![Page 1: POLYESTER POLYMER CONCRETE Indian Roads Congress Accredited (March 2012) DDR Global Infrastructure Pvt. Ltd. Rajesh Oberoi, P.E. (California, USA) WALIA.](https://reader035.fdocuments.net/reader035/viewer/2022062620/551a2a205503463e778b46f4/html5/thumbnails/1.jpg)
POLYESTER POLYMER CONCRETEIndian Roads Congress Accredited (March 2012)
DDR Global Infrastructure Pvt. Ltd.
Rajesh Oberoi, P.E. (California, USA)
WALIA INTERNATIONAL MACHINES CORPORATION408, Vishwadeep, District Centre, Janak Puri, New Delhi – 110058
Ph # 011-25546044, 25521275, E-mail : [email protected] : www.waliainternational.com
![Page 2: POLYESTER POLYMER CONCRETE Indian Roads Congress Accredited (March 2012) DDR Global Infrastructure Pvt. Ltd. Rajesh Oberoi, P.E. (California, USA) WALIA.](https://reader035.fdocuments.net/reader035/viewer/2022062620/551a2a205503463e778b46f4/html5/thumbnails/2.jpg)
Introduction
DDR Global Infrastructure Pvt. Ltd.
RAJESH OBEROIP.E. (Civil) State of California,
USAB.Tech. (Civil), 1981, IIT,
Kanpur, IndiaM.S. (Civil), 1985, Univ. of
Massachussetts, Amherst, MA, USA
![Page 3: POLYESTER POLYMER CONCRETE Indian Roads Congress Accredited (March 2012) DDR Global Infrastructure Pvt. Ltd. Rajesh Oberoi, P.E. (California, USA) WALIA.](https://reader035.fdocuments.net/reader035/viewer/2022062620/551a2a205503463e778b46f4/html5/thumbnails/3.jpg)
Why Polyester Concrete for Overlays in India? Proven technology with a track record
of 30+ years ELIMINATES Maintenance Cost Provides almost 100% protection
against chloride intrusion Provides high skid resistance Quick return to service in less than 2
hrs Can be placed in one lift from 25mm –
300 mm Exceptional Bond Strength Used in EXTREME CLIMATIC
CONDITIONS with Altitude, Marine/Coastal, Humid, Freeze-Thaw and Desert Environments
Polyester
Concrete
Bond line
Break line
![Page 4: POLYESTER POLYMER CONCRETE Indian Roads Congress Accredited (March 2012) DDR Global Infrastructure Pvt. Ltd. Rajesh Oberoi, P.E. (California, USA) WALIA.](https://reader035.fdocuments.net/reader035/viewer/2022062620/551a2a205503463e778b46f4/html5/thumbnails/4.jpg)
What is Polyester Concrete?A very durable composite
material made of hardened polyester resin, coarse aggregate and sand.
The polyester resin serves as the binding agent - similar to hydrated Portland Cement in PCC.
Engineered Material with Consistent Properties.
