships , Activity identification , Network construction
Your Answer Activity relationships , Activity identification , Network construction
Select The BlankQuestion Capacity decisions have a direct influence on performance of production
system in respect of ________Correct Answer Delivery performance
Your Answer Delivery performance
Select The BlankQuestion The ________ pertain to the climatic conditions which the component ,
product or material should withstand.Correct Answer Environmental specifications
Your Answer Environmental specifications
Multiple Choice Single Answer
Question How to calculate activity cost slope?
Correct Answer Activity cost slope = ( Crash cost - Normal cost ) / ( Normal time - Crashtime )
Your Answer Activity cost slope = ( Crash cost - Normal cost ) / ( Normal time - Crashtime )
Select The BlankQuestion One detachable ticket is prepared for each ________.
Correct Answer Operation
Your Answer Operation
Multiple Choice Single AnswerQuestion Which phase of method study is concerned with analyzing the facts
critically, generating alternatives which form the basis for selection anddevelopment of improved methods?
Correct Answer Critical examination
Your Answer Critical examination
True/FalseQuestion During set up of X bar-R control chart, control limts should be practically
revised from time to time as additional data is accumulated.Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Operation Layout generally contains following information
Correct Answer Part Sketch , Standard Time , Jigs and fixtures
Your Answer Part Sketch , Standard Time , Jigs and fixtures
True/FalseQuestion Every network does not necessarily have a critical path.
Correct Answer False
Your Answer False
Select The BlankQuestion An ________ history card is the record of all repairs, replacements and
engineering changes carried out in the equipment during it's period ofservice.
Correct Answer Equipment history card
Your Answer Equipment history card
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to
entity can be defined as
Correct Answer Operation
Your Answer Operation
Multiple Choice Single AnswerQuestion Technique which can help an organization to reduce inventory is called
Correct Answer MRP
Your Answer MRP
True/FalseQuestion In case of two handed process chart, inspection symbol is used when check
by touch or feel is involved.Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Components of Production Management include
Correct Answer Capacity Planning , Job Design , Production Planning
Your Answer Capacity Planning , Job Design , Production Planning
Multiple Choice Multiple AnswerQuestion Which of the following is a part of preparing manufacturing order set as a
primary function of dispatching?Correct Answer Operational layouts , Move orders , Pre-filled stores issue orders
Your Answer Operational layouts , Move orders , Pre-filled stores issue orders
Multiple Choice Multiple AnswerQuestion Following are some of the Principles of Management advocated by F W
TaylorCorrect Answer Selection of best worker for each particular task , Division of work between
worker and management , Training and development of the workmenYour Answer Selection of best worker for each particular task , Division of work between
worker and management , Training and development of the workmen
True/FalseQuestion The OC curve is based on the assumption that if the lot is large in
comparison to the sample, the probabilities of the OC curve will follow apoisson distribution.
Correct Answer False
Your Answer False
True/FalseQuestion Inspection order is must even for simple jobs which can be inspected by
shop inspector with the tooling available on shop.Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion What can be the worst effect due to excessive vibration?
Correct Answer Breakdown
Your Answer Breakdown
True/FalseQuestion Cent percent inspection is often more practical and economical than
sampling inspection.Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion Which rule is used for numbering of events?
Correct Answer Fulkerson's Rule
Your Answer Fulkerson's Rule
Select The BlankQuestion The term ________ emplies the foregone profit due to inability of company
to produce.Correct Answer Opportunity cost
Your Answer Opportunity cost
Multiple Choice Multiple AnswerQuestion Which of the following causes can be responsible for derailing the
production schedule in a factory?Correct Answer Errors in drawings , Delay in receipt of material from vendor , Excessive
absenteeismYour Answer Errors in drawings , Delay in receipt of material from vendor , Excessive
absenteeism
Multiple Choice Multiple AnswerQuestion Which are the subfactors of community facilities or social infrastructure?
Correct Answer Accomodation , Educational , Entertainment
Your Answer Accomodation , Educational , Entertainment
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any
product/s is calledCorrect Answer Factory
Your Answer Factory
True/False
Question Only skilled worker can use the fixed limit gauge.
Correct Answer False
Your Answer False
Select The BlankQuestion The ________ advocates maintenance procedures whereby the condition of
the plant is constantly watched through systematic inspection to unearthunhealthy conditions and preventive
Correct Answer Preventive Maintenance
Your Answer Preventive Maintenance
Select The BlankQuestion Goods after final inspection should accompany ________to enable dispatch
department to identify and draw correct reference.Correct Answer Forwarding note
Your Answer Forwarding note
Multiple Choice Single AnswerQuestion The ratio of output to input of a production system is commonly known as
Correct Answer Productivity
Your Answer Productivity
Multiple Choice Single AnswerQuestion What do you understand by totality of features and characteristics of a
product or service that bears on it's ability to satisfy the customer?Correct Answer Quality
Your Answer Quality
Multiple Choice Single AnswerQuestion What do you mean by a single event which represents the joint completion
of more than one activities?Correct Answer Merge event
Your Answer Merge event
True/FalseQuestion All activities lying on the non-critical paths must have total float and free
float.Correct Answer False
Your Answer False
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Machine utilization
Gantt Chart Production Scheduling Production Scheduling
Select The BlankQuestion The ________ is the watch dog which ensures that every element of
production and activities which could affect the quality of end product areregulated to the extent desirable.
Correct Answer Quality control
Your Answer Quality control
Match The FollowingQuestion Correct Answer Your Answer
Subtraction Removal of worn-out part from amachine
Removal of worn-out part from amachine
Change in chemical characteristic Chemical reaction Chemical reaction
Consumption of effort Posting a ledger Posting a ledger
Information given Giving directions or instructions Giving directions or instructions
Multiple Choice Single AnswerQuestion Product layout is employed for manufacturing following products
Correct Answer refrigirators
Your Answer refrigirators
POM assgn : Meena
Multiple Choice Single AnswerQuestion MRP is based on the concept of inventory demand which is of following type
Correct Answer Dependent and independent
Your Answer Dependent and independent
Multiple Choice Single AnswerQuestion Main objective of a good plant layout is
Correct Answer Reduce material handling cost
Your Answer Reduce material handling cost
True/FalseQuestion As a general rule, the number of tail event of an activity is more than that of it's head
event.Correct Answer False
Your Answer False
Select The BlankQuestion The ________ is the probability that a good lot will be rejected by the sampling plan.
Correct Answer Producer's risk
Your Answer Producer's risk
Multiple Choice Multiple AnswerQuestion Which of the following are important considerations concerning activity times?
Correct Answer Activity time should be obtained from the person responsible for the completion of anactivity , Activity time must be independent of any influence which the preceding orsucceeding activity may have on it. , Activity time may assume that just the normalquantity of resources required to carry out the activity are available.
Your Answer Activity time should be obtained from the person responsible for the completion of anactivity , Activity time must be independent of any influence which the preceding orsucceeding activity may have on it. , Activity time may assume that just the normalquantity of resources required to carry out the activity are available.
Select The BlankQuestion The ________ pertain to the climatic conditions which the component , product or
material should withstand.Correct Answer Environmental specifications
Your Answer Environmental specifications
Multiple Choice Multiple AnswerQuestion Following are some of the factors considered for evaluation of alternative layouts
Correct Answer Flow of Material , Equipment utilization , Ease of supervision
Your Answer Flow of Material , Ease of supervision , Delivery performance
Multiple Choice Multiple AnswerQuestion Which of the following are assignable cause?
Correct Answer Large varaitions in hardness of material , Tool wear , Errors in setting
Your Answer Large varaitions in hardness of material , Tool wear , Errors in setting
True/FalseQuestion All activities must not be tied up into the network
Correct Answer False
Your Answer False
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot may vary between
________.Correct Answer 0.01 to 10%
Your Answer 0.01 to 10%
True/FalseQuestion In case of X bar, if the process is not under control indicated by some points falling
outside the control limits, such points outside the control limits are eliminated andnew trial control limits for the remaining points are computed.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion What is the base for considering activity time as single time estimate or three time
estimate?Correct Answer Level of uncertainty
Your Answer Availability of labour
Select The BlankQuestion The ________ is the maximum percentage defective that for the purpose of
sampling inspection can be considered satisfactory as a process average.Correct Answer Acceptable quality level
Your Answer Acceptable quality level
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to complete an activity
within it's normal time?Correct Answer Normal cost
Your Answer Normal cost
Select The BlankQuestion A good maintenance system is not a luxary but a ________.
Correct Answer Necessity
Your Answer Necessity
Select The BlankQuestion A ________helps to avoid crowding of jobs at a particular machine by change of
route of some of the jobs or by diverting work to other machine.Correct Answer Control board
Your Answer Move order
Select The BlankQuestion The ________ is the watch dog which ensures that every element of production and
activities which could affect the quality of end product are regulated to the extentdesirable.
Correct Answer Quality control
Your Answer Quality control
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any product/s is
calledCorrect Answer Factory
Your Answer Factory
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Machine utilization
Gantt Chart Production Scheduling Production Scheduling
Select The BlankQuestion A ________ is another form of subcontracting.
Correct Answer Hiring capacity
Your Answer Hiring capacity
Multiple Choice Multiple AnswerQuestion In an organization there may not be a formal PPC department if
Correct Answer Work is highly repetitive in nature , Planning activities are performed by the line staff, Number of workmen is not very large
Your Answer Work is highly repetitive in nature , Planning activities are performed by the line staff, Number of workmen is not very large
Multiple Choice Multiple AnswerQuestion Which of the following cases can be treated as delay during recording of method
study?Correct Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools
stores , Jobs awaiting at the machines for their turnYour Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools
stores , Jobs awaiting at the machines for their turn
True/FalseQuestion Inspection order is must even for simple jobs which can be inspected by shop
inspector with the tooling available on shop.Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Order preparation process for products manufatured to order requires following
documentsCorrect Answer Sales Order , Work order , Shop order
Your Answer Sales Order , Work order , Purchase order
Multiple Choice Single AnswerQuestion Technique of Value Engineering can be effectively employed in design of a product
toCorrect Answer To meet the intended function at lowest cost
Your Answer Reduce lead time
True/FalseQuestion Cent percent inspection is often more practical and economical than sampling
inspection.Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Scale model used for layout analysis have following advantages
Correct Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown ,Models can be shifted easily
Your Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown ,Models can be shifted easily
Multiple Choice Single AnswerQuestion Which of the following technique is event oriented ?
Correct Answer Project Evaluation & Review Technique
Your Answer Project Evaluation & Review Technique
Multiple Choice Single AnswerQuestion What is the meaning of " Product features" according to J.M.Juran?
Correct Answer Quality of design
Your Answer Quality of design
Match The FollowingQuestion Correct Answer Your Answer
Crash cost of an activity Cc Cc
Normal time of an activity Tn Tn
Crash time of activity Tc Tc
Normal cost of an activity Cn Cn
Multiple Choice Multiple AnswerQuestion What are uses of diagrams in method study?
Correct Answer Study different plant layouts and select the most optimum one , Study the extent oftraffic over the different routes of the plant , Identify the extent of backtracking, crosstraffic and obstacles encountered during the movement of material.
Your Answer Study different plant layouts and select the most optimum one , Study the extent oftraffic over the different routes of the plant , Identify the extent of backtracking, crosstraffic and obstacles encountered during the movement of material.
True/FalseQuestion A load chart specifies the work to be carried out by each person of company during
shift hours.Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Route Sheet generally contains following information
Correct Answer Material Specification , Sequence of operation , Skill of Labour
Your Answer Material Specification , Sequence of operation , Skill of Labour
True/FalseQuestion Cellular layout is based on the concept of Group Technology
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Which varaible is taken along the abscissa or X axis?
Correct Answer Time
Your Answer Standard deviation
Multiple Choice Multiple AnswerQuestion Which are the advantages of suburban location?
Correct Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can beavailable , Plant expansion is easier due to less or no restriction for building andconstruction
Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can beavailable , Plant expansion is easier due to less or no restriction for building andconstruction
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of the
condition of an item from routine or continuous checking.Correct Answer Condition monitoring
Your Answer Condition monitoring
Multiple Choice Multiple AnswerQuestion Expediting function is concerned with following activities
Correct Answer Progress chasing to identify delays which may hold up production , Communicatingpossible delays in delivery date commitment to sales department , Devising cures tokeep rate of production in line with schedule
Your Answer Recording progress of work , Progress chasing to identify delays which may hold upproduction , Communicating possible delays in delivery date commitment to salesdepartment
Select The BlankQuestion Production control work is ________ in case of floor inspection as compared with the
centralised inspection.Correct Answer easier
Your Answer time consuming
Select The BlankQuestion The easiest way to bring the delayed job within the promised delivery time by using
extra shift or weekly holiday is ________.Correct Answer Overtime working
Your Answer Overtime working
True/FalseQuestion In case of forward pass computation, the earliest event time of the first event is zero.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion What is represented by an arrow in a network?
Correct Answer Activity
Your Answer Activity
True/FalseQuestion As a general rule, a site five times the actual plant size is considered minimum for
parking, access facilities and future expansion.Correct Answer True
Your Answer True
True/FalseQuestion Independent float either affects the float of preceding activities or that of succeeding
activities.Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion The document raised by PPC which authorises different functions to take action as
per instruction is calledCorrect Answer Work Order
Your Answer Work Order
Multiple Choice Single AnswerQuestion A good layout makes effective use of space. Utilization of space for a department
like Stores can be measured byCorrect Answer Proportion of Cubic volume space utilized
Your Answer Ratio of area utilised to area available
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to entity can
be defined asCorrect Answer Operation
Your Answer Operation
POM assgn : GS Kumars
Multiple Choice Single AnswerQuestion MRP is based on the concept of inventory demand which is of following type
Correct Answer Dependent and independent
Your Answer Dependent and independent
Multiple Choice Single AnswerQuestion Main objective of a good plant layout is
Correct Answer Reduce material handling cost
Your Answer Reduce material handling cost
True/FalseQuestion As a general rule, the number of tail event of an activity is more than that of it's head
event.Correct Answer False
Your Answer False
Select The BlankQuestion The ________ is the probability that a good lot will be rejected by the sampling plan.
Correct Answer Producer's risk
Your Answer Producer's risk
Multiple Choice Multiple AnswerQuestion Which of the following are important considerations concerning activity times?
Correct Answer Activity time should be obtained from the person responsible for the completion of anactivity , Activity time must be independent of any influence which the preceding orsucceeding activity may have on it. , Activity time may assume that just the normalquantity of resources required to carry out the activity are available.
Your Answer Activity time should be obtained from the person responsible for the completion of anactivity , Activity time must be independent of any influence which the preceding orsucceeding activity may have on it. , Activity time may assume that just the normalquantity of resources required to carry out the activity are available.
Select The BlankQuestion The ________ pertain to the climatic conditions which the component , product or
material should withstand.Correct Answer Environmental specifications
Your Answer Environmental specifications
Multiple Choice Multiple AnswerQuestion Following are some of the factors considered for evaluation of alternative layouts
Correct Answer Flow of Material , Equipment utilization , Ease of supervision
Your Answer Flow of Material , Ease of supervision , Delivery performance
Multiple Choice Multiple AnswerQuestion Which of the following are assignable cause?
Correct Answer Large varaitions in hardness of material , Tool wear , Errors in setting
Your Answer Large varaitions in hardness of material , Tool wear , Errors in setting
True/FalseQuestion All activities must not be tied up into the network
Correct Answer False
Your Answer False
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot may vary between
________.Correct Answer 0.01 to 10%
Your Answer 0.01 to 10%
True/FalseQuestion In case of X bar, if the process is not under control indicated by some points falling
outside the control limits, such points outside the control limits are eliminated andnew trial control limits for the remaining points are computed.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion What is the base for considering activity time as single time estimate or three time
estimate?Correct Answer Level of uncertainty
Your Answer Availability of labour
Select The BlankQuestion The ________ is the maximum percentage defective that for the purpose of
sampling inspection can be considered satisfactory as a process average.Correct Answer Acceptable quali ty level
Your Answer Acceptable quality level
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to complete an activity
within it's normal time?Correct Answer Normal cost
Your Answer Normal cost
Select The BlankQuestion A good maintenance system is not a luxary but a ________.
Correct Answer Necessity
Your Answer Necessity
Select The BlankQuestion A ________helps to avoid crowding of jobs at a particular machine by change of
route of some of the jobs or by diverting work to other machine.Correct Answer Control board
Your Answer Move order
Select The BlankQuestion The ________ is the watch dog which ensures that every element of production and
activities which could affect the quality of end product are regulated to the extentdesirable.
Correct Answer Quality control
Your Answer Quality control
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any product/s is
calledCorrect Answer Factory
Your Answer Factory
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Machine utilization
Gantt Chart Production Scheduling Production Scheduling
Select The BlankQuestion A ________ is another form of subcontracting.
Correct Answer Hiring capacity
Your Answer Hiring capacity
Multiple Choice Multiple AnswerQuestion In an organization there may not be a formal PPC department if
Correct Answer Work is highly repetitive in nature , Planning activities are performed by the line staff, Number of workmen is not very large
Your Answer Work is highly repetitive in nature , Planning activities are performed by the line staff, Number of workmen is not very large
Multiple Choice Multiple AnswerQuestion Which of the following cases can be treated as delay during recording of method
study?Correct Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools
stores , Jobs awaiting at the machines for their turnYour Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools
stores , Jobs awaiting at the machines for their turn
True/FalseQuestion Inspection order is must even for simple jobs which can be inspected by shop
inspector with the tooling available on shop.Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Order preparation process for products manufatured to order requires following
documentsCorrect Answer Sales Order , Work order , Shop order
Your Answer Sales Order , Work order , Purchase order
Multiple Choice Single AnswerQuestion Technique of Value Engineering can be effectively employed in design of a product
toCorrect Answer To meet the intended function at lowest cost
Your Answer Reduce lead time
True/FalseQuestion Cent percent inspection is often more practical and economical than sampling
inspection.Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Scale model used for layout analysis have following advantages
Correct Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown ,Models can be shifted easily
Your Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown ,Models can be shifted easily
Multiple Choice Single AnswerQuestion Which of the following technique is event oriented ?
Correct Answer Project Evaluation & Review Technique
Your Answer Project Evaluation & Review Technique
Multiple Choice Single AnswerQuestion What is the meaning of " Product features" according to J.M.Juran?
Correct Answer Quality of design
Your Answer Quality of design
Match The FollowingQuestion Correct Answer Your Answer
Crash cost of an activity Cc Cc
Normal time of an activity Tn Tn
Crash time of activity Tc Tc
Normal cost of an activity Cn Cn
Multiple Choice Multiple AnswerQuestion What are uses of diagrams in method study?
Correct Answer Study different plant layouts and select the most optimum one , Study the extent oftraffic over the different routes of the plant , Identify the extent of backtracking, crosstraffic and obstacles encountered during the movement of material.
Your Answer Study different plant layouts and select the most optimum one , Study the extent oftraffic over the different routes of the plant , Identify the extent of backtracking, crosstraffic and obstacles encountered during the movement of material.
True/FalseQuestion A load chart specifies the work to be carried out by each person of company during
shift hours.Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Route Sheet generally contains following information
Correct Answer Material Specification , Sequence of operation , Skill of Labour
Your Answer Material Specification , Sequence of operation , Skill of Labour
True/FalseQuestion Cellular layout is based on the concept of Group Technology
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Which varaible is taken along the abscissa or X axis?
Correct Answer Time
Your Answer Standard deviation
Multiple Choice Multiple AnswerQuestion Which are the advantages of suburban location?
Correct Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can beavailable , Plant expansion is easier due to less or no restriction for building andconstruction
Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can beavailable , Plant expansion is easier due to less or no restriction for building andconstruction
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of the
condition of an item from routine or continuous checking.Correct Answer Condition monitoring
Your Answer Condition monitoring
Multiple Choice Multiple AnswerQuestion Expediting function is concerned with following activities
Correct Answer Progress chasing to identify delays which may hold up production , Communicatingpossible delays in delivery date commitment to sales department , Devising cures tokeep rate of production in line with schedule
Your Answer Recording progress of work , Progress chasing to identify delays which may hold upproduction , Communicating possible delays in delivery date commitment to salesdepartment
Select The BlankQuestion Production control work is ________ in case of floor inspection as compared with the
centralised inspection.Correct Answer easier
Your Answer time consuming
Select The BlankQuestion The easiest way to bring the delayed job within the promised delivery time by using
extra shift or weekly holiday is ________.Correct Answer Overtime working
Your Answer Overtime working
True/FalseQuestion In case of forward pass computation, the earliest event time of the first event is zero.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion What is represented by an arrow in a network?
Correct Answer Activity
Your Answer Activity
True/FalseQuestion As a general rule, a site five times the actual plant size is considered minimum for
parking, access facilities and future expansion.Correct Answer True
Your Answer True
True/FalseQuestion Independent float either affects the float of preceding activities or that of succeeding
activities.Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion The document raised by PPC which authorises different functions to take action as
per instruction is calledCorrect Answer Work Order
Your Answer Work Order
Multiple Choice Single AnswerQuestion A good layout makes effective use of space. Utilization of space for a department
like Stores can be measured byCorrect Answer Proportion of Cubic volume space utilized
Your Answer Ratio of area utilised to area available
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to entity can
be defined asCorrect Answer Operation
Your Answer Operation
POM assgnMultiple Choice Multiple AnswerQuestion Why graphical method of recording is preferred over the descriptive method during method
study?Correct Answer It segregates effective part form ineffective parts , It reduces effort involved in writing ,
Critical examinations easier and more effectiveYour Answer Critical examinations easier and more effective , It segregates effective part form
ineffective parts , It reduces effort involved in writing
Multiple Choice Multiple AnswerQuestion Which are the subfactors of community facilities or social infrastructure?Correct Answer Accomodation , Educational , EntertainmentYour Answer Accomodation , Educational , Entertainment
Select The BlankQuestion The ________ is the probability that a bad lot will be accepted by the sampling plan.Correct Answer Consumer's riskYour Answer Consumer's risk
Multiple Choice Multiple AnswerQuestion Which of the following are examples of consumption of physical effort during recording for
method study?Correct Answer Bending , Positioning , UnloadingYour Answer Bending , Positioning , Unloading
Multiple Choice Single AnswerQuestion How to claculate the producer risk in the OC Curve?Correct Answer Probability that a good lot will be rejected by the samplingYour Answer Probability that a good lot will be rejected by the sampling
Select The BlankQuestion The ________ are the definitions of the measurable as well as nonmeasurable characteristics
of the product.Correct Answer SpecificationsYour Answer Specifications
Select The BlankQuestion The ________ is the watch dog which ensures that every element of production and activities
which could affect the quality of end product are regulated to the extent desirable.Correct Answer Quality controlYour Answer Quality control
True/FalseQuestion Expediting action is necessary if the delays and interruptions are abnormal and hence any
subsequent delay is bound to extend the promised delivery date.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Process Engineer does not get sufficient time for designing tooling for most economic
production run whenCorrect Answer Delivery time is lessYour Answer Delivery time is less
Select The BlankQuestion The ________ includes preventive maintenance activities whose needs are identified through
inspection which requires stoppage of machines.Correct Answer Shutdown MaintenanceYour Answer Shutdown Maintenance
True/FalseQuestion Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity
in process layoutCorrect Answer TrueYour Answer True
Select The BlankQuestion The ________ is the maximum percentage defective that for the purpose of sampling
inspection can be considered satisfactory as a process average.Correct Answer Acceptable quality levelYour Answer Acceptable quality level
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to complete an activity within it's
crashed time?Correct Answer Crash costYour Answer Crash cost
Multiple Choice Multiple AnswerQuestion Which are the first three steps of Critical Path Analysis technique?Correct Answer Activity relationships , Activity identification , Network constructionYour Answer Activity relationships , Activity identification , Network construction
True/FalseQuestion Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure
of machinery.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following can be subtypes of corrective maintenance?Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in MaintenanceYour Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of the condition of
an item from routine or continuous checking.Correct Answer Condition monitoringYour Answer Condition monitoring
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to entity can be
defined asCorrect Answer OperationYour Answer Production
Match The FollowingQuestion Correct Answer Your Answer
Toung Sweet Sweet
Eye Crack Crack
Nose Burnout Burnout
Ear Impact Impact
Select The BlankQuestion The ________ is a set of tools and techniques by which products are made to comply with the
specifications at minimum cost to the firm.Correct Answer Quality control systemYour Answer Quality control system
Multiple Choice Single AnswerQuestion What is the meaning of " Product features" according to J.M.Juran?Correct Answer Quality of designYour Answer Quality of design
Multiple Choice Multiple AnswerQuestion Which of the following method can be used to record the facts during the method study?Correct Answer Micromotion study , Cyclegraph , ChronocyclegraphYour Answer Micromotion study , Photograph , Cyclegraph , Chronocyclegraph
True/FalseQuestion All activities must not be tied up into the networkCorrect Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Which of the following are types of sampling plan?Correct Answer Single sampling plan , Double sampling plan , Multiple sampling planYour Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Multiple Choice Multiple AnswerQuestion How many of the following are types of specification?Correct Answer Material specifications , Dimensional specifications , Performance specificationsYour Answer Material specifications , Dimensional specifications , Performance specifications
Multiple Choice Multiple AnswerQuestion Plant layout facilitates processing of products in most effective manner through the followingCorrect Answer Shortest possible distance , Shortest processing time , Minimum movementYour Answer Shortest possible distance , Minimum movement
Select The BlankQuestion Work study is also called ________ studyCorrect Answer Time and MotionYour Answer Time and Motion
True/FalseQuestion Operation Process Chart provides information on time and distancesCorrect Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Plant Layout is concerned with optimum arrangement of the followingCorrect Answer Storage space , Machines , Material Handling EquipmentYour Answer Storage space , Machines , Sequence of operation
Multiple Choice Single AnswerQuestion Management often fails to realize the importance of efficient layout due to following reasonCorrect Answer losses resulting from poor layout are not directly shown in the financial statementsYour Answer losses resulting from poor layout are not directly shown in the financial statements
True/FalseQuestion Inspection order is must even for simple jobs which can be inspected by shop inspector with
the tooling available on shop.
Correct Answer FalseYour Answer True
True/FalseQuestion Feasibility of time schedule requires that an activity be scheduled before any of it's
predecessors are scheduled.Correct Answer FalseYour Answer True
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any product/s is calledCorrect Answer FactoryYour Answer Factory
True/FalseQuestion Planned lubrication is said to be the nervous system of the equipment.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion What is the basic philosophy of statistical process control?Correct Answer Prevention is better than cureYour Answer Prevention is better than cure
Multiple Choice Single AnswerQuestion How does the control chart of statistical quality control helps the operating personnel?Correct Answer Identify the presence of an assignable cause before it developsYour Answer Identify the presence of an assignable cause before it develops
Multiple Choice Single AnswerQuestion Where does the central line is located in case of p-chart?Correct Answer at p barYour Answer at p bar
Multiple Choice Multiple AnswerQuestion Which of the following may be the objectives of project crashing?Correct Answer To complete the project in the least possible time , To reduce project cost below it's
normal cost , To achieve uniformity in requirement of resourcesYour Answer To complete the project in the least possible time , To reduce project cost below it's
normal cost , To achieve uniformity in requirement of resources
Select The BlankQuestion The ________ advocates maintenance procedures whereby the condition of the plant is
constantly watched through systematic inspection to unearth unhealthy conditions and preventiveCorrect Answer Preventive MaintenanceYour Answer Preventive Maintenance
True/FalseQuestion A network should be progression of activities always moving forward.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Which is the ideal place to write a description of an activity in a network?Correct Answer Above the arrowYour Answer Above the arrow
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.
Correct Answer 0.01 to 10%Your Answer 0.01 to 10%
True/FalseQuestion For p-chart, the central line of fraction defectives is determined by average percentage
defectives.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Which phase of method study is concerned with analyzing the facts critically, generating
alternatives which form the basis for selection and development of improved methods?Correct Answer Critical examinationYour Answer Critical examination
Multiple Choice Single AnswerQuestion Which of the following policies is advisable in case of low product variety and large volumes?Correct Answer Low Skilled Labour & Special Purpose MachinesYour Answer Low Skilled Labour & Special Purpose Machines
Multiple Choice Single AnswerQuestion Which kind of inspection is followed in case of product layout?Correct Answer Pilot inspectionYour Answer Pilot inspection
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Sampling Inspection
Gantt Chart Production Scheduling Production Scheduling
POM assgn : Seema
Select The BlankQuestion The ________ is the process of withdrawing the equipment from the production line,
dismantling it unitwise, visualising defects, effecting adjustments, replacing worn-outparts and finally building it up to get desired accuracies.
CorrectAnswer
Reconditioning
Your Answer Overhauling
Multiple Choice Single AnswerQuestion What do you understand by the measurement of work to establish allowed time for a job
for the defined method?Correct
AnswerWork measurement
Your Answer Work measurement
Multiple Choice Single AnswerQuestion The ratio of output to input of a production system is commonly known as
CorrectAnswer
Productivity
Your Answer Productivity
Multiple Choice Single AnswerQuestion What is the location of lower control limit in the X bar-R control chart?
CorrectAnswer
3 standard deviations below central line
Your Answer 2 standard deviations below central line
Match The FollowingQuestion Correct Answer Your Answer
Factor Analysis Method to evaluate layouts Technique for evolving andanalysis of layouts
Minimization of production delays Objective of good layout Principles of good layout
Maximum visibility Principles of good layout Layout analysis
Scale model Layout analysis Method to evaluate layouts
Multiple Choice Single AnswerQuestion What is the name of the document on which details of the process are recorded by the
symbols and charting conventions?Correct
AnswerChart
Your Answer Chart
Multiple Choice Single AnswerQuestion Which kind of inspection is followed in case of process layout?
CorrectAnswer
First off inspection
Your Answer Cent percent inspection
Multiple Choice Multiple AnswerQuestion Which of the following defects can be observed during preventive inspection by using
human senses?Correct
AnswerDeviation from normal sound , Excessive Vibration , Leakage of a gas
Your Answer Deviation from normal sound , Excessive Vibration , Leakage of a gas
True/FalseQuestion Process Sheets for parts in batch production are not maintained as standard process
sheetCorrect
AnswerFalse
Your Answer True
Select The BlankQuestion Goods after final inspection should accompany ________to enable dispatch department
to identify and draw correct reference.Correct
AnswerForwarding note
Your Answer Move order
Select The BlankQuestion A set of activities to keep an equipment in the specified condition is called as ________.
CorrectAnswer
Maintenance
Your Answer Maintenance
Multiple Choice Multiple AnswerQuestion What are the advantages of three dimensional models?
CorrectAnswer
Overhead facilities can be shown , Can be shifted easily and quickly , Even non-technicalperson can use it
Your Answer Overhead facilities can be shown , Economical , Can be shifted easily and quickly
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of the
condition of an item from routine or continuous checking.Correct
AnswerCondition monitoring
Your Answer Preventive maintenance
Multiple Choice Single AnswerQuestion What do you understand by the selection of the job for the method study on the basis of
money saving potential of the job?Correct
AnswerEconomic consideration
Your Answer Economic consideration
Select The BlankQuestion Capacity decisions have a direct influence on performance of production system in
respect of ________Correct
AnswerDelivery performance
Your Answer Quality
Multiple Choice Multiple AnswerQuestion Which of the following are the objectives of a good maintenance system?
CorrectAnswer
Elimination of unsafe conditions , Minimisation of wear and tear of machines , Ensuringmaximum plant availability
Your Answer Elimination of unsafe conditions , Minimisation of wear and tear of machines , Ensuringmaximum plant availability
Match The FollowingQuestion Correct Answer Your Answer
First off inspection First piece produced after toolchange
First piece produced after toolchange
Critical operation inspection After whose no rework is possible Last operation
Patrolling inspection Inspection at the place of actualproduction
Inspection at the place of actualproduction
Key operation inspection Costlier operation After whose no rework is possible
True/FalseQuestion In case of backward pass computation, the latest event time of a tail event equals to the
latest event time of the succeeding ( Head ) event minus duration of the activityconverging to the head event..
CorrectAnswer
True
Your Answer True
Multiple Choice Multiple AnswerQuestion Which of the following factors affect the quality control function?
CorrectAnswer
Quality of workmanship , Production aids , Manufacturing facilities
Your Answer Quality of workmanship , Production aids , Manufacturing facilities
Multiple Choice Multiple AnswerQuestion Which of the following products should be produced by using mass production?
CorrectAnswer
Refrigerator , Tyre for automobile , Television Set
Your Answer Refrigerator , Tyre for automobile , Television Set
True/False
Question Cent percent inspection does not mean inspection of component for 100% qualitycharacteristics.
CorrectAnswer
True
Your Answer True
True/FalseQuestion Cellular layout is based on the concept of Group Technology
CorrectAnswer
True
Your Answer True
True/FalseQuestion A lot declared rejected in sampling inspection should not be inspected 100% in any
case.Correct
AnswerFalse
Your Answer False
Multiple Choice Single AnswerQuestion Which kind of relationship exists between those activities which can be carried out
simultaneously and both activities require definite time to finish?Correct
AnswerConcurrent activities
Your Answer Concurrent activities
True/FalseQuestion Recording of movement is not necessary in case of method study in any form.
CorrectAnswer
False
Your Answer False
Select The BlankQuestion The ________ includes preventive maintenance activities whose needs are identified
through inspection which requires stoppage of machines.Correct
AnswerShutdown Maintenance
Your Answer Shutdown Maintenance
Select The BlankQuestion Production control work is ________ in case of floor inspection as compared with the
centralised inspection.Correct
Answereasier
Your Answer easier
True/FalseQuestion In case of backward pass computation, the latest event time of the burst event equals
the smallest of the difference between the latest event time of the head event less
duration of the activity converging on the head event.
CorrectAnswer
True
Your Answer True
Select The BlankQuestion The ________ breakdowns usually cost more, partly due to damage done to the
adjustment components and partly due to emergency actions.Correct
AnswerUnexpected
Your Answer Unexpected
Multiple Choice Multiple AnswerQuestion Which of the following are examples of addition during recording for method study?
CorrectAnswer
Brazing , Welding , Riveting
Your Answer Brazing , Welding , Riveting
Multiple Choice Multiple AnswerQuestion Which kind of natural delays and interruptions are considered during estimation of
activity time?Correct
AnswerShop efficiency , Breakdowns , Absenteeism
Your Answer Shop efficiency , Breakdowns , Absenteeism
Multiple Choice Single AnswerQuestion How does the control chart of statistical quality control helps the operating personnel?
CorrectAnswer
Identify the presence of an assignable cause before it develops
Your Answer Identify the presence of an assignable cause before it develops
True/FalseQuestion Inspection Order can be a verbal order
CorrectAnswer
True
Your Answer True
Multiple Choice Multiple AnswerQuestion Lack of material planning results in the following
CorrectAnswer
Over ordering , under ordering , stockouts
Your Answer Over ordering , under ordering , stockouts
Multiple Choice Single AnswerQuestion Inherent Safety' is one of the principle of good layout. In context of layout, this can be
achieved by the following
CorrectAnswer
Clear gangway, location of material and material handling system
Your Answer Proper plant location
Multiple Choice Multiple AnswerQuestion What are the benefits of reconditioning?
CorrectAnswer
Eliminates problems and frequent breakdowns , Increases life of an equipment , It helpsto plan requirement of replacement spares
Your Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helpsto plan requirement of replacement spares
Multiple Choice Multiple AnswerQuestion Which are the general principles underlying probability aspects of project planning?
CorrectAnswer
Statistically three time estimate of an activity conform to Beta distribution. , Expectedtime divides the area under the curve into two equal parts. , Expected time of an activityis located at one third of the distance between "m" and mid-range { (a+b)/2 } awayfrom the most likely time.
Your Answer Statistically three time estimate of an activity conform to Beta distribution. , Expectedtime divides the area under the curve into three equal parts. , Expected time of anactivity is located at one third of the distance between "m" and mid-range { (a+b)/2 }away from the most likely time.
Select The BlankQuestion OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the
probability of acceptance of ________.Correct
AnswerOne
Your Answer 0.5
True/FalseQuestion Grouping of machines gives a lot of flexibility in loading and scheduling
CorrectAnswer
True
Your Answer True
Select The BlankQuestion The ________ is specified to indicate the maximum permissible variability in the
dimensions product or parts.Correct
AnswerTolerance
Your Answer Tolerance
Multiple Choice Single AnswerQuestion What is the nature of the sampling plan for critical defects?
CorrectAnswer
Tight
Your Answer Tight
Multiple Choice Multiple Answer
Question Which are the first three steps of Critical Path Analysis technique?
CorrectAnswer
Activity relationships , Activity identification , Network construction
Your Answer Activity relationships , Activity identification , Network construction
Select The BlankQuestion The ________ is the maximum percentage defective that for the purpose of sampling
inspection can be considered satisfactory as a process average.Correct
AnswerAcceptable quality level
Your Answer Lot Tolerance Percentage Defective
Multiple Choice Single AnswerQuestion What do you understand by the critical analysis of existing jobs to develop easier and
effective method?Correct
AnswerMethod study
Your Answer Method study
Multiple Choice Multiple AnswerQuestion Which utilities are considered as infrastructural requirements?
CorrectAnswer
Disposal of waste , Power , Water
Your Answer Power , Labour , Water
True/FalseQuestion During set up of X bar-R control chart, control limts should be practically revised from
time to time as additional data is accumulated.Correct
AnswerTrue
Your Answer False
Multiple Choice Single AnswerQuestion What do you understand by identification of defects in materials, components,
machining processes or men to fix responsibility of defectives, thereby preventing orminimising occurance of defectives?
CorrectAnswer
Preventive function
Your Answer Preventive function
POM assgn : Naresh
True/FalseQuestion Objective of Work Study is to improve Productivity
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion What do you mean by the chart on which the major activities and entry
points of materials are recorded to have graphic view of operations andinspections involved in the process?
Correct Answer Operation process chart
Your Answer Flow Process chart
Multiple Choice Multiple AnswerQuestion Which of the following are types of non-destructive testing?
Correct Answer Visual Testing , Eddy current , Magnetic flow detectors
Your Answer Stress testing , Visual Testing , Magnetic flow detectors
Multiple Choice Single AnswerQuestion What do you mean by the selection of the job for the method study on the
basis of manufacturing difficulties?Correct Answer Technical consideration
Your Answer Manufacturing consideration
True/FalseQuestion After goods have been manufactured, route sheets and operation layouts
should not be collected back.Correct Answer False
Your Answer False
True/FalseQuestion Expediting action is necessary if the delays and interruptions are abnormal
and hence any subsequent delay is bound to extend the promised deliverydate.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Which of the following are important considerations concerning activity
times?Correct Answer Activity time should be obtained from the person responsible for the
completion of an activity , Activity time must be independent of anyinfluence which the preceding or succeeding activity may have on it. ,Activity time may assume that just the normal quantity of resourcesrequired to carry out the activity are available.
Your Answer Activity time should be obtained from the person responsible for thecompletion of an activity , Infinite resources are available to carry out theactivity , Activity time may assume that just the normal quantity ofresources required to carry out the activity are available.
Multiple Choice Multiple Answer
Question Which are the distinguished features of TQM ?
Correct Answer Covers all kinds of industries , Gradual removal of interdepartmental barriers, Continuous improvement
Your Answer Covers all kinds of industries , Continuous improvement , Corrective function
Multiple Choice Multiple AnswerQuestion How many of the following are types of specification?
Correct Answer Material specifications , Dimensional specifications , Performancespecifications
Your Answer Cost specifications , Material specifications , Performance specifications
Select The BlankQuestion A ________ is another form of subcontracting.
Correct Answer Hiring capacity
Your Answer Hiring capacity
Select The BlankQuestion A ________helps to avoid crowding of jobs at a particular machine by
change of route of some of the jobs or by diverting work to other machine.Correct Answer Control board
Your Answer Control board
True/FalseQuestion Site selection should also take into account topography and soil structure of
the land.Correct Answer True
Your Answer True
Match The FollowingQuestion Correct Answer Your Answer
Combined Layout Mixed Layout Mixed Layout
Fixed Position Layout Project Layout Project Layout
Product Layout Line Layout Line Layout
Process Layout Functional Layout Functional Layout
Select The BlankQuestion The easiest way to bring the delayed job within the promised delivery time
by using extra shift or weekly holiday is ________.Correct Answer Overtime working
Your Answer Overtime working
Multiple Choice Single AnswerQuestion Which is the ideal place to write a description of an activity in a network?
Correct Answer Above the arrow
Your Answer Above the arrow
Select The BlankQuestion An Ideal OC curve is ________ shaped curve that accpets all the lots with
quality equal to or better than AQL .Correct Answer Rectangular
Your Answer Rectangular
Multiple Choice Single AnswerQuestion Which of the following is the most popular technique for Project Production?
Correct Answer PERT & CPM
Your Answer PERT & CPM
Multiple Choice Single AnswerQuestion What is the purpose of squares used in progress chart?
Correct Answer To record the progress of work for each operation
Your Answer To record the progress of work for each operation
Select The BlankQuestion An ________ history card is the record of all repairs, replacements and
engineering changes carried out in the equipment during it's period ofservice.
Correct Answer Equipment history card
Your Answer Equipment specification sheet
Select The BlankQuestion The ________ includes preventive maintenance activities whose needs are
identified through inspection which requires stoppage of machines.Correct Answer Shutdown Maintenance
Your Answer Shutdown Maintenance
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any
product/s is calledCorrect Answer Factory
Your Answer Factory
Multiple Choice Single AnswerQuestion What do you understand by the properties which are difficult to measure
quantitatively but usually measured by the comarision and then classificationinto acceptable or unacceptable?
Correct Answer Attributes
Your Answer Specifications
Multiple Choice Single AnswerQuestion What is the relation between duration of an activity and length of an arrow?
Correct Answer No relation
Your Answer No relation
True/FalseQuestion Independent float either affects the float of preceding activities or that of
succeeding activities.Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Which of the following activities are used while recording for method study?
Correct Answer Delay , Operation , Inspection
Your Answer Operation , Inspection , Production
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to complete an
activity within it's crashed time?Correct Answer Crash cost
Your Answer Crash cost
Multiple Choice Multiple AnswerQuestion Which three of the following are causes of continuous upward pattern of
Xbar-R control chart?Correct Answer Wear of tool , Abnormal rise in temperature , Accumulation of dirt
Your Answer Wear of tool , Abnormal rise in temperature , Accumulation of dirt
Multiple Choice Single AnswerQuestion How is the probability of acceptance in case of Acceptable Quality Level (AQL
)?Correct Answer Very high
Your Answer Very high
Multiple Choice Multiple AnswerQuestion Which of the following factors related to the labour and wages are considered
while deciding the plant location?Correct Answer Prevailing wage pattern , Productivity of labour , Industrial relations
Your Answer Prevailing wage pattern , Productivity of labour , Industrial relations
Multiple Choice Single AnswerQuestion Which of the following is the criteria for the percentage defectives in the
zone of the indecision?Correct Answer Lots having the percentage defective more than AQL but less than LPTD
Your Answer Lots having the percentage defective in AQL is equal to LPTD
Select The BlankQuestion Goods after final inspection should accompany ________to enable dispatch
department to identify and draw correct reference.Correct Answer Forwarding note
Your Answer Forwarding note
Select The BlankQuestion The ________ is necessary when the job requires detailed of one or more of
the job characteristics with the help of special equipment which is notavailable at the producing company.
Correct Answer Inspection order
Your Answer Inspection order
True/FalseQuestion Quality can not be inspected into a product, it must be manufactured into it
by the supplier.Correct Answer True
Your Answer False
Select The BlankQuestion The ________ is the probability that a good lot will be rejected by the
sampling plan.Correct Answer Producer's risk
Your Answer Producer's risk
True/FalseQuestion A properly designed sampling plan can control sampling errors and
completely eliminate them.Correct Answer False
Your Answer True
Multiple Choice Single AnswerQuestion When should operator or supervisor is supposed to sign the perforated route
sheet?Correct Answer After completion of operation
Your Answer At the start of the operation
Multiple Choice Multiple AnswerQuestion Which of the following are assignable cause?
Correct Answer Large varaitions in hardness of material , Tool wear , Errors in setting
Your Answer Large varaitions in hardness of material , Tool wear , Errors in setting
Multiple Choice Multiple AnswerQuestion What is indicated by the hugging points lying close to mean of the process in
X bar-R- control chart?Correct Answer Biases in measurements , Recording done without actual measurements ,
Improper selection of samplesYour Answer Biases in measurements , Defect in materials , Improper selection of
samples
Multiple Choice Single AnswerQuestion Which is the alternative way of indicating the load other than numerical way,
in case of Gantt chart ?Correct Answer Graphical approach
Your Answer Graphical approach
True/False
Question Kanban system is essentially a computer based system for productionscheduling and control
Correct Answer False
Your Answer True
True/FalseQuestion The earliest start time of an activity equals earliest time for the event from
which activity arrow originates.Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Which of the following situations demand the technical consideration while
selecting a job for method study?Correct Answer Jobs having inconsistent quality , Operations inviting frequent requests from
supervisors for relaxation in allowed time because of variations in materialsand tool performance , Jobs in which too many man-hours are spend inchecking and rechecking work
Your Answer Jobs having inconsistent quality , Operations inviting frequent requests fromsupervisors for relaxation in allowed time because of variations in materialsand tool performance , Jobs in which too many man-hours are spend inchecking and rechecking work
Select The BlankQuestion The ________ is specified to indicate the maximum permissible variability in
the dimensions product or parts.Correct Answer Tolerance
Your Answer Drawing
True/FalseQuestion Theoretical capacity equals number of normal working hours of that
machine.Correct Answer True
Your Answer True
Match The FollowingQuestion Correct Answer Your Answer
Change in chemical characteristic Chemical reaction Chemical reaction
Consumption of effort Posting a ledger Posting a ledger
Information given Giving directions or instructions Giving directions or instructions
Subtraction Removal of worn-out part from amachine
Removal of worn-out part from amachine
Multiple Choice Multiple AnswerQuestion Which are the factors on which the structure of the transportation cost
depends?Correct Answer Average distance of shipment , Characteristics of the commodity , Medium of
shipment
Your Answer Average distance of shipment , Characteristics of the commodity , Medium ofshipment
Select The BlankQuestion The ________ is the watch dog which ensures that every element of
production and activities which could affect the quality of end product areregulated to the extent desirable.
Correct Answer Quality control
Your Answer Quality control
POM assgn : Raj
True/FalseQuestion Flow process charts do record movements as well as visual pictures.
CorrectAnswer
False
Your Answer False
True/FalseQuestion The OC curve is based on the assumption that if the lot is large in comparison to the
sample, the probabilities of the OC curve will follow a poisson distribution.Correct
AnswerFalse
Your Answer True
Multiple Choice Single AnswerQuestion The ratio of output to input of a production system is commonly known as
CorrectAnswer
Productivity
Your Answer Productivity
Multiple Choice Multiple AnswerQuestion Order preparation process for products manufatured to order requires following
documentsCorrect
AnswerSales Order , Work order , Shop order
Your Answer Work order , Purchase order
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of the
condition of an item from routine or continuous checking.Correct
AnswerCondition monitoring
Your Answer Preventive maintenance
Match The FollowingQuestion Correct Answer Your Answer
Scheduling of interrelatedactivities of small projects withconsideration of uncertainty ofduration of activities.
Critical Path Analysis Critical Path Analysis
Two machines & processing timedepends on sequence of jobloading
Johnson's Two Machine Algorithm Johnson's Two Machine Algorithm
Sufficient orders and resonablechoice of machines
Index Method Index Method
Time relationship between when aproduct is required and when itcan be made available
Critical Ratio Scheduling Time series
Select The BlankQuestion Production control work is ________ in case of floor inspection as compared with the
centralised inspection.Correct
Answereasier
Your Answer easier
Match The FollowingQuestion Correct Answer Your Answer
When to inspect Stages of inspection Specification
What to inspect Specification Standard
How to inspect Inspection devices Tools & Jigs
How much to inspect Sampling or cent percentinspection
Stages of inspection
Multiple Choice Single AnswerQuestion Material Planning is an integral part of
CorrectAnswer
Production Planning
Your Answer Process Planning
Select The BlankQuestion An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal
to or better than AQL .Correct
AnswerRectangular
Your Answer Rectangular
Multiple Choice Single AnswerQuestion Technique of Value Engineering can be effectively employed in design of a product to
CorrectAnswer
To meet the intended function at lowest cost
Your Answer Reduce lead time
Multiple Choice Single AnswerQuestion Material control function of PPC is concerned with
CorrectAnswer
Preparation of material estimates
Your Answer Preparation of material estimates
Multiple Choice Single AnswerQuestion Main objective of a good plant layout is
CorrectAnswer
Reduce material handling cost
Your Answer Reduce material handling cost
True/FalseQuestion In case of X bar-R charts, statistical limits are calculated from averages of samples of n
(4,5,…) instead of single sample of large size to reduce the spread of natural variability.Correct
AnswerTrue
Your Answer True
Multiple Choice Multiple AnswerQuestion Which of the following is not the characteristic of Project Production?
CorrectAnswer
Continuous flow of material , Highly mechanised material handling , Virtually zeromanufacturing cycle time
Your Answer Fixed position layout , Virtually zero manufacturing cycle time
Multiple Choice Single AnswerQuestion A good plant layout helps in
CorrectAnswer
Reducing handling costs
Your Answer Reducing handling costs
Multiple Choice Single AnswerQuestion Inadequate production capacity ultimately leads to
CorrectAnswer
Poor Customer Service
Your Answer Low Productivity
Select The BlankQuestion Production Planning is a centralised activity which includes functions such as ________
CorrectAnswer
Scheduling
Your Answer Scheduling
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any product/s is
calledCorrect
AnswerFactory
Your Answer Factory
Multiple Choice Multiple AnswerQuestion What are the uses of the instruction manual provided by the manufacturer of a machine?
CorrectAnswer
It gives instructions regarding installation and operation of the equipment , It containsnote on common troubles with causes and remedies for troubleshooting , It enlistspoints, frequency and type of lubrication
Your Answer It gives instructions regarding installation and operation of the equipment , It containsnote on common troubles with causes and remedies for troubleshooting
Multiple Choice Multiple AnswerQuestion MRP utilises the following information
CorrectAnswer
Master production schedule , Product structure , Lead time forprocurement/manufacturing
Your Answer Master production schedule , Product structure , Lead time forprocurement/manufacturing
Select The BlankQuestion A good maintenance system is not a luxary but a ________.
CorrectAnswer
Necessity
Your Answer Necessity
True/FalseQuestion Shape od an OC curve is a function of sample size and the acceptance number.
CorrectAnswer
True
Your Answer False
Multiple Choice Multiple AnswerQuestion Which of the following can be subtypes of corrective maintenance?
CorrectAnswer
Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Your Answer Predictive Maintenance , Shutdown Maintenance
True/FalseQuestion For p-chart, "Inspection by variables" is much faster than "Inspection by attributes"
CorrectAnswer
False
Your Answer True
Multiple Choice Single AnswerQuestion Site factors for plant location include
CorrectAnswer
Suitability of land
Your Answer Suitability of land
Select The BlankQuestion The ________ breakdowns usually cost more, partly due to damage done to the
adjustment components and partly due to emergency actions.Correct
AnswerUnexpected
Your Answer Partial
True/False
Question Cent percent inspection is a must if the inspection is of destructive nature.
CorrectAnswer
False
Your Answer False
True/FalseQuestion Since value of p can never be positive, hence" if LCLp works out to be positive, it is taken
as zero."Correct
AnswerFalse
Your Answer True
Multiple Choice Single AnswerQuestion Which varaible is taken along the abscissa or X axis?
CorrectAnswer
Time
Your Answer Standard deviation
Multiple Choice Multiple AnswerQuestion Which of the following are examples of specifications?
CorrectAnswer
Commercial standards , Assembly and testing instructions , Bill of material
Your Answer Production schedule , Commercial standards , Assembly and testing instructions
Multiple Choice Multiple AnswerQuestion Which of the following products should be produced by using mass production?
CorrectAnswer
Refrigerator , Tyre for automobile , Television Set
Your Answer Refrigerator , Tyre for automobile , Television Set
Multiple Choice Single AnswerQuestion Which of the following techniques is used by industrial engineering department to obtain
the utilisation index?Correct
AnswerWork Sampling Studies
Your Answer Method Study
True/FalseQuestion An ideal OC curve is never possible only with cent percent inspection.
CorrectAnswer
False
Your Answer False
Select The BlankQuestion The ________ is the probability that a bad lot will be accepted by the sampling plan.
CorrectAnswer
Consumer's risk
Your Answer Producer's risk
Select The BlankQuestion The easiest way to bring the delayed job within the promised delivery time by using extra
shift or weekly holiday is ________.Correct
AnswerOvertime working
Your Answer Overtime working
True/FalseQuestion The operator should not stop production if first piece is not approved by the inspector.
CorrectAnswer
False
Your Answer False
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to entity can be
defined asCorrect
AnswerOperation
Your Answer Conversion
Multiple Choice Single AnswerQuestion Which kind of relationship exists between those activities which can be carried out
simultaneously and both activities require definite time to finish?Correct
AnswerConcurrent activities
Your Answer Concurrent activities
Multiple Choice Multiple AnswerQuestion Which are different ways to show critical path in a network?
CorrectAnswer
Thick Line , Red Line , Double Line
Your Answer Dotted line
Select The BlankQuestion A ________helps to avoid crowding of jobs at a particular machine by change of route of
some of the jobs or by diverting work to other machine.Correct
AnswerControl board
Your Answer Control board
Multiple Choice Single AnswerQuestion What do you understand by PERT ?
CorrectAnswer
Project Evaluation & Review Technique
Your Answer Project Evaluation & Review Technique
Multiple Choice Multiple AnswerQuestion Which of the following factors play important role while selecting or rejecting a particular
site from legislation and taxation point of view?Correct
AnswerLabour laws , Building codes , Policies regarding issue of licences
Your Answer Labour laws , Policies regarding issue of licences
Multiple Choice Multiple AnswerQuestion Which of the following concepts must be understood for the achievement of quality?
CorrectAnswer
Quality of conformance , Purpose of product , Quality of design
Your Answer Purpose of product , Process specifications , Quality of design
Select The BlankQuestion The ________ is the probability that a good lot will be rejected by the sampling plan.
CorrectAnswer
Producer's risk
Your Answer Producer's risk
Multiple Choice Single AnswerQuestion What do you mean by the project duration for which the total cost is minimum?
CorrectAnswer
Optimum duration
Your Answer Optimum duration
True/FalseQuestion Originating process of raw material influence Process Planning
CorrectAnswer
True
Your Answer True
POM assgn : Raj
Multiple Choice Single AnswerQuestion Which of the following data is unnecessary for scheduling process?
Correct Answer Cost breakup of products
Your Answer Cost breakup of products
Multiple Choice Single AnswerQuestion Management often fails to realize the importance of efficient layout due to
following reasonCorrect Answer losses resulting from poor layout are not directly shown in the financial
statementsYour Answer losses resulting from poor layout are not directly shown in the financial
statements
Multiple Choice Multiple AnswerQuestion Which are the distinguished features of TQM ?
Correct Answer Covers all kinds of industries , Gradual removal of interdepartmental barriers ,Continuous improvement
Your Answer Covers all kinds of industries , Continuous improvement , Corrective function
Multiple Choice Multiple AnswerQuestion Which are major benefits of identifying the critical path?
Correct Answer It helps to identify the set of activities and events which are critical and as suchmust be carefully controlled and monitored , It identifies activities to be givenpreference in allocation of resources. , It helps to exercise "control by exception".
Your Answer It helps to identify the set of activities and events which are critical and as suchmust be carefully controlled and monitored , It identifies activities to be givenpreference in allocation of resources. , It helps to exercise "control by exception".
True/FalseQuestion Process layout is also called line layout
Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion Document raised by Sales department for goods manufactured to stock is called
Correct Answer Shipment order
Your Answer Stock order
Multiple Choice Multiple AnswerQuestion Which of the following factors affect the quality control function?
Correct Answer Quality of workmanship , Production aids , Manufacturing facilities
Your Answer Quality of workmanship , Production aids , Manufacturing facilities
Multiple Choice Single Answer
Question Which kind of defect can be called as minor defect?
Correct Answer Which does not reduce the usability of the product for its intended use
Your Answer Which does not reduce the usability of the product for its intended use
Select The BlankQuestion A ________helps to avoid crowding of jobs at a particular machine by change of
route of some of the jobs or by diverting work to other machine.Correct Answer Control board
Your Answer Control board
Multiple Choice Single AnswerQuestion What do you understand by totality of features and characteristics of a product or
service that bears on it's ability to satisfy the customer?Correct Answer Quality
Your Answer Quality
Select The BlankQuestion The ________ is the probability that a good lot will be rejected by the sampling
plan.Correct Answer Producer's risk
Your Answer Producer's risk
Match The FollowingQuestion Correct Answer Your Answer
Change in physical characteristic Punching Assembly
Addition Assembly Posting a ledger
Consumption of physical effort Lifting Lifting
Information received Taking dictation Taking dictation
Multiple Choice Multiple AnswerQuestion Expediting function is concerned with following activities
Correct Answer Progress chasing to identify delays which may hold up production ,Communicating possible delays in delivery date commitment to sales department ,Devising cures to keep rate of production in line with schedule
Your Answer Progress chasing to identify delays which may hold up production ,Communicating possible delays in delivery date commitment to sales department ,Devising cures to keep rate of production in line with schedule
Multiple Choice Multiple AnswerQuestion Material Requirement Planning is very useful in following situations
Correct Answer Long Lead time for procurement , Several levels of assemblies in product , Longmanufacturing cycle
Your Answer Demand for the product is not known , Long Lead time for procurement , Longmanufacturing cycle
True/FalseQuestion Specifications is the basic tool of inspection.
Correct Answer True
Your Answer True
True/FalseQuestion Shop order is one of the subsidiary order
Correct Answer True
Your Answer True
Select The BlankQuestion A good maintenance system is not a luxary but a ________.
Correct Answer Necessity
Your Answer Necessity
Multiple Choice Multiple AnswerQuestion Route Sheet generally contains following information
Correct Answer Material Specification , Sequence of operation , Skill of Labour
Your Answer Material Specification , Sequence of operation , Skill of Labour
Select The BlankQuestion The ________ includes preventive maintenance activities whose needs are
identified through inspection which requires stoppage of machines.Correct Answer Shutdown Maintenance
Your Answer Shutdown Maintenance
Select The BlankQuestion An ________ history card is the record of all repairs, replacements and
engineering changes carried out in the equipment during it's period of service.Correct Answer Equipment history card
Your Answer Equipment history card
True/FalseQuestion Floor inspection promotes tendency of machines to drift out of limits and produce
defectives.Correct Answer False
Your Answer False
Select The Blank
Question The easiest way to bring the delayed job within the promised delivery time byusing extra shift or weekly holiday is ________.
Correct Answer Overtime working
Your Answer Overtime working
Multiple Choice Multiple AnswerQuestion Which of the following observations are expected from the preventive
maintenance person?Correct Answer Wrong allignments , Overheating defects , Excessive play
Your Answer Wrong allignments , Overheating defects , Excessive play
Select The BlankQuestion The ________ is a set of tools and techniques by which products are made to
comply with the specifications at minimum cost to the firm.Correct Answer Quality control system
Your Answer Design system
Multiple Choice Multiple AnswerQuestion Which are the first three steps of Critical Path Analysis technique?
Correct Answer Activity identification , Network construction , Activity relationships
Your Answer Activity relationships , Activity identification , Network construction
Multiple Choice Multiple AnswerQuestion What are the benefits of inspection and quality control?
Correct Answer Adequate maintenance of quality , Ensures parts are within specified limits ofaccuracy , Gives economy in production through reduction of defective work
Your Answer Adequate maintenance of quality , Ensures parts are within specified limits ofaccuracy , Gives economy in production through reduction of defective work
Multiple Choice Multiple AnswerQuestion Gross requirement of finished product is determined on the basis of following
Correct Answer Forecasted sales , Pending sales order , Management decision to stock
Your Answer Pending sales order , Management decision to stock , Gross Market requirement
Multiple Choice Single AnswerQuestion Where does the SPC exercises the control to prevent the occurances of defectives?
Correct Answer On manufacturing process
Your Answer On manufacturing process
True/FalseQuestion Operation process charts though indicates the sequence of events but do not show
movements.Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion What do you mean by planned corrective manitenance which provides an
opportunity to undertake design modifications in the equipment to eliminate orreduce frequency of breakdowns.
Correct Answer Design-out Maintenance
Your Answer Design-in Maintenance
Multiple Choice Single AnswerQuestion Which is the zone beyond LTPD in case of Oc curve of a general plan?
Correct Answer Zone of rejection
Your Answer Zone of rejection
Select The BlankQuestion The ________ is the process of withdrawing the equipment from the production
line, dismantling it unitwise, visualising defects, effecting adjustments, replacingworn-out parts and finally building it up to get desired accuracies.
Correct Answer Reconditioning
Your Answer Reconditioning
Multiple Choice Single AnswerQuestion Which varaible is taken along the ordinate or Y axis?
Correct Answer Quality
Your Answer Standard deviation
Multiple Choice Multiple AnswerQuestion What are the benefits of overhauling?
Correct Answer It increases useful life of an equipment and it's parts , Advance planning allows toattend equipment without disturbing the production programme , Advanceplanning allows to prepare and keep ready the list of replacement spares
Your Answer It increases useful life of an equipment and it's parts , Advance planning allows toattend equipment without disturbing the production programme , It eliminates thechances of breakdown
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot may vary between
________.Correct Answer 0.01 to 10%
Your Answer 0.10 to 10%
Multiple Choice Single AnswerQuestion In case of Batch Production which kind of labour is expected?
Correct Answer Skilled in one specific Manufacturing Process
Your Answer Skilled in one specific Manufacturing Process
True/FalseQuestion Cent percent inspection is a must if the inspection is of destructive nature.
Correct Answer False
Your Answer False
True/FalseQuestion Job life is one of the factors that influence Process Planning
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Operation Layout generally contains following information
Correct Answer Part Sketch , Standard Time , Jigs and fixtures
Your Answer Sequence of operations , Standard Time , Jigs and fixtures
Multiple Choice Single AnswerQuestion Plant Layout decisions are considered to be
Correct Answer Strategic
Your Answer Strategic
True/FalseQuestion In case of X bar-R charts,it is ensured that the assignable causes are detected
before the tolerances are violated, upper and lower statistical limits are workedout and inserted into a chart.
Correct Answer True
Your Answer True
True/FalseQuestion Labour turnover rate is higher in case of rural area as compared to urban area.
Correct Answer False
Your Answer False
Match The FollowingQuestion Correct Answer Your Answer
Number of defectives chart np-chart np-chart
Range chart R chart X chart
Fraction defective chart p-chart p-chart
Defects chart c-chart c-chart
Select The BlankQuestion An Ideal OC curve is ________ shaped curve that accpets all the lots with quality
equal to or better than AQL .Correct Answer Rectangular
Your Answer Bell
True/FalseQuestion Cent percent inspection is required on WIP prior to the key, critical or costly
operation.Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion Which of the following policies is advisable in case of low product variety and large
volumes?Correct Answer Low Skilled Labour & Special Purpose Machines
Your Answer Low Skilled Labour & Special Purpose Machines
Select The BlankQuestion The ________ is specified to indicate the maximum permissible variability in the
dimensions product or parts.Correct Answer Tolerance
Your Answer Tolerance
POM assgn : SenthilMultiple Choice Multiple AnswerQuestion Why graphical method of recording is preferred over the descriptive method during method
study?Correct Answer It segregates effective part form ineffective parts , It reduces effort involved in writing ,
Critical examinations easier and more effectiveYour Answer Critical examinations easier and more effective , It segregates effective part form
ineffective parts , It reduces effort involved in writing
Multiple Choice Multiple AnswerQuestion Which are the subfactors of community facilities or social infrastructure?Correct Answer Accomodation , Educational , EntertainmentYour Answer Accomodation , Educational , Entertainment
Select The BlankQuestion The ________ is the probability that a bad lot will be accepted by the sampling plan.Correct Answer Consumer's riskYour Answer Consumer's risk
Multiple Choice Multiple AnswerQuestion Which of the following are examples of consumption of physical effort during recording for
method study?Correct Answer Bending , Positioning , UnloadingYour Answer Bending , Positioning , Unloading
Multiple Choice Single AnswerQuestion How to claculate the producer risk in the OC Curve?Correct Answer Probability that a good lot will be rejected by the samplingYour Answer Probability that a good lot will be rejected by the sampling
Select The BlankQuestion The ________ are the definitions of the measurable as well as nonmeasurable characteristics
of the product.Correct Answer SpecificationsYour Answer Specifications
Select The BlankQuestion The ________ is the watch dog which ensures that every element of production and activities
which could affect the quality of end product are regulated to the extent desirable.Correct Answer Quality controlYour Answer Quality control
True/FalseQuestion Expediting action is necessary if the delays and interruptions are abnormal and hence any
subsequent delay is bound to extend the promised delivery date.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Process Engineer does not get sufficient time for designing tooling for most economic
production run whenCorrect Answer Delivery time is lessYour Answer Delivery time is less
Select The BlankQuestion The ________ includes preventive maintenance activities whose needs are identified through
inspection which requires stoppage of machines.Correct Answer Shutdown MaintenanceYour Answer Shutdown Maintenance
True/FalseQuestion Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity
in process layoutCorrect Answer TrueYour Answer True
Select The BlankQuestion The ________ is the maximum percentage defective that for the purpose of sampling
inspection can be considered satisfactory as a process average.Correct Answer Acceptable quality levelYour Answer Acceptable quality level
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to complete an activity within it's
crashed time?Correct Answer Crash costYour Answer Crash cost
Multiple Choice Multiple AnswerQuestion Which are the first three steps of Critical Path Analysis technique?Correct Answer Activity relationships , Activity identification , Network constructionYour Answer Activity relationships , Activity identification , Network construction
True/FalseQuestion Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure
of machinery.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following can be subtypes of corrective maintenance?Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in MaintenanceYour Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of the condition of
an item from routine or continuous checking.Correct Answer Condition monitoringYour Answer Condition monitoring
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to entity can be
defined asCorrect Answer OperationYour Answer Production
Match The FollowingQuestion Correct Answer Your Answer
Toung Sweet Sweet
Eye Crack Crack
Nose Burnout Burnout
Ear Impact Impact
Select The BlankQuestion The ________ is a set of tools and techniques by which products are made to comply with the
specifications at minimum cost to the firm.Correct Answer Quality control systemYour Answer Quality control system
Multiple Choice Single AnswerQuestion What is the meaning of " Product features" according to J.M.Juran?Correct Answer Quality of designYour Answer Quality of design
Multiple Choice Multiple AnswerQuestion Which of the following method can be used to record the facts during the method study?Correct Answer Micromotion study , Cyclegraph , ChronocyclegraphYour Answer Micromotion study , Photograph , Cyclegraph , Chronocyclegraph
True/FalseQuestion All activities must not be tied up into the networkCorrect Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Which of the following are types of sampling plan?Correct Answer Single sampling plan , Double sampling plan , Multiple sampling planYour Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Multiple Choice Multiple AnswerQuestion How many of the following are types of specification?Correct Answer Material specifications , Dimensional specifications , Performance specificationsYour Answer Material specifications , Dimensional specifications , Performance specifications
Multiple Choice Multiple AnswerQuestion Plant layout facilitates processing of products in most effective manner through the followingCorrect Answer Shortest possible distance , Shortest processing time , Minimum movementYour Answer Shortest possible distance , Minimum movement
Select The BlankQuestion Work study is also called ________ studyCorrect Answer Time and MotionYour Answer Time and Motion
True/FalseQuestion Operation Process Chart provides information on time and distancesCorrect Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Plant Layout is concerned with optimum arrangement of the followingCorrect Answer Storage space , Machines , Material Handling EquipmentYour Answer Storage space , Machines , Sequence of operation
Multiple Choice Single AnswerQuestion Management often fails to realize the importance of efficient layout due to following reasonCorrect Answer losses resulting from poor layout are not directly shown in the financial statementsYour Answer losses resulting from poor layout are not directly shown in the financial statements
True/FalseQuestion Inspection order is must even for simple jobs which can be inspected by shop inspector with
the tooling available on shop.
Correct Answer FalseYour Answer True
True/FalseQuestion Feasibility of time schedule requires that an activity be scheduled before any of it's
predecessors are scheduled.Correct Answer FalseYour Answer True
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any product/s is calledCorrect Answer FactoryYour Answer Factory
True/FalseQuestion Planned lubrication is said to be the nervous system of the equipment.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion What is the basic philosophy of statistical process control?Correct Answer Prevention is better than cureYour Answer Prevention is better than cure
Multiple Choice Single AnswerQuestion How does the control chart of statistical quality control helps the operating personnel?Correct Answer Identify the presence of an assignable cause before it developsYour Answer Identify the presence of an assignable cause before it develops
Multiple Choice Single AnswerQuestion Where does the central line is located in case of p-chart?Correct Answer at p barYour Answer at p bar
Multiple Choice Multiple AnswerQuestion Which of the following may be the objectives of project crashing?Correct Answer To complete the project in the least possible time , To reduce project cost below it's
normal cost , To achieve uniformity in requirement of resourcesYour Answer To complete the project in the least possible time , To reduce project cost below it's
normal cost , To achieve uniformity in requirement of resources
Select The BlankQuestion The ________ advocates maintenance procedures whereby the condition of the plant is
constantly watched through systematic inspection to unearth unhealthy conditions and preventiveCorrect Answer Preventive MaintenanceYour Answer Preventive Maintenance
True/FalseQuestion A network should be progression of activities always moving forward.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Which is the ideal place to write a description of an activity in a network?Correct Answer Above the arrowYour Answer Above the arrow
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.
Correct Answer 0.01 to 10%Your Answer 0.01 to 10%
True/FalseQuestion For p-chart, the central line of fraction defectives is determined by average percentage
defectives.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Which phase of method study is concerned with analyzing the facts critically, generating
alternatives which form the basis for selection and development of improved methods?Correct Answer Critical examinationYour Answer Critical examination
Multiple Choice Single AnswerQuestion Which of the following policies is advisable in case of low product variety and large volumes?Correct Answer Low Skilled Labour & Special Purpose MachinesYour Answer Low Skilled Labour & Special Purpose Machines
Multiple Choice Single AnswerQuestion Which kind of inspection is followed in case of product layout?Correct Answer Pilot inspectionYour Answer Pilot inspection
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Sampling Inspection
Gantt Chart Production Scheduling Production Scheduling
POM assgn : Deepak
True/FalseQuestion Skill of labour force in a product type layout is usually higher than in the process type
of layoutCorrect Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Which information is recorded in an equipment card?
Correct Answer Date of commissioning , Equipment specifications , Name and address ofmanufacturer
Your Answer Date of commissioning , Equipment specifications , Name and address ofmanufacturer
True/FalseQuestion Suburban location provides the compromise netween rural and urban locations.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Which of the following information is available in summary of part in a chart during
methods study?Correct Answer Frequency of each symbol , Total time for each symbol , Total distance travelled by
the objectYour Answer Frequency of each symbol , Total time for each symbol , Present and proposed
method
Multiple Choice Multiple AnswerQuestion Which of the following activities can become a part of a preventive maintenance
system?Correct Answer Condition monitoring , Planned Lubrication , Preventive inspection
Your Answer Planned Lubrication , Overhauling , Preventive inspection
True/FalseQuestion In case of two handed process chart, storage symbol is used when either hand is
used as grip or vice to hold an object.Correct Answer True
Your Answer False
Select The BlankQuestion The ________ are the definitions of the measurable as well as nonmeasurable
characteristics of the product.Correct Answer Specifications
Your Answer Standards
Multiple Choice Single Answer
Question Out of two basic criteria for the selection of a manufacturing method, one is, it mustbe able to meet the specifications of final product and the other is, it must be
Correct Answer Cost effective method
Your Answer Cost effective method
Multiple Choice Single AnswerQuestion The ratio of output to input of a production system is commonly known as
Correct Answer Productivity
Your Answer Productivity
Multiple Choice Multiple AnswerQuestion Route Sheet generally contains following information
Correct Answer Material Specification , Sequence of operation , Skill of Labour
Your Answer Material Specification , Sequence of operation , Order Quantity
Select The BlankQuestion Capacity decisions have a direct influence on performance of production system in
respect of ________Correct Answer Delivery performance
Your Answer Delivery performance
True/FalseQuestion Activities whose earliest finish times and latest finish times are not equal constitutes
the critical path.Correct Answer False
Your Answer False
True/FalseQuestion An ideal OC curve is never possible only with cent percent inspection.
Correct Answer False
Your Answer True
Multiple Choice Single AnswerQuestion Which of the following policies is advisable in case of low product variety and large
volumes?Correct Answer Low Skilled Labour & Special Purpose Machines
Your Answer Semiskilled Labour & General Purpose Machines
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot may vary between
________.Correct Answer 0.01 to 10%
Your Answer 0.01 to 10%
Select The BlankQuestion A good maintenance system is not a luxary but a ________.
Correct Answer Necessity
Your Answer Necessity
True/FalseQuestion As a general rule, a site five times the actual plant size is considered minimum for
parking, access facilities and future expansion.Correct Answer True
Your Answer False
Multiple Choice Single AnswerQuestion A good plant layout helps in
Correct Answer Reducing handling costs
Your Answer Reducing handling costs
Multiple Choice Multiple AnswerQuestion Which of the following concepts must be understood for the achievement of quality?
Correct Answer Quality of conformance , Purpose of product , Quality of design
Your Answer Quality of conformance , Purpose of product , Process specifications , Quality ofdesign
Multiple Choice Multiple AnswerQuestion Which of the following industries justify the use of move order?
Correct Answer Power plant , Steel plant , Heavy machinery manufacturing
Your Answer Power plant , Steel plant , Heavy machinery manufacturing
Multiple Choice Multiple AnswerQuestion Which of the following charts are used for the recording of data during the method
study?Correct Answer Operation process chart , Multiple activity chart , Flow process chart
Your Answer Single handed process chart , Operation process chart , Flow process chart
Multiple Choice Single AnswerQuestion Inadequate production capacity ultimately leads to
Correct Answer Poor Customer Service
Your Answer Poor Customer Service
Multiple Choice Single Answer
Question Which document is used for returning the surplus material?
Correct Answer Stores Return Note
Your Answer Stores Return Note
Multiple Choice Multiple AnswerQuestion Which kind of natural delays and interruptions are considered during estimation of
activity time?Correct Answer Shop efficiency , Breakdowns , Absenteeism
Your Answer Breakdowns , Absenteeism , Delay due to shortage of resources
Multiple Choice Single AnswerQuestion Technique of Value Engineering can be effectively employed in design of a product to
Correct Answer To meet the intended function at lowest cost
Your Answer To meet the intended function at lowest cost
Multiple Choice Multiple AnswerQuestion Components of Production Management include
Correct Answer Capacity Planning , Job Design , Production Planning
Your Answer Capacity Planning , Production Planning , Manpower Planning
Select The BlankQuestion The ________ breakdowns usually cost more, partly due to damage done to the
adjustment components and partly due to emergency actions.Correct Answer Unexpected
Your Answer Unexpected
Select The BlankQuestion The term ________ emplies the foregone profit due to inability of company to
produce.Correct Answer Opportunity cost
Your Answer Down time cost
True/FalseQuestion Job life is one of the factors that influence Process Planning
Correct Answer True
Your Answer False
Multiple Choice Multiple AnswerQuestion Which are the different methods of recording actual progress of work?
Correct Answer Display boards , Progress cards , Network updating
Your Answer Display boards , Job cards , Network updating
Select The BlankQuestion An ________ history card is the record of all repairs, replacements and engineering
changes carried out in the equipment during it's period of service.Correct Answer Equipment history card
Your Answer Equipment history card
Multiple Choice Single AnswerQuestion A good layout makes effective use of space. Utilization of space for a department like
Stores can be measured byCorrect Answer Proportion of Cubic volume space utilized
Your Answer Ratio of area utilised to area available
Select The BlankQuestion A ________ is another form of subcontracting.
Correct Answer Hiring capacity
Your Answer Open purchase order
Match The Following
Question Correct Answer Your Answer
Combined Layout Mixed Layout Mixed Layout
Fixed Position Layout Project Layout Project Layout
Product Layout Line Layout Line Layout
Process Layout Functional Layout Functional Layout
Select The BlankQuestion A ________helps to avoid crowding of jobs at a particular machine by change of
route of some of the jobs or by diverting work to other machine.Correct Answer Control board
Your Answer Forwarding note
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any product/s is
calledCorrect Answer Factory
Your Answer Factory
Multiple Choice Single AnswerQuestion What do you mean by the study of repetitive short cycle operations which involve
quick hand / feet motions?
Correct Answer Micromotion study
Your Answer Cycle study
True/FalseQuestion The steeper the OC curve, the better is the discrimination between good and bad lots.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Which of the following causes can be responsible for derailing the production schedule
in a factory?Correct Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism
Your Answer Delay in receipt of material from vendor , Excessive absenteeism
Multiple Choice Single AnswerQuestion Which is the next stage to the inspection based quality control in the historical
development of quality management.Correct Answer Quality assurance
Your Answer Quality assurance
Multiple Choice Single AnswerQuestion Which is the most popular scientific tool for project planning?
Correct Answer Critical path analysis
Your Answer Critical path analysis
True/FalseQuestion Planned lubrication is said to be the nervous system of the equipment.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion What is the basic philosophy of statistical process control?
Correct Answer Prevention is better than cure
Your Answer Prevention is better than cure
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to entity can
be defined asCorrect Answer Operation
Your Answer Operation
Multiple Choice Single AnswerQuestion Following is not a function of PPC
Correct Answer Product Planning
Your Answer Order Processing
Select The BlankQuestion The ________ is the maximum percentage defective that for the purpose of sampling
inspection can be considered satisfactory as a process average.Correct Answer Acceptable quality level
Your Answer Acceptable quality level
Match The FollowingQuestion Correct Answer Your Answer
Community Facilities Educational facility Educational facility
Proximity to market Fragile product Fragile product
Industrial and labour attitude Productivity of labour Productivity of labour
Legislation and taxation Licenses Licenses
POM assgn : Deepak
Select The BlankQuestion Work study is also called ________ study
Correct Answer Time and Motion
Your Answer Time and Motion
Select The BlankQuestion The ________ includes preventive maintenance activities whose needs are
identified through inspection which requires stoppage of machines.Correct Answer Shutdown Maintenance
Your Answer Running Maintenance
Multiple Choice Single AnswerQuestion What is the reason of fluctuations, if the control chart evaluates that the process
is not in a state of statistical control?Correct Answer Assignable variability
Your Answer Planned variability
Multiple Choice Single AnswerQuestion Which of the following techniques is used by industrial engineering department
to obtain the utilisation index?Correct Answer Work Sampling Studies
Your Answer Break Even Analysis
Multiple Choice Single AnswerQuestion Process type layout is suitable when
Correct Answer there is wide variation in processing time of operations
Your Answer Product is required in huge quantity
Multiple Choice Multiple AnswerQuestion What are the advantages of three dimensional models?
Correct Answer Even non-technical person can use it , Overhead facilities can be shown , Can beshifted easily and quickly
Your Answer Even non-technical person can use it , Overhead facilities can be shown ,Economical
Select The BlankQuestion One detachable ticket is prepared for each ________.
Correct Answer Operation
Your Answer Operation
True/FalseQuestion Since recording by descriptive method has it's limitations, it is not recommended
for use in method study.
Correct Answer True
Your Answer True
Match The FollowingQuestion Correct Answer Your Answer
Combined Layout Mixed Layout Mixed Layout
Fixed Position Layout Project Layout Project Layout
Product Layout Line Layout Line Layout
Process Layout Functional Layout Functional Layout
Select The BlankQuestion The ________ pertain to the climatic conditions which the component , product
or material should withstand.Correct Answer Environmental specifications
Your Answer Material specifications
Multiple Choice Multiple AnswerQuestion Which of the following situations demand that the human consideration should
be given preference over other considerations?Correct Answer Inconsistent earnings where the earnings are tied to output , Poor morale
evidenced by petty or trivial complaints , Repeated cases of accidents and healthhazards
Your Answer Excessive rejections , Poor morale evidenced by petty or trivial complaints ,Repeated cases of accidents and health hazards
Multiple Choice Multiple AnswerQuestion Which are the different situations in which the process capability studies of the
various process are likely to fit?Correct Answer Process variability is just adequate , Good process variability but bad process
centering , Good process variability but poor process centeringYour Answer Very good process variability but process is off-centre , Good process variability
but bad process centering , Good process variability but poor process centering
Select The BlankQuestion A set of activities to keep an equipment in the specified condition is called as
________.Correct Answer Maintenance
Your Answer Maintenance
True/FalseQuestion Feasibility of time schedule requires that an activity be scheduled before any of
it's predecessors are scheduled.Correct Answer False
Your Answer True
Multiple Choice Single AnswerQuestion How industry has responded to the fact of existence of inherant variability of the
manufacturing process?Correct Answer Inclusion of certain tolerance on the basic dimensions in the drawing
Your Answer Inclusion of certain tolerance on the basic dimensions in the drawing
Match The FollowingQuestion Correct Answer Your Answer
Factor Analysis Method to evaluate layouts Method to evaluate layouts
Minimization of production delays Objective of good layout Principles of good layout
Maximum visibility Principles of good layout Technique for evolving andanalysis of layouts
Scale model Layout analysis Modelling approach to layouts
Multiple Choice Multiple AnswerQuestion Which of the following are the most suitable cases where we can use CPA as
effective technique of scheduling?Correct Answer Overhauling of a CNC machine , Purchase and installation of a newly imported
special purpose machine , Design, production and testing of prototype of afighter aircraft.
Your Answer Overhauling of a CNC machine , Purchase and installation of a newly importedspecial purpose machine , Production of batch of 1000 jobs on two machines
True/FalseQuestion With a general OC curve, probability of acceptance of lots of good quality is
never unity.Correct Answer True
Your Answer True
Select The BlankQuestion OC curve of ideal sampling plan suggests that all lots less than 3% defectives
have the probability of acceptance of ________.Correct Answer One
Your Answer Two
Select The BlankQuestion The ________ is necessary when the job requires detailed of one or more of the
job characteristics with the help of special equipment which is not available atthe producing company.
