POINT Profile 2012 - Point Engineering Ltdpointengineering.com/images/point profile_2012.pdfBoard of...

58
Corporate Profile www.pointengineering.com www.pointengineering.com NIS ISO 9001:2008 Certified NIS ISO 9001:2008 Certified Making a POINT

Transcript of POINT Profile 2012 - Point Engineering Ltdpointengineering.com/images/point profile_2012.pdfBoard of...

Corporate Profile

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified

Making a POINT

CONTENTSCONTENTSPage

1. Company Contact Addresses 3

2. Company Overview 4p y

3. Corporate Mission & Vision Statements 5

4. Corporate Structure & Affiliations 6

5. Scope of Engineering Services 8

6. CASHES Policy 9

7 Q lit P li 107. Quality Policy 10

8. Ultramodern Office Facilities 11

9. Clients List 13

10. Sample Projects Experience 14

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified

2Making a POINT

Company Contact AddressesCompany Contact Addresses

P i t E i i Li it d (POINT)’ h d ffi i l t d i P t

Main Office:POINT House

Point Engineering Limited (POINT)’s head office is located in Port Harcourt, Rivers State with a branch office in Lagos.

POINT HousePlot 129 Bodo RoadOff Woji Road, GRA Phase II Port Harcourt Rivers State, NigeriaP.M.B. 1, Woji Port HarcourtTel: 234 – 84 – 464915 - 917Fax: 234 – 84 – 464918E-mail: [email protected] b it i t i iWebsite: www.pointengineering.com

Lagos Office:1st Floor, Block AAVM Ehigie Industrial ComplexKm 14, Lekki - Epe Expressway Lagos NigeriaLagos, NigeriaTel: +234 – 802 315 4930

+234 – 709 602 0413

E-mail: [email protected]: www.pointengineering.com

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified

3Making a POINT

Company OverviewCompany OverviewPoint Engineering Limited (POINT) is an independent and wholly (100%)Nigerian engineering consultancy company dedicated to providingresponsive high quality and cost-effective services to clients, who are mainlyp g q y , yin the oil and gas production, gas processing and oil refining industries.

Point Engineering Limited was established in 1995, started business in1997 and active operations in January 2000 with a dedicated team ofmechanical, process, civil/structural, instrumentation and electrical

i Si th th h l d i t f ll lti di i liengineers. Since then, the company has evolved into a full multi-disciplinaryconsultancy group working on contracts varying in size from individualassignments to over 30,000 man-hours.

Our philosophy is to provide innovative, cost effective solutions, on time,within budget and develop a relationship with our clients for mutual respectwithin budget and develop a relationship with our clients for mutual respect,whereby our professional approach places us first on the list whenconsidering new tasks or technologies.

We undertake a wide range of Engineering and Project management tasksfor oil exploration and production facilities, gas production and processingp p g p p gfacilities, separation, liquefaction and oil refining.

Projects executed include study, analysis, engineering (front-end anddetailed), procurement assistance and project management services. Wehave worked and can still work under a number of contractual arrangementsi l di R i b bl T t P i L S S i d Fincluding Reimbursable, Target Price, Lump Sum, Service and FrameContracts depending on the nature of the project assignment and clients’preference. Our approach is always flexible and whilst we prefer to becontracted directly with the main client, in order to achieve the clients’ goal,we do engage in sub-contract and/or consortium arrangements in order todraw synergy together in meeting clients’ requirements

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified

draw synergy together in meeting clients requirements.

4Making a POINT

Corporate Mission & Vision StatementsCorporate Mission & Vision Statements

OUR VISION IS:OUR VISION IS:

To be a reference POINT in turning Engineering Concepts

into Reality in the Nigerian Oil and Gas Sector.

OUR MISSION IS:OUR MISSION IS:

To prove a POINT for indigenous participation in the

Nigerian Oil and Gas Sector by providing complete;Nigerian Oil and Gas Sector by providing complete;

quality assured engineering services capable of satisfying

the most stringent requirements of our clients wherever it

is required using the best available technical skills.q g

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified

5Making a POINT

Board of Directors

Corporate Structure & AffiliationsCorporate Structure & Affiliations

Managing DirectorEngr. George Okoyo

Point Engineering Technology

Foreign Technical Partners

Ext. AuditorsDele Dina

gy(PointTec)

Company SecretaryBar. O. Ben-Whyte

HODQA/QC & HSE

Admin ManagerOdinaka Okoyo

(Mrs)

Engineering Manager

Engr. K. Okanigbe

Head, Business Development

Bunna Ugwunne

Finance ManagerChioma Ojukwu

(Mrs)

PointProc/Canada RepEngr. Adeoye Awe

HODCADD & Drawing

Office

HODProject

Management

HODElectrical & Instrument Engineering

HODProcess

Engineering

HODMech/Piping Engineering

HODCivil/Structural

Engineering

HODInfo & Comm.

Technology

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified

6Making a POINT

STAFF:

We maintain a wide spread of permanent and contract staff based

professionals specialising in various aspects of oil & gas and

Petrochemical Engineering Design Services. A comprehensive list of

Point Engineering’s key staff is presented in our Management Profile.

AFFILIATES:

In order to pull synergy for effective execution of projects in theIn order to pull synergy for effective execution of projects in the

Nigerian Oil and Gas Industry, Point Engineering has enter into

strategic technical alliances with the following companies:

1) TWD Technologies, of 905 Century Drive, Burlington, Ontario

Canada, ON L7L 5J8

2) UniversalPegasus International, of 4848 Loop Central Drive,Houston, TX 77081

3) Project Masters – for Onshore / Offshore fabrications, construction &installations

4) Dec Oil & Gas (Nigeria) – for Marine & Jetty services5) Freezone Plant Fabrication (Nigeria) - for Vessels, Onshore /

Offshore fabrications, construction & installations6) Irovester (Nigeria) - for Onshore / Offshore Instrumentation

construction & installations7) MILAT (Nigeria) – Procurement services

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified

7Making a POINT

Scope of Engineering ServicesScope of Engineering Services

We have the capability to handle projects from initial feasibility phase right

through to design, implementation and commissioning. Also, we can

provide assistance at a particular stage of the project cycle according to

clients’ requirements. We undertake various kinds of projects which are

categorized as follows:

Process / Front-End Engineering

Detailed Engineering Design Project Management / Consultancy Services

Field Development Studies

Feasibility & Concept Selection Studies

Mechanical / Piping Design.

Corrosion Prevention & Cathodic Protection Design.

Plant Technical Appraisal / Audit.

Software Development / Training.

Debottlenecking, Upgrade / Revamp Studies.

Pipeline Hydraulic Studies.

Flow Assurance & Riser Analysis.

Design.

Electrical Designs.

Instrumentation Design.

Pipeline Design.

Civil/Structural Designs (onshore & offshore, i l di l tf

Economic Studies.

Design Verification / Audit.

Design & Safety Reviews (HAZOP, HAZID, FIREPRAN, etc.)

Operational Assistance / Riser Analysis.

Complete Basic Engineering / FEED Packages.

including platform modeling using SACS)

As-built Drawings.

Discipline Support to EPC Projects.

Support.

Multi-disciplined Project Management.

Technical Support

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified

8Making a POINT

CASHES CASHES PolicyPolicyThe management of Point Engineering Limited is totally committed to thef C ff S f Sfollowing Community Affairs, Safety, Health, Environment and Security(CASHES) Policy:

• to take all reasonable measures to make personnel, informationand facilities secure; minimize the effect of any operation to thehost community, minimize injuries at the workplace and minimizeenvironmental damage.