Polyester
Concrete
Bond line
Break line
![Page 5: POLYESTER POLYMER CONCRETE Indian Roads Congress Accredited (March 2012) DDR Global Infrastructure Pvt. Ltd. Rajesh Oberoi, P.E. (California, USA) WALIA.](https://reader035.fdocuments.net/reader035/viewer/2022062620/551a2a205503463e778b46f4/html5/thumbnails/5.jpg)
Polyester Concrete backgroundFirst use of current system 1983 – Thomson
Creek & Beaver Creek Bridges, Yreka, California, USA
1985/86 Highway overlay I-80 (10 lane miles), California, USA
5 million m2 (55 million ft2) surface in place on BRIDGES ALONE in 20 States in the USA equates to approximately 1,500 km of single lane
TODAY – An average of 2 tenders/month are advertised in just one State (California)
![Page 6: POLYESTER POLYMER CONCRETE Indian Roads Congress Accredited (March 2012) DDR Global Infrastructure Pvt. Ltd. Rajesh Oberoi, P.E. (California, USA) WALIA.](https://reader035.fdocuments.net/reader035/viewer/2022062620/551a2a205503463e778b46f4/html5/thumbnails/6.jpg)
What is Polyester Concrete?POLYSTER POLYMER
CONCRETE (PPC 1121)PORTLAND CEMENT
CONCRETE
WATER
POLYESTER POLYMER RESIN (Unsaturated IsophthalicPoly-Styrene Co-Polymer)
CEMENT
SAND IS383
SANDIS383
AGGREGATENatural,10mm Down, River
Borne
AGGREGATECrushed, 26.5mm Down
![Page 7: POLYESTER POLYMER CONCRETE Indian Roads Congress Accredited (March 2012) DDR Global Infrastructure Pvt. Ltd. Rajesh Oberoi, P.E. (California, USA) WALIA.](https://reader035.fdocuments.net/reader035/viewer/2022062620/551a2a205503463e778b46f4/html5/thumbnails/7.jpg)
Approved by FHWA in year 1988
![Page 8: POLYESTER POLYMER CONCRETE Indian Roads Congress Accredited (March 2012) DDR Global Infrastructure Pvt. Ltd. Rajesh Oberoi, P.E. (California, USA) WALIA.](https://reader035.fdocuments.net/reader035/viewer/2022062620/551a2a205503463e778b46f4/html5/thumbnails/8.jpg)
AASHTO Guide Specifications - 1995
![Page 9: POLYESTER POLYMER CONCRETE Indian Roads Congress Accredited (March 2012) DDR Global Infrastructure Pvt. Ltd. Rajesh Oberoi, P.E. (California, USA) WALIA.](https://reader035.fdocuments.net/reader035/viewer/2022062620/551a2a205503463e778b46f4/html5/thumbnails/9.jpg)
Indian Roads Congress Accredited - 2012
![Page 10: POLYESTER POLYMER CONCRETE Indian Roads Congress Accredited (March 2012) DDR Global Infrastructure Pvt. Ltd. Rajesh Oberoi, P.E. (California, USA) WALIA.](https://reader035.fdocuments.net/reader035/viewer/2022062620/551a2a205503463e778b46f4/html5/thumbnails/10.jpg)
![Page 11: POLYESTER POLYMER CONCRETE Indian Roads Congress Accredited (March 2012) DDR Global Infrastructure Pvt. Ltd. Rajesh Oberoi, P.E. (California, USA) WALIA.](https://reader035.fdocuments.net/reader035/viewer/2022062620/551a2a205503463e778b46f4/html5/thumbnails/11.jpg)
Polyester Concrete use in USA
![Page 12: POLYESTER POLYMER CONCRETE Indian Roads Congress Accredited (March 2012) DDR Global Infrastructure Pvt. Ltd. Rajesh Oberoi, P.E. (California, USA) WALIA.](https://reader035.fdocuments.net/reader035/viewer/2022062620/551a2a205503463e778b46f4/html5/thumbnails/12.jpg)
30+ Years of Proven Performance
Polyester Polymer Concrete Overlay Placed in 1983
These Pictures were taken in
July 2011
![Page 13: POLYESTER POLYMER CONCRETE Indian Roads Congress Accredited (March 2012) DDR Global Infrastructure Pvt. Ltd. Rajesh Oberoi, P.E. (California, USA) WALIA.](https://reader035.fdocuments.net/reader035/viewer/2022062620/551a2a205503463e778b46f4/html5/thumbnails/13.jpg)