Correct Answer Inspection order
Your Answer Job card
Select The BlankQuestion Production Planning is a centralised activity which includes functions such as
________
Correct Answer Scheduling
Your Answer Scheduling
Multiple Choice Multiple AnswerQuestion Which of the following products should be produced by using mass production?
Correct Answer Refrigerator , Tyre for automobile , Television Set
Your Answer Refrigerator , Tyre for automobile , Television Set
Multiple Choice Single AnswerQuestion Following is not an input information for Process Planning
Correct Answer Inventory level
Your Answer Standard Time Data
True/FalseQuestion All activities must not be tied up into the network
Correct Answer False
Your Answer True
True/FalseQuestion All activities lying on the non-critical paths must have total float and free float.
Correct Answer False
Your Answer False
True/FalseQuestion Grouping of machines gives a lot of flexibility in loading and scheduling
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion One of the following is not a gross material
Correct Answer cotton
Your Answer Timber
True/FalseQuestion Limit gauges are not useful when it is necessary to measure the exact amount of
variation.Correct Answer True
Your Answer False
Multiple Choice Single AnswerQuestion What is the relation between duration of an activity and length of an arrow?
Correct Answer No relation
Your Answer No relation
Multiple Choice Multiple AnswerQuestion Which are different ways to show critical path in a network?
Correct Answer Thick Line , Red Line , Double Line
Your Answer Thick Line , Dotted line
Multiple Choice Single AnswerQuestion Which manufacturing method is ideal for the use of air gauges as inspection
device?Correct Answer Mass
Your Answer Process
Multiple Choice Multiple AnswerQuestion Which of the following can be subtypes of corrective maintenance?
Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Your Answer Predictive Maintenance , Design-out Maintenance , Design-in Maintenance
Multiple Choice Multiple AnswerQuestion What are the uses of the instruction manual provided by the manufacturer of a
machine?Correct Answer It gives instructions regarding installation and operation of the equipment , It
contains note on common troubles with causes and remedies for troubleshooting, It enlists points, frequency and type of lubrication
Your Answer It gives instructions regarding installation and operation of the equipment , Itcontains note on common troubles with causes and remedies for troubleshooting, It enlists points, frequency and type of lubrication
Select The BlankQuestion The ________ is a set of tools and techniques by which products are made to
comply with the specifications at minimum cost to the firm.Correct Answer Quality control system
Your Answer Design system
Multiple Choice Single AnswerQuestion Provision of drainage facilities is important for the following type of industry
Correct Answer Chemical Process
Your Answer Chemical Process
Multiple Choice Multiple Answer
Question Which are three different bases to establish an activity time?
Correct Answer Past experience , Judgement , Historical data
Your Answer Actual measurement , Past experience , Historical data
Multiple Choice Single AnswerQuestion Inherent Safety' is one of the principle of good layout. In context of layout, this
can be achieved by the followingCorrect Answer Clear gangway, location of material and material handling system
Your Answer Clear gangway, location of material and material handling system
Multiple Choice Multiple AnswerQuestion Which of the following are examples of attributes?
Correct Answer Cracks , Burrs , Texture
Your Answer Cracks , Hardness , Burrs
True/FalseQuestion Diversified labour is adequately available in rural area as compared to urban
area.Correct Answer False
Your Answer True
True/FalseQuestion Fixed cost is lower in case of continuous production than intermittent production.
Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Why graphical method of recording is preferred over the descriptive method
during method study?Correct Answer It segregates effective part form ineffective parts , It reduces effort involved in
writing , Critical examinations easier and more effectiveYour Answer It segregates effective part form ineffective parts , It reduces effort involved in
writing , Critical examinations easier and more effective
Multiple Choice Single AnswerQuestion Process planning is the process of
Correct Answer establishing shortest and most economic path of production
Your Answer establishing shortest and most economic path of production
Multiple Choice Multiple AnswerQuestion Which are the different types of flow process charts used for method study?
Correct Answer Equipment type , Man type , Material type
Your Answer Equipment type , Material type , Operator type
True/FalseQuestion In case of X bar-R charts, statistical limits are calculated from averages of
samples of n (4,5,…) instead of single sample of large size to reduce the spreadof natural variability.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion How does motion economy prove useful in mass production?
Correct Answer It improves work bench layout and evolve logical sequence of assembly of parts
Your Answer It improves work bench layout and evolve logical sequence of assembly of parts
Select The BlankQuestion The ________ is the probability that a bad lot will be accepted by the sampling
plan.Correct Answer Consumer's risk
Your Answer Lot Tolerance Percentage Defective
Select The BlankQuestion Goods after final inspection should accompany ________to enable dispatch
department to identify and draw correct reference.Correct Answer Forwarding note
Your Answer Forwarding note
POM assgn : GS KumarsMultiple Choice Multiple AnswerQuestion Why graphical method of recording is preferred over the descriptive method during method
study?Correct Answer It segregates effective part form ineffective parts , It reduces effort involved in writing ,
Critical examinations easier and more effectiveYour Answer Critical examinations easier and more effective , It segregates effective part form
ineffective parts , It reduces effort involved in writing
Multiple Choice Multiple AnswerQuestion Which are the subfactors of community facilities or social infrastructure?Correct Answer Accomodation , Educational , EntertainmentYour Answer Accomodation , Educational , Entertainment
Select The BlankQuestion The ________ is the probability that a bad lot will be accepted by the sampling plan.Correct Answer Consumer's riskYour Answer Consumer's risk
Multiple Choice Multiple AnswerQuestion Which of the following are examples of consumption of physical effort during recording for
method study?Correct Answer Bending , Positioning , UnloadingYour Answer Bending , Positioning , Unloading
Multiple Choice Single AnswerQuestion How to claculate the producer risk in the OC Curve?Correct Answer Probability that a good lot will be rejected by the samplingYour Answer Probability that a good lot will be rejected by the sampling
Select The BlankQuestion The ________ are the definitions of the measurable as well as nonmeasurable characteristics
of the product.Correct Answer SpecificationsYour Answer Specifications
Select The BlankQuestion The ________ is the watch dog which ensures that every element of production and activities
which could affect the quality of end product are regulated to the extent desirable.Correct Answer Quality controlYour Answer Quality control
True/FalseQuestion Expediting action is necessary if the delays and interruptions are abnormal and hence any
subsequent delay is bound to extend the promised delivery date.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Process Engineer does not get sufficient time for designing tooling for most economic
production run whenCorrect Answer Delivery time is lessYour Answer Delivery time is less
Select The BlankQuestion The ________ includes preventive maintenance activities whose needs are identified through
inspection which requires stoppage of machines.Correct Answer Shutdown MaintenanceYour Answer Shutdown Maintenance
True/FalseQuestion Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity
in process layoutCorrect Answer TrueYour Answer True
Select The BlankQuestion The ________ is the maximum percentage defective that for the purpose of sampling
inspection can be considered satisfactory as a process average.Correct Answer Acceptable quality levelYour Answer Acceptable quality level
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to complete an activity within it's
crashed time?Correct Answer Crash costYour Answer Crash cost
Multiple Choice Multiple AnswerQuestion Which are the first three steps of Critical Path Analysis technique?Correct Answer Activity relationships , Activity identification , Network constructionYour Answer Activity relationships , Activity identification , Network construction
True/FalseQuestion Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure
of machinery.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following can be subtypes of corrective maintenance?Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in MaintenanceYour Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of the condition of
an item from routine or continuous checking.Correct Answer Condition monitoringYour Answer Condition monitoring
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to entity can be
defined asCorrect Answer OperationYour Answer Production
Match The FollowingQuestion Correct Answer Your Answer
Toung Sweet Sweet
Eye Crack Crack
Nose Burnout Burnout
Ear Impact Impact
Select The BlankQuestion The ________ is a set of tools and techniques by which products are made to comply with the
specifications at minimum cost to the firm.Correct Answer Quality control systemYour Answer Quality control system
Multiple Choice Single AnswerQuestion What is the meaning of " Product features" according to J.M.Juran?Correct Answer Quality of designYour Answer Quality of design
Multiple Choice Multiple AnswerQuestion Which of the following method can be used to record the facts during the method study?Correct Answer Micromotion study , Cyclegraph , ChronocyclegraphYour Answer Micromotion study , Photograph , Cyclegraph , Chronocyclegraph
True/FalseQuestion All activities must not be tied up into the networkCorrect Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Which of the following are types of sampling plan?Correct Answer Single sampling plan , Double sampling plan , Multiple sampling planYour Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Multiple Choice Multiple AnswerQuestion How many of the following are types of specification?Correct Answer Material specifications , Dimensional specifications , Performance specificationsYour Answer Material specifications , Dimensional specifications , Performance specifications
Multiple Choice Multiple AnswerQuestion Plant layout facilitates processing of products in most effective manner through the followingCorrect Answer Shortest possible distance , Shortest processing time , Minimum movementYour Answer Shortest possible distance , Minimum movement
Select The BlankQuestion Work study is also called ________ studyCorrect Answer Time and MotionYour Answer Time and Motion
True/FalseQuestion Operation Process Chart provides information on time and distancesCorrect Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Plant Layout is concerned with optimum arrangement of the followingCorrect Answer Storage space , Machines , Material Handling EquipmentYour Answer Storage space , Machines , Sequence of operation
Multiple Choice Single AnswerQuestion Management often fails to realize the importance of efficient layout due to following reasonCorrect Answer losses resulting from poor layout are not directly shown in the financial statementsYour Answer losses resulting from poor layout are not directly shown in the financial statements
True/FalseQuestion Inspection order is must even for simple jobs which can be inspected by shop inspector with
the tooling available on shop.
Correct Answer FalseYour Answer True
True/FalseQuestion Feasibility of time schedule requires that an activity be scheduled before any of it's
predecessors are scheduled.Correct Answer FalseYour Answer True
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any product/s is calledCorrect Answer FactoryYour Answer Factory
True/FalseQuestion Planned lubrication is said to be the nervous system of the equipment.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion What is the basic philosophy of statistical process control?Correct Answer Prevention is better than cureYour Answer Prevention is better than cure
Multiple Choice Single AnswerQuestion How does the control chart of statistical quality control helps the operating personnel?Correct Answer Identify the presence of an assignable cause before it developsYour Answer Identify the presence of an assignable cause before it develops
Multiple Choice Single AnswerQuestion Where does the central line is located in case of p-chart?Correct Answer at p barYour Answer at p bar
Multiple Choice Multiple AnswerQuestion Which of the following may be the objectives of project crashing?Correct Answer To complete the project in the least possible time , To reduce project cost below it's
normal cost , To achieve uniformity in requirement of resourcesYour Answer To complete the project in the least possible time , To reduce project cost below it's
normal cost , To achieve uniformity in requirement of resources
Select The BlankQuestion The ________ advocates maintenance procedures whereby the condition of the plant is
constantly watched through systematic inspection to unearth unhealthy conditions and preventiveCorrect Answer Preventive MaintenanceYour Answer Preventive Maintenance
True/FalseQuestion A network should be progression of activities always moving forward.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Which is the ideal place to write a description of an activity in a network?Correct Answer Above the arrowYour Answer Above the arrow
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.
Correct Answer 0.01 to 10%Your Answer 0.01 to 10%
True/FalseQuestion For p-chart, the central line of fraction defectives is determined by average percentage
defectives.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Which phase of method study is concerned with analyzing the facts critically, generating
alternatives which form the basis for selection and development of improved methods?Correct Answer Critical examinationYour Answer Critical examination
Multiple Choice Single AnswerQuestion Which of the following policies is advisable in case of low product variety and large volumes?Correct Answer Low Skilled Labour & Special Purpose MachinesYour Answer Low Skilled Labour & Special Purpose Machines
Multiple Choice Single AnswerQuestion Which kind of inspection is followed in case of product layout?Correct Answer Pilot inspectionYour Answer Pilot inspection
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Sampling Inspection
Gantt Chart Production Scheduling Production Scheduling
POM assgn : Raj
Multiple Choice Single AnswerQuestion Which phase of method study is concerned with analyzing the facts critically,
generating alternatives which form the basis for selection and development ofimproved methods?
Correct Answer Critical examination
Your Answer Development and selection
Select The BlankQuestion The ________ advocates maintenance procedures whereby the condition of the
plant is constantly watched through systematic inspection to unearth unhealthyconditions and preventive
Correct Answer Preventive Maintenance
Your Answer Design-in Maintenance
Select The BlankQuestion The term ________ emplies the foregone profit due to inability of company to
produce.Correct Answer Opportunity cost
Your Answer Down time cost
True/FalseQuestion A network should employ only those dummy activities which are absolutely
necessary.Correct Answer True
Your Answer True
Select The BlankQuestion A set of activities to keep an equipment in the specified condition is called as
________.Correct Answer Maintenance
Your Answer Maintenance
True/FalseQuestion While making X bar-R-chart, values of X bar and R are recoded samplewise either
on the extreme right of the individual measurements on the data sheet or in aseparate sheet.
Correct Answer True
Your Answer False
Select The BlankQuestion The ________ must ensure that the product satisfy the functional requirements of
it's usage.Correct Answer Quality of design
Your Answer Quality of inspection
True/FalseQuestion Even if any activity on the critical path is delayed, project completes on the
scheduled time.Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion Which is the alternative way of indicating the load other than numerical way, in
case of Gantt chart ?Correct Answer Graphical approach
Your Answer Symbolic pproach
Multiple Choice Multiple AnswerQuestion Which of the following are types of sampling plan?
Correct Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Your Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Multiple Choice Multiple AnswerQuestion Which of the following are major inputs to scheduling?
Correct Answer Overlapping of operations , Effective Capacity per work centre , Performancestandards
Your Answer Overlapping of operations , Effective Capacity per work centre , Performancestandards
Select The BlankQuestion The ________ is necessary when the job requires detailed of one or more of the
job characteristics with the help of special equipment which is not available at theproducing company.
Correct Answer Inspection order
Your Answer Stores issue order
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of the
condition of an item from routine or continuous checking.Correct Answer Condition monitoring
Your Answer Condition monitoring
True/FalseQuestion Diversified labour is adequately available in rural area as compared to urban area.
Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Which of the following cases indicated that the operation has occurred?
Correct Answer Movement of components to assembly section , Raw material movement , Aworker's trip to grinder to sharpen the tools
Your Answer Movement of components to assembly section , A worker's trip to grinder tosharpen the tools , Tools kept in rack of tool crib
Multiple Choice Single AnswerQuestion What is the reason of fluctuations, if the control chart evaluates that the process
is in a state of statistical control?Correct Answer Random variability
Your Answer Set up variability
Select The BlankQuestion The ________ is the maximum percentage defective that for the purpose of
sampling inspection can be considered satisfactory as a process average.Correct Answer Acceptable quality level
Your Answer Acceptable quality level
Multiple Choice Single AnswerQuestion Product layout is suitable when
Correct Answer Products have reasonable stable demand
Your Answer Products are not required in large quantities
Multiple Choice Multiple AnswerQuestion Which of the following charts are used for the recording of data during the method
study?Correct Answer Operation process chart , Multiple activity chart , Flow process chart
Your Answer Operation process chart , Multiple activity chart , Flow process chart
True/FalseQuestion The operator should not stop production if first piece is not approved by the
inspector.Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion Need for change in layout can occur due to following reason
Correct Answer introduction of new product
Your Answer introduction of new product
Multiple Choice Single AnswerQuestion What do you mean by a single event which represents the joint completion of
more than one activities?Correct Answer Merge event
Your Answer Merge event
True/FalseQuestion The control chart for number of defectives is more convenient to make than
control chart for fraction defectives sincethe fugure of number of defectives unitscan be directly taken from the inspection report.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion Which rule is used for numbering of events?
Correct Answer Fulkerson's Rule
Your Answer Juran's Rule
True/FalseQuestion In case of two handed process chart, the simultaneous activities of both hands are
recorded opposite to each other on the chart.Correct Answer True
Your Answer True
True/FalseQuestion All activities lying on the non-critical paths must have total float and free float.
Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Which of the following is not the characteristic of Project Production?
Correct Answer Continuous flow of material , Highly mechanised material handling , Virtually zeromanufacturing cycle time
Your Answer Continuous flow of material , Highly mechanised material handling , Virtually zeromanufacturing cycle time
Multiple Choice Multiple AnswerQuestion Which of the following is not the characteristic of Project Production?
Correct Answer Continuous flow of material , Highly mechanised material handling , Virtually zeromanufacturing cycle time
Your Answer Fixed position layout
Select The BlankQuestion The ________ are the definitions of the measurable as well as nonmeasurable
characteristics of the product.Correct Answer Specifications
Your Answer Specifications
Multiple Choice Single AnswerQuestion How industry has responded to the fact of existence of inherant variability of the
manufacturing process?
Correct Answer Inclusion of certain tolerance on the basic dimensions in the drawing
Your Answer Inclusion of certain tolerance on the basic dimensions in the drawing
Select The BlankQuestion Work study is also called ________ study
Correct Answer Time and Motion
Your Answer Time and Motion
Multiple Choice Multiple AnswerQuestion Which are the different methods of recording actual progress of work?
Correct Answer Display boards , Progress cards , Network updating
Your Answer Job cards , Progress cards , Network updating
True/FalseQuestion In case of backward pass computation, the latest event time of the end event
equals to the earliest event time minus duration of that activity.Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Which of the following products should be produced by using mass production?
Correct Answer Refrigerator , Tyre for automobile , Television Set
Your Answer Refrigerator , Tyre for automobile , Television Set
Multiple Choice Multiple AnswerQuestion Which of the following are examples of attributes?
Correct Answer Cracks , Burrs , Texture
Your Answer Cracks , Burrs , Texture
Match The FollowingQuestion Correct Answer Your Answer
Scheduling Device Strings Strings
Interruption for machineutilisation
Preventive maintenance Preventive maintenance
Input for scheduling Overlapping of operations Critical Path Analysis
Technique of scheduling Critical Path Analysis JIT
Multiple Choice Multiple AnswerQuestion Which are the three distinct parts of the chart?
Correct Answer Summary , Introduction , Body
Your Answer Summary , Introduction , Analysis
Match The FollowingQuestion Correct Answer Your Answer
Combined Layout Mixed Layout Mixed Layout
Fixed Position Layout Project Layout Project Layout
Product Layout Line Layout Line Layout
Process Layout Functional Layout Functional Layout
Multiple Choice Multiple AnswerQuestion Following are the commonly used factors considered for evaluation of layout in
factor analysis methodCorrect Answer Flow of material , Equipment utilization , Working condition
Your Answer Flow of material , Equipment utilization , Working condition
Multiple Choice Single AnswerQuestion Fixed position layout is adopted when
Correct Answer product is very heavy involving assembly of large number of parts
Your Answer product is very heavy involving assembly of large number of parts
Select The BlankQuestion The ________ is the defect level for which lots are regarded as bad lots.
Correct Answer Lot Tolerance Percentage Defective
Your Answer Acceptable quality level
Multiple Choice Multiple AnswerQuestion Which of the following are examples of specifications?
Correct Answer Commercial standards , Assembly and testing instructions , Bill of material
Your Answer Commercial standards , Assembly and testing instructions , Bill of material
Multiple Choice Single AnswerQuestion Process Engineer does not get sufficient time for designing tooling for most
economic production run whenCorrect Answer Delivery time is less
Your Answer Delivery time is less
Multiple Choice Single AnswerQuestion What do you mean by the graphical representation of the project which is
composed as series of connected arrows and circles to describe the
interrelationship of the activities involved?
Correct Answer Network
Your Answer Flow chart
True/FalseQuestion Latest finishing date is the latest event time of the tail event.
Correct Answer False
Your Answer True
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any product/s
is calledCorrect Answer Factory
Your Answer Factory
Select The BlankQuestion The ________ is the probability that a bad lot will be accepted by the sampling
plan.Correct Answer Consumer's risk
Your Answer Consumer's risk
POM assgnMultiple Choice Multiple AnswerQuestion Why graphical method of recording is preferred over the descriptive method during method
study?Correct Answer It segregates effective part form ineffective parts , It reduces effort involved in writing ,
Critical examinations easier and more effectiveYour Answer Critical examinations easier and more effective , It segregates effective part form
ineffective parts , It reduces effort involved in writing
Multiple Choice Multiple AnswerQuestion Which are the subfactors of community facilities or social infrastructure?Correct Answer Accomodation , Educational , EntertainmentYour Answer Accomodation , Educational , Entertainment
Select The BlankQuestion The ________ is the probability that a bad lot will be accepted by the sampling plan.Correct Answer Consumer's riskYour Answer Consumer's risk
Multiple Choice Multiple AnswerQuestion Which of the following are examples of consumption of physical effort during recording for
method study?Correct Answer Bending , Positioning , UnloadingYour Answer Bending , Positioning , Unloading
Multiple Choice Single AnswerQuestion How to claculate the producer risk in the OC Curve?Correct Answer Probability that a good lot will be rejected by the samplingYour Answer Probability that a good lot will be rejected by the sampling
Select The BlankQuestion The ________ are the definitions of the measurable as well as nonmeasurable characteristics
of the product.Correct Answer SpecificationsYour Answer Specifications
Select The BlankQuestion The ________ is the watch dog which ensures that every element of production and activities
which could affect the quality of end product are regulated to the extent desirable.Correct Answer Quality controlYour Answer Quality control
True/FalseQuestion Expediting action is necessary if the delays and interruptions are abnormal and hence any
subsequent delay is bound to extend the promised delivery date.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Process Engineer does not get sufficient time for designing tooling for most economic
production run whenCorrect Answer Delivery time is lessYour Answer Delivery time is less
Select The BlankQuestion The ________ includes preventive maintenance activities whose needs are identified through
inspection which requires stoppage of machines.Correct Answer Shutdown MaintenanceYour Answer Shutdown Maintenance
True/FalseQuestion Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity
in process layoutCorrect Answer TrueYour Answer True
Select The BlankQuestion The ________ is the maximum percentage defective that for the purpose of sampling
inspection can be considered satisfactory as a process average.Correct Answer Acceptable quality levelYour Answer Acceptable quality level
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to complete an activity within it's
crashed time?Correct Answer Crash costYour Answer Crash cost
Multiple Choice Multiple AnswerQuestion Which are the first three steps of Critical Path Analysis technique?Correct Answer Activity relationships , Activity identification , Network constructionYour Answer Activity relationships , Activity identification , Network construction
True/FalseQuestion Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure
of machinery.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following can be subtypes of corrective maintenance?Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in MaintenanceYour Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of the condition of
an item from routine or continuous checking.Correct Answer Condition monitoringYour Answer Condition monitoring
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to entity can be
defined asCorrect Answer OperationYour Answer Production
Match The FollowingQuestion Correct Answer Your Answer
Toung Sweet Sweet
Eye Crack Crack
Nose Burnout Burnout
Ear Impact Impact
Select The BlankQuestion The ________ is a set of tools and techniques by which products are made to comply with the
specifications at minimum cost to the firm.Correct Answer Quality control systemYour Answer Quality control system
Multiple Choice Single AnswerQuestion What is the meaning of " Product features" according to J.M.Juran?Correct Answer Quality of designYour Answer Quality of design
Multiple Choice Multiple AnswerQuestion Which of the following method can be used to record the facts during the method study?Correct Answer Micromotion study , Cyclegraph , ChronocyclegraphYour Answer Micromotion study , Photograph , Cyclegraph , Chronocyclegraph
True/FalseQuestion All activities must not be tied up into the networkCorrect Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Which of the following are types of sampling plan?Correct Answer Single sampling plan , Double sampling plan , Multiple sampling planYour Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Multiple Choice Multiple AnswerQuestion How many of the following are types of specification?Correct Answer Material specifications , Dimensional specifications , Performance specificationsYour Answer Material specifications , Dimensional specifications , Performance specifications
Multiple Choice Multiple AnswerQuestion Plant layout facilitates processing of products in most effective manner through the followingCorrect Answer Shortest possible distance , Shortest processing time , Minimum movementYour Answer Shortest possible distance , Minimum movement
Select The BlankQuestion Work study is also called ________ studyCorrect Answer Time and MotionYour Answer Time and Motion
True/FalseQuestion Operation Process Chart provides information on time and distancesCorrect Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Plant Layout is concerned with optimum arrangement of the followingCorrect Answer Storage space , Machines , Material Handling EquipmentYour Answer Storage space , Machines , Sequence of operation
Multiple Choice Single AnswerQuestion Management often fails to realize the importance of efficient layout due to following reasonCorrect Answer losses resulting from poor layout are not directly shown in the financial statementsYour Answer losses resulting from poor layout are not directly shown in the financial statements
True/FalseQuestion Inspection order is must even for simple jobs which can be inspected by shop inspector with
the tooling available on shop.
Correct Answer FalseYour Answer True
True/FalseQuestion Feasibility of time schedule requires that an activity be scheduled before any of it's
predecessors are scheduled.Correct Answer FalseYour Answer True
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any product/s is calledCorrect Answer FactoryYour Answer Factory
True/FalseQuestion Planned lubrication is said to be the nervous system of the equipment.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion What is the basic philosophy of statistical process control?Correct Answer Prevention is better than cureYour Answer Prevention is better than cure
Multiple Choice Single AnswerQuestion How does the control chart of statistical quality control helps the operating personnel?Correct Answer Identify the presence of an assignable cause before it developsYour Answer Identify the presence of an assignable cause before it develops
Multiple Choice Single AnswerQuestion Where does the central line is located in case of p-chart?Correct Answer at p barYour Answer at p bar
Multiple Choice Multiple AnswerQuestion Which of the following may be the objectives of project crashing?Correct Answer To complete the project in the least possible time , To reduce project cost below it's
normal cost , To achieve uniformity in requirement of resourcesYour Answer To complete the project in the least possible time , To reduce project cost below it's
normal cost , To achieve uniformity in requirement of resources
Select The BlankQuestion The ________ advocates maintenance procedures whereby the condition of the plant is
constantly watched through systematic inspection to unearth unhealthy conditions and preventiveCorrect Answer Preventive MaintenanceYour Answer Preventive Maintenance
True/FalseQuestion A network should be progression of activities always moving forward.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Which is the ideal place to write a description of an activity in a network?Correct Answer Above the arrowYour Answer Above the arrow
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.
Correct Answer 0.01 to 10%Your Answer 0.01 to 10%
True/FalseQuestion For p-chart, the central line of fraction defectives is determined by average percentage
defectives.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Which phase of method study is concerned with analyzing the facts critically, generating
alternatives which form the basis for selection and development of improved methods?Correct Answer Critical examinationYour Answer Critical examination
Multiple Choice Single AnswerQuestion Which of the following policies is advisable in case of low product variety and large volumes?Correct Answer Low Skilled Labour & Special Purpose MachinesYour Answer Low Skilled Labour & Special Purpose Machines
Multiple Choice Single AnswerQuestion Which kind of inspection is followed in case of product layout?Correct Answer Pilot inspectionYour Answer Pilot inspection
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Sampling Inspection
Gantt Chart Production Scheduling Production Scheduling
POM assgn : Rahul
Multiple Choice Multiple AnswerQuestion What are the benefits of reconditioning?
Correct Answer Eliminates problems and frequent breakdowns , Increases life of anequipment , It helps to plan requirement of replacement spares
Your Answer Eliminates problems and frequent breakdowns , Increases life of anequipment , It helps to plan requirement of replacement spares
Select The BlankQuestion Production control work is ________ in case of floor inspection as
compared with the centralised inspection.Correct Answer easier
Your Answer time consuming
Multiple Choice Single AnswerQuestion What is the nature of the sampling plan for critical defects?
Correct Answer Tight
Your Answer Moderate
Select The BlankQuestion Work study is also called ________ study
Correct Answer Time and Motion
Your Answer Time and Motion
Multiple Choice Multiple AnswerQuestion Which of the following information is available in summary of part in a chart
during methods study?Correct Answer Frequency of each symbol , Total time for each symbol , Total distance
travelled by the objectYour Answer Frequency of each symbol , Total time for each symbol , Present and
proposed method
True/FalseQuestion Development of a good lubrication programme begins with the identification
of lubrication points.Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Which of the following are important considerations concerning activity
times?Correct Answer Activity time should be obtained from the person responsible for the
completion of an activity , Activity time must be independent of anyinfluence which the preceding or succeeding activity may have on it. ,Activity time may assume that just the normal quantity of resourcesrequired to carry out the activity are available.
Your Answer Activity time should be obtained from the person responsible for thecompletion of an activity , Infinite resources are available to carry out the
activity , Activity time must be independent of any influence which thepreceding or succeeding activity may have on it.
Select The BlankQuestion The ________ includes preventive maintenance activities whose needs are
identified through inspection which requires stoppage of machines.Correct Answer Shutdown Maintenance
Your Answer Shutdown Maintenance
True/FalseQuestion The operator should not stop production if first piece is not approved by the
inspector.Correct Answer False
Your Answer False
True/FalseQuestion Sampling inspection suffice to check the work of line inspectors and stage
inspectors.Correct Answer True
Your Answer False
True/FalseQuestion Feasibility of time schedule requires that an activity be scheduled before
any of it's predecessors are scheduled.Correct Answer False
Your Answer True
True/FalseQuestion In case of backward pass computation method, the latest event time
represents the latest occurrence time of the event.Correct Answer True
Your Answer True
Select The BlankQuestion Capacity decisions have a direct influence on performance of production
system in respect of ________Correct Answer Delivery performance
Your Answer Quality
Multiple Choice Single AnswerQuestion Which of the following technique is event oriented ?
Correct Answer Project Evaluation & Review Technique
Your Answer Project Engineering & Resources Technique
Select The BlankQuestion An ________ history card is the record of all repairs, replacements and
engineering changes carried out in the equipment during it's period ofservice.
Correct Answer Equipment history card
Your Answer Equipment history card
Select The BlankQuestion The ________ breakdowns usually cost more, partly due to damage done
to the adjustment components and partly due to emergency actions.Correct Answer Unexpected
Your Answer Unexpected
Multiple Choice Single AnswerQuestion Which is the ideal place to write a time allotted for an activity in a network?
Correct Answer Below the arrow
Your Answer Below the arrow
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any
product/s is calledCorrect Answer Factory
Your Answer Factory
Multiple Choice Single AnswerQuestion The ratio of output to input of a production system is commonly known as
Correct Answer Productivity
Your Answer Productivity
Match The FollowingQuestion Correct Answer Your Answer
Combined Layout Mixed Layout Mixed Layout
Fixed Position Layout Project Layout Project Layout
Product Layout Line Layout Line Layout
Process Layout Functional Layout Functional Layout
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge
of the condition of an item from routine or continuous checking.Correct Answer Condition monitoring
Your Answer Overhauling
Multiple Choice Multiple AnswerQuestion Which of the following factors related to the labour and wages are
considered while deciding the plant location?Correct Answer Prevailing wage pattern , Productivity of labour , Industrial relations
Your Answer Prevailing wage pattern , Productivity of labour , Industrial relations
Multiple Choice Single AnswerQuestion What do you mean by planned corrective manitenance which provides an
opportunity to undertake design modifications in the equipment toeliminate or reduce frequency of breakdowns.
Correct Answer Design-out Maintenance
Your Answer Design-in Maintenance
True/FalseQuestion It pays in the long run to inform the customer regarding expected delays in
the deliveries.Correct Answer True
Your Answer True
Select The BlankQuestion The ________ is a set of tools and techniques by which products are made
to comply with the specifications at minimum cost to the firm.Correct Answer Quality control system
Your Answer Quality control system
Multiple Choice Single AnswerQuestion Which kind of labour force is required in case of Jobbing Production?
Correct Answer Highly Skilled
Your Answer Highly Skilled
Match The FollowingQuestion Correct Answer Your Answer
Temperature of motor Body Watch
Exhaust gas Smell Smell
Air leakage Listen Listen
Corrosion Watch Body
Multiple Choice Single Answer
Question Which is the most popular scientific tool for project planning?
Correct Answer Critical path analysis
Your Answer Fishbone diagram
Multiple Choice Single AnswerQuestion One of the sophisticated operations research techniques used in material
planning isCorrect Answer Dynamic programming
Your Answer MAPI method
Select The BlankQuestion A set of activities to keep an equipment in the specified condition is called
as ________.Correct Answer Maintenance
Your Answer Maintenance
True/FalseQuestion Cent percent inspection is required on WIP prior to the key, critical or costly
operation.Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to
entity can be defined asCorrect Answer Operation
Your Answer Manufacturing
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot may vary
between ________.Correct Answer 0.01 to 10%
Your Answer 0.01 to 10%
Multiple Choice Multiple AnswerQuestion Which of the following can be subtypes of corrective maintenance?
Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Your Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Multiple Choice Multiple AnswerQuestion What are uses of diagrams in method study?
Correct Answer Study different plant layouts and select the most optimum one , Study the
extent of traffic over the different routes of the plant , Identify the extent ofbacktracking, cross traffic and obstacles encountered during the movementof material.
Your Answer Study different plant layouts and select the most optimum one , Study theextent of traffic over the different routes of the plant , Identify the extent ofbacktracking, cross traffic and obstacles encountered during the movementof material.
Multiple Choice Single AnswerQuestion In case of Batch Production which kind of labour is expected?
Correct Answer Skilled in one specific Manufacturing Process
Your Answer Skilled in one specific Manufacturing Process
Multiple Choice Single AnswerQuestion What do you understand by the inspection conducted on all nonreworkable
jobs prior to their movement to the scrap yard?Correct Answer Salvage inspection
Your Answer Salvage inspection
True/FalseQuestion Cent percent inspection does not mean inspection of component for 100%
quality characteristics.Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Following are some of the factors considered for evaluation of alternative
layoutsCorrect Answer Flow of Material , Equipment utilization , Ease of supervision
Your Answer Flow of Material , Equipment utilization , Delivery performance
True/FalseQuestion In a control chart, as a general rule, time interval should be inversely
proportional to the average frequency of out of control conditions.Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Which of the following situations demand the technical consideration while
selecting a job for method study?Correct Answer Jobs having inconsistent quality , Operations inviting frequent requests
from supervisors for relaxation in allowed time because of variations inmaterials and tool performance , Jobs in which too many man-hours arespend in checking and rechecking work
Your Answer Excessive overtime , Operations inviting frequent requests from supervisorsfor relaxation in allowed time because of variations in materials and toolperformance , Jobs in which too many man-hours are spend in checkingand rechecking work
Multiple Choice Single AnswerQuestion Which kind of relationship exists between those activities which can be
carried out simultaneously and both activities require definite time tofinish?
Correct Answer Concurrent activities
Your Answer Concurrent activities
Select The BlankQuestion An Ideal OC curve is ________ shaped curve that accpets all the lots with
quality equal to or better than AQL .Correct Answer Rectangular
Your Answer Oval
Multiple Choice Single AnswerQuestion What is expected from stores department after they receive the stores
issue order from dispatcher?Correct Answer Keep material ready for issue to shop when authorized
Your Answer Keep material ready for issue to shop when authorized
Multiple Choice Multiple AnswerQuestion Which are the distinct functions of scientific quality control?
Correct Answer Acceptance function , Preventive function , Assurance function
Your Answer Feedback function , Preventive function , Assurance function
Multiple Choice Multiple AnswerQuestion Which are major benefits of identifying the critical path?
Correct Answer It helps to identify the set of activities and events which are critical and assuch must be carefully controlled and monitored , It identifies activities tobe given preference in allocation of resources. , It helps to exercise "controlby exception".
Your Answer It helps to identify the set of activities and events which are critical and assuch must be carefully controlled and monitored , It identifies activities tobe given preference in allocation of resources. , It helps to exercise "controlby exception".
Multiple Choice Multiple AnswerQuestion Material Requirement Planning is very useful in following situations
Correct Answer Long Lead time for procurement , Several levels of assemblies in product ,Long manufacturing cycle
Your Answer Long Lead time for procurement , Several levels of assemblies in product ,Demand for the product is not known
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/FalseQuestion Planned lubrication is said to be the nervous system of the
equipment.Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Features of Cellular layout are
Correct Answer It is a type of mixed layout , Uses concept of Group Technology, Facilities are grouped in to cells
Your Answer It is a type of mixed layout , Uses concept of Group Technology, Facilities are grouped in to cells
Select The BlankQuestion The ________ is the watch dog which ensures that every
element of production and activities which could affect thequality of end product are regulated to the extent desirable.
Correct Answer Quality control
Your Answer Quality control
Multiple Choice Multiple AnswerQuestion What are the advantages of three dimensional models?
Correct Answer Even non-technical person can use it , Overhead facilities canbe shown , Can be shifted easily and quickly
Your Answer Even non-technical person can use it , Overhead facilities canbe shown , Can be shifted easily and quickly
Multiple Choice Single AnswerQuestion Production Planning includes
Correct Answer Predetermination of manufacturing requirements
Your Answer Review of progress
Multiple Choice Single AnswerQuestion A good plant layout helps in
Correct Answer Reducing handling costs
Your Answer Reducing handling costs
Multiple Choice Multiple Answer
Question Which are the three basic types of control chart by attribute?
Correct Answer p-chart , c-chart , np-chart
Your Answer Xbar-R-chart , c-chart , np-chart
Select The BlankQuestion The term ________ emplies the foregone profit due to inability
of company to produce.Correct Answer Opportunity cost
Your Answer Opportunity cost
Multiple Choice Multiple AnswerQuestion Which are different ways to show critical path in a network?
Correct Answer Thick Line , Red Line , Double Line
Your Answer Thick Line , Red Line , Double Line
Multiple Choice Single AnswerQuestion Technique of Value Engineering can be effectively employed in
design of a product toCorrect Answer To meet the intended function at lowest cost
Your Answer To meet the intended function at lowest cost
Multiple Choice Single AnswerQuestion Inadequate production capacity ultimately leads to
Correct Answer Poor Customer Service
Your Answer Low Productivity
Multiple Choice Single AnswerQuestion What do you understand by the timeframe for the maintenance
needs of the equipment?Correct Answer Maintenance inspection schedule
Your Answer Material Requirement planning
Multiple Choice Single AnswerQuestion Technique which can help an organization to reduce inventory is
calledCorrect Answer MRP
Your Answer MRP
Match The FollowingQuestion Correct Answer Your Answer
Scheduling Device Strings Critical Path Analysis
Interruption for machineutilisation
Preventive maintenance Overlapping of operations
Input for scheduling Overlapping of operations Blackboard
Technique of scheduling Critical Path Analysis JIT
Multiple Choice Multiple AnswerQuestion Plant Layout is concerned with optimum arrangement of the
followingCorrect Answer Storage space , Machines , Material Handling Equipment
Your Answer Machines , Material Handling Equipment , Storage space
True/FalseQuestion Independent float either affects the float of preceding activities
or that of succeeding activities.Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Which are the basic requirements of the " Quality of Design "?
Correct Answer Identification of right product , Selection of appropriate features ,Ensure that product renders satisfactory service to customer
Your Answer Identification of right product , Selection of appropriate features ,Ensure that product renders satisfactory service to customer
Multiple Choice Single AnswerQuestion Material control function of PPC is concerned with
Correct Answer Preparation of material estimates
Your Answer indenting all required material
Multiple Choice Single AnswerQuestion What do you mean by the verification of object against
predetermined standards of quality or quantity or both?Correct Answer Inspection
Your Answer Inspection
Multiple Choice Multiple AnswerQuestion Which of the following symbols are used in flow process chart
but not used in operation process chart?Correct Answer Storage , Delay , Transport
Your Answer Delay , Inspection , Transport
Multiple Choice Multiple AnswerQuestion Which are the distinguished features of TQM ?
Correct Answer Covers all kinds of industries , Gradual removal ofinterdepartmental barriers , Continuous improvement
Your Answer Covers all kinds of industries , Gradual removal ofinterdepartmental barriers , Corrective function
True/FalseQuestion F W Taylor devised a system for classifying motions into basic
divisions called TherbligsCorrect Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Components of Production Management include
Correct Answer Capacity Planning , Job Design , Production Planning
Your Answer Capacity Planning , Production Planning , Manpower Planning
Multiple Choice Single AnswerQuestion What do you mean by the chart on which the major activities
and entry points of materials are recorded to have graphic viewof operations and inspections involved in the process?
Correct Answer Operation process chart
Your Answer Operation process chart
Multiple Choice Single AnswerQuestion Which photographic technique is used to record path of motions
of the members of the body during method study?Correct Answer Cyclograph
Your Answer Cyclograph
Select The Blank
Question The ________ must ensure that the product satisfy thefunctional requirements of it's usage.
Correct Answer Quality of design
Your Answer Quality of conformance
Select The BlankQuestion The ________ is the probability that a bad lot will be accepted
by the sampling plan.Correct Answer Consumer's risk
Your Answer Lot Tolerance Percentage Defective
Select The BlankQuestion The ________ advocates maintenance procedures whereby the
condition of the plant is constantly watched through systematicinspection to unearth unhealthy conditions and preventive
Correct Answer Preventive Maintenance
Your Answer Design-in Maintenance
True/FalseQuestion In case of forward pass computation, the earliest event time of a
plain event equals the earliest event time of the preceding eventplus duration of activity emanating from the preceding event.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion How to claculate the producer risk in the OC Curve?
Correct Answer Probability that a good lot will be rejected by the sampling
Your Answer Probability that a bad lot will be accepted by the sampling
True/FalseQuestion An activity can share the same tail event and same head event
with any other activity.Correct Answer False
Your Answer False
True/FalseQuestion Expediting action is necessary if the delays and interruptions are
abnormal and hence any subsequent delay is bound to extendthe promised delivery date.
Correct Answer True
Your Answer False
Multiple Choice Multiple AnswerQuestion Following are the commonly used factors considered for
evaluation of layout in factor analysis methodCorrect Answer Flow of material , Equipment utilization , Working condition
Your Answer Flow of material , Equipment utilization , Working condition
Multiple Choice Multiple AnswerQuestion Which of the following are illustrations of inspection?
Correct Answer Physical count of incoming material against the quantitymentioned in delivery challan , A dimensional check withmeasuring instrument , Visual check of burrs and finish
Your Answer A dimensional check with measuring instrument , Visual checkof burrs and finish , Check the operator performance
True/FalseQuestion Since value of c can never be negativee, hence" if LCLp works
out to be negative, it is taken as zero."Correct Answer True
Your Answer True
Select The BlankQuestion One detachable ticket is prepared for each ________.
Correct Answer Operation
Your Answer Machine
Multiple Choice Single AnswerQuestion How industry has responded to the fact of existence of inherant
variability of the manufacturing process?Correct Answer Inclusion of certain tolerance on the basic dimensions in the
drawingYour Answer Inclusion of certain tolerance on the basic dimensions in the
drawing
True/FalseQuestion Job life is one of the factors that influence Process Planning
Correct Answer True
Your Answer False
Multiple Choice Multiple AnswerQuestion Which of the following products should be produced by using
mass production?Correct Answer Refrigerator , Tyre for automobile , Television Set
Your Answer Refrigerator , Tyre for automobile , Television Set
Select The BlankQuestion A good maintenance system is not a luxary but a ________.
Correct Answer Necessity
Your Answer Necessity
True/FalseQuestion Process layout is also called line layout
Correct Answer False
Your Answer True
Multiple Choice Single AnswerQuestion Which document is used for returning the surplus material?
Correct Answer Stores Return Note
Your Answer Stores Return Note
Select The BlankQuestion The ________ pertain to the climatic conditions which the
component , product or material should withstand.Correct Answer Environmental specifications
Your Answer Environmental specifications
Multiple Choice Multiple AnswerQuestion Which of the following cases can be referred as operation in
method study recording?Correct Answer Change in physical characteristic , Consumption of physical
effort , Change in chemical characteristicYour Answer Change in physical characteristic , Movement of material ,
Change in chemical characteristic
True/FalseQuestion Breakdown of machines, absenteeism of worker does not
dislocate the manufacturing activity in process layout
Correct Answer True
Your Answer True
Select The BlankQuestion A ________helps to avoid crowding of jobs at a particular
machine by change of route of some of the jobs or by divertingwork to other machine.
Correct Answer Control board
Your Answer Move order
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/FalseQuestion Sampling inspection is best suited when cost of inspection is
much higher than the loss arising from the acceptance of adefective part.
Correct Answer True
Your Answer True
Select The BlankQuestion The ________ advocates maintenance procedures whereby the
condition of the plant is constantly watched through systematicinspection to unearth unhealthy conditions and preventive
Correct Answer Preventive Maintenance
Your Answer Preventive Maintenance
Multiple Choice Single AnswerQuestion Inadequate production capacity ultimately leads to
Correct Answer Poor Customer Service
Your Answer Poor Customer Service
True/FalseQuestion Breakdown is inversly proportional to the investment in W.I.P.
Correct Answer False
Your Answer False
Select The BlankQuestion The ________ is the maximum percentage defective that for the
purpose of sampling inspection can be considered satisfactoryas a process average.
Correct Answer Acceptable quality level
Your Answer Acceptable quality level
True/FalseQuestion Inspection Order can be a verbal order
Correct Answer True
Your Answer False
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to
complete an activity within it's normal time?Correct Answer Normal cost
Your Answer Normal cost
Multiple Choice Single AnswerQuestion Following is not a function of PPC
Correct Answer Product Planning
Your Answer Product Planning
Select The BlankQuestion Work study is also called ________ study
Correct Answer Time and Motion
Your Answer Time and Motion
Match The FollowingQuestion Correct Answer Your Answer
Combined Layout Mixed Layout Mixed Layout
Fixed Position Layout Project Layout Project Layout
Product Layout Line Layout Line Layout
Process Layout Functional Layout Functional Layout
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot
may vary between ________.Correct Answer 0.01 to 10%
Your Answer 0.01 to 10%
True/FalseQuestion Maintenance function must be decentralised apart from a size of
a manufacturing organisation for it's better functioning.Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Which of the following is not the characteristic of Project
Production?Correct Answer Continuous flow of material , Highly mechanised material
handling , Virtually zero manufacturing cycle timeYour Answer Highly mechanised material handling
Select The BlankQuestion The ________ is a set of tools and techniques by which
products are made to comply with the specifications at minimumcost to the firm.
Correct Answer Quality control system
Your Answer Production system
Multiple Choice Single AnswerQuestion What do you understand by the extent the products
manufactured conforms to the laid down design?Correct Answer Quality of conformance
Your Answer Quality of conformance
Multiple Choice Multiple AnswerQuestion Which of the following observations are expected from the
preventive maintenance person?Correct Answer Wrong allignments , Overheating defects , Excessive play
Your Answer Wrong allignments , Overheating defects , Excessive play
Select The BlankQuestion The ________ are the definitions of the measurable as well as
nonmeasurable characteristics of the product.Correct Answer Specifications
Your Answer Specifications
Multiple Choice Single AnswerQuestion How industry has responded to the fact of existence of inherant
variability of the manufacturing process?Correct Answer Inclusion of certain tolerance on the basic dimensions in the
drawingYour Answer Inclusion of certain tolerance on the basic dimensions in the
drawing
Select The BlankQuestion The ________ is specified to indicate the maximum permissible
variability in the dimensions product or parts.
Correct Answer Tolerance
Your Answer Tolerance
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Machine utilization
Gantt Chart Production Scheduling Production Scheduling
Select The BlankQuestion Capacity decisions have a direct influence on performance of
production system in respect of ________Correct Answer Delivery performance
Your Answer Delivery performance
Select The BlankQuestion The ________ is the probability that a bad lot will be accepted
by the sampling plan.Correct Answer Consumer's risk
Your Answer Consumer's risk
Multiple Choice Multiple AnswerQuestion Which of the following schedules are recommended to prepare
and follow as a part of preventive maintenance system?Correct Answer Preventive inspection schedule , Cleaning and upkeep schedule
, Lubrication scheduleYour Answer Preventive inspection schedule , Cleaning and upkeep schedule
, Lubrication schedule
Multiple Choice Multiple AnswerQuestion Which are the three distinct parts of the chart?
Correct Answer Summary , Introduction , Body
Your Answer Summary , Introduction , Analysis
True/False
Question F W Taylor devised a system for classifying motions into basicdivisions called Therbligs
Correct Answer False
Your Answer False
True/FalseQuestion A properly designed sampling plan can control sampling errors
and completely eliminate them.Correct Answer False
Your Answer False
True/FalseQuestion Since value of p can never be positive, hence" if LCLp works out
to be positive, it is taken as zero."Correct Answer False
Your Answer True
Multiple Choice Single AnswerQuestion Which kind of preventive inspection detects some maintenance
related characteristics by making use of human senses, whenequipment is in operation?
Correct Answer Extrernal inspection
Your Answer Daily inspection
Multiple Choice Multiple AnswerQuestion Which of the following information is available in summary of
part in a chart during methods study?Correct Answer Frequency of each symbol , Total time for each symbol , Total
distance travelled by the objectYour Answer Frequency of each symbol , Total time for each symbol ,
Present and proposed method
Multiple Choice Single AnswerQuestion Which kind of labour force is required in case of Jobbing
Production?Correct Answer Highly Skilled
Your Answer Semiskilled
True/FalseQuestion In case of X bar-R charts,it is ensured that the assignable
causes are detected before the tolerances are violated, upperand lower statistical limits are worked out and inserted into achart.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Which are the different methods to record details of the existing
method during method study?Correct Answer Charts , Diagrams , Templates or models
Your Answer Charts , Diagrams , Templates or models
Multiple Choice Multiple AnswerQuestion Which of the following causes can be responsible for derailing
the production schedule in a factory?Correct Answer Errors in drawings , Delay in receipt of material from vendor ,
Excessive absenteeismYour Answer Errors in drawings , Delay in receipt of material from vendor ,
Excessive absenteeism
Multiple Choice Single AnswerQuestion Technique of Value Engineering can be effectively employed in
design of a product toCorrect Answer To meet the intended function at lowest cost
Your Answer To meet the intended function at lowest cost
Multiple Choice Single AnswerQuestion Product layout is suitable when
Correct Answer Products have reasonable stable demand
Your Answer Products are not required in large quantities
Multiple Choice Single AnswerQuestion Following is one of the tasks of Production Control
Correct Answer Actual issue of forms and documents
Your Answer Actual issue of forms and documents
Select The BlankQuestion A good maintenance system is not a luxary but a ________.
Correct Answer Necessity
Your Answer Necessity
Multiple Choice Single AnswerQuestion A good plant layout helps in
Correct Answer Reducing handling costs
Your Answer Reducing handling costs
True/FalseQuestion A lot declared rejected in sampling inspection should not be
inspected 100% in any case.Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Which information is recorded in an equipment card?
Correct Answer Date of commissioning , Equipment specifications , Name andaddress of manufacturer
Your Answer Equipment specifications
Multiple Choice Multiple AnswerQuestion Which of the following are illustrations of inspection?
Correct Answer Physical count of incoming material against the quantitymentioned in delivery challan , A dimensional check withmeasuring instrument , Visual check of burrs and finish
Your Answer Physical count of incoming material against the quantitymentioned in delivery challan , A dimensional check withmeasuring instrument , Visual check of burrs and finish
Multiple Choice Multiple AnswerQuestion What is the basic minimum requirement for those who are
responsible for the quality of design?Correct Answer In depth knowledge about alternative materials and
manufacturing processes , access to latest technology andproduction process adopted by industries in the developedmarket , Continuous effort in product development
Your Answer In depth knowledge about alternative materials andmanufacturing processes , access to latest technology andproduction process adopted by industries in the developedmarket , Continuous effort in product development
Multiple Choice Multiple AnswerQuestion Which of the following cases can be treated as delay during
recording of method study?Correct Answer Operators awaiting instructions from supervisor , Worker waiting
for his turn at tools stores , Jobs awaiting at the machines fortheir turn
Your Answer Operators awaiting instructions from supervisor , Worker waitingfor his turn at tools stores , Jobs awaiting at the machines fortheir turn
True/FalseQuestion Regular lubrication with carefully selected lubricants is an
essential factor in the maintenance of high grade machine toolsworking under continuous load.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion Following is not an input information for Process Planning
Correct Answer Inventory level
Your Answer Drawings
Select The BlankQuestion OC curve of ideal sampling plan suggests that all lots less than
3% defectives have the probability of acceptance of ________.Correct Answer One
Your Answer One
Multiple Choice Single AnswerQuestion Technique which can help an organization to reduce inventory is
calledCorrect Answer MRP
Your Answer CPM
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose
of making any product/s is calledCorrect Answer Factory
Your Answer Factory
True/FalseQuestion Objective of Work Study is to improve Productivity
Correct Answer True
Your Answer True
True/FalseQuestion The OC curve is based on the assumption that if the lot
is large in comparison to the sample, the probabilities ofthe OC curve will follow a poisson distribution.
Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion What are the uses of failure statistics analysis?
Correct Answer To forecast the defect , To identify causes of majorrepetative failures , To quantify the frequency ofpreventive inspection
Your Answer To forecast the defect , To identify causes of majorrepetative failures , To quantify the frequency ofpreventive inspection
True/FalseQuestion Systematic maintenance system can completely
eliminate the wear and tear of machines.Correct Answer False
Your Answer False
Select The BlankQuestion Production control work is ________ in case of floor
inspection as compared with the centralised inspection.
Correct Answer easier
Your Answer time consuming
True/FalseQuestion Originating process of raw material influence Process
PlanningCorrect Answer True
Your Answer True
Multiple Choice Single AnswerQuestion What is represented by an arrow in a network?
Correct Answer Activity
Your Answer Activity
Multiple Choice Single AnswerQuestion What do you mean by the selection of the job for the
method study on the basis of manufacturing difficulties?Correct Answer Technical consideration
Your Answer Manufacturing consideration
Multiple Choice Single AnswerQuestion Who prepares the daily production report?
Correct Answer Shop Supervisor
Your Answer Shop Supervisor
True/FalseQuestion Fixed cost is lower in case of continuous production than
intermittent production.Correct Answer False
Your Answer True
Select The BlankQuestion An ________ history card is the record of all repairs,
replacements and engineering changes carried out in theequipment during it's period of service.
Correct Answer Equipment history card
Your Answer Equipment history card
True/FalseQuestion Grouping of machines gives a lot of flexibility in loading
and schedulingCorrect Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Which are the advantages of suburban location?
Correct Answer Avaialability of adequate land at lower cost , Both skilledand unskilled labour can be available , Plant expansionis easier due to less or no restriction for building andconstruction
Your Answer Avaialability of adequate land at lower cost , Both skilledand unskilled labour can be available , Plant expansionis easier due to less or no restriction for building andconstruction
Select The BlankQuestion The ________ is the probability that a good lot will be
rejected by the sampling plan.Correct Answer Producer's risk
Your Answer Producer's risk
Multiple Choice Single AnswerQuestion Technique of Value Engineering can be effectively
employed in design of a product toCorrect Answer To meet the intended function at lowest cost
Your Answer To meet the intended function at lowest cost
Multiple Choice Single AnswerQuestion Which kind of preventive inspection detects some
maintenance related characteristics by making use ofhuman senses, when equipment is in operation?
Correct Answer Extrernal inspection
Your Answer Daily inspection
Multiple Choice Multiple AnswerQuestion Route Sheet generally contains following information
Correct Answer Material Specification , Sequence of operation , Skill ofLabour
Your Answer Material Specification , Sequence of operation , OrderQuantity
Multiple Choice Single AnswerQuestion Data from Process Sheet can be used to
Correct Answer Prepare load and schedule charts
Your Answer Prepare load and schedule charts
Multiple Choice Single AnswerQuestion The ratio of output to input of a production system is
commonly known asCorrect Answer Productivity
Your Answer Productivity
Match The FollowingQuestion Correct Answer Your Answer
Net requirement ofmaterial under MRP
Stock on hand Stock on hand
Fixation of inventorylevel
Reorder level Reorder level
Symptom of ill plannedpurchasing
Over ordering Over ordering
Factor influencingmaterial planning
Lead time Price of material
Multiple Choice Multiple AnswerQuestion Which of the following products should be produced by
using mass production?Correct Answer Refrigerator , Tyre for automobile , Television Set
Your Answer Refrigerator , Tyre for automobile , Television Set
Select The BlankQuestion The ________ is necessary when the job requires
detailed of one or more of the job characteristics with thehelp of special equipment which is not available at theproducing company.
Correct Answer Inspection order
Your Answer Job card
True/FalseQuestion Limit gauges are not useful when it is necessary to
measure the exact amount of variation.Correct Answer True
Your Answer False
Multiple Choice Single AnswerQuestion A good plant layout helps in
Correct Answer Reducing handling costs
Your Answer Reducing handling costs
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good
quality lot may vary between ________.Correct Answer 0.01 to 10%
Your Answer 0.10 to 10%
Select The BlankQuestion The ________ is the maximum percentage defective that
for the purpose of sampling inspection can beconsidered satisfactory as a process average.
Correct Answer Acceptable quality level
Your Answer Acceptable quality level
Multiple Choice Multiple AnswerQuestion Which of the following is not the characteristic of Project
Production?Correct Answer Continuous flow of material , Highly mechanised material
handling , Virtually zero manufacturing cycle timeYour Answer Continuous flow of material , Virtually zero manufacturing
cycle time
Select The BlankQuestion Goods after final inspection should accompany
________to enable dispatch department to identify anddraw correct reference.
Correct Answer Forwarding note
Your Answer Move order
Select The BlankQuestion Production Planning is a centralised activity which
includes functions such as ________Correct Answer Scheduling
Your Answer Expediting
Multiple Choice Multiple AnswerQuestion Which of the following are steps to identify the critical
path in a small network?Correct Answer Compare the durations of all paths to identify the longest
path. , Sum up the durations of activities along eachpath. , Enumerate all paths in the network and list downactivities on each path.
Your Answer Compare the durations of all paths to identify the longestpath. , Sum up the durations of activities along eachpath. , Enumerate all paths in the network and list downactivities on each path.
Select The BlankQuestion Capacity decisions have a direct influence on
performance of production system in respect of________
Correct Answer Delivery performance
Your Answer Delivery performance
True/FalseQuestion Floor inspection promotes tendency of machines to drift
out of limits and produce defectives.Correct Answer False
Your Answer False
True/FalseQuestion Even if any activity on the critical path is delayed, project
completes on the scheduled time.Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Which are different ways to show critical path in a
network?
Correct Answer Thick Line , Red Line , Double Line
Your Answer Thick Line , Red Line , Double Line
Multiple Choice Single AnswerQuestion Which phase of method study is concerned with
analyzing the facts critically, generating alternativeswhich form the basis for selection and development ofimproved methods?
Correct Answer Critical examination
Your Answer Development and selection
True/FalseQuestion Operation Process Chart provides information on time
and distancesCorrect Answer False
Your Answer False
Multiple Choice Single AnswerQuestion The document which incorporates details of process
planning for a job is calledCorrect Answer Route Sheet
Your Answer Route Sheet
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby
adding some value to entity can be defined asCorrect Answer Operation
Your Answer Manufacturing
Select The BlankQuestion The ________ are the definitions of the measurable as
well as nonmeasurable characteristics of the product.Correct Answer Specifications
Your Answer Specifications
Multiple Choice Multiple AnswerQuestion Which of the following method can be adopted to
overcome the problem of rushing up a job for it's timelycompletion?
Correct Answer Use of optimum speeds and feeds , Subcontracting , Jobsplitting
Your Answer Use alternative materials , Subcontracting , Job splitting
Multiple Choice Multiple AnswerQuestion What is the basic minimum requirement for those who
are responsible for the quality of design?Correct Answer In depth knowledge about alternative materials and
manufacturing processes , access to latest technologyand production process adopted by industries in thedeveloped market , Continuous effort in productdevelopment
Your Answer In depth knowledge about alternative materials andmanufacturing processes , access to latest technologyand production process adopted by industries in thedeveloped market , Continuous effort in productdevelopment
Multiple Choice Single AnswerQuestion Following is not an input information for Process
PlanningCorrect Answer Inventory level
Your Answer Drawings
Multiple Choice Single AnswerQuestion Which kind of inspection is followed in case of product
layout?Correct Answer Pilot inspection
Your Answer Vendor inspection
Match The FollowingQuestion Correct Answer Your Answer
Bottom compartment ofcontrol board
Bunch of work ordersarranged in a sequencein which they are to beprocessed.
Bunch of work ordersarranged in a sequencein which they are to beprocessed.
Control board Pictorial view ofmachine loading activity
Pictorial view of machineloading activity
Top compartment ofcontrol board
Work order of itemcurrently being worked
Work order of itemcurrently being worked
on the machine on the machine
Middle compartment ofcontrol board
Work order of item tobe processed next onthe machine
Work order of item to beprocessed next on themachine
Select The BlankQuestion The ________ is the probability that a bad lot will be
accepted by the sampling plan.Correct Answer Consumer's risk
Your Answer Consumer's risk
Multiple Choice Single AnswerQuestion How to reveal the capability of the sampling plan to
discriminate between good lots and bad lots?Correct Answer Operating characteristics curve ( OC )
Your Answer Operating characteristics curve ( OC )
LIST OF ATTEMPTED QUESTIONS AND ANSWERSSelect The BlankQuestion An Ideal OC curve is ________ shaped curve that accpets all
the lots with quality equal to or better than AQL .Correct Answer RectangularYour Answer Rectangular
Multiple Choice Multiple AnswerQuestion How the concept of float is helpful to planners?
Correct Answer To decide priorities in allocation of resources , To minimize therequirement of resources , To prevent peaks and valleys inrequirement of resources
Your Answer To minimize the requirement of resources , To prevent peaksand valleys in requirement of resources , To decide priorities inallocation of resources
Multiple Choice Single AnswerQuestion The product layout has following disadvantage
Correct Answer Layout is not flexible
Your Answer Layout is not flexible
Multiple Choice Single AnswerQuestion What do you understand by the difference between the
specification limits within which manufacturing process isexpected to produce?
Correct Answer Design tolerance
Your Answer Design tolerance
Multiple Choice Single AnswerQuestion Which kind of relationship exists between those activities
which can be carried out simultaneously and both activitiesrequire definite time to finish?
Correct Answer Concurrent activities
Your Answer Concurrent activities
True/FalseQuestion Complexity and difficulty of Planning is influenced by types of
layoutCorrect Answer True
Your Answer True
True/FalseQuestion Dispatching function is not a part of Production Planning
Correct Answer True
Your Answer False
True/FalseQuestion Sample sizes for the construction of p-chart are typicaly larger
that for Xbar-R-charts.Correct Answer True
Your Answer True
Select The BlankQuestion The ________ must ensure that the product satisfy the
functional requirements of it's usage.Correct Answer Quality of design
Your Answer Quality of design
Select The BlankQuestion The term ________ emplies the foregone profit due to inability
of company to produce.Correct Answer Opportunity cost
Your Answer Opportunity cost
Multiple Choice Multiple AnswerQuestion What is indicated by the hugging points lying close to mean of
the process in X bar-R- control chart?Correct Answer Biases in measurements , Recording done without actual
measurements , Improper selection of samplesYour Answer Biases in measurements , Recording done without actual
measurements , Improper selection of samplesMultiple Choice Multiple AnswerQuestion Which of the following method can be adopted to overcome
the problem of rushing up a job for it's timely completion?Correct Answer Job splitting , Use of optimum speeds and feeds ,
SubcontractingYour Answer Subcontracting , Job splitting
Select The BlankQuestion The ________ is the probability that a bad lot will be accepted
by the sampling plan.Correct Answer Consumer's risk
Your Answer Consumer's risk
Match The FollowingQuestion Correct Answer Your Answer
What to inspect Specification Specification
How to inspect Inspection devices Inspection devices
How much to inspect Sampling or cent percentinspection
Sampling or cent percentinspection
When to inspect Stages of inspection Stages of inspection
True/FalseQuestion Flow process charts do record movements as well as visual
pictures.Correct Answer False
Your Answer False
True/FalseQuestion Originating process of raw material influence Process Planning
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Which of the following variables which operate periodically are
the reasons for the cyclic pattern depicting peaks and valleysduring Xbar-R control chart?
Correct Answer Wornout positions , Fatigue , Roller eccentricity
Your Answer Wornout positions , Fatigue , Roller eccentricity
Multiple Choice Multiple AnswerQuestion Which of the following factors play important role while
selecting or rejecting a particular site from legislation andtaxation point of view?
Correct Answer Labour laws , Building codes , Policies regarding issue oflicences
Your Answer Labour laws , Building codes , Policies regarding issue oflicences
True/FalseQuestion Cent percent inspection is a must if the inspection is of
destructive nature.Correct Answer False
Your Answer False
Select The BlankQuestion One detachable ticket is prepared for each ________.
Correct Answer Operation
Your Answer Operation
Multiple Choice Multiple AnswerQuestion Components of Production Management include
Correct Answer Capacity Planning , Job Design , Production Planning
Your Answer Capacity Planning , Job Design , Production Planning
Select The BlankQuestion The ________ breakdowns usually cost more, partly due to
damage done to the adjustment components and partly due toemergency actions.
Correct Answer Unexpected
Your Answer Unexpected
Multiple Choice Single AnswerQuestion Plant location decisions concern following type of
organizationsCorrect Answer Manufacturing and service organizations
Your Answer Manufacturing and service organizations
Multiple Choice Multiple AnswerQuestion Following are some of the Principles of Management
advocated by F W Taylor
Correct Answer Selection of best worker for each particular task , Division ofwork between worker and management , Training anddevelopment of the workmen
Your Answer Selection of best worker for each particular task , Division ofwork between worker and management , Training anddevelopment of the workmen
True/FalseQuestion As a general rule, a site five times the actual plant size is
considered minimum for parking, access facilities and futureexpansion.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion What is the basic minimum requirement for those who are
responsible for the quality of design?Correct Answer In depth knowledge about alternative materials and
manufacturing processes , access to latest technology andproduction process adopted by industries in the developedmarket , Continuous effort in product development
Your Answer In depth knowledge about alternative materials andmanufacturing processes , access to latest technology andproduction process adopted by industries in the developedmarket , Continuous effort in product development
Match The FollowingQuestion Correct Answer Your Answer
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Machine utilization
Gantt Chart Production Scheduling Production Scheduling
Emerson Efficiency Plan Wage Payment Wage Payment
Multiple Choice Single AnswerQuestion What do you understand by inspection conducted on all jobs
received back from a customer as defectives?Correct Answer Appraisal inspection
Your Answer Appraisal inspection
Multiple Choice Multiple AnswerQuestion Which of the following are the major steps of making of the X
bar-R control chart?Correct Answer Collection of data , Claculation of mean,range,grand average
and mean range , Set up control chart for average andcalculate control limits of range chart
Your Answer Collection of data , Claculation of mean,range,grand averageand mean range , Set up control chart for average andcalculate control limits of range chart
Multiple Choice Single AnswerQuestion What do you understand by identification of defects in
materials, components, machining processes or men to fixresponsibility of defectives, thereby preventing or minimisingoccurance of defectives?
Correct Answer Preventive function
Your Answer Preventive function
Multiple Choice Single AnswerQuestion What do you mean by planned corrective manitenance which
provides an opportunity to undertake design modifications inthe equipment to eliminate or reduce frequency ofbreakdowns.
Correct Answer Design-out Maintenance
Your Answer Design-out Maintenance
Multiple Choice Single AnswerQuestion What can be the worst effect due to excessive vibration?
Correct Answer Breakdown
Your Answer Breakdown
Multiple Choice Multiple AnswerQuestion Which of the following schedules are recommended to prepare
and follow as a part of preventive maintenance system?Correct Answer Preventive inspection schedule , Cleaning and upkeep
schedule , Lubrication scheduleYour Answer Preventive inspection schedule , Cleaning and upkeep
schedule , Lubrication scheduleMultiple Choice Single AnswerQuestion Which is the ideal place to write a description of an activity in a
network?Correct Answer Above the arrow
Your Answer Above the arrow
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of
making any product/s is calledCorrect Answer FactoryYour Answer Factory
Select The BlankQuestion The ________ is the probability that a good lot will be rejected
by the sampling plan.Correct Answer Producer's riskYour Answer Producer's risk
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot
may vary between ________.Correct Answer 0.01 to 10%Your Answer 0.01 to 10%
Multiple Choice Multiple AnswerQuestion Which are the different methods of recording actual progress
of work?Correct Answer Display boards , Progress cards , Network updating
Your Answer Display boards , Progress cards , Network updating
Multiple Choice Single AnswerQuestion What does the additional cost incurred to reduce the duration
of an activity by one unit of time represent?Correct Answer Activity cost slope
Your Answer Activity cost slope
Select The BlankQuestion The easiest way to bring the delayed job within the promised
delivery time by using extra shift or weekly holiday is________.
Correct Answer Overtime working
Your Answer Overtime working
Multiple Choice Single AnswerQuestion The ratio of output to input of a production system is commonly
known asCorrect Answer Productivity
Your Answer Productivity
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding
some value to entity can be defined asCorrect Answer Operation
Your Answer Operation
True/FalseQuestion An activity can share the same tail event and same head event
with any other activity.Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion What are the benefits of inspection and quality control?
Correct Answer Adequate maintenance of quality , Ensures parts are withinspecified limits of accuracy , Gives economy in productionthrough reduction of defective work
Your Answer Adequate maintenance of quality , Ensures parts are withinspecified limits of accuracy , Gives economy in productionthrough reduction of defective work
Multiple Choice Multiple AnswerQuestion Which utilities are considered as infrastructural requirements?
Correct Answer Disposal of waste , Power , Water
Your Answer Disposal of waste , Power , Water
Select The Blank
Question The ________ pertain to the climatic conditions which thecomponent , product or material should withstand.
Correct Answer Environmental specifications
Your Answer Environmental specifications
Multiple Choice Single AnswerQuestion A good plant layout helps in
Correct Answer Reducing handling costs
Your Answer Reducing handling costs
POM assgnMultiple Choice Multiple AnswerQuestion Why graphical method of recording is preferred over the descriptive method during method
study?Correct Answer It segregates effective part form ineffective parts , It reduces effort involved in writing ,
Critical examinations easier and more effectiveYour Answer Critical examinations easier and more effective , It segregates effective part form
ineffective parts , It reduces effort involved in writing
Multiple Choice Multiple AnswerQuestion Which are the subfactors of community facilities or social infrastructure?Correct Answer Accomodation , Educational , EntertainmentYour Answer Accomodation , Educational , Entertainment
Select The BlankQuestion The ________ is the probability that a bad lot will be accepted by the sampling plan.Correct Answer Consumer's riskYour Answer Consumer's risk
Multiple Choice Multiple AnswerQuestion Which of the following are examples of consumption of physical effort during recording for
method study?Correct Answer Bending , Positioning , UnloadingYour Answer Bending , Positioning , Unloading
Multiple Choice Single AnswerQuestion How to claculate the producer risk in the OC Curve?Correct Answer Probability that a good lot will be rejected by the samplingYour Answer Probability that a good lot will be rejected by the sampling
Select The BlankQuestion The ________ are the definitions of the measurable as well as nonmeasurable characteristics
of the product.Correct Answer SpecificationsYour Answer Specifications
Select The BlankQuestion The ________ is the watch dog which ensures that every element of production and activities
which could affect the quality of end product are regulated to the extent desirable.Correct Answer Quality controlYour Answer Quality control
True/FalseQuestion Expediting action is necessary if the delays and interruptions are abnormal and hence any
subsequent delay is bound to extend the promised delivery date.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Process Engineer does not get sufficient time for designing tooling for most economic
production run whenCorrect Answer Delivery time is lessYour Answer Delivery time is less
Select The BlankQuestion The ________ includes preventive maintenance activities whose needs are identified through
inspection which requires stoppage of machines.Correct Answer Shutdown MaintenanceYour Answer Shutdown Maintenance
True/FalseQuestion Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity
in process layoutCorrect Answer TrueYour Answer True
Select The BlankQuestion The ________ is the maximum percentage defective that for the purpose of sampling
inspection can be considered satisfactory as a process average.Correct Answer Acceptable quality levelYour Answer Acceptable quality level
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to complete an activity within it's
crashed time?Correct Answer Crash costYour Answer Crash cost
Multiple Choice Multiple AnswerQuestion Which are the first three steps of Critical Path Analysis technique?Correct Answer Activity relationships , Activity identification , Network constructionYour Answer Activity relationships , Activity identification , Network construction
True/FalseQuestion Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure
of machinery.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following can be subtypes of corrective maintenance?Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in MaintenanceYour Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of the condition of
an item from routine or continuous checking.Correct Answer Condition monitoringYour Answer Condition monitoring
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to entity can be
defined asCorrect Answer OperationYour Answer Production
Match The FollowingQuestion Correct Answer Your Answer
Toung Sweet Sweet
Eye Crack Crack
Nose Burnout Burnout
Ear Impact Impact
Select The BlankQuestion The ________ is a set of tools and techniques by which products are made to comply with the
specifications at minimum cost to the firm.Correct Answer Quality control systemYour Answer Quality control system
Multiple Choice Single AnswerQuestion What is the meaning of " Product features" according to J.M.Juran?Correct Answer Quality of designYour Answer Quality of design
Multiple Choice Multiple AnswerQuestion Which of the following method can be used to record the facts during the method study?Correct Answer Micromotion study , Cyclegraph , ChronocyclegraphYour Answer Micromotion study , Photograph , Cyclegraph , Chronocyclegraph
True/FalseQuestion All activities must not be tied up into the networkCorrect Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Which of the following are types of sampling plan?Correct Answer Single sampling plan , Double sampling plan , Multiple sampling planYour Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Multiple Choice Multiple AnswerQuestion How many of the following are types of specification?Correct Answer Material specifications , Dimensional specifications , Performance specificationsYour Answer Material specifications , Dimensional specifications , Performance specifications
Multiple Choice Multiple AnswerQuestion Plant layout facilitates processing of products in most effective manner through the followingCorrect Answer Shortest possible distance , Shortest processing time , Minimum movementYour Answer Shortest possible distance , Minimum movement
Select The BlankQuestion Work study is also called ________ studyCorrect Answer Time and MotionYour Answer Time and Motion
True/FalseQuestion Operation Process Chart provides information on time and distancesCorrect Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Plant Layout is concerned with optimum arrangement of the followingCorrect Answer Storage space , Machines , Material Handling EquipmentYour Answer Storage space , Machines , Sequence of operation
Multiple Choice Single AnswerQuestion Management often fails to realize the importance of efficient layout due to following reasonCorrect Answer losses resulting from poor layout are not directly shown in the financial statementsYour Answer losses resulting from poor layout are not directly shown in the financial statements
True/FalseQuestion Inspection order is must even for simple jobs which can be inspected by shop inspector with
the tooling available on shop.
Correct Answer FalseYour Answer True
True/FalseQuestion Feasibility of time schedule requires that an activity be scheduled before any of it's
predecessors are scheduled.Correct Answer FalseYour Answer True
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any product/s is calledCorrect Answer FactoryYour Answer Factory
True/FalseQuestion Planned lubrication is said to be the nervous system of the equipment.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion What is the basic philosophy of statistical process control?Correct Answer Prevention is better than cureYour Answer Prevention is better than cure
Multiple Choice Single AnswerQuestion How does the control chart of statistical quality control helps the operating personnel?Correct Answer Identify the presence of an assignable cause before it developsYour Answer Identify the presence of an assignable cause before it develops
Multiple Choice Single AnswerQuestion Where does the central line is located in case of p-chart?Correct Answer at p barYour Answer at p bar
Multiple Choice Multiple AnswerQuestion Which of the following may be the objectives of project crashing?Correct Answer To complete the project in the least possible time , To reduce project cost below it's
normal cost , To achieve uniformity in requirement of resourcesYour Answer To complete the project in the least possible time , To reduce project cost below it's
normal cost , To achieve uniformity in requirement of resources
Select The BlankQuestion The ________ advocates maintenance procedures whereby the condition of the plant is
constantly watched through systematic inspection to unearth unhealthy conditions and preventiveCorrect Answer Preventive MaintenanceYour Answer Preventive Maintenance
True/FalseQuestion A network should be progression of activities always moving forward.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Which is the ideal place to write a description of an activity in a network?Correct Answer Above the arrowYour Answer Above the arrow
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.
Correct Answer 0.01 to 10%Your Answer 0.01 to 10%
True/FalseQuestion For p-chart, the central line of fraction defectives is determined by average percentage
defectives.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Which phase of method study is concerned with analyzing the facts critically, generating
alternatives which form the basis for selection and development of improved methods?Correct Answer Critical examinationYour Answer Critical examination
Multiple Choice Single AnswerQuestion Which of the following policies is advisable in case of low product variety and large volumes?Correct Answer Low Skilled Labour & Special Purpose MachinesYour Answer Low Skilled Labour & Special Purpose Machines
Multiple Choice Single AnswerQuestion Which kind of inspection is followed in case of product layout?Correct Answer Pilot inspectionYour Answer Pilot inspection
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Sampling Inspection
Gantt Chart Production Scheduling Production Scheduling
POM assgn
Multiple Choice Single AnswerQuestion MRP is based on the concept of inventory demand which is of following type
CorrectAnswer
Dependent and independent
Your Answer Dependent and independent
Multiple Choice Single AnswerQuestion Main objective of a good plant layout is
CorrectAnswer
Reduce material handling cost
Your Answer Reduce material handling cost
True/FalseQuestion As a general rule, the number of tail event of an activity is more than that of it's head
event.Correct
AnswerFalse
Your Answer False
Select The BlankQuestion The ________ is the probability that a good lot will be rejected by the sampling plan.
CorrectAnswer
Producer's risk
Your Answer Producer's risk
Multiple Choice Multiple AnswerQuestion Which of the following are important considerations concerning activity times?
CorrectAnswer
Activity time should be obtained from the person responsible for the completion of anactivity , Activity time must be independent of any influence which the preceding orsucceeding activity may have on it. , Activity time may assume that just the normalquantity of resources required to carry out the activity are available.
Your Answer Activity time should be obtained from the person responsible for the completion of anactivity , Activity time must be independent of any influence which the preceding orsucceeding activity may have on it. , Activity time may assume that just the normalquantity of resources required to carry out the activity are available.
Select The BlankQuestion The ________ pertain to the climatic conditions which the component , product or
material should withstand.Correct
AnswerEnvironmental specifications
Your Answer Environmental specifications
Multiple Choice Multiple AnswerQuestion Following are some of the factors considered for evaluation of alternative layouts
CorrectAnswer
Flow of Material , Equipment utilization , Ease of supervision
Your Answer Flow of Material , Ease of supervision , Delivery performance
Multiple Choice Multiple AnswerQuestion Which of the following are assignable cause?
CorrectAnswer
Large varaitions in hardness of material , Tool wear , Errors in setting
Your Answer Large varaitions in hardness of material , Tool wear , Errors in setting
True/FalseQuestion All activities must not be tied up into the network
CorrectAnswer
False
Your Answer False
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot may vary between
________.Correct
Answer0.01 to 10%
Your Answer 0.01 to 10%
True/FalseQuestion In case of X bar, if the process is not under control indicated by some points falling
outside the control limits, such points outside the control limits are eliminated and newtrial control limits for the remaining points are computed.
CorrectAnswer
True
Your Answer True
Multiple Choice Single AnswerQuestion What is the base for considering activity time as single time estimate or three time
estimate?Correct
AnswerLevel of uncertainty
Your Answer Availability of labour
Select The BlankQuestion The ________ is the maximum percentage defective that for the purpose of sampling
inspection can be considered satisfactory as a process average.Correct
AnswerAcceptable quality level
Your Answer Acceptable quality level
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to complete an activity within
it's normal time?Correct
AnswerNormal cost
Your Answer Normal cost
Select The BlankQuestion A good maintenance system is not a luxary but a ________.
CorrectAnswer
Necessity
Your Answer Necessity
Select The BlankQuestion A ________helps to avoid crowding of jobs at a particular machine by change of route of
some of the jobs or by diverting work to other machine.Correct
AnswerControl board
Your Answer Move order
Select The BlankQuestion The ________ is the watch dog which ensures that every element of production and
activities which could affect the quality of end product are regulated to the extentdesirable.
CorrectAnswer
Quality control
Your Answer Quality control
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any product/s is called
CorrectAnswer
Factory
Your Answer Factory
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Machine utilization
Gantt Chart Production Scheduling Production Scheduling
Select The BlankQuestion A ________ is another form of subcontracting.
CorrectAnswer
Hiring capacity
Your Answer Hiring capacity
Multiple Choice Multiple Answer
Question In an organization there may not be a formal PPC department if
CorrectAnswer
Work is highly repetitive in nature , Planning activities are performed by the line staff ,Number of workmen is not very large
Your Answer Work is highly repetitive in nature , Planning activities are performed by the line staff ,Number of workmen is not very large
Multiple Choice Multiple AnswerQuestion Which of the following cases can be treated as delay during recording of method study?
CorrectAnswer
Operators awaiting instructions from supervisor , Worker waiting for his turn at toolsstores , Jobs awaiting at the machines for their turn
Your Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at toolsstores , Jobs awaiting at the machines for their turn
True/FalseQuestion Inspection order is must even for simple jobs which can be inspected by shop inspector
with the tooling available on shop.Correct
AnswerFalse
Your Answer False
Multiple Choice Multiple AnswerQuestion Order preparation process for products manufatured to order requires following documents
CorrectAnswer
Sales Order , Work order , Shop order
Your Answer Sales Order , Work order , Purchase order
Multiple Choice Single AnswerQuestion Technique of Value Engineering can be effectively employed in design of a product to
CorrectAnswer
To meet the intended function at lowest cost
Your Answer Reduce lead time
True/FalseQuestion Cent percent inspection is often more practical and economical than sampling inspection.
CorrectAnswer
False
Your Answer False
Multiple Choice Multiple AnswerQuestion Scale model used for layout analysis have following advantages
CorrectAnswer
Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown ,Models can be shifted easily
Your Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown ,Models can be shifted easily
Multiple Choice Single AnswerQuestion Which of the following technique is event oriented ?
CorrectAnswer
Project Evaluation & Review Technique
Your Answer Project Evaluation & Review Technique
Multiple Choice Single AnswerQuestion What is the meaning of " Product features" according to J.M.Juran?
CorrectAnswer
Quality of design
Your Answer Quality of design
Match The FollowingQuestion Correct Answer Your Answer
Crash cost of an activity Cc Cc
Normal time of an activity Tn Tn
Crash time of activity Tc Tc
Normal cost of an activity Cn Cn
Multiple Choice Multiple AnswerQuestion What are uses of diagrams in method study?
CorrectAnswer
Study different plant layouts and select the most optimum one , Study the extent of trafficover the different routes of the plant , Identify the extent of backtracking, cross traffic andobstacles encountered during the movement of material.