• to be sensitive to the needs and concerns of all hostcommunities.

• to establish and maintain standards for community affairs, safety,health, the environment and security within the Company whichadhere to all relevant aspects of applicable laws and meet thehigh standards applicable to the industry.high standards applicable to the industry.

• to ensure that all Company personnel are given the necessaryinformation, instruction and training to enable them to work in asecure and safe manner so that they understand and can fulfilltheir responsibilities with regard to Community Affairs, Safety,Health, Environmental and Security requirements.

• to ensure that safety is an integral part of all the work performedby the Company

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified

9

by the Company.

Making a POINT

Quality PolicyQuality Policy

The management of Point Engineering Limited is totally committed to the following Quality Policy and Objectives:

• to achieve a quality service by meeting customers’requirements.

• to define and document the Quality System for all functions ofthe company to comply with the requirements of ISO 9001latest edition.

• to develop and use qualified personnel trained with theto develop and use qualified personnel, trained with thenecessary skills and experience to perform their duties.

• to perform in accordance with the documented Quality Systemwith the aim of developing all products and services correctlythe first time.the first time.

• to ensure that services and products provided by PointEngineering are in accordance with the contract, safety andlegislative requirements.

• to ensure that quality activities are specified to suppliers tomaintain the overall level of quality of the project.

• to continually evaluate the Quality System’s suitability andmonitor its operation to improve its effectiveness

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified

10

monitor its operation to improve its effectiveness.

Making a POINT

Ultra Modern FacilitiesUltra Modern Facilities

OFFICE STRUCTURE:

Point Engineering Limited currently operates and executes projects in an ultra-

modern office in the central city of Niger Delta region, Port Harcourt, Rivers State. This

office, POINT HOUSE, which is the head office, is conveniently situated at Plot 129

B d R d ff W ji R d G R A Ph II P t H t Thi tBodo Road, off Woji Road, G.R.A. Phase II, Port Harcourt. This property covers a

gross land area of approximately 3,063.477 square meters. POINT also operates in a

well-equipped branch office at Lekki, Lagos State.

We currently occupy about 1,200 m2 of space at POINT HOUSE in Port Harcourt, 501y py p

m2 of space at the AVM Ehigie Industrial Complex, Km 14 Lekki – Epe Expressway

Lagos State. The offices are fully furnished and equipped with state-of-the-art facilities

including complete communication systems, computer software and hardware facilities

with a Local Area Computer Network systemwith a Local Area Computer Network system.

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified

11Making a POINT

E-Mail Facilities:E Mail Facilities:

[email protected]

Website:

www.pointengineering.com

Engineering Library:

Comprises of:Professional Textbooks and JournalsProfessional Textbooks and Journals

Engineering Standards and Codes - API, DEP’s, etc.Regulatory Guidelines - DPR, FEPA, etc.

QA/QC Procedures & Training Manuals, etc.Sample Project Deliverables

Others/Miscellaneous:

250kVA Perkins Power Generating Set150kVA Perkins Power Generating Set

300kVA TransformerAi ditiAir conditioners

Computer Network System

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified

12Making a POINT

Clients ListClients ListPoint Engineering Limited has a proven track record in providing qualitative and

ffcost effective engineering and project management services to clientsspecifications, on schedule and within budget. We have worked on variousengineering projects for major oil and gas companies both on / offshore in Nigeria. Thefollowing are some major companies we have either worked directly or indirectly (assub-contractor) for in Nigeria:

• Mobil Producing Nigeria Unlimited (both Lagos and Eket Divisions)

• Shell Petroleum Development Company (both Western and Eastern Divisions)

• Shell Nigeria Gas Limited

• Nigeria Agip Oil Company

• AMNI International Limited

• Daewoo Nigeria Limited

• ELF Nigeria LimitedELF Nigeria Limited

• Midwestern Oil & Gas Plc

• Chevron Nigeria Limited

• Niger Delta Petroleum Resources

• Seplat Petroleum Resources

• NPDC

The table overleaf provides a list of some projects successfully executed by PointEngineering Limited.

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified

13Making a POINT

Sample Projects ExperienceSample Projects Experience

The sheets

attached overleaf

contain brief description

of some of the key projects

previously executed or on-going

By

Point Engineering Limited:

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified

14Making a POINT

Sinopec International Petroleum Exploration andProduction Company Nigeria Limited (SIPEC), Operatorof the joint venture between SIPEC and NigerianPetroleum Development Company Limited (NPDC) for

PROVISION OF FEASIBILITY & Petroleum Development Company Limited (NPDC) for

the development of OMLs 64 & 66, intends to embark onCrude Oil production from OMLs 64 & 66 Oil blocks.

There are currently no processing facilities existing inOMLs 64 & 66 to accommodate productions from theblocks and in order to develop these required surface

FEASIBILITY & CONCEPTUAL STUDY FOR OMLs 64 & 66 FACILITIES blocks and in order to develop these required surface

processing facilities, SIPEC requires Feasibility andConceptual Engineering Services

Concepts identified for OML 64 include:• Multiphase flow to third party processing facility suchas SHELL’s Forcadoes/Yokri, SHELL’s Egwa, SHELL’s

FIELD DEVELOPMENT

Client Name: NPDC / Odidi• Lease EPF, process crude oil and evacuateprocessed production to SPDC’s Forcados Terminal• Owned processing facility in OML 64

Concepts already identified for OML 66 include:M lti h fl t thi d t i f ilit h

Client Name: NPDC / SIPEC, BeninLocation: OML64 & 66 FieldDate: July2012 –

• Multiphase flow to third party processing facility suchas SHELL’s Nembe Flowstation• Lease EPF, process crude oil and evacuateprocessed production to Agip’s Brass Terminal• Owned processing facility in OML 66

POINT is currently undertaking this work in its Port

PresentContract Type:Lumpsum, Feasibility & Conceptual Studies

POINT is currently undertaking this work in its PortHarcourt office.

Client Contact: David [email protected], [email protected]

NIGERIAN PETROLEUM DEVELOPMENT COMPANY LIMITED (NPDC)

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified

15Making a POINT

LIMITED (NPDC)

Point Engineering is proud to be part of the group that is presently executing such large diameter pipeline Engineering in Nigeria for the first time.

POINT’S Scope of Work: The scope of work is

OML58 Upgrade - Detailed Engineering design of 42”x45 k OUR Pi li POINT S Scope of Work: The scope of work is

divided into the following work packages:

Sub Work Unit 5.1.1 Civil Sub Work Unit 5.1.2 Structural SteelSub Work Unit 5.1.3 Mechanical & MaterialsSub Work Unit 5.1.4 ProcessSub Work Unit 5 1 5 Piping / Layout

km OUR Pipeline

Client Name: ZB / Sub Work Unit 5.1.5 Piping / LayoutSub Work Unit 5.1.6 PaintingSub Work Unit 5.1.7 Pig Traps / Pressure VesselsSub Work Unit 5.1.8 PipelineSub Work Unit 5.1.9 ElectricalSub Work Unit 5.1.10 Instrumentation & Valves Sub Work Unit 5.1.11 TelecommunicationSub Work Unit 5.1.12 Health, Safety and Environment

Client Name: ZB / Total, LagosLocation: OML58 FieldDate: March 2010 –

Sub Work Unit 5.1.13 Cathodic ProtectionSub Work Unit 5.1.14 MiscellaneousWork Unit 5.2 Construction EngineeringWork Unit 5.3 As-Built and Final Doc.