Polyester Concrete Properties Thermal coefficient of expansion – 14.6 x 10-6
deg CLower modulus equals less stressHigher tensile and flexural strengthHigh abrasion resistanceExcellent bond strength (composite)Very low permeability to water and chloridesFast setting – traffic in about 2 hours
![Page 14: POLYESTER POLYMER CONCRETE Indian Roads Congress Accredited (March 2012) DDR Global Infrastructure Pvt. Ltd. Rajesh Oberoi, P.E. (California, USA) WALIA.](https://reader035.fdocuments.net/reader035/viewer/2022062620/551a2a205503463e778b46f4/html5/thumbnails/14.jpg)
Key Engineering Properties
Polyester Polymer
Concrete (PPC 1121)
Portland Cement(8-Bags)
Chloride Permeability,Coulombs 0 – 200 1,000 - 3,000
Compressive Strength 565 Kg/cm2 490 Kg/cm2
24-hr Early Strength 280 Kg/cm2 105 Kg/cm2
Flexural Strength 155 Kg/cm2 55 Kg/cm2
Modulus of Elasticity(E) 7000 - 14000 Mpa 21000 - 35000
Mpa
Abrasion 0.25mm/year 4.0 mm/year
Open to Traffic 2 - 4 Hours 3 - 7 Days
![Page 15: POLYESTER POLYMER CONCRETE Indian Roads Congress Accredited (March 2012) DDR Global Infrastructure Pvt. Ltd. Rajesh Oberoi, P.E. (California, USA) WALIA.](https://reader035.fdocuments.net/reader035/viewer/2022062620/551a2a205503463e778b46f4/html5/thumbnails/15.jpg)
PERMEABILITY
![Page 16: POLYESTER POLYMER CONCRETE Indian Roads Congress Accredited (March 2012) DDR Global Infrastructure Pvt. Ltd. Rajesh Oberoi, P.E. (California, USA) WALIA.](https://reader035.fdocuments.net/reader035/viewer/2022062620/551a2a205503463e778b46f4/html5/thumbnails/16.jpg)
Signature ProjectsPolyester Polymer Concrete Overlays
San Francisco-Oakland Bay Bridge, CA- 300,000 ADT
Richmond San Rafael Bridge, CA- 80,000 ADT
Benicia Martinez Bridge, CA – 100,000 ADTVincent Thomas Bridge, Long Beach, CA-
35,000 ADTSouth Grand Island Bridge Buffalo, NY-
40,000 ADTMcCullough Memorial Bridge, Oregon-
20,000 ADT
![Page 17: POLYESTER POLYMER CONCRETE Indian Roads Congress Accredited (March 2012) DDR Global Infrastructure Pvt. Ltd. Rajesh Oberoi, P.E. (California, USA) WALIA.](https://reader035.fdocuments.net/reader035/viewer/2022062620/551a2a205503463e778b46f4/html5/thumbnails/17.jpg)
Richmond-San Rafael BridgeExtreme Coastal/Marine EnvironmentBuilt in 1956, 8.85 KM, Upper & Lower Decks – 3 Lanes on Each DeckLeft Lane - GrindedRight Lane - Overlain by PPCMiddle Lane - Original,
Damaged, Potholed, patched
![Page 18: POLYESTER POLYMER CONCRETE Indian Roads Congress Accredited (March 2012) DDR Global Infrastructure Pvt. Ltd. Rajesh Oberoi, P.E. (California, USA) WALIA.](https://reader035.fdocuments.net/reader035/viewer/2022062620/551a2a205503463e778b46f4/html5/thumbnails/18.jpg)
1 KM long critical link, Niagara Falls and Buffalo, NY was overlaid with Polyester Concrete.
Completed: night and full weekend closures
Largest polyester project to date on East Coast
Tough winter weather conditions
Overlay applied to newly replaced precast deck system to protect thin 100 mm concrete deck section
South Grand Island Bridge, NYExtreme Winter Conditions
![Page 19: POLYESTER POLYMER CONCRETE Indian Roads Congress Accredited (March 2012) DDR Global Infrastructure Pvt. Ltd. Rajesh Oberoi, P.E. (California, USA) WALIA.](https://reader035.fdocuments.net/reader035/viewer/2022062620/551a2a205503463e778b46f4/html5/thumbnails/19.jpg)
San Francisco - Oakland Bay BridgeExtreme Coastal/Marine Environment
Built in 1936 Total Length = 7.18 km Deck Surface overlaid with 25 mm Thick