Your Answer Study different plant layouts and select the most optimum one , Study the extent of trafficover the different routes of the plant , Identify the extent of backtracking, cross traffic andobstacles encountered during the movement of material.
True/FalseQuestion A load chart specifies the work to be carried out by each person of company during shift
hours.Correct
AnswerFalse
Your Answer True
Multiple Choice Multiple AnswerQuestion Route Sheet generally contains following information
CorrectAnswer
Material Specification , Sequence of operation , Skill of Labour
Your Answer Material Specification , Sequence of operation , Skill of Labour
True/FalseQuestion Cellular layout is based on the concept of Group Technology
CorrectAnswer
True
Your Answer True
Multiple Choice Single AnswerQuestion Which varaible is taken along the abscissa or X axis?
CorrectAnswer
Time
Your Answer Standard deviation
Multiple Choice Multiple AnswerQuestion Which are the advantages of suburban location?
CorrectAnswer
Avaialability of adequate land at lower cost , Both skilled and unskilled labour can beavailable , Plant expansion is easier due to less or no restriction for building andconstruction
Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can beavailable , Plant expansion is easier due to less or no restriction for building andconstruction
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of the condition
of an item from routine or continuous checking.Correct
AnswerCondition monitoring
Your Answer Condition monitoring
Multiple Choice Multiple AnswerQuestion Expediting function is concerned with following activities
CorrectAnswer
Progress chasing to identify delays which may hold up production , Communicatingpossible delays in delivery date commitment to sales department , Devising cures to keeprate of production in line with schedule
Your Answer Recording progress of work , Progress chasing to identify delays which may hold upproduction , Communicating possible delays in delivery date commitment to salesdepartment
Select The BlankQuestion Production control work is ________ in case of floor inspection as compared with the
centralised inspection.Correct
Answereasier
Your Answer time consuming
Select The BlankQuestion The easiest way to bring the delayed job within the promised delivery time by using extra
shift or weekly holiday is ________.Correct
AnswerOvertime working
Your Answer Overtime working
True/FalseQuestion In case of forward pass computation, the earliest event time of the first event is zero.
CorrectAnswer
True
Your Answer True
Multiple Choice Single AnswerQuestion What is represented by an arrow in a network?
CorrectAnswer
Activity
Your Answer Activity
True/FalseQuestion As a general rule, a site five times the actual plant size is considered minimum for
parking, access facilities and future expansion.Correct
AnswerTrue
Your Answer True
True/FalseQuestion Independent float either affects the float of preceding activities or that of succeeding
activities.Correct
AnswerFalse
Your Answer False
Multiple Choice Single AnswerQuestion The document raised by PPC which authorises different functions to take action as per
instruction is calledCorrect
AnswerWork Order
Your Answer Work Order
Multiple Choice Single AnswerQuestion A good layout makes effective use of space. Utilization of space for a department like
Stores can be measured byCorrect
AnswerProportion of Cubic volume space utilized
Your Answer Ratio of area utilised to area available
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to entity can be
defined asCorrect
AnswerOperation
Your Answer Operation
POM assgnMultiple Choice Multiple AnswerQuestion Which are major benefits of identifying the critical path?
Correct Answer It identifies activities to be given preference in allocation of resources. , It helps toexercise "control by exception". , It helps to identify the set of activities and eventswhich are critical and as such must be carefully controlled and monitored
Your Answer It helps to identify the set of activities and events which are critical and as such mustbe carefully controlled and monitored , It identifies activities to be given preference inallocation of resources. , It helps to exercise "control by exception".
Select The BlankQuestion An Ideal OC curve is ________ shaped curve that accpets all the lots with quality
equal to or better than AQL .Correct Answer Rectangular
Your Answer Bell
Select The BlankQuestion The ________ is the probability that a bad lot will be accepted by the sampling plan.
Correct Answer Consumer's risk
Your Answer Lot Tolerance Percentage Defective
Multiple Choice Single AnswerQuestion Why method study should precede work measurement?
Correct Answer Time for a job can be accessed accurately only after standardizing the method
Your Answer Time for a job can be accessed accurately only after standardizing the method
Select The BlankQuestion The ________ is the process of withdrawing the equipment from the production line,
dismantling it unitwise, visualising defects, effecting adjustments, replacing worn-outparts and finally building it up to get desired accuracies.
Correct Answer Reconditioning
Your Answer Reconditioning
Multiple Choice Single AnswerQuestion Which of the following is the most popular technique for Project Production?
Correct Answer PERT & CPM
Your Answer Break Even Analysis
True/FalseQuestion In case of backward pass computation, the latest event time of the end event equals
to the earliest event time minus duration of that activity.Correct Answer False
Your Answer True
Match The Following
Question Correct Answer Your Answer
Draining and refilling of oilreserviors of plunger pump
Yearly Hourly
Parts lubricated with oil nipple Daily Weekly
Tools and slideways two to three times a day Six monthly
Table lubrication Weekly two to three times a day
Select The BlankQuestion The ________ breakdowns usually cost more, partly due to damage done to the
adjustment components and partly due to emergency actions.Correct Answer Unexpected
Your Answer Unexpected
Multiple Choice Single AnswerQuestion What is expected from stores department after they receive the stores issue order
from dispatcher?Correct Answer Keep material ready for issue to shop when authorized
Your Answer Keep material ready for issue to shop when authorized
True/FalseQuestion Every network does not necessarily have a critical path.
Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Which are the subfactors of community facilities or social infrastructure?
Correct Answer Accomodation , Educational , Entertainment
Your Answer Accomodation , Labour laws , Educational , Entertainment
Multiple Choice Single AnswerQuestion One of the following is not a gross material
Correct Answer cotton
Your Answer Coal
Select The BlankQuestion The ________ is the defect level for which lots are regarded as bad lots.
Correct Answer Lot Tolerance Percentage Defective
Your Answer Producer's risk
Multiple Choice Multiple Answer
Question Which of the following are types of non-destructive testing?
Correct Answer Visual Testing , Eddy current , Magnetic flow detectors
Your Answer Visual Testing , Eddy current , Magnetic flow detectors
Multiple Choice Multiple AnswerQuestion Which of the following are steps to identify the critical path in a small network?
Correct Answer Compare the durations of all paths to identify the longest path. , Sum up the durationsof activities along each path. , Enumerate all paths in the network and list downactivities on each path.
Your Answer Sum up the durations of activities along each path. , Find out the shortest path amongall paths. , Enumerate all paths in the network and list down activities on each path. ,Compare the durations of all paths to identify the longest path.
Multiple Choice Multiple AnswerQuestion Which of the following factors affect the quality control function?
Correct Answer Quality of workmanship , Production aids , Manufacturing facilities
Your Answer Quality of workmanship , Production aids , Competitive prices , Manufacturing facilities
True/FalseQuestion The plotting of activities - critical, non-critical and dummy activities- is strictly
according to their precedence relationship.Correct Answer True
Your Answer True
True/FalseQuestion Process layout is also called line layout
Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Which of the following three methods used to select the qualified supplier?
Correct Answer By vendor plant surveys , By reputation , By experience
Your Answer By vendor plant surveys , By reputation , By the perofrmance of first lot , Byexperience
Multiple Choice Single AnswerQuestion Which kind of relationship exists between those activities which can be carried out
simultaneously and both activities require definite time to finish?Correct Answer Concurrent activities
Your Answer Concurrent activities
Select The BlankQuestion A good maintenance system is not a luxary but a ________.
Correct Answer Necessity
Your Answer Necessity
True/FalseQuestion Quality can not be inspected into a product, it must be manufactured into it by the
supplier.Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion What do you mean by the preventive maintenance by using five human senses?
Correct Answer Preventive inspection
Your Answer Manual inspection
Multiple Choice Single AnswerQuestion What do you mean by design modifications made to reduce time and effort required in
carrying out maintenance work ?Correct Answer Design-in Maintenance
Your Answer Design-in Maintenance
True/FalseQuestion A load chart specifies the work to be carried out by each person of company during
shift hours.Correct Answer False
Your Answer True
Multiple Choice Single AnswerQuestion Process type layout is suitable when
Correct Answer there is wide variation in processing time of operations
Your Answer there is wide variation in processing time of operations
Multiple Choice Single AnswerQuestion Where the ignorance towards the degradation of machine leads to?
Correct Answer Eventual breakdown
Your Answer Eventual breakdown
True/FalseQuestion Dispatching function is not a part of Production Planning
Correct Answer True
Your Answer True
Match The Following
Question Correct Answer Your Answer
First off inspection First piece produced after toolchange
First piece produced after toolchange
Critical operation inspection After whose no rework is possible Costlier operation
Patrolling inspection Inspection at the place of actualproduction
Inspection at the place of actualproduction
Key operation inspection Costlier operation After whose no rework is possible
Multiple Choice Multiple AnswerQuestion Which three of the following options can be used to reduce the duration of activity
during project crashing?Correct Answer Allocating more manpower and machines than originally planned for. , Working
additional shifts or overtime. , Awarding work to vendors who charge extra butexpedite deliveries.
Your Answer Allocating more manpower and machines than originally planned for. , Conduct workstudy for that activity , Working additional shifts or overtime. , Awarding work tovendors who charge extra but expedite deliveries.
Select The BlankQuestion The ________ is the probability that a good lot will be rejected by the sampling plan.
Correct Answer Producer's risk
Your Answer Lot Tolerance Percentage Defective
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot may vary between
________.Correct Answer 0.01 to 10%
Your Answer 0.10 to 10%
True/FalseQuestion Three time estimates are transformed into expected time before using it into a
network.Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion What is indicated by the erratic pattern points falling above and below the control
limits in the Xbar-R-control chart?Correct Answer Defects in materials , Poorly trained operators , Frequent adjustments of machines
Your Answer Defects in materials , Poorly trained operators , Frequent adjustments of machines ,Clogging of fixtures and holes
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of the
condition of an item from routine or continuous checking.Correct Answer Condition monitoring
Your Answer Preventive maintenance
Multiple Choice Single AnswerQuestion Which kind of inspection is followed in case of process layout?
Correct Answer First off inspection
Your Answer Pilot inspection
True/FalseQuestion Latest finishing date is the latest event time of the tail event.
Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Following are the commonly used factors considered for evaluation of layout in factor
analysis methodCorrect Answer Flow of material , Equipment utilization , Working condition
Your Answer Flow of information , Flow of material , Equipment utilization , Working condition
Multiple Choice Multiple AnswerQuestion Why graphical method of recording is preferred over the descriptive method during
method study?Correct Answer It segregates effective part form ineffective parts , It reduces effort involved in writing
, Critical examinations easier and more effectiveYour Answer It segregates effective part form ineffective parts , It reduces effort involved in writing
, It improves morale of workers , Critical examinations easier and more effective
Select The BlankQuestion OC curve of ideal sampling plan suggests that all lots less than 3% defectives have
the probability of acceptance of ________.Correct Answer One
Your Answer One
True/FalseQuestion Floor inspection delays the identification of faults which can not be rectified
immediately before large lots are spoiled.Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion Which kind of preventive inspection detects some defects in moving parts, internal
cracks, and others , when machine is under preplanned shutdown?Correct Answer Internal inspection
Your Answer Internal inspection
Select The BlankQuestion Capacity decisions have a direct influence on performance of production system in
respect of ________
Correct Answer Delivery performance
Your Answer Delivery performance
Multiple Choice Multiple AnswerQuestion Which of the following are illustrations of inspection?
Correct Answer Physical count of incoming material against the quantity mentioned in delivery challan, A dimensional check with measuring instrument , Visual check of burrs and finish
Your Answer Physical count of incoming material against the quantity mentioned in delivery challan, A dimensional check with measuring instrument , Visual check of burrs and finish ,Check the operator performance
Multiple Choice Multiple AnswerQuestion Which of the following variables which operate periodically are the reasons for the
cyclic pattern depicting peaks and valleys during Xbar-R control chart?Correct Answer Wornout positions , Fatigue , Roller eccentricity
Your Answer Wornout positions , Intentional mistakes by unsatisfied worker , Fatigue , Rollereccentricity
Multiple Choice Single AnswerQuestion Which portion of the perforated route sheet should be signed by the operator or
supervisor?Correct Answer Lower portion
Your Answer Top portion
LIST OFATTEMPTEDQUESTIONS
ANDANSWERS
Multiple Choice Multiple AnswerQuestion Which are major benefits of identifying the critical path?
Correct Answer It identifies activities to be given preference in allocation of resources. , It helps to exercise "control by exception". ,It helps to identify the set of activities and events which are critical and as such must be carefully controlled andmonitored
Your Answer It helps to identify the set of activities and events which are critical and as such must be carefully controlled andmonitored , It identifies activities to be given preference in allocation of resources. , It helps to exercise "control byexception".
Select The BlankQuestion An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL .
Correct Answer Rectangular
Your Answer Bell
Select The BlankQuestion The ________ is the probability that a bad lot will be accepted by the sampling plan.
Correct Answer Consumer's risk
Your Answer Lot Tolerance Percentage Defective
Multiple Choice Single AnswerQuestion Why method study should precede work measurement?
Correct Answer Time for a job can be accessed accurately only after standardizing the method
Your Answer Time for a job can be accessed accurately only after standardizing the method
Select The BlankQuestion The ________ is the process of withdrawing the equipment from the production line, dismantling it unitwise,
visualising defects, effecting adjustments, replacing worn-out parts and finally building it up to get desiredaccuracies.
Correct Answer Reconditioning
Your Answer Reconditioning
Multiple Choice Single AnswerQuestion Which of the following is the most popular technique for Project Production?
Correct Answer PERT & CPM
Your Answer Break Even Analysis
True/FalseQuestion In case of backward pass computation, the latest event time of the end event equals to the earliest event time
minus duration of that activity.
Correct Answer False
Your Answer True
Match The Following
Question Correct Answer Your Answer
Draining and refilling of oil reserviors ofplunger pump
Yearly Hourly
Parts lubricated with oil nipple Daily Weekly
Tools and slideways two to three times a day Six monthly
Table lubrication Weekly two to three times a day
Select The BlankQuestion The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and
partly due to emergency actions.
Correct Answer Unexpected
Your Answer Unexpected
Multiple Choice Single AnswerQuestion What is expected from stores department after they receive the stores issue order from dispatcher?
Correct Answer Keep material ready for issue to shop when authorized
Your Answer Keep material ready for issue to shop when authorized
True/FalseQuestion Every network does not necessarily have a critical path.
Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Which are the subfactors of community facilities or social infrastructure?
Correct Answer Accomodation , Educational , Entertainment
Your Answer Accomodation , Labour laws , Educational , Entertainment
Multiple Choice Single AnswerQuestion One of the following is not a gross material
Correct Answer cotton
Your Answer Coal
Select The BlankQuestion The ________ is the defect level for which lots are regarded as bad lots.
Correct Answer Lot Tolerance Percentage Defective
Your Answer Producer's risk
Multiple Choice Multiple Answer
Question Which of the following are types of non-destructive testing?
Correct Answer Visual Testing , Eddy current , Magnetic flow detectors
Your Answer Visual Testing , Eddy current , Magnetic flow detectors
Multiple Choice Multiple AnswerQuestion Which of the following are steps to identify the critical path in a small network?
Correct Answer Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along each path., Enumerate all paths in the network and list down activities on each path.
Your Answer Sum up the durations of activities along each path. , Find out the shortest path among all paths. , Enumerate allpaths in the network and list down activities on each path. , Compare the durations of all paths to identify thelongest path.
Multiple Choice Multiple AnswerQuestion Which of the following factors affect the quality control function?
Correct Answer Quality of workmanship , Production aids , Manufacturing facilities
Your Answer Quality of workmanship , Production aids , Competitive prices , Manufacturing facilities
True/FalseQuestion The plotting of activities - critical, non-critical and dummy activities- is strictly according to their precedence
relationship.
Correct Answer True
Your Answer True
True/FalseQuestion Process layout is also called line layout
Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Which of the following three methods used to select the qualified supplier?
Correct Answer By vendor plant surveys , By reputation , By experience
Your Answer By vendor plant surveys , By reputation , By the perofrmance of first lot , By experience
Multiple Choice Single AnswerQuestion Which kind of relationship exists between those activities which can be carried out simultaneously and both
activities require definite time to finish?
Correct Answer Concurrent activities
Your Answer Concurrent activities
Select The BlankQuestion A good maintenance system is not a luxary but a ________.
Correct Answer Necessity
Your Answer Necessity
True/FalseQuestion Quality can not be inspected into a product, it must be manufactured into it by the supplier.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion What do you mean by the preventive maintenance by using five human senses?
Correct Answer Preventive inspection
Your Answer Manual inspection
Multiple Choice Single AnswerQuestion What do you mean by design modifications made to reduce time and effort required in carrying out maintenance
work ?
Correct Answer Design-in Maintenance
Your Answer Design-in Maintenance
True/FalseQuestion A load chart specifies the work to be carried out by each person of company during shift hours.
Correct Answer False
Your Answer True
Multiple Choice Single AnswerQuestion Process type layout is suitable when
Correct Answer there is wide variation in processing time of operations
Your Answer there is wide variation in processing time of operations
Multiple Choice Single AnswerQuestion Where the ignorance towards the degradation of machine leads to?
Correct Answer Eventual breakdown
Your Answer Eventual breakdown
True/FalseQuestion Dispatching function is not a part of Production Planning
Correct Answer True
Your Answer True
Match The Following
Question Correct Answer Your Answer
First off inspection First piece produced after tool change First piece produced after tool change
Critical operation inspection After whose no rework is possible Costlier operation
Patrolling inspection Inspection at the place of actual production Inspection at the place of actual production
Key operation inspection Costlier operation After whose no rework is possible
Multiple Choice Multiple AnswerQuestion Which three of the following options can be used to reduce the duration of activity during project crashing?
Correct Answer Allocating more manpower and machines than originally planned for. , Working additional shifts or overtime. ,Awarding work to vendors who charge extra but expedite deliveries.
Your Answer Allocating more manpower and machines than originally planned for. , Conduct work study for that activity ,Working additional shifts or overtime. , Awarding work to vendors who charge extra but expedite deliveries.
Select The BlankQuestion The ________ is the probability that a good lot will be rejected by the sampling plan.
Correct Answer Producer's risk
Your Answer Lot Tolerance Percentage Defective
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.
Correct Answer 0.01 to 10%
Your Answer 0.10 to 10%
True/FalseQuestion Three time estimates are transformed into expected time before using it into a network.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion What is indicated by the erratic pattern points falling above and below the control limits in the Xbar-R-control
chart?
Correct Answer Defects in materials , Poorly trained operators , Frequent adjustments of machines
Your Answer Defects in materials , Poorly trained operators , Frequent adjustments of machines , Clogging of fixtures and holes
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine
or continuous checking.
Correct Answer Condition monitoring
Your Answer Preventive maintenance
Multiple Choice Single AnswerQuestion Which kind of inspection is followed in case of process layout?
Correct Answer First off inspection
Your Answer Pilot inspection
True/FalseQuestion Latest finishing date is the latest event time of the tail event.
Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Following are the commonly used factors considered for evaluation of layout in factor analysis method
Correct Answer Flow of material , Equipment utilization , Working condition
Your Answer Flow of information , Flow of material , Equipment utilization , Working condition
Multiple Choice Multiple AnswerQuestion Why graphical method of recording is preferred over the descriptive method during method study?
Correct Answer It segregates effective part form ineffective parts , It reduces effort involved in writing , Critical examinations easierand more effective
Your Answer It segregates effective part form ineffective parts , It reduces effort involved in writing , It improves morale ofworkers , Critical examinations easier and more effective
Select The BlankQuestion OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of acceptance
of ________.
Correct Answer One
Your Answer One
True/FalseQuestion Floor inspection delays the identification of faults which can not be rectified immediately before large lots are
spoiled.
Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion Which kind of preventive inspection detects some defects in moving parts, internal cracks, and others , when
machine is under preplanned shutdown?
Correct Answer Internal inspection
Your Answer Internal inspection
Select The BlankQuestion Capacity decisions have a direct influence on performance of production system in respect of ________
Correct Answer Delivery performance
Your Answer Delivery performance
Multiple Choice Multiple AnswerQuestion Which of the following are illustrations of inspection?
Correct Answer Physical count of incoming material against the quantity mentioned in delivery challan , A dimensional check withmeasuring instrument , Visual check of burrs and finish
Your Answer Physical count of incoming material against the quantity mentioned in delivery challan , A dimensional check withmeasuring instrument , Visual check of burrs and finish , Check the operator performance
Multiple Choice Multiple AnswerQuestion Which of the following variables which operate periodically are the reasons for the cyclic pattern depicting peaks
and valleys during Xbar-R control chart?
Correct Answer Wornout positions , Fatigue , Roller eccentricity
Your Answer Wornout positions , Intentional mistakes by unsatisfied worker , Fatigue , Roller eccentricity
Multiple Choice Single AnswerQuestion Which portion of the perforated route sheet should be signed by the operator or supervisor?
Correct Answer Lower portion
Your Answer Top portion
Topic Page NoChapter 1 - Production Manufacturing FunctionOperation concept of production 1Production as the conversion process 2Alteration 2Transportation 2Storage 2Inspection 2Productivity of conversion process 3Objectives of Production Management 4Components of production function 4Aspects of Management 5product selection and design 5Process selection and planning 5Facilities (Plant) location 6Facilities (plant) layout and materials handling 6Capacity planning 6forecasting 7production planning and contril (PPC) 7Inventory Control 7Quality assurance and control 8work study and job design 8Method study 8work measurement 8Maintenance and replacement 9cost reduction and cost control 9short history of production management 9Adam smith (1776) 9Charles Babbage (1883) 10F.W. Taylor (1859 to 1915) 10Frank B. Gilbreth (1917) 11Henry Ford (1913) 11Henry Gantt (1913) 11Harington Emerson (1913) 12F.W. Harris (1914) 12Walter Shewhart (1924) 12F.H. Dodge H.G. Roming & W. Shewhart (1931) 12L.H.C. Tippett (1937) 12Between 1940-1980 12Present day position 13Prganisation for production 14Typical organisation structure 15The responsibilities of a production manager 15qualities of production manager 16intelligence 16enthusiasm and perseverance 16imagination 16resourcefulness 16self control 16sympathy 16communication ability 16flexibility 16
production as a co-ordination function 17Chapter 2- Manufacturing MethodsDefinition 23factors influenceing choice of manufacturing method 24effect of volume/variety 24relationship between degree of repetitive and manufacturing method 25capacity of the plant 25flexibility 25lead time 26efficiency 26environment 26Classification of manufacturing methods 27project production 27Jobbing production 29batch production 31Mass & Flow production 34process production 35selection of the manufacturing methods 36Chapter 3 -Facilities (Plant) Locationwhen does a location decision arise (Necessity) 41factors governing plant location 42procimity to market 43procimity to sources of raw materials 44gros materials 45pure material 45Infrastructureal facilities 46transport facilities 46labour wages 46legisiation and taxation 47climate conditions 47Industrial and loaur attitudes 47safety requirement 47communtiy facilities (social infrasturcture) 48community attitudes 48supporting industries and services 48waste disposal 49availability and cost of the land 49suitability of the land 49economic survey for the site selection 49Urban versus rural site location 51sub urban loaction 52typical examples on plant location 53Chapter 4 - Facilities( Plant) Layoutobjective of a good plant layout 60principles of a good layout 60types of layout 64process or functional layout 65product or line layout 66project or fixed position layout 68comparison between prodcut layout and process layout 69cost analysis of basic forms of layout 72combination layout (mixed layout) 73
factors governing plantlayout 74system layout procedure 74tools and techniques for layout analysis 76space determination and area allocation 79evaluation of layout plans and selection of the optima layout 80Chapter 5- Production Planning and Controlmeaning 89production planning versus production control 90objective of production control (PC) 91functions of production planning and control 91organisation of PPC department 93status of the PPC department in the company 93degree of centralisation 94internal structure 94Chapter 6 - Production Planning (Order Preparation)work order preparation 101subsidiary orders 104Chapter 7 - Prodcution Planning (Material Planning)factors of influencing material planning 109technique for materials planning 110bill of materials 111material requirement planning (MRP) 113procedural steps in MRP 113computerised system of MRP 117past consumption anlaysis technique 117moving average method 117exponential smoothing 118Inventory control 119other operations research techniques 120Chapter 8- Production Planning (Process Planning)inputs of process planning 126factors influencing process planning 127steps in process planning 128route sheets 129processing planning in differece situations 131documents in process planning 131Route sheets example 132Chapter 9- Production Planning (Loading & Scheduling)why scheduling 137inputs of scheduling 136gantt charts 142technique of scheduling 147Chapter 10- Production control (Dispatching)Function of dispatching 153how dispatching function is perdormed 160dispatching under difeerenct situations 161documents in dispatching 161Chapter 11- Production Control (Processing or Follow-Up)Functions in progressing 167documents in progressing 175Chapter 12- Project Planning & control Critical Path Analysis (PERT/CPM)Meaning of project 181
need for systematic approach 182what is CPA 183what can CPA give 183network logic 184procedural steps 189activity identification 189activity relationships 190network construction 193node labelling 200Fulkerson's rule 200activity time estimation 202project classification 203PERT concept of multipe times 203use of time estimation 206unit of time etimation 206network time analysis 207critical path 207non critical paths nad float times 209forward computation (earliest event times) 210backward pass computation (latest allowable event times) 212computation for analysis of activity durations 213activity float analysis 215types of float 215probability aspects of project planning 224cost analysis and crashing of activities 234time cost relationship 234graphical representation of project costs 236procedural steps 237project crashing 238project scheduling 251project monitoring 252computer applications in project management 255Chapter 13 - Maintenace of the Planttypical causes of plant breakdown 270costs association with an eventual breakdown 270objectives of a good maintenance system 271types of maintenance 271elements of a good maintenance system 276preventive maintenance 277planned maintenance 273unplanned maintenance 275Basic activities of the preventive maintenace 279Preventive inspection 279planned lubricants 282cleaning and upkeep 285minor adjustments and replacements 287equipment records 288corrective maintenance 293condtional monitoring 293organisation for maintenance 296Chapter 14- Quality Management( Inspection and Quality Control)definition of quality 304
J.M Juran's views of quality 305historical development of quality management 205the achivement of quality 306quality of design 307customer's acceptance of the product and its price 307quality of conformance 308quality standards 309meaning of quality control 310three basic aspects of quality control 310inspection versus quality control 311inspection planning 312what to inspect specification 313stages of inspection 313where to inspect places of inspection 316how to inspect inspection devices 319how much to inspect sampling or cent percent inspection 322how to exercise control over qulity 323quality control of purchased material 324need for control 324defining the right quality 324selecting suppliers for quality 325ensuring suppliers understanding requirement 326monitoring suppliers quality 327defect identificationand defect prevention 328importance of defect prevention 329vendor performance evaluation 331quality control of work done at the home plant 331organisation for inspection and quality control 333Chapter 15- Quality Management Acceptance Samplingtypes of inspection 343basis of sampling inspection 344defects and their classification 345critical defect 345major defect 345minor defect 345operating characterisitc curve 346Parameter of an OC curve 347relationship between the parameters 348OC curve of an ideal plan 349OC curve of general plan 349zone of acceptance and rejction 349zone of indecision 35010 specification an operating characheteristic curve 351acceptable quality level (AQL 351Lot tolerance percent defectives LTPD 351producer's risk Alpha 352consumer risk Beeta 352types of sampling plans 352single sampling plan 353double sampling plan 354multiple sampling plan 356comparison of different sampling plan 358
Chapter 16- Quality Management Statistical Process Control SPCPrinciples underlying process control 353control charts as tool for process control 368types of control charts 369control charts for variables (X-R charts) 370Theory 371steps to prepare X-R chart 374what are control charts by attributes 383control charts for fraction defectives P-chart 384control charts for number defectives nP chart 388control charts for the number of defects c-Chart 390Chapter 17 Work Study Method studywhat is work study 401introduction to method study 402Basic procedure of method study 404selection of the job 407recording of facts 410method study symbols 411operation process chart OPCFlow process chart FPC 421templates and models 431three dimensional models 431critical examination 432development and selection 433installation of the proposed method 435maintenance of the proposed method 436Chapter -18 Work Study Work Measurementinformal standard 447Elwood S Buffa 447uses of work measurement data 448equitable standards 448control of exception 449rational basis of incentives 449sub standard workers 450techniques of work measurement 451PMTS - method of time measurement (MTM) 451TMU 452time study 452time study procedure 453steps in time study 453select the job to be timed 453select the operator 454flyback method 455rating 455determine representative time of each element 455observed time into normal time 456assess relaxation and other allowance 456calculate standard time of the job 457constituents of standard time 457standard time computation 458operator efficiency 458standard time computation involving frequency of elements 461
standard time computation when stop watch readings are given 462standard time computation when stop watch readings involved some foreign elements 464work sampling 467Morrow 468Procedure for conducting a work sampling study 468Master list of work and delay elements 469Divgi Metalwares Pvt Ltd 469want of tools 469want of work 469interference 470Duration of the study 471number of observers 471accuracy desired 471cyclical work patterns 472accuracy 472, 481confidence 472activity percentage 472design the study 473number of observation 473total number of rounds and rounds per day 474average time between the rounds 475fix up the time required to make a round 476compare average time per round with time required to make a round 476prepare the schedule for the rounds 477datasheet 478summary of recommendations 482setting performance standards with work sampling 483rating index 483overall time per unit 484effective time per unit 484breakdown of effective time 484normal time per piece 485standard time per piece 485adavantage and disadvantage of work sampling over time study 488random rounds 492clock time for the random rounds 492machine controlled time 496hand controlled time 496standard time 497Chapter -19 Financial incentives 509fear motivation 509motivation 509non financial incentives 509semi financial incentives 510financial incentives 510incentive scheme 510,513individual incentives 511minimisation of loss of time 511equitable wage earnings 512reduction in supervision 512managerial functions 512surplus labour , indirect workmen 512
wage incentive plan 513fair wage structure 514overtime 514quality control 514accurate projection of future busimess 515labour body 515training of supervisors 515good incentive plan 516safeguards 518classification of standards incentive plans 519classification of std wage incentive plans 520straight piece rate methods 521characteristic of piece rate system 521Differential piece rate method 524taylor differential piece rate method 524the merrick differential piece rate method 524gantt task and bonus scheme 528emerson efficiency plan 530Halsey system 531halsey plan 532halsey weir plan 533Rowan system 534incentive bonus 535bedaux point system 537barath variable sharing plan 538earnings 539Preiestman production plan 539Productivity bonus unde the plan
POM assgn : Shagun
True/FalseQuestion It pays in the long run to inform the customer regarding expected delays in
the deliveries.Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion Fixed position layout is adopted when
Correct Answer product is very heavy involving assembly of large number of parts
Your Answer product is very heavy involving assembly of large number of parts
Select The BlankQuestion The ________ is the defect level for which lots are regarded as bad lots.
Correct Answer Lot Tolerance Percentage Defective
Your Answer Lot Tolerance Percentage Defective
Multiple Choice Multiple AnswerQuestion Which are the advantages of suburban location?
Correct Answer Avaialability of adequate land at lower cost , Both skilled and unskilledlabour can be available , Plant expansion is easier due to less or norestriction for building and construction
Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilledlabour can be available , Plant expansion is easier due to less or norestriction for building and construction
Select The BlankQuestion One detachable ticket is prepared for each ________.
Correct Answer Operation
Your Answer Worker
Select The BlankQuestion A good maintenance system is not a luxary but a ________.
Correct Answer Necessity
Your Answer Necessity
Multiple Choice Multiple AnswerQuestion Following are some of the factors which influence process planning
Correct Answer Order Quantity , Process capability of machine , Delivery Dates
Your Answer Order Quantity , Delivery Dates , Plant layout
True/False
Question Availability of training schools, colleges and management institutes reducesthe company's internal training needs.
Correct Answer True
Your Answer False
Multiple Choice Multiple AnswerQuestion Which of the following are examples of pure materials?
Correct Answer Bakeries , Ice factories , Woolen
Your Answer Bakeries , Ice factories , Lime stone
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Production Scheduling
Work Sampling Machine utilization Sampling Inspection
Gantt Chart Production Scheduling Charting technique
Match The FollowingQuestion Correct Answer Your Answer
Fixation of inventory level Reorder level Stock on hand
Symptom of ill plannedpurchasing
Over ordering Over ordering
Factor influencing materialplanning
Lead time Lead time
Net requirement of material underMRP
Stock on hand Price of material
Multiple Choice Multiple AnswerQuestion Which of the following are steps to identify the critical path in a small
network?Correct Answer Compare the durations of all paths to identify the longest path. , Sum up
the durations of activities along each path. , Enumerate all paths in thenetwork and list down activities on each path.
Your Answer Compare the durations of all paths to identify the longest path. , Sum upthe durations of activities along each path. , Enumerate all paths in thenetwork and list down activities on each path.
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot may vary
between ________.Correct Answer 0.01 to 10%
Your Answer 0.01 to 10%
True/FalseQuestion Tool breakage has got nearly zero chances in case of eventual breakdown.
Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Which are the three types of float?
Correct Answer Total float , Independent float , Free float
Your Answer Total float , Dependent float , Free float
Multiple Choice Multiple AnswerQuestion Which of the following are major inputs to scheduling?
Correct Answer Overlapping of operations , Effective Capacity per work centre ,Performance standards
Your Answer Effective Capacity per work centre , Ratio of skilled to unskilled labour ,Performance standards
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any
product/s is calledCorrect Answer Factory
Your Answer Factory
Select The BlankQuestion The ________ is the maximum percentage defective that for the purpose of
sampling inspection can be considered satisfactory as a process average.Correct Answer Acceptable quality level
Your Answer Lot Tolerance Percentage Defective
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of
the condition of an item from routine or continuous checking.Correct Answer Condition monitoring
Your Answer Overhauling
Select The BlankQuestion OC curve of ideal sampling plan suggests that all lots less than 3%
defectives have the probability of acceptance of ________.Correct Answer One
Your Answer One
Multiple Choice Single AnswerQuestion How to calculate activity cost slope?
Correct Answer Activity cost slope = ( Crash cost - Normal cost ) / ( Normal time - Crashtime )
Your Answer Activity cost slope = ( Normal cost - Crash cost ) / ( Normal time - Crashtime )
Multiple Choice Multiple AnswerQuestion Which of the following are minimum requirement for a good quality of
design?Correct Answer Resonable cost , Resonable procurement time , Resonable manufacturing
timeYour Answer Resonable cost , Resonable procurement time , Resonable manufacturing
time
True/FalseQuestion In case of control chart, large smaples such as n=15 or 20 are used if the
process standard deviation is small.Correct Answer False
Your Answer True
Select The BlankQuestion Production control work is ________ in case of floor inspection as compared
with the centralised inspection.Correct Answer easier
Your Answer labourious
Multiple Choice Single AnswerQuestion Production Planning includes
Correct Answer Predetermination of manufacturing requirements
Your Answer Predetermination of manufacturing requirements
Multiple Choice Single AnswerQuestion How does the control chart of statistical quality control helps the operating
personnel?Correct Answer Identify the presence of an assignable cause before it develops
Your Answer Reduces chances of rejections
Multiple Choice Single AnswerQuestion What can be the worst effect due to excessive vibration?
Correct Answer Breakdown
Your Answer Reduced salvage value of machine
Multiple Choice Single AnswerQuestion What do you understand by the metallergical aspects of product which
forms the vital part of engineering function?Correct Answer Material specifications
Your Answer Performance specifications
Multiple Choice Single AnswerQuestion Which of the following is a cause of plant breakdown?
Correct Answer Overloading of machines
Your Answer Overloading of machines
Multiple Choice Multiple AnswerQuestion Which of the following possibilities can be explored by using flow process
chart?Correct Answer Eliminating the operations or combining the operations with another ,
Reducing the distance traveled by the workmen or materials , Avoiding thewaiting time and thereby reduce production losses
Your Answer Reducing the distance traveled by the workmen or materials , Reducingrejections drastically , Avoiding the waiting time and thereby reduceproduction losses
Multiple Choice Single AnswerQuestion Material Planning is an integral part of
Correct Answer Production Planning
Your Answer Process Planning
True/FalseQuestion Dust gets mixed with lubricants, forms an abrasive substance and causes
pre-mature failure of machinery.Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Which of the following activities are used while recording for method study?
Correct Answer Delay , Operation , Inspection
Your Answer Operation , Inspection , Production
True/FalseQuestion In case of centralised inspection, inspection rooms generally become
bottleneck and cause delay in taking action regarding rejection or rework.Correct Answer True
Your Answer True
Select The BlankQuestion The ________ advocates maintenance procedures whereby the condition of
the plant is constantly watched through systematic inspection to unearthunhealthy conditions and preventive
Correct Answer Preventive Maintenance
Your Answer Preventive Maintenance
True/FalseQuestion The problems of congestion, bottlenecks and backtracking can not be
visualized by using templates and models.Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion Which varaible is taken along the abscissa or X axis?
Correct Answer Time
Your Answer Quality
True/FalseQuestion Delay in completion of projects result in unwelcome additions to the fixed
manufacturing expenses.Correct Answer True
Your Answer True
Select The BlankQuestion The term ________ emplies the foregone profit due to inability of company
to produce.Correct Answer Opportunity cost
Your Answer Idle wages
Multiple Choice Single AnswerQuestion Taxes / duties levied is one of the important determinant for location
decision as taxes/duties substantially influenceCorrect Answer Product cost
Your Answer Order procurement
Multiple Choice Multiple AnswerQuestion What are the uses of failure statistics analysis?
Correct Answer To forecast the defect , To identify causes of major repetative failures , Toquantify the frequency of preventive inspection
Your Answer To forecast the defect , To identify causes of major repetative failures , Toquantify the frequency of preventive inspection
True/FalseQuestion Shop order is one of the subsidiary order
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion Which of the following is the most popular technique for Project Production?
Correct Answer PERT & CPM
Your Answer PERT & CPM
Select The BlankQuestion The ________ is the probability that a good lot will be rejected by the
sampling plan.Correct Answer Producer's risk
Your Answer Lot Tolerance Percentage Defective
True/FalseQuestion The component produced on completely automatic machines may be
subjected to sampling inspection while parts produced on semi-automaticand completely manual operated machines require cent percent inspection.
Correct Answer True
Your Answer False
Multiple Choice Multiple AnswerQuestion In an organization there may not be a formal PPC department if
Correct Answer Work is highly repetitive in nature , Planning activities are performed by theline staff , Number of workmen is not very large
Your Answer Work is highly repetitive in nature , Planning activities are performed by theline staff , Number of workmen is not very large
Multiple Choice Multiple AnswerQuestion Which of the following factors play important role while selecting or
rejecting a particular site from legislation and taxation point of view?Correct Answer Labour laws , Building codes , Policies regarding issue of licences
Your Answer Labour laws , Policies regarding issue of licences , Productivity of labour
POM assgn : Shagun
Select The BlankQuestion A ________ is another form of subcontracting.
Correct Answer Hiring capacity
Your Answer Open purchase order
True/FalseQuestion An ideal OC curve is never possible only with cent percent inspection.
Correct Answer False
Your Answer True
Match The FollowingQuestion Correct Answer Your Answer
Table lubrication Weekly Six monthly
Draining and refilling of oilreserviors of plunger pump
Yearly Yearly
Parts lubricated with oil nipple Daily Weekly
Tools and slideways two to three times a day Daily
True/FalseQuestion The operator should not stop production if first piece is not approved by the
inspector.Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Which of the following causes can be responsible for derailing the
production schedule in a factory?Correct Answer Errors in drawings , Delay in receipt of material from vendor , Excessive
absenteeismYour Answer Errors in drawings , Delay in receipt of material from vendor , Excessive
absenteeism
True/FalseQuestion For p-chart, the central line of fraction defectives is determined by average
percentage defectives.Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Expediting function is concerned with following activities
Correct Answer Progress chasing to identify delays which may hold up production ,Communicating possible delays in delivery date commitment to salesdepartment , Devising cures to keep rate of production in line with schedule
Your Answer Recording progress of work , Communicating possible delays in deliverydate commitment to sales department , Devising cures to keep rate ofproduction in line with schedule
Multiple Choice Single AnswerQuestion When should operator or supervisor is supposed to sign the perforated
route sheet?Correct Answer After completion of operation
Your Answer After completion of operation
Select The BlankQuestion The ________ is necessary when the job requires detailed of one or more
of the job characteristics with the help of special equipment which is notavailable at the producing company.
Correct Answer Inspection order
Your Answer Move order
Multiple Choice Multiple AnswerQuestion What are the benefits of reconditioning?
Correct Answer Eliminates problems and frequent breakdowns , Increases life of anequipment , It helps to plan requirement of replacement spares
Your Answer Eliminates problems and frequent breakdowns , Increases life of anequipment , It helps to plan requirement of replacement spares
Multiple Choice Multiple AnswerQuestion Which of the following processes or activities are denoted by using symbols
while recording in method study?Correct Answer Transport , Delay , Storage
Your Answer Transport , Rejection , Storage
Multiple Choice Single AnswerQuestion Which is the zone beyond LTPD in case of Oc curve of a general plan?
Correct Answer Zone of rejection
Your Answer Zone of rejection
True/FalseQuestion A properly designed sampling plan can control sampling errors and
completely eliminate them.Correct Answer False
Your Answer True
Select The BlankQuestion The ________ includes preventive maintenance activities whose needs are
identified through inspection which requires stoppage of machines.Correct Answer Shutdown Maintenance
Your Answer Shutdown Maintenance
Select The BlankQuestion The ________ pertain to the climatic conditions which the component ,
product or material should withstand.Correct Answer Environmental specifications
Your Answer Environmental specifications
True/FalseQuestion Grouping of machines gives a lot of flexibility in loading and scheduling
Correct Answer True
Your Answer True
True/FalseQuestion A lot declared rejected in sampling inspection should not be inspected
100% in any case.Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Which of the following are the basic requirements of quality standard?
Correct Answer Deifinite , Undesrstandable , Economically viable
Your Answer Absolute uniformity , Undesrstandable , Economically viable
True/FalseQuestion The plotting of activities - critical, non-critical and dummy activities- is
strictly according to their precedence relationship.Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Which of the following are activities of corrective maintenance?
Correct Answer Modifications and improvements , Overhauling , Emergency repairs
Your Answer Modifications and improvements , Overhauling , Lubrication as per schedule
Multiple Choice Single AnswerQuestion Following is not a function of PPC
Correct Answer Product Planning
Your Answer Order Processing
Multiple Choice Multiple AnswerQuestion Which of the following three methods used to select the qualified supplier?
Correct Answer By vendor plant surveys , By reputation , By experience
Your Answer By vendor plant surveys , By the perofrmance of first lot , By experience
Select The BlankQuestion The ________ is the watch dog which ensures that every element of
production and activities which could affect the quality of end product areregulated to the extent desirable.
Correct Answer Quality control
Your Answer Quality control
Match The FollowingQuestion Correct Answer Your Answer
Pessimistic time b p
Expected time Te Te
Optimistic time a o
Most likely time m m
Multiple Choice Multiple AnswerQuestion Which are the different methods of recording actual progress of work?
Correct Answer Display boards , Progress cards , Network updating
Your Answer Display boards , Job cards , Progress cards
Multiple Choice Single AnswerQuestion One of the characterstic of layout is about the flow of material / personnel.
In a good layout the flow should beCorrect Answer Unidirectional
Your Answer Unidirectional
Multiple Choice Multiple AnswerQuestion What is indicated by the hugging points lying close to mean of the process
in X bar-R- control chart?Correct Answer Biases in measurements , Recording done without actual measurements ,
Improper selection of samplesYour Answer Biases in measurements , Recording done without actual measurements ,
Improper selection of samples
Multiple Choice Multiple AnswerQuestion Operation Layout generally contains following information
Correct Answer Part Sketch , Standard Time , Jigs and fixtures
Your Answer Sequence of operations , Standard Time , Jigs and fixtures
Multiple Choice Single AnswerQuestion What do you mean by the graphical representation of the project which is
composed as series of connected arrows and circles to describe the
interrelationship of the activities involved?
Correct Answer Network
Your Answer Flow chart
Multiple Choice Single AnswerQuestion Where does the SPC exercises the control to prevent the occurances of
defectives?Correct Answer On manufacturing process
Your Answer On manufacturing process
Multiple Choice Single AnswerQuestion Which photographic technique is used to record path of motions of the
members of the body during method study?Correct Answer Cyclograph
Your Answer Pictograph
Select The BlankQuestion An Ideal OC curve is ________ shaped curve that accpets all the lots with
quality equal to or better than AQL .Correct Answer Rectangular
Your Answer Bell
True/FalseQuestion In Gantt Chart, the horizontal lines devide vertical lines into sections which
represents either operations or work centres.Correct Answer True
Your Answer True
Select The BlankQuestion Goods after final inspection should accompany ________to enable dispatch
department to identify and draw correct reference.Correct Answer Forwarding note
Your Answer Forwarding note
Select The BlankQuestion Capacity decisions have a direct influence on performance of production
system in respect of ________Correct Answer Delivery performance
Your Answer Quality
True/FalseQuestion Floor inspection promotes tendency of machines to drift out of limits and
produce defectives.Correct Answer False
Your Answer False
True/FalseQuestion A sampling plan which perfectly discriminates will have vertical OC curve.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to
entity can be defined asCorrect Answer Operation
Your Answer Manufacturing
Multiple Choice Multiple AnswerQuestion Which are the different methods to record details of the existing method
during method study?Correct Answer Charts , Diagrams , Templates or models
Your Answer Control plans , Charts , Templates or models
Select The BlankQuestion The ________ breakdowns usually cost more, partly due to damage done
to the adjustment components and partly due to emergency actions.Correct Answer Unexpected
Your Answer Unexpected
Multiple Choice Single AnswerQuestion Gross requirement of products is determined on the basis of
Correct Answer Both forecast and pending orders
Your Answer Past sales
Select The BlankQuestion The ________ is the probability that a bad lot will be accepted by the
sampling plan.Correct Answer Consumer's risk
Your Answer Acceptable quality level
Select The BlankQuestion The easiest way to bring the delayed job within the promised delivery time
by using extra shift or weekly holiday is ________.Correct Answer Overtime working
Your Answer Overtime working
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to complete an
activity within it's normal time?Correct Answer Normal cost
Your Answer Normal cost
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to complete an
activity within it's crashed time?Correct Answer Crash cost
Your Answer Total cost
Multiple Choice Single AnswerQuestion What do you understand by the extent the products manufactured conforms
to the laid down design?Correct Answer Quality of conformance
Your Answer Quality of design
Multiple Choice Multiple AnswerQuestion Which kind of possible defectives can be reduced due to first off inspection?
Correct Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due towrong machine set up
Your Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due towrong machine set up
POM assgn
Multiple Choice Single AnswerQuestion Which phase of method study is concerned with analyzing the facts critically,
generating alternatives which form the basis for selection and development ofimproved methods?
Correct Answer Critical examination
Your Answer Development and selection
Select The BlankQuestion The ________ advocates maintenance procedures whereby the condition of the
plant is constantly watched through systematic inspection to unearth unhealthyconditions and preventive
Correct Answer Preventive Maintenance
Your Answer Design-in Maintenance
Select The BlankQuestion The term ________ emplies the foregone profit due to inability of company to
produce.Correct Answer Opportunity cost
Your Answer Down time cost
True/FalseQuestion A network should employ only those dummy activities which are absolutely
necessary.Correct Answer True
Your Answer True
Select The BlankQuestion A set of activities to keep an equipment in the specified condition is called as
________.Correct Answer Maintenance
Your Answer Maintenance
True/FalseQuestion While making X bar-R-chart, values of X bar and R are recoded samplewise either
on the extreme right of the individual measurements on the data sheet or in aseparate sheet.
Correct Answer True
Your Answer False
Select The BlankQuestion The ________ must ensure that the product satisfy the functional requirements of
it's usage.Correct Answer Quality of design
Your Answer Quality of inspection
True/FalseQuestion Even if any activity on the critical path is delayed, project completes on the
scheduled time.Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion Which is the alternative way of indicating the load other than numerical way, in
case of Gantt chart ?Correct Answer Graphical approach
Your Answer Symbolic pproach
Multiple Choice Multiple AnswerQuestion Which of the following are types of sampling plan?
Correct Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Your Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Multiple Choice Multiple AnswerQuestion Which of the following are major inputs to scheduling?
Correct Answer Overlapping of operations , Effective Capacity per work centre , Performancestandards
Your Answer Overlapping of operations , Effective Capacity per work centre , Performancestandards
Select The BlankQuestion The ________ is necessary when the job requires detailed of one or more of the
job characteristics with the help of special equipment which is not available at theproducing company.
Correct Answer Inspection order
Your Answer Stores issue order
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of the
condition of an item from routine or continuous checking.Correct Answer Condition monitoring
Your Answer Condition monitoring
True/FalseQuestion Diversified labour is adequately available in rural area as compared to urban area.
Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Which of the following cases indicated that the operation has occurred?
Correct Answer Movement of components to assembly section , Raw material movement , Aworker's trip to grinder to sharpen the tools
Your Answer Movement of components to assembly section , A worker's trip to grinder tosharpen the tools , Tools kept in rack of tool crib
Multiple Choice Single AnswerQuestion What is the reason of fluctuations, if the control chart evaluates that the process
is in a state of statistical control?Correct Answer Random variability
Your Answer Set up variability
Select The BlankQuestion The ________ is the maximum percentage defective that for the purpose of
sampling inspection can be considered satisfactory as a process average.Correct Answer Acceptable quality level
Your Answer Acceptable quality level
Multiple Choice Single AnswerQuestion Product layout is suitable when
Correct Answer Products have reasonable stable demand
Your Answer Products are not required in large quantities
Multiple Choice Multiple AnswerQuestion Which of the following charts are used for the recording of data during the method
study?Correct Answer Operation process chart , Multiple activity chart , Flow process chart
Your Answer Operation process chart , Multiple activity chart , Flow process chart
True/FalseQuestion The operator should not stop production if first piece is not approved by the
inspector.Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion Need for change in layout can occur due to following reason
Correct Answer introduction of new product
Your Answer introduction of new product
Multiple Choice Single AnswerQuestion What do you mean by a single event which represents the joint completion of
more than one activities?Correct Answer Merge event
Your Answer Merge event
True/FalseQuestion The control chart for number of defectives is more convenient to make than
control chart for fraction defectives sincethe fugure of number of defectives unitscan be directly taken from the inspection report.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion Which rule is used for numbering of events?
Correct Answer Fulkerson's Rule
Your Answer Juran's Rule
True/FalseQuestion In case of two handed process chart, the simultaneous activities of both hands are
recorded opposite to each other on the chart.Correct Answer True
Your Answer True
True/FalseQuestion All activities lying on the non-critical paths must have total float and free float.
Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Which of the following is not the characteristic of Project Production?
Correct Answer Continuous flow of material , Highly mechanised material handling , Virtually zeromanufacturing cycle time
Your Answer Continuous flow of material , Highly mechanised material handling , Virtually zeromanufacturing cycle time
Multiple Choice Multiple AnswerQuestion Which of the following is not the characteristic of Project Production?
Correct Answer Continuous flow of material , Highly mechanised material handling , Virtually zeromanufacturing cycle time
Your Answer Fixed position layout
Select The BlankQuestion The ________ are the definitions of the measurable as well as nonmeasurable
characteristics of the product.Correct Answer Specifications
Your Answer Specifications
Multiple Choice Single AnswerQuestion How industry has responded to the fact of existence of inherant variability of the
manufacturing process?
Correct Answer Inclusion of certain tolerance on the basic dimensions in the drawing
Your Answer Inclusion of certain tolerance on the basic dimensions in the drawing
Select The BlankQuestion Work study is also called ________ study
Correct Answer Time and Motion
Your Answer Time and Motion
Multiple Choice Multiple AnswerQuestion Which are the different methods of recording actual progress of work?
Correct Answer Display boards , Progress cards , Network updating
Your Answer Job cards , Progress cards , Network updating
True/FalseQuestion In case of backward pass computation, the latest event time of the end event
equals to the earliest event time minus duration of that activity.Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Which of the following products should be produced by using mass production?
Correct Answer Refrigerator , Tyre for automobile , Television Set
Your Answer Refrigerator , Tyre for automobile , Television Set
Multiple Choice Multiple AnswerQuestion Which of the following are examples of attributes?
Correct Answer Cracks , Burrs , Texture
Your Answer Cracks , Burrs , Texture
Match The FollowingQuestion Correct Answer Your Answer
Scheduling Device Strings Strings
Interruption for machineutilisation
Preventive maintenance Preventive maintenance
Input for scheduling Overlapping of operations Critical Path Analysis
Technique of scheduling Critical Path Analysis JIT
Multiple Choice Multiple AnswerQuestion Which are the three distinct parts of the chart?
Correct Answer Summary , Introduction , Body
Your Answer Summary , Introduction , Analysis
Match The FollowingQuestion Correct Answer Your Answer
Combined Layout Mixed Layout Mixed Layout
Fixed Position Layout Project Layout Project Layout
Product Layout Line Layout Line Layout
Process Layout Functional Layout Functional Layout
Multiple Choice Multiple AnswerQuestion Following are the commonly used factors considered for evaluation of layout in
factor analysis methodCorrect Answer Flow of material , Equipment utilization , Working condition
Your Answer Flow of material , Equipment utilization , Working condition
Multiple Choice Single AnswerQuestion Fixed position layout is adopted when
Correct Answer product is very heavy involving assembly of large number of parts
Your Answer product is very heavy involving assembly of large number of parts
Select The BlankQuestion The ________ is the defect level for which lots are regarded as bad lots.
Correct Answer Lot Tolerance Percentage Defective
Your Answer Acceptable quality level
Multiple Choice Multiple AnswerQuestion Which of the following are examples of specifications?
Correct Answer Commercial standards , Assembly and testing instructions , Bill of material
Your Answer Commercial standards , Assembly and testing instructions , Bill of material
Multiple Choice Single AnswerQuestion Process Engineer does not get sufficient time for designing tooling for most
economic production run whenCorrect Answer Delivery time is less
Your Answer Delivery time is less
Multiple Choice Single AnswerQuestion What do you mean by the graphical representation of the project which is
composed as series of connected arrows and circles to describe the
interrelationship of the activities involved?
Correct Answer Network
Your Answer Flow chart
True/FalseQuestion Latest finishing date is the latest event time of the tail event.
Correct Answer False
Your Answer True
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any product/s
is calledCorrect Answer Factory
Your Answer Factory
Select The BlankQuestion The ________ is the probability that a bad lot will be accepted by the sampling
plan.Correct Answer Consumer's risk
Your Answer Consumer's risk
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single AnswerQuestion What is represented by an arrow in a network?
Correct Answer Activity
Your Answer Activity
True/FalseQuestion Skill of labour force in a product type layout is usually higher than in the
process type of layoutCorrect Answer False
Your Answer True
Select The BlankQuestion Production control work is ________ in case of floor inspection as compared
with the centralised inspection.Correct Answer easier
Your Answer easier
True/FalseQuestion In case of X bar, if the process is not under control indicated by some points
falling outside the control limits, such points outside the control limits areeliminated and new trial control limits for the remaining points are computed.
Correct Answer True
Your Answer False
Multiple Choice Single AnswerQuestion Need for change in layout can occur due to following reason
Correct Answer introduction of new product
Your Answer introduction of new product
Multiple Choice Multiple AnswerQuestion Material Requirement Planning is very useful in following situations
Correct Answer Long Lead time for procurement , Several levels of assemblies in product ,Long manufacturing cycle
Your Answer Long Lead time for procurement , Several levels of assemblies in product ,Long manufacturing cycle
True/FalseQuestion The plotting of activities - critical, non-critical and dummy activities- is strictly
according to their precedence relationship.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion Data from Process Sheet can be used to
Correct Answer Prepare load and schedule charts
Your Answer Monitor progress of work
Multiple Choice Single AnswerQuestion How should a dummy activity be represented in a network?
Correct Answer By dotted line
Your Answer By dotted line
Select The BlankQuestion The ________ are the definitions of the measurable as well as
nonmeasurable characteristics of the product.Correct Answer Specifications
Your Answer Specifications
True/FalseQuestion A load chart specifies the work to be carried out by each person of company
during shift hours.Correct Answer False
Your Answer False
Match The FollowingQuestion Correct Answer Your Answer
Scheduling of interrelatedactivities of small projects withconsideration of uncertainty ofduration of activities.
Critical Path Analysis Critical Path Analysis
Two machines & processingtime depends on sequence ofjob loading
Johnson's Two MachineAlgorithm
Critical Ratio Scheduling
Sufficient orders andresonable choice of machines
Index Method Johnson's Two MachineAlgorithm
Time relationship betweenwhen a product is requiredand when it can be made
Critical Ratio Scheduling Time series
available
True/FalseQuestion Systematic maintenance system can completely eliminate the wear and tear
of machines.Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion Providing flexibility in plant layout means
Correct Answer Layout can be changed without much cost if required
Your Answer Machine allocation can be changed easily
True/FalseQuestion Since value of p can never be positive, hence" if LCLp works out to be
positive, it is taken as zero."Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Which information is recorded in an equipment card?
Correct Answer Date of commissioning , Equipment specifications , Name and address ofmanufacturer
Your Answer Price of an equipment , Equipment specifications , Name and address ofmanufacturer
Multiple Choice Multiple AnswerQuestion Which of the following method can be adopted to overcome the problem of
rushing up a job for it's timely completion?Correct Answer Use of optimum speeds and feeds , Subcontracting , Job splitting
Your Answer Use of optimum speeds and feeds , Subcontracting , Job splitting
Multiple Choice Multiple AnswerQuestion Which of the following method can be used to record the facts during the
method study?Correct Answer Micromotion study , Cyclegraph , Chronocyclegraph
Your Answer Micromotion study , Cyclegraph , Chronocyclegraph
Multiple Choice Multiple Answer
Question Which are the sources of information to update the progress card daily?
Correct Answer Detachable ticket , Daily production report , Job Card
Your Answer Detachable ticket , Daily production report , Job Card
Multiple Choice Single AnswerQuestion What do you understand by the critical analysis of existing jobs to develop
easier and effective method?Correct Answer Method study
Your Answer Method study
Select The BlankQuestion Production Planning is a centralised activity which includes functions such as
________Correct Answer Scheduling
Your Answer Scheduling
Multiple Choice Multiple AnswerQuestion Plant layout facilitates processing of products in most effective manner
through the followingCorrect Answer Shortest possible distance , Shortest processing time , Minimum movement
Your Answer Shortest possible distance , Shortest processing time , Minimum movement
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot may vary
between ________.Correct Answer 0.01 to 10%
Your Answer 0.01 to 10%
True/FalseQuestion Dispatching function is not a part of Production Planning
Correct Answer True
Your Answer False
Select The BlankQuestion Work study is also called ________ study
Correct Answer Time and Motion
Your Answer Time and Motion
Multiple Choice Multiple AnswerQuestion Which are the distinct functions of scientific quality control?
Correct Answer Acceptance function , Preventive function , Assurance function
Your Answer Acceptance function , Preventive function , Assurance function
True/FalseQuestion The component produced on completely automatic machines may be
subjected to sampling inspection while parts produced on semi-automaticand completely manual operated machines require cent percent inspection.
Correct Answer True
Your Answer True
Match The FollowingQuestion Correct Answer Your Answer
Draining and refilling of oilreserviors of plunger pump
Yearly Yearly
Parts lubricated with oil nipple Daily Daily
Tools and slideways two to three times a day two to three times a day
Table lubrication Weekly Weekly
Multiple Choice Multiple AnswerQuestion Which of the following are examples of consumption of physical effort during
recording for method study?Correct Answer Bending , Positioning , Unloading
Your Answer Positioning , Unloading , Drilling
True/FalseQuestion Labour turnover rate is higher in case of rural area as compared to urban
area.Correct Answer False
Your Answer True
Select The BlankQuestion Goods after final inspection should accompany ________to enable dispatch
department to identify and draw correct reference.Correct Answer Forwarding note
Your Answer Forwarding note
Multiple Choice Single AnswerQuestion What does CPA stand for?
Correct Answer Critical Path Analysis
Your Answer Critical Path Analysis
Select The BlankQuestion The ________ advocates maintenance procedures whereby the condition of
the plant is constantly watched through systematic inspection to unearthunhealthy conditions and preventive
Correct Answer Preventive Maintenance
Your Answer Preventive Maintenance
Multiple Choice Single AnswerQuestion Following is one of the techniques used for Material Planning for high value
materialCorrect Answer MRP
Your Answer Exponential smoothing
Multiple Choice Single AnswerQuestion What is the name of the document on which details of the process are
recorded by the symbols and charting conventions?Correct Answer Chart
Your Answer Flowsheet
Multiple Choice Multiple AnswerQuestion Which are the general principles underlying probability aspects of project
planning?Correct Answer Statistically three time estimate of an activity conform to Beta distribution. ,
Expected time divides the area under the curve into two equal parts. ,Expected time of an activity is located at one third of the distance between"m" and mid-range { (a+b)/2 } away from the most likely time.
Your Answer Statistically three time estimate of an activity conform to Beta distribution. ,Expected time divides the area under the curve into two equal parts. ,Expected time of an activity is located at one third of the distance between"m" and mid-range { (a+b)/2 } away from the most likely time.
Multiple Choice Multiple AnswerQuestion Gross requirement of finished product is determined on the basis of following
Correct Answer Forecasted sales , Pending sales order , Management decision to stock
Your Answer Pending sales order , Management decision to stock , Gross Marketrequirement
Select The BlankQuestion The easiest way to bring the delayed job within the promised delivery time by
using extra shift or weekly holiday is ________.Correct Answer Overtime working
Your Answer Overtime working
True/FalseQuestion An activity should represent an operation or set of operations which can be
performed using a particular kind of equipment or a special skill.Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion How many of the following are types of specification?
Correct Answer Material specifications , Dimensional specifications , Performancespecifications
Your Answer Cost specifications , Material specifications , Dimensional specifications
Select The BlankQuestion The ________ is specified to indicate the maximum permissible variability in
the dimensions product or parts.Correct Answer Tolerance
Your Answer Tolerance
Select The BlankQuestion The ________ pertain to the climatic conditions which the component ,
product or material should withstand.Correct Answer Environmental specifications
Your Answer Environmental specifications
Select The BlankQuestion The ________ is a set of tools and techniques by which products are made
to comply with the specifications at minimum cost to the firm.Correct Answer Quality control system
Your Answer Quality control system
Multiple Choice Single Answer
Question Which chart sets out the sequence of flow of work of a product, or any part ofit through the section or department or a factory by recording the eventsunder review using appropriate symbols?
Correct Answer Flow process chart
Your Answer Operation process chart
Multiple Choice Single AnswerQuestion What do you understand by the measurement of work to establish allowed
time for a job for the defined method?Correct Answer Work measurement
Your Answer Work measurement
Multiple Choice Multiple AnswerQuestion Which three of the following options can be used to reduce the duration of
activity during project crashing?Correct Answer Allocating more manpower and machines than originally planned for. ,
Working additional shifts or overtime. , Awarding work to vendors whocharge extra but expedite deliveries.
Your Answer Allocating more manpower and machines than originally planned for. ,Working additional shifts or overtime. , Awarding work to vendors whocharge extra but expedite deliveries.
Multiple Choice Single AnswerQuestion Which photographic technique is used to record path of motions of the
members of the body during method study?Correct Answer Cyclograph
Your Answer Cyclograph
POM assgn : Amit
True/FalseQuestion The problems of congestion, bottlenecks and backtracking can not be
visualized by using templates and models.Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Following are some of the factors which influence process planning
Correct Answer Order Quantity , Process capability of machine , Delivery Dates
Your Answer Process capability of machine , Delivery Dates , Order Quantity
Multiple Choice Single AnswerQuestion Gross requirement of products is determined on the basis of
Correct Answer Both forecast and pending orders
Your Answer Both forecast and pending orders
True/FalseQuestion Skill of labour force in a product type layout is usually higher than in the
process type of layoutCorrect Answer False
Your Answer True
Multiple Choice Single AnswerQuestion In exponential smoothing method,for a stable demand pattern and better
smoothing effect, value of fraction( Alpha) selected isCorrect Answer 0.05 to 0.10
Your Answer 0.05 to 0.10
True/FalseQuestion Recording of movement is not necessary in case of method study in any
form.Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Which of the following may be the objectives of project crashing?
Correct Answer To complete the project in the least possible time , To reduce project costbelow it's normal cost , To achieve uniformity in requirement of resources
Your Answer To complete the project in the least possible time , To reduce project costbelow it's normal cost , To achieve uniformity in requirement of resources
Multiple Choice Single Answer
Question Which is the next stage to the inspection based quality control in thehistorical development of quality management.
Correct Answer Quality assurance
Your Answer Total Quality management
Select The BlankQuestion The ________ includes preventive maintenance activities whose needs are
identified through inspection which requires stoppage of machines.Correct Answer Shutdown Maintenance
Your Answer Shutdown Maintenance
Multiple Choice Single AnswerQuestion Inadequate production capacity ultimately leads to
Correct Answer Poor Customer Service
Your Answer Low Productivity
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of
the condition of an item from routine or continuous checking.Correct Answer Condition monitoring
Your Answer Condition monitoring
True/FalseQuestion Inspection should be conducted on all incoming materials, semifinished
items, bought out components, subcontract items prior to any operation,assembly.
Correct Answer True
Your Answer True
Select The BlankQuestion The ________ is the maximum percentage defective that for the purpose of
sampling inspection can be considered satisfactory as a process average.Correct Answer Acceptable quality level
Your Answer Acceptable quality level
Multiple Choice Single AnswerQuestion Production Planning includes
Correct Answer Predetermination of manufacturing requirements
Your Answer Predetermination of manufacturing requirements
Multiple Choice Multiple AnswerQuestion Expediting function is concerned with following activities
Correct Answer Progress chasing to identify delays which may hold up production ,Communicating possible delays in delivery date commitment to salesdepartment , Devising cures to keep rate of production in line with schedule
Your Answer Progress chasing to identify delays which may hold up production ,Communicating possible delays in delivery date commitment to salesdepartment , Devising cures to keep rate of production in line with schedule
Select The BlankQuestion The ________ is the watch dog which ensures that every element of
production and activities which could affect the quality of end product areregulated to the extent desirable.
Correct Answer Quality control
Your Answer Quality control
True/FalseQuestion A load chart specifies the work to be carried out by each person of company
during shift hours.Correct Answer False
Your Answer False
Match The FollowingQuestion Correct Answer Your Answer
Pessimistic time b b
Expected time Te Te
Optimistic time a a
Most likely time m m
True/FalseQuestion Breakdown is inversly proportional to the investment in W.I.P.
Correct Answer False
Your Answer True
Select The BlankQuestion Production Planning is a centralised activity which includes functions such as
________Correct Answer Scheduling
Your Answer Scheduling
Select The BlankQuestion A set of activities to keep an equipment in the specified condition is called
as ________.Correct Answer Maintenance
Your Answer Maintenance
Multiple Choice Single AnswerQuestion A good plant layout helps in
Correct Answer Reducing handling costs
Your Answer Reducing handling costs
Select The BlankQuestion The ________ is the probability that a good lot will be rejected by the
sampling plan.Correct Answer Producer's risk
Your Answer Producer's risk
Multiple Choice Multiple AnswerQuestion Components of Production Management include
Correct Answer Capacity Planning , Job Design , Production Planning
Your Answer Capacity Planning , Job Design , Production Planning
Multiple Choice Single AnswerQuestion Technique of Value Engineering can be effectively employed in design of a
product toCorrect Answer To meet the intended function at lowest cost
Your Answer To meet the intended function at lowest cost
Multiple Choice Multiple AnswerQuestion Which are the subtasks of the maintenance phase of the method study?
Correct Answer Monitoring and control , Performance appraisal , Audit on savings
Your Answer Monitoring and control , Performance appraisal , Audit on savings
True/FalseQuestion short cycle job should be studied for macroscopic motions.
Correct Answer False
Your Answer True
Select The BlankQuestion The ________ is a set of tools and techniques by which products are made
to comply with the specifications at minimum cost to the firm.Correct Answer Quality control system
Your Answer Quality control system
True/FalseQuestion Inspection Order can be a verbal order
Correct Answer True
Your Answer False
Multiple Choice Single AnswerQuestion Need for change in layout can occur due to following reason
Correct Answer introduction of new product
Your Answer improve quality
Select The BlankQuestion Goods after final inspection should accompany ________to enable dispatch
department to identify and draw correct reference.Correct Answer Forwarding note
Your Answer Forwarding note
Multiple Choice Multiple AnswerQuestion Which are the different methods of recording actual progress of work?
Correct Answer Display boards , Progress cards , Network updating
Your Answer Display boards , Progress cards , Network updating
Select The BlankQuestion The term ________ emplies the foregone profit due to inability of company
to produce.Correct Answer Opportunity cost
Your Answer Opportunity cost
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to complete an
activity within it's crashed time?Correct Answer Crash cost
Your Answer Normal cost
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any
product/s is calledCorrect Answer Factory
Your Answer Factory
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to
entity can be defined as
Correct Answer Operation
Your Answer Operation
Multiple Choice Single AnswerQuestion What do you mean by the selection of the job for the method study on the
basis of manufacturing difficulties?Correct Answer Technical consideration
Your Answer Economic consideration
True/FalseQuestion In case of backward pass computation, the latest event time of the end
event equals to the earliest event time minus duration of that activity.Correct Answer False
Your Answer True
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Machine utilization
Gantt Chart Production Scheduling Production Scheduling
Multiple Choice Multiple AnswerQuestion Which of the following are examples of addition during recording for method
study?Correct Answer Brazing , Welding , Riveting
Your Answer Brazing , Welding , Riveting
Multiple Choice Single AnswerQuestion The ratio of output to input of a production system is commonly known as
Correct Answer Productivity
Your Answer Productivity
Multiple Choice Single AnswerQuestion In case of Batch Production which kind of labour is expected?
Correct Answer Skilled in one specific Manufacturing Process
Your Answer Skilled in all Manufacturing Processes
Select The Blank
Question The ________ is necessary when the job requires detailed of one or moreof the job characteristics with the help of special equipment which is notavailable at the producing company.
Correct Answer Inspection order
Your Answer Inspection order
Multiple Choice Multiple AnswerQuestion Which are the factors on which the structure of the transportation cost
depends?Correct Answer Average distance of shipment , Characteristics of the commodity , Medium
of shipmentYour Answer Average distance of shipment , Characteristics of the commodity , Medium
of shipment
Multiple Choice Single AnswerQuestion Which is the ideal place to inspect jigs and fixtures in a mass manufacturing
unit?Correct Answer Separate inspection room
Your Answer Separate inspection room
True/FalseQuestion In Gantt Chart, the horizontal lines devide vertical lines into sections which
represents either operations or work centres.Correct Answer True
Your Answer True
POM assgn : Amit
Multiple Choice Multiple AnswerQuestion Which of the following are minimum requirement for a good quality of design?
Correct Answer Resonable cost , Resonable procurement time , Resonable manufacturing time
Your Answer Resonable manufacturing time , Resonable cost , Resonable procurement time
Multiple Choice Single AnswerQuestion Where does the central line is located in case of p-chart?
Correct Answer at p bar
Your Answer at median
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any product/s
is calledCorrect Answer Factory
Your Answer Factory
Multiple Choice Single AnswerQuestion Technique of Value Engineering can be effectively employed in design of a product
toCorrect Answer To meet the intended function at lowest cost
Your Answer To meet the intended function at lowest cost
Select The BlankQuestion The ________ is the probability that a good lot will be rejected by the sampling
plan.Correct Answer Producer's risk
Your Answer Producer's risk
Multiple Choice Multiple AnswerQuestion Material Requirement Planning is very useful in following situations
Correct Answer Long Lead time for procurement , Several levels of assemblies in product , Longmanufacturing cycle
Your Answer Long Lead time for procurement , Long manufacturing cycle , Demand for theproduct is not known
Select The BlankQuestion The ________ is the watch dog which ensures that every element of production
and activities which could affect the quality of end product are regulated to theextent desirable.
Correct Answer Quality control
Your Answer Quality control
Select The Blank
Question The ________ is the process of withdrawing the equipment from the productionline, dismantling it unitwise, visualising defects, effecting adjustments, replacingworn-out parts and finally building it up to get desired accuracies.
Correct Answer Reconditioning
Your Answer Overhauling
Multiple Choice Single AnswerQuestion The ratio of output to input of a production system is commonly known as
Correct Answer Productivity
Your Answer Productivity
True/FalseQuestion In case of two handed process chart, the simultaneous activities of both hands are
recorded opposite to each other on the chart.Correct Answer True
Your Answer True
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Machine utilization
Gantt Chart Production Scheduling Production Scheduling
Multiple Choice Multiple AnswerQuestion Which of the following factors play important role while selecting or rejecting a
particular site from legislation and taxation point of view?Correct Answer Labour laws , Building codes , Policies regarding issue of licences
Your Answer Labour laws , Building codes , Policies regarding issue of licences
Multiple Choice Single AnswerQuestion What do you mean by the study of repetitive short cycle operations which involve
quick hand / feet motions?Correct Answer Micromotion study
Your Answer Macromotion study
True/FalseQuestion An activity should represent an operation or set of operations which can be
performed using a particular kind of equipment or a special skill.Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Which of the following products should be produced by using mass production?
Correct Answer Refrigerator , Tyre for automobile , Television Set
Your Answer Refrigerator , Tyre for automobile , Television Set
True/FalseQuestion In case of X bar, if the process is not under control indicated by some points
falling outside the control limits, such points outside the control limits areeliminated and new trial control limits for the remaining points are computed.
Correct Answer True
Your Answer True
True/FalseQuestion After goods have been manufactured, route sheets and operation layouts should
not be collected back.Correct Answer False
Your Answer False
True/FalseQuestion Planned lubrication is said to be the nervous system of the equipment.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion What does the points falling outside the control limits indicate?
Correct Answer Presence of assignable causes
Your Answer Mean = Standard deviation
Multiple Choice Single AnswerQuestion Which industry out of the following industries require maximum consideration for
safety factor while selecting plant location?Correct Answer Nuclear power plant
Your Answer Nuclear power plant
Multiple Choice Multiple AnswerQuestion Which of the following are assignable cause?
Correct Answer Large varaitions in hardness of material , Tool wear , Errors in setting
Your Answer Large varaitions in hardness of material , Play in guide rods , Errors in setting
Multiple Choice Single AnswerQuestion A good plant layout helps in
Correct Answer Reducing handling costs
Your Answer Reducing handling costs
Multiple Choice Multiple AnswerQuestion Which of the following are examples of addition during recording for method
study?Correct Answer Brazing , Welding , Riveting
Your Answer Brazing , Welding , Riveting
True/FalseQuestion An activity can share the same tail event and same head event with any other
activity.Correct Answer False
Your Answer True
Select The BlankQuestion Work study is also called ________ study
Correct Answer Time and Motion
Your Answer Time and Motion
Multiple Choice Single AnswerQuestion Which kind of gauge consists of electrical contacts operating a series of colloured
signal lamps which indicate whether the dimension is correct, oversize orundersize?
Correct Answer Multiple gauging
Your Answer Multiple gauging
Multiple Choice Multiple AnswerQuestion Components of Production Management include
Correct Answer Capacity Planning , Job Design , Production Planning
Your Answer Capacity Planning , Job Design , Production Planning
True/FalseQuestion Only skilled worker can use the fixed limit gauge.
Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Question Which are major benefits of identifying the critical path?
Correct Answer It helps to identify the set of activities and events which are critical and as suchmust be carefully controlled and monitored , It identifies activities to be givenpreference in allocation of resources. , It helps to exercise "control by exception".
Your Answer It helps to identify the set of activities and events which are critical and as suchmust be carefully controlled and monitored , It reduces the paperwork , Itidentifies activities to be given preference in allocation of resources.
Multiple Choice Multiple AnswerQuestion Which are reason due to which the progress of work is rarely in line with it's plan?
Correct Answer Absenteeism , Machine breakdowns , Substandard performance against prefixedproduction standards
Your Answer Absenteeism , Machine breakdowns , Substandard performance against prefixedproduction standards
Select The BlankQuestion The ________ is necessary when the job requires detailed of one or more of the
job characteristics with the help of special equipment which is not available at theproducing company.
Correct Answer Inspection order
Your Answer Inspection order
Multiple Choice Multiple AnswerQuestion Which of the following are important considerations concerning activity times?
Correct Answer Activity time should be obtained from the person responsible for the completion ofan activity , Activity time must be independent of any influence which thepreceding or succeeding activity may have on it. , Activity time may assume thatjust the normal quantity of resources required to carry out the activity areavailable.
Your Answer Activity time should be obtained from the person responsible for the completion ofan activity , Activity time must be independent of any influence which thepreceding or succeeding activity may have on it. , Activity time may assume thatjust the normal quantity of resources required to carry out the activity areavailable.
Select The BlankQuestion Capacity decisions have a direct influence on performance of production system in
respect of ________Correct Answer Delivery performance
Your Answer Delivery performance
True/FalseQuestion Breakdown of machines, absenteeism of worker does not dislocate the
manufacturing activity in process layoutCorrect Answer True
Your Answer True
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to entity
can be defined as
Correct Answer Operation
Your Answer Operation
Multiple Choice Multiple AnswerQuestion Which of the following possibilities can be explored by using flow process chart?
Correct Answer Eliminating the operations or combining the operations with another , Reducingthe distance traveled by the workmen or materials , Avoiding the waiting time andthereby reduce production losses
Your Answer Eliminating the operations or combining the operations with another , Reducingthe distance traveled by the workmen or materials , Avoiding the waiting time andthereby reduce production losses
Multiple Choice Single AnswerQuestion The document raised by PPC which authorises different functions to take action as
per instruction is calledCorrect Answer Work Order
Your Answer Work Order
True/FalseQuestion Dust gets mixed with lubricants, forms an abrasive substance and causes pre-
mature failure of machinery.Correct Answer True
Your Answer True
Match The FollowingQuestion Correct Answer Your Answer
Draining and refilling of oilreserviors of plunger pump
Yearly Yearly
Parts lubricated with oil nipple Daily Daily
Tools and slideways two to three times a day two to three times a day
Table lubrication Weekly Weekly
Select The BlankQuestion Production control work is ________ in case of floor inspection as compared with
the centralised inspection.Correct Answer easier
Your Answer easier
True/FalseQuestion Operation process charts though indicates the sequence of events but do not show
movements.
Correct Answer True
Your Answer True
Select The BlankQuestion The ________ is the probability that a bad lot will be accepted by the sampling
plan.Correct Answer Consumer's risk
Your Answer Consumer's risk
Select The BlankQuestion A ________ is another form of subcontracting.
Correct Answer Hiring capacity
Your Answer Hiring capacity
Select The BlankQuestion The ________ breakdowns usually cost more, partly due to damage done to the
adjustment components and partly due to emergency actions.Correct Answer Unexpected
Your Answer Unexpected
Select The BlankQuestion Production Planning is a centralised activity which includes functions such as
________Correct Answer Scheduling
Your Answer Scheduling
Multiple Choice Single AnswerQuestion Which is the zone beyond LTPD in case of Oc curve of a general plan?
Correct Answer Zone of rejection
Your Answer Zone of rejection
Multiple Choice Single AnswerQuestion Where the ignorance towards the degradation of machine leads to?
Correct Answer Eventual breakdown
Your Answer Eventual breakdown
Production / Operations Management—Page 1
ASSIGNMENT
Q.1) What is “Operations Management”? What are the objectives of OperationsManagement? Enlist key elements of Operations Management.
Answer.1)
An operation may be defined “as the process of changing inputs into outputs therebyadding value to some entity”.Right quality, right quantity, right time and right price arethe four basic requirements of the customers and as such they determine the extent ofcustomer satisfaction. And if these can be provided at a minimum cost, then the value ofgoods produced or services rendered increases. Thus the objectives of productionmanagement are “to produce goods and services of the right quality, in the rightquantities, according to the time schedule and a minimum cost”.
Objectives of production management may be amplified as under:
Producing the right kind of goods and services that satisfy customers’ needs(effectiveness objective).
Maximizing output of goods and services with minimum resource inputs (efficiencyobjective).
Ensuring that goods and services produced conform to pre-set quality specifications(quality objective).
Minimizing throughput-time- the time that elapses in the conversion process- by reducingdelays, waiting time and idle time (lead time objective).
Maximizing utilization of manpower, machines, etc. (Capacity utilization objective).
Minimizing cost of producing goods or rendering a service (Cost objective).
Key elements of Operations Management
1. Product selection and design
The right kind of products and good designs of the products are crucial for the success of anorganizing. A wrong selection of the product and/or poor design of the products can render thecompany’s operation ineffective and non-competitive. Products/services, therefore, must bechosen after detailed evaluation of the product/services alternatives in conformity with theorganization’s objectives. Techniques like value engineering may be employed in creatingalternate designs, which are free from unnecessary features and meet the intended functions at thelowest cost.
2. Process selection and planning
Selection of the optimal “conversion system” is as important as choice of products/services andtheir design. Process selection decisions include decisions concerning choice of technology,
Production / Operations Management—Page 2
Equipment, machines, material handling systems, mechanization and automation. Processplanning involves detailing of processes if resource conversion required and their sequence.
3 Facilities (Plant) location
Plant location decisions are strategic decisions and once plant is set up at a location, it iscomparatively immobile and can be shifted later only at a considerable cost and interruption ofproduction. Although problem of location choice does not fall within preview the productionfunction and it occurs infrequently, yet it is of crucial importance because of its major effect onthe performance of every department including production. Therefore, it is important to choosethe right location, which will minimize total “delivered customer” cost (Production anddistribution cost). Locational decisions involve evaluation of locational alternatives againstmultiplicity of relevant factors considering their relative importance to the organization andselecting those, which are operationally advantageous to the organization.
4. Facilities (Plant) layout and materials handling
Plant layout is concerned with relative location of one department (Work centre) with another inorder to facilitate material flow and processing of a product in the most efficient manner throughthe shortest possible time. A good layout reduces material handling cost, eliminates delays andcongestion, improves co-ordination, provide good housekeeping etc. while a poor layout resultsin congestion, waste, frustration, inefficiency and loss of profit.