POINT is currently undertaking this work in its Port Harcourt office.

PresentContract Type:Lumpsum, Detailed Engineering

Client Contact: Chris Baywood [email protected]

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified

16Making a POINT

Point Engineering Limited

Point Engineering is proud to be part of thegroup that executed the Detailed Design of

Deep Water Development Projects - Detailed Engineering design

f USAN SUBSEA group that executed the Detailed Design ofSubsea Manifold in Nigeria for the first time.

POINT’S Scope of Work: detailed designof manifolds and piles including elementsof:

•Structural engineering

of USAN – SUBSEA PRODUCTION SYSTEM

Cli t N Structural engineering•Piping engineering•Interface engineering•Geotechnical (soils analysis etc)•QA/QC procedures•Test regime procedures•Assistance at fabrication site

Client Name:Cameron / Total, LagosLocation: Usan FieldDate: March 2008 •Installation procedures

•Documentation control•Misc (coatings, preservation,storage etc)

POINT completed this work in December2009 i it L ffi hi h th

Date: March 2008 –PresentContract Type:Reimbusable, Detailed Engineering 2009 in its Lagos office which was the

Project Office.

Detailed Engineering

Client Contact: John HellumsJohn Hellums@c a m com

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified17

[email protected]

Making a POINT

An in-house concept selection study has favoreddeveloping Ovhor infill wells as follows:

Install 2 (two) new remote 600# manifolds systemwith Four headers and six ligaments at Ovhor;

Provision of Engineering Services for with Four headers and six ligaments at Ovhor;

Convert the two flowlines currently conveyingproductions from Ovhor 2L/S to Sapele to Bulklines,by hooking them to the new manifold;

Install a new Bulkline (to be used for intermittent

Services for Ovhor Field Development

Client Name: (wells testing) from the new Ovhor Manifold system toSapele Flowstation

Install 12 flowlines from the two new Ovhor Manifoldto Ovhor infill Wells comprising the existing 2 OvhorL/S wells and 4 new Ovhor Infill wells

Client Name:Seplat, LagosLocation: OvhorFieldDate: March 2012

Ovhor Manifold Leak Containment System

POINT successfully completed this work in its PortHarcourt office.

– July 2012Contract Type:Lumpsum, FEED & Detailed Engineeringg ee g

Client Contact: Onyebuchi [email protected]

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified

18Making a POINT

Seplat Petroleum Development Company

The scope requires CONTRACTOR to collate andassimilate the 2008 platforms inspection data andassimilate the 2008 platforms inspection data andassess their overall structural integrity and fitness-for-service. Then screen, interrogate and trend theresults against past inspection results, but not limitedto, the 1986, 1991, 1996 MPN platforms inspections.CONTRACTOR shall perform all necessaryassessment to determine structural integrity of

Post-Inspection Engineering Evaluation for 79 Platforms P j t

g yplatforms inspected. CONTRACTOR shall documentall anomalies for corrective action, backed by soundengineering.

Seventy-nine (79) platforms were inspected during the2008 underwater inspection program.

Project

Client Name:ExxonMobil, LagosLocation: Offshore

As part of the Structural Integrity Management (SIM)process the results of these inspections weresubsequently evaluated by POINT and its partner onthe project, Atkins, and the findings summarise into areport

PlatformsDate: July 2009 –Dec. 2010Contract Type:Lumpsum, SIM &Lumpsum, SIM & Studies

Client Contact: Isang [email protected]

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified

19Making a POINT

POINT’S Scope of Work: Carry outC t l E i i D i D t il d

Central Processing Conceptual Engineering Design, DetailedEngineering Design and Procurementassistance for the proposed CPF. Thedesign is being performed in 4 Phases asfollows:

Phase 1: To perform Conceptual and

gFacilities (CPF) Engineering Design, Procurement,

Phase - 1: To perform Conceptual andBasic Engineering Design based on theField DST and PVT Reports.

Phase – 2: To perform DetailedEngineering Design for theinterconnection of the engineered

Installation And Commissioning at Umusadege

Cli t N interconnection of the engineeredpackages and systems.

Phase – 3: To assist Midwestern to floattenders technical evaluation of the bidsreceived and in placement of orders forthe equipments.

Client Name:Midwestern Oil & Gas, LagosLocation:Umusadege

Phase 4: To ensure quality control &quality assurance and superviseinstallation & commissioning carried outby a 3rd Party.

POINT i tl d t ki thi k

UmusadegeDate: August 2008 –April 2009Contract Type:Reimbusable: POINT is currently undertaking this work.Reimbusable: Conceptual & Detailed Engineering

Client Contact: Peter IdowuIdo peter@mid esternog com

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified20

[email protected]

Making a POINT

Niger Delta Petroleum Resources (NDPR)Limited desires to deliver Lean Gas via a 12”x 20 Km pipeline from its field in Ogbele /x 20 Km pipeline from its field in Ogbele /Otari / Obumeze Community to the NigeriaLiquefied Natural Gas (NLNG) CompanyPipeline Node (Manifold) at Rumuji. It isanticipated that the Pipeline will tie-in to in-plant piping at the proposed NDPR Gas Plantand the 28” Soku – Rumuji NLNG Gastrunkline (GTS 1) at the Rumuji Node

Conceptual & Detailed Design of 12” x 20km Ogbelle – Rumuji

trunkline (GTS 1) at the Rumuji Node

The main activities being undertaken byPOINT includes:• Review, verification and acceptance ofengineering data provided by the NDPR.•Detailed sizing of pipeline and associated

i t

g jPipeline Project

Cli t N NDPR equipment.•Detailed engineering, analysis, calculation,evaluation, certification (as necessary and asrequired), material take-off, specifications,procedures, methods and planning.•Site surveys, soil tests / analysis and civilworks, etc, together with any measures

Client Name: NDPR, Port HarcourtLocation:Ogbele/RumujiDate: May 2008 deemed necessary for site reclamation /

preparation and for other appropriate civildesign.•Issue to NDPR Approved for Construction(AFC) Package necessary for the fabrication,installation and construction of the completepipeline and facilities as proposed.

Date: May 2008 –December 2008Contract Type:Lumpsum: Conceptual & p p p p

•Project management and control of the entireengineering design project from awardthrough to final acceptance by NDPR toensure proper, sound and timely performanceof the work

Conceptual & Detailed Engineering

Client Contact: Smart Ogbuliefemiolani an@ngdelta com

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified21

[email protected]

Making a POINT

Nembe Creek Trunkline (NCTL)evacuates crude oil from SPDC’s SwampEast and West Fields via CawthorneChannel junction to Bonny terminal.

Recent integrity issues on the NCTL havetl i t d it bilit t t

Conceptual & Detailed Design

f NCTL greatly impacted on its ability to evacuateproduction from the various swamp fieldsto the Bonny terminal. It has thereforebecome necessary to seek alternativeroutes for producing these fields to easepressure on the NCTL.

of NCTL Temporary By -Pass Project

Cli t N SPDCAmong options being evaluated is thetemporary diversion of production fromupstream fields (Nembe Fields) of theNCTL in to the GPHSL via existing AGlines that transport associated gas fromNembe fields to the Soku gas plant.