PPC Total of 110,000 Square Meters One of the busiest bridges in the US 300,000+ vehicles per day 5 lanes on the upper and lower deck
![Page 20: POLYESTER POLYMER CONCRETE Indian Roads Congress Accredited (March 2012) DDR Global Infrastructure Pvt. Ltd. Rajesh Oberoi, P.E. (California, USA) WALIA.](https://reader035.fdocuments.net/reader035/viewer/2022062620/551a2a205503463e778b46f4/html5/thumbnails/20.jpg)
Polyester Concrete at AirportsPolyester Concrete has been used at airports across the country for spall and concrete repairs:
�San Diego International Airport �Southern CA Logistics Airport �Marine Corps Air Station Pendleton �Sacramento International Airport �Niagara Falls Guard Station Airport �Denver International Airport �Dallas Fort Worth International Airport �Los Angeles International Airport
�PPC 1121 - High Resistance to Jet Fuel/Aviation Hydraulic Fluids
![Page 21: POLYESTER POLYMER CONCRETE Indian Roads Congress Accredited (March 2012) DDR Global Infrastructure Pvt. Ltd. Rajesh Oberoi, P.E. (California, USA) WALIA.](https://reader035.fdocuments.net/reader035/viewer/2022062620/551a2a205503463e778b46f4/html5/thumbnails/21.jpg)
Skid DataMarina Viaduct
Measured Skid Resistance in 1991 Friction Coefficient = 0.4
Measured Skid Resistance in 2010Measured by Towed-Trailer Skid Test Friction Coefficient = 0.4
![Page 22: POLYESTER POLYMER CONCRETE Indian Roads Congress Accredited (March 2012) DDR Global Infrastructure Pvt. Ltd. Rajesh Oberoi, P.E. (California, USA) WALIA.](https://reader035.fdocuments.net/reader035/viewer/2022062620/551a2a205503463e778b46f4/html5/thumbnails/22.jpg)
Polyester Overlay Construction:Step 1 (If Required): Remove/Grinding existing asphalt or
concrete overlay/coating by micro-millingStep 2: Find & Repair spalls or unsound concreteStep 3: Surface Preparation/ShotblastingStep 4: Apply HMWM Resin Prime CoatStep 5: Mix and PaveStep 6: Finish, Tine, sprinkle dry sand, Open to Traffic!
![Page 23: POLYESTER POLYMER CONCRETE Indian Roads Congress Accredited (March 2012) DDR Global Infrastructure Pvt. Ltd. Rajesh Oberoi, P.E. (California, USA) WALIA.](https://reader035.fdocuments.net/reader035/viewer/2022062620/551a2a205503463e778b46f4/html5/thumbnails/23.jpg)
Polyester Overlay Construction:Step 1 (If Required): Remove existing asphalt
or concrete overlay/coating by micromilling Construction Keys:
Use specialized equipment to prevent damage to concrete deck (Caltrans Micromill spec) 6mm tooth spacing Hand removal near metal joints Remove slurry seals, chip seals etc. Potholing may be needed to determine existing overlay thickness
![Page 24: POLYESTER POLYMER CONCRETE Indian Roads Congress Accredited (March 2012) DDR Global Infrastructure Pvt. Ltd. Rajesh Oberoi, P.E. (California, USA) WALIA.](https://reader035.fdocuments.net/reader035/viewer/2022062620/551a2a205503463e778b46f4/html5/thumbnails/24.jpg)
Polyester Overlay Construction:Step 2: Find & Repair spalls or unsound
concreteConstruction Keys:
Sawcut edges square Remove only unsound material May be placed during overlay Sandblast or shotblast, blow w/ air
![Page 25: POLYESTER POLYMER CONCRETE Indian Roads Congress Accredited (March 2012) DDR Global Infrastructure Pvt. Ltd. Rajesh Oberoi, P.E. (California, USA) WALIA.](https://reader035.fdocuments.net/reader035/viewer/2022062620/551a2a205503463e778b46f4/html5/thumbnails/25.jpg)
Polyester Overlay Construction:Step 3: Surface
Preparation/Shotblasting Construction Keys
The objective is a surface free of loose material, laitance, previous coatings or oils.