5. Capacity Planning
Capacity planning concerns determination and acquisition of productive resource to ensure thattheir availability matches the demand. Capacity decisions have a directInfluence on performance of production system in respect of both resource productivity andcustomer service (i.e. delivery performance). Excess capacity results in low resource productivitywhile inadequate capacity leads to poor customer service. Capacity planning decisions can beshort-term decisions. Long-term capacity planning decisions concern expansion/contraction ofmajor facilities required in the conversion process, economics of multiple shift operation,development of vendors for major components etc. Short term capacity planning decisions concernissues like overtime working, sub-contracting, shift adjustments etc. Break even analysis is avaluable tool for capacity planning.
6. Production Planning and Control (PPC)
Production planning is the system for specifying the production procedure to obtain the desiredoutput in a given time at optimum cost in conformance with specified standard of quality, andcontrol is essential to ensure that manufacturing takes place in the manner stated in the plan.
7. Inventory control
Inventory control deals with determination of optimal inventory levels of raw materials,components, parts, tools; finished goods, spares and supplies to ensure their availability withminimum capital lock up. Material requirement planning (MRP) and just-in-Time (JIT) are thelatest techniques that can help the firm to reduce inventory.
Production / Operations Management—Page 3
8. Quality assurance and control
Quality is an important aspect of production system and it must ensure that services and productsproduced by the company conform to the declared quality standards at the minimum cost A totalquality assurance system includes such aspects as setting standards of quality, inspection ofpurchased and sub-contracted parts, control of quality during manufacture and inspection offinished product including performance testing etc.
9. Work study and job design
Work-study, also called time and motion study, is concerned with improvement of productivity inthe existing jobs and the maximization of productivity in the design of new jobs. Two principalcomponent of work-study are:
(i) Method study(ii) Work measurement
Method study has been defined (BS 3138) as the systematic recording and critical examinationof the existing and proposed ways of doing work, as a means of developing and applying easierand more effective methods and reducing costs. Method study when applied to productionmethods yields one or more of the following benefits:
Improved work environment Improved facility layout Better utilization of facilities Greater safety Lesser materials handling Smooth production flow Lower work-in-process Higher earnings for the workmen
10. Maintenance and replacement
Maintenance and replacement involve selection of optimal maintenance Preventive and/orbreakdown) policy to ensure higher equipment availability at minimum maintenance and repaircost. Preventive maintenance, which includes preventive inspection, planned lubrication,periodic cleaning and upkeep, planned replacement of parts, condition monitoring of theequipment and machines, etc. is most appropriate for critical machines.
11. Cost reduction and cost control
Effective production management must ensure minimum cost of production and in this contextcost reduction and cost control acquires significant importance. There are large number of toolsand techniques available that can help to make a heavy dent on the production cost.
Production / Operations Management—Page 4
Q.2) What is batch Production? What are its key characteristics? Compare thesecharacteristics with those of project production.
Answer.2)
Batch production is characterized by the manufacture of a limited number of a product(but many such quantities of different products) produced at periodic intervals and stocked inwarehouses as finished goods (or finished parts) awaiting sales (or withdrawal for assembly).Typical examples of batch production are: process industries such as pharmaceuticals, paints,chemicals; medium and heavy engineering industry engaged in the manufacture of electricmotors, switch gears, heavy motor vehicles, internal combustion engines; manufacture of readymade garments; manufacture of assembly shops such as machine tools; sub contractors whichtake on machining of batches of components to the drawings of a large manufacture etc.
Characteristics of batch production
(a) Short runs:Short production runs and frequent changes of set also characterize batch
production up. The equipment and the assembly set up is used for a limitednumber of parts or assemblies and is then changed to make a different product. Theproduction is generally made to stock.
(b) Skilled labour in specific trades:The labour force is expected to posses skill in one specific manufacturing
process, Turning, milling, drilling, welding, grinding, hobbing, fitting etc.
The operator may perform simpler machine set-ups but the separate machine tool setterperforms those involving complex operations.
(c) Supervision to possess knowledge of a specific processThe supervision has considerable knowledge of a specific process. Supervisor in
the grinding section for example, may not expert in turning and drilling work but sexpected to possess a find of knowledge of different types of grinding operations.
Similarly a supervisor in the gear shop is expected to have sound knowledge in workingof different types of gear cutting machines.
(d) Limited span of control:The amount of supervision required in batch production is lower than that of
jobbing production. The ration of direct workmen to supervisors is more or less afunction of batch size. The smaller the batches, the lower are the ratio of direct workersto supervisors, and vice versa. This is because smaller lots require each supervisor tospend a great deal of his time in allocating new work, giving instructions, follow up onthe shop floor for proper movement of materials from and to the machines, identifyingdelays and interruptions, and arranging, in consultation with planning, work load in hissection to keep his men busy.
(e) General purpose machines and process type of layoutPlant and equipment is procured and arranged to obtain maximum flexibility.
General purpose machines and handling equipment capable of performing variety of operationswith minimum set –up times are installed in lieu of variety of products. The machines are
Production / Operations Management—Page 5
arranged to give process layout-layout by function. Similar machines capable of doing similartypes of operations are grouped together and kept at one place. Presses for example, are puttogether and kept at one place milling machines are placed together at another place, drillingmachines are kept at the third place, gear cutting machines are located at the fourth place and soon. Each Group of machines is usually designated as a work centre or a section or a shop.
(f) Manual materials handling:Materials handling in batch production as compared to jobbing production are
small. Individual components and parts are placed in trolleys and trays and aretransported as unit loads. Materials handling may be mechanized by deploying powerdriven trucks.
(g) Manufacturing cycle time affected due to queues:The manufacture cycle time is comparatively smaller than jobbing production but
is much more than mass and flow production. The batches of work tend to queue up atdifferent machines due to differing cycles times, batch sizes and sequence of operations.
(h) Large work-in-progress:Work in progress is comparatively large due to varying work content of different
components, imbalance in manufacturing times, formation of queues between themachines.
(i) Flexibility of production schedules:Disruptions due to machine breakdown or absenteeism do not seriously affect
production as job can be shifted to another machine or another operator from anothermachine can be shifted.
(j) Need to have production planning and control:Functions of production planning and control in a batch production unit are more
complex than those in jobbing production or mass and flow production:
Materials control and tools control functions are important. Some kind of replenishmentsystem needs to be used to ensure routine replenishment
Detailed operational layout and route sheets are prepared for each part of the product.
Loading and scheduling needs to be more detailed and more sophisticated since everymachine requires to be individually scheduled.
Progressing function is very important to collect information on progress of work. Aseparate progress card needs to be maintained to record progress of each component.
Expediting is generally necessary since quite often jobs, due to imbalances in workcontent, tend to lag behind
Production / Operations Management—Page 6
Q.3) (a) Why are locational decisions important? What factors should be taken intoaccount while deciding location of a unit to manufacture washing machines?
Answer.3a)
Locational decisions generally arise when:
A new manufacturing (or servicing) unit is to be set up. Existing plant operations are difficult to expand due to poor selection of site earlier. The growth of the business makes it advisable to establish additional facilities in new
territories. There is emergence of new social (chronic labour problems) political (political instability
or economic conditions that suggest a change in the location of the existing plant. The product development has over weighted the advantages of the existing plant. The changes in the industrial Policy of the Government, favoring decentralizing and
dispersal of industries to achieve overall development of the country, do not permitexpansion of the existing plant
FACTORS GOVERNING PLANT LOCATION
Plant location studies are conducted in three phases:
(i) General territory selection(ii) Community selection, and(iii) Site selection
1. Proximity to market:
Every company is in business to market and it can survive only if their product reaches theconsumers on time and at the competitive price. The ratio of selling costs to sales generallyincreases with distance. Therefore, in the choice of location o the plant, the factor of “proximityto the market” is given the highest priority. Locating a plant nearer to the market is preferred if:
The product is fragile. The product is susceptible to spoilage. The promptness of service is required. The product is relatively inexpensive and transportation costs add significantly to the
cost.
Bread, soap factories, etc. require the market to be nearby. If factory cannot be started inBombay, it may be started in Thane, Kalyan or Poona. If the product is exported, location nearports is desirable. This is particularly important for producers who sell bulky commodities,which incur high transportation costs
Production / Operations Management—Page 7
Nearness to market not only lowers transportation costs but also gives many other benefitsnamely:
A good many administrative problems, which cause perpetual headaches and add tocosts, are avoided.
Liaison with dealers or whole sellers can be maintained economically and easily Other costs such as commission to middlemen, which at times run as high as 20 to 50
percent can be reduced significantly. Customer’s accounts do not remain outstanding for settlement. This recovery is easy and
less time saving which itself reduces selling costs.
2. Proximity to source of raw materials:
Since raw materials usually constitute 50 to 60 percent of the total product cost, it is importantthat the firm gets its requirements of raw materials at the right time and at the reasonable price forwhich the plant must be located in the neighborhood of some source which can meet the rawmaterials requirement of the unit “Proximity to supply of raw materials” factor assumes stillgreater importance if raw materials are of perishable nature or if they are expensive to transport,or if their weight is substantially reduced by processing.
Proximity to sources of raw materials is equally important for small units. This is becauseusually small units are not considered important customers. They get least priority and in theevent of scarcity are the one to be struck off first from the list. The availability of materials tosmall units to a large extent thus depends on their follow up and personal visits to the supplier’splant which is possible only if the buyer’s plant is close by.
3. Infrastructural facilities:
Infrastructural facilities consider availability of utilities like power water, disposal of waste etc.These form the life-blood of many types of industries without which there facilities may come toa stand still. Underestimating the need of any one of the utilities can be extremely costly andinconvenient.
Certain industries, for example, aluminium, steel, etc are power intensive and must be locatedclose to the sites of power generation failing which the shortage of, or increase in cost ofgenerating power may spell problems for their survival.
Similarly, chemical process industries like paper and pulp, cement, steel, sugar laundries, metalplating, food preparation etc. requires perennial source of water. Mineral content of water mayalso be an important factor. Treatment of water is an expense to be considered while comparingeconomics of different locations.
Drainage facilities are important for process industries otherwise disposal of process waster cancreate lot of difficulties.
4. Transport facilities:
Transportation cost to the value added is a key determinant of the plant location. The structure ofthe transportation cost depends on (i) Characteristics of the commodity (ii) average distance ofshipment (iii) medium of shipment: rail, road, and air sea.
Production / Operations Management—Page 8
The need for transport arises because raw materials and fuel are to be moved to factory site andfinished goods are to be transported from factory to markets. Other things being equal sincetransport cost has a major effect on product cost, the regions well served by transport facilities aremost suitable for industrial locations.
5. Labour and wages:
Plant location should be such that required labour is easily available in the neighbourhood.Importing labour from outside is usually costly and it causes lot of administrative problems.Availability of required labour locally is better since problem of arranging accommodation andother related problems do not arise. Since normally workers with specific skills are required,some sort of training facility should also be available in the neighborhood. Skilled employees areeasily available if ITI’s, or Engineering colleges are there in the neighbourhood.
6. Legislation and taxation:
The policies of the state Government and Local Bodies relating to issue of licenses, buildingcodes, labour laws, etc. are the factors in selecting/rejecting a particular community/site.
In order to disperse industries and ensure balanced economic growth, both Central and Stategovernment offer a package of incentives for setting up industries in particular locations.Exemption from excise duty, sales tax and octroi, soft loans from financial institutions, subsidy inelectricity charges, etc. are some of the incentives offered.
Since taxes and duties levied by the State Government and Local bodies substantially influenceproduct cost, the incidence of such taxes/levies must be taken into account while selecting acommunity/site.
7. Climatic conditions:
Climatic factors may not have a major influence these days because of modern air conditioningfacilities available today. However, it may be important factor for certain industries like textilemills, which require high humidity.
8. Industrial and labour attitudes:
Community attitudes towards supporting hostile trade union activities are an important factor.Locating facilities in a certain region/community may not be desirable as frequent labourproblems and interruptions are harmful to the plant in the long run. Political situation in the stateand attitude of the government towards labour activities also influences selection of the site forthe plant.
9. Safety requirement:
Safety factor may be important for certain industries such as:
- Nuclear power plants- Explosive factories
Location of such industries close to border areas is undesirable.
Production / Operations Management—Page 9
10. Community facilities (or social infrastructure):
Community facilities imply accommodation, educational, entertainment and transport facilities.
Accommodation is needed unless the employees are local residents. Accommodation should beeasily available, comparatively cheap and near some public transport stop.The locational area should be fully developed, be accessible by road and should have aconvenient and efficient public transport system operating between the area and the township toenable employees, officials, customers and suppliers to make easy trips for their work
11. Community attitudes:
Community attitudes towards work (i.e. whether the people in the location are hard working orotherwise) as well as their attitudes towards the incoming entrepreneurs (helpful and cooperativeor otherwise) can make or mar an industry. Locational decisions, therefore, must take suchfactors also into account particularly while setting up labour intensive units.
12. Supporting industries and services:
Locational factors should also include proximity of services needed by the firm. A firm desirousof getting some or all parts made from outside or some of the operations done from outside mustsee that such sub-contractors are located in the neighbourhood. Getting a job done from unitslocated at far off places will mean not only additional transportation cost but also time consumingand costly. Also if units are too far off, the control on quality of work done by them cannot beexercised.
13. Suitability of the land:
Site selection should also take into account topography and soil structure of the land. The soilstructure must be capable of bearing loads of foundations. Though modern building techniquescan overcome the limitations of the soil, but if considerable improvement is required thenselection of a low cost and may ultimately turn out to be expensive.
14. Availability and cost of the land:
Site size (Plot size) must be large enough to accommodate the present production facilities,parking and access facilities but also leave sufficient room for future expansion. As a generalrule, a site five times the actual plant size is considered minimum for all these things includingfuture expansion.
Production / Operations Management—Page 10
ECONOMY SURVEY OF THE SITE SELECTION:
An ideal location is one where the cost of obtaining materials and processing them into finishedproduct plus the cost of distributing the finished product to customers is minimum.
One of the most commonly used approaches consists of following steps:
Step 1: Prepare a list of all relevant factors.
Step 2: Estimate expenses on materials, transport, wages, power etc for each location oneach of the above factors.
Step 3: Collect data on intangible factors like community facilities, community attitudes etc.
Step 4: Analyse the tangible data for each location and calculate rate of return oninvestment.
Step 5: Select provisionally a locational based on financial data.
Step 6: Compare the intangible data for the different locations and select the optimallocation considering intangible data.
Production / Operations Management—Page 11
Q.3) (b) What are objectives of a good layout? Discuss any six principles of a good layout?
Answer.3)(b)
OBJECTIVE OF A GOOD PLANT LAYOUT
Only through an efficient layout, the organization can attain the following objectives:
(i) Economy in handling of materials, work-in-process and finished goods.
(ii) Minimization of product delays.
(iii) Lesser work-in-progress and minimum manufacturing cycle time.
(iv) Efficient utilization of available space.
(v) Easy supervision and better production control.
(vi) Greater flexibility for changes in product design and for future expansion.
(vii) Better working conditions by eliminating causes of excessive noise, objectionable odorsmoke etc.
PRINCIPLES OF A GOOD LAYOUT
(i) Overall integration of factors:A good layout is one that integrates men, materials, machines and supporting
activities and others in a way that the best compromise is obtained
No layout can satisfy each and every principle of a good layout. Some criterion mayconflict with some other criterion and as a result no layout can be ideal it has tointegrate all factors into the best possible compromise.
(ii) Minimum movement:A good layout is one that permits the minimum movement between theoperations.
The plant and machinery in case of product layout and departments in case ofprocess layout should be arranged as per sequence of operations of most of theproducts.
Since straight line is the shortest distance between any two points, menand materials as far as possible should be made to move along thestraight path
A door may be made in a wall or a hole may be drilled in a ceiling if that eliminates orreduces material handling in place of stairs or a distant door.
Production / Operations Management—Page 12
(iii) Uni-direction flow:A good layout is one that makes the materials move only in the forward
direction, towards stage of completion, with any backtracking.
Since straight line is the shortest distance between any two, points,materials as far as possible should be made to move on the principle ofstraight line flow. And when straight line flow is not possible, otherflows like U-shaped flow, circular flow or zig zag flow may be adopted,but the layout may ensure that materials move in the forward direction(Fig 4.1)
To ensure forward flow, equipment if necessary may be duplicated.
(iv) Effective use of available space:A good layout is one that makes effective use of available space bothhorizontal and vertical
Backtracking and duplicated movements consume more time, involve un-necessarymaterials handling, add to cost and lead to inefficiency.
Raw materials, work-in-progress and finished goods should be piled vertically one aboveanother rather than being strewn on the floor.
Pallets or equivalents should be made use of to pile up several layers one above another
Area below the work tables or in the cupboards built into the wall are welcome since theyreduce requirement of space
(v) Maximum visibility:A good layout is one that makes men, machines and materials ready observable at all
times.
All departments should be smoothly integrated, convenient to service and easy tosupervise
Every piece of positioning or screening or partitioning should be scrutinized and carefullyplanned.
Special cupboards, enclosures, offices, partitions etc. should be avoided except whentheir utility is established beyond doubt.
(vi) Maximum accessibility:A good layout is one that makes all servicing and maintenance point readily
accessible.
Machines should be kept sufficiently apart and with reasonable clearance fromThe wall so that lubrication, adjustment and replacement of belts, removal of parts at thetime of repairs etc can be done conveniently by the maintenance staff.
Area in front of electrical panels and fire extinguishers should be kept free fromobstructions.
Production / Operations Management—Page 13
Q.4) How does production planning differ from production control? What are the keyfunctions of production planning and control?
Answer.4)Production planning versus production control.
Planning (Planning the work) Control (Working the Plan)
Planning involves collection and maintenanceof data regarding time standards, materials andtheir specifications, machines and theirquantities, tools and their process capabilities,drawings and operational layouts etc.
Planning is seeing that requirements tool,machines, men, instructions, authorization andthe like-will be available at the right time andin the right quantities and are of proper quality.
Planning involves preparations of load chartsand fitting various work orders intouncommitted time available on the company’sfacilities (men or machines).
Planning involves preparation of all necessaryforms and paper work.
Planning involves designing suitable feed backas to what may happen.
Planning involves forwarding thinkingregarding the remedial action to be taken if thejob falls behind schedule.
Planning therefore is a centralizedActivity (in the office) and includes suchfunctions as materials control, tools control,process planning and scheduling.
Control involves dissemination of datapreparation of reports regarding output,machine and labour efficiency, percentdefectives etc.
Control is seeing the requirements are actuallymade available at the right place and in theright quantities.
Control involves actual seeing that the jobs arestarted and completed as per schedule preparedby the scheduling cell of the PPC.
Control involves actual issue of forms andpaper work.
Control involves keeping track of what ishappening and collecting information as towhat has happened.
Control involves suggesting remedial actionwhen the job is falling behind schedule.
Control is thus a diffused activity (in the shops)and includes functions such as dispatching,progressing and expediting.
Production / Operations Management—Page 14
FUNCTIONS OF PRODUCTION PLANNING AND CONTROL:
Production planning and control is normally assigned two sets of functions:(I)Regular functions and(ii) Optional functions.
(i) Regular functions are those, which are generally assigned to PPC in most of theorganizations through the importance of the function, may vary from industry toindustry.
(ii) Optional functions are those, which may be assigned to PPC depending upon policyof the management of the firm.
Common (or Regular Functions) Optional Functions
Order Preparation includes activities likemaking of work orders, converting work ordersto shop orders, preparing auxiliary orders andreleasing such orders to those concerned toauthorize their activities
Materials control concerns preparations ofmaterials estimates, indenting non-stockmaterials, ascertaining availability of materialspurchased to stock, continual follow-up withpurchase and stores for timely receipt ofmaterials, and advising stores to allocaterequired quantities or available materials(alternatively on their receipt) against specificshop orders.
Process planning or Routing concerns fixationof method of manufacture: operations and theirsequence, machine tool for each operation, jigsand fixtures, measuring instruments and gaugesetc. to enable shops to produce goods of theright quality at the lowest cost.
Tools control concerns preparations ofestimates of cutting tools (Standards as weekAs non-standards tools), gauges and measuringinstruments, jigs and fixtures etc indenting non-stick tooling: follow up with tool room fortimely manufacture of jigs and fixtures;periodical replenishment of worn-out-non-consumable tooling (e.g. work arbors, collets,copying masters, Allen keys, spanners, etc.
Cost Estimation concerns preparations ofPreproduction cost estimates to be used bysales department for quotation purposes(Alternatively this may be assigned to CostingDepartment Or Industrial EngineeringDepartment)
Work measurement concern fixation of time tobe allowed to a qualified workman to carry outa specific task, under specified conditions andat the defined level of performance. Workmeasurement employs scientific, well-knowntechniques like time study, work samplingstandard data, production study, analyticalestimating etc. (Alternatively, workmeasurement function may be assigned toIndustrial Engineering department.Sub-Contract concerns offloading of certainwork on outside vendors for economic reasonsor to augment the existing manufacturingfacilities (Sub-contract work alternatively) behandled by Materials/purchase Department)
Capacity planning concerns estimation ofrequirements of men and machines as the basisof decision making to meet the firm’s increasedvolume of business (Some companies prefer toassign this function to Engineering department.
Production / Operations Management—Page 15
Scheduling concerns preparation of machineloads, fixation of calendar dates of variousoperations to be performed on a job,coordination with sales to confirm deliverydates of new items and periodical preparationof dispatch schedules of regular items.
Dispatching concerns preparation anddistribution of shop orders and manufacturinginstructions to the concerned department astheir authority to perform the work accordingto the predetermined schedule.
Progressing concerns collection of data frommanufacturing shops, recording of progress ofwork, and comparing progress against the plan.
Expediting concerns intensive progress chasingto identify delays and interruptions which mayhold up production, devising cures from time totime to keep rate of production in line with theschedule, communicating possible failure indelivery commitments to Sales Department.
Demand forecasting concerns makingprojection of company’s product market.Though, long term forecasts are given by SalesDepartment but short term forecasts requiredfor materials planning, machine loading, subcontracting etc may be prepared by PPCdepartment
Production / Operations Management—Page 16
Q.12 (a) What is critical path? What does it signify? How is it identified?
Answer.2)(a)
Critical path analysis, an important aid to planning, scheduling and coordinating theactivities if large scale projects. Is a synthesis of two independent techniques: ProgrammeEvaluation and Review Technique (PERT) and Critical Path Method (CPM).Though the two techniques were developed independently, they are only superficially different.The two method have many features in common and are now combined into a technique calledCritical Path Analysis (CPA) or Network Analysis.
There are three basic different between a PERT network and CPM network:
PERT is event oriented while CPM is activity oriented (i.e. PERT prepares network fromevents while CPM builds if from activities)
PERT provides for an allowance for uncertainty while CPM does not (i.e. PERT makesthree time estimates for each activity while CPM makes one time estimate)
Activity time in CPM technique are related to costs while it is not so in PERT since it isevent oriented
Significance of critical path
Critical path analysis offers several advantages. It
(i) Forces through pre-planning. Each and every activity compromising the project isidentified and recorded. Nothing is left to memory or chance which prevents crisesin scheduling
(ii) Increases coordination of tasks as technological relationship between the activitiessuggests which activities can run simultaneously and which should succeed others.
(iii) Helps computations of different project duration’s for different level of resources andthereby select a plan that minimizes total project cost.
(iv) Indicates optimal start and finish times of each activity of the project.(v) Defines areas of responsibility of different departmental heads for timely execution
of the project.(vi) Facilitates progress reporting and limits unnecessary discussion at the progress
meetings.(vii) Identifies troubles spot often in advance and apply remedial measures.(viii) Enables the plan to be revised in accordance with changes/changing circumstances.(ix) Helps to exercise “control by exception” and prevents cost overruns.
A Project comprises a series of activities and the identification of the individual activities requiresknowledge and experience of the men responsible for the planning of the project. Even thepreliminaries-mere listing of the activities-make the operating personnel:
Think of details about the project well in advance.
Observe critically the way in which the various activities interact or compete for scarceresources
Production / Operations Management—Page 17
Improve upon the original plans even before network is formally drawn and analyzed.
A project, therefore, must be torn into a set of identifiable activities. There are no set rules butgeneral guidelines are as under:
An activity should represent the smallest unit of the operation or set of operations overwhich management desires control.
An activity should represent an operation or set of operations, which can be performedusing a particular kind of equipment or a special skill. For example in
construction project, plumbing is considered as one activity while wiring can beconsidered as another activity since the first activity requires plumbers and the secondactivity needs electricians.
Production / Operations Management—Page 18
Q.12) (b)
Activity Optimistic Most Likely Pessimistic1-2 02 03 101-3 02 04 061-4 02 06 102-5 01 01 013-5 04 05 124-5 02 03 044-6 02 05 085-6 03 05 13
Answer:
(a) Expected time of an activity can be obtained from the three time estimates using the formula:
te = a + 4m +b6
where a = Optimistic timem = most likely timeb = pessimistic time
For activity (1-2)a = 2m = 3b = 10
te = 2 + 4 x 3 + 106
te = 24 = 46
Expected times of all activities of the network, calculated on above lines, are tabulated below.
Activity Three time estimates Expected time1-2 02-03-10 41-3 02-04-06 41-4 02-06-10 62-5 01-01-01 13-5 04-05-12 64-5 02-03-04 34-6 02-05-08 55-6 03-05-13 6
Production / Operations Management—Page 19
5
6 36
4 6
4 1
Critical path is 1-3,3-5,5-6 and the duration for the project is 16 weeks (4+6+6)
Variance isVi = (b –a) X (b – a)
6 6
V1-3 = 49
V3-5 = 169
V5-6 = 259
V = V1-3 + V3-5 + V5-6
V = 5
Standard deviation Z = T - Tcp
= 19 -165
= 32.236
= 1.34
The approximate probability value when Z = 1.34 is 0.9099
The probability of completion of critical path by the schedule time of 19 weeks = 91%
1
4 6
2 5
3
Production / Operations Management—Page 20
Q.5) What is preventive maintenance? Why it is better than Breakdown Maintenance?What are the key activities of Preventive Maintenance?
Answer.5)
Preventive maintenance anticipates failures and adopts necessary actions to checkfailures before they occur. It includes activities like inspection, lubrication cleaning and unkeeps,minor adjustments and replacements found necessary at the time of inspection etc. Preventivemaintenance can be either: running maintenance or “shut down maintenance”. Runningmaintenance includes maintenance activities (e.g. minor adjustments In machines revealedthrough inspections, lubrication, cleaning and unkeep etc.) Which are carried out when themachine is still running. Shutdown maintenance includes preventive maintenance activities suchas minor component replacement whose needs are identified through inspections, which requirestoppage of Machines. Preventive inspection is one of the key activities of preventivemaintenance which is usually performed by making use of human senses – watch) eye),listen (ear), Touch (hand, leg, body) smell (nose) and taste (tongue) – but the trend is Changingtowards use of condition monitoring instruments. Such maintenance. Practice is known aspredictive maintenance or condition based maintenance.
Production / Operations Management—Page 21
Q.10) (a) What are X-R Charts? How are they made and used in controlling a process?
Answer.10)
X-R chart is a pair of chart consisting of a average (called X chart) and a rangeChart (called R chart) placed one below another on a piece of graph paper. The X chart is used tocontrol the mean value of the characteristic an R-chart is used to restrict the range of variations inthe values. X-R charts are drawn when the characteristics are measurable. Each chart consists ofthree values: a central line, upper control limit and lower control limit. The central line representsthe arithmetic average of the sample means which equals the mean of the population, u. Theupper and lower control limits are located at three standard deviation on either side of the centralline.Samples of fixed size are drawn at regular intervals and measurements are taken. Thesamples wise values of the mean and range are plotted in their respective X and R charts.The spread of sample points in the charts is studied to decide the remedial action (if any) to betaken. The X chart analyses whether or not the mean of the quality Characteristics is withincontrol while R-chart analyses whether or not the variability is within control.
STEPS TO PREPARE X-R CHART
A pre-requisite to the preparation of the chart is the decision on the following aspects:
Quality Characteristics refer to the property of the product, which is to be assessed. Thequality characteristics must be capable of being measured. In case of more than qualitycharacteristics, separate chart is made for each quality characteristic.
Sample size refers to number of pieces comprising each sample. Sample size is animportant decision. It is a common practice to use sample of n = 4 or 5 to have lowappraisal cost. Large samples such as n = 15 or 20 are used if the process standarddeviation is large.
Sample Population refers to the number of samples to be collected to construct a controlchart. The number of samples must be sufficient. Usually, 20 samples each of size 4 or 5are enough to have good estimates of the process average (X) and dispersion (R).
Time Interval measures the time gap between consecutive samples. Time interval, as agenera rule, should be proportional to the average frequency of out-of-control conditions.It is a fairly complex decision since a number of factors such as cost economy,susceptibility of the process to disturbances; convenience of the inspector etc. requires tobe considered.
The making of X-R Charts involves the following Steps:
Step 1: Collect Data
(a) Collect sufficient samples spread over a reasonable period. Each sample must beof equal size.
(b) Measure each component comprising the sample for the given qualitycharacteristic
(c) Record individual measurements on a work data sheet.
Step 2: Calculate mean (X) and Range (R) of each sample
A The mean which is written as X (X bar) is average of each sample and is
Production / Operations Management—Page 22
Obtained by totaling the individual measurements of the units comprising thesample and dividing the total by the sample size (number of units in each sample)
B The range, which is written as R, is obtained as the difference between thehighest and the lowest measurement of a sample.
C The values of X and R are recorded sample wise either on the extreme right ofthe individual measurements on the data sheet or in a separate table.
Step 3: Calculate grand Average (X) and mean Range (R)
A The grand average, which is written as, X (X double bar) is the average of thesample averages and is obtained by dividing the total of the averages of all thesamples by the total number of samples.
B The mean range, which is written as, R (R bar) is the average of the ranges and isobtained by dividing the total of the ranges of the samples by the total number ofsamples.
Step 4: Set up Control chart for the average
A Set up a control chart with the central line drawn at X (X double bar), uppercontrol limit located X + A2R (R bar) and the lower control limit set up at X-A2R.
B Plot the averages to see whether the process was under control when sampleswere drawn.
C If all points fall within the control limits, the process is said to be under controlD If process is not under control (indicated by some points falling outside the
control limits), eliminate points outside the control limits and compute new trialcontrol limits for the remaining points.
E Repeat step 4 (d) until all points fall within the control limitsF Control limits in a particular situation should be revised from time to time as
additional data is accumulated.
Step 5: Calculate control limits of the range chart
A The control chart for range chart is set up with central line as R, upper controllimit (UCLR) located at D4R above the central line and lower control limit(LCL) at D3R below the central line
B Plot the value of the range of each sample.C If all points fall within the control limits no modification is necessary unless it is
desired to reduce the process dispersionD if range chart exhibits lack of control indicated by some points falling outside the
control limits, eliminate those points out of control and compute new trial controllimits
E Repeat step 5 (d) until all points fall within the control limits.F Control limits in a practical situation should be revised time to time as
additional data is accumulated.
Production / Operations Management—Page 23
Step 6: Use control chart
A Collect samples of fixed size at specified intervals of time.B Measure each unit of the sample for the quality characteristics, calculate mean
and the range of each sample.
C Plot the values of X and R of each sample in their respective chartsD Study the trend of the points to interpret and suggest remedial action
Q10 (b) ABC company produces a solvent, which must contain 3 percent of alcohol. It triesto maintain the actual percentage at 3 + 0.3 percent. It tests hourly in samples of five. Thefollowing table shows the results of last five samples. Set up a control chart for mean andexamine whether the process is under control.
A) Solution:(i) Collect data(ii) Calculate mean (X bar) and range(R bar)
Sample No. Arithmetic Mean (X bar) Range(R)
1 2.92 0.32 2.98 0.13 3.06 0.14 3 05 3 0.2
(iii) Calculate grand average and the mean range
X(X bar) = 2.92 + 2.98 + 3.06 + 3 + 35
= 2.992
R = 0.3 + 0.1 + 0.1 + 0 + 0.25
= 0.14
Production / Operations Management—Page 24
(iv) Set Up control chart for the average
Central Line = CLx = X(X bar) = 2.992
Upper Control Limit = UCLx = X (X bar) + A2.R(R bar)
= 2.992 + 0.5768 x 0.14
= 3.476
Lower Control Limit = UCLx = X (X bar) - A2.R(R bar)
= 2.992 - 0.5768 x 0.14
= 2.507
(v) Set up a range chart
Central line CLR = R(R bar) = 0.14
Lower control limit = LCLR = D3.R (R bar)
= 0 x 0.14
= 0
Lower control limit = UCLR = D4.R (R bar)
= 2.114 x 0.14
= 0.29596
Production / Operations Management—Page 25
Q.6) What is method study? Describe the procedural steps to develop easier and effectivemethods.
Answer.6)
Method study is the systematic recording and critical examination of existing andproposed ways of doing work, as a means of developing and applying easier and more effectivemethods and reducing costs.
Method study is an organized approach and its investigation rests on the following six basic stepsoutlined in the block diagram
Select the work to be analyzed. Record all facts relating to the existing method. Examine the recorded facts critically but impartially. Develop the most economical method commensurate with plant Requirements Install the new method as standard practice. Maintain the new method.
Selection of the job
Selections of the jobs to be studied for methods improvement by the method studypractioner is a managerial responsibility and it (selection) may be based on economictechnical or human consideration. Economic consideration justifies selection based onthe economic worth (i.e. money saving potential) of the job.Technical consideration identifies jobs, which require studies to overcome manufacturingdifficulties (excessive rejection, relaxation in prefixed performance standards, inability ifthe shops to stick to specified machining parameters such as speeds, feeds, depth of cutetc., inconsistent quality etc.) Human consideration in job selection is usually givenweightage while introducing method study practices for the first time.
Recording of facts
Systematic recording is the most crucial step in method improvement. Since recordingby long hand (or by descriptive method) has its limitations, it is not recommended for usein method study. Instead, five symbols and eight charting conventions are used to recordfacts relating to the job under study. Five typical symbols are O, ||, , D and V and eightcharting conventions concern composition of the chart, reject, rework, repletion, changeof state, introducing of new material, combined events and numbering of events. Thedocument on which details of the process are recorded by the above referred symbols andconventions is called chart. There are four basic types of chart: (i) operation processchart (ii) Flow process chart (iii) multiple activity charts and (iv) two handed processchart.
Besides charts, two types of diagrams-flow diagram and string diagram are drawn whenrecording details of an existing layout. Travel chart is another typical chart, which isused to record frequency of movements (weight x distance) between workcentres/departments.
Production / Operations Management—Page 26
Repetitive short cycle operation which involves quick hand/feel motions (i.e. microscopicmotions) may be studied with micro motion study. Glibreth, founder father of micromotion study, also developed photographic techniques called cyclograph andchronocylegraph to record path of the motions of the members of the body.
Critical examination
Critical examination aims to analyze the facts critically and thereby give rise toalternatives, which form the basis of selection and development of easier, and effectivemethods.
Critical examination is conducted through a systematic and methodical questioningprocess. Each activity recorded on the chart, whether it relates to processing orinspection, or material handling, or to any other aspect, is picked up one at a time and isexamined minutely. The questioning process is considered under five major heads,namely the purpose, the place, the sequence, the person and the means. These fiveaspects in critical examination are referred to as five governing considerations.
Development and selection:
Development and selection stage concerns short listing of ideas generated at the criticalexamination stage, testing each short listed idea for its technical and economic feasibility,and making selection among the alternatives wherever choice exists. To develop ideasand to ascertain their technical and economical feasibility, the method study practionerneeds to solicit the cooperation of personnel from different departments of the company.Various techniques available for the development and selection purpose are: cost benefitanalysis, break even analysis, investment analysis and critical path analysis.
Installation
‘Installation’ (or implementation) of the proposed method involves preparation of projectreport on recommendations making oral presentation to the top management, securingapproval of the decision maker, assisting line management during implementation,arranging training of workmen, and getting jobs (operations) retime after implementation,arranging training of workmen, and getting jobs (operations) retimed afterimplementation.
Maintenance
“ Maintenance” phase is the follow up phase after implementation, which serves as amonitoring and control mechanism. It helps to ensure that the revised methods are setinto concrete and workmen do not revert back to old methods. It also provides anopportunity to the practitioner to assess the effectiveness of the approach followed byhim and makes changes in the methodology (if required).
Production / Operations Management—Page 27
Q.9) (a) What desirable conditions need to be present to be present to guarantee success ofan incentive scheme?
Answer.9)
A good wage incentive plan should have the following characteristics.
Administrative simplicity:The incentive system should be simple and must be easily understood by the workers andtheir representatives. An incentives scheme, which can be understood, only by engineers andmathematicians or a scheme which involves the use of complex formulate or references andcross-references is sure to fail. The incentive scheme should be such that workmen cancalculate their own earnings easily and quickly.
Minimum clerical work:The system should fit into existing system of production and cost control. It should notinvolve any significant addition to the clerical work.
Maximum coverage:The system should cover as many workmen as possible. A scheme if applied to a fewworkmen creates a demoralizing effect on the morale of those not covered by the scheme.
DirectIncentive payments should increase at least in direct proportion to the increase in output bythe operator. There are two reasons:Firstly because it is more difficult to producer extra units and secondly because saving in theoverheads are far greater at higher levels of production.
Period of PaymentThe period of payment should be as short as possible
Adequate guaranteed minimum hourly rateThe scheme must ensure adequate guaranteed minimum hourly rate to all incentive workersregardless of their output. Such an hourly guaranteed rate is normally referred to as theguaranteed base rate.The guaranteed base rate must be realistic and should be at least equal to the hourly ratepayable to a non-incentive worker doing similar job in the industry. Incentive earnings of theworkers should never be regarded as a substitute for poor wages.
Accurate and yet attainable performance standardsPerformance standards should be set through systematic work measurement studies. Theexperts to that there is no dispute or malpractice and yet the standards are attainable so that aworker working at normal pace can attain them should base the standards of measurement onthe assessment.
Production / Operations Management—Page 28
Further the incentive plan should be such that it provides an opportunity to all averageworkers to earn reasonable earnings.
Consistency of the standardsStandards once fixed should not be changed unless there is a permanent change in methods,or change in equipment, or change in material and plan should provide for the provisions tomodify the performance standards.
Inbuilt check on process rejectionsA good incentive scheme should exercise a check on the operator against achieving higherbonus by poor workmanship. Payment should be made only for pieces declared acceptableby the inspection department and a workman constantly producing substandard pieces shouldbe liable for disciplinary action.
Payment of partially completed jobsThe problem of payment for the incomplete work arises only in case of long cycle jobs.Situations do arise when the jobs are of very long cycle duration and cannot be finishedwithin the bonus period. Similarly, a semi-finished job may require to be handed over by oneoperator to another at the end of shift, or prior to having a holiday. The scheme shouldclearly spell out as how assessment of work done by the workmen on the same job will becarried out and how disputes arising out of such assessment would be resolved.
Payment of Idle TimeAdequate safeguards must be provided to compensate the operator for the time lost due toreasons beyond his control. A good incentive scheme should ensure that an operator does notsuffer financial loss for reasons attributable to the managerial weakness, e.g.: lack of materialdue to bad buying, breakdowns of the machines due to poor maintenance practices, non-availability of work etc. Thus an operator rendered idle because of factors attributable to themanagement should be given a lieu bonus.
SafeguardsThe scheme should be fair not only to the employees but also to the employer. Safeguardingclauses as under should be incorporated to protect.
a. Management’s right to change a standard when there are changes in methods. Materialsand machines
b. Management’s right to withdraw or discontinue temporarily a scheme during bad period.c. Management’s right to initiate disciplinary action against operators who continually
produce sub-standard articles.d. Management’s right to initiate disciplinary action against employees who, time and
again, do not achieve minimum standard of production even in the presence of fair andaccurate standards.
e. Management’s right to initiate disciplinary action against employees who, time and againare found using speeds and feeds higher than those recommended in the process sheet (oroperational layouts)
Maximum ceiling on the earningsThe system should have built-in-control against higher earnings beyond a certain limit.Firstly, the system should discourage workers to work beyond a certain limit otherwise tooattractive an incentive scheme may induce the worker to work more and more and thereby
Production / Operations Management—Page 29
adversely affect his health. Secondly, the system should ensure that in case of loosestandards the company does not lose financially.
Consistency of PlanThe plan should be consistent over a period of time. Frequent changes in the plan make it’sfunctioning difficult. Faith in plan is lost if there are frequent revisions.
Acceptance of Labour BodyThe scheme should finally have acceptance of the labour body. The body of workers’representatives to prevent any misunderstanding and ill-feeling later on must accept the basicincentive plan and its provisions.
Continuous UseThe scheme should be in continuous use. The temporary use of the scheme in good times andits discontinuation in bad times makes it’s functioning difficult.
Define End ResultsThe plan must result in reduction in per unit labor cost.
Production / Operations Management—Page 30
Q 13)Answer 13)
i) Average Cycle time = 0.22 + 0.24 + 0.28 + 0.26 + 0.255
= 0.25
Normal Time = Observed time x Rating100
= 0.25 x 80100
= 0.2
Similarly, average cycle time and normal time for all the elements are calculated andtabulated as below
Element Avg. cycle time Rating Normal timeA 0.25 80 0.2B 0.15 100 0.15C 0.35 120 0.42D 0.102 90 0.0918E 0.12 100 0.12
Total Normal time = 0.2 + 0.15 + 0.42 + 0.0918 + 0.12
Total Normal time = 0.9818
ii) Relaxation Allowance = 15 x 0.9818100
= 0.1473
Contingency Allowance= 5 x 0.9818100
Standard time = 0.0491
Normal time + Relaxation Allowance + Contingency Allowance
= 0.9818 + 0.1473 + 0.0491
Standard time = 1.1782
POM assgn : SushantMultiple Choice Multiple AnswerQuestion Which of the following products should be produced by using mass production?Correct Answer Refrigerator , Tyre for automobile , Television SetYour Answer Refrigerator , Tyre for automobile , Television Set
Multiple Choice Multiple AnswerQuestion What are the benefits of reconditioning?Correct Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It
helps to plan requirement of replacement sparesYour Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps
to plan requirement of replacement spares
Multiple Choice Multiple AnswerQuestion Which kind of natural delays and interruptions are considered during estimation of activity
time?Correct Answer Shop efficiency , Breakdowns , AbsenteeismYour Answer Breakdowns , Absenteeism , Delay due to shortage of resources
Multiple Choice Multiple AnswerQuestion How to exercise control over quality?Correct Answer Periodical analysis of inspecting reports to establish causes of rejections , Preperation of
quality standard and specifications , Exercising control over inputsYour Answer Periodical analysis of inspecting reports to establish causes of rejections , Preperation of
quality standard and specifications , Replacing existing measuring instruments by those having smallerleast count. , Exercising control over inputs
True/FalseQuestion In case of forward pass computation, the earliest event time of a plain event equals the
earliest event time of the preceding event plus duration of activity emanating from the preceding event.Correct Answer TrueYour Answer True
True/FalseQuestion Any proposed change must not be intimated to workers in advance.Correct Answer FalseYour Answer False
Select The BlankQuestion The ________ are the definitions of the measurable as well as nonmeasurable characteristics
of the product.Correct Answer SpecificationsYour Answer Standards
Multiple Choice Multiple AnswerQuestion How many of the following are types of specification?Correct Answer Material specifications , Dimensional specifications , Performance specificationsYour Answer Material specifications , Dimensional specifications , Performance specifications
Select The BlankQuestion A ________ is another form of subcontracting.Correct Answer Hiring capacityYour Answer Collaboration
Select The BlankQuestion The ________ advocates maintenance procedures whereby the condition of the plant is
constantly watched through systematic inspection to unearth unhealthy conditions and preventiveCorrect Answer Preventive MaintenanceYour Answer Preventive Maintenance
Multiple Choice Single AnswerQuestion Which phase of method study is concerned with analyzing the facts critically, generating
alternatives which form the basis for selection and development of improved methods?Correct Answer Critical examinationYour Answer Development and selection
Multiple Choice Single AnswerQuestion In exponential smoothing method,for a stable demand pattern and better smoothing effect,
value of fraction( Alpha) selected isCorrect Answer 0.05 to 0.10Your Answer 0.20 to 0.25
Multiple Choice Single AnswerQuestion Technique of Value Engineering can be effectively employed in design of a product toCorrect Answer To meet the intended function at lowest costYour Answer Reduce process rejections
Select The BlankQuestion The ________ is the probability that a bad lot will be accepted by the sampling plan.Correct Answer Consumer's riskYour Answer Acceptable quality level
Multiple Choice Multiple AnswerQuestion Which of the following observations are expected from the preventive maintenance person?Correct Answer Wrong allignments , Overheating defects , Excessive playYour Answer Wrong allignments , Overheating defects , Excessive play
Multiple Choice Single AnswerQuestion When should operator or supervisor is supposed to sign the perforated route sheet?Correct Answer After completion of operationYour Answer After completion of operation
Select The BlankQuestion The ________ must ensure that the product satisfy the functional requirements of it's usage.Correct Answer Quality of designYour Answer Quality of conformance
Multiple Choice Single AnswerQuestion What do you understand by the properties which are difficult to measure quantitatively but
usually measured by the comarision and then classification into acceptable or unacceptable?Correct Answer AttributesYour Answer Attributes
Multiple Choice Multiple AnswerQuestion Which of the following may be the objectives of project crashing?Correct Answer To complete the project in the least possible time , To reduce project cost below it's
normal cost , To achieve uniformity in requirement of resourcesYour Answer To complete the project in the least possible time , To reduce project cost below it's
normal cost , To achieve uniformity in requirement of resources , To improve the labour efficiency
True/FalseQuestion Since recording by descriptive method has it's limitations, it is not recommended for use in
method study.Correct Answer TrueYour Answer True
Multiple Choice Single Answer
Question What do you mean by the selection of the job for the method study on the basis ofmanufacturing difficulties?Correct Answer Technical considerationYour Answer Economic consideration
Multiple Choice Single AnswerQuestion One of the external factors influencing Material Planning isCorrect Answer Price trendsYour Answer Price trends
Select The BlankQuestion The ________ is the maximum percentage defective that for the purpose of sampling
inspection can be considered satisfactory as a process average.Correct Answer Acceptable quality levelYour Answer Lot Tolerance Percentage Defective
True/FalseQuestion Cent percent inspection is a must if the inspection is of destructive nature.Correct Answer FalseYour Answer True
Select The BlankQuestion Capacity decisions have a direct influence on performance of production system in respect of
________Correct Answer Delivery performanceYour Answer Delivery performance
Multiple Choice Multiple AnswerQuestion Which of the following factors related to the labour and wages are considered while deciding
the plant location?Correct Answer Prevailing wage pattern , Productivity of labour , Industrial relationsYour Answer Prevailing wage pattern , Productivity of labour , Industrial relations
Multiple Choice Single AnswerQuestion Which is the ideal place to write a description of an activity in a network?Correct Answer Above the arrowYour Answer Above the arrow
True/FalseQuestion If the firm has adopted elaborate planned maintenance system, there is no chance of any
unplanned maintenance work.Correct Answer FalseYour Answer False
Match The FollowingQuestion Correct Answer Your Answer
Change in chemical characteristic Chemical reaction Chemical reaction
Consumption of effort Posting a ledger Giving directions or instructions
Information given Giving directions or instructions Posting a ledger
Subtraction Removal of worn-out part from a machine Removal of worn-out part from a machine
Select The BlankQuestion OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the
probability of acceptance of ________.
Correct Answer OneYour Answer One
Select The BlankQuestion A set of activities to keep an equipment in the specified condition is called as ________.Correct Answer MaintenanceYour Answer Maintenance
Multiple Choice Single AnswerQuestion Site factors for plant location includeCorrect Answer Suitability of landYour Answer Suitability of land
True/FalseQuestion Both, preventive and breakdown maintenance work must be assigned to the same team.Correct Answer FalseYour Answer False
Multiple Choice Single AnswerQuestion Product layout is employed for manufacturing following productsCorrect Answer refrigiratorsYour Answer automobile components
Multiple Choice Single AnswerQuestion What can be the worst effect due to excessive vibration?Correct Answer BreakdownYour Answer Breakdown
Multiple Choice Multiple AnswerQuestion What is indicated by the erratic pattern points falling above and below the control limits in the
Xbar-R-control chart?Correct Answer Defects in materials , Poorly trained operators , Frequent adjustments of machinesYour Answer Defects in materials , Poorly trained operators , Frequent adjustments of machines
True/FalseQuestion In case of two handed process chart, inspection symbol is used when check by touch or feel is
involved.Correct Answer TrueYour Answer True
True/FalseQuestion Site selection should also take into account topography and soil structure of the land.Correct Answer TrueYour Answer False
Multiple Choice Single AnswerQuestion The ratio of output to input of a production system is commonly known asCorrect Answer ProductivityYour Answer Effectiveness
Select The BlankQuestion A ________helps to avoid crowding of jobs at a particular machine by change of route of
some of the jobs or by diverting work to other machine.Correct Answer Control boardYour Answer Control board
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Sampling Inspection
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Production Scheduling
Gantt Chart Production Scheduling Charting technique
True/FalseQuestion Only skilled worker can use the fixed limit gauge.Correct Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Which are the different methods to record details of the existing method during method
study?Correct Answer Charts , Diagrams , Templates or modelsYour Answer Charts , Diagrams
Multiple Choice Single AnswerQuestion Which photographic technique is used to record path of motions of the members of the body
during method study?Correct Answer CyclographYour Answer Flowgraph
Select The BlankQuestion The ________ is the watch dog which ensures that every element of production and activities
which could affect the quality of end product are regulated to the extent desirable.Correct Answer Quality controlYour Answer Inspection
True/FalseQuestion In case of centralised inspection, inspection rooms generally become bottleneck and cause
delay in taking action regarding rejection or rework.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following are minimum requirement for a good quality of design?Correct Answer Resonable cost , Resonable procurement time , Resonable manufacturing timeYour Answer Resonable cost , Resonable procurement time , Resonable manufacturing time
POM assgn
True/FalseQuestion Flow process charts do record movements as well as visual pictures.
Correct Answer False
Your Answer False
True/FalseQuestion The OC curve is based on the assumption that if the lot is large in comparison to the
sample, the probabilities of the OC curve will follow a poisson distribution.Correct Answer False
Your Answer True
Multiple Choice Single AnswerQuestion The ratio of output to input of a production system is commonly known as
Correct Answer Productivity
Your Answer Productivity
Multiple Choice Multiple AnswerQuestion Order preparation process for products manufatured to order requires following
documentsCorrect Answer Sales Order , Work order , Shop order
Your Answer Work order , Purchase order
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of the
condition of an item from routine or continuous checking.Correct Answer Condition monitoring
Your Answer Preventive maintenance
Match The FollowingQuestion Correct Answer Your Answer
Scheduling of interrelatedactivities of small projects withconsideration of uncertainty ofduration of activities.
Critical Path Analysis Critical Path Analysis
Two machines & processing timedepends on sequence of jobloading
Johnson's Two Machine Algorithm Johnson's Two Machine Algorithm
Sufficient orders and resonablechoice of machines
Index Method Index Method
Time relationship between when aproduct is required and when itcan be made available
Critical Ratio Scheduling Time series
Select The BlankQuestion Production control work is ________ in case of floor inspection as compared with the
centralised inspection.Correct Answer easier
Your Answer easier
Match The FollowingQuestion Correct Answer Your Answer
When to inspect Stages of inspection Specification
What to inspect Specification Standard
How to inspect Inspection devices Tools & Jigs
How much to inspect Sampling or cent percentinspection
Stages of inspection
Multiple Choice Single AnswerQuestion Material Planning is an integral part of
Correct Answer Production Planning
Your Answer Process Planning
Select The BlankQuestion An Ideal OC curve is ________ shaped curve that accpets all the lots with quality
equal to or better than AQL .Correct Answer Rectangular
Your Answer Rectangular
Multiple Choice Single AnswerQuestion Technique of Value Engineering can be effectively employed in design of a product to
Correct Answer To meet the intended function at lowest cost
Your Answer Reduce lead time
Multiple Choice Single AnswerQuestion Material control function of PPC is concerned with
Correct Answer Preparation of material estimates
Your Answer Preparation of material estimates
Multiple Choice Single AnswerQuestion Main objective of a good plant layout is
Correct Answer Reduce material handling cost
Your Answer Reduce material handling cost
True/FalseQuestion In case of X bar-R charts, statistical limits are calculated from averages of samples of
n (4,5,…) instead of single sample of large size to reduce the spread of naturalvariability.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Which of the following is not the characteristic of Project Production?
Correct Answer Continuous flow of material , Highly mechanised material handling , Virtually zeromanufacturing cycle time
Your Answer Fixed position layout , Virtually zero manufacturing cycle time
Multiple Choice Single AnswerQuestion A good plant layout helps in
Correct Answer Reducing handling costs
Your Answer Reducing handling costs
Multiple Choice Single AnswerQuestion Inadequate production capacity ultimately leads to
Correct Answer Poor Customer Service
Your Answer Low Productivity
Select The BlankQuestion Production Planning is a centralised activity which includes functions such as ________
Correct Answer Scheduling
Your Answer Scheduling
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any product/s is
calledCorrect Answer Factory
Your Answer Factory
Multiple Choice Multiple AnswerQuestion What are the uses of the instruction manual provided by the manufacturer of a
machine?Correct Answer It gives instructions regarding installation and operation of the equipment , It contains
note on common troubles with causes and remedies for troubleshooting , It enlistspoints, frequency and type of lubrication
Your Answer It gives instructions regarding installation and operation of the equipment , It containsnote on common troubles with causes and remedies for troubleshooting
Multiple Choice Multiple AnswerQuestion MRP utilises the following information
Correct Answer Master production schedule , Product structure , Lead time forprocurement/manufacturing
Your Answer Master production schedule , Product structure , Lead time forprocurement/manufacturing
Select The BlankQuestion A good maintenance system is not a luxary but a ________.
Correct Answer Necessity
Your Answer Necessity
True/FalseQuestion Shape od an OC curve is a function of sample size and the acceptance number.
Correct Answer True
Your Answer False
Multiple Choice Multiple AnswerQuestion Which of the following can be subtypes of corrective maintenance?
Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Your Answer Predictive Maintenance , Shutdown Maintenance
True/FalseQuestion For p-chart, "Inspection by variables" is much faster than "Inspection by attributes"
Correct Answer False
Your Answer True
Multiple Choice Single AnswerQuestion Site factors for plant location include
Correct Answer Suitability of land
Your Answer Suitability of land
Select The BlankQuestion The ________ breakdowns usually cost more, partly due to damage done to the
adjustment components and partly due to emergency actions.Correct Answer Unexpected
Your Answer Partial
True/FalseQuestion Cent percent inspection is a must if the inspection is of destructive nature.
Correct Answer False
Your Answer False
True/FalseQuestion Since value of p can never be positive, hence" if LCLp works out to be positive, it is
taken as zero."Correct Answer False
Your Answer True
Multiple Choice Single AnswerQuestion Which varaible is taken along the abscissa or X axis?
Correct Answer Time
Your Answer Standard deviation
Multiple Choice Multiple AnswerQuestion Which of the following are examples of specifications?
Correct Answer Commercial standards , Assembly and testing instructions , Bill of material
Your Answer Production schedule , Commercial standards , Assembly and testing instructions
Multiple Choice Multiple AnswerQuestion Which of the following products should be produced by using mass production?
Correct Answer Refrigerator , Tyre for automobile , Television Set
Your Answer Refrigerator , Tyre for automobile , Television Set
Multiple Choice Single AnswerQuestion Which of the following techniques is used by industrial engineering department to
obtain the utilisation index?Correct Answer Work Sampling Studies
Your Answer Method Study
True/FalseQuestion An ideal OC curve is never possible only with cent percent inspection.
Correct Answer False
Your Answer False
Select The BlankQuestion The ________ is the probability that a bad lot will be accepted by the sampling plan.
Correct Answer Consumer's risk
Your Answer Producer's risk
Select The BlankQuestion The easiest way to bring the delayed job within the promised delivery time by using
extra shift or weekly holiday is ________.Correct Answer Overtime working
Your Answer Overtime working
True/FalseQuestion The operator should not stop production if first piece is not approved by the inspector.
Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to entity can
be defined asCorrect Answer Operation
Your Answer Conversion
Multiple Choice Single AnswerQuestion Which kind of relationship exists between those activities which can be carried out
simultaneously and both activities require definite time to finish?Correct Answer Concurrent activities
Your Answer Concurrent activities
Multiple Choice Multiple AnswerQuestion Which are different ways to show critical path in a network?
Correct Answer Thick Line , Red Line , Double Line
Your Answer Dotted line
Select The BlankQuestion A ________helps to avoid crowding of jobs at a particular machine by change of route
of some of the jobs or by diverting work to other machine.Correct Answer Control board
Your Answer Control board
Multiple Choice Single AnswerQuestion What do you understand by PERT ?
Correct Answer Project Evaluation & Review Technique
Your Answer Project Evaluation & Review Technique
Multiple Choice Multiple AnswerQuestion Which of the following factors play important role while selecting or rejecting a
particular site from legislation and taxation point of view?Correct Answer Labour laws , Building codes , Policies regarding issue of licences
Your Answer Labour laws , Policies regarding issue of licences
Multiple Choice Multiple AnswerQuestion Which of the following concepts must be understood for the achievement of quality?
Correct Answer Quality of conformance , Purpose of product , Quality of design
Your Answer Purpose of product , Process specifications , Quality of design
Select The BlankQuestion The ________ is the probability that a good lot will be rejected by the sampling plan.
Correct Answer Producer's risk
Your Answer Producer's risk
Multiple Choice Single AnswerQuestion What do you mean by the project duration for which the total cost is minimum?
Correct Answer Optimum duration
Your Answer Optimum duration
True/FalseQuestion Originating process of raw material influence Process Planning
Correct Answer True
Your Answer True
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single AnswerQuestion MRP is based on the concept of inventory demand which is of
following typeCorrect Answer Dependent and independent
Your Answer Dependent and independent
Multiple Choice Single AnswerQuestion Main objective of a good plant layout is
Correct Answer Reduce material handling cost
Your Answer Reduce material handling cost
True/FalseQuestion As a general rule, the number of tail event of an activity is more
than that of it's head event.Correct Answer False
Your Answer False
Select The BlankQuestion The ________ is the probability that a good lot will be rejected
by the sampling plan.Correct Answer Producer's risk
Your Answer Producer's risk
Multiple Choice Multiple AnswerQuestion Which of the following are important considerations concerning
activity times?Correct Answer Activity time should be obtained from the person responsible for
the completion of an activity , Activity time must be independentof any influence which the preceding or succeeding activity mayhave on it. , Activity time may assume that just the normalquantity of resources required to carry out the activity areavailable.
Your Answer Activity time should be obtained from the person responsible forthe completion of an activity , Activity time must be independentof any influence which the preceding or succeeding activity mayhave on it. , Activity time may assume that just the normalquantity of resources required to carry out the activity areavailable.
Select The Blank
Question The ________ pertain to the climatic conditions which thecomponent , product or material should withstand.
Correct Answer Environmental specifications
Your Answer Environmental specifications
Multiple Choice Multiple AnswerQuestion Following are some of the factors considered for evaluation of
alternative layoutsCorrect Answer Flow of Material , Equipment utilization , Ease of supervision
Your Answer Flow of Material , Ease of supervision , Delivery performance
Multiple Choice Multiple AnswerQuestion Which of the following are assignable cause?
Correct Answer Large varaitions in hardness of material , Tool wear , Errors insetting
Your Answer Large varaitions in hardness of material , Tool wear , Errors insetting
True/FalseQuestion All activities must not be tied up into the network
Correct Answer False
Your Answer False
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot
may vary between ________.Correct Answer 0.01 to 10%
Your Answer 0.01 to 10%
True/FalseQuestion In case of X bar, if the process is not under control indicated by
some points falling outside the control limits, such points outsidethe control limits are eliminated and new trial control limits forthe remaining points are computed.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion What is the base for considering activity time as single time
estimate or three time estimate?
Correct Answer Level of uncertainty
Your Answer Availability of labour
Select The BlankQuestion The ________ is the maximum percentage defective that for the
purpose of sampling inspection can be considered satisfactoryas a process average.
Correct Answer Acceptable quality level
Your Answer Acceptable quality level
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to
complete an activity within it's normal time?Correct Answer Normal cost
Your Answer Normal cost
Select The BlankQuestion A good maintenance system is not a luxary but a ________.
Correct Answer Necessity
Your Answer Necessity
Select The BlankQuestion A ________helps to avoid crowding of jobs at a particular
machine by change of route of some of the jobs or by divertingwork to other machine.
Correct Answer Control board
Your Answer Move order
Select The BlankQuestion The ________ is the watch dog which ensures that every
element of production and activities which could affect thequality of end product are regulated to the extent desirable.
Correct Answer Quality control
Your Answer Quality control
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of
making any product/s is calledCorrect Answer Factory
Your Answer Factory
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Machine utilization
Gantt Chart Production Scheduling Production Scheduling
Select The BlankQuestion A ________ is another form of subcontracting.
Correct Answer Hiring capacity
Your Answer Hiring capacity
Multiple Choice Multiple AnswerQuestion In an organization there may not be a formal PPC department if
Correct Answer Work is highly repetitive in nature , Planning activities areperformed by the line staff , Number of workmen is not verylarge
Your Answer Work is highly repetitive in nature , Planning activities areperformed by the line staff , Number of workmen is not verylarge
Multiple Choice Multiple AnswerQuestion Which of the following cases can be treated as delay during
recording of method study?Correct Answer Operators awaiting instructions from supervisor , Worker waiting
for his turn at tools stores , Jobs awaiting at the machines fortheir turn
Your Answer Operators awaiting instructions from supervisor , Worker waitingfor his turn at tools stores , Jobs awaiting at the machines fortheir turn
True/FalseQuestion Inspection order is must even for simple jobs which can be
inspected by shop inspector with the tooling available on shop.Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Order preparation process for products manufatured to order
requires following documentsCorrect Answer Sales Order , Work order , Shop order
Your Answer Sales Order , Work order , Purchase order
Multiple Choice Single AnswerQuestion Technique of Value Engineering can be effectively employed in
design of a product toCorrect Answer To meet the intended function at lowest cost
Your Answer Reduce lead time
True/FalseQuestion Cent percent inspection is often more practical and economical
than sampling inspection.Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Scale model used for layout analysis have following advantages
Correct Answer Nontechnical person finds it easy to comprehend , Oveheadfacilities can be shown , Models can be shifted easily
Your Answer Nontechnical person finds it easy to comprehend , Oveheadfacilities can be shown , Models can be shifted easily
Multiple Choice Single AnswerQuestion Which of the following technique is event oriented ?
Correct Answer Project Evaluation & Review Technique
Your Answer Project Evaluation & Review Technique
Multiple Choice Single AnswerQuestion What is the meaning of " Product features" according to
J.M.Juran?Correct Answer Quality of design
Your Answer Quality of design
Match The FollowingQuestion Correct Answer Your Answer
Crash cost of an activity Cc Cc
Normal time of an activity Tn Tn
Crash time of activity Tc Tc
Normal cost of an activity Cn Cn
Multiple Choice Multiple AnswerQuestion What are uses of diagrams in method study?
Correct Answer Study different plant layouts and select the most optimum one ,Study the extent of traffic over the different routes of the plant ,Identify the extent of backtracking, cross traffic and obstaclesencountered during the movement of material.
Your Answer Study different plant layouts and select the most optimum one ,Study the extent of traffic over the different routes of the plant ,Identify the extent of backtracking, cross traffic and obstaclesencountered during the movement of material.
True/FalseQuestion A load chart specifies the work to be carried out by each person
of company during shift hours.Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Route Sheet generally contains following information
Correct Answer Material Specification , Sequence of operation , Skill of Labour
Your Answer Material Specification , Sequence of operation , Skill of Labour
True/FalseQuestion Cellular layout is based on the concept of Group Technology
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion Which varaible is taken along the abscissa or X axis?
Correct Answer Time
Your Answer Standard deviation
Multiple Choice Multiple Answer
Question Which are the advantages of suburban location?
Correct Answer Avaialability of adequate land at lower cost , Both skilled andunskilled labour can be available , Plant expansion is easier dueto less or no restriction for building and construction
Your Answer Avaialability of adequate land at lower cost , Both skilled andunskilled labour can be available , Plant expansion is easier dueto less or no restriction for building and construction
Select The BlankQuestion The ________ is the maintenance work initiated on a result of
knowledge of the condition of an item from routine or continuouschecking.
Correct Answer Condition monitoring
Your Answer Condition monitoring
Multiple Choice Multiple AnswerQuestion Expediting function is concerned with following activities
Correct Answer Progress chasing to identify delays which may hold upproduction , Communicating possible delays in delivery datecommitment to sales department , Devising cures to keep rateof production in line with schedule
Your Answer Recording progress of work , Progress chasing to identify delayswhich may hold up production , Communicating possible delaysin delivery date commitment to sales department
Select The BlankQuestion Production control work is ________ in case of floor inspection
as compared with the centralised inspection.Correct Answer easier
Your Answer time consuming
Select The BlankQuestion The easiest way to bring the delayed job within the promised
delivery time by using extra shift or weekly holiday is ________.Correct Answer Overtime working
Your Answer Overtime working
True/FalseQuestion In case of forward pass computation, the earliest event time of
the first event is zero.Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion What is represented by an arrow in a network?
Correct Answer Activity
Your Answer Activity
True/FalseQuestion As a general rule, a site five times the actual plant size is
considered minimum for parking, access facilities and futureexpansion.
Correct Answer True
Your Answer True
True/FalseQuestion Independent float either affects the float of preceding activities
or that of succeeding activities.Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion The document raised by PPC which authorises different
functions to take action as per instruction is calledCorrect Answer Work Order
Your Answer Work Order
Multiple Choice Single AnswerQuestion A good layout makes effective use of space. Utilization of space
for a department like Stores can be measured byCorrect Answer Proportion of Cubic volume space utilized
Your Answer Ratio of area utilised to area available
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding
some value to entity can be defined asCorrect Answer Operation
Your Answer Operation
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single AnswerQuestion MRP is based on the concept of inventory demand which is of
following typeCorrect Answer Dependent and independent
Your Answer Dependent and independent
Multiple Choice Single AnswerQuestion Main objective of a good plant layout is
Correct Answer Reduce material handling cost
Your Answer Reduce material handling cost
True/FalseQuestion As a general rule, the number of tail event of an activity is more
than that of it's head event.Correct Answer False
Your Answer False
Select The BlankQuestion The ________ is the probability that a good lot will be rejected
by the sampling plan.Correct Answer Producer's risk
Your Answer Producer's risk
Multiple Choice Multiple AnswerQuestion Which of the following are important considerations concerning
activity times?Correct Answer Activity time should be obtained from the person responsible for
the completion of an activity , Activity time must be independentof any influence which the preceding or succeeding activity mayhave on it. , Activity time may assume that just the normalquantity of resources required to carry out the activity areavailable.
Your Answer Activity time should be obtained from the person responsible forthe completion of an activity , Activity time must be independentof any influence which the preceding or succeeding activity mayhave on it. , Activity time may assume that just the normalquantity of resources required to carry out the activity areavailable.
Select The Blank
Question The ________ pertain to the climatic conditions which thecomponent , product or material should withstand.
Correct Answer Environmental specifications
Your Answer Environmental specifications
Multiple Choice Multiple AnswerQuestion Following are some of the factors considered for evaluation of
alternative layoutsCorrect Answer Flow of Material , Equipment utilization , Ease of supervision
Your Answer Flow of Material , Ease of supervision , Delivery performance
Multiple Choice Multiple AnswerQuestion Which of the following are assignable cause?
Correct Answer Large varaitions in hardness of material , Tool wear , Errors insetting
Your Answer Large varaitions in hardness of material , Tool wear , Errors insetting
True/FalseQuestion All activities must not be tied up into the network
Correct Answer False
Your Answer False
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot
may vary between ________.Correct Answer 0.01 to 10%
Your Answer 0.01 to 10%
True/FalseQuestion In case of X bar, if the process is not under control indicated by
some points falling outside the control limits, such points outsidethe control limits are eliminated and new trial control limits forthe remaining points are computed.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion What is the base for considering activity time as single time
estimate or three time estimate?
Correct Answer Level of uncertainty
Your Answer Availability of labour
Select The BlankQuestion The ________ is the maximum percentage defective that for the
purpose of sampling inspection can be considered satisfactoryas a process average.
Correct Answer Acceptable quality level
Your Answer Acceptable quality level
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to
complete an activity within it's normal time?Correct Answer Normal cost
Your Answer Normal cost
Select The BlankQuestion A good maintenance system is not a luxary but a ________.
Correct Answer Necessity
Your Answer Necessity
Select The BlankQuestion A ________helps to avoid crowding of jobs at a particular
machine by change of route of some of the jobs or by divertingwork to other machine.
Correct Answer Control board
Your Answer Move order
Select The BlankQuestion The ________ is the watch dog which ensures that every
element of production and activities which could affect thequality of end product are regulated to the extent desirable.
Correct Answer Quality control
Your Answer Quality control
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of
making any product/s is calledCorrect Answer Factory
Your Answer Factory
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Machine utilization
Gantt Chart Production Scheduling Production Scheduling
Select The BlankQuestion A ________ is another form of subcontracting.
Correct Answer Hiring capacity
Your Answer Hiring capacity
Multiple Choice Multiple AnswerQuestion In an organization there may not be a formal PPC department if
Correct Answer Work is highly repetitive in nature , Planning activities areperformed by the line staff , Number of workmen is not verylarge
Your Answer Work is highly repetitive in nature , Planning activities areperformed by the line staff , Number of workmen is not verylarge
Multiple Choice Multiple AnswerQuestion Which of the following cases can be treated as delay during
recording of method study?Correct Answer Operators awaiting instructions from supervisor , Worker waiting
for his turn at tools stores , Jobs awaiting at the machines fortheir turn
Your Answer Operators awaiting instructions from supervisor , Worker waitingfor his turn at tools stores , Jobs awaiting at the machines fortheir turn
True/FalseQuestion Inspection order is must even for simple jobs which can be
inspected by shop inspector with the tooling available on shop.Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Order preparation process for products manufatured to order
requires following documentsCorrect Answer Sales Order , Work order , Shop order
Your Answer Sales Order , Work order , Purchase order
Multiple Choice Single AnswerQuestion Technique of Value Engineering can be effectively employed in
design of a product toCorrect Answer To meet the intended function at lowest cost
Your Answer Reduce lead time
True/FalseQuestion Cent percent inspection is often more practical and economical
than sampling inspection.Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Scale model used for layout analysis have following advantages
Correct Answer Nontechnical person finds it easy to comprehend , Oveheadfacilities can be shown , Models can be shifted easily
Your Answer Nontechnical person finds it easy to comprehend , Oveheadfacilities can be shown , Models can be shifted easily
Multiple Choice Single AnswerQuestion Which of the following technique is event oriented ?
Correct Answer Project Evaluation & Review Technique
Your Answer Project Evaluation & Review Technique
Multiple Choice Single AnswerQuestion What is the meaning of " Product features" according to
J.M.Juran?Correct Answer Quality of design
Your Answer Quality of design
Match The FollowingQuestion Correct Answer Your Answer
Crash cost of an activity Cc Cc
Normal time of an activity Tn Tn
Crash time of activity Tc Tc
Normal cost of an activity Cn Cn
Multiple Choice Multiple AnswerQuestion What are uses of diagrams in method study?
Correct Answer Study different plant layouts and select the most optimum one ,Study the extent of traffic over the different routes of the plant ,Identify the extent of backtracking, cross traffic and obstaclesencountered during the movement of material.
Your Answer Study different plant layouts and select the most optimum one ,Study the extent of traffic over the different routes of the plant ,Identify the extent of backtracking, cross traffic and obstaclesencountered during the movement of material.
True/FalseQuestion A load chart specifies the work to be carried out by each person
of company during shift hours.Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Route Sheet generally contains following information
Correct Answer Material Specification , Sequence of operation , Skill of Labour
Your Answer Material Specification , Sequence of operation , Skill of Labour
True/FalseQuestion Cellular layout is based on the concept of Group Technology
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion Which varaible is taken along the abscissa or X axis?
Correct Answer Time
Your Answer Standard deviation
Multiple Choice Multiple Answer
Question Which are the advantages of suburban location?
Correct Answer Avaialability of adequate land at lower cost , Both skilled andunskilled labour can be available , Plant expansion is easier dueto less or no restriction for building and construction
Your Answer Avaialability of adequate land at lower cost , Both skilled andunskilled labour can be available , Plant expansion is easier dueto less or no restriction for building and construction
Select The BlankQuestion The ________ is the maintenance work initiated on a result of
knowledge of the condition of an item from routine or continuouschecking.
Correct Answer Condition monitoring
Your Answer Condition monitoring
Multiple Choice Multiple AnswerQuestion Expediting function is concerned with following activities
Correct Answer Progress chasing to identify delays which may hold upproduction , Communicating possible delays in delivery datecommitment to sales department , Devising cures to keep rateof production in line with schedule
Your Answer Recording progress of work , Progress chasing to identify delayswhich may hold up production , Communicating possible delaysin delivery date commitment to sales department
Select The BlankQuestion Production control work is ________ in case of floor inspection
as compared with the centralised inspection.Correct Answer easier
Your Answer time consuming
Select The BlankQuestion The easiest way to bring the delayed job within the promised
delivery time by using extra shift or weekly holiday is ________.Correct Answer Overtime working
Your Answer Overtime working
True/FalseQuestion In case of forward pass computation, the earliest event time of
the first event is zero.Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion What is represented by an arrow in a network?
Correct Answer Activity
Your Answer Activity
True/FalseQuestion As a general rule, a site five times the actual plant size is
considered minimum for parking, access facilities and futureexpansion.
Correct Answer True
Your Answer True
True/FalseQuestion Independent float either affects the float of preceding activities
or that of succeeding activities.Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion The document raised by PPC which authorises different
functions to take action as per instruction is calledCorrect Answer Work Order
Your Answer Work Order
Multiple Choice Single AnswerQuestion A good layout makes effective use of space. Utilization of space
for a department like Stores can be measured byCorrect Answer Proportion of Cubic volume space utilized
Your Answer Ratio of area utilised to area available
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding
some value to entity can be defined asCorrect Answer Operation
Your Answer Operation
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple AnswerQuestion Material Requirement Planning is very useful in following situations
Correct Answer Long Lead time for procurement , Several levels of assemblies inproduct , Long manufacturing cycle
Your Answer Long Lead time for procurement , Several levels of assemblies inproduct , Long manufacturing cycle
Select The BlankQuestion The ________ is specified to indicate the maximum permissible
variability in the dimensions product or parts.Correct Answer Tolerance
Your Answer Standard
Select The BlankQuestion An ________ history card is the record of all repairs, replacements and
engineering changes carried out in the equipment during it's period ofservice.
Correct Answer Equipment history card
Your Answer Equipment history card
Multiple Choice Single AnswerQuestion What can be the worst effect due to excessive vibration?
Correct Answer Breakdown
Your Answer Breakdown
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any
product/s is calledCorrect Answer Factory
Your Answer Factory
Multiple Choice Single AnswerQuestion How dummy activities are shown in the time chart during project
scheduling?Correct Answer Vertical lines
Your Answer Vertical lines
Multiple Choice Single Answer
Question Which of the following technique makes three time estimates for eachactivity?
Correct Answer Project Evaluation & Review Technique
Your Answer Project Evaluation & Review Technique
True/FalseQuestion Expediting action is necessary if the delays and interruptions are
abnormal and hence any subsequent delay is bound to extend thepromised delivery date.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Which features should be covered by the specifications of materials
while defining the qualitative requirement?Correct Answer Material composition , Dimensions , Any heat treatment if required
Your Answer Material composition , Dimensions , Any heat treatment if required
True/FalseQuestion Limit gauges are not useful when it is necessary to measure the exact
amount of variation.Correct Answer True
Your Answer False
Select The BlankQuestion The ________ is the defect level for which lots are regarded as bad
lots.Correct Answer Lot Tolerance Percentage Defective
Your Answer Lot Tolerance Percentage Defective
Multiple Choice Single AnswerQuestion Technique of Value Engineering can be effectively employed in design
of a product toCorrect Answer To meet the intended function at lowest cost
Your Answer Increase resourse utilization
Multiple Choice Single AnswerQuestion What do you mean by the preventive maintenance by using five human
senses?Correct Answer Preventive inspection
Your Answer Sensitive inspection
Multiple Choice Multiple AnswerQuestion Which of the following are typical examples of limit gauges?
Correct Answer Snap gauge , Plug gauge , Ring gauge
Your Answer Snap gauge , Plug gauge , Ring gauge
Multiple Choice Multiple AnswerQuestion Which are the major types of defects?
Correct Answer Minor , Major , Critical
Your Answer Major , Critical
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Facilities Planning
Craft Facilities Planning Production Scheduling
Work Sampling Machine utilization Sampling Inspection
Gantt Chart Production Scheduling Charting technique
Select The BlankQuestion The ________ is the maximum percentage defective that for the
purpose of sampling inspection can be considered satisfactory as aprocess average.
Correct Answer Acceptable quality level
Your Answer Acceptable quality level
Multiple Choice Single AnswerQuestion A good plant layout helps in
Correct Answer Reducing handling costs
Your Answer Reducing handling costs
Multiple Choice Multiple AnswerQuestion Which of the following charts are used for the recording of data during
the method study?
Correct Answer Operation process chart , Multiple activity chart , Flow process chart
Your Answer Operation process chart , Multiple activity chart , Flow process chart
Multiple Choice Single AnswerQuestion What do you mean by the selection of the job for the method study on
the basis of manufacturing difficulties?Correct Answer Technical consideration
Your Answer Human consideration
True/FalseQuestion An activity can share the same tail event and same head event with any
other activity.Correct Answer False
Your Answer False
Select The BlankQuestion The ________ is the probability that a good lot will be rejected by the
sampling plan.Correct Answer Producer's risk
Your Answer Producer's risk
Multiple Choice Single AnswerQuestion Inadequate production capacity ultimately leads to
Correct Answer Poor Customer Service
Your Answer Poor Customer Service
True/FalseQuestion All activities must not be tied up into the network
Correct Answer False
Your Answer True
Multiple Choice Single AnswerQuestion Technique which can help an organization to reduce inventory is called
Correct Answer MRP
Your Answer CPM
True/False
Question Dust gets mixed with lubricants, forms an abrasive substance andcauses pre-mature failure of machinery.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Which of the following situations demand the technical consideration
while selecting a job for method study?Correct Answer Jobs having inconsistent quality , Operations inviting frequent requests
from supervisors for relaxation in allowed time because of variations inmaterials and tool performance , Jobs in which too many man-hours arespend in checking and rechecking work
Your Answer Jobs having inconsistent quality , Operations inviting frequent requestsfrom supervisors for relaxation in allowed time because of variations inmaterials and tool performance , Jobs in which too many man-hours arespend in checking and rechecking work
Multiple Choice Multiple AnswerQuestion Which of the following are examples of attributes?
Correct Answer Cracks , Burrs , Texture
Your Answer Cracks , Hardness , Burrs
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot may vary
between ________.Correct Answer 0.01 to 10%
Your Answer 0.01 to 10%
Select The BlankQuestion The ________ must ensure that the product satisfy the functional
requirements of it's usage.Correct Answer Quality of design
Your Answer Quality of inspection
True/FalseQuestion Delay in completion of projects result in unwelcome additions to the
fixed manufacturing expenses.Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question Which of the following activities are used while recording for methodstudy?
Correct Answer Delay , Operation , Inspection
Your Answer Delay , Operation , Inspection
True/FalseQuestion Root cause of most of the breakdowns is failure of the lubrication
system.Correct Answer True
Your Answer True
Select The BlankQuestion The term ________ emplies the foregone profit due to inability of
company to produce.Correct Answer Opportunity cost
Your Answer Opportunity cost
True/FalseQuestion Latest finishing date is the latest event time of the tail event.
Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion What is the basic minimum requirement for those who are responsible
for the quality of design?Correct Answer In depth knowledge about alternative materials and manufacturing
processes , access to latest technology and production processadopted by industries in the developed market , Continuous effort inproduct development
Your Answer In depth knowledge about alternative materials and manufacturingprocesses , access to latest technology and production processadopted by industries in the developed market , Continuous effort inproduct development
True/FalseQuestion If the firm has adopted elaborate planned maintenance system, there is
no chance of any unplanned maintenance work.Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Question Which of the following is not the characteristic of Project Production?
Correct Answer Continuous flow of material , Highly mechanised material handling ,Virtually zero manufacturing cycle time
Your Answer Continuous flow of material , Highly mechanised material handling ,Virtually zero manufacturing cycle time
Multiple Choice Single AnswerQuestion Which document is used for returning the surplus material?
Correct Answer Stores Return Note
Your Answer Stores Return Note
Select The BlankQuestion Work study is also called ________ study
Correct Answer Time and Motion
Your Answer Time and Motion
Match The FollowingQuestion Correct Answer Your Answer
Factor Analysis Method to evaluate layouts Method to evaluate layouts
Minimization of productiondelays
Objective of good layout Objective of good layout
Maximum visibility Principles of good layout Principles of good layout
Scale model Layout analysis Layout analysis
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value
to entity can be defined asCorrect Answer Operation
Your Answer Operation
Multiple Choice Single AnswerQuestion What does the additional cost incurred to reduce the duration of an
activity by one unit of time represent?Correct Answer Activity cost slope
Your Answer Activity time slope
Select The Blank
Question Production control work is ________ in case of floor inspection ascompared with the centralised inspection.
Correct Answer easier
Your Answer easier
Select The BlankQuestion One detachable ticket is prepared for each ________.
Correct Answer Operation
Your Answer Operation
Multiple Choice Single AnswerQuestion The ratio of output to input of a production system is commonly known
asCorrect Answer Productivity
Your Answer Productivity
Multiple Choice Single AnswerQuestion Which of the following policies is advisable in case of low product
variety and large volumes?Correct Answer Low Skilled Labour & Special Purpose Machines
Your Answer Low Skilled Labour & Special Purpose Machines
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Select The BlankQuestion The ________ must ensure that the product satisfy the
functional requirements of it's usage.Correct Answer Quality of design
Your Answer Quality of design
Multiple Choice Multiple AnswerQuestion Which of the following information is available in
summary of part in a chart during methods study?Correct Answer Frequency of each symbol , Total time for each symbol ,
Total distance travelled by the objectYour Answer Frequency of each symbol , Total time for each symbol
True/FalseQuestion The event numbers as far as possible reflect the logical
relationships of the activities.Correct Answer True
Your Answer False
Multiple Choice Single AnswerQuestion Which varaible is taken along the ordinate or Y axis?