Client Name: SPDC, Port HarcourtLocation: NembeCreekDate: April 2008 g p

The aim of the NCTL Temporary By-PassProject is to divert Nembe field crudeproduction to the GPHSL via the 24”/28”Nembe/Soku AG lines through the 18”Soku Flowstation to Soku Gas Plant

Date: April 2008 –December 2008Contract Type:Lumpsum: Conceptual &

gaslineConceptual & Detailed Engineering

Client Contact: Smart Ogbuliesmart ogb lie@shell com

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified22

[email protected]

Making a POINT

NAOC carried out an in-house study ofvarious alternative concepts for ensuringthat oily water from the Brass Terminal isproperly treated before final disposal intothe canal. NAOC in-house studyconcluded that the preferred option would

f

Feasibility Study for Brass Canal / Fire Fighting Pumps Station

be to proceed on the concept of a systemthat is fully integrate-able with the existingproduction facilities.

With this concept in mind, POINT carriedout a Feasibility that details theengineering study of alternative oily water

Revamp Project

Cli t N engineering study of alternative oily watertreatment schemes vis-à-vis NAOCConcept. The selection of all alternativesoily water treatment schemes were guidedby ability to be fully integrated into existingBrass Terminal facilities. Based on NAOCrequirements a recommendation was

Client Name:NAOC, Port HarcourtLocation: Brass TerminalDate: June 2007 requirements, a recommendation was

made that outline further engineeringdesign activities of the preferred schemewithin DPR guidelines

Date: June 2007 –December 2007Contract Type:Lumpsum: Feasibility StudyStudy

Client Contact: Benedict Egonubenedict egon @naoc agip it

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified23

[email protected]

Making a POINT

Addax requires studies and design of certaink th i ti Ad P d ti

Engineering Studies and Detailed Design on Adanga Production C l work on the existing Adanga Production

Platform.

The purpose of these studies (de-bottlenecking and platform modification) is toprovide data for Addax to use the existingAdanga Production Platform “A” (ADPP) and

Complex

Cli t N Adanga Production Platform A (ADPP) andMOPU to handle the increase in productionand gas compression interface.

The modification work will be done mostlyunder SIMOPS conditions and the facilitiesmust be safe condition at all times.

Client Name:ADDAX, LagosLocation: AdangaPlatformDate: Sept 2006

POINT is currently undertaking this work.

Date: Sept. 2006 –April 2007Contract Type:Reimbusable, FEED & Detailed& Detailed Engineering

Client Contact: Felix AgunuFeli ag n @aogltd com

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified24

[email protected]

Making a POINT

Point Engineering design team will beresponsible for developing, under SEIsupervision, the following activities with theli i ifi d i h i f i

OB-OB Gas Plant Upgrade for LNG T i 4 5 & 6 limits specified in the interface matrix:

Process designPiping designMechanical designInstrumentation and control designElectrical designStructural design

Trains 4, 5 & 6 Gas Supply

Cli t N Structural designCivil DesignIssue of MTORevision/updating of the engineering design

following vendor’s informations.As-built revisions for all the disciplines.Test & Commissioning Check List &

Client Name:SAIPEM/NAOC, Port HarcourtLocation: OB-OBDate: Feb 2005 Test & Commissioning Check List &

proceduresStart up and operation manuals.

Date: Feb. 2005 –Feb. 2006Contract Type:Reimbusable, Detail EngineeringEngineering

Client Contact: Camillo CattaneoCamillo cattaneo@saipem eni it

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified25

[email protected]

Making a POINT

Isobo A Gas Lift Project:The East Area Project (EAP) will provideThe East Area Project (EAP) will providehigh pressure dry gas on the Isobo A via asubsea pipeline. This will be utilized to gaslift one (1) underperforming well (Isobo 10AS)and four (4) wells (Isobo 5AS, 6AS, 7AS and9AS) shut in on low well head pressure.

Detail Design for Isobo A, Ubit K

d Ubit H G Ubit H Gas Cap Gas Lift Project:Gas cap gas will be utilized to gas lift three (3)underperforming wells (Ubit 76HS, 78HS and79HS) and two (2) wells (Ubit 80HS and81HS) shut in on low well head pressure.

and Ubit H Gas Lift Systems

Cli t N MPN Ubit K Gas Lift Project:The project entails providing the surfaceproduction facilities to separate the gas froman existing high pressure, high Gas Oil Ratio(GOR) Ubit 107K well stream and to use thegas to gas lift four (4) low performing Ubit K

ells (Ubit 108K Unam 36K Unam 37K and

Client Name: MPN, LagosLocation: Isobo A, Ubit K & H Offshore Platforms wells (Ubit 108K, Unam 36K, Unam 37K and

Unam 38K).

POINT carried out FEED/Detailedengineering required to complete the Issuedfor Construction (IFC) packages

PlatformsDate: Jan. 2006 –April 2006Contract Type:Reimbusable DetailReimbusable, Detail Engineering

Client Contact: Tunde PearseBabat nde pearse@e onmobil com

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified26

[email protected]

Making a POINT

This study consider the development of the gas lift facilities into the

FEED for Gas Lift Study

Okpoho platform, starting from the existing 8” sealine and riser that will transport compressed gas from Mystras FPSO to Okpoho platform. The stream gas will be diverted, one for gas export purposes (subject of

t t d ) d f liftCli t N separate study) and one for gas lift. The stream of gas lift will enter into a manifold from where will be distributed to every string.

Client Name:SAIPEM/NAOC, Port HarcourtLocation: OkpohoPlatformPlatformDate: Nov. 2005 –Feb. 2006Contract Type:Reimbusable FEEDReimbusable, FEED

Client Contact: Camillo CattaneoCamillo cattaneo@saipem eni it

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified27

[email protected]

Making a POINT

Two different scenarios were considered:.Case B) This study consider the possibility to

export the excess gas produced in Okono & Okpoho field to Bonny terminal, through Okpoho platform. The compressed gas goes from Mystras FPSO

Ok h l f i i i 8”

FEED for Gas Export

to Okpoho platform via an existing 8” sealine. The stream gas will be diverted, one for gas lift purposes (subject of separate study) and one for gas export after chocking and metering. The new export line (tentatively 10”) will be equipped with pig trap launcher suitableCli t N equipped with pig trap launcher suitable for intelligent pigging.

Case C1) This study is similar to the previous case but also consider another 8” gas line coming from Addax FPSO. The gas stream from Mystras FPSO will be

Client Name:SAIPEM/NAOC, Port HarcourtLocation: OkpohoPlatform stream from Mystras FPSO will be

chocked, mixed with the new stream coming from Addax, metered and then sent to the export sealine (tentatively 12”). The arrival line from Addax will be equipped with receiving pig trap suitable for intelligent pigging. The new export

PlatformDate: Nov. 2005 –Feb. 2006Contract Type:Reimbusable FEED

line (tentatively 12”) will also be equipped with pig trap launcher suitable for intelligent pigging

Reimbusable, FEED

Client Contact: Camillo CattaneoCamillo cattaneo@saipem eni it

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified28

[email protected]

Making a POINT

Apart from existing problems, Warri Computer Center will be used as fallback site,Computer Center will be used as fallback site, providing backup and fail-over for critical business applications, as the EPG/African regional hub would reside in the existing Data Center in Shell I.A, Port Harcourt. Warri Computer Center will provide minimal hosting for some key business applications,

Detailed Design of Electrical Utiliti f W i particularly and those with a heavy network

footprint, whose critical mass of users is located in Warri. The existing installation can not provide adequate UPS capacity to power a load of 200kVA at autonomy of one hour, which is the

i f llb k i d idi

Utilities for WarriData Center

requirement as fallback site and providing

backup for critical business applicationsThe work involves capacity check of the existing power system in order to ascertain its adequacy to meet the additional load requirement of the proposed power network

Client Name: SPDC, Western DivisionLocation: Shell IA requirement of the proposed power network,

carry out detailed design of a reliable system that will efficiently accommodate the required loads with reasonable level of spare capacity, identify the best tie-in points and propose a modification that would minimize shut down time for the operating loads before hook up to

Location: Shell IA, WarriDate: June 2005 –March 2006Contract Type: time for the operating loads before hook up to

the new system.Contract Type:Lumpsum, Detail Engineering

Client Contact: Ali MastroukAli mastro k@shell com

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified29

[email protected]

Making a POINT

Shell Nigeria Exploration & Production Company Limited (SNEPCO) intends to embark on the engineering of the Gas Export

Define Phase Engineering for B SW/A Pipeline from the Steel Catenary Riser

(SCR)/pipeline on the seabed close to the FPSO, to the shallow water tie-in platform. The 16-inch export pipeline which is approximately 100 km long, will transport processed gas from the FPSO to the Offshore G G h i S (OGGS) Ri

Bonga SW/AparoGas Export Pipeline

Cli t N Gas Gathering System (OGGS) Riser platform A (RP-A) in about 20 meters of water depth. The gas export pipeline will be designed with pigging facilities for cleaning and inspection.