Utilize shotblasting machines Reblast if too much primer
applied in previous shift Remove traffic stripe or buttons
prior to shotblasting Should be blown off with high
pressure air after shotblasting
![Page 26: POLYESTER POLYMER CONCRETE Indian Roads Congress Accredited (March 2012) DDR Global Infrastructure Pvt. Ltd. Rajesh Oberoi, P.E. (California, USA) WALIA.](https://reader035.fdocuments.net/reader035/viewer/2022062620/551a2a205503463e778b46f4/html5/thumbnails/26.jpg)
Polyester Overlay Construction:Step 4: Apply HMWM Resin
Prime CoatConstruction Keys:
Minimize puddling Place overlay within 15 mins of
placing primer and/or before primer gels
Can be applied with sprayer or rollers
Paving equipment may drive on prime coat
Deck surface temperature between 0 to 350C
Dry deck surface conditions
![Page 27: POLYESTER POLYMER CONCRETE Indian Roads Congress Accredited (March 2012) DDR Global Infrastructure Pvt. Ltd. Rajesh Oberoi, P.E. (California, USA) WALIA.](https://reader035.fdocuments.net/reader035/viewer/2022062620/551a2a205503463e778b46f4/html5/thumbnails/27.jpg)
Polyester Overlay Construction: Step 5: Mix and Pave
Construction Keys Volumetric mixer ensures best product consistency Paver should have grade control & should consolidate overlay Polyester concrete should be thoroughly mixed and should be
applied within 3-5 minutes of mixing
![Page 28: POLYESTER POLYMER CONCRETE Indian Roads Congress Accredited (March 2012) DDR Global Infrastructure Pvt. Ltd. Rajesh Oberoi, P.E. (California, USA) WALIA.](https://reader035.fdocuments.net/reader035/viewer/2022062620/551a2a205503463e778b46f4/html5/thumbnails/28.jpg)
Polyester Overlay Construction: Step 6: Finish, Tine, Apply Sand,
Open to Traffic! Construction Keys:
Edges should be tapered, joints/ends may require hand finishing
Expansion joints must be blocked out or sawcut within 4 hours
Sand should be applied uniformly, with additional sand for wet or glossy looking areas
Tining should be applied by paving machine or shortly after
Paving may be opened to traffic after Schmidt hammer reading of 24 or greater
![Page 29: POLYESTER POLYMER CONCRETE Indian Roads Congress Accredited (March 2012) DDR Global Infrastructure Pvt. Ltd. Rajesh Oberoi, P.E. (California, USA) WALIA.](https://reader035.fdocuments.net/reader035/viewer/2022062620/551a2a205503463e778b46f4/html5/thumbnails/29.jpg)
Polyester Concrete Spall Repair
Step 1: Determine limits, sawcut rectangular
Step 2: Chip and remove unsound concrete, prep and blow clean
Step 3: Apply HMWM prime coat
Step 4: Place and finish polyester concrete, apply sand
![Page 30: POLYESTER POLYMER CONCRETE Indian Roads Congress Accredited (March 2012) DDR Global Infrastructure Pvt. Ltd. Rajesh Oberoi, P.E. (California, USA) WALIA.](https://reader035.fdocuments.net/reader035/viewer/2022062620/551a2a205503463e778b46f4/html5/thumbnails/30.jpg)
Summary Polymer Concrete Overlay 30+ years of Proven performance. Used in EXTREME CLIMATIC CONDITIONS with Altitude,
Marine/Coastal, Humid, Freeze-Thaw and Desert Environments ELIMINATES almost 100% Maintenance Cost High Strength – Flexural, Tensile, and Compressive Strength 100% Seals bridge deck surfaces against chloride intrusion,
Extremely low permeability to seal the deck Superior adhesion, Exceptional Bond Strength Placement temperature - 00 C to 350 C Performance Temperature: -500 C to +500 C Open to traffic quickly – in 2 hours Provides high skid resistance Thermal coefficient of expansion – compatible to PCC Lower modulus and higher creep equals less stress Excellent abrasion resistance – 16 Times Portland Cement
Concrete Thin composite - minimizing dead load/clearance issues Improves ride quality and drainage MULTIPLE USES APPLICATION – ONE MATERIAL
![Page 31: POLYESTER POLYMER CONCRETE Indian Roads Congress Accredited (March 2012) DDR Global Infrastructure Pvt. Ltd. Rajesh Oberoi, P.E. (California, USA) WALIA.](https://reader035.fdocuments.net/reader035/viewer/2022062620/551a2a205503463e778b46f4/html5/thumbnails/31.jpg)
WHAT ABOUT THE COST?OVER A LIFE OF 30 YEARS
Polyester Polymer Concrete
Overlay (25 mm)
Conventional Overlay on Concrete
(Typical 65-100mm)
Rs. 4,500/Sq. m. Rs. 60,000/Sq. m.
Rs. 1.25 Cr/Km Lane Length