Correct Answer Quality
Your Answer Quality
Multiple Choice Multiple AnswerQuestion Which of the following schedules are recommended to
prepare and follow as a part of preventive maintenancesystem?
Correct Answer Preventive inspection schedule , Cleaning and upkeepschedule , Lubrication schedule
Your Answer Preventive inspection schedule , Cleaning and upkeepschedule , Lubrication schedule
Multiple Choice Single AnswerQuestion Which kind of preventive inspection detects some
maintenance related characteristics by making use ofhuman senses, when equipment is in operation?
Correct Answer Extrernal inspection
Your Answer Extrernal inspection
Multiple Choice Multiple AnswerQuestion Which are different ways to show critical path in a
network?Correct Answer Thick Line , Red Line , Double Line
Your Answer Thick Line , Red Line , Double Line
Multiple Choice Multiple AnswerQuestion What are the benefits of overhauling?
Correct Answer It increases useful life of an equipment and it's parts ,Advance planning allows to attend equipment withoutdisturbing the production programme , Advance planningallows to prepare and keep ready the list of replacementspares
Your Answer It increases useful life of an equipment and it's parts ,Advance planning allows to attend equipment withoutdisturbing the production programme , Advance planningallows to prepare and keep ready the list of replacementspares
Match The FollowingQuestion Correct Answer Your Answer
Combined Layout Mixed Layout Mixed Layout
Fixed Position Layout Project Layout Line Layout
Product Layout Line Layout Shop layout
Process Layout Functional Layout Functional Layout
Multiple Choice Multiple AnswerQuestion Which of the following factors play important role while
selecting or rejecting a particular site from legislation andtaxation point of view?
Correct Answer Labour laws , Building codes , Policies regarding issue oflicences
Your Answer Labour laws , Building codes , Policies regarding issue oflicences
Select The BlankQuestion The ________ is the maximum percentage defective that
for the purpose of sampling inspection can be considered
satisfactory as a process average.
Correct Answer Acceptable quality level
Your Answer Acceptable quality level
Multiple Choice Multiple AnswerQuestion Major contributors in the development of Control Charts,
Sampling plan areCorrect Answer F H Dodge , H G Roming , Walter Schewhart
Your Answer F H Dodge , H G Roming , Walter Schewhart
True/FalseQuestion Skill of labour force in a product type layout is usually
higher than in the process type of layoutCorrect Answer False
Your Answer True
True/FalseQuestion Repetitive movements between work stations which are
difficult to be traced on string diagrams can beconveniently shown on flow diagrams.
Correct Answer False
Your Answer True
Select The BlankQuestion The ________ is necessary when the job requires
detailed of one or more of the job characteristics with thehelp of special equipment which is not available at theproducing company.
Correct Answer Inspection order
Your Answer Job card
Multiple Choice Multiple AnswerQuestion Which of the following cases can be referred as operation
in method study recording?Correct Answer Change in physical characteristic , Consumption of
physical effort , Change in chemical characteristicYour Answer Change in physical characteristic , Consumption of
physical effort , Change in chemical characteristic
Select The Blank
Question The ________ is the maintenance work initiated on aresult of knowledge of the condition of an item fromroutine or continuous checking.
Correct Answer Condition monitoring
Your Answer Overhauling
True/FalseQuestion All activities lying on the non-critical paths must have total
float and free float.Correct Answer False
Your Answer False
Select The BlankQuestion Work study is also called ________ study
Correct Answer Time and Motion
Your Answer Method
Match The FollowingQuestion Correct Answer Your Answer
Crash cost of an activity Cc Cc
Normal time of anactivity
Tn Tn
Crash time of activity Tc Tc
Normal cost of anactivity
Cn Cn
Multiple Choice Multiple AnswerQuestion Which are the advantages of suburban location?
Correct Answer Avaialability of adequate land at lower cost , Both skilledand unskilled labour can be available , Plant expansion iseasier due to less or no restriction for building andconstruction
Your Answer Avaialability of adequate land at lower cost , Both skilledand unskilled labour can be available , Plant expansion iseasier due to less or no restriction for building andconstruction
True/False
Question In case of X bar-R charts,it is ensured that the assignablecauses are detected before the tolerances are violated,upper and lower statistical limits are worked out andinserted into a chart.
Correct Answer True
Your Answer False
Multiple Choice Single AnswerQuestion Which of the following is the criteria for the percentage
defectives in the zone of the indecision?Correct Answer Lots having the percentage defective more than AQL but
less than LPTDYour Answer Lots having the percentage defective less than AQL but
more than LPTD
Select The BlankQuestion The easiest way to bring the delayed job within the
promised delivery time by using extra shift or weeklyholiday is ________.
Correct Answer Overtime working
Your Answer Overtime working
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost
required to complete an activity within it's crashed time?Correct Answer Crash cost
Your Answer Crash cost
Multiple Choice Single AnswerQuestion In case of Batch Production which kind of labour is
expected?Correct Answer Skilled in one specific Manufacturing Process
Your Answer Semiskilled
Multiple Choice Multiple AnswerQuestion Which three of the following are causes of continuous
upward pattern of Xbar-R control chart?Correct Answer Wear of tool , Abnormal rise in temperature ,
Accumulation of dirtYour Answer Wear of tool , Abnormal rise in temperature ,
Accumulation of dirt
True/FalseQuestion Root cause of most of the breakdowns is failure of the
lubrication system.Correct Answer True
Your Answer True
True/FalseQuestion It is not necessary to know spare time available on the
non-critical path to allow a little delay for noncriticalactivity.
Correct Answer False
Your Answer False
True/FalseQuestion MRP software generates time periodwise requiremetn of
subassembliesCorrect Answer True
Your Answer True
True/FalseQuestion In case of two handed process chart, the simultaneous
activities of both hands are recorded opposite to eachother on the chart.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion What do you mean by CPM?
Correct Answer Critical Path Method
Your Answer Critical Path Method
Multiple Choice Multiple AnswerQuestion Which of the following are major inputs to scheduling?
Correct Answer Overlapping of operations , Effective Capacity per workcentre , Performance standards
Your Answer Overlapping of operations , Effective Capacity per workcentre , Performance standards
Multiple Choice Multiple Answer
Question Lack of material planning results in the following
Correct Answer Over ordering , under ordering , stockouts
Your Answer Over ordering , under ordering , stockouts
Multiple Choice Single AnswerQuestion What do you mean by the verification of object against
predetermined standards of quality or quantity or both?Correct Answer Inspection
Your Answer Inspection
Multiple Choice Multiple AnswerQuestion What are the advantages of templates over diagrams?
Correct Answer Can be conveniently moved on the graph paper , Lesslaborious , Saves time
Your Answer Can be conveniently moved on the graph paper , Lesslaborious , Unskilled person can do and analyze it
True/FalseQuestion It would not affect the project completion time if non-
critical activities take little loner time than planned.Correct Answer True
Your Answer True
Select The BlankQuestion The ________ is the probability that a good lot will be
rejected by the sampling plan.Correct Answer Producer's risk
Your Answer Producer's risk
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose
of making any product/s is calledCorrect Answer Factory
Your Answer Factory
Select The BlankQuestion An Ideal OC curve is ________ shaped curve that
accpets all the lots with quality equal to or better thanAQL .
Correct Answer Rectangular
Your Answer Bell
Multiple Choice Single AnswerQuestion Which is the right time to prepare stores issue order?
Correct Answer When route sheet is ready
Your Answer When route sheet is ready
Multiple Choice Single AnswerQuestion Which element of a network represents a task which has
got a definite beginning and definite end?Correct Answer Activity
Your Answer Activity
Multiple Choice Single AnswerQuestion Which kind of preventive inspection detects some defects
in moving parts, internal cracks, and others , whenmachine is under preplanned shutdown?
Correct Answer Internal inspection
Your Answer Internal inspection
Select The BlankQuestion Production Planning is a centralised activity which
includes functions such as ________Correct Answer Scheduling
Your Answer Dispatching
Select The BlankQuestion The ________ is the watch dog which ensures that every
element of production and activities which could affectthe quality of end product are regulated to the extentdesirable.
Correct Answer Quality control
Your Answer Quality control
Select The BlankQuestion Goods after final inspection should accompany
________to enable dispatch department to identify and
draw correct reference.
Correct Answer Forwarding note
Your Answer Forwarding note
Multiple Choice Single AnswerQuestion Who has introduced the useful concept of control chart in
1931?Correct Answer Walter Shewhart
Your Answer Walter Shewhart
POM assgn : Sushant
True/FalseQuestion Cent percent inspection is required on WIP prior to the key, critical or costly operation.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Which of the following aspects are essential to ensure quality of purchased items?
Correct Answer Defining right quality for the job , Vendor performance evaluation , Making sure thatsuppliers understand the requirements
Your Answer Vendor performance evaluation , Making sure that suppliers understand the requirements, Defining right quality for the job
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any product/s is
calledCorrect Answer Factory
Your Answer Factory
Multiple Choice Single AnswerQuestion Which of the following technique is event oriented ?
Correct Answer Project Evaluation & Review Technique
Your Answer Project Evaluation & Review Technique
Select The BlankQuestion Work study is also called ________ study
Correct Answer Time and Motion
Your Answer Time and Motion
Multiple Choice Multiple AnswerQuestion Which of the following concepts must be understood for the achievement of quality?
Correct Answer Quality of conformance , Purpose of product , Quality of design
Your Answer Quality of conformance , Quality of design
Multiple Choice Multiple AnswerQuestion Following are some of the factors considered for evaluation of alternative layouts
Correct Answer Flow of Material , Equipment utilization , Ease of supervision
Your Answer Flow of Material , Equipment utilization , Ease of supervision
Match The FollowingQuestion Correct Answer Your Answer
Toung Sweet Sweet
Eye Crack Crack
Nose Burnout Burnout
Ear Impact Impact
Multiple Choice Multiple AnswerQuestion Which of the following are important considerations concerning activity times?
Correct Answer Activity time should be obtained from the person responsible for the completion of anactivity , Activity time must be independent of any influence which the preceding orsucceeding activity may have on it. , Activity time may assume that just the normalquantity of resources required to carry out the activity are available.
Your Answer Activity time should be obtained from the person responsible for the completion of anactivity , Activity time must be independent of any influence which the preceding orsucceeding activity may have on it. , Activity time may assume that just the normalquantity of resources required to carry out the activity are available.
Multiple Choice Multiple AnswerQuestion Which are the subtasks of the maintenance phase of the method study?
Correct Answer Monitoring and control , Performance appraisal , Audit on savings
Your Answer Monitoring and control , Performance appraisal , Audit on savings
Multiple Choice Multiple AnswerQuestion Which of the following are characteristics of an operating characteristics curve?
Correct Answer Producer risk , Consumer Risk , Acceptable Quality Level
Your Answer Producer risk , Consumer Risk , Acceptable Quality Level
Select The BlankQuestion The ________ breakdowns usually cost more, partly due to damage done to the
adjustment components and partly due to emergency actions.Correct Answer Unexpected
Your Answer Partial
Multiple Choice Single AnswerQuestion Why stores issue order should not be issued as soon as it is prepared?
Correct Answer Material may or may not be available at the time of preparation
Your Answer Inventory investment will increase
Multiple Choice Single AnswerQuestion What is the nature of the sampling plan for critical defects?
Correct Answer Tight
Your Answer Tight
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot may vary between
________.Correct Answer 0.01 to 10%
Your Answer 0.01 to 10%
Multiple Choice Multiple AnswerQuestion Plant layout facilitates processing of products in most effective manner through the
followingCorrect Answer Shortest possible distance , Shortest processing time , Minimum movement
Your Answer Shortest possible distance , Shortest processing time , Minimum movement
True/FalseQuestion After goods have been manufactured, route sheets and operation layouts should not be
collected back.Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion Process planning is the process of
Correct Answer establishing shortest and most economic path of production
Your Answer establishing shortest and most economic path of production
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to entity can be
defined asCorrect Answer Operation
Your Answer Operation
Select The BlankQuestion The ________ is specified to indicate the maximum permissible variability in the
dimensions product or parts.Correct Answer Tolerance
Your Answer Tolerance
Select The BlankQuestion Goods after final inspection should accompany ________to enable dispatch department
to identify and draw correct reference.Correct Answer Forwarding note
Your Answer Forwarding note
Select The Blank
Question The ________ includes preventive maintenance activities whose needs are identifiedthrough inspection which requires stoppage of machines.
Correct Answer Shutdown Maintenance
Your Answer Shutdown Maintenance
True/FalseQuestion A load chart specifies the work to be carried out by each person of company during shift
hours.Correct Answer False
Your Answer True
Select The BlankQuestion The easiest way to bring the delayed job within the promised delivery time by using extra
shift or weekly holiday is ________.Correct Answer Overtime working
Your Answer Overtime working
True/FalseQuestion Under MRP system for common items order for procurement is placed based on
requirement for each productCorrect Answer False
Your Answer True
Multiple Choice Single AnswerQuestion What do you understand by the extent the products manufactured conforms to the laid
down design?Correct Answer Quality of conformance
Your Answer Quality of conformance
Select The BlankQuestion The ________ is necessary when the job requires detailed of one or more of the job
characteristics with the help of special equipment which is not available at the producingcompany.
Correct Answer Inspection order
Your Answer Job card
Multiple Choice Multiple AnswerQuestion Which of the following are the basic requirements of quality standard?
Correct Answer Deifinite , Undesrstandable , Economically viable
Your Answer Deifinite , Undesrstandable , Economically viable
True/FalseQuestion In case of forward pass computation, the earliest event time of the first event is zero.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Which kind of possible defectives can be reduced due to first off inspection?
Correct Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machineset up
Your Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machineset up , Due to purposely done mistakes by unsatisfied worker
True/FalseQuestion A sampling plan which perfectly discriminates will have vertical OC curve.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Which of the following is a part of preparing manufacturing order set as a primary
function of dispatching?Correct Answer Operational layouts , Move orders , Pre-filled stores issue orders
Your Answer Operational layouts , Rejection reports , Move orders , Pre-filled stores issue orders
Select The BlankQuestion An ________ history card is the record of all repairs, replacements and engineering
changes carried out in the equipment during it's period of service.Correct Answer Equipment history card
Your Answer Equipment history card
True/FalseQuestion Specifications is the basic tool of inspection.
Correct Answer True
Your Answer True
Match The FollowingQuestion Correct Answer Your Answer
Forcasting requirement for indirectmaterial
Past consumption analysistechnique
Economic order quantity
Inventory control by classification ABC Analysis ABC Analysis
Structure of the product BOM BOM
Material Planning for dependentdemand
MRP MRP
Multiple Choice Single AnswerQuestion The document raised by PPC which authorises different functions to take action as per
instruction is calledCorrect Answer Work Order
Your Answer Job Instructions
Multiple Choice Single AnswerQuestion Who prepares the daily production report?
Correct Answer Shop Supervisor
Your Answer Shop Supervisor
True/FalseQuestion A lot declared rejected in sampling inspection should not be inspected 100% in any case.
Correct Answer False
Your Answer True
Multiple Choice Single AnswerQuestion How is the probability of acceptance in case of Acceptable Quality Level (AQL )?
Correct Answer Very high
Your Answer Average
Multiple Choice Multiple AnswerQuestion Which are the different methods of recording actual progress of work?
Correct Answer Display boards , Progress cards , Network updating
Your Answer Display boards , Progress cards , Network updating
True/FalseQuestion The dispatching function is of very importance in flow and mass production units.
Correct Answer False
Your Answer True
True/FalseQuestion Proper care and storage is not an essential part of a well planned lubrication system.
Correct Answer False
Your Answer False
Select The BlankQuestion The ________ pertain to the climatic conditions which the component , product or
material should withstand.
Correct Answer Environmental specifications
Your Answer Environmental specifications
Multiple Choice Single AnswerQuestion Which of the following is the most popular technique for Project Production?
Correct Answer PERT & CPM
Your Answer PERT & CPM
Select The BlankQuestion Production Planning is a centralised activity which includes functions such as ________
Correct Answer Scheduling
Your Answer Scheduling
Multiple Choice Single AnswerQuestion Which rule is used for numbering of events?
Correct Answer Fulkerson's Rule
Your Answer Fulkerson's Rule
POM assgn : Grace
True/FalseQuestion Floor inspection delays the identification of faults which can not be rectified
immediately before large lots are spoiled.Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion Management often fails to realize the importance of efficient layout due to
following reasonCorrect Answer losses resulting from poor layout are not directly shown in the financial
statementsYour Answer losses resulting from poor layout are not directly shown in the financial
statements
Select The BlankQuestion The ________ is the defect level for which lots are regarded as bad lots.
Correct Answer Lot Tolerance Percentage Defective
Your Answer Lot Tolerance Percentage Defective
Multiple Choice Single AnswerQuestion Which method of critical path determination begins with the end event and
moves backward to the start event of the project network?Correct Answer Backward pass computation
Your Answer Backward pass computation
True/FalseQuestion Complexity and difficulty of Planning is influenced by types of layout
Correct Answer True
Your Answer False
True/FalseQuestion For p-chart, p bar is the ratio of total number of units inspected to the total
number of units defectives.Correct Answer False
Your Answer True
Multiple Choice Single AnswerQuestion What is represented by an arrow in a network?
Correct Answer Activity
Your Answer Activity
Multiple Choice Multiple Answer
Question MRP utilises the following information
Correct Answer Master production schedule , Product structure , Lead time forprocurement/manufacturing
Your Answer Master production schedule , Lead time for procurement/manufacturing , listof machines
Multiple Choice Single AnswerQuestion Which is the ideal place to write a description of an activity in a network?
Correct Answer Above the arrow
Your Answer Above the arrow
Select The BlankQuestion The ________ breakdowns usually cost more, partly due to damage done to
the adjustment components and partly due to emergency actions.Correct Answer Unexpected
Your Answer Unexpected
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any
product/s is calledCorrect Answer Factory
Your Answer Factory
True/FalseQuestion Systematic maintenance system can completely eliminate the wear and tear
of machines.Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Which of the following are types of non-destructive testing?
Correct Answer Visual Testing , Eddy current , Magnetic flow detectors
Your Answer Visual Testing , Eddy current , Magnetic flow detectors
Select The BlankQuestion Work study is also called ________ study
Correct Answer Time and Motion
Your Answer Time and Motion
Multiple Choice Single AnswerQuestion Providing flexibility in plant layout means
Correct Answer Layout can be changed without much cost if required
Your Answer Layout can be changed without much cost if required
Multiple Choice Multiple AnswerQuestion Which of the following aspects are essential to ensure quality of purchased
items?Correct Answer Defining right quality for the job , Vendor performance evaluation , Making
sure that suppliers understand the requirementsYour Answer Defining right quality for the job , Vendor performance evaluation , Making
sure that suppliers understand the requirements
Multiple Choice Multiple AnswerQuestion Which of the following are scheduling techniques?
Correct Answer Critical Path Analysis , Index Method , Johnson's two machine algorithm
Your Answer Critical Path Analysis , Index Method , Johnson's two machine algorithm
Select The BlankQuestion The ________ advocates maintenance procedures whereby the condition of
the plant is constantly watched through systematic inspection to unearthunhealthy conditions and preventive
Correct Answer Preventive Maintenance
Your Answer Preventive Maintenance
True/FalseQuestion A network should be progression of activities always moving forward.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion In an organization there may not be a formal PPC department if
Correct Answer Work is highly repetitive in nature , Planning activities are performed by theline staff , Number of workmen is not very large
Your Answer Work is highly repetitive in nature , Planning activities are performed by theline staff , Number of workmen is not very large
Select The BlankQuestion The ________ is necessary when the job requires detailed of one or more of
the job characteristics with the help of special equipment which is notavailable at the producing company.
Correct Answer Inspection order
Your Answer Inspection order
Multiple Choice Multiple AnswerQuestion Order preparation process for products manufatured to order requires
following documents
Correct Answer Sales Order , Work order , Shop order
Your Answer Sales Order , Work order , Shop order
Multiple Choice Single AnswerQuestion What do you understand by the selection of the job for the method study on
the basis of money saving potential of the job?Correct Answer Economic consideration
Your Answer Economic consideration
Select The BlankQuestion Production Planning is a centralised activity which includes functions such as
________Correct Answer Scheduling
Your Answer Scheduling
Multiple Choice Multiple AnswerQuestion Scale model used for layout analysis have following advantages
Correct Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can beshown , Models can be shifted easily
Your Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can beshown , Models can be shifted easily
Multiple Choice Single AnswerQuestion Which is the ideal place to inspect jigs and fixtures in a mass manufacturing
unit?Correct Answer Separate inspection room
Your Answer Separate inspection room
Multiple Choice Single AnswerQuestion How to reveal the capability of the sampling plan to discriminate between
good lots and bad lots?Correct Answer Operating characteristics curve ( OC )
Your Answer Operating characteristics curve ( OC )
True/FalseQuestion It would not affect the project completion time if non-critical activities take
little loner time than planned.Correct Answer True
Your Answer True
Select The BlankQuestion The ________ includes preventive maintenance activities whose needs are
identified through inspection which requires stoppage of machines.Correct Answer Shutdown Maintenance
Your Answer Shutdown Maintenance
Match The FollowingQuestion Correct Answer Your Answer
Forcasting requirement forindirect material
Past consumption analysistechnique
Past consumption analysistechnique
Inventory control by classification ABC Analysis ABC Analysis
Structure of the product BOM BOM
Material Planning for dependentdemand
MRP MRP
True/FalseQuestion The dispatching function is of very importance in flow and mass production
units.Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Which features should be covered by the specifications of materials while
defining the qualitative requirement?Correct Answer Material composition , Dimensions , Any heat treatment if required
Your Answer Material composition , Dimensions , Cost of material
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of
the condition of an item from routine or continuous checking.Correct Answer Condition monitoring
Your Answer Condition monitoring
Select The BlankQuestion One detachable ticket is prepared for each ________.
Correct Answer Operation
Your Answer Operation
Multiple Choice Single AnswerQuestion Which of the following is the most popular technique for Project Production?
Correct Answer PERT & CPM
Your Answer PERT & CPM
Select The Blank
Question A good maintenance system is not a luxary but a ________.
Correct Answer Necessity
Your Answer Necessity
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to
entity can be defined asCorrect Answer Operation
Your Answer Operation
True/FalseQuestion An activity should represent an operation or set of operations which can be
performed using a particular kind of equipment or a special skill.Correct Answer True
Your Answer False
Multiple Choice Multiple AnswerQuestion Which of the following are types of sampling plan?
Correct Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Your Answer Single sampling plan , Double sampling plan , Multiple sampling plan
True/FalseQuestion In case of forward pass computation, the earliest event time of a plain event
equals the earliest event time of the preceding event plus duration of activityemanating from the preceding event.
Correct Answer True
Your Answer False
Multiple Choice Multiple AnswerQuestion Which of the following are ideal situations for the preventive inspection?
Correct Answer Weekly off and holidays , Non-production hours , Stand-up equipment
Your Answer Weekly off and holidays , Non-production hours , Stand-up equipment
Multiple Choice Single AnswerQuestion What do you mean by the chart on which the major activities and entry points
of materials are recorded to have graphic view of operations and inspectionsinvolved in the process?
Correct Answer Operation process chart
Your Answer Flow Process chart
Match The Following
Question Correct Answer Your Answer
Fixation of inventory level Reorder level Reorder level
Symptom of ill plannedpurchasing
Over ordering Over ordering
Factor influencing materialplanning
Lead time Lead time
Net requirement of material underMRP
Stock on hand Stock on hand
Multiple Choice Single AnswerQuestion Taxes / duties levied is one of the important determinant for location decision
as taxes/duties substantially influenceCorrect Answer Product cost
Your Answer Product cost
Multiple Choice Single AnswerQuestion Which kind of gauge consists of electrical contacts operating a series of
colloured signal lamps which indicate whether the dimension is correct,oversize or undersize?
Correct Answer Multiple gauging
Your Answer Multiple gauging
Multiple Choice Multiple AnswerQuestion Which of the following are minimum requirement for a good quality of design?
Correct Answer Resonable cost , Resonable procurement time , Resonable manufacturing time
Your Answer Resonable cost , Resonable procurement time , Resonable manufacturing time
Select The BlankQuestion OC curve of ideal sampling plan suggests that all lots less than 3% defectives
have the probability of acceptance of ________.Correct Answer One
Your Answer One
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Select The BlankQuestion An ________ history card is the record of all repairs, replacements and engineering changes
carried out in the equipment during it's period of service.Correct Answer Equipment history cardYour Answer Equipment history card
Select The BlankQuestion The ________ pertain to the climatic conditions which the component , product or material
should withstand.Correct Answer Environmental specificationsYour Answer Environmental specifications
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to entity can be defined
asCorrect Answer OperationYour Answer Operation
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of the condition of an
item from routine or continuous checking.Correct Answer Condition monitoringYour Answer Condition monitoring
True/FalseQuestion A lot declared rejected in sampling inspection should not be inspected 100% in any case.Correct Answer FalseYour Answer False
Multiple Choice Single AnswerQuestion The ratio of output to input of a production system is commonly known asCorrect Answer ProductivityYour Answer Productivity
Multiple Choice Single AnswerQuestion What do you mean by the graphical representation of the project which is composed as series
of connected arrows and circles to describe the interrelationship of the activities involved?Correct Answer NetworkYour Answer Network
True/FalseQuestion Since value of p can never be positive, hence" if LCLp works out to be positive, it is taken as
zero."Correct Answer FalseYour Answer False
True/FalseQuestion Kanban system is essentially a computer based system for production scheduling and controlCorrect Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Which of the following possibilities can be explored by using flow process chart?
Correct Answer Eliminating the operations or combining the operations with another , Reducing thedistance traveled by the workmen or materials , Avoiding the waiting time and thereby reduce productionlosses
Your Answer Eliminating the operations or combining the operations with another , Reducing thedistance traveled by the workmen or materials , Avoiding the waiting time and thereby reduce productionlosses
Multiple Choice Multiple AnswerQuestion Which are the subfactors of community facilities or social infrastructure?Correct Answer Accomodation , Educational , EntertainmentYour Answer Accomodation , Educational , Entertainment
True/FalseQuestion Only skilled worker can use the fixed limit gauge.Correct Answer FalseYour Answer False
Select The BlankQuestion The term ________ emplies the foregone profit due to inability of company to produce.Correct Answer Opportunity costYour Answer Opportunity cost
Multiple Choice Single AnswerQuestion A good plant layout helps inCorrect Answer Reducing handling costsYour Answer Reducing handling costs
Multiple Choice Multiple AnswerQuestion Which kind of possible defectives can be reduced due to first off inspection?Correct Answer Due to wrong machine set up , Due to mistakes in reading blue prints , Due to errors in
toolingYour Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine
set up
Select The BlankQuestion The ________ is a set of tools and techniques by which products are made to comply with the
specifications at minimum cost to the firm.Correct Answer Quality control systemYour Answer Quality control system
Multiple Choice Single AnswerQuestion What do you understand by identification of defects in materials, components, machining
processes or men to fix responsibility of defectives, thereby preventing or minimising occurance ofdefectives?
Correct Answer Preventive functionYour Answer Preventive function
Multiple Choice Multiple AnswerQuestion Which of the following products should be produced by using mass production?Correct Answer Refrigerator , Tyre for automobile , Television SetYour Answer Refrigerator , Tyre for automobile , Television Set
Select The BlankQuestion Work study is also called ________ studyCorrect Answer Time and MotionYour Answer Time and Motion
Multiple Choice Single AnswerQuestion Which kind of relationship exists between those activities which can be carried out
simultaneously and both activities require definite time to finish?Correct Answer Concurrent activitiesYour Answer Concurrent activities
Multiple Choice Multiple AnswerQuestion Which are the sources of information to update the progress card daily?Correct Answer Detachable ticket , Daily production report , Job CardYour Answer Detachable ticket , Daily production report , Job Card
Multiple Choice Single AnswerQuestion Out of two basic criteria for the selection of a manufacturing method, one is, it must be able to
meet the specifications of final product and the other is, it must beCorrect Answer Cost effective methodYour Answer Cost effective method
Multiple Choice Multiple AnswerQuestion Which of the following charts are used for the recording of data during the method study?Correct Answer Operation process chart , Multiple activity chart , Flow process chartYour Answer Operation process chart , Multiple activity chart , Flow process chart
Select The BlankQuestion The ________ is the probability that a bad lot will be accepted by the sampling plan.Correct Answer Consumer's riskYour Answer Consumer's risk
True/FalseQuestion Suburban location provides the compromise netween rural and urban locations.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following method can be used to record the facts during the method study?Correct Answer Micromotion study , Cyclegraph , ChronocyclegraphYour Answer Micromotion study , Cyclegraph , Chronocyclegraph
Match The FollowingQuestion Correct Answer Your Answer
Combined Layout Mixed Layout Mixed Layout
Fixed Position Layout Project Layout Project Layout
Product Layout Line Layout Line Layout
Process Layout Functional Layout Functional Layout
Multiple Choice Single AnswerQuestion Inadequate production capacity ultimately leads toCorrect Answer Poor Customer ServiceYour Answer Low Productivity
Multiple Choice Single Answer
Question Which varaible is taken along the ordinate or Y axis?Correct Answer QualityYour Answer Quality
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any product/s is calledCorrect Answer FactoryYour Answer Factory
Multiple Choice Multiple AnswerQuestion Which of the following defects can be observed during preventive inspection by using human
senses?Correct Answer Leakage of a gas , Deviation from normal sound , Excessive VibrationYour Answer Deviation from normal sound , Excessive Vibration , Leakage of a gas
Multiple Choice Multiple AnswerQuestion Which of the following are uses of the lubricants?Correct Answer Retard rate of wear and tear of moving parts , Protect parts from moisture and dust ,
Keep temperature of bearings within allowable limitsYour Answer Retard rate of wear and tear of moving parts , Protect parts from moisture and dust , Keep
temperature of bearings within allowable limits
Multiple Choice Single AnswerQuestion Why method study should precede work measurement?Correct Answer Time for a job can be accessed accurately only after standardizing the methodYour Answer Time for a job can be accessed accurately only after standardizing the method
True/FalseQuestion In case of two handed process chart, storage symbol is used when either hand is used as grip or
vice to hold an object.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Process type layout is suitable whenCorrect Answer there is wide variation in processing time of operationsYour Answer there is wide variation in processing time of operations
Multiple Choice Single AnswerQuestion Site factors for plant location includeCorrect Answer Suitability of landYour Answer Suitability of land
Select The BlankQuestion The ________ is the probability that a good lot will be rejected by the sampling plan.Correct Answer Producer's riskYour Answer Producer's risk
Multiple Choice Single AnswerQuestion What is the location of upper control limit in the X bar-R control chart?Correct Answer 3 standard deviations above central lineYour Answer 3 standard deviations above central line
Multiple Choice Single AnswerQuestion Which of the following data is unnecessary for scheduling process?Correct Answer Cost breakup of products
Your Answer Cost breakup of products
Multiple Choice Multiple AnswerQuestion Which of the following are typical examples of limit gauges?Correct Answer Snap gauge , Plug gauge , Ring gaugeYour Answer Snap gauge , Plug gauge , Ring gauge
True/FalseQuestion Sample sizes for the construction of p-chart are typicaly larger that for Xbar-R-charts.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following are the basic requirements of quality standard?Correct Answer Deifinite , Undesrstandable , Economically viableYour Answer Deifinite , Undesrstandable , Economically viable
Multiple Choice Multiple AnswerQuestion Which of the following is not the characteristic of Project Production?Correct Answer Continuous flow of material , Highly mechanised material handling , Virtually zero
manufacturing cycle timeYour Answer Continuous flow of material , Highly mechanised material handling , Virtually zero
manufacturing cycle time
Match The FollowingQuestion Correct Answer Your Answer
Community Facilities Educational facility Educational facility
Proximity to market Fragile product Fragile product
Industrial and labour attitude Productivity of labour Productivity of labour
Legislation and taxation Licenses Licenses
True/FalseQuestion Breakdown of a machine is normally accompanied by added machine setup cost such as
resetting of jobs or change of jobs.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following are examples of gross materials?Correct Answer Timber , Iron ore , Sugar caneYour Answer Timber , Iron ore , Sugar cane
Select The BlankQuestion The easiest way to bring the delayed job within the promised delivery time by using extra shift
or weekly holiday is ________.Correct Answer Overtime workingYour Answer Overtime working
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Select The BlankQuestion Production Planning is a centralised activity which includes functions such as ________Correct Answer SchedulingYour Answer Scheduling
Multiple Choice Single AnswerQuestion In case of Batch Production which kind of labour is expected?Correct Answer Skilled in one specific Manufacturing ProcessYour Answer Skilled in one specific Manufacturing Process
Select The BlankQuestion A good maintenance system is not a luxary but a ________.Correct Answer NecessityYour Answer Necessity
Multiple Choice Single AnswerQuestion A good layout makes effective use of space. Utilization of space for a department like Stores
can be measured byCorrect Answer Proportion of Cubic volume space utilizedYour Answer No such measure in use
True/FalseQuestion One major difference between CPM and PERT is the former's adaptability for the projects
where high degree of uncertainty prevails and activity times during performance are expected to varyconsiderably for certain activities.
Correct Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion In an organization there may not be a formal PPC department ifCorrect Answer Work is highly repetitive in nature , Planning activities are performed by the line staff ,
Number of workmen is not very largeYour Answer Work is highly repetitive in nature , Planning activities are performed by the line staff ,
Number of workmen is not very large
Multiple Choice Single AnswerQuestion Which industry out of the following industries require maximum consideration for safety factor
while selecting plant location?Correct Answer Nuclear power plantYour Answer Nuclear power plant
Select The BlankQuestion The easiest way to bring the delayed job within the promised delivery time by using extra shift
or weekly holiday is ________.Correct Answer Overtime workingYour Answer Overtime working
Select The BlankQuestion OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the
probability of acceptance of ________.Correct Answer OneYour Answer One
Multiple Choice Multiple Answer
Question Following are some of the Principles of Management advocated by F W TaylorCorrect Answer Selection of best worker for each particular task , Division of work between worker and
management , Training and development of the workmenYour Answer Selection of best worker for each particular task , Division of work between worker and
management , Training and development of the workmen
Multiple Choice Single AnswerQuestion Out of two basic criteria for the selection of a manufacturing method, one is, it must be able to
meet the specifications of final product and the other is, it must beCorrect Answer Cost effective methodYour Answer Cost effective method
Multiple Choice Single AnswerQuestion What does CPA stand for?Correct Answer Critical Path AnalysisYour Answer Critical Path Analysis
Multiple Choice Multiple AnswerQuestion What is the basic minimum requirement for those who are responsible for the quality of
design?Correct Answer In depth knowledge about alternative materials and manufacturing processes , access to
latest technology and production process adopted by industries in the developed market , Continuous effortin product development
Your Answer In depth knowledge about alternative materials and manufacturing processes , access tolatest technology and production process adopted by industries in the developed market , Continuous effortin product development
True/FalseQuestion A lot declared rejected in sampling inspection should not be inspected 100% in any case.Correct Answer FalseYour Answer False
True/FalseQuestion A network should employ only those dummy activities which are absolutely necessary.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following are scheduling techniques?Correct Answer Critical Path Analysis , Index Method , Johnson's two machine algorithmYour Answer Critical Path Analysis , Index Method , Johnson's two machine algorithm
True/FalseQuestion The component produced on completely automatic machines may be subjected to sampling
inspection while parts produced on semi-automatic and completely manual operated machines require centpercent inspection.
Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion The ratio of output to input of a production system is commonly known asCorrect Answer ProductivityYour Answer Productivity
Multiple Choice Single AnswerQuestion Which of the following policies is advisable in case of low product variety and large volumes?
Correct Answer Low Skilled Labour & Special Purpose MachinesYour Answer Low Skilled Labour & Special Purpose Machines
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any product/s is calledCorrect Answer FactoryYour Answer Factory
Multiple Choice Multiple AnswerQuestion Plant layout facilitates processing of products in most effective manner through the followingCorrect Answer Shortest possible distance , Shortest processing time , Minimum movementYour Answer Shortest possible distance , Shortest processing time
Multiple Choice Single AnswerQuestion Site factors for plant location includeCorrect Answer Suitability of landYour Answer Suitability of land
Multiple Choice Single AnswerQuestion A good plant layout helps inCorrect Answer Reducing handling costsYour Answer Reducing handling costs
Match The FollowingQuestion Correct Answer Your Answer
Combined Layout Mixed Layout Mixed Layout
Fixed Position Layout Project Layout Project Layout
Product Layout Line Layout Line Layout
Process Layout Functional Layout Functional Layout
Multiple Choice Single AnswerQuestion Which kind of inspection is followed in case of process layout?Correct Answer First off inspectionYour Answer First off inspection
True/FalseQuestion Even if any activity on the critical path is delayed, project completes on the scheduled time.Correct Answer FalseYour Answer False
Multiple Choice Single AnswerQuestion Inadequate production capacity ultimately leads toCorrect Answer Poor Customer ServiceYour Answer Poor Customer Service
Select The BlankQuestion The ________ is the probability that a bad lot will be accepted by the sampling plan.Correct Answer Consumer's riskYour Answer Consumer's risk
Multiple Choice Multiple Answer
Question Which are the different methods of recording actual progress of work?Correct Answer Display boards , Progress cards , Network updatingYour Answer Display boards , Progress cards , Network updating
Select The BlankQuestion Production control work is ________ in case of floor inspection as compared with the
centralised inspection.Correct Answer easierYour Answer easier
Multiple Choice Single AnswerQuestion Product layout offer following advantagesCorrect Answer There is economy in manufacturing timeYour Answer There is economy in manufacturing time
True/FalseQuestion Flow process charts do record movements as well as visual pictures.Correct Answer FalseYour Answer False
Multiple Choice Single AnswerQuestion Main objective of a good plant layout isCorrect Answer Reduce material handling costYour Answer Reduce material handling cost
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.Correct Answer 0.01 to 10%Your Answer 0.01 to 10%
Multiple Choice Multiple AnswerQuestion Features of Cellular layout areCorrect Answer It is a type of mixed layout , Uses concept of Group Technology , Facilities are grouped
in to cellsYour Answer It is a type of mixed layout , Uses concept of Group Technology , Facilities are grouped in
to cells
True/FalseQuestion Cent percent inspection is required on WIP prior to the key, critical or costly operation.Correct Answer TrueYour Answer True
Select The BlankQuestion The ________ is the defect level for which lots are regarded as bad lots.Correct Answer Lot Tolerance Percentage DefectiveYour Answer Lot Tolerance Percentage Defective
Multiple Choice Multiple AnswerQuestion What are the benefits of reconditioning?Correct Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps
to plan requirement of replacement sparesYour Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to
plan requirement of replacement spares
Multiple Choice Single AnswerQuestion What does head of an arrow represent?
Correct Answer End of an activityYour Answer End of an activity
Multiple Choice Single AnswerQuestion What do you mean by planned corrective manitenance which provides an opportunity to
undertake design modifications in the equipment to eliminate or reduce frequency of breakdowns.Correct Answer Design-out MaintenanceYour Answer Design-out Maintenance
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of the condition of an
item from routine or continuous checking.Correct Answer Condition monitoringYour Answer Condition monitoring
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to entity can be defined
asCorrect Answer OperationYour Answer Operation
Multiple Choice Multiple AnswerQuestion Which of the following are characteristics of an operating characteristics curve?Correct Answer Producer risk , Consumer Risk , Acceptable Quality LevelYour Answer Producer risk , Consumer Risk , Acceptable Quality Level
Match The FollowingQuestion Correct Answer Your Answer
Toung Sweet Sweet
Eye Crack Crack
Nose Burnout Burnout
Ear Impact Impact
Select The BlankQuestion The ________ is a set of tools and techniques by which products are made to comply with the
specifications at minimum cost to the firm.Correct Answer Quality control systemYour Answer Quality control system
Multiple Choice Multiple AnswerQuestion Which three of the following options can be used to reduce the duration of activity during
project crashing?Correct Answer Allocating more manpower and machines than originally planned for. , Working
additional shifts or overtime. , Awarding work to vendors who charge extra but expedite deliveries.Your Answer Allocating more manpower and machines than originally planned for. , Working additional
shifts or overtime. , Awarding work to vendors who charge extra but expedite deliveries.
Select The BlankQuestion Goods after final inspection should accompany ________to enable dispatch department to
identify and draw correct reference.Correct Answer Forwarding note
Your Answer Forwarding note
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single AnswerQuestion Which of the following technique makes three time estimates for each activity?Correct Answer Project Evaluation & Review TechniqueYour Answer Project Evaluation & Review Technique
True/FalseQuestion Mixed layouts are generally used in case of product is to be produced in different sizes/types:
contains too many componentsCorrect Answer TrueYour Answer True
True/FalseQuestion In case of two handed process chart, storage symbol is used when either hand is used as grip or
vice to hold an object.Correct Answer TrueYour Answer True
Match The FollowingQuestion Correct Answer Your Answer
Fixation of inventory level Reorder level Reorder level
Symptom of ill planned purchasing Over ordering Over ordering
Factor influencing material planning Lead time Lead time
Net requirement of material under MRP Stock on hand Stock on hand
Multiple Choice Multiple AnswerQuestion Following are the commonly used factors considered for evaluation of layout in factor analysis
methodCorrect Answer Flow of material , Equipment utilization , Working conditionYour Answer Flow of material , Equipment utilization , Working condition
Multiple Choice Multiple AnswerQuestion Which of the following are examples of pure materials?Correct Answer Bakeries , Ice factories , WoolenYour Answer Bakeries , Ice factories , Woolen
Multiple Choice Multiple AnswerQuestion Which of the following factors decide the choice between the cent percent and sampling
inspection?Correct Answer Nature of inspection , Natural tolerance versus design tolerance , Vendor's quality ratingYour Answer Nature of inspection , Natural tolerance versus design tolerance , Vendor's quality rating
Multiple Choice Single AnswerQuestion What do you mean by planned corrective manitenance which provides an opportunity to
undertake design modifications in the equipment to eliminate or reduce frequency of breakdowns.Correct Answer Design-out MaintenanceYour Answer Design-out Maintenance
Multiple Choice Single AnswerQuestion The product layout has following disadvantage
Correct Answer Layout is not flexibleYour Answer Layout is not flexible
Multiple Choice Multiple AnswerQuestion Which utilities are considered as infrastructural requirements?Correct Answer Disposal of waste , Power , WaterYour Answer Disposal of waste , Power , Water
Multiple Choice Multiple AnswerQuestion Which are the factors on which the structure of the transportation cost depends?Correct Answer Average distance of shipment , Characteristics of the commodity , Medium of shipmentYour Answer Average distance of shipment , Characteristics of the commodity , Medium of shipment
Multiple Choice Multiple AnswerQuestion Which are the three basic types of control chart by attribute?Correct Answer p-chart , c-chart , np-chartYour Answer p-chart , c-chart , np-chart
True/FalseQuestion It would not affect the project completion time if non-critical activities take little loner time
than planned.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion A good layout makes effective use of space. Utilization of space for a department like Stores
can be measured byCorrect Answer Proportion of Cubic volume space utilizedYour Answer Proportion of Cubic volume space utilized
Multiple Choice Single AnswerQuestion Process planning is the process ofCorrect Answer establishing shortest and most economic path of productionYour Answer establishing shortest and most economic path of production
Multiple Choice Single AnswerQuestion Who prepares the daily production report?Correct Answer Shop SupervisorYour Answer Shop Supervisor
Multiple Choice Multiple AnswerQuestion Which of the following are examples of gross materials?Correct Answer Timber , Iron ore , Sugar caneYour Answer Timber , Iron ore , Sugar cane
Multiple Choice Multiple AnswerQuestion Which of the following defects can be observed during preventive inspection by using human
senses?Correct Answer Deviation from normal sound , Excessive Vibration , Leakage of a gasYour Answer Deviation from normal sound , Excessive Vibration , Leakage of a gas
Multiple Choice Multiple AnswerQuestion Which of the following are the objectives of a good maintenance system?Correct Answer Elimination of unsafe conditions , Minimisation of wear and tear of machines , Ensuring
maximum plant availability
Your Answer Elimination of unsafe conditions , Minimisation of wear and tear of machines , Ensuringmaximum plant availability
Select The BlankQuestion Production control work is ________ in case of floor inspection as compared with the
centralised inspection.Correct Answer easierYour Answer easier
Select The BlankQuestion The easiest way to bring the delayed job within the promised delivery time by using extra shift
or weekly holiday is ________.Correct Answer Overtime workingYour Answer Overtime working
True/FalseQuestion Latest starting date is the latest finishing time minus activity duration.Correct Answer TrueYour Answer True
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.Correct Answer 0.01 to 10%Your Answer 0.01 to 10%
Select The BlankQuestion The ________ advocates maintenance procedures whereby the condition of the plant is
constantly watched through systematic inspection to unearth unhealthy conditions and preventiveCorrect Answer Preventive MaintenanceYour Answer Preventive Maintenance
Select The BlankQuestion The ________ breakdowns usually cost more, partly due to damage done to the adjustment
components and partly due to emergency actions.Correct Answer UnexpectedYour Answer Unexpected
Select The BlankQuestion The term ________ emplies the foregone profit due to inability of company to produce.Correct Answer Opportunity costYour Answer Opportunity cost
Multiple Choice Single AnswerQuestion Process type layout is suitable whenCorrect Answer there is wide variation in processing time of operationsYour Answer there is wide variation in processing time of operations
Select The BlankQuestion The ________ is the process of withdrawing the equipment from the production line,
dismantling it unitwise, visualising defects, effecting adjustments, replacing worn-out parts and finallybuilding it up to get desired accuracies.
Correct Answer ReconditioningYour Answer Reconditioning
True/False
Question One major difference between CPM and PERT is the former's adaptability for the projectswhere high degree of uncertainty prevails and activity times during performance are expected to varyconsiderably for certain activities.
Correct Answer FalseYour Answer False
True/FalseQuestion Kanban system is essentially a computer based system for production scheduling and controlCorrect Answer FalseYour Answer False
Select The BlankQuestion The ________ is the defect level for which lots are regarded as bad lots.Correct Answer Lot Tolerance Percentage DefectiveYour Answer Lot Tolerance Percentage Defective
Multiple Choice Single AnswerQuestion How dummy activities are shown in the time chart during project scheduling?Correct Answer Vertical linesYour Answer Dotted lines
Match The FollowingQuestion Correct Answer Your Answer
Factor Analysis Method to evaluate layouts Method to evaluate layouts
Minimization of production delays Objective of good layout Objective of good layout
Maximum visibility Principles of good layout Principles of good layout
Scale model Layout analysis Layout analysis
Multiple Choice Multiple AnswerQuestion In an organization there may not be a formal PPC department ifCorrect Answer Work is highly repetitive in nature , Planning activities are performed by the line staff ,
Number of workmen is not very largeYour Answer Work is highly repetitive in nature , Planning activities are performed by the line staff ,
Number of workmen is not very large
Multiple Choice Multiple AnswerQuestion Which three of the following are causes of continuous upward pattern of Xbar-R control chart?Correct Answer Wear of tool , Abnormal rise in temperature , Accumulation of dirtYour Answer Wear of tool , Abnormal rise in temperature , Accumulation of dirt
True/FalseQuestion A network should employ only those dummy activities which are absolutely necessary.Correct Answer TrueYour Answer True
Select The BlankQuestion The ________ includes preventive maintenance activities whose needs are identified through
inspection which requires stoppage of machines.Correct Answer Shutdown MaintenanceYour Answer Shutdown Maintenance
Multiple Choice Single AnswerQuestion What do you understand by identification of defects in materials, components, machining
processes or men to fix responsibility of defectives, thereby preventing or minimising occurance ofdefectives?
Correct Answer Preventive functionYour Answer Preventive function
Select The BlankQuestion OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the
probability of acceptance of ________.Correct Answer OneYour Answer One
Select The BlankQuestion A set of activities to keep an equipment in the specified condition is called as ________.Correct Answer MaintenanceYour Answer Maintenance
Multiple Choice Single AnswerQuestion One of the external factors influencing Material Planning isCorrect Answer Price trendsYour Answer Price trends
Multiple Choice Multiple AnswerQuestion What is indicated by the erratic pattern points falling above and below the control limits in the
Xbar-R-control chart?Correct Answer Defects in materials , Poorly trained operators , Frequent adjustments of machinesYour Answer Defects in materials , Poorly trained operators , Frequent adjustments of machines
True/FalseQuestion Inspection should be conducted prior to an operaion, after whose completion no rework
whatsoever is possible.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion What do you mean by CPM?Correct Answer Critical Path MethodYour Answer Critical Path Method
True/FalseQuestion Planned lubrication is said to be the nervous system of the equipment.Correct Answer TrueYour Answer True
True/FalseQuestion In case of X bar-R charts,it is ensured that the assignable causes are detected before the
tolerances are violated, upper and lower statistical limits are worked out and inserted into a chart.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Provision of drainage facilities is important for the following type of industryCorrect Answer Chemical ProcessYour Answer Chemical Process
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple AnswerQuestion How the concept of float is helpful to planners?Correct Answer To minimize the requirement of resources , To prevent peaks and valleys in requirement
of resources , To decide priorities in allocation of resourcesYour Answer To decide priorities in allocation of resources , To minimize the requirement of resources ,
To prevent peaks and valleys in requirement of resources
True/FalseQuestion Floor inspection delays the identification of faults which can not be rectified immediately
before large lots are spoiled.Correct Answer FalseYour Answer False
Multiple Choice Single AnswerQuestion What is the location of lower control limit in the X bar-R control chart?Correct Answer 3 standard deviations below central lineYour Answer 3 standard deviations below central line
Multiple Choice Multiple AnswerQuestion Which of the following variables which operate periodically are the reasons for the cyclic
pattern depicting peaks and valleys during Xbar-R control chart?Correct Answer Wornout positions , Fatigue , Roller eccentricityYour Answer Wornout positions , Fatigue , Roller eccentricity
Select The BlankQuestion The ________ pertain to the climatic conditions which the component , product or material
should withstand.Correct Answer Environmental specificationsYour Answer Environmental specifications
Multiple Choice Multiple AnswerQuestion Order preparation process for products manufatured to order requires following documentsCorrect Answer Sales Order , Work order , Shop orderYour Answer Sales Order , Work order , Shop order
Multiple Choice Single AnswerQuestion What do you understand by the measurement of work to establish allowed time for a job for the
defined method?Correct Answer Work measurementYour Answer Work measurement
True/FalseQuestion Suburban location provides the compromise netween rural and urban locations.Correct Answer TrueYour Answer True
Match The FollowingQuestion Correct Answer Your Answer
Scale model Layout analysis Technique for evolving and analysis of layouts
Factor Analysis Method to evaluate layouts Method to evaluate layouts
Minimization of production delays Objective of good layout Objective of good layout
Maximum visibility Principles of good layout Principles of good layout
Multiple Choice Multiple AnswerQuestion Plant Layout is concerned with optimum arrangement of the followingCorrect Answer Storage space , Machines , Material Handling EquipmentYour Answer Storage space , Machines , Material Handling Equipment
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to entity can be defined
asCorrect Answer OperationYour Answer Production
True/FalseQuestion A sampling plan which perfectly discriminates will have vertical OC curve.Correct Answer TrueYour Answer False
Multiple Choice Multiple AnswerQuestion Which kind of possible defectives can be reduced due to first off inspection?Correct Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine
set upYour Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine
set up
Multiple Choice Multiple AnswerQuestion Which of the following concepts must be understood for the achievement of quality?Correct Answer Quality of conformance , Purpose of product , Quality of designYour Answer Quality of conformance , Quality of design
Multiple Choice Single AnswerQuestion Site factors for plant location includeCorrect Answer Suitability of landYour Answer Suitability of land
Multiple Choice Single AnswerQuestion The ratio of output to input of a production system is commonly known asCorrect Answer ProductivityYour Answer Productivity
Multiple Choice Multiple AnswerQuestion Which of the following cases indicated that the operation has occurred?Correct Answer Movement of components to assembly section , Raw material movement , A worker's
trip to grinder to sharpen the toolsYour Answer Movement of components to assembly section , Raw material movement , A worker's trip
to grinder to sharpen the tools
Multiple Choice Single AnswerQuestion Which kind of gauge consists of electrical contacts operating a series of colloured signal lamps
which indicate whether the dimension is correct, oversize or undersize?Correct Answer Multiple gaugingYour Answer Multiple gauging
Select The Blank
Question A ________helps to avoid crowding of jobs at a particular machine by change of route of someof the jobs or by diverting work to other machine.
Correct Answer Control boardYour Answer Forwarding note
True/FalseQuestion Proper care and storage is not an essential part of a well planned lubrication system.Correct Answer FalseYour Answer False
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any product/s is calledCorrect Answer FactoryYour Answer Factory
Multiple Choice Multiple AnswerQuestion Major contributors in the development of Control Charts, Sampling plan areCorrect Answer F H Dodge , H G Roming , Walter SchewhartYour Answer F H Dodge , Walter Schewhart , L H C Tippet
Multiple Choice Single AnswerQuestion How to claculate the producer risk in the OC Curve?Correct Answer Probability that a good lot will be rejected by the samplingYour Answer Probability that a good lot will be rejected by the sampling
Multiple Choice Single AnswerQuestion How many types of charts are used for the purpose of method study?Correct Answer FourYour Answer Eight
Multiple Choice Multiple AnswerQuestion Which three of the following options can be used to reduce the duration of activity during
project crashing?Correct Answer Allocating more manpower and machines than originally planned for. , Working
additional shifts or overtime. , Awarding work to vendors who charge extra but expedite deliveries.Your Answer Allocating more manpower and machines than originally planned for. , Working additional
shifts or overtime. , Awarding work to vendors who charge extra but expedite deliveries.
Multiple Choice Single AnswerQuestion What does head of an arrow represent?Correct Answer End of an activityYour Answer End of an activity
Match The FollowingQuestion Correct Answer Your Answer
Combined Layout Mixed Layout Project Layout
Fixed Position Layout Project Layout job layout
Product Layout Line Layout Mixed Layout
Process Layout Functional Layout Functional Layout
Multiple Choice Single Answer
Question How to reveal the capability of the sampling plan to discriminate between good lots and badlots?
Correct Answer Operating characteristics curve ( OC )Your Answer Operating characteristics curve ( OC )
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of the condition of an
item from routine or continuous checking.Correct Answer Condition monitoringYour Answer Condition monitoring
Select The BlankQuestion The ________ is the probability that a good lot will be rejected by the sampling plan.Correct Answer Producer's riskYour Answer Producer's risk
Multiple Choice Multiple AnswerQuestion Which of the following are minimum requirement for a good quality of design?Correct Answer Resonable procurement time , Resonable cost , Resonable manufacturing timeYour Answer Resonable cost , Resonable procurement time , Resonable manufacturing time
Select The BlankQuestion The ________ is a set of tools and techniques by which products are made to comply with the
specifications at minimum cost to the firm.Correct Answer Quality control systemYour Answer Quality control system
Select The BlankQuestion The ________ is necessary when the job requires detailed of one or more of the job
characteristics with the help of special equipment which is not available at the producing company.Correct Answer Inspection orderYour Answer Inspection order
True/FalseQuestion Delay in completion of projects result in unwelcome additions to the fixed manufacturing
expenses.Correct Answer TrueYour Answer True
Select The BlankQuestion One detachable ticket is prepared for each ________.Correct Answer OperationYour Answer Operation
True/FalseQuestion Objective of Work Study is to improve ProductivityCorrect Answer TrueYour Answer False
True/FalseQuestion As a general rule, the number of tail event of an activity is more than that of it's head event.Correct Answer FalseYour Answer False
Multiple Choice Single AnswerQuestion How critical activities are shown in the time chart during project scheduling?
Correct Answer Solid linesYour Answer Solid lines
Multiple Choice Multiple AnswerQuestion Which of the following products should be produced by using mass production?Correct Answer Refrigerator , Tyre for automobile , Television SetYour Answer Refrigerator , Tyre for automobile , Television Set
Select The BlankQuestion Work study is also called ________ studyCorrect Answer Time and MotionYour Answer Time and Motion
Multiple Choice Multiple AnswerQuestion What are the benefits of reconditioning?Correct Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps
to plan requirement of replacement sparesYour Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to
plan requirement of replacement spares
Select The BlankQuestion A good maintenance system is not a luxary but a ________.Correct Answer NecessityYour Answer Necessity
Multiple Choice Single AnswerQuestion Which of the following technique is event oriented ?Correct Answer Project Evaluation & Review TechniqueYour Answer Project Evaluation & Review Technique
Multiple Choice Multiple AnswerQuestion Which of the following is not the characteristic of Project Production?Correct Answer Continuous flow of material , Highly mechanised material handling , Virtually zero
manufacturing cycle timeYour Answer Continuous flow of material , Highly mechanised material handling , Virtually zero
manufacturing cycle time
True/FalseQuestion Breakdown of a machine is normally accompanied by added machine setup cost such as
resetting of jobs or change of jobs.Correct Answer TrueYour Answer True
True/FalseQuestion The problems of congestion, bottlenecks and backtracking can not be visualized by using
templates and models.Correct Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Which of the following are illustrations of inspection?Correct Answer Physical count of incoming material against the quantity mentioned in delivery challan ,
A dimensional check with measuring instrument , Visual check of burrs and finishYour Answer Physical count of incoming material against the quantity mentioned in delivery challan ,
Visual check of burrs and finish , Check the operator performance
POM assgn : Senthil
Multiple Choice Multiple AnswerQuestion Which of the following aspects are essential to ensure quality of purchased
items?Correct Answer Defining right quality for the job , Vendor performance evaluation , Making
sure that suppliers understand the requirementsYour Answer Defining right quality for the job , Vendor performance evaluation , Making
sure that suppliers understand the requirements
Select The BlankQuestion The ________ breakdowns usually cost more, partly due to damage done
to the adjustment components and partly due to emergency actions.Correct Answer Unexpected
Your Answer Unexpected
True/FalseQuestion After goods have been manufactured, route sheets and operation layouts
should not be collected back.Correct Answer False
Your Answer False
True/FalseQuestion In case of centralised inspection, inspection rooms generally become
bottleneck and cause delay in taking action regarding rejection or rework.Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion MRP is based on the concept of inventory demand which is of following type
Correct Answer Dependent and independent
Your Answer Dependent and independent
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any
product/s is calledCorrect Answer Factory
Your Answer Factory
Multiple Choice Multiple AnswerQuestion Components of Production Management include
Correct Answer Capacity Planning , Job Design , Production Planning
Your Answer Capacity Planning , Job Design , Production Planning
Multiple Choice Single Answer
Question Which of the following is the criteria for the percentage defectives in thezone of the indecision?
Correct Answer Lots having the percentage defective more than AQL but less than LPTD
Your Answer Lots having the percentage defective more than AQL but less than LPTD
Multiple Choice Multiple AnswerQuestion Which of the following are examples of addition during recording for method
study?Correct Answer Brazing , Welding , Riveting
Your Answer Brazing , Welding , Riveting
Select The BlankQuestion The easiest way to bring the delayed job within the promised delivery time
by using extra shift or weekly holiday is ________.Correct Answer Overtime working
Your Answer Overtime working
Select The BlankQuestion An Ideal OC curve is ________ shaped curve that accpets all the lots with
quality equal to or better than AQL .Correct Answer Rectangular
Your Answer Rectangular
Multiple Choice Multiple AnswerQuestion Which of the following causes can be responsible for derailing the
production schedule in a factory?Correct Answer Errors in drawings , Delay in receipt of material from vendor , Excessive
absenteeismYour Answer Errors in drawings , Delay in receipt of material from vendor , Excessive
absenteeism
Multiple Choice Multiple AnswerQuestion Which of the following situations demand the economic consideration while
selecting a job for method study?Correct Answer Unorderly movement of men and materials , Excessive process defectives ,
Too many suggestions received for improvement from a department orsection
Your Answer Unorderly movement of men and materials , Excessive process defectives ,Inconsistent quality
True/FalseQuestion During set up of X bar-R control chart, control limts should be practically
revised from time to time as additional data is accumulated.Correct Answer True
Your Answer False
Multiple Choice Multiple Answer
Question Which of the following are the basic requirements of quality standard?
Correct Answer Deifinite , Undesrstandable , Economically viable
Your Answer Absolute uniformity , Undesrstandable , Economically viable
Match The FollowingQuestion Correct Answer Your Answer
Toung Sweet Sweet
Eye Crack Crack
Nose Burnout Burnout
Ear Impact Roughness
Select The BlankQuestion The ________ is the defect level for which lots are regarded as bad lots.
Correct Answer Lot Tolerance Percentage Defective
Your Answer Acceptable quality level
True/FalseQuestion Floor inspection delays the identification of faults which can not be rectified
immediately before large lots are spoiled.Correct Answer False
Your Answer False
True/FalseQuestion Cent percent inspection is required on WIP prior to the key, critical or costly
operation.Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion The document which incorporates details of process planning for a job is
calledCorrect Answer Route Sheet
Your Answer Route Sheet
True/FalseQuestion Repetitive movements between work stations which are difficult to be
traced on string diagrams can be conveniently shown on flow diagrams.Correct Answer False
Your Answer True
Multiple Choice Single AnswerQuestion Which of the following is the most popular technique for Project Production?
Correct Answer PERT & CPM
Your Answer PERT & CPM
Multiple Choice Single AnswerQuestion Technique of Value Engineering can be effectively employed in design of a
product toCorrect Answer To meet the intended function at lowest cost
Your Answer To meet the intended function at lowest cost
Multiple Choice Single AnswerQuestion What can be the worst effect due to excessive vibration?
Correct Answer Breakdown
Your Answer Breakdown
Multiple Choice Single AnswerQuestion What is the relation between duration of an activity and length of an arrow?
Correct Answer No relation
Your Answer No relation
Multiple Choice Single AnswerQuestion What is the nature of the sampling plan for critical defects?
Correct Answer Tight
Your Answer Tight
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of
the condition of an item from routine or continuous checking.Correct Answer Condition monitoring
Your Answer Condition monitoring
Multiple Choice Multiple AnswerQuestion Which of the following are important considerations concerning activity
times?Correct Answer Activity time should be obtained from the person responsible for the
completion of an activity , Activity time must be independent of anyinfluence which the preceding or succeeding activity may have on it. ,Activity time may assume that just the normal quantity of resourcesrequired to carry out the activity are available.
Your Answer Activity time should be obtained from the person responsible for thecompletion of an activity , Activity time must be independent of any
influence which the preceding or succeeding activity may have on it. ,Activity time may assume that just the normal quantity of resourcesrequired to carry out the activity are available.
Multiple Choice Single AnswerQuestion Which of the following techniques is used by industrial engineering
department to obtain the utilisation index?Correct Answer Work Sampling Studies
Your Answer Break Even Analysis
Multiple Choice Multiple AnswerQuestion Which of the following factors play important role while selecting or
rejecting a particular site from legislation and taxation point of view?Correct Answer Labour laws , Building codes , Policies regarding issue of licences
Your Answer Labour laws , Building codes , Policies regarding issue of licences
Multiple Choice Multiple AnswerQuestion Which of the following cases can be referred as operation in method study
recording?Correct Answer Change in physical characteristic , Consumption of physical effort , Change
in chemical characteristicYour Answer Change in physical characteristic , Consumption of physical effort ,
Movement of material
True/FalseQuestion An activity can share the same tail event and same head event with any
other activity.Correct Answer False
Your Answer True
Select The BlankQuestion The ________ must ensure that the product satisfy the functional
requirements of it's usage.Correct Answer Quality of design
Your Answer Quality of design
Multiple Choice Multiple AnswerQuestion Which of the following are examples of pure materials?
Correct Answer Bakeries , Ice factories , Woolen
Your Answer Bakeries , Ice factories , Woolen
Select The BlankQuestion The ________ are the definitions of the measurable as well as
nonmeasurable characteristics of the product.Correct Answer Specifications
Your Answer Specifications
Multiple Choice Single AnswerQuestion Site factors for plant location include
Correct Answer Suitability of land
Your Answer Suitability of land
Select The BlankQuestion The ________ is the probability that a good lot will be rejected by the
sampling plan.Correct Answer Producer's risk
Your Answer Producer's risk
Multiple Choice Multiple AnswerQuestion Which of the following defects can be observed during preventive inspection
by using human senses?Correct Answer Deviation from normal sound , Excessive Vibration , Leakage of a gas
Your Answer Deviation from normal sound , Excessive Vibration , Leakage of a gas
Select The BlankQuestion The ________ includes preventive maintenance activities whose needs are
identified through inspection which requires stoppage of machines.Correct Answer Shutdown Maintenance
Your Answer Working Maintenance
True/FalseQuestion Independent float either affects the float of preceding activities or that of
succeeding activities.Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Lack of material planning results in the following
Correct Answer Over ordering , under ordering , stockouts
Your Answer Over ordering , under ordering , stockouts
True/FalseQuestion F W Taylor devised a system for classifying motions into basic divisions
called TherbligsCorrect Answer False
Your Answer False
Select The Blank
Question Work study is also called ________ study
Correct Answer Time and Motion
Your Answer Time and Motion
Match The FollowingQuestion Correct Answer Your Answer
Factor Analysis Method to evaluate layouts Technique for evolving andanalysis of layouts
Minimization of production delays Objective of good layout Objective of good layout
Maximum visibility Principles of good layout Principles of good layout
Scale model Layout analysis Method to evaluate layouts
Multiple Choice Single AnswerQuestion Following is one of the techniques used for Material Planning for high value
materialCorrect Answer MRP
Your Answer MRP
Multiple Choice Single AnswerQuestion What do you understand by totality of features and characteristics of a
product or service that bears on it's ability to satisfy the customer?Correct Answer Quality
Your Answer Quality
Select The BlankQuestion One detachable ticket is prepared for each ________.
Correct Answer Operation
Your Answer Worker
POM assgn : Senthil
True/FalseQuestion Site selection should also take into account topography and soil structure of the land.
CorrectAnswer
True
Your Answer True
Multiple Choice Single AnswerQuestion Which manufacturing method is ideal for the use of air gauges as inspection device?
CorrectAnswer
Mass
Your Answer Batch
True/FalseQuestion Kanban system is essentially a computer based system for production scheduling and
controlCorrect
AnswerFalse
Your Answer False
Multiple Choice Multiple AnswerQuestion Which are three different bases to establish an activity time?
CorrectAnswer
Past experience , Judgement , Historical data
Your Answer Past experience , Judgement , Historical data
True/FalseQuestion Inspection order is must even for simple jobs which can be inspected by shop inspector
with the tooling available on shop.Correct
AnswerFalse
Your Answer False
Multiple Choice Single AnswerQuestion Which of the following policies is advisable in case of low product variety and large
volumes?Correct
AnswerLow Skilled Labour & Special Purpose Machines
Your Answer Semiskilled Labour & General Purpose Machines
Select The BlankQuestion Capacity decisions have a direct influence on performance of production system in
respect of ________Correct
AnswerDelivery performance
Your Answer Delivery performance
True/False
Question In case of X bar, if the process is not under control indicated by some points fallingoutside the control limits, such points outside the control limits are eliminated and newtrial control limits for the remaining points are computed.
CorrectAnswer
True
Your Answer True
Select The BlankQuestion The ________ pertain to the climatic conditions which the component , product or
material should withstand.Correct
AnswerEnvironmental specifications
Your Answer Environmental specifications
Select The BlankQuestion The ________ is necessary when the job requires detailed of one or more of the job
characteristics with the help of special equipment which is not available at the producingcompany.
CorrectAnswer
Inspection order
Your Answer Job card
Match The FollowingQuestion Correct Answer Your Answer
Crash cost of an activity Cc Cc
Normal time of an activity Tn Cn
Crash time of activity Tc Tc
Normal cost of an activity Cn Tn
True/FalseQuestion Lubrication survey should never be done for a new machine.
CorrectAnswer
False
Your Answer False
Multiple Choice Single AnswerQuestion A good plant layout helps in
CorrectAnswer
Reducing handling costs
Your Answer Reducing handling costs
Multiple Choice Single AnswerQuestion Out of two basic criteria for the selection of a manufacturing method, one is, it must be
able to meet the specifications of final product and the other is, it must be
CorrectAnswer
Cost effective method
Your Answer Cost effective method
Multiple Choice Multiple AnswerQuestion Which of the following is a part of preparing manufacturing order set as a primary
function of dispatching?Correct
AnswerOperational layouts , Move orders , Pre-filled stores issue orders
Your Answer Operational layouts , Move orders , Pre-filled stores issue orders
Select The BlankQuestion A ________ is another form of subcontracting.
CorrectAnswer
Hiring capacity
Your Answer Hiring capacity
Multiple Choice Multiple AnswerQuestion Which are the major types of defects?
CorrectAnswer
Minor , Major , Critical
Your Answer Minor , Critical , General
Multiple Choice Single AnswerQuestion Which kind of labour force is required in case of Jobbing Production?
CorrectAnswer
Highly Skilled
Your Answer Highly Skilled
Multiple Choice Multiple AnswerQuestion Which are the sources of information to update the progress card daily?
CorrectAnswer
Detachable ticket , Daily production report , Job Card
Your Answer Detachable ticket , Daily production report , Job Card
True/FalseQuestion In case of forward pass computation, the earliest event time of the first event is zero.
CorrectAnswer
True
Your Answer True
Multiple Choice Multiple AnswerQuestion Which are the distinct functions of scientific quality control?
CorrectAnswer
Acceptance function , Preventive function , Assurance function
Your Answer Acceptance function , Preventive function , Assurance function
Multiple Choice Multiple AnswerQuestion Which of the following are examples of specifications?
CorrectAnswer
Commercial standards , Assembly and testing instructions , Bill of material
Your Answer Production schedule , Commercial standards , Bill of material
Multiple Choice Single AnswerQuestion Technique which can help an organization to reduce inventory is called
CorrectAnswer
MRP
Your Answer MRP
Multiple Choice Single AnswerQuestion In case of Batch Production which kind of labour is expected?
CorrectAnswer
Skilled in one specific Manufacturing Process
Your Answer Semiskilled
Multiple Choice Multiple AnswerQuestion Major contributors in the development of Control Charts, Sampling plan are
CorrectAnswer
F H Dodge , H G Roming , Walter Schewhart
Your Answer F H Dodge , H G Roming , Walter Schewhart
Multiple Choice Single AnswerQuestion What is represented by an arrow in a network?
CorrectAnswer
Activity
Your Answer Event
True/FalseQuestion Feasibility of time schedule requires that an activity be scheduled before any of it's
predecessors are scheduled.Correct
AnswerFalse
Your Answer True
Multiple Choice Single AnswerQuestion Which method of critical path determination begins with the end event and moves
backward to the start event of the project network?Correct
AnswerBackward pass computation
Your Answer Backward pass computation
True/FalseQuestion Operation process charts though indicates the sequence of events but do not show
movements.Correct
AnswerTrue
Your Answer True
Multiple Choice Single AnswerQuestion Which kind of relationship exists between those activities which can be carried out
simultaneously and both activities require definite time to finish?Correct
AnswerConcurrent activities
Your Answer Concurrent activities
True/FalseQuestion One major difference between CPM and PERT is the former's adaptability for the projects
where high degree of uncertainty prevails and activity times during performance areexpected to vary considerably for certain activities.
CorrectAnswer
False
Your Answer False
Multiple Choice Multiple AnswerQuestion Following are some of the Principles of Management advocated by F W Taylor
CorrectAnswer
Selection of best worker for each particular task , Division of work between worker andmanagement , Training and development of the workmen
Your Answer Selection of best worker for each particular task , Division of work between worker andmanagement , Training and development of the workmen
Multiple Choice Single AnswerQuestion Inadequate production capacity ultimately leads to
CorrectAnswer
Poor Customer Service
Your Answer Poor Machine Utilization
Multiple Choice Multiple AnswerQuestion Which of the following schedules are recommended to prepare and follow as a part of
preventive maintenance system?Correct
AnswerPreventive inspection schedule , Cleaning and upkeep schedule , Lubrication schedule
Your Answer Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication schedule
Multiple Choice Single AnswerQuestion What is the reason of fluctuations, if the control chart evaluates that the process is in a
state of statistical control?Correct
AnswerRandom variability
Your Answer Random variability
True/False
Question Even in a small set up wherein maintenance of a machine is looked after by a mechaniccum worker, he should report directly to the person responsible for the manufacturingoperations.
CorrectAnswer
True
Your Answer True
Multiple Choice Single AnswerQuestion What do you mean by the chart on which the major activities and entry points of
materials are recorded to have graphic view of operations and inspections involved in theprocess?
CorrectAnswer
Operation process chart
Your Answer Operation process chart
Multiple Choice Single AnswerQuestion Plant Layout decisions are considered to be
CorrectAnswer
Strategic
Your Answer Strategic
Multiple Choice Multiple AnswerQuestion What are the uses of the instruction manual provided by the manufacturer of a machine?
CorrectAnswer
It gives instructions regarding installation and operation of the equipment , It containsnote on common troubles with causes and remedies for troubleshooting , It enlistspoints, frequency and type of lubrication
Your Answer It gives instructions regarding installation and operation of the equipment , It containsnote on common troubles with causes and remedies for troubleshooting , It enlistspoints, frequency and type of lubrication
Multiple Choice Single AnswerQuestion When should operator or supervisor is supposed to sign the perforated route sheet?
CorrectAnswer
After completion of operation
Your Answer After completion of operation
Multiple Choice Multiple AnswerQuestion Which of the following situations demand that the human consideration should be given
preference over other considerations?Correct
AnswerInconsistent earnings where the earnings are tied to output , Poor morale evidenced bypetty or trivial complaints , Repeated cases of accidents and health hazards
Your Answer Excessive rejections , Poor morale evidenced by petty or trivial complaints , Repeatedcases of accidents and health hazards
True/FalseQuestion A network can have more than one starting event but completion event must be only
one.Correct
AnswerFalse
Your Answer True
Multiple Choice Single AnswerQuestion Which is the ideal place to write a description of an activity in a network?
CorrectAnswer
Above the arrow
Your Answer Above the arrow
Multiple Choice Multiple AnswerQuestion Which features should be covered by the specifications of materials while defining the
qualitative requirement?Correct
AnswerMaterial composition , Dimensions , Any heat treatment if required
Your Answer Material composition , Dimensions , Any heat treatment if required
Match The Following
Question Correct Answer Your Answer
When to inspect Stages of inspection Stages of inspection
What to inspect Specification Specification
How to inspect Inspection devices Inspection devices
How much to inspect Sampling or cent percentinspection
Sampling or cent percentinspection
Multiple Choice Multiple AnswerQuestion How the concept of float is helpful to planners?
CorrectAnswer
To decide priorities in allocation of resources , To minimize the requirement of resources, To prevent peaks and valleys in requirement of resources
Your Answer To decide priorities in allocation of resources , To minimize the requirement of resources, To prevent peaks and valleys in requirement of resources
POM assgn : Senthil
Multiple Choice Single AnswerQuestion One of the sophisticated operations research techniques used in material
planning isCorrect Answer Dynamic programming
Your Answer Dynamic programming
True/FalseQuestion Job life is one of the factors that influence Process Planning
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Following are some of the Principles of Management advocated by F W
TaylorCorrect Answer Selection of best worker for each particular task , Division of work between
worker and management , Training and development of the workmenYour Answer Selection of best worker for each particular task , Division of work between
worker and management , Training and development of the workmen
Multiple Choice Single AnswerQuestion Product layout is employed for manufacturing following products
Correct Answer refrigirators
Your Answer ships
Select The BlankQuestion Work study is also called ________ study
Correct Answer Time and Motion
Your Answer Job
Multiple Choice Multiple AnswerQuestion Which of the following situations demand the technical consideration while
selecting a job for method study?Correct Answer Jobs having inconsistent quality , Operations inviting frequent requests
from supervisors for relaxation in allowed time because of variations inmaterials and tool performance , Jobs in which too many man-hours arespend in checking and rechecking work
Your Answer Jobs having inconsistent quality , Operations inviting frequent requestsfrom supervisors for relaxation in allowed time because of variations inmaterials and tool performance , Jobs in which too many man-hours arespend in checking and rechecking work
True/FalseQuestion Quality control determines what, when, and how much to inspect while
inspection actually conducts examination of goods.Correct Answer True
Your Answer True
Select The BlankQuestion The ________ is the maximum percentage defective that for the purpose of
sampling inspection can be considered satisfactory as a process average.Correct Answer Acceptable quality level
Your Answer Producer's risk
Select The BlankQuestion The term ________ emplies the foregone profit due to inability of company
to produce.Correct Answer Opportunity cost
Your Answer Opportunity cost
True/FalseQuestion All activities must not be tied up into the network
Correct Answer False
Your Answer False
True/FalseQuestion F W Taylor devised a system for classifying motions into basic divisions
called TherbligsCorrect Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Which of the following may be the objectives of project crashing?
Correct Answer To achieve uniformity in requirement of resources , To complete the projectin the least possible time , To reduce project cost below it's normal cost
Your Answer To complete the project in the least possible time , To achieve uniformity inrequirement of resources , To improve the labour efficiency
Multiple Choice Multiple AnswerQuestion What is indicated by the hugging points lying close to mean of the process
in X bar-R- control chart?Correct Answer Biases in measurements , Recording done without actual measurements ,
Improper selection of samplesYour Answer Recording done without actual measurements , Improper selection of
samples
Multiple Choice Single AnswerQuestion Following is one of the techniques used for Material Planning for high value
materialCorrect Answer MRP
Your Answer MRP
Select The BlankQuestion The ________ is the probability that a good lot will be rejected by the
sampling plan.Correct Answer Producer's risk
Your Answer Producer's risk
Multiple Choice Single AnswerQuestion One of the characterstic of layout is about the flow of material / personnel.
In a good layout the flow should beCorrect Answer Unidirectional
Your Answer Unidirectional
True/FalseQuestion The event numbers as far as possible reflect the logical relationships of the
activities.Correct Answer True
Your Answer False
Multiple Choice Multiple AnswerQuestion Material Requirement Planning is very useful in following situations
Correct Answer Long Lead time for procurement , Several levels of assemblies in product ,Long manufacturing cycle
Your Answer Long Lead time for procurement , Several levels of assemblies in product ,Long manufacturing cycle
True/FalseQuestion Cent percent inspection is often more practical and economical than
sampling inspection.Correct Answer False
Your Answer False
Select The BlankQuestion The ________ must ensure that the product satisfy the functional
requirements of it's usage.Correct Answer Quality of design
Your Answer Quality of conformance
True/FalseQuestion Both, preventive and breakdown maintenance work must be assigned to
the same team.Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion Following is one of the tasks of Production Control
Correct Answer Actual issue of forms and documents
Your Answer Actual issue of forms and documents
Multiple Choice Single AnswerQuestion Process Engineer does not get sufficient time for designing tooling for most
economic production run whenCorrect Answer Delivery time is less
Your Answer Delivery time is less
Multiple Choice Multiple AnswerQuestion Components of Production Management include
Correct Answer Capacity Planning , Job Design , Production Planning
Your Answer Capacity Planning , Production Planning , Manpower Planning
Multiple Choice Multiple AnswerQuestion Which of the following products should be produced by using mass
production?Correct Answer Refrigerator , Tyre for automobile , Television Set
Your Answer Refrigerator , Tyre for automobile , Television Set
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to
entity can be defined asCorrect Answer Operation
Your Answer Manufacturing
Select The BlankQuestion A good maintenance system is not a luxary but a ________.
Correct Answer Necessity
Your Answer Necessity
Multiple Choice Single AnswerQuestion What is the specific name for the Gantt chart when it shows at a glance the
scheduling of various operations involved in a job?Correct Answer Job Schedule
Your Answer Load Chart
Select The BlankQuestion A set of activities to keep an equipment in the specified condition is called
as ________.Correct Answer Maintenance
Your Answer Maintenance
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to complete an
activity within it's crashed time?Correct Answer Crash cost
Your Answer Crash cost
Multiple Choice Multiple AnswerQuestion Which of the following factors decide the choice between the cent percent
and sampling inspection?Correct Answer Nature of inspection , Natural tolerance versus design tolerance , Vendor's
quality ratingYour Answer Nature of inspection , Natural tolerance versus design tolerance , Vendor's
quality rating
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge
of the condition of an item from routine or continuous checking.Correct Answer Condition monitoring
Your Answer Condition monitoring
Multiple Choice Multiple AnswerQuestion Which of the following are examples of attributes?
Correct Answer Cracks , Burrs , Texture
Your Answer Cracks , Burrs , Texture
Multiple Choice Single AnswerQuestion Which of the following is the criteria for the percentage defectives in the
zone of the indecision?Correct Answer Lots having the percentage defective more than AQL but less than LPTD
Your Answer Lots having the percentage defective more than AQL but less than LPTD
Multiple Choice Single AnswerQuestion In mass/batch production organizations where goods are produced for
stocking, Work Order is raised on the basis ofCorrect Answer Sales Programme
Your Answer Sales Order
Match The FollowingQuestion Correct Answer Your Answer
Fixed Position Layout Project Layout Functional Layout
Product Layout Line Layout Project Layout
Process Layout Functional Layout job layout
Combined Layout Mixed Layout Mixed Layout
Multiple Choice Single AnswerQuestion What do you understand by the measurement of work to establish allowed
time for a job for the defined method?Correct Answer Work measurement
Your Answer Work measurement
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot may vary
between ________.Correct Answer 0.01 to 10%
Your Answer 0.01 to 10%
True/FalseQuestion Objective of Work Study is to improve Productivity
Correct Answer True
Your Answer False
Multiple Choice Multiple AnswerQuestion Which are the distinct functions of scientific quality control?