PEL Scope of work includes:

Client Name:SNEPCO, LagosLocation: OGGS Offshore PlatformDate: Sept 2005 PEL Scope of work includes:

• Pipeline to Platform riser tie-in spool

• Platform riser, riser clamps and riser guard

• Platform piping to OGGS tie-in manifold,

Date: Sept. 2005 –December 2005Contract Type:Reimbusable, Detailed Engineering Platform piping to OGGS tie in manifold,

including overpressure protection and pig receiver.

Detailed Engineering

Client Contact: Uche OkonkwoUche okonk o@shell com

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified30

[email protected]

Making a POINT

Ubit "B" (GB) is an unmanned 4-leg fixed steel jacket wellhead platforms, in water depth of 94 ft, and presently has 4 conductors. Crude from Mfem "A" flows into Ubit "B" (GB) where it commingles with production from Ubit "B" (GB) prior to flowing to Ubit

Detailed Design for Ubit B Internal Sl t Additi from Ubit B (GB) prior to flowing to Ubit

"P" (GP). The crude from Ubit "P" (GP) is transported to QIT via a 24" pipeline.

The primary engineering objective is the verification of conceptual engineering and the performance of additional engineering to

Slots Addition Project

Cli t N MPN p g gprepare an Issued for Construction (IFC) package. The IFC package prepared by POINT addressed the following:Addition of one 34"ID slot to accommodate a new 30"OD conductor, Structural modification of the main deck, cellar deck and

Client Name: MPN, LagosLocation: Ubit B Offshore PlatformDate: August 2005 boat landing deck to accommodate the

conductor, Design of one (1) new 4-inch flowline, Process verification of all equipment and piping/pipelines between the new well up to, and including, the departing pipeline, Installation of new one (1) Pressure Pilot on

i ti 4 l t k

Date: August 2005 –December 2005Contract Type:Reimbusable, Detailed Engineering existing 4-slot rack Detailed Engineering

Client Contact: Tunde PearseBabat nde pearse@e onmobil com

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified31

[email protected]

Making a POINT

Shell Petroleum Development Company intends to prove the concept of Infield Separation and Injection of Produced Waterusing Compact Separation Technology in the Obigbo North oil field.In 2003, a feasibility study of the Obigbo North D1.300 reservoir for trial injection of

d d i d

Detailed Interface Design for P d d W t produced water was carried out.

Upon the completion of the feasibility studies, SIEP-EPT embarked and completed the design of a Compact Separation Skid that will take fluids directly from the Obigbo North flowstation facility. The skid has fit-for-purpose separation injection and metering

Produced Water Re-injection at Obigbo North

Cli t N SPDC purpose separation, injection and metering modules.Typically, the Compact Separation Skid consists of: inlet manifold, degassing vessel, booster pump, injection pump and instrument air compressors. To this Compact Separation Skid will be attached Liquid – Liquid

Client Name: SPDC, EastLocation: ObigboNorthDate: June 2005 Skid will be attached Liquid Liquid

separation equipment (collectively called a Separation Module) to form a total Produced Water Re-Injection (PWRI) System.

POINT carried out the required detailed hook-up design.

Date: June 2005 –January 2006Contract Type:Lumpsum, Detailed EngineeringEngineering

Client Contact: Daka OtonyeOton e daka@shell com

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified32

[email protected]

Making a POINT

Pipe ModelingPipe Modeling and Stress Analysis for UsariC Slot O ti i ti

The scope of the work is to carry out a static stress analysis for the newly installed

OptimisationProject

Cli t N MPN stress analysis for the newly installed Flowlines.

Details of the scope include:Develop Caesar II stress models for the Flowlines using already prepared Isometrics.

Client Name: MPN, LagosLocation: Usari C Offshore PlatformDate: July 2005

Run stress models based on load cases stipulated in the Master specifications (KBR-03-18-02) – Pipe Stress Analysis Philosophy .

Date: July 2005Contract Type:Reimbusable, Detailed Engineering

Client Contact: Tunde PearseBabat nde pearse@e onmobil com

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified33

[email protected]

Making a POINT

In November 2002, a visual and / photographic survey incorporating ultrasonic wall thickness survey readings was conducted on the 8’’ Etim PP gas export riser and

Detailed Design for 8” Gas Line

d Ri R i g passociated topsides piping. The survey indicated that 95% of the riser section was in bad condition with 100% of the coatings broken down. The topsides piping and components were badly corroded and need repair or replacement.

and Riser Repair Project

Cli t N MPNDue to the extent of damage on the 8’’ riser, the line was decommissioned leading to the resultant problems of local gas flaring and other operational problems on the Ubit end of the gas line. These led to the decision to repair th 8’’ i d i t d t id i i

Client Name: MPN, LagosLocation: EtimOffshore PlatformDate: July 2005 the 8’’ riser and associated topside piping.

POINT carried out the necessary detailed design to enable the replacement.

Date: July 2005 –September 2005Contract Type:Reimbusable, Detailed EngineeringDetailed Engineering

Client Contact: Tunde PearseBabat nde pearse@e onmobil com

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified34

[email protected]

Making a POINT

The overall purpose of the project is the addition of one external conductor to accommodate a new well. Enang A external slot addition would be executed in 3 phases:

PHASE I

Detailed Design for Enang A (2 & 3) Sl t Additi Installation of an external conductor (outside

the jacket) south of the Enang A platform. A cantilevered framework would be installed to support the conductor at +33ft elevation (cellar deck) and to provide wellhead access from the cellar deck.

3) Slots Addition Project

Cli t N MPNPHASE IIInstallation of flowline piping connecting the external wellhead to the production manifold.

PHASE IIIInstallation of Protective frame around the

Client Name: MPN, LagosLocation: Enang A Offshore PlatformDate: Sept 2005 Installation of Protective frame around the

external Conductor. The conductor protection frame will provide a level of protection determined by assessed boat collision scenario and associated impact energy.