Correct Answer Acceptance function , Preventive function , Assurance function
Your Answer Acceptance function , Feedback function , Preventive function
Match The FollowingQuestion Correct Answer Your Answer
Interruption for machineutilisation
Preventive maintenance Preventive maintenance
Input for scheduling Overlapping of operations Strings
Technique of scheduling Critical Path Analysis Critical Path Analysis
Scheduling Device Strings Blackboard
Select The BlankQuestion An Ideal OC curve is ________ shaped curve that accpets all the lots with
quality equal to or better than AQL .Correct Answer Rectangular
Your Answer Rectangular
True/False
Question Breakdown of machines, absenteeism of worker does not dislocate themanufacturing activity in process layout
Correct Answer True
Your Answer True
True/FalseQuestion Since value of c can never be negativee, hence" if LCLp works out to be
negative, it is taken as zero."Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion Who prepares the daily production report?
Correct Answer Shop Supervisor
Your Answer Worker
True/FalseQuestion The dispatching function is of very importance in flow and mass production
units.Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Which are major benefits of identifying the critical path?
Correct Answer It helps to identify the set of activities and events which are critical and assuch must be carefully controlled and monitored , It identifies activities tobe given preference in allocation of resources. , It helps to exercise "controlby exception".
Your Answer It helps to identify the set of activities and events which are critical and assuch must be carefully controlled and monitored , It helps to exercise"control by exception".
POM assgn : Senthil
Multiple Choice Single AnswerQuestion MRP is based on the concept of inventory demand which is of following type
Correct Answer Dependent and independent
Your Answer Dependent and independent
Multiple Choice Single AnswerQuestion Main objective of a good plant layout is
Correct Answer Reduce material handling cost
Your Answer Reduce material handling cost
True/FalseQuestion As a general rule, the number of tail event of an activity is more than that
of it's head event.Correct Answer False
Your Answer False
Select The BlankQuestion The ________ is the probability that a good lot will be rejected by the
sampling plan.Correct Answer Producer's risk
Your Answer Producer's risk
Multiple Choice Multiple AnswerQuestion Which of the following are important considerations concerning activity
times?Correct Answer Activity time should be obtained from the person responsible for the
completion of an activity , Activity time must be independent of anyinfluence which the preceding or succeeding activity may have on it. ,Activity time may assume that just the normal quantity of resourcesrequired to carry out the activity are available.
Your Answer Activity time should be obtained from the person responsible for thecompletion of an activity , Activity time must be independent of anyinfluence which the preceding or succeeding activity may have on it. ,Activity time may assume that just the normal quantity of resourcesrequired to carry out the activity are available.
Select The BlankQuestion The ________ pertain to the climatic conditions which the component ,
product or material should withstand.Correct Answer Environmental specifications
Your Answer Environmental specifications
Multiple Choice Multiple AnswerQuestion Following are some of the factors considered for evaluation of alternative
layouts
Correct Answer Flow of Material , Equipment utilization , Ease of supervision
Your Answer Flow of Material , Ease of supervision , Delivery performance
Multiple Choice Multiple AnswerQuestion Which of the following are assignable cause?
Correct Answer Large varaitions in hardness of material , Tool wear , Errors in setting
Your Answer Large varaitions in hardness of material , Tool wear , Errors in setting
True/FalseQuestion All activities must not be tied up into the network
Correct Answer False
Your Answer False
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot may vary
between ________.Correct Answer 0.01 to 10%
Your Answer 0.01 to 10%
True/FalseQuestion In case of X bar, if the process is not under control indicated by some
points falling outside the control limits, such points outside the controllimits are eliminated and new trial control limits for the remaining pointsare computed.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion What is the base for considering activity time as single time estimate or
three time estimate?Correct Answer Level of uncertainty
Your Answer Availability of labour
Select The BlankQuestion The ________ is the maximum percentage defective that for the purpose of
sampling inspection can be considered satisfactory as a process average.Correct Answer Acceptable quality level
Your Answer Acceptable quality level
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to complete an
activity within it's normal time?
Correct Answer Normal cost
Your Answer Normal cost
Select The BlankQuestion A good maintenance system is not a luxary but a ________.
Correct Answer Necessity
Your Answer Necessity
Select The BlankQuestion A ________helps to avoid crowding of jobs at a particular machine by
change of route of some of the jobs or by diverting work to other machine.Correct Answer Control board
Your Answer Move order
Select The BlankQuestion The ________ is the watch dog which ensures that every element of
production and activities which could affect the quality of end product areregulated to the extent desirable.
Correct Answer Quality control
Your Answer Quality control
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any
product/s is calledCorrect Answer Factory
Your Answer Factory
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Machine utilization
Gantt Chart Production Scheduling Production Scheduling
Select The BlankQuestion A ________ is another form of subcontracting.
Correct Answer Hiring capacity
Your Answer Hiring capacity
Multiple Choice Multiple AnswerQuestion In an organization there may not be a formal PPC department if
Correct Answer Work is highly repetitive in nature , Planning activities are performed by theline staff , Number of workmen is not very large
Your Answer Work is highly repetitive in nature , Planning activities are performed by theline staff , Number of workmen is not very large
Multiple Choice Multiple AnswerQuestion Which of the following cases can be treated as delay during recording of
method study?Correct Answer Operators awaiting instructions from supervisor , Worker waiting for his
turn at tools stores , Jobs awaiting at the machines for their turnYour Answer Operators awaiting instructions from supervisor , Worker waiting for his
turn at tools stores , Jobs awaiting at the machines for their turn
True/FalseQuestion Inspection order is must even for simple jobs which can be inspected by
shop inspector with the tooling available on shop.Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Order preparation process for products manufatured to order requires
following documentsCorrect Answer Sales Order , Work order , Shop order
Your Answer Sales Order , Work order , Purchase order
Multiple Choice Single AnswerQuestion Technique of Value Engineering can be effectively employed in design of a
product toCorrect Answer To meet the intended function at lowest cost
Your Answer Reduce lead time
True/FalseQuestion Cent percent inspection is often more practical and economical than
sampling inspection.Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Scale model used for layout analysis have following advantages
Correct Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can beshown , Models can be shifted easily
Your Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can beshown , Models can be shifted easily
Multiple Choice Single Answer
Question Which of the following technique is event oriented ?
Correct Answer Project Evaluation & Review Technique
Your Answer Project Evaluation & Review Technique
Multiple Choice Single AnswerQuestion What is the meaning of " Product features" according to J.M.Juran?
Correct Answer Quality of design
Your Answer Quality of design
Match The FollowingQuestion Correct Answer Your Answer
Crash cost of an activity Cc Cc
Normal time of an activity Tn Tn
Crash time of activity Tc Tc
Normal cost of an activity Cn Cn
Multiple Choice Multiple AnswerQuestion What are uses of diagrams in method study?
Correct Answer Study different plant layouts and select the most optimum one , Study theextent of traffic over the different routes of the plant , Identify the extent ofbacktracking, cross traffic and obstacles encountered during the movementof material.
Your Answer Study different plant layouts and select the most optimum one , Study theextent of traffic over the different routes of the plant , Identify the extent ofbacktracking, cross traffic and obstacles encountered during the movementof material.
True/FalseQuestion A load chart specifies the work to be carried out by each person of company
during shift hours.Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Route Sheet generally contains following information
Correct Answer Material Specification , Sequence of operation , Skill of Labour
Your Answer Material Specification , Sequence of operation , Skill of Labour
True/FalseQuestion Cellular layout is based on the concept of Group Technology
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion Which varaible is taken along the abscissa or X axis?
Correct Answer Time
Your Answer Standard deviation
Multiple Choice Multiple AnswerQuestion Which are the advantages of suburban location?
Correct Answer Avaialability of adequate land at lower cost , Both skilled and unskilledlabour can be available , Plant expansion is easier due to less or norestriction for building and construction
Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilledlabour can be available , Plant expansion is easier due to less or norestriction for building and construction
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge
of the condition of an item from routine or continuous checking.Correct Answer Condition monitoring
Your Answer Condition monitoring
Multiple Choice Multiple AnswerQuestion Expediting function is concerned with following activities
Correct Answer Progress chasing to identify delays which may hold up production ,Communicating possible delays in delivery date commitment to salesdepartment , Devising cures to keep rate of production in line with schedule
Your Answer Recording progress of work , Progress chasing to identify delays which mayhold up production , Communicating possible delays in delivery datecommitment to sales department
Select The BlankQuestion Production control work is ________ in case of floor inspection as
compared with the centralised inspection.Correct Answer easier
Your Answer time consuming
Select The BlankQuestion The easiest way to bring the delayed job within the promised delivery time
by using extra shift or weekly holiday is ________.Correct Answer Overtime working
Your Answer Overtime working
True/False
Question In case of forward pass computation, the earliest event time of the firstevent is zero.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion What is represented by an arrow in a network?
Correct Answer Activity
Your Answer Activity
True/FalseQuestion As a general rule, a site five times the actual plant size is considered
minimum for parking, access facilities and future expansion.Correct Answer True
Your Answer True
True/FalseQuestion Independent float either affects the float of preceding activities or that of
succeeding activities.Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion The document raised by PPC which authorises different functions to take
action as per instruction is calledCorrect Answer Work Order
Your Answer Work Order
Multiple Choice Single AnswerQuestion A good layout makes effective use of space. Utilization of space for a
department like Stores can be measured byCorrect Answer Proportion of Cubic volume space utilized
Your Answer Ratio of area utilised to area available
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to
entity can be defined asCorrect Answer Operation
Your Answer Operation
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Select The BlankQuestion The ________ must ensure that the product satisfy the
functional requirements of it's usage.Correct Answer Quality of design
Your Answer Quality of design
Multiple Choice Multiple AnswerQuestion Which of the following information is available in
summary of part in a chart during methods study?Correct Answer Frequency of each symbol , Total time for each symbol ,
Total distance travelled by the objectYour Answer Frequency of each symbol , Total time for each symbol
True/FalseQuestion The event numbers as far as possible reflect the logical
relationships of the activities.Correct Answer True
Your Answer False
Multiple Choice Single AnswerQuestion Which varaible is taken along the ordinate or Y axis?
Correct Answer Quality
Your Answer Quality
Multiple Choice Multiple AnswerQuestion Which of the following schedules are recommended to
prepare and follow as a part of preventive maintenancesystem?
Correct Answer Preventive inspection schedule , Cleaning and upkeepschedule , Lubrication schedule
Your Answer Preventive inspection schedule , Cleaning and upkeepschedule , Lubrication schedule
Multiple Choice Single AnswerQuestion Which kind of preventive inspection detects some
maintenance related characteristics by making use ofhuman senses, when equipment is in operation?
Correct Answer Extrernal inspection
Your Answer Extrernal inspection
Multiple Choice Multiple AnswerQuestion Which are different ways to show critical path in a
network?Correct Answer Thick Line , Red Line , Double Line
Your Answer Thick Line , Red Line , Double Line
Multiple Choice Multiple AnswerQuestion What are the benefits of overhauling?
Correct Answer It increases useful life of an equipment and it's parts ,Advance planning allows to attend equipment withoutdisturbing the production programme , Advance planningallows to prepare and keep ready the list of replacementspares
Your Answer It increases useful life of an equipment and it's parts ,Advance planning allows to attend equipment withoutdisturbing the production programme , Advance planningallows to prepare and keep ready the list of replacementspares
Match The FollowingQuestion Correct Answer Your Answer
Combined Layout Mixed Layout Mixed Layout
Fixed Position Layout Project Layout Line Layout
Product Layout Line Layout Shop layout
Process Layout Functional Layout Functional Layout
Multiple Choice Multiple AnswerQuestion Which of the following factors play important role while
selecting or rejecting a particular site from legislation andtaxation point of view?
Correct Answer Labour laws , Building codes , Policies regarding issue oflicences
Your Answer Labour laws , Building codes , Policies regarding issue oflicences
Select The BlankQuestion The ________ is the maximum percentage defective that
for the purpose of sampling inspection can be considered
satisfactory as a process average.
Correct Answer Acceptable quality level
Your Answer Acceptable quality level
Multiple Choice Multiple AnswerQuestion Major contributors in the development of Control Charts,
Sampling plan areCorrect Answer F H Dodge , H G Roming , Walter Schewhart
Your Answer F H Dodge , H G Roming , Walter Schewhart
True/FalseQuestion Skill of labour force in a product type layout is usually
higher than in the process type of layoutCorrect Answer False
Your Answer True
True/FalseQuestion Repetitive movements between work stations which are
difficult to be traced on string diagrams can beconveniently shown on flow diagrams.
Correct Answer False
Your Answer True
Select The BlankQuestion The ________ is necessary when the job requires
detailed of one or more of the job characteristics with thehelp of special equipment which is not available at theproducing company.
Correct Answer Inspection order
Your Answer Job card
Multiple Choice Multiple AnswerQuestion Which of the following cases can be referred as operation
in method study recording?Correct Answer Change in physical characteristic , Consumption of
physical effort , Change in chemical characteristicYour Answer Change in physical characteristic , Consumption of
physical effort , Change in chemical characteristic
Select The Blank
Question The ________ is the maintenance work initiated on aresult of knowledge of the condition of an item fromroutine or continuous checking.
Correct Answer Condition monitoring
Your Answer Overhauling
True/FalseQuestion All activities lying on the non-critical paths must have total
float and free float.Correct Answer False
Your Answer False
Select The BlankQuestion Work study is also called ________ study
Correct Answer Time and Motion
Your Answer Method
Match The FollowingQuestion Correct Answer Your Answer
Crash cost of an activity Cc Cc
Normal time of anactivity
Tn Tn
Crash time of activity Tc Tc
Normal cost of anactivity
Cn Cn
Multiple Choice Multiple AnswerQuestion Which are the advantages of suburban location?
Correct Answer Avaialability of adequate land at lower cost , Both skilledand unskilled labour can be available , Plant expansion iseasier due to less or no restriction for building andconstruction
Your Answer Avaialability of adequate land at lower cost , Both skilledand unskilled labour can be available , Plant expansion iseasier due to less or no restriction for building andconstruction
True/False
Question In case of X bar-R charts,it is ensured that the assignablecauses are detected before the tolerances are violated,upper and lower statistical limits are worked out andinserted into a chart.
Correct Answer True
Your Answer False
Multiple Choice Single AnswerQuestion Which of the following is the criteria for the percentage
defectives in the zone of the indecision?Correct Answer Lots having the percentage defective more than AQL but
less than LPTDYour Answer Lots having the percentage defective less than AQL but
more than LPTD
Select The BlankQuestion The easiest way to bring the delayed job within the
promised delivery time by using extra shift or weeklyholiday is ________.
Correct Answer Overtime working
Your Answer Overtime working
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost
required to complete an activity within it's crashed time?Correct Answer Crash cost
Your Answer Crash cost
Multiple Choice Single AnswerQuestion In case of Batch Production which kind of labour is
expected?Correct Answer Skilled in one specific Manufacturing Process
Your Answer Semiskilled
Multiple Choice Multiple AnswerQuestion Which three of the following are causes of continuous
upward pattern of Xbar-R control chart?Correct Answer Wear of tool , Abnormal rise in temperature ,
Accumulation of dirtYour Answer Wear of tool , Abnormal rise in temperature ,
Accumulation of dirt
True/FalseQuestion Root cause of most of the breakdowns is failure of the
lubrication system.Correct Answer True
Your Answer True
True/FalseQuestion It is not necessary to know spare time available on the
non-critical path to allow a little delay for noncriticalactivity.
Correct Answer False
Your Answer False
True/FalseQuestion MRP software generates time periodwise requiremetn of
subassembliesCorrect Answer True
Your Answer True
True/FalseQuestion In case of two handed process chart, the simultaneous
activities of both hands are recorded opposite to eachother on the chart.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion What do you mean by CPM?
Correct Answer Critical Path Method
Your Answer Critical Path Method
Multiple Choice Multiple AnswerQuestion Which of the following are major inputs to scheduling?
Correct Answer Overlapping of operations , Effective Capacity per workcentre , Performance standards
Your Answer Overlapping of operations , Effective Capacity per workcentre , Performance standards
Multiple Choice Multiple Answer
Question Lack of material planning results in the following
Correct Answer Over ordering , under ordering , stockouts
Your Answer Over ordering , under ordering , stockouts
Multiple Choice Single AnswerQuestion What do you mean by the verification of object against
predetermined standards of quality or quantity or both?Correct Answer Inspection
Your Answer Inspection
Multiple Choice Multiple AnswerQuestion What are the advantages of templates over diagrams?
Correct Answer Can be conveniently moved on the graph paper , Lesslaborious , Saves time
Your Answer Can be conveniently moved on the graph paper , Lesslaborious , Unskilled person can do and analyze it
True/FalseQuestion It would not affect the project completion time if non-
critical activities take little loner time than planned.Correct Answer True
Your Answer True
Select The BlankQuestion The ________ is the probability that a good lot will be
rejected by the sampling plan.Correct Answer Producer's risk
Your Answer Producer's risk
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose
of making any product/s is calledCorrect Answer Factory
Your Answer Factory
Select The BlankQuestion An Ideal OC curve is ________ shaped curve that
accpets all the lots with quality equal to or better thanAQL .
Correct Answer Rectangular
Your Answer Bell
Multiple Choice Single AnswerQuestion Which is the right time to prepare stores issue order?
Correct Answer When route sheet is ready
Your Answer When route sheet is ready
Multiple Choice Single AnswerQuestion Which element of a network represents a task which has
got a definite beginning and definite end?Correct Answer Activity
Your Answer Activity
Multiple Choice Single AnswerQuestion Which kind of preventive inspection detects some defects
in moving parts, internal cracks, and others , whenmachine is under preplanned shutdown?
Correct Answer Internal inspection
Your Answer Internal inspection
Select The BlankQuestion Production Planning is a centralised activity which
includes functions such as ________Correct Answer Scheduling
Your Answer Dispatching
Select The BlankQuestion The ________ is the watch dog which ensures that every
element of production and activities which could affectthe quality of end product are regulated to the extentdesirable.
Correct Answer Quality control
Your Answer Quality control
Select The BlankQuestion Goods after final inspection should accompany
________to enable dispatch department to identify and
draw correct reference.
Correct Answer Forwarding note
Your Answer Forwarding note
Multiple Choice Single AnswerQuestion Who has introduced the useful concept of control chart in
1931?Correct Answer Walter Shewhart
Your Answer Walter Shewhart
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single AnswerQuestion MRP is based on the concept of inventory demand which is of
following typeCorrect Answer Dependent and independent
Your Answer Dependent and independent
Multiple Choice Single AnswerQuestion Main objective of a good plant layout is
Correct Answer Reduce material handling cost
Your Answer Reduce material handling cost
True/FalseQuestion As a general rule, the number of tail event of an activity is more
than that of it's head event.Correct Answer False
Your Answer False
Select The BlankQuestion The ________ is the probability that a good lot will be rejected
by the sampling plan.Correct Answer Producer's risk
Your Answer Producer's risk
Multiple Choice Multiple AnswerQuestion Which of the following are important considerations concerning
activity times?Correct Answer Activity time should be obtained from the person responsible for
the completion of an activity , Activity time must be independentof any influence which the preceding or succeeding activity mayhave on it. , Activity time may assume that just the normalquantity of resources required to carry out the activity areavailable.
Your Answer Activity time should be obtained from the person responsible forthe completion of an activity , Activity time must be independentof any influence which the preceding or succeeding activity mayhave on it. , Activity time may assume that just the normalquantity of resources required to carry out the activity areavailable.
Select The Blank
Question The ________ pertain to the climatic conditions which thecomponent , product or material should withstand.
Correct Answer Environmental specifications
Your Answer Environmental specifications
Multiple Choice Multiple AnswerQuestion Following are some of the factors considered for evaluation of
alternative layoutsCorrect Answer Flow of Material , Equipment utilization , Ease of supervision
Your Answer Flow of Material , Ease of supervision , Delivery performance
Multiple Choice Multiple AnswerQuestion Which of the following are assignable cause?
Correct Answer Large varaitions in hardness of material , Tool wear , Errors insetting
Your Answer Large varaitions in hardness of material , Tool wear , Errors insetting
True/FalseQuestion All activities must not be tied up into the network
Correct Answer False
Your Answer False
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot
may vary between ________.Correct Answer 0.01 to 10%
Your Answer 0.01 to 10%
True/FalseQuestion In case of X bar, if the process is not under control indicated by
some points falling outside the control limits, such points outsidethe control limits are eliminated and new trial control limits forthe remaining points are computed.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion What is the base for considering activity time as single time
estimate or three time estimate?
Correct Answer Level of uncertainty
Your Answer Availability of labour
Select The BlankQuestion The ________ is the maximum percentage defective that for the
purpose of sampling inspection can be considered satisfactoryas a process average.
Correct Answer Acceptable quality level
Your Answer Acceptable quality level
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to
complete an activity within it's normal time?Correct Answer Normal cost
Your Answer Normal cost
Select The BlankQuestion A good maintenance system is not a luxary but a ________.
Correct Answer Necessity
Your Answer Necessity
Select The BlankQuestion A ________helps to avoid crowding of jobs at a particular
machine by change of route of some of the jobs or by divertingwork to other machine.
Correct Answer Control board
Your Answer Move order
Select The BlankQuestion The ________ is the watch dog which ensures that every
element of production and activities which could affect thequality of end product are regulated to the extent desirable.
Correct Answer Quality control
Your Answer Quality control
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of
making any product/s is calledCorrect Answer Factory
Your Answer Factory
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Machine utilization
Gantt Chart Production Scheduling Production Scheduling
Select The BlankQuestion A ________ is another form of subcontracting.
Correct Answer Hiring capacity
Your Answer Hiring capacity
Multiple Choice Multiple AnswerQuestion In an organization there may not be a formal PPC department if
Correct Answer Work is highly repetitive in nature , Planning activities areperformed by the line staff , Number of workmen is not verylarge
Your Answer Work is highly repetitive in nature , Planning activities areperformed by the line staff , Number of workmen is not verylarge
Multiple Choice Multiple AnswerQuestion Which of the following cases can be treated as delay during
recording of method study?Correct Answer Operators awaiting instructions from supervisor , Worker waiting
for his turn at tools stores , Jobs awaiting at the machines fortheir turn
Your Answer Operators awaiting instructions from supervisor , Worker waitingfor his turn at tools stores , Jobs awaiting at the machines fortheir turn
True/FalseQuestion Inspection order is must even for simple jobs which can be
inspected by shop inspector with the tooling available on shop.Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Order preparation process for products manufatured to order
requires following documentsCorrect Answer Sales Order , Work order , Shop order
Your Answer Sales Order , Work order , Purchase order
Multiple Choice Single AnswerQuestion Technique of Value Engineering can be effectively employed in
design of a product toCorrect Answer To meet the intended function at lowest cost
Your Answer Reduce lead time
True/FalseQuestion Cent percent inspection is often more practical and economical
than sampling inspection.Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Scale model used for layout analysis have following advantages
Correct Answer Nontechnical person finds it easy to comprehend , Oveheadfacilities can be shown , Models can be shifted easily
Your Answer Nontechnical person finds it easy to comprehend , Oveheadfacilities can be shown , Models can be shifted easily
Multiple Choice Single AnswerQuestion Which of the following technique is event oriented ?
Correct Answer Project Evaluation & Review Technique
Your Answer Project Evaluation & Review Technique
Multiple Choice Single AnswerQuestion What is the meaning of " Product features" according to
J.M.Juran?Correct Answer Quality of design
Your Answer Quality of design
Match The FollowingQuestion Correct Answer Your Answer
Crash cost of an activity Cc Cc
Normal time of an activity Tn Tn
Crash time of activity Tc Tc
Normal cost of an activity Cn Cn
Multiple Choice Multiple AnswerQuestion What are uses of diagrams in method study?
Correct Answer Study different plant layouts and select the most optimum one ,Study the extent of traffic over the different routes of the plant ,Identify the extent of backtracking, cross traffic and obstaclesencountered during the movement of material.
Your Answer Study different plant layouts and select the most optimum one ,Study the extent of traffic over the different routes of the plant ,Identify the extent of backtracking, cross traffic and obstaclesencountered during the movement of material.
True/FalseQuestion A load chart specifies the work to be carried out by each person
of company during shift hours.Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Route Sheet generally contains following information
Correct Answer Material Specification , Sequence of operation , Skill of Labour
Your Answer Material Specification , Sequence of operation , Skill of Labour
True/FalseQuestion Cellular layout is based on the concept of Group Technology
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion Which varaible is taken along the abscissa or X axis?
Correct Answer Time
Your Answer Standard deviation
Multiple Choice Multiple Answer
Question Which are the advantages of suburban location?
Correct Answer Avaialability of adequate land at lower cost , Both skilled andunskilled labour can be available , Plant expansion is easier dueto less or no restriction for building and construction
Your Answer Avaialability of adequate land at lower cost , Both skilled andunskilled labour can be available , Plant expansion is easier dueto less or no restriction for building and construction
Select The BlankQuestion The ________ is the maintenance work initiated on a result of
knowledge of the condition of an item from routine or continuouschecking.
Correct Answer Condition monitoring
Your Answer Condition monitoring
Multiple Choice Multiple AnswerQuestion Expediting function is concerned with following activities
Correct Answer Progress chasing to identify delays which may hold upproduction , Communicating possible delays in delivery datecommitment to sales department , Devising cures to keep rateof production in line with schedule
Your Answer Recording progress of work , Progress chasing to identify delayswhich may hold up production , Communicating possible delaysin delivery date commitment to sales department
Select The BlankQuestion Production control work is ________ in case of floor inspection
as compared with the centralised inspection.Correct Answer easier
Your Answer time consuming
Select The BlankQuestion The easiest way to bring the delayed job within the promised
delivery time by using extra shift or weekly holiday is ________.Correct Answer Overtime working
Your Answer Overtime working
True/FalseQuestion In case of forward pass computation, the earliest event time of
the first event is zero.Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion What is represented by an arrow in a network?
Correct Answer Activity
Your Answer Activity
True/FalseQuestion As a general rule, a site five times the actual plant size is
considered minimum for parking, access facilities and futureexpansion.
Correct Answer True
Your Answer True
True/FalseQuestion Independent float either affects the float of preceding activities
or that of succeeding activities.Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion The document raised by PPC which authorises different
functions to take action as per instruction is calledCorrect Answer Work Order
Your Answer Work Order
Multiple Choice Single AnswerQuestion A good layout makes effective use of space. Utilization of space
for a department like Stores can be measured byCorrect Answer Proportion of Cubic volume space utilized
Your Answer Ratio of area utilised to area available
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding
some value to entity can be defined asCorrect Answer Operation
Your Answer Operation
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple AnswerQuestion Why graphical method of recording is preferred over the descriptive method
during method study?Correct Answer It segregates effective part form ineffective parts , It reduces effort
involved in writing , Critical examinations easier and more effectiveYour Answer Critical examinations easier and more effective , It segregates effective
part form ineffective parts , It reduces effort involved in writing
Multiple Choice Multiple AnswerQuestion Which are the subfactors of community facilities or social infrastructure?Correct Answer Accomodation , Educational , EntertainmentYour Answer Accomodation , Educational , Entertainment
Select The BlankQuestion The ________ is the probability that a bad lot will be accepted by the
sampling plan.Correct Answer Consumer's riskYour Answer Consumer's risk
Multiple Choice Multiple AnswerQuestion Which of the following are examples of consumption of physical effort
during recording for method study?Correct Answer Bending , Positioning , UnloadingYour Answer Bending , Positioning , Unloading
Multiple Choice Single AnswerQuestion How to claculate the producer risk in the OC Curve?Correct Answer Probability that a good lot will be rejected by the samplingYour Answer Probability that a good lot will be rejected by the sampling
Select The BlankQuestion The ________ are the definitions of the measurable as well as nonmeasurable
characteristics of the product.Correct Answer SpecificationsYour Answer Specifications
Select The BlankQuestion The ________ is the watch dog which ensures that every element of
production and activities which could affect the quality of end product are regulated tothe extent desirable.
Correct Answer Quality controlYour Answer Quality control
True/False
Question Expediting action is necessary if the delays and interruptions are abnormaland hence any subsequent delay is bound to extend the promised delivery date.
Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Process Engineer does not get sufficient time for designing tooling for most
economic production run whenCorrect Answer Delivery time is lessYour Answer Delivery time is less
Select The BlankQuestion The ________ includes preventive maintenance activities whose needs are
identified through inspection which requires stoppage of machines.Correct Answer Shutdown MaintenanceYour Answer Shutdown Maintenance
True/FalseQuestion Breakdown of machines, absenteeism of worker does not dislocate the
manufacturing activity in process layoutCorrect Answer TrueYour Answer True
Select The BlankQuestion The ________ is the maximum percentage defective that for the purpose of
sampling inspection can be considered satisfactory as a process average.Correct Answer Acceptable quality levelYour Answer Acceptable quality level
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to complete an
activity within it's crashed time?Correct Answer Crash costYour Answer Crash cost
Multiple Choice Multiple AnswerQuestion Which are the first three steps of Critical Path Analysis technique?Correct Answer Activity relationships , Activity identification , Network constructionYour Answer Activity relationships , Activity identification , Network construction
True/FalseQuestion Dust gets mixed with lubricants, forms an abrasive substance and causes pre-
mature failure of machinery.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following can be subtypes of corrective maintenance?Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in
MaintenanceYour Answer Shutdown Maintenance , Design-out Maintenance , Design-in
Maintenance
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of
the condition of an item from routine or continuous checking.Correct Answer Condition monitoringYour Answer Condition monitoring
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to
entity can be defined asCorrect Answer OperationYour Answer Production
Match The FollowingQuestion Correct Answer Your Answer
Toung Sweet Sweet
Eye Crack Crack
Nose Burnout Burnout
Ear Impact Impact
Select The BlankQuestion The ________ is a set of tools and techniques by which products are made to
comply with the specifications at minimum cost to the firm.Correct Answer Quality control systemYour Answer Quality control system
Multiple Choice Single AnswerQuestion What is the meaning of " Product features" according to J.M.Juran?Correct Answer Quality of designYour Answer Quality of design
Multiple Choice Multiple AnswerQuestion Which of the following method can be used to record the facts during the
method study?Correct Answer Micromotion study , Cyclegraph , Chronocyclegraph
Your Answer Micromotion study , Photograph , Cyclegraph , Chronocyclegraph
True/FalseQuestion All activities must not be tied up into the networkCorrect Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Which of the following are types of sampling plan?Correct Answer Single sampling plan , Double sampling plan , Multiple sampling planYour Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Multiple Choice Multiple AnswerQuestion How many of the following are types of specification?Correct Answer Material specifications , Dimensional specifications , Performance
specificationsYour Answer Material specifications , Dimensional specifications , Performance
specifications
Multiple Choice Multiple AnswerQuestion Plant layout facilitates processing of products in most effective manner
through the followingCorrect Answer Shortest possible distance , Shortest processing time , Minimum
movementYour Answer Shortest possible distance , Minimum movement
Select The BlankQuestion Work study is also called ________ studyCorrect Answer Time and MotionYour Answer Time and Motion
True/FalseQuestion Operation Process Chart provides information on time and distancesCorrect Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Plant Layout is concerned with optimum arrangement of the followingCorrect Answer Storage space , Machines , Material Handling EquipmentYour Answer Storage space , Machines , Sequence of operation
Multiple Choice Single AnswerQuestion Management often fails to realize the importance of efficient layout due to
following reasonCorrect Answer losses resulting from poor layout are not directly shown in the
financial statements
Your Answer losses resulting from poor layout are not directly shown in the financialstatements
True/FalseQuestion Inspection order is must even for simple jobs which can be inspected by shop
inspector with the tooling available on shop.Correct Answer FalseYour Answer True
True/FalseQuestion Feasibility of time schedule requires that an activity be scheduled before any
of it's predecessors are scheduled.Correct Answer FalseYour Answer True
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any
product/s is calledCorrect Answer FactoryYour Answer Factory
True/FalseQuestion Planned lubrication is said to be the nervous system of the equipment.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion What is the basic philosophy of statistical process control?Correct Answer Prevention is better than cureYour Answer Prevention is better than cure
Multiple Choice Single AnswerQuestion How does the control chart of statistical quality control helps the operating
personnel?Correct Answer Identify the presence of an assignable cause before it developsYour Answer Identify the presence of an assignable cause before it develops
Multiple Choice Single AnswerQuestion Where does the central line is located in case of p-chart?Correct Answer at p barYour Answer at p bar
Multiple Choice Multiple AnswerQuestion Which of the following may be the objectives of project crashing?Correct Answer To complete the project in the least possible time , To reduce project
cost below it's normal cost , To achieve uniformity in requirement of resources
Your Answer To complete the project in the least possible time , To reduce project costbelow it's normal cost , To achieve uniformity in requirement of resources
Select The BlankQuestion The ________ advocates maintenance procedures whereby the condition of
the plant is constantly watched through systematic inspection to unearth unhealthyconditions and preventive
Correct Answer Preventive MaintenanceYour Answer Preventive Maintenance
True/FalseQuestion A network should be progression of activities always moving forward.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Which is the ideal place to write a description of an activity in a network?Correct Answer Above the arrowYour Answer Above the arrow
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot may vary
between ________.Correct Answer 0.01 to 10%Your Answer 0.01 to 10%
True/FalseQuestion For p-chart, the central line of fraction defectives is determined by average
percentage defectives.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Which phase of method study is concerned with analyzing the facts critically,
generating alternatives which form the basis for selection and development of improvedmethods?
Correct Answer Critical examinationYour Answer Critical examination
Multiple Choice Single AnswerQuestion Which of the following policies is advisable in case of low product variety
and large volumes?Correct Answer Low Skilled Labour & Special Purpose MachinesYour Answer Low Skilled Labour & Special Purpose Machines
Multiple Choice Single Answer
Question Which kind of inspection is followed in case of product layout?Correct Answer Pilot inspectionYour Answer Pilot inspection
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Sampling Inspection
Gantt Chart Production Scheduling Production Scheduling
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single AnswerQuestion MRP is based on the concept of inventory demand which is of
following typeCorrect Answer Dependent and independent
Your Answer Dependent and independent
Multiple Choice Single AnswerQuestion Main objective of a good plant layout is
Correct Answer Reduce material handling cost
Your Answer Reduce material handling cost
True/FalseQuestion As a general rule, the number of tail event of an activity is more
than that of it's head event.Correct Answer False
Your Answer False
Select The BlankQuestion The ________ is the probability that a good lot will be rejected
by the sampling plan.Correct Answer Producer's risk
Your Answer Producer's risk
Multiple Choice Multiple AnswerQuestion Which of the following are important considerations concerning
activity times?Correct Answer Activity time should be obtained from the person responsible for
the completion of an activity , Activity time must be independentof any influence which the preceding or succeeding activity mayhave on it. , Activity time may assume that just the normalquantity of resources required to carry out the activity areavailable.
Your Answer Activity time should be obtained from the person responsible forthe completion of an activity , Activity time must be independentof any influence which the preceding or succeeding activity mayhave on it. , Activity time may assume that just the normalquantity of resources required to carry out the activity areavailable.
Select The Blank
Question The ________ pertain to the climatic conditions which thecomponent , product or material should withstand.
Correct Answer Environmental specifications
Your Answer Environmental specifications
Multiple Choice Multiple AnswerQuestion Following are some of the factors considered for evaluation of
alternative layoutsCorrect Answer Flow of Material , Equipment utilization , Ease of supervision
Your Answer Flow of Material , Ease of supervision , Delivery performance
Multiple Choice Multiple AnswerQuestion Which of the following are assignable cause?
Correct Answer Large varaitions in hardness of material , Tool wear , Errors insetting
Your Answer Large varaitions in hardness of material , Tool wear , Errors insetting
True/FalseQuestion All activities must not be tied up into the network
Correct Answer False
Your Answer False
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot
may vary between ________.Correct Answer 0.01 to 10%
Your Answer 0.01 to 10%
True/FalseQuestion In case of X bar, if the process is not under control indicated by
some points falling outside the control limits, such points outsidethe control limits are eliminated and new trial control limits forthe remaining points are computed.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion What is the base for considering activity time as single time
estimate or three time estimate?
Correct Answer Level of uncertainty
Your Answer Availability of labour
Select The BlankQuestion The ________ is the maximum percentage defective that for the
purpose of sampling inspection can be considered satisfactoryas a process average.
Correct Answer Acceptable quality level
Your Answer Acceptable quality level
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to
complete an activity within it's normal time?Correct Answer Normal cost
Your Answer Normal cost
Select The BlankQuestion A good maintenance system is not a luxary but a ________.
Correct Answer Necessity
Your Answer Necessity
Select The BlankQuestion A ________helps to avoid crowding of jobs at a particular
machine by change of route of some of the jobs or by divertingwork to other machine.
Correct Answer Control board
Your Answer Move order
Select The BlankQuestion The ________ is the watch dog which ensures that every
element of production and activities which could affect thequality of end product are regulated to the extent desirable.
Correct Answer Quality control
Your Answer Quality control
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of
making any product/s is calledCorrect Answer Factory
Your Answer Factory
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Machine utilization
Gantt Chart Production Scheduling Production Scheduling
Select The BlankQuestion A ________ is another form of subcontracting.
Correct Answer Hiring capacity
Your Answer Hiring capacity
Multiple Choice Multiple AnswerQuestion In an organization there may not be a formal PPC department if
Correct Answer Work is highly repetitive in nature , Planning activities areperformed by the line staff , Number of workmen is not verylarge
Your Answer Work is highly repetitive in nature , Planning activities areperformed by the line staff , Number of workmen is not verylarge
Multiple Choice Multiple AnswerQuestion Which of the following cases can be treated as delay during
recording of method study?Correct Answer Operators awaiting instructions from supervisor , Worker waiting
for his turn at tools stores , Jobs awaiting at the machines fortheir turn
Your Answer Operators awaiting instructions from supervisor , Worker waitingfor his turn at tools stores , Jobs awaiting at the machines fortheir turn
True/FalseQuestion Inspection order is must even for simple jobs which can be
inspected by shop inspector with the tooling available on shop.Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Order preparation process for products manufatured to order
requires following documentsCorrect Answer Sales Order , Work order , Shop order
Your Answer Sales Order , Work order , Purchase order
Multiple Choice Single AnswerQuestion Technique of Value Engineering can be effectively employed in
design of a product toCorrect Answer To meet the intended function at lowest cost
Your Answer Reduce lead time
True/FalseQuestion Cent percent inspection is often more practical and economical
than sampling inspection.Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Scale model used for layout analysis have following advantages
Correct Answer Nontechnical person finds it easy to comprehend , Oveheadfacilities can be shown , Models can be shifted easily
Your Answer Nontechnical person finds it easy to comprehend , Oveheadfacilities can be shown , Models can be shifted easily
Multiple Choice Single AnswerQuestion Which of the following technique is event oriented ?
Correct Answer Project Evaluation & Review Technique
Your Answer Project Evaluation & Review Technique
Multiple Choice Single AnswerQuestion What is the meaning of " Product features" according to
J.M.Juran?Correct Answer Quality of design
Your Answer Quality of design
Match The FollowingQuestion Correct Answer Your Answer
Crash cost of an activity Cc Cc
Normal time of an activity Tn Tn
Crash time of activity Tc Tc
Normal cost of an activity Cn Cn
Multiple Choice Multiple AnswerQuestion What are uses of diagrams in method study?
Correct Answer Study different plant layouts and select the most optimum one ,Study the extent of traffic over the different routes of the plant ,Identify the extent of backtracking, cross traffic and obstaclesencountered during the movement of material.
Your Answer Study different plant layouts and select the most optimum one ,Study the extent of traffic over the different routes of the plant ,Identify the extent of backtracking, cross traffic and obstaclesencountered during the movement of material.
True/FalseQuestion A load chart specifies the work to be carried out by each person
of company during shift hours.Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Route Sheet generally contains following information
Correct Answer Material Specification , Sequence of operation , Skill of Labour
Your Answer Material Specification , Sequence of operation , Skill of Labour
True/FalseQuestion Cellular layout is based on the concept of Group Technology
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion Which varaible is taken along the abscissa or X axis?
Correct Answer Time
Your Answer Standard deviation
Multiple Choice Multiple Answer
Question Which are the advantages of suburban location?
Correct Answer Avaialability of adequate land at lower cost , Both skilled andunskilled labour can be available , Plant expansion is easier dueto less or no restriction for building and construction
Your Answer Avaialability of adequate land at lower cost , Both skilled andunskilled labour can be available , Plant expansion is easier dueto less or no restriction for building and construction
Select The BlankQuestion The ________ is the maintenance work initiated on a result of
knowledge of the condition of an item from routine or continuouschecking.
Correct Answer Condition monitoring
Your Answer Condition monitoring
Multiple Choice Multiple AnswerQuestion Expediting function is concerned with following activities
Correct Answer Progress chasing to identify delays which may hold upproduction , Communicating possible delays in delivery datecommitment to sales department , Devising cures to keep rateof production in line with schedule
Your Answer Recording progress of work , Progress chasing to identify delayswhich may hold up production , Communicating possible delaysin delivery date commitment to sales department
Select The BlankQuestion Production control work is ________ in case of floor inspection
as compared with the centralised inspection.Correct Answer easier
Your Answer time consuming
Select The BlankQuestion The easiest way to bring the delayed job within the promised
delivery time by using extra shift or weekly holiday is ________.Correct Answer Overtime working
Your Answer Overtime working
True/FalseQuestion In case of forward pass computation, the earliest event time of
the first event is zero.Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion What is represented by an arrow in a network?
Correct Answer Activity
Your Answer Activity
True/FalseQuestion As a general rule, a site five times the actual plant size is
considered minimum for parking, access facilities and futureexpansion.
Correct Answer True
Your Answer True
True/FalseQuestion Independent float either affects the float of preceding activities
or that of succeeding activities.Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion The document raised by PPC which authorises different
functions to take action as per instruction is calledCorrect Answer Work Order
Your Answer Work Order
Multiple Choice Single AnswerQuestion A good layout makes effective use of space. Utilization of space
for a department like Stores can be measured byCorrect Answer Proportion of Cubic volume space utilized
Your Answer Ratio of area utilised to area available
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding
some value to entity can be defined asCorrect Answer Operation
Your Answer Operation
POM assgn
Multiple Choice Single AnswerQuestion MRP is based on the concept of inventory demand which is of following type
CorrectAnswer
Dependent and independent
Your Answer Dependent and independent
Multiple Choice Single AnswerQuestion Main objective of a good plant layout is
CorrectAnswer
Reduce material handling cost
Your Answer Reduce material handling cost
True/FalseQuestion As a general rule, the number of tail event of an activity is more than that of it's head
event.Correct
AnswerFalse
Your Answer False
Select The BlankQuestion The ________ is the probability that a good lot will be rejected by the sampling plan.
CorrectAnswer
Producer's risk
Your Answer Producer's risk
Multiple Choice Multiple AnswerQuestion Which of the following are important considerations concerning activity times?
CorrectAnswer
Activity time should be obtained from the person responsible for the completion of anactivity , Activity time must be independent of any influence which the preceding orsucceeding activity may have on it. , Activity time may assume that just the normalquantity of resources required to carry out the activity are available.
Your Answer Activity time should be obtained from the person responsible for the completion of anactivity , Activity time must be independent of any influence which the preceding orsucceeding activity may have on it. , Activity time may assume that just the normalquantity of resources required to carry out the activity are available.
Select The BlankQuestion The ________ pertain to the climatic conditions which the component , product or
material should withstand.Correct
AnswerEnvironmental specifications
Your Answer Environmental specifications
Multiple Choice Multiple AnswerQuestion Following are some of the factors considered for evaluation of alternative layouts
CorrectAnswer
Flow of Material , Equipment utilization , Ease of supervision
Your Answer Flow of Material , Ease of supervision , Delivery performance
Multiple Choice Multiple AnswerQuestion Which of the following are assignable cause?
CorrectAnswer
Large varaitions in hardness of material , Tool wear , Errors in setting
Your Answer Large varaitions in hardness of material , Tool wear , Errors in setting
True/FalseQuestion All activities must not be tied up into the network
CorrectAnswer
False
Your Answer False
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot may vary between
________.Correct
Answer0.01 to 10%
Your Answer 0.01 to 10%
True/FalseQuestion In case of X bar, if the process is not under control indicated by some points falling
outside the control limits, such points outside the control limits are eliminated and newtrial control limits for the remaining points are computed.
CorrectAnswer
True
Your Answer True
Multiple Choice Single AnswerQuestion What is the base for considering activity time as single time estimate or three time
estimate?Correct
AnswerLevel of uncertainty
Your Answer Availability of labour
Select The BlankQuestion The ________ is the maximum percentage defective that for the purpose of sampling
inspection can be considered satisfactory as a process average.Correct
AnswerAcceptable quality level
Your Answer Acceptable quality level
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to complete an activity within
it's normal time?Correct
AnswerNormal cost
Your Answer Normal cost
Select The BlankQuestion A good maintenance system is not a luxary but a ________.
CorrectAnswer
Necessity
Your Answer Necessity
Select The BlankQuestion A ________helps to avoid crowding of jobs at a particular machine by change of route of
some of the jobs or by diverting work to other machine.Correct
AnswerControl board
Your Answer Move order
Select The BlankQuestion The ________ is the watch dog which ensures that every element of production and
activities which could affect the quality of end product are regulated to the extentdesirable.
CorrectAnswer
Quality control
Your Answer Quality control
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any product/s is
calledCorrect
AnswerFactory
Your Answer Factory
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Machine utilization
Gantt Chart Production Scheduling Production Scheduling
Select The BlankQuestion A ________ is another form of subcontracting.
CorrectAnswer
Hiring capacity
Your Answer Hiring capacity
Multiple Choice Multiple Answer
Question In an organization there may not be a formal PPC department if
CorrectAnswer
Work is highly repetitive in nature , Planning activities are performed by the line staff ,Number of workmen is not very large
Your Answer Work is highly repetitive in nature , Planning activities are performed by the line staff ,Number of workmen is not very large
Multiple Choice Multiple AnswerQuestion Which of the following cases can be treated as delay during recording of method study?
CorrectAnswer
Operators awaiting instructions from supervisor , Worker waiting for his turn at toolsstores , Jobs awaiting at the machines for their turn
Your Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at toolsstores , Jobs awaiting at the machines for their turn
True/FalseQuestion Inspection order is must even for simple jobs which can be inspected by shop inspector
with the tooling available on shop.Correct
AnswerFalse
Your Answer False
Multiple Choice Multiple AnswerQuestion Order preparation process for products manufatured to order requires following
documentsCorrect
AnswerSales Order , Work order , Shop order
Your Answer Sales Order , Work order , Purchase order
Multiple Choice Single AnswerQuestion Technique of Value Engineering can be effectively employed in design of a product to
CorrectAnswer
To meet the intended function at lowest cost
Your Answer Reduce lead time
True/FalseQuestion Cent percent inspection is often more practical and economical than sampling inspection.
CorrectAnswer
False
Your Answer False
Multiple Choice Multiple AnswerQuestion Scale model used for layout analysis have following advantages
CorrectAnswer
Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown ,Models can be shifted easily
Your Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown ,Models can be shifted easily
Multiple Choice Single AnswerQuestion Which of the following technique is event oriented ?
CorrectAnswer
Project Evaluation & Review Technique
Your Answer Project Evaluation & Review Technique
Multiple Choice Single AnswerQuestion What is the meaning of " Product features" according to J.M.Juran?
CorrectAnswer
Quality of design
Your Answer Quality of design
Match The FollowingQuestion Correct Answer Your Answer
Crash cost of an activity Cc Cc
Normal time of an activity Tn Tn
Crash time of activity Tc Tc
Normal cost of an activity Cn Cn
Multiple Choice Multiple AnswerQuestion What are uses of diagrams in method study?
CorrectAnswer
Study different plant layouts and select the most optimum one , Study the extent oftraffic over the different routes of the plant , Identify the extent of backtracking, crosstraffic and obstacles encountered during the movement of material.
Your Answer Study different plant layouts and select the most optimum one , Study the extent oftraffic over the different routes of the plant , Identify the extent of backtracking, crosstraffic and obstacles encountered during the movement of material.
True/FalseQuestion A load chart specifies the work to be carried out by each person of company during shift
hours.Correct
AnswerFalse
Your Answer True
Multiple Choice Multiple AnswerQuestion Route Sheet generally contains following information
CorrectAnswer
Material Specification , Sequence of operation , Skill of Labour
Your Answer Material Specification , Sequence of operation , Skill of Labour
True/FalseQuestion Cellular layout is based on the concept of Group Technology
CorrectAnswer
True
Your Answer True
Multiple Choice Single AnswerQuestion Which varaible is taken along the abscissa or X axis?
CorrectAnswer
Time
Your Answer Standard deviation
Multiple Choice Multiple AnswerQuestion Which are the advantages of suburban location?
CorrectAnswer
Avaialability of adequate land at lower cost , Both skilled and unskilled labour can beavailable , Plant expansion is easier due to less or no restriction for building andconstruction
Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can beavailable , Plant expansion is easier due to less or no restriction for building andconstruction
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of the
condition of an item from routine or continuous checking.Correct
AnswerCondition monitoring
Your Answer Condition monitoring
Multiple Choice Multiple AnswerQuestion Expediting function is concerned with following activities
CorrectAnswer
Progress chasing to identify delays which may hold up production , Communicatingpossible delays in delivery date commitment to sales department , Devising cures tokeep rate of production in line with schedule
Your Answer Recording progress of work , Progress chasing to identify delays which may hold upproduction , Communicating possible delays in delivery date commitment to salesdepartment
Select The BlankQuestion Production control work is ________ in case of floor inspection as compared with the
centralised inspection.Correct
Answereasier
Your Answer time consuming
Select The BlankQuestion The easiest way to bring the delayed job within the promised delivery time by using extra
shift or weekly holiday is ________.Correct
AnswerOvertime working
Your Answer Overtime working
True/FalseQuestion In case of forward pass computation, the earliest event time of the first event is zero.
CorrectAnswer
True
Your Answer True
Multiple Choice Single AnswerQuestion What is represented by an arrow in a network?
CorrectAnswer
Activity
Your Answer Activity
True/FalseQuestion As a general rule, a site five times the actual plant size is considered minimum for
parking, access facilities and future expansion.Correct
AnswerTrue
Your Answer True
True/FalseQuestion Independent float either affects the float of preceding activities or that of succeeding
activities.Correct
AnswerFalse
Your Answer False
Multiple Choice Single AnswerQuestion The document raised by PPC which authorises different functions to take action as per
instruction is calledCorrect
AnswerWork Order
Your Answer Work Order
Multiple Choice Single AnswerQuestion A good layout makes effective use of space. Utilization of space for a department like
Stores can be measured byCorrect
AnswerProportion of Cubic volume space utilized
Your Answer Ratio of area utilised to area available
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to entity can be
defined asCorrect
AnswerOperation
Your Answer Operation
POM assgn
Select The BlankQuestion The ________ must ensure that the product satisfy the functional requirements of
it's usage.Correct Answer Quality of design
Your Answer Quality of design
Multiple Choice Multiple AnswerQuestion Which of the following information is available in summary of part in a chart during
methods study?Correct Answer Frequency of each symbol , Total time for each symbol , Total distance travelled by
the objectYour Answer Frequency of each symbol , Total time for each symbol
True/FalseQuestion The event numbers as far as possible reflect the logical relationships of the activities.
Correct Answer True
Your Answer False
Multiple Choice Single AnswerQuestion Which varaible is taken along the ordinate or Y axis?
Correct Answer Quality
Your Answer Quality
Multiple Choice Multiple AnswerQuestion Which of the following schedules are recommended to prepare and follow as a part
of preventive maintenance system?Correct Answer Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication
scheduleYour Answer Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication
schedule
Multiple Choice Single AnswerQuestion Which kind of preventive inspection detects some maintenance related
characteristics by making use of human senses, when equipment is in operation?Correct Answer Extrernal inspection
Your Answer Extrernal inspection
Multiple Choice Multiple AnswerQuestion Which are different ways to show critical path in a network?
Correct Answer Thick Line , Red Line , Double Line
Your Answer Thick Line , Red Line , Double Line
Multiple Choice Multiple Answer
Question What are the benefits of overhauling?
Correct Answer It increases useful life of an equipment and it's parts , Advance planning allows toattend equipment without disturbing the production programme , Advance planningallows to prepare and keep ready the list of replacement spares
Your Answer It increases useful life of an equipment and it's parts , Advance planning allows toattend equipment without disturbing the production programme , Advance planningallows to prepare and keep ready the list of replacement spares
Match The FollowingQuestion Correct Answer Your Answer
Combined Layout Mixed Layout Mixed Layout
Fixed Position Layout Project Layout Line Layout
Product Layout Line Layout Shop layout
Process Layout Functional Layout Functional Layout
Multiple Choice Multiple AnswerQuestion Which of the following factors play important role while selecting or rejecting a
particular site from legislation and taxation point of view?Correct Answer Labour laws , Building codes , Policies regarding issue of licences
Your Answer Labour laws , Building codes , Policies regarding issue of licences
Select The BlankQuestion The ________ is the maximum percentage defective that for the purpose of
sampling inspection can be considered satisfactory as a process average.Correct Answer Acceptable quality level
Your Answer Acceptable quality level
Multiple Choice Multiple AnswerQuestion Major contributors in the development of Control Charts, Sampling plan are
Correct Answer F H Dodge , H G Roming , Walter Schewhart
Your Answer F H Dodge , H G Roming , Walter Schewhart
True/FalseQuestion Skill of labour force in a product type layout is usually higher than in the process
type of layoutCorrect Answer False
Your Answer True
True/FalseQuestion Repetitive movements between work stations which are difficult to be traced on
string diagrams can be conveniently shown on flow diagrams.Correct Answer False
Your Answer True
Select The BlankQuestion The ________ is necessary when the job requires detailed of one or more of the job
characteristics with the help of special equipment which is not available at theproducing company.
Correct Answer Inspection order
Your Answer Job card
Multiple Choice Multiple AnswerQuestion Which of the following cases can be referred as operation in method study
recording?Correct Answer Change in physical characteristic , Consumption of physical effort , Change in
chemical characteristicYour Answer Change in physical characteristic , Consumption of physical effort , Change in
chemical characteristic
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of the
condition of an item from routine or continuous checking.Correct Answer Condition monitoring
Your Answer Overhauling
True/FalseQuestion All activities lying on the non-critical paths must have total float and free float.
Correct Answer False
Your Answer False
Select The BlankQuestion Work study is also called ________ study
Correct Answer Time and Motion
Your Answer Method
Match The FollowingQuestion Correct Answer Your Answer
Crash cost of an activity Cc Cc
Normal time of an activity Tn Tn
Crash time of activity Tc Tc
Normal cost of an activity Cn Cn
Multiple Choice Multiple Answer
Question Which are the advantages of suburban location?
Correct Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can beavailable , Plant expansion is easier due to less or no restriction for building andconstruction
Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can beavailable , Plant expansion is easier due to less or no restriction for building andconstruction
True/FalseQuestion In case of X bar-R charts,it is ensured that the assignable causes are detected
before the tolerances are violated, upper and lower statistical limits are worked outand inserted into a chart.
Correct Answer True
Your Answer False
Multiple Choice Single AnswerQuestion Which of the following is the criteria for the percentage defectives in the zone of the
indecision?Correct Answer Lots having the percentage defective more than AQL but less than LPTD
Your Answer Lots having the percentage defective less than AQL but more than LPTD
Select The BlankQuestion The easiest way to bring the delayed job within the promised delivery time by using
extra shift or weekly holiday is ________.Correct Answer Overtime working
Your Answer Overtime working
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to complete an activity
within it's crashed time?Correct Answer Crash cost
Your Answer Crash cost
Multiple Choice Single AnswerQuestion In case of Batch Production which kind of labour is expected?
Correct Answer Skilled in one specific Manufacturing Process
Your Answer Semiskilled
Multiple Choice Multiple AnswerQuestion Which three of the following are causes of continuous upward pattern of Xbar-R
control chart?Correct Answer Wear of tool , Abnormal rise in temperature , Accumulation of dirt
Your Answer Wear of tool , Abnormal rise in temperature , Accumulation of dirt
True/False
Question Root cause of most of the breakdowns is failure of the lubrication system.
Correct Answer True
Your Answer True
True/FalseQuestion It is not necessary to know spare time available on the non-critical path to allow a
little delay for noncritical activity.Correct Answer False
Your Answer False
True/FalseQuestion MRP software generates time periodwise requiremetn of subassemblies
Correct Answer True
Your Answer True
True/FalseQuestion In case of two handed process chart, the simultaneous activities of both hands are
recorded opposite to each other on the chart.Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion What do you mean by CPM?
Correct Answer Critical Path Method
Your Answer Critical Path Method
Multiple Choice Multiple AnswerQuestion Which of the following are major inputs to scheduling?
Correct Answer Overlapping of operations , Effective Capacity per work centre , Performancestandards
Your Answer Overlapping of operations , Effective Capacity per work centre , Performancestandards
Multiple Choice Multiple AnswerQuestion Lack of material planning results in the following
Correct Answer Over ordering , under ordering , stockouts
Your Answer Over ordering , under ordering , stockouts
Multiple Choice Single AnswerQuestion What do you mean by the verification of object against predetermined standards of
quality or quantity or both?Correct Answer Inspection
Your Answer Inspection
Multiple Choice Multiple AnswerQuestion What are the advantages of templates over diagrams?
Correct Answer Can be conveniently moved on the graph paper , Less laborious , Saves time
Your Answer Can be conveniently moved on the graph paper , Less laborious , Unskilled personcan do and analyze it
True/FalseQuestion It would not affect the project completion time if non-critical activities take little
loner time than planned.Correct Answer True
Your Answer True
Select The BlankQuestion The ________ is the probability that a good lot will be rejected by the sampling
plan.Correct Answer Producer's risk
Your Answer Producer's risk
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any product/s is
calledCorrect Answer Factory
Your Answer Factory
Select The BlankQuestion An Ideal OC curve is ________ shaped curve that accpets all the lots with quality
equal to or better than AQL .Correct Answer Rectangular
Your Answer Bell
Multiple Choice Single AnswerQuestion Which is the right time to prepare stores issue order?
Correct Answer When route sheet is ready
Your Answer When route sheet is ready
Multiple Choice Single AnswerQuestion Which element of a network represents a task which has got a definite beginning
and definite end?Correct Answer Activity
Your Answer Activity
Multiple Choice Single AnswerQuestion Which kind of preventive inspection detects some defects in moving parts, internal
cracks, and others , when machine is under preplanned shutdown?Correct Answer Internal inspection
Your Answer Internal inspection
Select The BlankQuestion Production Planning is a centralised activity which includes functions such as
________Correct Answer Scheduling
Your Answer Dispatching
Select The BlankQuestion The ________ is the watch dog which ensures that every element of production and
activities which could affect the quality of end product are regulated to the extentdesirable.
Correct Answer Quality control
Your Answer Quality control
Select The BlankQuestion Goods after final inspection should accompany ________to enable dispatch
department to identify and draw correct reference.Correct Answer Forwarding note
Your Answer Forwarding note
Multiple Choice Single AnswerQuestion Who has introduced the useful concept of control chart in 1931?
Correct Answer Walter Shewhart
Your Answer Walter Shewhart
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple AnswerQuestion Why graphical method of recording is preferred over the descriptive method
during method study?Correct Answer It segregates effective part form ineffective parts , It reduces effort
involved in writing , Critical examinations easier and more effectiveYour Answer Critical examinations easier and more effective , It segregates effective
part form ineffective parts , It reduces effort involved in writing
Multiple Choice Multiple AnswerQuestion Which are the subfactors of community facilities or social infrastructure?Correct Answer Accomodation , Educational , EntertainmentYour Answer Accomodation , Educational , Entertainment
Select The BlankQuestion The ________ is the probability that a bad lot will be accepted by the
sampling plan.Correct Answer Consumer's riskYour Answer Consumer's risk
Multiple Choice Multiple AnswerQuestion Which of the following are examples of consumption of physical effort
during recording for method study?Correct Answer Bending , Positioning , UnloadingYour Answer Bending , Positioning , Unloading
Multiple Choice Single AnswerQuestion How to claculate the producer risk in the OC Curve?Correct Answer Probability that a good lot will be rejected by the samplingYour Answer Probability that a good lot will be rejected by the sampling
Select The BlankQuestion The ________ are the definitions of the measurable as well as nonmeasurable
characteristics of the product.Correct Answer SpecificationsYour Answer Specifications
Select The BlankQuestion The ________ is the watch dog which ensures that every element of
production and activities which could affect the quality of end product are regulated tothe extent desirable.
Correct Answer Quality controlYour Answer Quality control
True/False
Question Expediting action is necessary if the delays and interruptions are abnormaland hence any subsequent delay is bound to extend the promised delivery date.
Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Process Engineer does not get sufficient time for designing tooling for most
economic production run whenCorrect Answer Delivery time is lessYour Answer Delivery time is less
Select The BlankQuestion The ________ includes preventive maintenance activities whose needs are
identified through inspection which requires stoppage of machines.Correct Answer Shutdown MaintenanceYour Answer Shutdown Maintenance
True/FalseQuestion Breakdown of machines, absenteeism of worker does not dislocate the
manufacturing activity in process layoutCorrect Answer TrueYour Answer True
Select The BlankQuestion The ________ is the maximum percentage defective that for the purpose of
sampling inspection can be considered satisfactory as a process average.Correct Answer Acceptable quality levelYour Answer Acceptable quality level
Multiple Choice Single AnswerQuestion What do you mean by lowest possible direct cost required to complete an
activity within it's crashed time?Correct Answer Crash costYour Answer Crash cost
Multiple Choice Multiple AnswerQuestion Which are the first three steps of Critical Path Analysis technique?Correct Answer Activity relationships , Activity identification , Network constructionYour Answer Activity relationships , Activity identification , Network construction
True/FalseQuestion Dust gets mixed with lubricants, forms an abrasive substance and causes pre-
mature failure of machinery.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following can be subtypes of corrective maintenance?Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in
MaintenanceYour Answer Shutdown Maintenance , Design-out Maintenance , Design-in
Maintenance
Select The BlankQuestion The ________ is the maintenance work initiated on a result of knowledge of
the condition of an item from routine or continuous checking.Correct Answer Condition monitoringYour Answer Condition monitoring
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to
entity can be defined asCorrect Answer OperationYour Answer Production
Match The FollowingQuestion Correct Answer Your Answer
Toung Sweet Sweet
Eye Crack Crack
Nose Burnout Burnout
Ear Impact Impact
Select The BlankQuestion The ________ is a set of tools and techniques by which products are made to
comply with the specifications at minimum cost to the firm.Correct Answer Quality control systemYour Answer Quality control system
Multiple Choice Single AnswerQuestion What is the meaning of " Product features" according to J.M.Juran?Correct Answer Quality of designYour Answer Quality of design
Multiple Choice Multiple AnswerQuestion Which of the following method can be used to record the facts during the
method study?Correct Answer Micromotion study , Cyclegraph , Chronocyclegraph
Your Answer Micromotion study , Photograph , Cyclegraph , Chronocyclegraph
True/FalseQuestion All activities must not be tied up into the networkCorrect Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Which of the following are types of sampling plan?Correct Answer Single sampling plan , Double sampling plan , Multiple sampling planYour Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Multiple Choice Multiple AnswerQuestion How many of the following are types of specification?Correct Answer Material specifications , Dimensional specifications , Performance
specificationsYour Answer Material specifications , Dimensional specifications , Performance
specifications
Multiple Choice Multiple AnswerQuestion Plant layout facilitates processing of products in most effective manner
through the followingCorrect Answer Shortest possible distance , Shortest processing time , Minimum
movementYour Answer Shortest possible distance , Minimum movement
Select The BlankQuestion Work study is also called ________ studyCorrect Answer Time and MotionYour Answer Time and Motion
True/FalseQuestion Operation Process Chart provides information on time and distancesCorrect Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Plant Layout is concerned with optimum arrangement of the followingCorrect Answer Storage space , Machines , Material Handling EquipmentYour Answer Storage space , Machines , Sequence of operation
Multiple Choice Single AnswerQuestion Management often fails to realize the importance of efficient layout due to
following reasonCorrect Answer losses resulting from poor layout are not directly shown in the
financial statements
Your Answer losses resulting from poor layout are not directly shown in the financialstatements
True/FalseQuestion Inspection order is must even for simple jobs which can be inspected by shop
inspector with the tooling available on shop.Correct Answer FalseYour Answer True
True/FalseQuestion Feasibility of time schedule requires that an activity be scheduled before any
of it's predecessors are scheduled.Correct Answer FalseYour Answer True
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any
product/s is calledCorrect Answer FactoryYour Answer Factory
True/FalseQuestion Planned lubrication is said to be the nervous system of the equipment.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion What is the basic philosophy of statistical process control?Correct Answer Prevention is better than cureYour Answer Prevention is better than cure
Multiple Choice Single AnswerQuestion How does the control chart of statistical quality control helps the operating
personnel?Correct Answer Identify the presence of an assignable cause before it developsYour Answer Identify the presence of an assignable cause before it develops
Multiple Choice Single AnswerQuestion Where does the central line is located in case of p-chart?Correct Answer at p barYour Answer at p bar
Multiple Choice Multiple AnswerQuestion Which of the following may be the objectives of project crashing?Correct Answer To complete the project in the least possible time , To reduce project
cost below it's normal cost , To achieve uniformity in requirement of resources
Your Answer To complete the project in the least possible time , To reduce project costbelow it's normal cost , To achieve uniformity in requirement of resources
Select The BlankQuestion The ________ advocates maintenance procedures whereby the condition of
the plant is constantly watched through systematic inspection to unearth unhealthyconditions and preventive
Correct Answer Preventive MaintenanceYour Answer Preventive Maintenance
True/FalseQuestion A network should be progression of activities always moving forward.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Which is the ideal place to write a description of an activity in a network?Correct Answer Above the arrowYour Answer Above the arrow
Select The BlankQuestion In case of an OC curve, the risk of rejecting a good quality lot may vary
between ________.Correct Answer 0.01 to 10%Your Answer 0.01 to 10%
True/FalseQuestion For p-chart, the central line of fraction defectives is determined by average
percentage defectives.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Which phase of method study is concerned with analyzing the facts critically,
generating alternatives which form the basis for selection and development of improvedmethods?
Correct Answer Critical examinationYour Answer Critical examination
Multiple Choice Single AnswerQuestion Which of the following policies is advisable in case of low product variety
and large volumes?Correct Answer Low Skilled Labour & Special Purpose MachinesYour Answer Low Skilled Labour & Special Purpose Machines
Multiple Choice Single Answer
Question Which kind of inspection is followed in case of product layout?Correct Answer Pilot inspectionYour Answer Pilot inspection
Match The FollowingQuestion Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Sampling Inspection
Gantt Chart Production Scheduling Production Scheduling
SM assgn :01: Shagun
Multiple Choice Single AnswerQuestion The decisions which are relate to daily decisions like leave records etc.
which are mundane in nature & highly routined & can be done at a juniorlevel are
Correct Answer operational decisions
Your Answer operational decisions
Multiple Choice Single AnswerQuestion Strategic management is concerned with
Correct Answer long- range planning
Your Answer long- range planning
Multiple Choice Single AnswerQuestion Mass media includes
Correct Answer radio, TV, internet etc.
Your Answer customer & dealers
Multiple Choice Multiple AnswerQuestion What is Statistical Quality Control(SQC)
Correct Answer Identifies quality and productivity from a production process , Identifiesimpact of any change on performance , Instantly spots malfunctions andshow where they occur
Your Answer Identifies quality and productivity from a production process , Identifiesimpact of any change on performance , Integrates manufacturing withbusiness strategy
Select The BlankQuestion ETOP stands for ________.
Correct Answer environmental threat & opportunity profile
Your Answer environmental threat & opportunity profile
Select The BlankQuestion ETOP stands for ________.
Correct Answer environmental threat & opportunity profile
Your Answer environmental threat & opportunity profile
Multiple Choice Multiple AnswerQuestion The various areas covered by social responsibility are
Correct Answer Inner Circle , Intermediate circle , Outer Circle
Your Answer Inner Circle , Outer Circle , Middle Circle
Select The Blank
Question ________ is the drive to achieve beyond one's expectations
Correct Answer Motivation
Your Answer Inspiration
Multiple Choice Single AnswerQuestion They enact the formal role of reviewing and screening executive decisions in
the light of their environmental, business and organisational implicationsCorrect Answer Board of director
Your Answer External auditor
True/FalseQuestion HR implementation involues a series of action programme like production,
estimation of raw materials, labour & machine hours.Correct Answer False
Your Answer True
Multiple Choice Single AnswerQuestion The decisions which are applied to structured or routine problems are
Correct Answer programmed decisions
Your Answer programmed decisions
Multiple Choice Single AnswerQuestion CAP related to internal appraisal of firm stands for
Correct Answer competitive advantage profile
Your Answer competitive advantage profile
Multiple Choice Multiple AnswerQuestion Factors to be considered in political- legal environmental scanning are
Correct Answer govt. policies, stability, philosophy of govt. , legal system, implementation,infrastructure , import-export
Your Answer govt. policies, stability, philosophy of govt. , legal system, implementation,infrastructure , import-export
Multiple Choice Single AnswerQuestion Denominator management
Correct Answer cost reduction
Your Answer cost reduction
True/FalseQuestion Counterfeiter copy but with a difference that can be seen.
Correct Answer False
Your Answer True
True/FalseQuestion The actual performance deviates positively over the budgeted performanve.
This is an indication of superior performanceCorrect Answer True
Your Answer True
Multiple Choice Single AnswerQuestion Strategic management is mainly the responsibility of
Correct Answer Top Management
Your Answer Top Management
Select The BlankQuestion Value chain analysis is an effective tool for ________.
Correct Answer internal analysis
Your Answer product performance analysis
Multiple Choice Single AnswerQuestion This strategic posture invests sufficiently to stay in the race but avoids pre-
mature commitmentsCorrect Answer Reserve the right to play
Your Answer Reserve the right to play
Select The BlankQuestion ________ and greater accountability replace formal control.
Correct Answer Self-discipline
Your Answer Co-operation
True/FalseQuestion Macro environment has got immediate impact on business.
Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Three important managerial qualities required for the effective strategic
managementCorrect Answer Conceptual, human & intellectual skills , Decision making ability , Vision
Your Answer Conceptual, human & intellectual skills , Decision making ability ,communication skills
True/False
Question Scheduling is a part of strategic management.
Correct Answer False
Your Answer True
Multiple Choice Single AnswerQuestion This strategic posture takes the current industry structure and its future
evolution as given and then react to the opportunities the market offersCorrect Answer Adapters
Your Answer Adapters
Multiple Choice Multiple AnswerQuestion Attack strategies are
Correct Answer frontal attack , flank attack , encirclement attack
Your Answer frontal attack , flank attack , Enrichment attack
Multiple Choice Multiple AnswerQuestion Merger takes place
Correct Answer between a buyer and a seller , to avail tax concessions , to increase growthrates
Your Answer between a buyer and a seller , to increase growth rates , to end rivalrybetween the two
Multiple Choice Multiple AnswerQuestion Principles to manage strategic alliances are
Correct Answer clarity in strategy & responsibilities , blending cultures , provide for an exitstrategy
Your Answer clarity in strategy & responsibilities , blending cultures
Select The BlankQuestion ________ identifies the impact of any change on performance
Correct Answer Statistical quality control
Your Answer Statistical quality control
Multiple Choice Multiple AnswerQuestion The Hallmarks for self-regulation are
Correct Answer Trust & fairness , Changed Management , Integrity & thoughtfulness
Your Answer Trust & fairness , Changed Management , Integrity & thoughtfulness
Match The FollowingQuestion Correct Answer Your Answer
Ballast business Fit well but low opportunities Fit well but low opportunities
Gap analysis Difference between desired andprojected performance
Difference between desired andprojected performance
Corporate parenting Managing SBU's by a corporate Managing SBU's by a corporate
Heartland business Give the highest priority Give the highest priority
True/FalseQuestion Standards of performance act as the benchmark against which the actual
performance is compared.Correct Answer True
Your Answer True
True/FalseQuestion Change in company's strategy gives rise to problems necessitating a new
structure to be madeCorrect Answer True
Your Answer False
Select The BlankQuestion Modern Accounting uses ________ as a unit of measure
Correct Answer Time
Your Answer Possession
Multiple Choice Single AnswerQuestion Corporate strategy ensures
Correct Answer fit between the firm and its environment
Your Answer fit between the firm and its environment
True/FalseQuestion Divestiture is opposed to diversification.
Correct Answer False
Your Answer True
Match The FollowingQuestion Correct Answer Your Answer
Marketing a product Mass segmentation Product formulated
Environmental Analysis Social, Political, legal &technology
Social, Political, legal & technology
Swot Analysis Matching, converting, minimizing Availability of resources
& avoiding strategies
Marketing strategy Life cycle considerations Product formulated
Multiple Choice Single AnswerQuestion It is the process of analyzing, dividing and arranging work or activities into
manageable portion for individuals, sections & departmentsCorrect Answer departmentation
Your Answer policy framing
Multiple Choice Multiple AnswerQuestion Factors to be considered while deciding candidates for divestiture are
Correct Answer taxes , availability of buyers , market reaction
Your Answer taxes , availability of buyers , willingness of employees
Select The BlankQuestion ________ is a modern plant consisting of modules centered around a stage
in the production processCorrect Answer Flotilla concept
Your Answer Flotilla concept
Multiple Choice Multiple AnswerQuestion An unhealthy portfolio has
Correct Answer More dogs , Few stars
Your Answer More dogs , Few stars
Multiple Choice Multiple AnswerQuestion Strategic intent
Correct Answer obsession with an organization , ambitions in proportion to their existingresources & capabilities , what the organization strives for.
Your Answer obsession with an organization , what the organization strives for. , conceptof optimization
True/FalseQuestion The actual performance matches the budgeted performance. This is a
realistic situation.Correct Answer False
Your Answer False
Select The BlankQuestion ________ should have the ability to develop a visionto see patterns into the
future.Correct Answer Leaders
Your Answer Inspectors
Multiple Choice Single AnswerQuestion Financial environment is concerned with
Correct Answer demand & supply of money, capital markets
Your Answer demand & supply of money, capital markets
Multiple Choice Multiple AnswerQuestion The control process requires the following types of information
Correct Answer Planned performance , Variances , Reasons
Your Answer Planned performance , Variances , Motivation
Select The BlankQuestion Strategic evaluation determines the effectiveness of ________
Correct Answer Strategy
Your Answer Strategy
Multiple Choice Multiple AnswerQuestion Various phases of Growth are
Correct Answer Creativity , Delegation , Co-ordination
Your Answer Creativity , Delegation , Co-ordination
SM assgn :03: Baizu
True/FalseQuestion Staffing function applies to all company levels irrespective of levels of hierarchy
CorrectAnswer
True
Your Answer True
Multiple Choice Multiple AnswerQuestion The reasons for acquisition are
CorrectAnswer
Increased market power , Increased diversification , Increased speed to market
Your Answer Increased diversification , Increased speed to market , Increased market power
Multiple Choice Multiple AnswerQuestion Principles to manage strategic alliances are
CorrectAnswer
clarity in strategy & responsibilities , blending cultures , provide for an exit strategy
Your Answer clarity in strategy & responsibilities , blending cultures , provide for an exit strategy
Multiple Choice Multiple AnswerQuestion Merger takes place
CorrectAnswer
between a buyer and a seller , to avail tax concessions , to increase growth rates
Your Answer between a buyer and a seller , to avail tax concessions , to increase growth rates
Select The BlankQuestion Titan going into setting their won retail outlets- this is ________ integration.
CorrectAnswer
vertical ( forward )
Your Answer vertical ( forward )
Select The BlankQuestion Delay in ________ measurement defeats the purpose of evaluation.
CorrectAnswer
Time
Your Answer Goals
Select The BlankQuestion Bajaj started manufacturing of sunny is an example of ________.
CorrectAnswer
concentration strategy
Your Answer concentration strategy
Multiple Choice Single Answer
Question A Large-scale community development project was funded to enable farmers to use localresources effectively by
CorrectAnswer
Asian Paints
Your Answer Asian Paints
True/FalseQuestion The actual performance deviates positively over the budgeted performanve. This is an
indication of superior performanceCorrect
AnswerTrue
Your Answer True
Multiple Choice Single AnswerQuestion It concentrates on organisation design and work flow
CorrectAnswer
Flotilla
Your Answer Flotilla
Multiple Choice Single AnswerQuestion It is the process of selecting people for company positions and developing skills and
abilities for assignments in the companyCorrect
AnswerStaffing
Your Answer Staffing
Select The BlankQuestion A hardware manufacture enters into software is an example of ________integration.
CorrectAnswer
vertical ( forward )
Your Answer horizontal
Multiple Choice Single AnswerQuestion This strategic posture invests sufficiently to stay in the race but avoids pre-mature
commitmentsCorrect
AnswerReserve the right to play
Your Answer Reserve the right to play
Multiple Choice Multiple AnswerQuestion The various areas covered by social responsibility are
CorrectAnswer
Inner Circle , Intermediate circle , Outer Circle
Your Answer Inner Circle , Intermediate circle , Outer Circle
Multiple Choice Multiple AnswerQuestion supplier & technological environment is concerned with
CorrectAnswer
quality & no. of suppliers , logistics , raw material , trends and rate of change oftechnology
Your Answer quality & no. of suppliers , logistics , raw material , trends and rate of change oftechnology
Multiple Choice Single AnswerQuestion The decisions which are applied to structured or routine problems are
CorrectAnswer
programmed decisions
Your Answer programmed decisions
True/FalseQuestion Labour satisfaction may result in unethical behaviour as anger.
CorrectAnswer
False
Your Answer False
True/FalseQuestion Reciprocal responsibility means equal blames and credit.
CorrectAnswer
False
Your Answer False
True/FalseQuestion Excelling in one market guarantees success in a new.
CorrectAnswer
False
Your Answer False
Multiple Choice Single AnswerQuestion Empower people through great software anytime , any place, on any device'- Microsoft
CorrectAnswer
vision
Your Answer vision
Select The BlankQuestion ETOP stands for ________.
CorrectAnswer
environmental threat & opportunity profile
Your Answer environmental threat & opportunity profile
Multiple Choice Multiple AnswerQuestion How does 'structure' reduce external uncertainity arising out of human behaviour
CorrectAnswer
Research and planning , Forecasting
Your Answer Research and planning , Forecasting , Division of labour
Multiple Choice Multiple AnswerQuestion A Company's strategy
CorrectAnswer
Vital ingredient in determinig it's future , Yields growth, profits etc , may result indisaster if inappropriate
Your Answer Vital ingredient in determinig it's future , Only factor determing it's success or failure ,may result in disaster if inappropriate
True/FalseQuestion Three C's affecting today's companies are customer, competition & change
CorrectAnswer
True
Your Answer True
Select The BlankQuestion Control should involve________ amount of information.
CorrectAnswer
Minimum
Your Answer Maximum
True/FalseQuestion HR implementation involues a series of action programme like production, estimation of
raw materials, labour & machine hours.Correct
AnswerFalse
Your Answer True
Match The FollowingQuestion Correct Answer Your Answer
Ballast business Fit well but low opportunities Fit well but low opportunities
Gap analysis Difference between desired andprojected performance
Difference between desired andprojected performance
Corporate parenting Managing SBU's by a corporate Managing SBU's by a corporate
Heartland business Give the highest priority Give the highest priority
Multiple Choice Multiple AnswerQuestion Strategic intent
CorrectAnswer
obsession with an organization , ambitions in proportion to their existing resources &capabilities , what the organization strives for.
Your Answer obsession with an organization , what the organization strives for. , concept ofoptimization
Multiple Choice Multiple Answer
Question Attack strategies are
CorrectAnswer
frontal attack , flank attack , encirclement attack
Your Answer frontal attack , flank attack , encirclement attack
Multiple Choice Single AnswerQuestion An approach that strives to follow ethical principles and percepts is
CorrectAnswer
Moral management
Your Answer Moral management
Multiple Choice Multiple AnswerQuestion Limitations of Traditional cost accounting are
CorrectAnswer
Assumes factory as an isolated entity , It measures only the cost of producing
Your Answer Assumes factory as an isolated entity , It measures only the cost of producing
Multiple Choice Multiple AnswerQuestion Business is rated on which dimensions
CorrectAnswer
Market attractiveness , Business strength
Your Answer Business strength , Profit margin , Competition level
Select The BlankQuestion Like roots of a tree, ________of organization is hidden from direct view.
CorrectAnswer
core competence
Your Answer goodwill
Select The BlankQuestion Factors leading to personnel capability are________.
CorrectAnswer
IR, OB
Your Answer PRM
True/FalseQuestion All policies are 'statements'
CorrectAnswer
False
Your Answer True
Multiple Choice Single AnswerQuestion W in SWOT stands for
CorrectAnswer
inherent inadequacy of organization
Your Answer inherent inadequacy of organization
True/FalseQuestion Divestiture is opposed to diversification.
CorrectAnswer
False
Your Answer True
Select The BlankQuestion ________ should have the ability to develop a visionto see patterns into the future.
CorrectAnswer
Leaders
Your Answer Leaders
Multiple Choice Single AnswerQuestion The process of forecasting an organization's future demands for and supply of right type
of people in right number isCorrect
AnswerMan-power planning
Your Answer Man-power planning
Match The FollowingQuestion Correct Answer Your Answer
Comparative analysis is historical analysis historical analysis
Benchmarking is competitive analysis competitive analysis
Michael Hammer & James Chapy Reengineering Reengineering
GDP stands for gross domestic product gross domestic product
Multiple Choice Multiple AnswerQuestion Organizational models are
CorrectAnswer
multinational model , international model , global organizational model
Your Answer multinational model , international model , global organizational model
Multiple Choice Single AnswerQuestion It enables the strategists to take corrective action at the right time
CorrectAnswer
Premise control
Your Answer Strategic surveillance
Select The BlankQuestion Value chain analysis is an effective tool for ________.
CorrectAnswer
internal analysis
Your Answer internal analysis
Multiple Choice Single AnswerQuestion The aim in stability strategies is-
CorrectAnswer
move slowly & surely
Your Answer move slowly & surely
True/FalseQuestion Business ethics is how personal norms do not apply to activities & goals of a commercial
firm.Correct
AnswerFalse
Your Answer False
Select The BlankQuestion ________ support managers by keeping track of the elementary activities & transactions
of the organization such as sales, receipts, raw materials etc.Correct
AnswerOperational level systems
Your Answer Operational level systems
Multiple Choice Single AnswerQuestion General Electric Matrix is divided into how many cells
CorrectAnswer
9
Your Answer 9
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/False Question In case of two handed process chart, storage symbol is used
when either hand is used as grip or vice to hold an object. Correct Answer True
Your Answer True
Multiple Choice Multiple Answer Question Which three of the following options can be used to reduce the
duration of activity during project crashing? Correct Answer Allocating more manpower and machines than originally planned
for. , Working additional shifts or overtime. , Awarding work to vendors who charge extra but expedite deliveries.