POINT carried out the detailed engineering

Date: Sept. 2005 –December 2005Contract Type:Reimbusable, Detailed Engineering POINT carried out the detailed engineering

necessary to meet the design intent.Detailed Engineering

Client Contact: Tunde PearseBabat nde pearse@e onmobil com

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified35

[email protected]

Making a POINT

POINT’s scope includes:Survey existing wellheads at Ossu and Izombe y gfield to obtain all necessary process and dimensional information.Survey existing Flowlines route along ROW from Ossu 4 up to Ossu Manifold at Ossu 3 Location to obtain all necessary process and dimensional information. Produce route map

Detailed Design for OML-124 Wellhead Hook-Ups and New

and alignment sheet for the flowlines laying.Survey existing Gas Lift hook-ups to obtain all necessary process and dimensional information and carry out detailed design to hook-up existing Gas feed lines to the wells.Carry out Calculations for Pipe sizing (make

d ti f ti l li i i

pFlowlinesInstallations

Cli t N recommendation for optimal line sizing downstream of the Choke Valves), foundations and the like where applicable.Develop detailed P & I Diagrams for the individual wellhead under consideration including Gas Lift System.Develop Structural Drawings for pipe

Client Name:ADDAX, LagosLocation: IzombeFieldDate: May 2005 Develop Structural Drawings for pipe

supports where necessary.Develop Piping Isometrics drawings.General Arrangement Drawings – Plans, Sections and Elevations.Develop Valve Schedule and Bulk Materials Take Off.

Date: May 2005 –September 2005Contract Type:Reimbusable, Detailed Engineering

Develop and issue Scope of Work for Construction.Produce final detailed design dossier.

Detailed Engineering

Client Contact: Felix AgunuFeli ag n @aogltd com

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified36

[email protected]

Making a POINT

The SPDC Server Consolidation & Upgrade as well as the Enterprise Storage Systems p g y(ESS) projects were initiated to provide hosting for SPDC applications and databases, while reducing the total cost of ownership of the server & storage infrastructure. These projects are introducing new high-end servers and storage devices that need to be hosted

Detailed Design of Electrical Utiliti f P t within the P-Harcourt data center. The

resultant load requirements for these high-end servers and storage infrastructures cannot be accommodated by the existing utilities

configuration.Th k i l it h k f th

Utilities for Port Harcourt Data Center

The work involves capacity check of the existing power system in order to ascertain its adequacy to meet the additional load requirement of the proposed power network,carry out detailed design of a reliable system that will efficiently accommodate the required loads with reasonable level of spare capacity

Client Name: SPDC, Eastern DivisionLocation: Shell IA loads with reasonable level of spare capacity,

identify the best tie-in points and propose a modification that would minimize shut down time for the operating loads before hook up to the new system.

Location: Shell IA, Port HarcourtDate: October 2004 –February 2005Contract Type:Contract Type:Lumpsum, Detail Engineering

Client Contact: Ali MastroukAli mastro k@shell com

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified37

[email protected]

Making a POINT

The objective of this detailed engineering is for the restoration of the Glycol Dehydration Unit (GDU), located on Edop Production Platform offshore Eket, to its original design intent and in compliance with MPN Master Specification DIM and industry standards

Detailed Engineering D i f Ed Specification, DIM and industry standards

where practical.

MPN contracted Point Engineering Limited (POINT) to carry out the Detailed Design Engineering works necessary for the restoration of the Tri-ethylene Glycol (TEG)

Design for EdopTEG Restoration

y y ( )Dehydration Unit. The detailed engineering design works performed by PEL reviewed the Edop Glycol Unit Assessment Report of June 2003 in addition to carrying out detailed engineering activities to provide a fit-for-purpose IFC package necessary for obtaining

Client Name: MPN, LagosLocation: EdopOffshore Platform cost and schedule estimates for the

Construction Contractor. Offshore PlatformDate: June. 2004 –September 2004Contract Type:Reimbusable DetailReimbusable, Detail Engineering

Client Contact: Deepesh [email protected]

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified38

Making a POINT

In respect of the fire incident that occurred in April, 2003 on the OSO Gas Compression (RG) Platform main deck in which the LPA Turbine Package located on the south end of Oso RG Platform was damaged, MPN issued a work order to PEL to carryout detailed

Detailed Design for Oso RG LPA T bi a work order to PEL to carryout detailed

engineering design for the replacement of this damaged turbine package with an identical unit.The replacement of this LPA Turbine Package involve various work activities which were segregated into seven (7) workpacks as

Turbine Replacement

g g ( ) ppresented below:

•Installation of new shutdown valve•Rerouting of start gas exhaust•Installation of seal leakage drain•Repair or replacement of damaged valves

Client Name: MPN, LagosLocation: Oso and piping

•Piping demolition and reinstallation for skid replacement•Repair of exhaust duct insulation•Inspection and cleaning of equipment and piping

Location: OsoOffshore PlatformDate: August 2004 –December 2004Contract Type:

The detailed design was successfully carried out on time and within budget.

Contract Type:Reimbusable, Detail Engineering

Client Contact: Mike AttahMichael e attah@e onmobil com

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified39

[email protected]

Making a POINT

The objective of the detailed engineering phase of the Oso Flare Segregationphase of the Oso Flare Segregation project is to provide a fit-for-purpose procurement/construction packages that will segregate the existing comined flare system.

The design eliminate risk of back drafting

Detailed Engineering D i f O g g

on the flare systems and balanced the relief load of the flare systems to be within the re-rated capacity of 800 Mscf/D by rerouting the blowdown and relief valves from the 4th and 5th stage compressors from the RG flare to the RK flare.

Designs for OsoFlare Segregation Piping and PSVs Modifications

Some PSV's were also modified to

achieve the design intent.Client Name: MPN, LagosLocation: OsoLocation: OsoOffshore PlatformDate: March 2004 –August 2004Contract Type:Contract Type:Reimbursable, Detail Engineering

Client Contact: Deepesh KaushishDeepesh ka shish@e onmobil com

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified40

[email protected]

Making a POINT

Escravos Production District is one of the 3 districts in the SPDC-West Northern Swamp Production Area (NSA) with a logistics baseProduction Area (NSA) with a logistics base located at Escravos Beach. It consists of four Flow-stations namely: Otumara, Saghara, Escravos, and Opuama. The combined production capacity of Escravos District is 180 Mobd of oil, which represents 40% of NSA installed production capacity. There are

Detailed Design for Power Generation, Transmission and p p y

8 principal communities in Escravos District. These communities are Ajudiabo, Madangho Ogidigben, Aruton, Ugboegungun, Degele, Opuama and Tsekelewu. SPDC planned to provide power to these host communities in 2 phases with phase 1 being to supply power to

Distribution to Forcados, Ogidigben, Communities the 3 communities around the Escravos

Logistic Base i.e. Ajudiabo, Madagho and Ogidigben. Each of the 3 communities identified in phase 1 have their own community distribution network that needs to be upgraded.

Communities

Client Name: SPDC, Western DivisionLocation: Forcados

Point Engineering Limited perform preliminary engineering studies and detailed engineering design necessary for the proposed Escravos Communities Electrification scheme for the Escravos Logistics Base, Madangho, Ogidigben and Ajudiabo communities

Date: January 2004 –June 2004Contract Type:Lumpsum, Detail Ogidigben and Ajudiabo communities. Engineering

Client Contact: Chris AnthonyChris anthon @shell com

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified41

[email protected]

Making a POINT

The Integrated Operations Standards and Practices are the Mandatory minimum requirement to control Operational and Maintenance Activities carried out in the Shell System. They provide the basic rules,

Preparation of Integrated Operating Standards

procedures, work practices and routines when used with the Health, Safety and Environmental Management Systems, to maintain a safe, efficient working environment.The Integrated Operations Standards consist f d t St di I t ti O tiof mandatory Standing Instructions, Operation

Instructions, Procedures, recommended Work Practices and Maintenance Job Routines.