Your Answer Allocating more manpower and machines than originally planned for. , Working additional shifts or overtime. , Awarding work to vendors who charge extra but expedite deliveries.
Multiple Choice Single Answer Question How to reveal the capability of the sampling plan to discriminate
between good lots and bad lots? Correct Answer Operating characteristics curve ( OC )
Your Answer Operating characteristics curve ( OC )
True/False Question short cycle job should be studied for macroscopic motions.
Correct Answer False
Your Answer False
Multiple Choice Single Answer Question Which is the next stage to the inspection based quality control in
the historical development of quality management. Correct Answer Quality assurance
Your Answer Quality assurance
True/False Question Quality can not be inspected into a product, it must be
manufactured into it by the supplier. Correct Answer True
Your Answer False
True/False Question A load chart specifies the work to be carried out by each person
of company during shift hours. Correct Answer False
Your Answer True
Match The Following
Question Correct Answer Your Answer Change in chemical characteristic
Chemical reaction Chemical reaction Consumption of effort Posting a ledger Posting a ledger Information given Giving directions or
instructions Giving directions or instructions
Subtraction Removal of worn-out part from a machine
Removal of worn-out part from a machine
Select The Blank Question The ________ is one of the photographic technique used to
record the path of motions of members of the body? Correct Answer Chronocyclograph
Your Answer Chronocyclograph
Multiple Choice Multiple Answer Question Which are the different methods to record details of the existing
method during method study? Correct Answer Charts , Diagrams , Templates or models
Your Answer Charts , Diagrams , Templates or models
Multiple Choice Multiple Answer Question In an organization there may not be a formal PPC department if
Correct Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large
Your Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large
True/False Question Floor inspection delays the identification of faults which can not
be rectified immediately before large lots are spoiled. Correct Answer False
Your Answer False
Multiple Choice Multiple Answer Question Which of the following are scheduling techniques?
Correct Answer Critical Path Analysis , Index Method , Johnson's two machine algorithm
Your Answer Critical Path Analysis , Index Method , Johnson's two machine algorithm
Select The Blank Question Activities comprising of a project are of two types, deterministic
and ________. Correct Answer Variable
Your Answer Critical
True/False
Question In case of backward pass computation, the latest event time of the burst event equals the smallest of the difference between the latest event time of the head event less duration of the activity converging on the head event.
Correct Answer True
Your Answer True
Match The Following Question Correct Answer Your Answer Emerson Efficiency Plan Wage Payment Wage Payment Craft Facilities Planning Facilities Planning Work Sampling Machine utilization Machine utilization Gantt Chart Production Scheduling Production Scheduling
Select The Blank Question The quality characteristic in case of ________ is number of
defects per unit. Correct Answer c-chart
Your Answer c-chart
Multiple Choice Multiple Answer Question Which of the following situations demand the economic
consideration while selecting a job for method study? Correct Answer Unorderly movement of men and materials , Excessive process
defectives , Too many suggestions received for improvement from a department or section
Your Answer Unorderly movement of men and materials , Excessive process defectives , Too many suggestions received for improvement from a department or section
Multiple Choice Multiple Answer Question Which of the following are examples of addition during recording
for method study? Correct Answer Brazing , Welding , Riveting
Your Answer Brazing , Welding , Riveting
Select The Blank Question In cellular layout the facilities are grouped together in cell which
are able to perform ________ type of operation for a group of products
Correct Answer Similar
Your Answer Special
Select The Blank Question Two welknown timing methods are cumulative method and
________.
Correct Answer Fly back method
Your Answer Standard method
Multiple Choice Single Answer Question One of the characterstic of layout is about the flow of material /
personnel. In a good layout the flow should be Correct Answer Unidirectional
Your Answer Unidirectional
Select The Blank Question The ________ technique builds the network from activities.
Correct Answer Critical Path Method
Your Answer Critical Path Method
Multiple Choice Single Answer Question Fixed position layout is adopted when
Correct Answer product is very heavy involving assembly of large number of parts
Your Answer product is very heavy involving assembly of large number of parts
Multiple Choice Single Answer Question Which chart sets out the sequence of flow of work of a product,
or any part of it through the section or department or a factory by recording the events under review using appropriate symbols?
Correct Answer Flow process chart
Your Answer Production chart
Select The Blank Question A ________ is another typical chart which is used to record
frequency of movements between work centers. Correct Answer Travel chart
Your Answer Movement chart
Select The Blank Question Production control work is ________ in case of floor inspection
as compared with the centralised inspection. Correct Answer easier
Your Answer easier
Multiple Choice Multiple Answer Question Which of the following can be termed as operation while
recording for method study? Correct Answer Information received , Addition or subtraction , Information given
Your Answer Information received , Addition or subtraction , Information given
Multiple Choice Multiple Answer Question Which of the following are the basic requirements of quality
standard? Correct Answer Deifinite , Undesrstandable , Economically viable
Your Answer Deifinite , Undesrstandable , Economically viable
True/False Question In case of X bar-R charts, statistical limits are calculated from
averages of samples of n (4,5,…) instead of single sample of large size to reduce the spread of natural variability.
Correct Answer True
Your Answer True
Multiple Choice Single Answer Question Following is one of the tasks of Production Control
Correct Answer Actual issue of forms and documents
Your Answer Actual issue of forms and documents
Select The Blank Question Goods after final inspection should accompany ________to
enable dispatch department to identify and draw correct reference.
Correct Answer Forwarding note
Your Answer Forwarding note
Multiple Choice Single Answer Question How total floats on non-critical activities are shown in the time
chart during project scheduling? Correct Answer Dotted lines
Your Answer Thin lines
Multiple Choice Single Answer Question What do you understand by PERT ?
Correct Answer Project Evaluation & Review Technique
Your Answer Project Evaluation & Review Technique
Multiple Choice Single Answer Question Gross requirement of products is determined on the basis of
Correct Answer Both forecast and pending orders
Your Answer Both forecast and pending orders
Multiple Choice Single Answer Question Following is one of the techniques used for Material Planning for
high value material Correct Answer MRP
Your Answer MRP
True/False Question Floor inspection promotes tendency of machines to drift out of
limits and produce defectives. Correct Answer False
Your Answer False
Multiple Choice Multiple Answer Question Which are the three distinct parts of the chart?
Correct Answer Summary , Introduction , Body
Your Answer Summary , Introduction , Body
Multiple Choice Multiple Answer Question How many of the following are types of specification?
Correct Answer Material specifications , Dimensional specifications , Performance specifications
Your Answer Cost specifications , Material specifications , Dimensional specifications
Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot
may vary between ________. Correct Answer 0.01 to 10%
Your Answer 0.01 to 10%
Multiple Choice Multiple Answer Question Which utilities are considered as infrastructural requirements?
Correct Answer Disposal of waste , Power , Water
Your Answer Disposal of waste , Power , Water
Multiple Choice Multiple Answer Question Which of the following are types of non-destructive testing?
Correct Answer Visual Testing , Eddy current , Magnetic flow detectors
Your Answer Visual Testing , Eddy current , Magnetic flow detectors
Multiple Choice Single Answer Question Which kind of labour force is required in case of Jobbing
Production? Correct Answer Highly Skilled
Your Answer Highly Skilled
True/False Question For p-chart, "Inspection by variables" is much faster than
"Inspection by attributes"
Correct Answer False
Your Answer False
Select The Blank Question The ________ must ensure that the product satisfy the
functional requirements of it's usage. Correct Answer Quality of design
Your Answer Quality of design
Multiple Choice Single Answer Question What do you mean by the preventive maintenance by using five
human senses? Correct Answer Preventive inspection
Your Answer Preventive inspection
True/False Question Dust gets mixed with lubricants, forms an abrasive substance
and causes pre-mature failure of machinery. Correct Answer True
Your Answer
True
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Match The Following Question Correct Answer Your Answer Deep Assortment Carrying a product family
in depth, drawing on many producer's output
Carrying the line of only one manufacturer
Exclusive Assortment Carrying the line of only
one manufacturer Carrying several product lines that fall within the resellers type of business
Open bid Contract awarded to lowest bidder
Direct negotiation with one or more companies covering project and terms
Negotiated Contract Direct negotiation with one or more companies covering project and terms
Contract awarded to lowest bidder
Multiple Choice Multiple Answer Question Types of Organisational Market
Correct Answer Reseller market , Industrial market , Government market
Your Answer Industrial market , Consumer market
True/False Question The super structure indicates ways in which company's tasks are
integrated or coordinated
Correct Answer True
Your Answer True
True/False Question A channel's length is also called as horizontal dimension.
Correct Answer False
Your Answer False
Multiple Choice Single Answer Question An example of Want is :
Correct Answer Continental food
Your Answer Continental food
True/False Question Product, place and promotion elements in the marketing mix are
viewed as cost factors. Correct Answer True
Your Answer False
Select The Blank Question The demand for a product is ________ when price cut causes
revenue to increase. Correct Answer Price elastic
Your Answer Price elastic
Select The Blank Question ________ eliminates the risk of losing customer's goodwill
Correct Answer One price policy
Your Answer One price policy
Select The Blank Question There are more number of substitutes for ________ products.
Correct Answer Multi use
Your Answer Multi use
True/False Question Storage helps firms balance supply and demand.
Correct Answer True
Your Answer True
Select The Blank
Question ________ are difficult to change
Correct Answer Attitudes
Your Answer Habits
Select The Blank Question Market ________ is more prevalent than Mass marketing
Correct Answer Segmentation
Your Answer Segmentation
Multiple Choice Single Answer Question The price of a product is determined by estimating the cost of
producing and marketing and then add a percentage of profits. This orientation is called:
Correct Answer Cost
Your Answer Demand
Multiple Choice Single Answer Question What is product concept?
Correct Answer Detailed version of idea stated in consumer terms
Your Answer Consumer's perception of an actual product
Match The Following Question Correct Answer Your Answer This refers to the number of product items within each product line.
Product depth Product height
This includes all product item's a company offers.
Product mix Product mix This is a group of products that are related.
Product line. Product line. This is the total number of product lines.
Product breadth Product breadth
Multiple Choice Multiple Answer Question Planning of long term strategies are based on following factors:
Correct Answer Opportunity , Objectives, Strategies, Situation assessment, Organisation mission , Resources
Your Answer Strengths , Objectives, Strategies, Situation assessment, Organisation mission , Resources
Multiple Choice Multiple Answer Question Types of psychological pricing are
Correct Answer Prestige , Leader
Your Answer Odd , Leader , Prestige
Multiple Choice Single Answer Question Marketer tries to seek what kind of response from the other
party? Correct Answer Behavioural
Your Answer Transaction
True/False Question Warehouses are needed when supply sources and markets are
located close by. Correct Answer False
Your Answer False
Select The Blank Question The onus of advertising, pricing and sales promotion policies is
put on ________ distribution. Correct Answer Exclusive
Your Answer Integral
True/False Question Marketer discourages his brand users for brand switching.
Correct Answer True
Your Answer True
Multiple Choice Single Answer Question Marketing arises from ?
Correct Answer Exchange
Your Answer Exchange
Multiple Choice Multiple Answer Question A transaction takes place when
Correct Answer There is time and place of agreement , Two things of value , Agreed upon conditions
Your Answer There is time and place of agreement , Two things of value , Agreed upon conditions
Select The Blank Question An organisational assessment uncovers________
Correct Answer Weaknesses
Your Answer Weaknesses
Multiple Choice Multiple Answer Question Shorter distribution channel results in
Correct Answer Reduced costs , Limited market coverage
Your Answer Reduced costs , High market coverage
Multiple Choice Single Answer Question The output of Stimulus Response Model is
Correct Answer Product decision
Your Answer Product
Select The Blank Question ________ exists when a few large independent firm accounts for
bulk of an industry's sales. Correct Answer Oligopoly
Your Answer Oligopoly
Multiple Choice Single Answer Question A diet conscious person after playing football is thirsty. He opts
for :- Correct Answer Diet coke
Your Answer Diet coke
Multiple Choice Single Answer Question It concentrates on organisation design and work flow
Correct Answer Flotilla
Your Answer Systems approach
Multiple Choice Single Answer Question The input to 'Stimulus Response Model' is
Correct Answer Stimuli
Your Answer Stimuli
Multiple Choice Multiple Answer Question Characteristics of Effective segmentation
Correct Answer Actionable , Measurable , Accessible
Your Answer Actionable , Measurable , Accessible
Multiple Choice Multiple Answer Question Types of strategic business units are :
Correct Answer Stars , Cash cows , Question marks
Your Answer Stars , Cash cows , Question marks
Multiple Choice Single Answer Question Pricing that enables sales people to tailor their prices to a
prospect's situation is called
Correct Answer Price shading
Your Answer Variable pricing
Multiple Choice Single Answer Question This pricing objective involves setting a low price to discourage
entry of new firms. Correct Answer Stay out
Your Answer Elimination
Multiple Choice Single Answer Question This distribution is necessary for most shopping and speciality
goods. Correct Answer Selective
Your Answer Selective
True/False Question The cultural environment shows long term trends towards a
hedonistic society. Correct Answer True
Your Answer True
Multiple Choice Single Answer Question This portfolio involves major capital investments which will result
in either large pay offs or large losses Correct Answer Big bets
Your Answer No-regret moves
Multiple Choice Multiple Answer Question What is Statistical Quality Control(SQC)
Correct Answer Identifies quality and productivity from a production process , Identifies impact of any change on performance , Instantly spots malfunctions and show where they occur
Your Answer Identifies quality and productivity from a production process , Identifies impact of any change on performance , Integrates manufacturing with business strategy
Select The Blank Question Optimum marketing mix is obtained using analysis, ________,
implementation and control. Correct Answer Planning
Your Answer Feedback
Multiple Choice Multiple Answer Question What are the stages in new product development ?
Correct Answer Idea screening , Market testing , Commercialisation
Your Answer Idea screening , Market testing , Commercialisation
Multiple Choice Single Answer Question These are moves that will pay off irrespective of what happens in
the future Correct Answer No-regret moves
Your Answer Big bets
Multiple Choice Single Answer Question A centralised inventory means
Correct Answer Fast delivery to customers
Your Answer Building and stocking one warehouse
Select The Blank Question ________ of physical distribution activities increases it's
productivity as well as of manufacturer. Correct Answer Automation
Your Answer Maximisation
True/False Question Shorter production runs are required to produce large number of
products in multi-segment strategy Correct Answer True
Your Answer False
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Select The Blank Question The ________ is a set of tools and techniques by which products
are made to comply with the specifications at minimum cost to the firm.
Correct Answer Quality control system
Your Answer Quality control system
Select The Blank Question Work study is also called ________ study
Correct Answer Time and Motion
Your Answer Time and Motion
Match The Following Question Correct Answer Your Answer Crash cost of an activity Cc Cc Normal time of an activity Tn Tn
Crash time of activity Tc Ct Normal cost of an activity Cn Tc
Multiple Choice Multiple Answer Question Which of the following situations demand the technical
consideration while selecting a job for method study? Correct Answer Jobs having inconsistent quality , Operations inviting frequent
requests from supervisors for relaxation in allowed time because of variations in materials and tool performance , Jobs in which too many man-hours are spend in checking and rechecking work
Your Answer Excessive overtime , Operations inviting frequent requests from supervisors for relaxation in allowed time because of variations in materials and tool performance , Jobs in which too many man-hours are spend in checking and rechecking work
Multiple Choice Multiple Answer Question Which of the following are activities of corrective maintenance?
Correct Answer Modifications and improvements , Overhauling , Emergency repairs
Your Answer Modifications and improvements , Overhauling , Emergency repairs
Multiple Choice Single Answer Question In case of Batch Production which kind of labour is expected?
Correct Answer Skilled in one specific Manufacturing Process
Your Answer Semiskilled
True/False Question The component produced on completely automatic machines
may be subjected to sampling inspection while parts produced on semi-automatic and completely manual operated machines require cent percent inspection.
Correct Answer True
Your Answer True
True/False Question Fixed cost is lower in case of continuous production than
intermittent production. Correct Answer False
Your Answer True
True/False Question Lubrication survey should never be done for a new machine.
Correct Answer False
Your Answer False
Multiple Choice Single Answer
Question One of the characterstic of layout is about the flow of material / personnel. In a good layout the flow should be
Correct Answer Unidirectional
Your Answer Unidirectional
Multiple Choice Single Answer Question The ratio of output to input of a production system is commonly
known as Correct Answer Productivity
Your Answer Productivity
Multiple Choice Single Answer Question How dummy activities are shown in the time chart during project
scheduling? Correct Answer Vertical lines
Your Answer Dotted lines
Multiple Choice Single Answer Question A good plant layout helps in
Correct Answer Reducing handling costs
Your Answer Reducing handling costs
Multiple Choice Single Answer Question What do you mean by planned corrective manitenance which
provides an opportunity to undertake design modifications in the equipment to eliminate or reduce frequency of breakdowns.
Correct Answer Design-out Maintenance
Your Answer Predictive Maintenance
True/False Question For p-chart, the central line of fraction defectives is determined
by average percentage defectives. Correct Answer True
Your Answer False
Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding
some value to entity can be defined as Correct Answer Operation
Your Answer Operation
Select The Blank Question An ________ history card is the record of all repairs,
replacements and engineering changes carried out in the equipment during it's period of service.
Correct Answer Equipment history card
Your Answer Equipment history card
Multiple Choice Multiple Answer Question Which are the subtasks of the maintenance phase of the method
study? Correct Answer Monitoring and control , Performance appraisal , Audit on
savings Your Answer Estimation of cost of testing and implementation , Monitoring and
control , Performance appraisal
Multiple Choice Multiple Answer Question What are the uses of the instruction manual provided by the
manufacturer of a machine? Correct Answer It gives instructions regarding installation and operation of the
equipment , It contains note on common troubles with causes and remedies for troubleshooting , It enlists points, frequency and type of lubrication
Your Answer It gives instructions regarding installation and operation of the equipment , It contains note on common troubles with causes and remedies for troubleshooting , It enlists points, frequency and type of lubrication
Multiple Choice Single Answer Question What do you mean by the project duration for which the total
cost is minimum? Correct Answer Optimum duration
Your Answer Optimum duration
Select The Blank Question The ________ is the probability that a good lot will be rejected
by the sampling plan. Correct Answer Producer's risk
Your Answer Producer's risk
Multiple Choice Single Answer Question Inadequate production capacity ultimately leads to
Correct Answer Poor Customer Service
Your Answer Low Productivity
Match The Following Question Correct Answer Your Answer Emerson Efficiency Plan Wage Payment Wage Payment Craft Facilities Planning Charting technique Work Sampling Machine utilization Sampling Inspection Gantt Chart Production Scheduling Machine utilization
True/False
Question Cellular layout is based on the concept of Group Technology
Correct Answer True
Your Answer False
Multiple Choice Single Answer Question Technique which can help an organization to reduce inventory is
called Correct Answer MRP
Your Answer MRP
True/False Question Floor inspection delays the identification of faults which can not
be rectified immediately before large lots are spoiled. Correct Answer False
Your Answer True
Select The Blank Question The ________ includes preventive maintenance activities whose
needs are identified through inspection which requires stoppage of machines.
Correct Answer Shutdown Maintenance
Your Answer Shutdown Maintenance
Multiple Choice Single Answer Question Which photographic technique is used to record path of motions
of the members of the body during method study? Correct Answer Cyclograph
Your Answer Cyclograph
Select The Blank Question The ________ advocates maintenance procedures whereby the
condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive
Correct Answer Preventive Maintenance
Your Answer Preventive Maintenance
True/False Question In case of X bar-R charts,it is ensured that the assignable
causes are detected before the tolerances are violated, upper and lower statistical limits are worked out and inserted into a chart.
Correct Answer True
Your Answer True
True/False Question Theoretical capacity equals number of normal working hours of
that machine.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer Question Gross requirement of finished product is determined on the basis
of following Correct Answer Forecasted sales , Pending sales order , Management decision
to stock Your Answer Forecasted sales , Management decision to stock , Gross
Market requirement
Multiple Choice Single Answer Question Product layout offer following advantages
Correct Answer There is economy in manufacturing time
Your Answer There is economy in manufacturing time
Multiple Choice Single Answer Question What do you mean by a single event which represents the joint
completion of more than one activities? Correct Answer Merge event
Your Answer Merge event
Select The Blank Question The ________ is the defect level for which lots are regarded as
bad lots. Correct Answer Lot Tolerance Percentage Defective
Your Answer Lot Tolerance Percentage Defective
Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of
making any product/s is called Correct Answer Factory
Your Answer Factory
Select The Blank Question One detachable ticket is prepared for each ________.
Correct Answer Operation
Your Answer Worker
Multiple Choice Single Answer Question Out of two basic criteria for the selection of a manufacturing
method, one is, it must be able to meet the specifications of final product and the other is, it must be
Correct Answer Cost effective method
Your Answer Cost effective method
Select The Blank Question The ________ pertain to the climatic conditions which the
component , product or material should withstand. Correct Answer Environmental specifications
Your Answer Environmental specifications
Multiple Choice Multiple Answer Question Which of the following cases can be referred as operation in
method study recording? Correct Answer Change in physical characteristic , Consumption of physical
effort , Change in chemical characteristic Your Answer Change in physical characteristic , Consumption of physical
effort , Change in chemical characteristic
Multiple Choice Single Answer Question Which document is used for returning the surplus material?
Correct Answer Stores Return Note
Your Answer Stores Return Note
Select The Blank Question Production control work is ________ in case of floor inspection
as compared with the centralised inspection. Correct Answer easier
Your Answer easier
Multiple Choice Multiple Answer Question Which of the following are characteristics of an operating
characteristics curve? Correct Answer Producer risk , Consumer Risk , Acceptable Quality Level
Your Answer Producer risk , Consumer Risk , Acceptable Quality Level
True/False Question Operation Process Chart provides information on time and
distances Correct Answer False
Your Answer False
Select The Blank Question The ________ must ensure that the product satisfy the
functional requirements of it's usage. Correct Answer Quality of design
Your Answer Quality of conformance
True/False Question A network should be progression of activities always moving
forward. Correct Answer True
Your Answer True
True/False Question As a general rule, a site five times the actual plant size is
considered minimum for parking, access facilities and future expansion.
Correct Answer True
Your Answer False
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Match The Following Question Correct Answer Your Answer Community Facilities Educational facility Educational facility Proximity to market Fragile product Fragile product Industrial and labour attitude
Productivity of labour Productivity of labour Legislation and taxation Licenses Licenses
Multiple Choice Multiple Answer Question Which of the following is not the characteristic of Project
Production? Correct Answer Continuous flow of material , Highly mechanised material
handling , Virtually zero manufacturing cycle time Your Answer Continuous flow of material , Highly mechanised material
handling , Virtually zero manufacturing cycle time
True/False Question An activity should represent an operation or set of operations
which can be performed using a particular kind of equipment or a special skill.
Correct Answer True
Your Answer True
Multiple Choice Single Answer Question How dummy activities are shown in the time chart during project
scheduling? Correct Answer Vertical lines
Your Answer Dotted lines
Multiple Choice Single Answer Question Which varaible is taken along the abscissa or X axis?
Correct Answer Time
Your Answer Time
Select The Blank Question The ________ is necessary when the job requires detailed of
one or more of the job characteristics with the help of special equipment which is not available at the producing company.
Correct Answer Inspection order
Your Answer Inspection order
Multiple Choice Single Answer Question What is the meaning of surplus material in context with stores
issue order? Correct Answer Materials issued are not fully consumed
Your Answer Extra material received from supplier
Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding
some value to entity can be defined as Correct Answer Operation
Your Answer Operation
Multiple Choice Single Answer Question What is the base for considering activity time as single time
estimate or three time estimate? Correct Answer Level of uncertainty
Your Answer Availability of raw material
Multiple Choice Single Answer Question What do you understand by the properties which are difficult to
measure quantitatively but usually measured by the comarision and then classification into acceptable or unacceptable?
Correct Answer Attributes
Your Answer Attributes
True/False Question All activities lying on the non-critical paths must have total float
and free float. Correct Answer False
Your Answer True
Select The Blank Question The ________ pertain to the climatic conditions which the
component , product or material should withstand. Correct Answer Environmental specifications
Your Answer Environmental specifications
Select The Blank Question Delay is indicated by ________ during recording for method
study. Correct Answer Letter Dee
Your Answer Letter Dee
Multiple Choice Single Answer Question Which rule is used for numbering of events?
Correct Answer Fulkerson's Rule
Your Answer Fulkerson's Rule
Select The Blank Question The ________ breakdowns usually cost more, partly due to
damage done to the adjustment components and partly due to emergency actions.
Correct Answer Unexpected
Your Answer Unexpected
True/False Question Under MRP system for common items order for procurement is
placed based on requirement for each product Correct Answer False
Your Answer False
True/False Question Quality control determines what, when, and how much to inspect
while inspection actually conducts examination of goods. Correct Answer True
Your Answer False
Select The Blank Question The ________ is one of the photographic technique used to
record the path of motions of members of the body? Correct Answer Chronocyclograph
Your Answer Chronocyclograph
True/False Question For p-chart, fraction defective units in each sample is calculated
by dividing number of defectives by the number of pieces in the sample.
Correct Answer True
Your Answer True
True/False Question As a general rule, a site five times the actual plant size is
considered minimum for parking, access facilities and future expansion.
Correct Answer True
Your Answer True
True/False Question A properly designed sampling plan can control sampling errors
and completely eliminate them. Correct Answer False
Your Answer False
Multiple Choice Multiple Answer Question Which of the following three methods used to select the qualified
supplier? Correct Answer By vendor plant surveys , By reputation , By experience
Your Answer By vendor plant surveys , By reputation , By experience
Multiple Choice Single Answer Question What do you understand by the selection of the job for the
method study on the basis of money saving potential of the job? Correct Answer Economic consideration
Your Answer Economic consideration
Multiple Choice Single Answer Question The ratio of output to input of a production system is commonly
known as Correct Answer Productivity
Your Answer Productivity
Multiple Choice Multiple Answer Question Which of the following possibilities can be explored by using flow
process chart? Correct Answer Eliminating the operations or combining the operations with
another , Reducing the distance traveled by the workmen or materials , Avoiding the waiting time and thereby reduce production losses
Your Answer Eliminating the operations or combining the operations with another , Reducing the distance traveled by the workmen or materials , Avoiding the waiting time and thereby reduce production losses
Select The Blank Question The ________ may be viewed as maximum leeway available to
an activity when all preceding activities occur at the earliest start time and all succeeding activities occur at the latest start time.
Correct Answer Total float
Your Answer Total float
Select The Blank Question In method study recording, ________ is represented by an
arrow. Correct Answer Transport
Your Answer Transport
Multiple Choice Single Answer
Question Which of the following technique is event oriented ?
Correct Answer Project Evaluation & Review Technique
Your Answer Project Evaluation & Review Technique
Multiple Choice Single Answer Question Following is not a function of PPC
Correct Answer Product Planning
Your Answer Product Planning
True/False Question In case of X bar-R charts,it is ensured that the assignable
causes are detected before the tolerances are violated, upper and lower statistical limits are worked out and inserted into a chart.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer Question Which are three different bases to establish an activity time?
Correct Answer Past experience , Judgement , Historical data
Your Answer Past experience , Judgement , Historical data
Multiple Choice Multiple Answer Question In an organization there may not be a formal PPC department if
Correct Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large
Your Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large
Select The Blank Question In Gantt Chart, the vertical lines devide horizontal lines into small
squares which represents ________. Correct Answer Units of measurement
Your Answer Units of measurement
True/False Question Lubrication survey should never be done for a new machine.
Correct Answer False
Your Answer False
Multiple Choice Single Answer Question Why stores issue order should not be issued as soon as it is
prepared? Correct Answer Material may or may not be available at the time of preparation
Your Answer Material may or may not be available at the time of preparation
Multiple Choice Multiple Answer Question Which of the following processes or activities are denoted by
using symbols while recording in method study? Correct Answer Transport , Delay , Storage
Your Answer Transport , Delay , Storage
Multiple Choice Multiple Answer Question Which are major benefits of identifying the critical path?
Correct Answer It helps to identify the set of activities and events which are critical and as such must be carefully controlled and monitored , It identifies activities to be given preference in allocation of resources. , It helps to exercise "control by exception".
Your Answer It helps to identify the set of activities and events which are critical and as such must be carefully controlled and monitored , It identifies activities to be given preference in allocation of resources. , It helps to exercise "control by exception".
Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of
making any product/s is called Correct Answer Factory
Your Answer Factory
Select The Blank Question Time data given in process sheet is helpful in knowing whether
________ performance is in line with the expected performance. Correct Answer Shop
Your Answer Planned
Multiple Choice Multiple Answer Question Which are the advantages of suburban location?
Correct Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction
Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction
Multiple Choice Multiple Answer Question Which details are recorded in columns when each square of
progress card is split up into columns? Correct Answer Date , Shift , Quantity produced
Your Answer Date , Shift , Quantity produced
True/False Question Repetitive movements between work stations which are difficult
to be traced on string diagrams can be conveniently shown on flow diagrams.
Correct Answer False
Your Answer False
Multiple Choice Single Answer Question What do you mean by a single event which represents the joint
completion of more than one activities? Correct Answer Burst event
Your Answer Merge event
Select The Blank Question The ________ is specified to indicate the maximum permissible
variability in the dimensions product or parts. Correct Answer Tolerance
Your Answer Tolerance
Multiple Choice Multiple Answer Question Which of the following are major inputs to scheduling?
Correct Answer Overlapping of operations , Effective Capacity per work centre , Performance standards
Your Answer Overlapping of operations , Effective Capacity per work centre , Performance standards
Match The Following Question Correct Answer Your Answer Combined Layout Mixed Layout Mixed Layout Fixed Position Layout Project Layout Project Layout Product Layout Line Layout Line Layout Process Layout Functional Layout Functional Layout
Select The Blank Question In Gantt Chart, the horizontal lines devide vertical lines into
sections which represents ________. Correct Answer No. of work centres or operations
Your Answer No. of work centres or operations
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple Answer Question Which of the following are uses of the lubricants?
Correct Answer Retard rate of wear and tear of moving parts , Protect parts from moisture and dust , Keep temperature of bearings within allowable limits
Your Answer Retard rate of wear and tear of moving parts , Protect parts from moisture and dust , Keep temperature of bearings within
allowable limits
Multiple Choice Single Answer Question In case of Batch Production which kind of labour is expected?
Correct Answer Skilled in one specific Manufacturing Process
Your Answer Skilled in one specific Manufacturing Process
Multiple Choice Multiple Answer Question Components of Production Management include
Correct Answer Capacity Planning , Job Design , Production Planning
Your Answer Capacity Planning , Job Design , Production Planning
Multiple Choice Multiple Answer Question Plant layout facilitates processing of products in most effective
manner through the following Correct Answer Shortest possible distance , Shortest processing time , Minimum
movement Your Answer Shortest possible distance , Shortest processing time , Minimum
movement
Multiple Choice Multiple Answer Question Which of the following concepts must be understood for the
achievement of quality? Correct Answer Quality of conformance , Purpose of product , Quality of design
Your Answer Quality of conformance , Purpose of product , Quality of design
Select The Blank Question Inspection points should be such that defectives are ________
segregated. Correct Answer Automatically
Your Answer Automatically
Match The Following Question Correct Answer Your Answer Bottom compartment of control board
Bunch of work orders arranged in a sequence in which they are to be processed.
Bunch of work orders arranged in a sequence in which they are to be processed.
Control board Pictorial view of machine loading activity
Pictorial view of machine loading activity
Top compartment of control board
Work order of item currently being worked on the machine
Work order of item currently being worked on the machine
Middle compartment of control board
Work order of item to be processed next on the machine
Work order of item to be processed next on the machine
Select The Blank Question A set of activities to keep an equipment in the specified condition
is called as ________.
Correct Answer Maintenance
Your Answer Maintenance
Multiple Choice Single Answer Question Inadequate production capacity ultimately leads to
Correct Answer Poor Customer Service
Your Answer Poor Customer Service
Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot
may vary between ________. Correct Answer 0.01 to 10%
Your Answer 0.01 to 10%
True/False Question Operation Process Chart provides information on time and
distances Correct Answer False
Your Answer True
Multiple Choice Single Answer Question Who has introduced the useful concept of control chart in 1931?
Correct Answer Walter Shewhart
Your Answer Walter Shewhart
Multiple Choice Single Answer Question What do you understand by the quality specified by the designer
on behalf the customer? Correct Answer Quality of design
Your Answer Quality of design
True/False Question In case of two handed process chart, the simultaneous activities
of both hands are recorded opposite to each other on the chart. Correct Answer True
Your Answer True
Multiple Choice Single Answer Question Which chart sets out the sequence of flow of work of a product,
or any part of it through the section or department or a factory by recording the events under review using appropriate symbols?
Correct Answer Flow process chart
Your Answer Flow process chart
Multiple Choice Multiple Answer Question Which are the subtasks of the maintenance phase of the method
study? Correct Answer Monitoring and control , Performance appraisal , Audit on
savings Your Answer Monitoring and control , Performance appraisal , Audit on
savings
Select The Blank Question Principle underlying the Moving Average mrthod is that future
demand shall be ________ past demand. Correct Answer Average of
Your Answer Average of
True/False Question In case of forward pass computation, the earliest event time of a
plain event equals the earliest event time of the preceding event plus duration of activity emanating from the preceding event.
Correct Answer True
Your Answer True
Match The Following Question Correct Answer Your Answer Emerson Efficiency Plan Wage Payment Wage Payment Craft Facilities Planning Facilities Planning Work Sampling Machine utilization Machine utilization Gantt Chart Production Scheduling Production Scheduling
Multiple Choice Multiple Answer Question Which of the following are typical examples of limit gauges?
Correct Answer Snap gauge , Plug gauge , Ring gauge
Your Answer Snap gauge , Plug gauge , Ring gauge
True/False Question Regular lubrication with carefully selected lubricants is an
essential factor in the maintenance of high grade machine tools working under continuous load.
Correct Answer True
Your Answer True
Select The Blank Question The ________ is one of the best known statistical relationship
regarding process control. Correct Answer Normal distribution
Your Answer Normal distribution
Multiple Choice Multiple Answer Question Which are the different methods of recording actual progress of
work? Correct Answer Display boards , Progress cards , Network updating
Your Answer Display boards , Progress cards , Network updating
Select The Blank Question The ________ technique builds the network from activities.
Correct Answer Critical Path Method
Your Answer Critical Path Method
Multiple Choice Multiple Answer Question Which of the following are steps to identify the critical path in a
small network? Correct Answer Compare the durations of all paths to identify the longest path. ,
Sum up the durations of activities along each path. , Enumerate all paths in the network and list down activities on each path.
Your Answer Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along each path. , Enumerate all paths in the network and list down activities on each path.
True/False Question Even if any activity on the critical path is delayed, project
completes on the scheduled time. Correct Answer False
Your Answer False
Multiple Choice Multiple Answer Question Which of the following variables which operate periodically are
the reasons for the cyclic pattern depicting peaks and valleys during Xbar-R control chart?
Correct Answer Wornout positions , Fatigue , Roller eccentricity
Your Answer Wornout positions , Fatigue , Roller eccentricity
Multiple Choice Multiple Answer Question Which are the different methods to record details of the existing
method during method study? Correct Answer Charts , Diagrams , Templates or models
Your Answer Charts , Diagrams , Templates or models
Select The Blank Question Work study is also called ________ study
Correct Answer Time and Motion
Your Answer Time and Motion
Multiple Choice Single Answer
Question Where does the SPC exercises the control to prevent the occurances of defectives?
Correct Answer On manufacturing process
Your Answer On manufacturing process
Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in
design of a product to Correct Answer To meet the intended function at lowest cost
Your Answer To meet the intended function at lowest cost
Multiple Choice Multiple Answer Question Which of the following are activities of corrective maintenance?
Correct Answer Modifications and improvements , Overhauling , Emergency repairs
Your Answer Modifications and improvements , Overhauling , Emergency repairs
True/False Question One major difference between CPM and PERT is the former's
adaptability for the projects where high degree of uncertainty prevails and activity times during performance are expected to vary considerably for certain activities.
Correct Answer False
Your Answer False
Multiple Choice Single Answer Question Following is one of the tasks of Production Control
Correct Answer Actual issue of forms and documents
Your Answer scheduling of jobs
Multiple Choice Multiple Answer Question Which are the different situations in which the process capability
studies of the various process are likely to fit? Correct Answer Process variability is just adequate , Good process variability but
bad process centering , Good process variability but poor process centering
Your Answer Process variability is just adequate , Good process variability but bad process centering , Good process variability but poor process centering
True/False Question The OC curve is based on the assumption that if the lot is large
in comparison to the sample, the probabilities of the OC curve will follow a poisson distribution.
Correct Answer False
Your Answer False
True/False
Question Systematic maintenance system can completely eliminate the wear and tear of machines.
Correct Answer False
Your Answer False
Multiple Choice Single Answer Question What do you mean by CPM?
Correct Answer Critical Path Method
Your Answer Critical Path Method
Multiple Choice Single Answer Question Material Planning is an integral part of
Correct Answer Production Planning
Your Answer Production Planning
Multiple Choice Single Answer Question How does the control chart of statistical quality control helps the
operating personnel? Correct Answer Identify the presence of an assignable cause before it develops
Your Answer Identify the presence of an assignable cause before it develops
Multiple Choice Single Answer Question Who prepares the daily production report?
Correct Answer Shop Supervisor
Your Answer Shop Supervisor
Select The Blank Question A ________ is another form of subcontracting.
Correct Answer Hiring capacity
Your Answer Hiring capacity
Select The Blank Question In ________ technique activity time are related to costs.
Correct Answer Critical Path Method
Your Answer Critical Path Method
Select The Blank Question Travel chart represents the quantitative data on material flow by
recording distance and ________ of movements between different pair of departments.
Correct Answer Frequency
Your Answer Frequency
Multiple Choice Single Answer Question A good plant layout helps in
Correct Answer Reducing handling costs
Your Answer Reducing handling costs
True/False Question In case of backward pass computation method, the latest event
time represents the latest occurrence time of the event. Correct Answer True
Your Answer True
True/False Question The component produced on completely automatic machines
may be subjected to sampling inspection while parts produced on semi-automatic and completely manual operated machines require cent percent inspection.
Correct Answer True
Your Answer True
- 1 -
1 True/False Question Only skilled worker can use the fixed limit gauge. Correct Answer False Your Answer True
True/False Question Availability of training schools, colleges and
management institutes reduces the company's internal training needs.
Correct Answer True Your Answer True
Select The Blank Question Material flow in process layout is ________. Correct Answer Discontinuous Your Answer Discontinuous
Multiple Choice Multiple Answer Question Which of the following is not the characteristic of
Project Production? Correct Answer Continuous flow of material , Highly mechanised
material handling , Virtually zero manufacturing cycle time
Your Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time
Multiple Choice Single Answer Question Which kind of labour force is required in case of
Jobbing Production? Correct Answer Highly Skilled Your Answer Highly Skilled
- 2 -
2
Select The Blank Question Start or finish points of activities is represented
by ________. Correct Answer Event Your Answer Event
Multiple Choice Multiple Answer Question Which of the following cases can be referred as
operation in method study recording? Correct Answer Change in physical characteristic , Consumption of
physical effort , Change in chemical characteristic Your Answer Change in physical characteristic , Consumption of
physical effort , Change in chemical characteristic Match The Following Question Correct Answer Your Answer Forcasting requirement for indirect material
Past consumption analysis technique
Past consumption analysis technique
Inventory control by classification
ABC Analysis ABC Analysis
Structure of the product
BOM BOM
Material Planning for dependent demand
MRP MRP
Multiple Choice Single Answer Question The ratio of output to input of a production
system is commonly known as Correct Answer Productivity Your Answer Productivity
- 3 -
3
True/False Question A properly designed sampling plan can control
sampling errors and completely eliminate them. Correct Answer False
Your Answer True
True/False Question Planned lubrication is said to be the nervous
system of the equipment. Correct Answer True Your Answer True
Multiple Choice Single Answer Question Any premise in which persons are employed for
purpose of making any product/s is called Correct Answer Factory Your Answer Factory
Select The Blank Question A ________ occurs when the object is moved
from one place to another. Correct Answer Transport Your Answer Transport
Multiple Choice Single Answer Question What do you understand by the metallergical
aspects of product which forms the vital part of engineering function?
Correct Answer Material specifications Your Answer Material specifications
Multiple Choice Single Answer
- 4 -
4
Question Technique of Value Engineering can be effectively employed in design of a product to
Correct Answer To meet the intended function at lowest cost Your Answer To meet the intended function at lowest cost
Select The Blank Question Process sheets for parts in job production are
prepared once and maintained as ________ process sheet.
Correct Answer Standard Your Answer Standard
Multiple Choice Single Answer Question Which method is used to trace especially those
movements which are too fast for human eye to pursue?
Correct Answer Cyclegraph Your Answer Three dimensional model
Multiple Choice Single Answer Question What is the meaning of " Product features"
according to J.M.Juran? Correct Answer Quality of design Your Answer Quality of design
Multiple Choice Single Answer Question A good plant layout helps in Correct Answer Reducing handling costs Your Answer Reducing handling costs
Multiple Choice Single Answer Question Process Engineer does not get sufficient time for
designing tooling for most economic production run
- 5 -
5
when Correct Answer Delivery time is less Your Answer Delivery time is less
Match The Following Question Correct Answer Your Answer Emerson Efficiency Plan
Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning Work Sampling Machine utilization Machine utilization Gantt Chart Production Scheduling Production Scheduling Multiple Choice Single Answer Question Where the ignorance towards the degradation of
machine leads to? Correct Answer Eventual breakdown Your Answer Eventual breakdown
Select The Blank Question A set of activities to keep an equipment in the
specified condition is called as ________. Correct Answer Maintenance Your Answer Maintenance
True/False Question An ideal OC curve is never possible only with cent
percent inspection. Correct Answer False Your Answer True
Multiple Choice Multiple Answer
- 6 -
6
Question Which kind of natural delays and interruptions are considered during estimation of activity time?
Correct Answer Shop efficiency , Breakdowns , Absenteeism Your Answer Breakdowns , Absenteeism , Delay due to shortage
of resources Multiple Choice Multiple Answer Question Which details are recorded in columns when each
square of progress card is split up into columns? Correct Answer Date , Shift , Quantity produced Your Answer Date , Shift , Quantity produced
Multiple Choice Multiple Answer Question Which of the following situations demand the
technical consideration while selecting a job for method study?
Correct Answer Jobs having inconsistent quality , Operations inviting frequent requests from supervisors for relaxation in allowed time because of variations in materials and tool performance , Jobs in which too many man-hours are spend in checking and rechecking work
Your Answer Jobs having inconsistent quality , Operations inviting frequent requests from supervisors for relaxation in allowed time because of variations in materials and tool performance , Jobs in which too many man-hours are spend in checking and rechecking work
Multiple Choice Multiple Answer Question Which of the following variables which operate
periodically are the reasons for the cyclic pattern depicting peaks and valleys during Xbar-R control chart?
- 7 -
7
Correct Answer Wornout positions , Fatigue , Roller eccentricity Your Answer Wornout positions , Fatigue , Roller eccentricity
Select The Blank Question In case of normal distribution curve, the
distribution is dependent on only two parameters, mean and ________.
Correct Answer Standard deviation Your Answer Standard deviation
Multiple Choice Single Answer Question What do you understand by the selection of the
job for the method study on the basis of money saving potential of the job?
Correct Answer Economic consideration Your Answer Economic consideration
True/False Question Shape od an OC curve is a function of sample size
and the acceptance number. Correct Answer True Your Answer True
Select The Blank Question In a Gantt chart, load can be indicated by
numbers or ________. Correct Answer Lines Your Answer Lines
Multiple Choice Multiple Answer Question Which of the following are examples of
consumption of physical effort during recording for method study?
- 8 -
8
Correct Answer Bending , Positioning , Unloading Your Answer Bending , Positioning , Unloading
Select The Blank Question American Society of Mechanical Engineers and
British Standard Institute have advocated ________ symbols for graphical method of recording in method study
Correct Answer Five Your Answer Five
Multiple Choice Multiple Answer Question Gross requirement of finished product is
determined on the basis of following Correct Answer Forecasted sales , Pending sales order ,
Management decision to stock Your Answer Forecasted sales , Pending sales order , Gross
Market requirement Multiple Choice Single Answer Question Material control function of PPC is concerned with Correct Answer Preparation of material estimates Your Answer Preparation of material estimates
Select The Blank Question An operation is indicated by ________ during
recording for method study. Correct Answer Circle Your Answer Circle
Select The Blank Question The normal distribution represents a ________
curve.
- 9 -
9
Correct Answer Bell shaped Your Answer Bell shaped
True/False Question Complexity and difficulty of Planning is influenced
by types of layout Correct Answer True Your Answer True
True/False Question Expediting action is necessary if the delays and
interruptions are abnormal and hence any subsequent delay is bound to extend the promised delivery date.
Correct Answer True Your Answer True
Multiple Choice Single Answer Question What do you understand by identification of
defects in materials, components, machining processes or men to fix responsibility of defectives, thereby preventing or minimising occurance of defectives?
Correct Answer Preventive function Your Answer Preventive function
Multiple Choice Single Answer Question Process type layout is suitable when Correct Answer there is wide variation in processing time of
operations Your Answer there is wide variation in processing time of
operations
- 10 -
10
Select The Blank Question Any incentive scheme must achieve the ________
of the organisation. Correct Answer Objectives Your Answer Objectives
Multiple Choice Multiple Answer Question Which of the following processes or activities are
denoted by using symbols while recording in method study?
Correct Answer Transport , Delay , Storage Your Answer Transport , Delay , Storage
Multiple Choice Multiple Answer Question Which of the following factors affect the quality
control function? Correct Answer Quality of workmanship , Production aids ,
Manufacturing facilities Your Answer Quality of workmanship , Production aids ,
Manufacturing facilities Multiple Choice Single Answer Question How to calculate the producer risk in the OC
Curve? Correct Answer Probability that a good lot will be rejected by the
sampling Your Answer Probability that a good lot will be rejected by the
sampling Multiple Choice Multiple Answer Question Lack of material planning results in the following Correct Answer Over ordering , under ordering , stockouts Your Answer Over ordering , under ordering , stockouts
- 11 -
11
Select The Blank Question In Gantt Chart, the vertical lines divide horizontal
lines into small squares which represents ________.
Correct Answer Units of measurement Your Answer Units of measurement
Select The Blank Question Manual computation in MRP system takes lot of
time and creates lot of ________. Correct Answer Delay Your Answer Delay
Multiple Choice Single Answer Question How many squares are there normally in a progress
card? Correct Answer 15 to 20 Your Answer 15 to 20
True/False Question A network should employ only those dummy
activities which are absolutely necessary. Correct Answer True Your Answer True
Select The Blank Question A ________ is one of the techniques of work
measurement to establish a time for a qualified worker to carry out a specified task under specified conditions and at the defined level of
- 12 -
12
performance. Correct Answer Time Study Your Answer Time Study
Multiple Choice Multiple Answer Question Components of Production Management include Correct Answer Capacity Planning , Job Design , Production
Planning Your Answer Capacity Planning , Production Planning , Manpower
Planning Multiple Choice Multiple Answer Question Which of the following are activities of corrective
maintenance? Correct Answer Modifications and improvements , Overhauling ,
Emergency repairs Your Answer Modifications and improvements , Overhauling ,
Emergency repairs Select The Blank Question The ________ pertain to the climatic conditions
which the component , product or material should withstand.
Correct Answer Environmental specifications Your Answer Environmental specifications
Match The Following Question Correct Answer Your Answer Combined Layout Mixed Layout Mixed Layout Fixed Position Layout Project Layout Project Layout Product Layout Line Layout Line Layout Process Layout Functional Layout Functional Layout
- 13 -
13
True/False Question Fixed cost is lower in case of continuous production
than intermittent production. Correct Answer False Your Answer True
Multiple Choice Single Answer Question Need for change in layout can occur due to
following reason Correct Answer introduction of new product Your Answer introduction of new product
Multiple Choice Multiple Answer Question Following are some of the Principles of
Management advocated by F W Taylor Correct Answer Selection of best worker for each particular task ,
Division of work between worker and management , Training and development of the workmen
Your Answer Selection of best worker for each particular task , Division of work between worker and management , Training and development of the workmen
Multiple Choice Single Answer Question One of the sophisticated operations research
techniques used in material planning is Correct Answer Dynamic programming Your Answer Dynamic programming
Multiple Choice Multiple Answer Question Which of the following may be the objectives of
project crashing? Correct Answer To complete the project in the least possible time
, To reduce project cost below it's normal cost ,
- 14 -
14
To achieve uniformity in requirement of resources Your Answer To complete the project in the least possible time
, To reduce project cost below it's normal cost , To achieve uniformity in requirement of resources
Multiple Choice Single Answer Question Gross requirement of products is determined on
the basis of Correct Answer Both forecast and pending orders Your Answer Both forecast and pending orders
True/False Question Kanban system is essentially a computer based
system for production scheduling and control Correct Answer False Your Answer False
True/False Question Cent percent inspection is required on WIP prior to
the key, critical or costly operation. Correct Answer True Your Answer True
Select The Blank Question ________ in the plan is lost if there are frequent
revisions. Correct Answer Faith Your Answer Faith
Select The Blank Question In case of an OC curve, the risk of rejecting a
good quality lot may vary between ________. Correct Answer 0.01 to 10%
- 15 -
15
Your Answer 0.01 to 10%
Multiple Choice Multiple Answer Question Which are the three basic types of control chart
by attribute? Correct Answer p-chart , c-chart , np-chart Your Answer p-chart , c-chart , np-chart
Select The Blank Question Production planning and control is normally assigned
to ________ sets of functions. Correct Answer Two Your Answer Two
Select The Blank Question Production Planning is the series of related and
coordinated activities designed to systematize in advance the ________ efforts.
Correct Answer Manufacturing Your Answer Manufacturing
True/False Question Breakdown is inversely proportional to the
investment in W.I.P. Correct Answer False Your Answer True
Multiple Choice Single Answer Question Fixed position layout is adopted when Correct Answer product is very heavy involving assembly of large
number of parts Your Answer product is very heavy involving assembly of large
number of parts
- 16 -
16
Select The Blank Question Function concerned with fixation of time allowed to
qualified worker for a job is called ________. Correct Answer Work Measurement Your Answer Time Measurement
Select The Blank Question The most commonly used methods employed to
determine the critical path in case of large networks are forward pass computation and ________.
Correct Answer Backward path computation Your Answer Backward path computation
Multiple Choice Single Answer Question Which is the next stage to the inspection based
quality control in the historical development of quality management.
Correct Answer Quality assurance Your Answer Quality assurance
Multiple Choice Multiple Answer Question Which are three different times considered in
PERT? Correct Answer Optimistic Time , Pessimistic time , Most likely
time Your Answer Most likely time , Optimistic Time , Pessimistic
time Multiple Choice Multiple Answer Question Which of the following causes can be responsible
for derailing the production schedule in a factory? Correct Answer Errors in drawings , Delay in receipt of material
- 17 -
17
from vendor , Excessive absenteeism Your Answer Errors in drawings , Delay in receipt of material
from vendor , Excessive absenteeism Select The Blank Question A ________ is another form of subcontracting. Correct Answer Hiring capacity Your Answer Hiring capacity
True/False Question In a control chart, as a general rule, time interval
should be inversely proportional to the average frequency of out of control conditions.
Correct Answer False Your Answer True
Multiple Choice Single Answer Question Following is one of the tasks of Production Control Correct Answer Actual issue of forms and documents Your Answer Preparation of load charts
True/False Question Job life is one of the factors that influence
Process Planning Correct Answer True Your Answer True
Multiple Choice Multiple Answer Question Plant Layout is concerned with optimum
arrangement of the following Correct Answer Storage space , Machines , Material Handling
Equipment Your Answer Storage space , Material Handling Equipment ,
- 18 -
18
Sequence of operation
Multiple Choice Multiple Answer Question Material Requirement Planning is very useful in
following situations Correct Answer Long Lead time for procurement , Several levels of
assemblies in product , Long manufacturing cycle Your Answer Several levels of assemblies in product , Long
manufacturing cycle , Demand for the product is not known
Multiple Choice Single Answer Question Which kind of preventive inspection detects some
maintenance related characteristics by making use of human senses, when equipment is in operation?
Correct Answer Extrernal inspection Your Answer Extrernal inspection
Multiple Choice Multiple Answer Question Which are reason due to which the progress of
work is rarely in line with it's plan? Correct Answer Absenteeism , Machine breakdowns , Substandard
performance against prefixed production standards Your Answer Absenteeism , Machine breakdowns , Substandard
performance against prefixed production standards True/False Question Three time estimates are transformed into
expected time before using it into a network. Correct Answer True Your Answer True
Multiple Choice Single Answer Question Which kind of labour force is required in case of
- 19 -
19
Jobbing Production? Correct Answer Highly Skilled Your Answer Highly Skilled
Multiple Choice Single Answer Question Inadequate production capacity ultimately leads to Correct Answer Poor Customer Service Your Answer Poor Customer Service
Multiple Choice Multiple Answer Question Which of the following are illustrations of
inspection? Correct Answer Physical count of incoming material against the
quantity mentioned in delivery challan , A dimensional check with measuring instrument , Visual check of burrs and finish
Your Answer A dimensional check with measuring instrument , Visual check of burrs and finish , Check the operator performance
Multiple Choice Single Answer Question Technique which can help an organization to reduce
inventory is called Correct Answer MRP Your Answer MRP
Multiple Choice Multiple Answer Question Which of the following method can be adopted to
overcome the problem of rushing up a job for it's timely completion?
Correct Answer Use of optimum speeds and feeds , Subcontracting , Job splitting
Your Answer Use alternative materials , Subcontracting , Job splitting
- 20 -
20
Match The Following Question Correct Answer Your Answer Emerson Efficiency Plan
Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning Work Sampling Machine utilization Machine utilization Gantt Chart Production Scheduling Production Scheduling True/False Question For p-chart, the central line of fraction
defectives is determined by average percentage defectives.
Correct Answer True Your Answer True
Multiple Choice Multiple Answer Question What is the basic minimum requirement for those
who are responsible for the quality of design? Correct Answer In depth knowledge about alternative materials and
manufacturing processes , access to latest technology and production process adopted by industries in the developed market , Continuous effort in product development
Your Answer In depth knowledge about alternative materials and manufacturing processes , access to latest technology and production process adopted by industries in the developed market , The designer must have a highest qualification in the particular area of working
Multiple Choice Single Answer Question Which industry out of the following industries
- 21 -
21
require maximum consideration for safety factor while selecting plant location?
Correct Answer Nuclear power plant Your Answer Nuclear power plant
Select The Blank Question The ________ is the probability that a good lot
will be rejected by the sampling plan. Correct Answer Producer's risk Your Answer Producer's risk
Multiple Choice Multiple Answer Question Which of the following are the basic requirements
of quality standard? Correct Answer Definite , Understandable , Economically viable Your Answer Definite , Understandable , Economically viable
Select The Blank Question The ________ is the defect level for which lots
are regarded as bad lots. Correct Answer Lot Tolerance Percentage Defective Your Answer Lot Tolerance Percentage Defective
Select The Blank Question An ________ history card is the record of all
repairs, replacements and engineering changes carried out in the equipment during it's period of service.
Correct Answer Equipment history card Your Answer Equipment history card
- 22 -
22
Multiple Choice Multiple Answer Question Which of the following are scheduling techniques? Correct Answer Critical Path Analysis , Index Method , Johnson's
two machine algorithm Your Answer Critical Path Analysis , Index Method , Johnson's
two machine algorithm True/False Question Sampling inspection suffice to check the work of
line inspectors and stage inspectors. Correct Answer True Your Answer True
Select The Blank Question The ________ advocates maintenance procedures
whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive
Correct Answer Preventive Maintenance Your Answer Preventive Maintenance
Multiple Choice Single Answer Question Which document is used for returning the surplus
material? Correct Answer Stores Return Note Your Answer Stores Return Note
Multiple Choice Multiple Answer Question Which of the following products should be
produced by using mass production? Correct Answer Refrigerator , Tyre for automobile , Television
Set Your Answer Refrigerator , Television Set
- 23 -
23
True/False Question Regular lubrication with carefully selected
lubricants is an essential factor in the maintenance of high grade machine tools working under continuous load.
Correct Answer True Your Answer True
Multiple Choice Single Answer Question Which time is determined by the backward pass
computation method of determination of critical path ?
Correct Answer Latest allowable time for each event Your Answer Latest allowable time for each event
Multiple Choice Single Answer Question Which photographic technique is used to record
path of motions of the members of the body during method study?
Correct Answer Cyclograph Your Answer Cyclograph
Match The Following Question Correct Answer Your Answer Consumption of effort Posting a ledger Removal of worn-out
part from a machine Information given Giving directions or
instructions Giving directions or instructions
Subtraction Removal of worn-out part from a machine
Posting a ledger
Change in chemical characteristic
Chemical reaction Chemical reaction
- 24 -
24
Multiple Choice Multiple Answer Question Which of the following is not the characteristic of
Project Production? Correct Answer Continuous flow of material , Highly mechanised
material handling , Virtually zero manufacturing cycle time
Your Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time
True/False Question Grouping of machines gives a lot of flexibility in
loading and scheduling Correct Answer True Your Answer True
Multiple Choice Single Answer Question Any premise in which persons are employed for
purpose of making any product/s is called Correct Answer Factory Your Answer Factory
Multiple Choice Single Answer Question The ratio of output to input of a production
system is commonly known as Correct Answer Productivity Your Answer Productivity
Multiple Choice Single Answer Question Technique of Value Engineering can be effectively
employed in design of a product to Correct Answer To meet the intended function at lowest cost Your Answer To meet the intended function at lowest cost
- 25 -
25
Multiple Choice Multiple Answer Question Which are the different methods to record details
of the existing method during method study? Correct Answer Charts , Diagrams , Templates or models Your Answer Charts , Diagrams , Templates or models
True/False Question Fixed cost is lower in case of continuous production
than intermittent production. Correct Answer False Your Answer False
Multiple Choice Single Answer Question How should a dummy activity be represented in a
network? Correct Answer By dotted line Your Answer By dotted line
True/False Question Tool breakage has got nearly zero chances in case
of eventual breakdown. Correct Answer False Your Answer False
True/False Question Under MRP system for common items order for
procurement is placed based on requirement for each product
Correct Answer False Your Answer True
Select The Blank Question Work study is also called ________ study
- 26 -
26
Correct Answer Time and Motion Your Answer Method
Match The Following Question Correct Answer Your Answer Craft Facilities Planning Facilities Planning Work Sampling Machine utilization Sampling Inspection Gantt Chart Production Scheduling Production Scheduling Emerson Efficiency Plan
Wage Payment Wage Payment
Multiple Choice Single Answer Question Which is the ideal place to write a time allotted
for an activity in a network? Correct Answer Below the arrow Your Answer Below the arrow
Select The Blank Question A set of activities to keep an equipment in the
specified condition is called as ________. Correct Answer Maintenance Your Answer Maintenance
True/False Question In a control chart, as a general rule, time interval
should be inversely proportional to the average frequency of out of control conditions.
Correct Answer False Your Answer False
True/False Question Floor inspection delays the identification of faults
- 27 -
27
which can not be rectified immediately before large lots are spoiled.
Correct Answer False Your Answer False
True/False Question MRP software generates time period wise
requirement of subassemblies Correct Answer True Your Answer True
Multiple Choice Single Answer Question In mass/batch production organizations where
goods are produced for stocking, Work Order is raised on the basis of
Correct Answer Sales Programme Your Answer Sales Programme
Multiple Choice Multiple Answer Question Which of the following are the objectives of a
good maintenance system? Correct Answer Elimination of unsafe conditions , Minimization of
wear and tear of machines , Ensuring maximum plant availability
Your Answer Elimination of unsafe conditions , Minimisation of wear and tear of machines , Ensuring maximum plant availability
Multiple Choice Single Answer Question Who prepares the daily production report? Correct Answer Shop Supervisor Your Answer Shop Supervisor
- 28 -
28
Multiple Choice Single Answer Question How does the control chart of statistical quality
control helps the operating personnel? Correct Answer Identify the presence of an assignable cause
before it develops Your Answer Identify the presence of an assignable cause
before it develops Multiple Choice Multiple Answer Question How to exercise control over quality? Correct Answer Periodical analysis of inspecting reports to
establish causes of rejections , Preperation of quality standard and specifications , Exercising control over inputs
Your Answer Periodical analysis of inspecting reports to establish causes of rejections , Preperation of quality standard and specifications , Exercising control over inputs
Multiple Choice Multiple Answer Question Which of the following concepts must be
understood for the achievement of quality? Correct Answer Quality of conformance , Purpose of product ,
Quality of design Your Answer Quality of conformance , Quality of design
Multiple Choice Single Answer Question What do you understand by the critical analysis of
existing jobs to develop easier and effective method?
Correct Answer Method study Your Answer Method study
Select The Blank
- 29 -
29
Question The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions.
Correct Answer Unexpected Your Answer Unexpected
True/False Question Proper care and storage is not an essential part of
a well planned lubrication system. Correct Answer False Your Answer True
Multiple Choice Multiple Answer Question Which of the following information is available in
summary of part in a chart during methods study? Correct Answer Frequency of each symbol , Total time for each
symbol , Total distance traveled by the object Your Answer Frequency of each symbol , Total time for each
symbol , Total distance travelled by the object True/False Question A network should employ only those dummy
activities which are absolutely necessary. Correct Answer True Your Answer True
Multiple Choice Multiple Answer Question Which of the following observations are expected
from the preventive maintenance person? Correct Answer Wrong allignments , Overheating defects ,
Excessive play Your Answer Wrong allignments , Overheating defects ,
Excessive play
- 30 -
30
Select The Blank Question The ________ includes preventive maintenance
activities whose needs are identified through inspection which requires stoppage of machines.
Correct Answer Shutdown Maintenance Your Answer Shutdown Maintenance
Multiple Choice Multiple Answer Question Which of the following activities can become a
part of a preventive maintenance system? Correct Answer Condition monitoring , Planned Lubrication ,
Preventive inspection Your Answer Condition monitoring , Planned Lubrication ,
Preventive inspection Multiple Choice Multiple Answer Question In an organization there may not be a formal PPC
department if Correct Answer Work is highly repetitive in nature , Planning
activities are performed by the line staff , Number of workmen is not very large
Your Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large
Multiple Choice Multiple Answer Question Which of the following symbols are used in flow
process chart but not used in operation process chart?
Correct Answer Storage , Delay , Transport Your Answer Storage , Delay , Transport
Multiple Choice Single Answer Question The process of changing inputs into outputs
- 31 -
31
thereby adding some value to entity can be defined as
Correct Answer Operation Your Answer Operation
Multiple Choice Multiple Answer Question Which of the following processes or activities are
denoted by using symbols while recording in methodstudy?
Correct Answer Transport , Delay , Storage Your Answer Transport , Delay , Storage
Multiple Choice Multiple Answer Question Which kind of natural delays and interruptions are
considered during estimation of activity time? Correct Answer Shop efficiency , Breakdowns , Absenteeism Your Answer Breakdowns , Absenteeism , Delay due to shortage
of resources True/False Question Kanban system is essentially a computer based
system for production scheduling and control Correct Answer False Your Answer False
Multiple Choice Multiple Answer Question Order preparation process for products
manufactured to order requires following documents
Correct Answer Sales Order , Work order , Shop order Your Answer Sales Order , Work order , Shop order
- 32 -
32
True/False Question Quality control determines what, when, and how
much to inspect while inspection actually conducts examination of goods.
Correct Answer True Your Answer True
Multiple Choice Single Answer Question What do you understand by identification of
defects in materials, components, machining processes or men to fix responsibility of defectives, thereby preventing or minimizing occurrence of defectives?
Correct Answer Preventive function Your Answer Assurance function
Multiple Choice Multiple Answer Question Which are the major types of defects? Correct Answer Minor , Major , Critical Your Answer Minor , Major , Critical
Select The Blank Question The ________ is necessary when the job requires
detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company.
Correct Answer Inspection order Your Answer Inspection order
Multiple Choice Single Answer Question What is the purpose of squares used in progress
chart? Correct Answer To record the progress of work for each operation
- 33 -
33
Your Answer To record the progress of work for each operation
Multiple Choice Single Answer Question How non-critical activities are shown in the time
chart during project scheduling? Correct Answer Thin lines Your Answer Thin lines
Multiple Choice Single Answer Question What is the meaning of " Product features"
according to J.M.Juran? Correct Answer Quality of design Your Answer Quality of design
Multiple Choice Multiple Answer Question Operation Layout generally contains following
information Correct Answer Part Sketch , Standard Time , Jigs and fixtures Your Answer Sequence of operations , Part Sketch , Jigs and
fixtures Multiple Choice Single Answer Question Where does the SPC exercises the control to
prevent the occurances of defectives? Correct Answer On manufacturing process Your Answer On manufacturing process
Multiple Choice Multiple Answer Question Which of the following are typical examples of
limit gauges? Correct Answer Snap gauge , Plug gauge , Ring gauge Your Answer Vernier height gauge , Plug gauge , Ring gauge
- 34 -
34
True/False Question An activity should represent an operation or set of
operations which can be performed using a particular kind of equipment or a special skill.
Correct Answer True Your Answer True
Select The Blank Question OC curve of ideal sampling plan suggests that all
lots less than 3% defectives have the probability of acceptance of ________.
Correct Answer One Your Answer One
True/False Question Fixed cost is lower in case of continuous production
than intermittent production. Correct Answer False Your Answer False
Match The Following Question Correct Answer Your Answer Combined Layout Mixed Layout Mixed Layout Fixed Position Layout Project Layout Functional Layout Product Layout Line Layout job layout Process Layout Functional Layout Line Layout True/False Question If the firm has adopted elaborate planned
maintenance system, there is no chance of any unplanned maintenance work.
Correct Answer False
- 35 -
35
Your Answer False
Multiple Choice Multiple Answer Question What are uses of diagrams in method study? Correct Answer Study different plant layouts and select the most
optimum one , Study the extent of traffic over the different routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during the movement of material.
Your Answer Study different plant layouts and select the most optimum one , Study the extent of traffic over the different routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during the movement of material.
Multiple Choice Multiple Answer Question Which of the following cases can be treated as
delay during recording of method study? Correct Answer Operators awaiting instructions from supervisor ,
Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn
Your Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn
Select The Blank Question The ________ is the probability that a bad lot
will be accepted by the sampling plan. Correct Answer Consumer's risk Your Answer Consumer's risk
True/False
- 36 -
36
Question Grouping of machines gives a lot of flexibility in loading and scheduling
Correct Answer True Your Answer True
Multiple Choice Single Answer Question Which kind of labour force is required in case of
Jobbing Production? Correct Answer Highly Skilled Your Answer Highly Skilled
Select The Blank Question The ________ is the maintenance work initiated
on a result of knowledge of the condition of an item from routine or continuous checking.
Correct Answer Condition monitoring Your Answer Preventive maintenance
Select The Blank Question The ________ pertain to the climatic conditions
which the component , product or material should withstand.
Correct Answer Environmental specifications Your Answer Design specifications
Select The Blank Question The ________ is the watch dog which ensures
that every element of production and activities which could affect the quality of end product are regulated to the extent desirable.
Correct Answer Quality control Your Answer Quality control
- 37 -
37
Select The Blank Question Goods after final inspection should accompany
________to enable dispatch department to identify and draw correct reference.
Correct Answer Forwarding note Your Answer Forwarding note
True/False Question After goods have been manufactured, route sheets
and operation layouts should not be collected back. Correct Answer False Your Answer False
Multiple Choice Multiple Answer Question The advantages of Factor Analysis method over
Balancing advantages against disadvantage methods are
Correct Answer Considers intangible costs/benefits , Is a rational method , Analysis is more objective
Your Answer Considers intangible costs/benefits , Is a rational method , Less time consuming
Select The Blank Question One detachable ticket is prepared for each
________. Correct Answer Operation Your Answer Operation
Multiple Choice Single Answer Question What do you understand by the properties which
are difficult to measure quantitatively but usually measured by the comarision and then classification into acceptable or unacceptable?
Correct Answer Attributes
- 38 -
38
Your Answer Tolerances
Multiple Choice Single Answer Question Which varaible is taken along the ordinate or Y
axis? Correct Answer Quality Your Answer Time
Select The Blank Question The ________ is specified to indicate the
maximum permissible variability in the dimensions product or parts.
Correct Answer Tolerance Your Answer Standard
Match The Following Question Correct Answer Your Answer Release of manufacturing orders
Job card Job card
Shop interdepartmental transport
Move order Move order
Issue of tools for production
Tool order Tool order
Return of surplus material
Stores return note Stores return note
Multiple Choice Multiple Answer Question Which of the following is not the characteristic of
Project Production? Correct Answer Continuous flow of material , Highly mechanised
material handling , Virtually zero manufacturing cycle time
- 39 -
39
Your Answer Highly mechanised material handling , Fixed position layout , Virtually zero manufacturing cycle time
True/False Question As a general rule, the number of tail event of an
activity is more than that of it's head event. Correct Answer False Your Answer False
Multiple Choice Multiple Answer Question Which of the following factors play important role
while selecting or rejecting a particular site from legislation and taxation point of view?
Correct Answer Labour laws , Building codes , Policies regarding issue of licences
Your Answer Labour laws , Building codes , Policies regarding issue of licences
True/False Question Breakdown is inversly proportional to the
investment in W.I.P. Correct Answer False Your Answer False
Select The Blank Question A ________ is another form of subcontracting. Correct Answer Hiring capacity Your Answer Hiring capacity
Multiple Choice Single Answer Question What do you mean by planned corrective
manitenance which provides an opportunity to undertake design modifications in the equipment to
- 40 -
40
eliminate or reduce frequency of breakdowns. Correct Answer Design-out Maintenance Your Answer Design-out Maintenance
True/False Question An activity can share the same tail event and
same head event with any other activity. Correct Answer False Your Answer True
Multiple Choice Single Answer Question Which manufacturing method is ideal for the use
of air gauges as inspection device? Correct Answer Mass Your Answer Jobbing
Multiple Choice Single Answer Question What do you understand by the metallergical
aspects of product which forms the vital part of engineering function?
Correct Answer Material specifications Your Answer Material specifications
Select The Blank Question An Ideal OC curve is ________ shaped curve that
accpets all the lots with quality equal to or better than AQL .
Correct Answer Rectangular Your Answer Bell
Multiple Choice Single Answer Question What do you understand by the quality specified
by the designer on behalf the customer?
- 41 -
41
Correct Answer Quality of design Your Answer Quality of design
True/False Question Independent float either affects the float of
preceding activities or that of succeeding activities.
Correct Answer False Your Answer True
True/False Question Inspection should be conducted prior to an
operation, after whose completion no rework whatsoever is possible.
Correct Answer True Your Answer True
Multiple Choice Multiple Answer Question Which are major benefits of identifying the
critical path? Correct Answer It helps to identify the set of activities and
events which are critical and as such must be carefully controlled and monitored , It identifies activities to be given preference in allocation of resources. , It helps to exercise "control by exception".
Your Answer It helps to identify the set of activities and events which are critical and as such must be carefully controlled and monitored , It identifies activities to be given preference in allocation of
- 42 -
42
resources. , It helps to exercise "control by exception".
Multiple Choice Multiple Answer Question Which of the following products should be
produced by using mass production? Correct Answer Refrigerator , Tyre for automobile , Television
Set Your Answer Refrigerator , Tyre for automobile , Television
Set Multiple Choice Single Answer Question What do you mean by lowest possible direct cost
required to complete an activity within it's normal time?
Correct Answer Normal cost Your Answer Normal cost
Select The Blank Question Production Planning is a centralised activity which
includes functions such as ________ Correct Answer Scheduling Your Answer Scheduling
True/False Question For p-chart, "Inspection by variables" is much
faster than "Inspection by attributes" Correct Answer False Your Answer False
Select The Blank Question The ________ are the definitions of the
measurable as well as non-measurable characteristics of the product.
- 43 -
43
Correct Answer Specifications Your Answer Specifications
Select The Blank Question The ________ must ensure that the product
satisfy the functional requirements of it's usage. Correct Answer Quality of design Your Answer Quality of design
Multiple Choice Single Answer Question What do you mean by the study of repetitive
short cycle operations which involve quick hand / feet motions?
Correct Answer Micro motion study Your Answer Micro motion study
Multiple Choice Single Answer Question Which industry out of the following industries
require maximum consideration for safety factor while selecting plant location?
Correct Answer Nuclear power plant Your Answer Nuclear power plant
Match The Following Question Correct Answer Your Answer Change in chemical characteristic
Chemical reaction Chemical reaction
Consumption of effort Posting a ledger Posting a ledger Information given Giving directions or
instructions Giving directions or instructions
Subtraction Removal of worn-out part from a machine
Removal of worn-out part from a machine
- 44 -
44
True/False Question Job life is one of the factors that influence
Process Planning Correct Answer True Your Answer True
Select The Blank Question A ________helps to avoid crowding of jobs at a
particular machine by change of route of some of the jobs or by diverting work to other machine.
Correct Answer Control board Your Answer Control board
Select The Blank Question The term ________ emplies the foregone profit
due to inability of company to produce. Correct Answer Opportunity cost Your Answer Opportunity cost
Multiple Choice Single Answer Question Inadequate production capacity ultimately leads to Correct Answer Poor Customer Service Your Answer Poor Customer Service
Multiple Choice Single Answer Question What does the additional cost incurred to reduce
the duration of an activity by one unit of time represent?
Correct Answer Activity cost slope Your Answer Activity cost slope
Select The Blank
- 45 -
45
Question The ________ is the process of withdrawing the equipment from the production line, dismantling it unit wise, visualising defects, effecting adjustments, replacing worn-out parts and finally building it up to get desired accuracies.
Correct Answer Reconditioning Your Answer Reconditioning
True/False Question Quality can not be inspected into a product, it
must be manufactured into it by the supplier. Correct Answer True Your Answer True
Multiple Choice Multiple Answer Question Major contributors in the development of Control
Charts, Sampling plan are Correct Answer F H Dodge , H G Roming , Walter Schewhart Your Answer F H Dodge , H G Roming , Walter Schewhart
Multiple Choice Single Answer Question A good plant layout helps in Correct Answer Reducing handling costs Your Answer Reducing handling costs
Multiple Choice Single Answer Question Technique which can help an organization to reduce
inventory is called Correct Answer MRP Your Answer MRP
Multiple Choice Multiple Answer Question Which are the distinct functions of scientific
- 46 -
46
quality control? Correct Answer Acceptance function , Preventive function ,
Assurance function Your Answer Acceptance function , Preventive function ,
Assurance function Multiple Choice Single Answer Question Which kind of preventive inspection detects some
defects in moving parts, internal cracks, and others , when machine is under preplanned shutdown?
Correct Answer Internal inspection Your Answer Internal inspection
Multiple Choice Single Answer Question How much time does the dummy activity take? Correct Answer Zero Time Your Answer Zero Time
Multiple Choice Single Answer Question Product layout offer following advantages Correct Answer There is economy in manufacturing time Your Answer There is economy in manufacturing time
True/False Question In Gantt Chart, the horizontal lines divide vertical
lines into sections which represents either operations or work centers.
Correct Answer True Your Answer True
Multiple Choice Multiple Answer Question Components of Production Management include
- 47 -
47
Correct Answer Capacity Planning , Job Design , Production Planning
Your Answer Capacity Planning , Job Design , Production Planning
Multiple Choice Single Answer Question Which of the following technique is activity
oriented? Correct Answer Critical Path Method Your Answer Critical Path Method
Multiple Choice Multiple Answer Question How the concept of float is helpful to planners? Correct Answer To decide priorities in allocation of resources , To
minimize the requirement of resources , To prevent peaks and valleys in requirement of resources
Your Answer To decide priorities in allocation of resources , To minimize the requirement of resources , To prevent peaks and valleys in requirement of resources
Multiple Choice Multiple Answer Question Which of the following are the major steps of
making of the X bar-R control chart? Correct Answer Collection of data , Calculation of mean, range,
grand average and mean range , Set up control chart for average and calculate control limits of range chart
Your Answer Collection of data , Calculation of mean, range, grand average and mean range , Set up control chart for average and calculate control limits of range chart
- 48 -
48
True/False Question Three time estimates are transformed into
expected time before using it into a network. Correct Answer True Your Answer True
Multiple Choice Multiple Answer Question Which of the following can be subtypes of
corrective maintenance? Correct Answer Shutdown Maintenance , Design-out Maintenance ,
Design-in Maintenance Your Answer Shutdown Maintenance , Design-out Maintenance ,
Design-in Maintenance Match The Following Question Correct Answer Your Answer Scheduling of interrelated activities of small projects with consideration of uncertainty of duration of activities.
Critical Path Analysis Critical Path Analysis
Two machines & processing time depends on sequence of job loading
Johnson's Two Machine Algorithm
Johnson's Two Machine Algorithm
Sufficient orders and resonable choice of machines
Index Method Index Method
Time relationship between when a product is required and when it can be
Critical Ratio Scheduling
Critical Ratio Scheduling
- 49 -
49
made available Multiple Choice Multiple Answer Question Which of the following method can be adopted to
overcome the problem of rushing up a job for it's timely completion?
Correct Answer Use of optimum speeds and feeds , Subcontracting , Job splitting
Your Answer Use of optimum speeds and feeds , Subcontracting , Job splitting
Select The Blank Question Capacity decisions have a direct influence on
performance of production system in respect of ________
Correct Answer Delivery performance Your Answer Delivery performance
Multiple Choice Multiple Answer Question Which of the following is a part of preparing
manufacturing order set as a primary function of dispatching?
Correct Answer Operational layouts , Move orders , Pre-filled stores issue orders
Your Answer Operational layouts , Move orders , Pre-filled stores issue orders
Multiple Choice Multiple Answer Question Which are the advantages of suburban location? Correct Answer Avaialability of adequate land at lower cost , Both
skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction
Your Answer Avaialability of adequate land at lower cost , Both
- 50 -
50
skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction
Select The Blank Question In case of an OC curve, the risk of rejecting a
good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.01 to 10%
Select The Blank Question The ________ is a set of tools and techniques by
which products are made to comply with the specifications at minimum cost to the firm.
Correct Answer Quality control system Your Answer Quality control system
True/False Question The problems of congestion, bottlenecks and
backtracking can not be visualized by using templates and models.
Correct Answer False Your Answer True
True/False Question Every network does not necessarily have a critical
path. Correct Answer False Your Answer False
Multiple Choice Single Answer Question Site factors for plant location include Correct Answer Suitability of land
- 51 -
51
Your Answer Suitability of land
True/False Question Shape od an OC curve is a function of sample size
and the acceptance number. Correct Answer True Your Answer True
True/False Question Inspection Order can be a verbal order Correct Answer True Your Answer True
True/False Question Suburban location provides the compromise
between rural and urban locations. Correct Answer True Your Answer True
Multiple Choice Multiple Answer Question Which of the following factors affect the quality
control function? Correct Answer Quality of workmanship , Production aids ,
Manufacturing facilities Your Answer Quality of workmanship , Production aids ,
Manufacturing facilities Multiple Choice Single Answer Question Which chart sets out the sequence of flow of work
of a product, or any part of it through the section or department or a factory by recording the events under review using appropriate symbols?
Correct Answer Flow process chart
- 52 -
52
Your Answer Flow process chart
Multiple Choice Multiple Answer Question Which of the following cases indicated that the
operation has occurred? Correct Answer Movement of components to assembly section ,
Raw material movement , A worker's trip to grinder to sharpen the tools
Your Answer Movement of components to assembly section , Raw material movement
Select The Blank Question Delay is indicated by ________ during recording
for method study. Correct Answer Letter Dee Your Answer Letter Dee
Multiple Choice Single Answer Question Which chart sets out the sequence of flow of work
of a product, or any part of it through the section or department or a factory by recording the events under review using appropriate symbols?
Correct Answer Flow process chart Your Answer Flow process chart
Multiple Choice Single Answer Question How dummy activities are shown in the time chart
during project scheduling? Correct Answer Vertical lines Your Answer Vertical lines
- 53 -
53
Select The Blank Question In a control chart, time interval measures the
time gap between ________. Correct Answer Two consequtive samples Your Answer Two central lines
Multiple Choice Multiple Answer Question What are the benefits of reconditioning? Correct Answer Eliminates problems and frequent breakdowns ,
Increases life of an equipment , It helps to plan requirement of replacement spares
Your Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It eliminates need of preventive maintenance
Multiple Choice Single Answer Question Who has introduced the useful concept of control
chart in 1931? Correct Answer Walter Shewhart Your Answer Walter Shewhart
True/False Question Kanban system is essentially a computer based
system for production scheduling and control Correct Answer False Your Answer True
True/False Question Even in a small set up where in maintenance of a
machine is looked after by a mechanic cum worker, he should report directly to the person responsible for the manufacturing operations.
Correct Answer True
- 54 -
54
Your Answer True
True/False Question Tool breakage has got nearly zero chances in case
of eventual breakdown. Correct Answer False Your Answer True
True/False Question Quality can not be inspected into a product, it
must be manufactured into it by the supplier. Correct Answer True Your Answer False
Select The Blank Question The ________ includes preventive maintenance
activities whose needs are identified through inspection which requires stoppage of machines.