The work entails developing the following Standards and Work Practices:Standing Instructions

Client Name: Shell Nigeria Gas LimitedLocation: Agbara / Ota

Standing InstructionsField OperationsMaintenance Job Routines

Point Engineering Limited developed the above Standards and Work Practices in line with SNG guidelines..

Date: October 2003 –January 2004Contract Type:Lumpsum, E i i S di

gEngineering Studies

Client Contact: John [email protected]

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified42

Making a POINT

Elf Petroleum Nigeria Limited intends to improve its material recovery process by the p y p yInstallation and construction of a Material Recovery Facility at Obagi in OML 58. The facility will have capability to segregate waste materials from the Obagi district area office/accommodation, recover useable wastes, incinerate discarded wastes and

Basic Engineering Studies and Design for the

dispose the residues in an environmental friendly way. The facility will also have a sewage treatment plant for centrally treating human waste, a Guard House with Rest-room, a three-room Office block with male /female Rest-rooms, Overhead Water Tank with

i t d B h l P d S ti

gMaterial Recovery Facilities at ObagiField – OML 58

associated Borehole Pumps and Supporting Structures, Generator House with the Diesel Storage Tank, Waste Processing Shed, Waste Offloading Shed, Ash Shed and a Gas Bottle Shelter. The works also include the installation of a Waste Incinerator a Sewage Treatment

Client Name: Elf Petroleum Nigeria Limited Waste Incinerator, a Sewage Treatment

Facility with associated accessories including Block Wall Fence, Firewater System with

associated hydrants

LimitedLocation: ObagiDate: May 2003 –December 2003Contract Type:Contract Type:Lumpsum, Detail Engineering

Client Contact: David FompunDavid FOMPUN@total com

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified43

[email protected]

Making a POINT

This project is necessitated by the recommendation of SPDC-EAST IP report developed in 2001 for the 28” x 17 km NCTL from Krakama manifold to Cawthorne junction manifold. The IP report

Detailed Design for 28” Pipeline Sectional Replacement by

recommended the sectional replacement of a defective pipe section, about 4 km from Krakama manifold, which has undergone 76% wall loss.In order to carry out the sectional replacement, hot-tapping and stoppling operations are

i d Thi j t d d t Oil

p yHot Tapping

Client Name: required. This project was awarded to Oilserv Limited who in turn sub-contracted the design

scope of the job to Point Engineering Limited

Client Name:Oilserv Limited / SPDCLocation: KrakamaDate: August 2003 –gSepteber 2003Contract Type:Lumpsum, Detail Engineering

Client Contact: Austin [email protected]

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified44

Making a POINT

In 2001, during the cleaning of 14” Okordia-Rumuekpe trunk line to enable intelligent pigging for integrity data acquisition it was

Detailed Designs pigging for integrity data acquisition, it was observed that the cleaning pig was stuck in the trunk line at Sambreiro river crossing as a result of obstruction in the trunk line. Similarly, a dent was revealed during the phase IV internal inspection program for pipelines in 2002 by a caliper survey of the 10”

for 14” Pipeline Sectional Replacement at Diebu River p p y p y

Diebu creek delivery line, approximately 6.97km away from a launcher manifold at Diebu creek flowstation. The dent lies within the river crossing section of the pipeline at Ekowe/Nange-ama. In view of this, planned replacement of these pipeline sections in line

Crossing and 10” Pipeline Sectional Replacement at Okordia River with SPDC’s standard is required.

The objective of the Design is to produce necessary engineering drawings to enable effective replacement of the dented or obstructed section of the delivery line and trunk line on the Ekowe/Nange ama and

Okordia River CrossingClient Name: SPDC, Easter Division

i b d trunk line on the Ekowe/Nange-ama and Sambreiro River crossing sections respectively.These replacements will ensure steady flow of crude oil through these pipelines and allow intelligent pigging for data acquisition in line with DPR’s requirements

Location: Diebu and OkordiaDate: March 2003 –August 2003C t t T with DPR s requirements Contract Type:Lumpsum, Detail Engineering

Client Contact: Joe [email protected]

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified45

[email protected]

Making a POINT

The project is necessitated by the need for MPN to carry out the complete replacement of some failed pipe supports on 36” and 48” pipeline headers transferring crude to and

Detailed Engineering D i f QIT from tank 5008 respectively at QIT process

area .

POINT’s scope of work is the provision of detailed engineering design, calculations, documentation and construction drawings to

bl i f d i f d

Design for QIT 36” Inlet Header and 48” Outlet Header Supports

enable construction of an adequate reinforced concrete pipe support for the 36’’ & 48’’ pipelines.

Detailed soil investigation was carried out at the failed section on the pipelines route.

UpgradeClient Name: MPN QIT, EketLocation: QIT Eket

Four new supports were designed to support the expansion loop section of the pipelines.

Location: QIT, EketDate: April 2003 –May 2003Contract Type:Reimbursable DetailReimbursable, Detail Engineering

Client Contact: Jim [email protected]

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified46

Making a POINT

As part of the activities for Well Clean out

EA PROJECTLayout/Hazardous A Cl ifi ti and Testing for the EA Project, SPDC issued a

work order to Oiltest Services (NIG.) Limited to carry out layout design to enable Oiltest and Halliburton Equipment hook-up on MV Lowell Granstaff Barge in line with safety requirements of API 15 (Hazardous A Cl ifi ti )

Area Classification of GranstaffBarge/DP-A Platform

Area Classification).

The project scope also involves Preparation of Process Drawings of the preferred scheme to enable HAZOP of the Oiltest and Halliburton processes

Client Name: SPDC, Eastern DivisionLocation: EALocation: EA Offshore PlatformDate: October 2002 –November 2002Contract Type:Contract Type:Lumpsum, Detail Engineering

Client Contact: Mr. Ubani

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified47

Making a POINT

In 1992 Phase IV of Pipeline Internal Inspection Program was undertaken by SPDC-EAST and modification of the scraper traps on the following three gas lines require immediate attention:

Design of Gas Line Scrapper Traps

d Sl C t h 8” x10.52 Km Afam Gas Plant – Afam NEPA MANIFOLD Gas line

10” x10.60 Km Afam Gas Plant – Afam NEPA MANIFOLD Gas line

and Slug Catchers

Client Name: SPDC 6” x1.9 Km Kolocreek – Imiringi Gas line

POINT scope includes modifications of the existing pig traps and design of new slug catchers for the above lines necessary to enable cleaning, flushing and internal i ti f th li i di f

Client Name: SPDC, Eastern DivisionLocation: Afam and KolocreekDate: April 2002 – inspection of the lines in readiness for

resumption of gas supply from Afam Gas Plant to NEPA Power Plant after a prolong shutdown of the plants since 1999.

pOctober 2002Contract Type:Lumpsum, Detail Engineering

Client Contact: Joe Dimjoe dim@shell com

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified48

[email protected]

Making a POINT

SPDC Planned to install a Remote Field Manifold (RFM) at Agbada Well, Location 20 as part of her efforts to reduce clusters of fl li i th fi ld I dditi t th RFM

Detailed Design of Remote Field M if ld RFM flowlines in the field. In addition to the RFM,

installation of 3 Nos 6” x 1.6Km Bulklines, 1 Nos 4” x 1.6Km Testline and 1 Nos 2” x 1.6Km Airline were also involved in the project.

POINT performed the detailed engineering

Manifold – RFM (Agbada Loc. 20)

Client Name: SPDC, E Di i i POINT performed the detailed engineering

phase of the project. The work includes preparation of Pipeline Alignment Sheets, Piping General Arrangement Drawings, Isometric Drawings with MTO’s, PEFS’s Instrument Design based on OPEN SYSTEM ARCHITECTURE etc.