Correct Answer Shutdown Maintenance Your Answer Working Maintenance
Match The Following Question Correct Answer Your Answer When to inspect Stages of inspection Specification What to inspect Specification Sampling or cent
percent inspection How to inspect Inspection devices Inspection devices How much to inspect Sampling or cent
percent inspection Stages of inspection
Multiple Choice Single Answer Question Which kind of inspection is followed in case of
- 55 -
55
process layout? Correct Answer First off inspection Your Answer Vendor inspection
True/False Question A network can have more than one starting event
but completion event must be only one. Correct Answer False Your Answer True
Multiple Choice Multiple Answer Question Which of the following are ideal situations for the
preventive inspection? Correct Answer Weekly off and holidays , Non-production hours ,
Stand-up equipment Your Answer Weekly off and holidays , Non-production hours ,
Stand-up equipment Match The Following Question Correct Answer Your Answer Forcasting requirement for indirect material
Past consumption analysis technique
MRP
Inventory control by classification
ABC Analysis ABC Analysis
Structure of the product
BOM Economic order quantity
Material Planning for dependent demand
MRP Past consumption analysis technique
Multiple Choice Multiple Answer Question MRP utilises the following information Correct Answer Master production schedule , Product structure ,
Lead time for procurement/manufacturing
- 56 -
56
Your Answer Master production schedule , Product structure , Lead time for procurement/manufacturing
Multiple Choice Single Answer Question What do you mean by a single event which
represents the joint completion of more than one activities?
Correct Answer Burst event Your Answer Float
Multiple Choice Single Answer Question Need for change in layout can occur due to
following reason Correct Answer introduction of new product Your Answer increase labour efficiency
Multiple Choice Single Answer Question What do you mean by the chart on which the
major activities and entry points of materials are recorded to have graphic view of operations and inspections involved in the process?
Correct Answer Operation process chart Your Answer Travel chart
Multiple Choice Multiple Answer Question Which are different ways to show critical path in
a network? Correct Answer Thick Line , Red Line , Double Line Your Answer Thick Line , Dotted line , Double Line
Multiple Choice Single Answer Question MRP is based on the concept of inventory demand
which is of following type
- 57 -
57
Correct Answer Dependent and independent Your Answer Dependent and independent
Multiple Choice Multiple Answer Question Which are three different bases to establish an
activity time? Correct Answer Past experience , Judgement , Historical data Your Answer Actual measurement , Past experience
Select The Blank Question A ________ is another typical chart which is used
to record frequency of movements between work centers.
Correct Answer Travel chart Your Answer Movement chart
True/False Question Process layout is also called line layout Correct Answer False Your Answer True
Select The Blank Question A ________helps to avoid crowding of jobs at a
particular machine by change of route of some of the jobs or by diverting work to other machine.
Correct Answer Control board Your Answer Move order
Select The Blank Question The ________ pertain to the climatic conditions
which the component , product or material should withstand.
Correct Answer Environmental specifications
- 58 -
58
Your Answer Environmental specifications
Select The Blank Question The most common confidence level corresponds
to________. Correct Answer 2 Sigma Your Answer 6 Sigma
Multiple Choice Multiple Answer Question Components of Production Management include Correct Answer Capacity Planning , Job Design , Production
Planning Your Answer Capacity Planning , Job Design , Production
Planning Multiple Choice Single Answer Question How to calculate float? Correct Answer Parallel critical path time minus Non-critical path
time Your Answer Parallel critical path time minus Non-critical path
time Select The Blank Question Travel chart represents the quantitative data on
material flow by recording distance and ________ of movements between different pair of departments.
Correct Answer Frequency Your Answer Time
Select The Blank Question The most commonly used methods employed to
determine the critical path in case of large networks are forward pass computation and
- 59 -
59
________. Correct Answer Backward path computation Your Answer Backward path computation
Multiple Choice Multiple Answer Question Which of the following aspects are essential to
ensure quality of purchased items? Correct Answer Defining right quality for the job , Vendor
performance evaluation , Making sure that suppliers understand the requirements
Your Answer Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers understand the requirements
Multiple Choice Multiple Answer Question Which of the following observations are expected
from the preventive maintenance person? Correct Answer Wrong allignments , Overheating defects ,
Excessive play Your Answer Wrong allignments , Overheating defects ,
Excessive play Multiple Choice Single Answer Question Why method study should precede work
measurement? Correct Answer Time for a job can be accessed accurately only
after standardizing the method Your Answer Time for a job can be accessed accurately only
after standardizing the method True/False Question Repetitive movements between work stations which
are difficult to be traced on string diagrams can be conveniently shown on flow diagrams.
- 60 -
60
Correct Answer False Your Answer True
Multiple Choice Single Answer Question Who prepares the daily production report? Correct Answer Shop Supervisor Your Answer Maintenance Engineer
Multiple Choice Single Answer Question Status of PPC department in an organization
depends on following factor Correct Answer manufacturing process Your Answer Plant location
True/False Question Dust gets mixed with lubricants, forms an abrasive
substance and causes pre-mature failure of machinery.
Correct Answer True Your Answer True
Multiple Choice Multiple Answer Question Scale model used for layout analysis have following
advantages Correct Answer Non-technical person finds it easy to comprehend
, Overhead facilities can be shown , Models can beshifted easily
Your Answer Non-technical person finds it easy to comprehend , Overhead facilities can be shown , are suitable for all types of layout analysis
True/False Question Feasibility of time schedule requires that an
- 61 -
61
activity be scheduled before any of it's predecessors are scheduled.
Correct Answer False Your Answer True
Multiple Choice Multiple Answer Question Which are the different methods to record details
of the existing method during method study? Correct Answer Charts , Diagrams , Templates or models Your Answer Charts , Diagrams , Templates or models
Select The Blank Question The ________ are the definitions of the
measurable as well as non-measurable characteristics of the product.
Correct Answer Specifications Your Answer Standards
True/False Question Suburban location provides the compromise
between rural and urban locations. Correct Answer True Your Answer True
Select The Blank Question The________ is a very fine work measurement
technique whereby the time required to do a job is synthesized by combining the predetermined times for different elements of the job.
Correct Answer Pre-determined Motion & Time Study Your Answer Time study
Multiple Choice Multiple Answer
- 62 -
62
Question Which details are recorded in columns when each square of progress card is split up into columns?
Correct Answer Date , Shift , Quantity produced Your Answer Date , Quantity subcontracted , Quantity
produced
Multiple Choice Single Answer Question The process of changing inputs into outputs
thereby adding some value to entity can be defined as
Correct Answer Operation Your Answer Conversion
Multiple Choice Multiple Answer Question Which of the following three methods used to
select the qualified supplier? Correct Answer By vendor plant surveys , By reputation , By
experience Your Answer By reputation , By the perofrmance of first lot ,
By vendor plant surveys
Select The Blank Question Simple processes or activities can be recorded
with the help of the ________. Correct Answer Foregoing symbols Your Answer Foregoing symbols
Select The Blank Question The ________ is a pair of chart consisting of
average chart and range chart placed one below another on a piece of graph paper.
- 63 -
63
Correct Answer X bar-R-chart Your Answer np-chart
True/False Question Flow process charts do record movements as well
as visual pictures. Correct Answer False Your Answer True
Multiple Choice Multiple Answer Question Which are three different bases to establish an
activity time? Correct Answer Past experience , Judgement , Historical data Your Answer Actual measurement , Past experience
Multiple Choice Single Answer Question Which is the ideal place to inspect jigs and
fixtures in a mass manufacturing unit? Correct Answer Separate inspection room Your Answer Shop floor
Match The Following Question Correct Answer Your Answer When to inspect Stages of inspection Specification What to inspect Specification Tools & Jigs How to inspect Inspection devices Stages of inspection How much to inspect Sampling or cent
percent inspection Inspection devices
Multiple Choice Multiple Answer Question Which are the sub factors of community facilities
or social infrastructure?
- 64 -
64
Correct Answer Accommodation , Educational , Entertainment Your Answer Accomodation , Labour laws
Multiple Choice Multiple Answer Question Which of the following is not the characteristic of
Project Production? Correct Answer Continuous flow of material , Highly mechanised
material handling , Virtually zero manufacturing cycle time
Your Answer Continuous flow of material , Highly mechanised material handling
True/False Question In case of X bar, if the process is not under
control indicated by some points falling outside the control limits, such points outside the control limitsare eliminated and new trial control limits for the remaining points are computed.
Correct Answer True Your Answer True
Select The Blank Question In a control chart, time interval measures the
time gap between ________. Correct Answer Two consequtive samples Your Answer Any two samples
True/False Question The control chart for number of defectives is
more convenient to make than control chart for fraction defectives since the fugure of number of defectives units can be directly taken from the inspection report.
Correct Answer True
- 65 -
65
Your Answer True
Multiple Choice Single Answer Question Which of the following techniques is used by
industrial engineering department to obtain the utilisation index?
Correct Answer Work Sampling Studies Your Answer Break Even Analysis
Multiple Choice Multiple Answer Question Which of the following are examples of addition
during recording for method study? Correct Answer Brazing , Welding , Riveting Your Answer Brazing , Welding
Select The Blank Question A ________ helps to determine the time required
by the operator to complete a specified task for the defined method at the defined pace of performance.
Correct Answer Work measurement Your Answer Work measurement
True/False Question The earliest start time of an activity equals
earliest time for the event from which activity arrow originates.
Correct Answer True Your Answer True
Multiple Choice Single Answer Question In mass/batch production organizations where
goods are produced for stocking, Work Order is
- 66 -
66
raised on the basis of Correct Answer Sales Programme Your Answer Sales Programme
Multiple Choice Single Answer Question Which kind of preventive inspection detects some
defects in moving parts, internal cracks, and others , when machine is under preplanned shutdown?
Correct Answer Internal inspection Your Answer Weekly inspection
Multiple Choice Multiple Answer Question Which are the different methods of recording
actual progress of work? Correct Answer Display boards , Progress cards , Network
updating Your Answer Display boards , Job cards
Match The Following Question Correct Answer Your Answer Pessimistic time B a Expected time Te Te Optimistic time A b Most likely time M o Multiple Choice Single Answer Question What do you mean by the selection of the job for
the method study on the basis of manufacturing difficulties?
Correct Answer Technical consideration Your Answer Human consideration
- 67 -
67
Multiple Choice Single Answer Question Site factors for plant location include Correct Answer Suitability of land Your Answer Suitability of land
Multiple Choice Multiple Answer Question Which of the following possibilities can be explored
by using flow process chart? Correct Answer Eliminating the operations or combining the
operations with another , Reducing the distance traveled by the workmen or materials , Avoiding the waiting time and thereby reduce production losses
Your Answer Eliminating the operations or combining the operations with another , Reducing the distance traveled by the workmen or materials , Reducing rejections drastically
Multiple Choice Multiple Answer Question Following are some of the factors which influence
process planning Correct Answer Order Quantity , Process capability of machine ,
Delivery Dates Your Answer Order Quantity , Process capability of machine
Select The Blank Question The area under the normal curve at two standard
deviations is ________% Correct Answer 95.45 Your Answer 99.5
Multiple Choice Multiple Answer Question Which of the following charts are used for the
- 68 -
68
recording of data during the method study? Correct Answer Operation process chart , Multiple activity chart ,
Flow process chart Your Answer Single handed process chart , Operation process
chart Select The Blank Question The ________ phase also provides an opportunity
to the practitioner to assess the effectiveness of the approach followed by him and make changes in the methodology.
Correct Answer Maintenance Your Answer Development and selection
True/False Question Process layout is also called line layout Correct Answer False Your Answer True
Multiple Choice Single Answer Question What do you understand by analysis of motions
employed by the workmen to perform a task? Correct Answer Motion economy Your Answer Method study
True/False Question Inspection should be avoided prior to long run of a
manufacturing stage as it becomes duplication of work and cost.
Correct Answer False Your Answer True
Select The Blank
- 69 -
69
Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average.
Correct Answer Acceptable quality level Your Answer Consumer's risk
True/False Question One major difference between CPM and PERT is
the former's adaptability for the projects where high degree of uncertainty prevails and activity times during performance are expected to vary considerably for certain activities.
Correct Answer False Your Answer True
Select The Blank Question The ________ breakdowns usually cost more,
partly due to damage done to the adjustment components and partly due to emergency actions.
Correct Answer Unexpected Your Answer Partial
True/False Question Every network does not necessarily have a critical
path. Correct Answer False Your Answer True
Multiple Choice Multiple Answer Question Which are the different methods to record details
of the existing method during method study? Correct Answer Charts , Diagrams , Templates or models
- 70 -
70
Your Answer Control plans , Charts
Multiple Choice Multiple Answer Question Route Sheet generally contains following
information Correct Answer Material Specification , Sequence of operation ,
Skill of Labour Your Answer Material Specification , Skill of Labour
Multiple Choice Single Answer Question Where does the SPC exercises the control to
prevent the occurances of defectives? Correct Answer On manufacturing process Your Answer On inspection process and tools for inspection
Select The Blank Question In ________ technique activity time are related
to costs. Correct Answer Critical Path Method Your Answer Project Engineering & Resources Technique
Multiple Choice Single Answer Question What do you understand by inspection conducted
on all jobs received back from a customer as defectives?
Correct Answer Appraisal inspection Your Answer Functional inspection
Select The Blank Question In cellular layout the facilities are grouped
together in cell which are able to perform ________ type of operation for a group of products
- 71 -
71
Correct Answer Similar Your Answer Different
Multiple Choice Single Answer Question What do you mean by the chart on which the
major activities and entry points of materials are recorded to have graphic view of operations and inspections involved in the process?
Correct Answer Operation process chart Your Answer Travel chart
Select The Blank Question The________ is characterised by manufacture of
a several number of a standard product produced and stocked in the warehouse as finished goods awaiting sales.
Correct Answer Mass Production Your Answer Mass Production
True/False Question Theoretical capacity equals number of normal
working hours of that machine. Correct Answer True Your Answer True
Multiple Choice Multiple Answer Question Which of the following schedules are recommended
to prepare and follow as a part of preventive maintenance system?
Correct Answer Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication schedule
Your Answer Production schedule , Cleaning and upkeep schedule
- 72 -
72
Multiple Choice Single Answer Question What can be the worst effect due to excessive
vibration? Correct Answer Breakdown Your Answer Reduced labour efficiency
True/False Question Inspection should be conducted on all incoming
materials, semi-finished items, bought out components, subcontract items prior to any operation, assembly.
Correct Answer True Your Answer True
Select The Blank Question A set of activities to keep an equipment in the
specified condition is called as ________. Correct Answer Maintenance Your Answer Maintenance
Multiple Choice Multiple Answer Question Which are the different types of flow process
charts used for method study? Correct Answer Equipment type , Man type , Material type Your Answer Equipment type , Man type , Material type
Multiple Choice Single Answer Question The process of changing inputs into outputs
thereby adding some value to entity can be
- 73 -
73
defined as Correct Answer Operation Your Answer Conversion
Select The Blank Question ________ in the plan is lost if there are frequent
revisions. Correct Answer Faith Your Answer Faith
Select The Blank Question In Gantt Chart, the horizontal lines devide vertical
lines into sections which represents ________. Correct Answer No. of work centres or operations Your Answer No. of work centres or operations
Multiple Choice Multiple Answer Question What are the benefits of inspection and quality
control? Correct Answer Adequate maintenance of quality , Ensures parts
are within specified limits of accuracy , Gives economy in production through reduction of defective work
Your Answer Adequate maintenance of quality , Ensures parts are within specified limits of accuracy , Gives economy in production through reduction of defective work
Multiple Choice Single Answer Question Out of two basic criteria for the selection of a
manufacturing method, one is, it must be able to meet the specifications of final product and the other is, it must be
Correct Answer Cost effective method
- 74 -
74
Your Answer Cost effective method
Multiple Choice Single Answer Question What is expected from stores department after
they receive the stores issue order from dispatcher?
Correct Answer Keep material ready for issue to shop when authorized
Your Answer Prepare delivery challan alongwith invoice
True/False Question For p-chart, fraction defective units in each
sample is calculated by dividing number of defectives by the number of pieces in the sample.
Correct Answer True Your Answer True
Select The Blank Question Production Planning is the series of related and
coordinated activities designed to systematise in advance the ________ efforts.
Correct Answer Manufacturing Your Answer Manufacturing
True/False Question In case of forward pass computation, the earliest
event time of a plain event equals the earliest event time of the preceding event plus duration of activity emanating from the preceding event.
Correct Answer True Your Answer True
Multiple Choice Multiple Answer
- 75 -
75
Question Which of the following situations demand the economic consideration while selecting a job for method study?
Correct Answer Unorderly movement of men and materials , Excessive process defectives , Too many suggestions received for improvement from a department or section
Your Answer Unorderly movement of men and materials , Excessive process defectives , Too many suggestions received for improvement from a department or section
True/False Question For p-chart, the central line of fraction
defectives is determined by average percentage defectives.
Correct Answer True Your Answer True
Multiple Choice Multiple Answer Question Which of the following factors affect the quality
control function? Correct Answer Quality of workmanship , Production aids ,
Manufacturing facilities Your Answer Quality of workmanship , Production aids ,
Manufacturing facilities
Multiple Choice Single Answer Question Fixed position layout is adopted when Correct Answer product is very heavy involving assembly of large
number of parts Your Answer product is very heavy involving assembly of large
number of parts
- 76 -
76
Select The Blank Question Two vital steps of installation phase of method
study are ________ and implementation. Correct Answer Recommendation Your Answer Maintenance
Multiple Choice Single Answer Question The document which incorporates details of
process planning for a job is called Correct Answer Route Sheet Your Answer Route Sheet
True/False Question Theoretical capacity equals number of normal
working hours of that machine. Correct Answer True Your Answer True
Multiple Choice Single Answer Question What is the meaning of " Product features"
according to J.M.Juran? Correct Answer Quality of design Your Answer Quality of design
Multiple Choice Single Answer Question What is the purpose of squares used in progress
chart? Correct Answer To record the progress of work for each operation Your Answer To record the progress of work for each operation
True/False Question Activities whose earliest finish times and latest
finish times are not equal constitutes the critical
- 77 -
77
path. Correct Answer False Your Answer True
True/False Question Labour turnover rate is higher in case of rural
area as compared to urban area. Correct Answer False Your Answer True
Multiple Choice Single Answer Question The ratio of output to input of a production
system is commonly known as Correct Answer Productivity Your Answer Productivity
Select The Blank Question In Gantt Chart, the vertical lines devide horizontal
lines into small squares which represents ________.
Correct Answer Units of measurement Your Answer Units of measurement
Multiple Choice Multiple Answer Question In an organization there may not be a formal PPC
department if Correct Answer Work is highly repetitive in nature , Planning
activities are performed by the line staff , Number of workmen is not very large
Your Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large
- 78 -
78
Multiple Choice Multiple Answer Question What is the basic minimum requirement for those
who are responsible for the quality of design? Correct Answer In depth knowledge about alternative materials and
manufacturing processes , access to latest technology and production process adopted by industries in the developed market , Continuous effort in product development
Your Answer In depth knowledge about alternative materials and manufacturing processes , access to latest technology and production process adopted by industries in the developed market , Continuous effort in product development
Multiple Choice Multiple Answer Question Which of the following defects can be observed
during preventive inspection by using human senses?
Correct Answer Deviation from normal sound , Excessive Vibration , Leakage of a gas
Your Answer Deviation from normal sound , Excessive Vibration , Leakage of a gas
Multiple Choice Single Answer Question What do you mean by the graphical representation
of the project which is composed as series of connected arrows and circles to describe the interrelationship of the activities involved?
Correct Answer Network Your Answer Network
True/False Question After goods have been manufactured, route sheets
and operation layouts should not be collected back.
- 79 -
79
Correct Answer False Your Answer False
Select The Blank Question Each arrow representing activity is bounded by
________. Correct Answer Two events Your Answer Two events
Match The Following Question Correct Answer Your Answer When to inspect Stages of inspection Stages of inspection What to inspect Specification Specification How to inspect Inspection devices Inspection devices How much to inspect Sampling or cent
percent inspection Sampling or cent percent inspection
Multiple Choice Single Answer Question Any premise in which persons are employed for
purpose of making any product/s is called Correct Answer Factory Your Answer Factory
Select The Blank Question The ________ results when all preceding and
succeeding activities occur at the earliest event time.
Correct Answer Free float Your Answer Total float
True/False Question Grouping of machines gives a lot of flexibility in
- 80 -
80
loading and scheduling Correct Answer True Your Answer True
True/False Question Fixed cost is lower in case of continuous production
than intermittent production. Correct Answer False Your Answer False
Multiple Choice Multiple Answer Question Which of the following is not the characteristic of
Project Production? Correct Answer Continuous flow of material , Highly mechanised
material handling , Virtually zero manufacturing cycle time
Your Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time
Select The Blank Question American Society of Mechanical Engineers and
British Standard Institute have advocated ________ symbols for graphical method of recording in method study
Correct Answer Five Your Answer Five
Multiple Choice Multiple Answer Question Which of the following can be termed as operation
while recording for method study? Correct Answer Information received , Addition or subtraction ,
Information given Your Answer Information received , Addition or subtraction ,
- 81 -
81
Information given
Multiple Choice Single Answer Question What do you understand by PERT ? Correct Answer Project Evaluation & Review Technique Your Answer Project Evaluation & Review Technique
******************************************************************************************************************************************************* Multiple Choice Multiple Answer Question Which of the following concepts must be understood for the achievement of quality? Correct Answer Quality of design , Quality of conformance , Purpose of product Multiple Choice Single Answer Question What do you mean by the graphical representation of the project which is composed as series of connected arrows and circles to describe the interrelationship of the activities involved? Correct Answer Network Multiple Choice Multiple Answer Question Which of the following cases indicates change in physical characteristic? Correct Answer Turning , Grinding , Drilling Multiple Choice Single Answer Question What do you mean by the verification of object against predetermined standards of quality or quantity or both? Correct Answer Inspection Select The Blank Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Correct Answer Preventive Maintenance Select The Blank Question The ________ is the defect level for which lots are regarded as bad lots. Correct Answer Lot Tolerance Percentage Defective Multiple Choice Single Answer Question How non‐critical activities are shown in the time chart during project scheduling? Correct Answer Thin lines Multiple Choice Single Answer Question Who prepares the daily production report? Correct Answer Shop Supervisor True/False
- 82 -
82 Question Every network does not necessarily have a critical path. Correct Answer False Multiple Choice Single Answer Question Which method of critical path determination begins with the end event and moves backward to the start event of the project network? Correct Answer Backward pass computation True/False Question Scrap allowance is added to net requirement of material while ordering for material Correct Answer True True/False Question Dust gets mixed with lubricants, forms an abrasive substance and causes pre‐mature failure of machinery. Correct Answer True Multiple Choice Single Answer Question A good plant layout helps in Correct Answer Reducing handling costs True/False Question It would not affect the project completion time if non‐critical activities take little loner time than planned. Correct Answer True True/False Question Process Planning is concerned with decisions regarding requirement of machines and manpower for meeting customer demand Correct Answer False Multiple Choice Single Answer Question What is the meaning of ʺ Product featuresʺ according to J.M.Juran? Correct Answer Quality of design Multiple Choice Single Answer Question Technique which can help an organization to reduce inventory is called Correct Answer MRP Multiple Choice Multiple Answer Question Which of the following are examples of consumption of physical effort during recording for method study? Correct Answer Bending , Positioning , Unloading Multiple Choice Multiple Answer
- 83 -
83 Question Which three of the following options can be used to reduce the duration of activity during project crashing? Correct Answer Allocating more manpower and machines than originally planned for. , Working additional shifts or overtime. , Awarding work to vendors who charge extra but expedite deliveries. Multiple Choice Single Answer Question Which is the next stage to the inspection based quality control in the historical development of quality management. Correct Answer Quality assurance Match The Following Question Correct Answer Bottom compartment of control board Bunch of work orders arranged in a sequence in which they are to be processed. Control board Pictorial view of machine loading activity Top compartment of control board Work order of item currently being worked on the machine Middle compartment of control board Work order of item to be processed next on the machine Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Multiple Choice Multiple Answer Question Following are some of the Principles of Management advocated by F W Taylor Correct Answer Selection of best worker for each particular task , Division of work between worker and management , Training and development of the workmen Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Multiple Choice Single Answer Question Which kind of defect can be called as minor defect? Correct Answer Which does not reduce the usability of the product for its intended use
- 84 -
84 Select The Blank Question The ________ is specified to indicate the maximum permissible variability in the dimensions product or parts. Correct Answer Tolerance Multiple Choice Single Answer Question Which element of a network represents a task which has got a definite beginning and definite end? Correct Answer Activity Multiple Choice Multiple Answer Question Following are the commonly used factors considered for evaluation of layout in factor analysis method Correct Answer Flow of material , Equipment utilization , Working condition Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Necessity Select The Blank Question The ________ are the definitions of the measurable as well as nonmeasurable characteristics of the product. Correct Answer Specifications Multiple Choice Multiple Answer Question Which features should be covered by the specifications of materials while defining the qualitative requirement? Correct Answer Material composition , Dimensions , Any heat treatment if required Multiple Choice Single Answer Question The ratio of output to input of a production system is commonly known as Correct Answer Productivity True/False Question F W Taylor devised a system for classifying motions into basic divisions called Therbligs Correct Answer False Multiple Choice Single Answer Question Which portion of the perforated route sheet should be signed by the operator or supervisor? Correct Answer Lower portion True/False Question In case of X bar, if the process is not under control indicated by some points falling outside the control limits, such points outside the control limits are eliminated and new trial control limits for the remaining points are computed. Correct Answer True
- 85 -
85 Match The Following Question Correct Answer Scale model Layout analysis Factor Analysis Method to evaluate layouts Minimization of production delays Objective of good layout Maximum visibility Principles of good layout True/False Question Maintenance function must be decentralised apart from a size of a manufacturing organisation for itʹs better functioning. Correct Answer False True/False Question Process Sheets for parts in batch production are not maintained as standard process sheet Correct Answer False True/False Question Theoretical capacity equals number of normal working hours of that machine. Correct Answer True Multiple Choice Multiple Answer Question Which are the basic requirements of the ʺ Quality of Design ʺ? Correct Answer Identification of right product , Selection of appropriate features , Ensure that product renders satisfactory service to customer Match The Following Question Correct Answer Change in chemical characteristic Chemical reaction Consumption of effort Posting a ledger Information given Giving directions or instructions Subtraction Removal of worn‐out part from a machine Select The Blank Question The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Correct Answer Inspection order
- 86 -
86 Select The Blank Question The term ________ emplies the foregone profit due to inability of company to produce. Correct Answer Opportunity cost Multiple Choice Multiple Answer Question Which of the following factors play important role while selecting or rejecting a particular site from legislation and taxation point of view? Correct Answer Labour laws , Building codes , Policies regarding issue of licences Multiple Choice Single Answer Question What is the base for considering activity time as single time estimate or three time estimate? Correct Answer Level of uncertainty Multiple Choice Single Answer Question Product layout is employed for manufacturing following products Correct Answer refrigirators True/False Question Diversified labour is adequately available in rural area as compared to urban area. Correct Answer False Match The Following Question Correct Answer Net requirement of material under MRP Stock on hand Stock on hand Fixation of inventory level Reorder level Symptom of ill planned purchasing Over ordering Factor influencing material planning Lead time True/False Question In case of backward pass computation, the latest event time of the end event equals to the earliest event time minus duration of that activity. Correct Answer False Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Producerʹs risk True/False Question Suburban location provides the compromise between rural and urban locations. Correct Answer True Multiple Choice Single Answer
- 87 -
87 Question Which time is determined by the backward pass computation method of determination of critical path ? Correct Answer Latest allowable time for each event Multiple Choice Single Answer Question What do you understand by the measurement of work to establish allowed time for a job for the defined method? Correct Answer Work measurement True/False Question Even in a small set up wherein maintenance of a machine is looked after by a mechanic cum worker, he should report directly to the person responsible for the manufacturing operations. Correct Answer True Multiple Choice Single Answer Question Out of two basic criteria for the selection of a manufacturing method, one is, it must be able to meet the specifications of final product and the other is, it must be Correct Answer Cost effective method True/False Question Kanban system is essentially a computer based system for production scheduling and control Correct Answer False Multiple Choice Multiple Answer Question Which of the following symbols are used in flow process chart but not used in operation process chart? Correct Answer Storage , Delay , Transport Multiple Choice Single Answer Question In case of Batch Production which kind of labour is expected? Correct Answer Skilled in one specific Manufacturing Process Multiple Choice Multiple Answer Question Which of the following are the major steps of making of the X bar‐R control chart? Correct Answer Collection of data , Claculation of mean,range,grand average and mean range , Set up control chart for average and calculate control limits of range chart True/False Question For p‐chart, p bar is the ratio of total number of units inspected to the total number of units defectives. Correct Answer False Multiple Choice Single Answer Question Which of the following is the most popular technique for Project Production? Correct Answer PERT & CPM
- 88 -
88Multiple Choice Single Answer Question Which kind of preventive inspection detects some maintenance related characteristics by making use of human senses, when equipment is in operation? Correct Answer Extrernal inspection Multiple Choice Single Answer Question Process Engineer does not get sufficient time for designing tooling for most economic production run when Correct Answer Delivery time is less Multiple Choice Single Answer Question How dummy activities are shown in the time chart during project scheduling? Correct Answer Vertical lines True/False Question The control chart for number of defectives is more convenient to make than control chart for fraction defectives sincethe fugure of number of defectives units can be directly taken from the inspection report. Correct Answer True Multiple Choice Multiple Answer Question Which are the advantages of suburban location? Correct Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Multiple Choice Multiple Answer Question Which utilities are considered as infrastructural requirements? Correct Answer Disposal of waste , Power , Water Multiple Choice Single Answer Question What do you understand by the timeframe for the maintenance needs of the equipment? Correct Answer Maintenance inspection schedule Multiple Choice Multiple Answer Question Which of the following are assignable cause? Correct Answer Large varaitions in hardness of material , Tool wear , Errors in setting Multiple Choice Single Answer Question Which of the following policies is advisable in case of low product variety and large volumes? Correct Answer Low Skilled Labour & Special Purpose Machines Multiple Choice Multiple Answer Question Gross requirement of finished product is determined on the basis of following Correct Answer Forecasted sales , Pending sales order , Management decision to stock Select The Blank
- 89 -
89 Question The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Correct Answer Shutdown Maintenance Select The Blank Question A set of activities to keep an equipment in the specified condition is called as ________. Correct Answer Maintenance Multiple Choice Single Answer Question Which kind of labour force is required in case of Jobbing Production? Correct Answer Highly Skilled Select The Blank Question One detachable ticket is prepared for each ________. Correct Answer Operation Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Multiple Choice Multiple Answer Question Which of the following products should be produced by using mass production? Correct Answer Refrigerator , Tyre for automobile , Television Set Multiple Choice Multiple Answer Question Material Requirement Planning is very useful in following situations Correct Answer Long Lead time for procurement , Several levels of assemblies in product , Long manufacturing cycle Multiple Choice Single Answer Question What can be the worst effect due to excessive vibration? Correct Answer Breakdown True/False Question Expediting action is necessary if the delays and interruptions are abnormal and hence any subsequent delay is bound to extend the promised delivery date. Correct Answer True True/False Question Limit gauges are not useful when it is necessary to measure the exact amount of variation.
- 90 -
90 Correct Answer True Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer To meet the intended function at lowest cost Multiple Choice Single Answer Question What do you mean by the preventive maintenance by using five human senses? Correct Answer Preventive inspection Multiple Choice Multiple Answer Question Which of the following are typical examples of limit gauges? Correct Answer Snap gauge , Plug gauge , Ring gauge Multiple Choice Multiple Answer Question Which are the major types of defects? Correct Answer Minor , Major , Critical Match The Following Question Correct Answer Emerson Efficiency Plan Wage Payment Craft Facilities Planning Work Sampling Machine utilization Gantt Chart Production Scheduling Multiple Choice Multiple Answer Question Which of the following charts are used for the recording of data during the method study? Correct Answer Operation process chart , Multiple activity chart , Flow process chart Multiple Choice Single Answer Question What do you mean by the selection of the job for the method study on the basis of manufacturing difficulties? Correct Answer Technical consideration True/False Question An activity can share the same tail event and same head event with any other activity. Correct Answer False Multiple Choice Single Answer Question Inadequate production capacity ultimately leads to Correct Answer Poor Customer Service
- 91 -
91 True/False Question All activities must not be tied up into the network Correct Answer False Multiple Choice Multiple Answer Question Which of the following situations demand the technical consideration while selecting a job for method study? Correct Answer Jobs having inconsistent quality , Operations inviting frequent requests from supervisors for relaxation in allowed time because of variations in materials and tool performance , Jobs in which too many man‐hours are spend in checking and rechecking work Multiple Choice Multiple Answer Question Which of the following are examples of attributes? Correct Answer Cracks , Burrs , Texture Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% True/False Question Delay in completion of projects result in unwelcome additions to the fixed manufacturing expenses. Correct Answer True Multiple Choice Multiple Answer Question Which of the following activities are used while recording for method study? Correct Answer Delay , Operation , Inspection True/False Question Root cause of most of the breakdowns is failure of the lubrication system. Correct Answer True True/False Question Latest finishing date is the latest event time of the tail event. Correct Answer False Multiple Choice Multiple Answer Question What is the basic minimum requirement for those who are responsible for the quality of design? Correct Answer In depth knowledge about alternative materials and manufacturing processes , access to latest technology and production process adopted by industries in the developed market , Continuous effort in product development True/False Question If the firm has adopted elaborate planned maintenance system, there is no chance of any unplanned maintenance work. Correct Answer False
- 92 -
92 Multiple Choice Multiple Answer Question Which of the following is not the characteristic of Project Production? Correct Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time Multiple Choice Single Answer Question Which document is used for returning the surplus material? Correct Answer Stores Return Note Multiple Choice Single Answer Question What does the additional cost incurred to reduce the duration of an activity by one unit of time represent? Correct Answer Activity cost slope Select The Blank Question Production control work is ________ in case of floor inspection as compared with the centralised inspection. Correct Answer easier Multiple Choice Single Answer Question What is represented by an arrow in a network? Correct Answer Activity Multiple Choice Single Answer Question Need for change in layout can occur due to following reason Correct Answer introduction of new product True/False Question The plotting of activities ‐ critical, non‐critical and dummy activities‐ is strictly according to their precedence relationship. Correct Answer True Multiple Choice Single Answer Question Data from Process Sheet can be used to Correct Answer Prepare load and schedule charts Multiple Choice Single Answer Question How should a dummy activity be represented in a network? Correct Answer By dotted line True/False Question A load chart specifies the work to be carried out by each person of company during shift hours. Correct Answer False Match The Following
- 93 -
93Question Correct Answer Scheduling of interrelated activities of small projects with consideration of uncertainty of duration of activities. Critical Path Analysis Two machines & processing time depends on sequence of job loading Johnsonʹs Two Machine Algorithm Sufficient orders and resonable choice of machines Index Method Time relationship between when a product is required and when it can be made available Critical Ratio Scheduling True/False Question Systematic maintenance system can completely eliminate the wear and tear of machines. Correct Answer False Multiple Choice Single Answer Question Providing flexibility in plant layout means Correct Answer Layout can be changed without much cost if required True/False Question Since value of p can never be positive, henceʺ if LCLp works out to be positive, it is taken as zero.ʺ Correct Answer False Multiple Choice Multiple Answer Question Which information is recorded in an equipment card? Correct Answer Date of commissioning , Equipment specifications , Name and address of manufacturer Multiple Choice Multiple Answer Question Which of the following method can be adopted to overcome the problem of rushing up a job for itʹs timely completion? Correct Answer Use of optimum speeds and feeds , Subcontracting , Job splitting Multiple Choice Multiple Answer Question Which of the following method can be used to record the facts during the method study? Correct Answer Micromotion study , Cyclegraph , Chronocyclegraph Multiple Choice Multiple Answer Question Which are the sources of information to update the progress card daily? Correct Answer Detachable ticket , Daily production report , Job Card Multiple Choice Single Answer Question What do you understand by the critical analysis of existing jobs to develop easier and effective method?
- 94 -
94 Correct Answer Method study Multiple Choice Multiple Answer Question Plant layout facilitates processing of products in most effective manner through the following Correct Answer Shortest possible distance , Shortest processing time , Minimum movement True/False Question Dispatching function is not a part of Production Planning Correct Answer True Multiple Choice Multiple Answer Question Which are the distinct functions of scientific quality control? Correct Answer Acceptance function , Preventive function , Assurance function True/False Question The component produced on completely automatic machines may be subjected to sampling inspection while parts produced on semi‐automatic and completely manual operated machines require cent percent inspection. Correct Answer True Match The Following Question Correct Answer Draining and refilling of oil reserviors of plunger pump Yearly Parts lubricated with oil nipple Daily Tools and slideways two to three times a day Table lubrication Weekly True/False Question Labour turnover rate is higher in case of rural area as compared to urban area. Correct Answer False Select The Blank Question Goods after final inspection should accompany ________to enable dispatch department to identify and draw correct reference. Correct Answer Forwarding note Multiple Choice Single Answer Question What does CPA stand for? Correct Answer Critical Path Analysis Multiple Choice Single Answer Question Following is one of the techniques used for Material Planning for high value material
- 95 -
95 Correct Answer MRP Multiple Choice Single Answer Question What is the name of the document on which details of the process are recorded by the symbols and charting conventions? Correct Answer Chart Multiple Choice Multiple Answer Question Which are the general principles underlying probability aspects of project planning? Correct Answer Statistically three time estimate of an activity conform to Beta distribution. , Expected time divides the area under the curve into two equal parts. , Expected time of an activity is located at one third of the distance between ʺmʺ and mid‐range { (a+b)/2 } away from the most likely time. True/False Question An activity should represent an operation or set of operations which can be performed using a particular kind of equipment or a special skill. Correct Answer True Multiple Choice Multiple Answer Question How many of the following are types of specification? Correct Answer Material specifications , Dimensional specifications , Performance specifications Select The Blank Question The ________ pertain to the climatic conditions which the component , product or material should withstand. Correct Answer Environmental specifications Select The Blank Question The ________ is a set of tools and techniques by which products are made to comply with the specifications at minimum cost to the firm. Correct Answer Quality control system Multiple Choice Single Answer Question Which chart sets out the sequence of flow of work of a product, or any part of it through the section or department or a factory by recording the events under review using appropriate symbols? Correct Answer Flow process chart Multiple Choice Single Answer Question Which photographic technique is used to record path of motions of the members of the body during method study? Correct Answer Cyclograph Select The Blank Question The ________ must ensure that the product satisfy the functional requirements of itʹs usage. Correct Answer Quality of design
- 96 -
96 Multiple Choice Multiple Answer Question Which of the following information is available in summary of part in a chart during methods study? Correct Answer Frequency of each symbol , Total time for each symbol , Total distance travelled by the object True/False Question The event numbers as far as possible reflect the logical relationships of the activities. Correct Answer True Multiple Choice Single Answer Question Which varaible is taken along the ordinate or Y axis? Correct Answer Quality Multiple Choice Multiple Answer Question Which of the following schedules are recommended to prepare and follow as a part of preventive maintenance system? Correct Answer Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication schedule Multiple Choice Multiple Answer Question Which are different ways to show critical path in a network? Correct Answer Thick Line , Red Line , Double Line Multiple Choice Multiple Answer Question What are the benefits of overhauling? Correct Answer It increases useful life of an equipment and itʹs parts , Advance planning allows to attend equipment without disturbing the production programme , Advance planning allows to prepare and keep ready the list of replacement spares Match The Following Question Correct Answer Combined Layout Mixed Layout Fixed Position Layout Project Layout Product Layout Line Layout Process Layout Functional Layout Multiple Choice Multiple Answer Question Major contributors in the development of Control Charts, Sampling plan are Correct Answer F H Dodge , H G Roming , Walter Schewhart True/False
- 97 -
97 Question Repetitive movements between work stations which are difficult to be traced on string diagrams can be conveniently shown on flow diagrams. Correct Answer False Multiple Choice Multiple Answer Question Which of the following cases can be referred as operation in method study recording? Correct Answer Change in physical characteristic , Consumption of physical effort , Change in chemical characteristic True/False Question All activities lying on the non‐critical paths must have total float and free float. Correct Answer False Match The Following Question Correct Answer Crash cost of an activity Cc Normal time of an activity Tn Crash time of activity Tc Normal cost of an activity Cn True/False Question In case of X bar‐R charts,it is ensured that the assignable causes are detected before the tolerances are violated, upper and lower statistical limits are worked out and inserted into a chart. Correct Answer True Multiple Choice Single Answer Question Which of the following is the criteria for the percentage defectives in the zone of the indecision? Correct Answer Lots having the percentage defective more than AQL but less than LPTD Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within itʹs crashed time? Correct Answer Crash cost Multiple Choice Multiple Answer Question Which three of the following are causes of continuous upward pattern of Xbar‐R control chart? Correct Answer Wear of tool , Abnormal rise in temperature , Accumulation of dirt True/False Question It is not necessary to know spare time available on the non‐critical path to allow a little delay for noncritical activity. Correct Answer False
- 98 -
98 True/False Question MRP software generates time periodwise requiremetn of subassemblies Correct Answer True True/False Question In case of two handed process chart, the simultaneous activities of both hands are recorded opposite to each other on the chart. Correct Answer True Multiple Choice Single Answer Question What do you mean by CPM? Correct Answer Critical Path Method Multiple Choice Multiple Answer Question Which of the following are major inputs to scheduling? Correct Answer Overlapping of operations , Effective Capacity per work centre , Performance standards Multiple Choice Multiple Answer Question Lack of material planning results in the following Correct Answer Over ordering , under ordering , stockouts Multiple Choice Multiple Answer Question What are the advantages of templates over diagrams? Correct Answer Can be conveniently moved on the graph paper , Less laborious , Saves time Multiple Choice Single Answer Question Which is the right time to prepare stores issue order? Correct Answer When route sheet is ready Multiple Choice Single Answer Question Which kind of preventive inspection detects some defects in moving parts, internal cracks, and others , when machine is under preplanned shutdown? Correct Answer Internal inspection Multiple Choice Single Answer Question Who has introduced the useful concept of control chart in 1931? Correct Answer Walter Shewhart Multiple Choice Multiple Answer Question Which are major benefits of identifying the critical path? Correct Answer It identifies activities to be given preference in allocation of resources. , It helps to exercise ʺcontrol by exceptionʺ. , It helps to identify the set of activities and events which are critical and as such must be carefully controlled and monitored Select The Blank
- 99 -
99 Question The ________ is the probability that a bad lot will be accepted by the sampling plan. Correct Answer Consumerʹs risk Multiple Choice Single Answer Question Why method study should precede work measurement? Correct Answer Time for a job can be accessed accurately only after standardizing the method Select The Blank Question The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions. Correct Answer Unexpected Multiple Choice Single Answer Question What is expected from stores department after they receive the stores issue order from dispatcher? Correct Answer Keep material ready for issue to shop when authorized Multiple Choice Multiple Answer Question Which are the subfactors of community facilities or social infrastructure? Correct Answer Accomodation , Educational , Entertainment Multiple Choice Single Answer Question One of the following is not a gross material Correct Answer cotton Multiple Choice Multiple Answer Question Which of the following are types of non‐destructive testing? Correct Answer Visual Testing , Eddy current , Magnetic flow detectors Multiple Choice Multiple Answer Question Which of the following are steps to identify the critical path in a small network? Correct Answer Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along each path. , Enumerate all paths in the network and list down activities on each path. Multiple Choice Multiple Answer Question Which of the following factors affect the quality control function? Correct Answer Quality of workmanship , Production aids , Manufacturing facilities True/False Question Process layout is also called line layout Correct Answer False Multiple Choice Multiple Answer Question Which of the following three methods used to select the qualified supplier? Correct Answer By vendor plant surveys , By reputation , By experience
- 100 -
100 Multiple Choice Single Answer Question Which kind of relationship exists between those activities which can be carried out simultaneously and both activities require definite time to finish? Correct Answer Concurrent activities True/False Question Quality can not be inspected into a product, it must be manufactured into it by the supplier. Correct Answer True Multiple Choice Single Answer Question What do you mean by design modifications made to reduce time and effort required in carrying out maintenance work ? Correct Answer Design‐in Maintenance Multiple Choice Single Answer Question Process type layout is suitable when Correct Answer there is wide variation in processing time of operations Multiple Choice Single Answer Question Where the ignorance towards the degradation of machine leads to? Correct Answer Eventual breakdown Match The Following Question Correct Answer First off inspection First piece produced after tool change Critical operation inspection After whose no rework is possible Patrolling inspection Inspection at the place of actual production Key operation inspection Costlier operation True/False Question Three time estimates are transformed into expected time before using it into a network. Correct Answer True Multiple Choice Multiple Answer Question What is indicated by the erratic pattern points falling above and below the control limits in the Xbar‐R‐control chart? Correct Answer Defects in materials , Poorly trained operators , Frequent adjustments of machines Multiple Choice Single Answer Question Which kind of inspection is followed in case of process layout? Correct Answer First off inspection
- 101 -
101 Select The Blank Question OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of acceptance of ________. Correct Answer One Select The Blank Question Capacity decisions have a direct influence on performance of production system in respect of ________ Correct Answer Delivery performance Multiple Choice Multiple Answer Question Which of the following are illustrations of inspection? Correct Answer Physical count of incoming material against the quantity mentioned in delivery challan , A dimensional check with measuring instrument , Visual check of burrs and finish Multiple Choice Multiple Answer Question Which of the following variables which operate periodically are the reasons for the cyclic pattern depicting peaks and valleys during Xbar‐R control chart? Correct Answer Wornout positions , Fatigue , Roller eccentricity Multiple Choice Single Answer Question MRP is based on the concept of inventory demand which is of following type Correct Answer Dependent and independent Multiple Choice Single Answer Question Main objective of a good plant layout is Correct Answer Reduce material handling cost True/False Question As a general rule, the number of tail event of an activity is more than that of itʹs head event. Correct Answer False Multiple Choice Multiple Answer Question Which of the following are important considerations concerning activity times? Correct Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Multiple Choice Multiple Answer Question Following are some of the factors considered for evaluation of alternative layouts Correct Answer Flow of Material , Equipment utilization , Ease of supervision Select The Blank Question A ________helps to avoid crowding of jobs at a particular machine by change of route of some of the jobs or by diverting work to other machine.
- 102 -
102 Correct Answer Control board Multiple Choice Multiple Answer Question In an organization there may not be a formal PPC department if Correct Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Multiple Choice Multiple Answer Question Which of the following cases can be treated as delay during recording of method study? Correct Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn True/False Question Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop. Correct Answer False Multiple Choice Multiple Answer Question Order preparation process for products manufatured to order requires following documents Correct Answer Sales Order , Work order , Shop order True/False Question Cent percent inspection is often more practical and economical than sampling inspection. Correct Answer False Multiple Choice Multiple Answer Question Scale model used for layout analysis have following advantages Correct Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily Multiple Choice Single Answer Question Which of the following technique is event oriented ? Correct Answer Project Evaluation & Review Technique Multiple Choice Multiple Answer Question What are uses of diagrams in method study? Correct Answer Study different plant layouts and select the most optimum one , Study the extent of traffic over the different routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during the movement of material. Multiple Choice Multiple Answer Question Route Sheet generally contains following information Correct Answer Material Specification , Sequence of operation , Skill of Labour True/False Question Cellular layout is based on the concept of Group Technology
- 103 -
103 Correct Answer True Multiple Choice Single Answer Question Which varaible is taken along the abscissa or X axis? Correct Answer Time Multiple Choice Multiple Answer Question Expediting function is concerned with following activities Correct Answer Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule True/False Question In case of forward pass computation, the earliest event time of the first event is zero. Correct Answer True True/False Question As a general rule, a site five times the actual plant size is considered minimum for parking, access facilities and future expansion. Correct Answer True True/False Question Independent float either affects the float of preceding activities or that of succeeding activities. Correct Answer False Multiple Choice Single Answer Question The document raised by PPC which authorises different functions to take action as per instruction is called Correct Answer Work Order Multiple Choice Single Answer Question A good layout makes effective use of space. Utilization of space for a department like Stores can be measured by Correct Answer Proportion of Cubic volume space utilized Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory True/False Question The OC curve is based on the assumption that if the lot is large in comparison to the sample, the probabilities of the OC curve will follow a poisson distribution. Correct Answer False Multiple Choice Multiple Answer Question What are the uses of failure statistics analysis?
- 104 -
104 Correct Answer To forecast the defect , To identify causes of major repetative failures , To quantify the frequency of preventive inspection True/False Question Originating process of raw material influence Process Planning Correct Answer True True/False Question Fixed cost is lower in case of continuous production than intermittent production. Correct Answer False True/False Question Grouping of machines gives a lot of flexibility in loading and scheduling Correct Answer True True/False Question Floor inspection promotes tendency of machines to drift out of limits and produce defectives. Correct Answer False True/False Question Even if any activity on the critical path is delayed, project completes on the scheduled time. Correct Answer False True/False Question Operation Process Chart provides information on time and distances Correct Answer False Multiple Choice Single Answer Question The document which incorporates details of process planning for a job is called Correct Answer Route Sheet Multiple Choice Single Answer Question Following is not an input information for Process Planning Correct Answer Inventory level Multiple Choice Single Answer Question Which kind of inspection is followed in case of product layout? Correct Answer Pilot inspection Multiple Choice Single Answer Question How to reveal the capability of the sampling plan to discriminate between good lots and bad lots? Correct Answer Operating characteristics curve ( OC ) True/False
- 105 -
105 Question For p‐chart, fraction defective units in each sample is calculated by dividing number of defectives by the number of pieces in the sample. Correct Answer True Multiple Choice Multiple Answer Question Which of the following possibilities can be explored by using flow process chart? Correct Answer Eliminating the operations or combining the operations with another , Reducing the distance traveled by the workmen or materials , Avoiding the waiting time and thereby reduce production losses Multiple Choice Multiple Answer Question Which of the following can be subtypes of corrective maintenance? Correct Answer Shutdown Maintenance , Design‐out Maintenance , Design‐in Maintenance Multiple Choice Multiple Answer Question Which are the first three steps of Critical Path Analysis technique? Correct Answer Activity relationships , Activity identification , Network construction Multiple Choice Single Answer Question How to calculate activity cost slope? Correct Answer Activity cost slope = ( Crash cost ‐ Normal cost ) / ( Normal time ‐ Crash time ) True/False Question During set up of X bar‐R control chart, control limts should be practically revised from time to time as additional data is accumulated. Correct Answer True Multiple Choice Multiple Answer Question Operation Layout generally contains following information Correct Answer Part Sketch , Standard Time , Jigs and fixtures True/False Question In case of two handed process chart, inspection symbol is used when check by touch or feel is involved. Correct Answer True Multiple Choice Multiple Answer Question Components of Production Management include Correct Answer Capacity Planning , Job Design , Production Planning Multiple Choice Multiple Answer Question Which of the following is a part of preparing manufacturing order set as a primary function of dispatching? Correct Answer Operational layouts , Move orders , Pre‐filled stores issue orders Multiple Choice Single Answer
- 106 -
106 Question Which rule is used for numbering of events? Correct Answer Fulkersonʹs Rule Multiple Choice Multiple Answer Question Which of the following causes can be responsible for derailing the production schedule in a factory? Correct Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism True/False Question Only skilled worker can use the fixed limit gauge. Correct Answer False Multiple Choice Single Answer Question What do you understand by totality of features and characteristics of a product or service that bears on itʹs ability to satisfy the customer? Correct Answer Quality Multiple Choice Single Answer Question What do you mean by a single event which represents the joint completion of more than one activities? Correct Answer Merge event True/False Question Flow process charts do record movements as well as visual pictures. Correct Answer False Match The Following Question Correct Answer When to inspect Stages of inspection What to inspect Specification How to inspect Inspection devices How much to inspect Sampling or cent percent inspection Multiple Choice Single Answer Question Material Planning is an integral part of Correct Answer Production Planning Multiple Choice Single Answer Question Material control function of PPC is concerned with Correct Answer Preparation of material estimates True/False
- 107 -
107 Question In case of X bar‐R charts, statistical limits are calculated from averages of samples of n (4,5,…) instead of single sample of large size to reduce the spread of natural variability. Correct Answer True Multiple Choice Multiple Answer Question What are the uses of the instruction manual provided by the manufacturer of a machine? Correct Answer It gives instructions regarding installation and operation of the equipment , It contains note on common troubles with causes and remedies for troubleshooting , It enlists points, frequency and type of lubrication Multiple Choice Multiple Answer Question MRP utilises the following information Correct Answer Master production schedule , Product structure , Lead time for procurement/manufacturing True/False Question Shape od an OC curve is a function of sample size and the acceptance number. Correct Answer True True/False Question For p‐chart, ʺInspection by variablesʺ is much faster than ʺInspection by attributesʺ Correct Answer False Multiple Choice Single Answer Question Site factors for plant location include Correct Answer Suitability of land True/False Question Cent percent inspection is a must if the inspection is of destructive nature. Correct Answer False Multiple Choice Multiple Answer Question Which of the following are examples of specifications? Correct Answer Commercial standards , Assembly and testing instructions , Bill of material Multiple Choice Single Answer Question Which of the following techniques is used by industrial engineering department to obtain the utilisation index? Correct Answer Work Sampling Studies True/False Question An ideal OC curve is never possible only with cent percent inspection. Correct Answer False True/False Question The operator should not stop production if first piece is not approved by the inspector.
- 108 -
108 Correct Answer False Multiple Choice Single Answer Question What do you understand by PERT ? Correct Answer Project Evaluation & Review Technique Multiple Choice Single Answer Question Which phase of method study is concerned with analyzing the facts critically, generating alternatives which form the basis for selection and development of improved methods? Correct Answer Critical examination True/False Question A network should employ only those dummy activities which are absolutely necessary. Correct Answer True True/False Question While making X bar‐R‐chart, values of X bar and R are recoded samplewise either on the extreme right of the individual measurements on the data sheet or in a separate sheet. Correct Answer True Multiple Choice Single Answer Question Which is the alternative way of indicating the load other than numerical way, in case of Gantt chart ? Correct Answer Graphical approach Multiple Choice Multiple Answer Question Which of the following are types of sampling plan? Correct Answer Single sampling plan , Double sampling plan , Multiple sampling plan Multiple Choice Multiple Answer Question Which of the following cases indicated that the operation has occurred? Correct Answer Movement of components to assembly section , Raw material movement , A workerʹs trip to grinder to sharpen the tools Multiple Choice Single Answer Question What is the reason of fluctuations, if the control chart evaluates that the process is in a state of statistical control? Correct Answer Random variability Multiple Choice Single Answer Question Product layout is suitable when Correct Answer Products have reasonable stable demand Multiple Choice Single Answer Question How industry has responded to the fact of existence of inherant variability of the manufacturing process?
- 109 -
109 Correct Answer Inclusion of certain tolerance on the basic dimensions in the drawing Multiple Choice Multiple Answer Question Which are the different methods of recording actual progress of work? Correct Answer Display boards , Progress cards , Network updating Match The Following Question Correct Answer Scheduling Device Strings Interruption for machine utilization Preventive maintenance Input for scheduling Overlapping of operations Technique of scheduling Critical Path Analysis Multiple Choice Multiple Answer Question Which are the three distinct parts of the chart? Correct Answer Summary , Introduction , Body Multiple Choice Single Answer Question Fixed position layout is adopted when Correct Answer product is very heavy involving assembly of large number of parts True/False Question Objective of Work Study is to improve Productivity Correct Answer True Multiple Choice Single Answer Question What do you mean by the chart on which the major activities and entry points of materials are recorded to have graphic view of operations and inspections involved in the process? Correct Answer Operation process chart True/False Question After goods have been manufactured, route sheets and operation layouts should not be collected back. Correct Answer False Multiple Choice Multiple Answer Question Which are the distinguished features of TQM ? Correct Answer Covers all kinds of industries , Gradual removal of interdepartmental barriers , Continuous improvement Multiple Choice Single Answer Question Which is the ideal place to write a description of an activity in a network?
- 110 -
110 Correct Answer Above the arrow Multiple Choice Single Answer Question What is the purpose of squares used in progress chart? Correct Answer To record the progress of work for each operation Multiple Choice Single Answer Question What do you understand by the properties which are difficult to measure quantitatively but usually measured by the comarision and then classification into acceptable or unacceptable? Correct Answer Attributes Multiple Choice Single Answer Question What is the relation between duration of an activity and length of an arrow? Correct Answer No relation Multiple Choice Single Answer Question How is the probability of acceptance in case of Acceptable Quality Level (AQL )? Correct Answer Very high Multiple Choice Multiple Answer Question Which of the following factors related to the labour and wages are considered while deciding the plant location? Correct Answer Prevailing wage pattern , Productivity of labour , Industrial relations True/False Question A properly designed sampling plan can control sampling errors and completely eliminate them. Correct Answer False Multiple Choice Single Answer Question When should operator or supervisor is supposed to sign the perforated route sheet? Correct Answer After completion of operation True/False Question The earliest start time of an activity equals earliest time for the event from which activity arrow originates. Correct Answer True Multiple Choice Multiple Answer Question Which are the factors on which the structure of the transportation cost depends? Correct Answer Average distance of shipment , Characteristics of the commodity , Medium of shipment Multiple Choice Multiple Answer Question Which of the following are minimum requirement for a good quality of design? Correct Answer Resonable cost , Resonable procurement time , Resonable manufacturing time Multiple Choice Single Answer
- 111 -
111 Question What do you mean by the study of repetitive short cycle operations which involve quick hand / feet motions? Correct Answer Micromotion study Multiple Choice Single Answer Question What does the points falling outside the control limits indicate? Correct Answer Presence of assignable causes Multiple Choice Single Answer Question Which industry out of the following industries require maximum consideration for safety factor while selecting plant location? Correct Answer Nuclear power plant Multiple Choice Multiple Answer Question Which of the following are examples of addition during recording for method study? Correct Answer Brazing , Welding , Riveting Multiple Choice Single Answer Question Which kind of gauge consists of electrical contacts operating a series of colloured signal lamps which indicate whether the dimension is correct, oversize or undersize? Correct Answer Multiple gauging Multiple Choice Multiple Answer Question Which are reason due to which the progress of work is rarely in line with itʹs plan? Correct Answer Absenteeism , Machine breakdowns , Substandard performance against prefixed production standards True/False Question Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity in process layout Correct Answer True True/False Question Operation process charts though indicates the sequence of events but do not show movements. Correct Answer True Multiple Choice Single Answer Question Which is the zone beyond LTPD in case of Oc curve of a general plan? Correct Answer Zone of rejection True/False Question Skill of labour force in a product type layout is usually higher than in the process type of layout Correct Answer False True/False Question Suburban location provides the compromise netween rural and urban locations.
- 112 -
112 Correct Answer True Multiple Choice Multiple Answer Question Which of the following activities can become a part of a preventive maintenance system? Correct Answer Condition monitoring , Planned Lubrication , Preventive inspection True/False Question In case of two handed process chart, storage symbol is used when either hand is used as grip or vice to hold an object. Correct Answer True True/False Question Activities whose earliest finish times and latest finish times are not equal constitutes the critical path. Correct Answer False Multiple Choice Multiple Answer Question Which of the following industries justify the use of move order? Correct Answer Power plant , Steel plant , Heavy machinery manufacturing Multiple Choice Multiple Answer Question Which kind of natural delays and interruptions are considered during estimation of activity time? Correct Answer Shop efficiency , Breakdowns , Absenteeism True/False Question Job life is one of the factors that influence Process Planning Correct Answer True True/False Question The steeper the OC curve, the better is the discrimination between good and bad lots. Correct Answer True Multiple Choice Single Answer Question Which is the most popular scientific tool for project planning? Correct Answer Critical path analysis Multiple Choice Single Answer Question What is the basic philosophy of statistical process control? Correct Answer Prevention is better than cure Multiple Choice Single Answer Question Following is not a function of PPC Correct Answer Product Planning Match The Following
- 113 -
113Question Correct Answer Community Facilities Educational facility Proximity to market Fragile product Industrial and labour attitude Productivity of labour Legislation and taxation Licenses True/False Question The actual performance deviates positively over the budgeted performanve. This is an indication of superior performance Correct Answer True True/False Question Sampling inspection is best suited when cost of inspection is much higher than the loss arising from the acceptance of a defective part. Correct Answer True True/False Question Breakdown is inversly proportional to the investment in W.I.P. Correct Answer False True/False Question Inspection Order can be a verbal order Correct Answer True Multiple Choice Single Answer Question What do you understand by the extent the products manufactured conforms to the laid down design? Correct Answer Quality of conformance Multiple Choice Multiple Answer Question Which of the following observations are expected from the preventive maintenance person? Correct Answer Wrong allignments , Overheating defects , Excessive play Multiple Choice Multiple Answer Question Which are the different methods to record details of the existing method during method study? Correct Answer Charts , Diagrams , Templates or models Multiple Choice Single Answer Question Following is one of the tasks of Production Control Correct Answer Actual issue of forms and documents True/False
- 114 -
114 Question A lot declared rejected in sampling inspection should not be inspected 100% in any case. Correct Answer False True/False Question Regular lubrication with carefully selected lubricants is an essential factor in the maintenance of high grade machine tools working under continuous load. Correct Answer True Multiple Choice Multiple Answer Question What is indicated by the hugging points lying close to mean of the process in X bar‐R‐ control chart? Correct Answer Recording done without actual measurements , Improper selection of samples , Biases in measurements Multiple Choice Multiple Answer Question Which of the following are the basic requirements of quality standard? Correct Answer Deifinite , Undesrstandable , Economically viable Multiple Choice Multiple Answer Question What are the benefits of inspection and quality control? Correct Answer Adequate maintenance of quality , Ensures parts are within specified limits of accuracy , Gives economy in production through reduction of defective work Multiple Choice Multiple Answer Question Which of the following are characteristics of an operating characteristics curve? Correct Answer Producer risk , Consumer Risk , Acceptable Quality Level True/False Question Inspection should be conducted on all incoming materials, semifinished items, bought out components, subcontract items prior to any operation, assembly. Correct Answer True True/False Question Since value of c can never be negativee, henceʺ if LCLp works out to be negative, it is taken as zero.ʺ Correct Answer True Multiple Choice Single Answer Question What do you understand by the quality specified by the designer on behalf the customer? Correct Answer Quality of design Multiple Choice Single Answer Question Which method is used to trace especially those movements which are too fast for human eye to pursue? Correct Answer Cyclegraph
- 115 -
115 Match The Following Question Correct Answer Template Two dimensional cutouts REL chart Degree of closeness Flow diagram Tracing movements Travel chart Distance and frequency of movements True/False Question Inspection should be avoided prior to long run of a manufacturing stage as it becomes duplication of work and cost. Correct Answer False Multiple Choice Multiple Answer Question Plant Layout is concerned with optimum arrangement of the following Correct Answer Storage space , Machines , Material Handling Equipment Multiple Choice Single Answer Question What is the location of upper control limit in the X bar‐R control chart? Correct Answer 3 standard deviations above central line True/False Question While numbering as per Fulkersonʹs rule, arrows emerging from the initial event are deleted so as to create one or more initial events. Correct Answer True Multiple Choice Single Answer Question Why stores issue order should not be issued as soon as it is prepared? Correct Answer Material may or may not be available at the time of preparation Multiple Choice Single Answer Question Which characteristics are verified in cent percent sampling? Correct Answer All important characteristics Multiple Choice Multiple Answer Question Features of Cellular layout are Correct Answer It is a type of mixed layout , Uses concept of Group Technology , Facilities are grouped in to cells Multiple Choice Multiple Answer Question Which of the following situations demand the economic consideration while selecting a job for method study?
- 116 -
116 Correct Answer Unorderly movement of men and materials , Excessive process defectives , Too many suggestions received for improvement from a department or section Multiple Choice Single Answer Question One of the sophisticated operations research techniques used in material planning is Correct Answer Dynamic programming True/False Question Quality control determines what, when, and how much to inspect while inspection actually conducts examination of goods. Correct Answer True Multiple Choice Multiple Answer Question Which of the following may be the objectives of project crashing? Correct Answer To achieve uniformity in requirement of resources , To complete the project in the least possible time , To reduce project cost below itʹs normal cost Multiple Choice Single Answer Question One of the characterstic of layout is about the flow of material / personnel. In a good layout the flow should be Correct Answer Unidirectional True/False Question Both, preventive and breakdown maintenance work must be assigned to the same team. Correct Answer False Multiple Choice Single Answer Question What is the specific name for the Gantt chart when it shows at a glance the scheduling of various operations involved in a job? Correct Answer Job Schedule Multiple Choice Multiple Answer Question Which of the following factors decide the choice between the cent percent and sampling inspection? Correct Answer Nature of inspection , Natural tolerance versus design tolerance , Vendorʹs quality rating Multiple Choice Single Answer Question In mass/batch production organizations where goods are produced for stocking, Work Order is raised on the basis of Correct Answer Sales Programme True/False Question The dispatching function is of very importance in flow and mass production units. Correct Answer False Multiple Choice Single Answer
- 117 -
117 Question What is the reason of excessive friction between parts? Correct Answer Improper or lack of lubrication Multiple Choice Single Answer Question How does the control chart of statistical quality control helps the operating personnel? Correct Answer Identify the presence of an assignable cause before it develops Multiple Choice Single Answer Question Inherent Safetyʹ is one of the principle of good layout. In context of layout, this can be achieved by the following Correct Answer Clear gangway, location of material and material handling system Match The Following Question Correct Answer Toung Sweet Eye Crack Nose Burnout Ear Impact Multiple Choice Single Answer Question How much time does the dummy activity take? Correct Answer Zero Time Multiple Choice Single Answer Question What does tail of an arrow represent? Correct Answer Start of an activity Multiple Choice Multiple Answer Question Which of the following are the most suitable cases where we can use CPA as effective technique of scheduling? Correct Answer Overhauling of a CNC machine , Purchase and installation of a newly imported special purpose machine , Design, production and testing of prototype of a fighter aircraft. Multiple Choice Multiple Answer Question Which are the different types of flow process charts used for method study? Correct Answer Equipment type , Man type , Material type True/False Question Use of accurate measuring instruments and better supervision for inspectors is not possible in case of floor inspection as compared to centralised inspection system. Correct Answer True
- 118 -
118 Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion Multiple Choice Single Answer Question What is the reason of fluctuations, if the c‐ontrol chart evaluates that the process is not in a state of statistical control? Correct Answer Assignable variability Multiple Choice Multiple Answer Question What are the advantages of three dimensional models? Correct Answer Even non‐technical person can use it , Overhead facilities can be shown , Can be shifted easily and quickly True/False Question Since recording by descriptive method has itʹs limitations, it is not recommended for use in method study. Correct Answer True Multiple Choice Multiple Answer Question Which of the following situations demand that the human consideration should be given preference over other considerations? Correct Answer Inconsistent earnings where the earnings are tied to output , Poor morale evidenced by petty or trivial complaints , Repeated cases of accidents and health hazards Multiple Choice Multiple Answer Question Which are the different situations in which the process capability studies of the various process are likely to fit? Correct Answer Process variability is just adequate , Good process variability but bad process centering , Good process variability but poor process centering True/False Question Feasibility of time schedule requires that an activity be scheduled before any of itʹs predecessors are scheduled. Correct Answer False True/False Question With a general OC curve, probability of acceptance of lots of good quality is never unity. Correct Answer True Multiple Choice Single Answer Question Which manufacturing method is ideal for the use of air gauges as inspection device? Correct Answer Mass Multiple Choice Single Answer Question Provision of drainage facilities is important for the following type of industry
- 119 -
119 Correct Answer Chemical Process Multiple Choice Multiple Answer Question Which are three different bases to establish an activity time? Correct Answer Past experience , Judgement , Historical data Multiple Choice Single Answer Question Process planning is the process of Correct Answer establishing shortest and most economic path of production Multiple Choice Single Answer Question How does motion economy prove useful in mass production? Correct Answer It improves work bench layout and evolve logical sequence of assembly of parts True/False Question The problems of congestion, bottlenecks and backtracking can not be visualized by using templates and models. Correct Answer False Multiple Choice Multiple Answer Question Following are some of the factors which influence process planning Correct Answer Order Quantity , Process capability of machine , Delivery Dates Multiple Choice Single Answer Question Gross requirement of products is determined on the basis of Correct Answer Both forecast and pending orders Multiple Choice Single Answer Question In exponential smoothing method,for a stable demand pattern and better smoothing effect, value of fraction( Alpha) selected is Correct Answer 0.05 to 0.10 True/False Question Recording of movement is not necessary in case of method study in any form. Correct Answer False Multiple Choice Single Answer Question Production Planning includes Correct Answer Predetermination of manufacturing requirements Match The Following Question Correct Answer Pessimistic time b Expected time Te Te
- 120 -
120 Optimistic time a Most likely time m Multiple Choice Multiple Answer Question Which are the subtasks of the maintenance phase of the method study? Correct Answer Monitoring and control , Performance appraisal , Audit on savings True/False Question short cycle job should be studied for macroscopic motions. Correct Answer False Multiple Choice Single Answer Question Which is the ideal place to inspect jigs and fixtures in a mass manufacturing unit? Correct Answer Separate inspection room True/False Question In Gantt Chart, the horizontal lines devide vertical lines into sections which represents either operations or work centres. Correct Answer True True/False Question Floor inspection delays the identification of faults which can not be rectified immediately before large lots are spoiled. Correct Answer False Multiple Choice Single Answer Question Management often fails to realize the importance of efficient layout due to following reason Correct Answer losses resulting from poor layout are not directly shown in the financial statements True/False Question Complexity and difficulty of Planning is influenced by types of layout Correct Answer True Multiple Choice Multiple Answer Question Which of the following are scheduling techniques? Correct Answer Critical Path Analysis , Index Method , Johnsonʹs two machine algorithm True/False Question A network should be progression of activities always moving forward. Correct Answer True Multiple Choice Single Answer Question What do you understand by the selection of the job for the method study on the basis of money saving potential of the job?
- 121 -
121 Correct Answer Economic consideration Match The Following Question Correct Answer Forcasting requirement for indirect material Past consumption analysis technique Inventory control by classification ABC Analysis Structure of the product BOM Material Planning for dependent demand MRP True/False Question In case of forward pass computation, the earliest event time of a plain event equals the earliest event time of the preceding event plus duration of activity emanating from the preceding event. Correct Answer True Multiple Choice Multiple Answer Question Which of the following are ideal situations for the preventive inspection? Correct Answer Weekly off and holidays , Non‐production hours , Stand‐up equipment Multiple Choice Single Answer Question Taxes / duties levied is one of the important determinant for location decision as taxes/duties substantially influence Correct Answer Product cost Select The Blank Question The ________ is the process of withdrawing the equipment from the production line, dismantling it unitwise, visualising defects, effecting adjustments, replacing worn‐out parts and finally building it up to get desired accuracies. Correct Answer Reconditioning Multiple Choice Single Answer Question What is the location of lower control limit in the X bar‐R control chart? Correct Answer 3 standard deviations below central line Multiple Choice Multiple Answer Question Which of the following defects can be observed during preventive inspection by using human senses? Correct Answer Deviation from normal sound , Excessive Vibration , Leakage of a gas Multiple Choice Multiple Answer Question Which of the following are the objectives of a good maintenance system? Correct Answer Elimination of unsafe conditions , Minimisation of wear and tear of machines , Ensuring maximum plant availability
- 122 -
122 True/False Question In case of backward pass computation, the latest event time of a tail event equals to the latest event time of the succeeding ( Head ) event minus duration of the activity converging to the head event.. Correct Answer True True/False Question Cent percent inspection does not mean inspection of component for 100% quality characteristics. Correct Answer True True/False Question In case of backward pass computation, the latest event time of the burst event equals the smallest of the difference between the latest event time of the head event less duration of the activity converging on the head event. Correct Answer True Multiple Choice Single Answer Question What is the nature of the sampling plan for critical defects? Correct Answer Tight Multiple Choice Single Answer Question What do you understand by identification of defects in materials, components, machining processes or men to fix responsibility of defectives, thereby preventing or minimising occurance of defectives? Correct Answer Preventive function True/False Question Planned lubrication is said to be the nervous system of the equipment. Correct Answer True Multiple Choice Multiple Answer Question Which are the three basic types of control chart by attribute? Correct Answer p‐chart , c‐chart , np‐chart Multiple Choice Single Answer Question How to claculate the producer risk in the OC Curve? Correct Answer Probability that a good lot will be rejected by the sampling Multiple Choice Multiple Answer Question What are the benefits of reconditioning? Correct Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement of replacement spares True/False Question Development of a good lubrication programme begins with the identification of lubrication points.
- 123 -
123 Correct Answer True True/False Question Sampling inspection suffice to check the work of line inspectors and stage inspectors. Correct Answer True True/False Question In case of backward pass computation method, the latest event time represents the latest occurrence time of the event. Correct Answer True Multiple Choice Single Answer Question Which is the ideal place to write a time allotted for an activity in a network? Correct Answer Below the arrow Multiple Choice Single Answer Question What do you mean by planned corrective manitenance which provides an opportunity to undertake design modifications in the equipment to eliminate or reduce frequency of breakdowns. Correct Answer Design‐out Maintenance Match The Following Question Correct Answer Temperature of motor Body Exhaust gas Smell Air leakage Listen Corrosion Watch Multiple Choice Single Answer Question What do you understand by the inspection conducted on all nonreworkable jobs prior to their movement to the scrap yard? Correct Answer Salvage inspection True/False Question In a control chart, as a general rule, time interval should be inversely proportional to the average frequency of out of control conditions. Correct Answer False Select The Blank Question A ________ is another form of subcontracting. Correct Answer Hiring capacity True/False
- 124 -
124 Question For p‐chart, the central line of fraction defectives is determined by average percentage defectives. Correct Answer True Multiple Choice Multiple Answer Question Which of the following processes or activities are denoted by using symbols while recording in method study? Correct Answer Transport , Delay , Storage Multiple Choice Multiple Answer Question Which of the following are activities of corrective maintenance? Correct Answer Modifications and improvements , Overhauling , Emergency repairs Multiple Choice Single Answer Question Where does the SPC exercises the control to prevent the occurances of defectives? Correct Answer On manufacturing process True/False Question A sampling plan which perfectly discriminates will have vertical OC curve. Correct Answer True Multiple Choice Multiple Answer Question Which kind of possible defectives can be reduced due to first off inspection? Correct Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up True/False Question It pays in the long run to inform the customer regarding expected delays in the deliveries. Correct Answer True True/False Question Availability of training schools, colleges and management institutes reduces the companyʹs internal training needs. Correct Answer True Multiple Choice Multiple Answer Question Which of the following are examples of pure materials? Correct Answer Bakeries , Ice factories , Woolen True/False Question Tool breakage has got nearly zero chances in case of eventual breakdown. Correct Answer False Multiple Choice Multiple Answer Question Which are the three types of float? Correct Answer Total float , Independent float , Free float
- 125 -
125 True/False Question In case of control chart, large smaples such as n=15 or 20 are used if the process standard deviation is small. Correct Answer False Multiple Choice Single Answer Question What do you understand by the metallergical aspects of product which forms the vital part of engineering function? Correct Answer Material specifications Multiple Choice Single Answer Question Which of the following is a cause of plant breakdown? Correct Answer Overloading of machines True/False Question In case of centralised inspection, inspection rooms generally become bottleneck and cause delay in taking action regarding rejection or rework. Correct Answer True True/False Question Shop order is one of the subsidiary order Correct Answer True Multiple Choice Single Answer Question Which of the following data is unnecessary for scheduling process? Correct Answer Cost breakup of products Multiple Choice Single Answer Question Document raised by Sales department for goods manufactured to stock is called Correct Answer Shipment order Match The Following Question Correct Answer Change in physical characteristic Punching Addition Assembly Consumption of physical effort Lifting Information received Taking dictation True/False Question Specifications is the basic tool of inspection. Correct Answer True
- 126 -
126 Multiple Choice Single Answer Question Plant Layout decisions are considered to be Correct Answer Strategic Match The Following Question Correct Answer Number of defectives chart np‐chart Range chart R chart Fraction defective chart p‐chart Defects chart c‐chart Multiple Choice Single Answer Question CAP related to internal appraisal of firm stands for Correct Answer competitive advantage profile Multiple Choice Multiple Answer Question Which of the following aspects are essential to ensure quality of purchased items? Correct Answer Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers understand the requirements True/False Question Site selection should also take into account topography and soil structure of the land. Correct Answer True True/False Question Lubrication survey should never be done for a new machine. Correct Answer False True/False Question One major difference between CPM and PERT is the formerʹs adaptability for the projects where high degree of uncertainty prevails and activity times during performance are expected to vary considerably for certain activities. Correct Answer False True/False Question A network can have more than one starting event but completion event must be only one. Correct Answer False True/False Question Cent percent inspection is required on WIP prior to the key, critical or costly operation. Correct Answer True
- 127 -
127 True/False Question Under MRP system for common items order for procurement is placed based on requirement for each product Correct Answer False True/False Question Proper care and storage is not an essential part of a well planned lubrication system. Correct Answer False Select The Blank Question An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL . Correct Answer Rectangular Multiple Choice Single Answer Question The product layout has following disadvantage Correct Answer Layout is not flexible Multiple Choice Single Answer Question What do you understand by the difference between the specification limits within which manufacturing process is expected to produce? Correct Answer Design tolerance True/False Question Sample sizes for the construction of p‐chart are typicaly larger that for Xbar‐R‐charts. Correct Answer True Multiple Choice Single Answer Question Plant location decisions concern following type of organizations Correct Answer Manufacturing and service organizations Multiple Choice Single Answer Question What do you understand by inspection conducted on all jobs received back from a customer as defectives? Correct Answer Appraisal inspection Multiple Choice Multiple Answer Question How the concept of float is helpful to planners? Correct Answer To minimize the requirement of resources , To prevent peaks and valleys in requirement of resources , To decide priorities in allocation of resources Multiple Choice Single Answer Question How many types of charts are used for the purpose of method study? Correct Answer Four
- 128 -
128 Multiple Choice Single Answer Question What does head of an arrow represent? Correct Answer End of an activity Multiple Choice Single Answer Question How critical activities are shown in the time chart during project scheduling? Correct Answer Solid lines True/False Question Breakdown of a machine is normally accompanied by added machine setup cost such as resetting of jobs or change of jobs. Correct Answer True Multiple Choice Single Answer Question Which of the following technique makes three time estimates for each activity? Correct Answer Project Evaluation & Review Technique True/False Question Mixed layouts are generally used in case of product is to be produced in different sizes/types: contains too many components Correct Answer True Multiple Choice Multiple Answer Question Which of the following are examples of gross materials? Correct Answer Timber , Iron ore , Sugar cane True/False Question Latest starting date is the latest finishing time minus activity duration. Correct Answer True Multiple Choice Single Answer Question One of the external factors influencing Material Planning is Correct Answer Price trends True/False Question Inspection should be conducted prior to an operaion, after whose completion no rework whatsoever is possible. Correct Answer True Select The Blank Question Production Planning is a centralised activity which includes functions such as ________ Correct Answer Scheduling Multiple Choice Single Answer Question Product layout offer following advantages Correct Answer There is economy in manufacturing time
- 129 -
129 Select The Blank Question An ________ history card is the record of all repairs, replacements and engineering changes carried out in the equipment during itʹs period of service. Correct Answer Equipment history card Multiple Choice Multiple Answer Question Which of the following are uses of the lubricants? Correct Answer Retard rate of wear and tear of moving parts , Protect parts from moisture and dust , Keep temperature of bearings within allowable limits Multiple Choice Multiple Answer Question Why graphical method of recording is preferred over the descriptive method during method study? Correct Answer It segregates effective part form ineffective parts , It reduces effort involved in writing , Critical examinations easier and more effective Multiple Choice Multiple Answer Question How to exercise control over quality? Correct Answer Periodical analysis of inspecting reports to establish causes of rejections , Preperation of quality standard and specifications , Exercising control over inputs True/False Question Any proposed change must not be intimated to workers in advance. Correct Answer False Multiple Choice Single Answer Question What do you mean by the project duration for which the total cost is minimum? Correct Answer Optimum duration Select The Blank Question Function concerned with fixation of time allowed to qualified worker for a job is called ________. Correct Answer Work Measurement Select The Blank Question The design of any layout is governed by large number of factors and the best layout is expected to ________ all these factors. Correct Answer Optimise Select The Blank Question The ________ is the process of assigning calender dates to the various operations of a job. Correct Answer Scheduling Select The Blank Question Two welknown timing methods are cumulative method and ________.
- 130 -
130 Correct Answer Fly back method Select The Blank Question A ________ is another typical chart which is used to record frequency of movements between work centers. Correct Answer Travel chart Select The Blank Question Any incentive scheme must achieve the ________ of the organisation. Correct Answer Objectives Multiple Choice Single Answer Question Where does the central line is located in case of p‐chart? Correct Answer at p bar Multiple Choice Single Answer Question What is the meaning of surplus material in context with stores issue order? Correct Answer Materials issued are not fully consumed Select The Blank Question In case of normal distribution curve, the distribution is dependent on only two parameters, mean and ________. Correct Answer Standard deviation Select The Blank Question In ________ technique activity time are related to costs. Correct Answer Critical Path Method Multiple Choice Multiple Answer Question The advantages of Factor Analysis method over Balancing advantages against disadvantage methods are Correct Answer Considers intangible costs/benefits , Is a rational method , Analysis is more objective Select The Blank Question The wage payable to the workman is calculated by ________ the quantity produced by him by the specified rate per piece, in the straight piece rate method. Correct Answer Multiplying Select The Blank Question The ________ is a pair of chart consisting of average chart and range chart placed one below another on a piece of graph paper Correct Answer X bar‐R‐chart Select The Blank Question The ________ results when all preceding and succeeding activities occur at the earliest event time
- 131 -
131 Correct Answer Free float Select The Blank Question Production planning and control is normally assigned to ________sets of functions Correct Answer Two Select The Blank Question Principle underlying the Moving Average mrthod is that future demand shall be ________ past demand Correct Answer Average of Select The Blank Question The most commonly used methods employed to determine the critical path in case of large networks are forward pass computation and ________. Correct Answer Backward path computation Select The Blank Question Start or finish points of activities is represented by ________. Correct Answer Event Multiple Choice Single Answer Question What is the reason of fluctuations, if the control chart evaluates that the process is not in a state of statistical control? Correct Answer Assignable variability Select The Blank Question Process sheets for parts in job production are prepared once and maintained as ________ process sheet. Correct Answer Standard The Project Evaluation & Review Technique Critical Path Method Critical Project Management Project Engineering & Resources Technique technique builds the network from activities The Maintenance Critical examination Development and selection Control phase also provides an opportunity to the practitioner to assess the effectiveness of the approach followed by him and make changes in the methodology Activities comprising of a project are of two types, deterministic and Critical Variable Fixed Standard. The time chart, if necessary, may be modified considering the limitations of resource. True /False