Eastern DivisionLocation: AgbadaFieldDate: August 2002 –November 2002November 2002Contract Type:Lumpsum, Detail Engineering

Client Contact: Elisha [email protected]

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified49

Making a POINT

SPDC embarked on various gas utilization projects as part of its efforts to eliminate continous gas flaring in its oil productioncontinous gas flaring in its oil production operations, and CCAGG was one of such projects.

The EPC phase of the project was split into pipeline & facility scopes and awarded to Daewoo Nigeria Limited who

CawthorneChannel AGG Pi li P j t awarded to Daewoo Nigeria Limited who

subcontracted the detailed engineering works to Point Engineering Limited. There were eleven pipelines involved for transportation of gas to and from locations within the AGG node and third party facilities (e.g NLNG, ASCON).

Pipeline Project (CCAGG)

Client Name: Daewoo / Point Engineering’s scope includes detailed engineering, Sub-Contracting Engineering Survey of the pipeline R.O.W in Swamps & river / creek terain with supervision and management of the

il i ti ti d i ti it

SPDCLocation: CawthorneChannelDate: May 2001 -

surveyors, soil investigation and resistivity survey, etc. Conceptual Design verification, Pipeline relief, vent and blowdown design were done on the eleven pipelines. Corrosion and Cathodic Protection design was also carried out.

November 2001Contract Type:Lumpsum, Detail Engineering

Client Contact: Joon [email protected]

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified50

Making a POINT

SPDC-E own and operate an existing Gas Plant at Afam located about 40km East of Port Harcourt, Nigeria (OML11). The Gas Plant was seriously vandalised in 1999 to the extent that a complete refurbishment of various facilities such as export pumps, generators,

Afam Gas Plant Rehabilitation D i p p p , g ,

instrumentation items, and electrical system etc. is required to bring the Gas Plant back on stream.

In addition it is also required to debottleneck the Gas Plant to enable the processing of

Design

Client Name: SPDC, 75MMscfd and at the same time meet the environmental upgrade requirements. The Process Automation System (PAS) is required to be upgraded to a novel OPEN SYSTEM ARCHITECTURE Technology.

P i t E i i f d th t l

Eastern DivisionLocation: AfamDate: Nov. 2001 -November 2002

Point Engineering performed the conceptual design and full detailed engineering design for the rehabilitation/upgrade works.

Contract Type:Lumpsum, Detail Engineering

Client Contact: Elisha [email protected]

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified51

Making a POINT

SPDC-E own and operate an existing Flowstation at Afam located about 40km East of Port Harcourt, Nigeria (OML11). The Flowstation was seriously vandalised in 1999 to the extent that a complete refurbishment of

Afam FlowstationRehabilitation D i various facilities such as export pumps,

generators, instrumentation items, and electrical system etc. is required to bring the Flowstation back on stream.

In addition it is also required to debottleneck th Fl t ti t bl th i f

Design

Client Name: SPDC, the Flowstation to enable the processing of 30,000bopd and at the same time meet the environmental upgrade requirements. The Process Automation System (PAS) is required to be upgraded to a novel OPEN SYSTEM ARCHITECTURE Technology.

Eastern DivisionLocation: AfamDate: Nov. 2001 -November 2002

Point Engineering performed the conceptual design and full detailed engineering design for the rehabilitation/upgrade works.

Contract Type:Lumpsum, Detail Engineering

Client Contact: Elisha [email protected]

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified52

Making a POINT

As part of the Field Development plan of theAs part of the Field Development plan of the Production Area ‘A’ of SPDC-E, installation of a 12” x 14km crude pipeline is required for bulk production from Gbaran Field to Kolo Creek Flowstation for processing as there is no existing Flowstation at Gbaran. It is also necessary to carry out some

Gbaran/Kolo Creek Pipelines & Fl t ti modifications/expansion work at Kolo Creek

flowstation to enable it to handle the additional fluid from Gbaran.

Point Engineering on behalf of Ozono Nigeria Limited carried out the full detailed

i i d i f hi j h d i

FlowstationExpansion Design

Client Name: SPDC, engineering design for this project. The design work involved Pipeline Hydraulic simulation, Pipeline Mechanical Design, Corrosion Engineering and Cathodic Protection System Design - Utilizing solar power system, etc.

Eastern DivisionLocation: Gbaranand KolocreekDate: Dec. 1999 -February 2000Contract Type:Lumpsum, Detail Engineering

Client Contact: Tayo [email protected]

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified53

Making a POINT

Electrification of Bille Community is required as Part of SPDC’s Community Development Project in the Area.

Bille Community Electrification P j t Point Engineering carried out the Detailed

Engineering Design of the Electrification Systems including 0.415/11KV and 11/0.415KV transformers, 500KVA Gas Engine Power Generators, 14 kM overhead Transmission line and Hook-Up S

Project

Client Name: SPDC, System.

Route Survey for pole locations and cable stringing was also performed by Point Engineering Limited.

Eastern DivisionLocation: BilleDate: Feb. 2001 -May 2001Contract Type:Lumpsum, Detail Engineering

Client Contact: Chinedu B. [email protected]

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified54

Making a POINT

AMNI I t ti l Li it d h Off h

Engineering Evaluation of F il d M i AMNI International Limited has an Offshore

Storage vessel called AILSA CRAIG with associated Single Buoy Mooring System. This project required the assessment of the failed bridle and fish plate and to carry out detailed design for the replacement.

Failed Mooring System & Detailed Design of Replacement Hose

Point Engineering performed mechanical engineering calculations ( stress & strength analysis) to investigate the most appropriate material for the mooring bridle/fish plate.

and Structure

Client Name: AMNILocation: Offshore S Pl fStorage PlatformDate: May 2001 -August 2001Contract Type:L mps m DetailLumpsum, Detail Engineering

Client Contact: Wale Olafisan234-84-239079

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified55

Making a POINT

E i i

AMNI’s IMA Field Platform comprise of a Processing Platform (PP), Well Production Platform (WPP), and interface linkage

Engineering Evaluation of Existing 6” Gas Injection Line & ( ), g

between WPP and PP. There is an existing 28ft x 6” flexible hose between WPP of compressor discharge and the bridge interface to the Gas Injection Wells. No evaluation was done when this line was installed. To determine the suitability of this line to convey

Design of New Gaslift Line

Cli t N AMNI gas from Gaslift compressors to WPP, an evaluation was required.

Point Engineering carried out engineering evaluation of the existing Gas Injection Line and designed a new Gaslift flowline to Ima-2ST4 I 7B d dditi l t l t ith

Client Name: AMNI Location: Langley Offshore PlatformDate: Nov. 2000 -January 2001 2ST4, Ima-7B and additional two slots with a

lift pressure of 1500psi in addition to the existing gas injection manifold.

January 2001Contract Type:Lumpsum, Detail Engineering

Client Contact: Wale Olafisan234-84-239079

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified

56

Making a POINT

Shell Petroleum Development Company ofDESIGN Shell Petroleum Development Company of Nigeria Limited plans to install 9 Centrifugal Pumps at Imo River 1, Obigbo North and Oguta flow stations to replace existing Reciprocating Pumps.

SPDC issued an order (ED-054) to Ozono

MODIFICATIONS FOR CP INSTALLATIONS AT IMO RIVER 1 ( )

Nigeria Limited to carry out design modifications of 4 bays in each of these stations to enables flexibility in pump hook-up installation and future replacements.

The project scope is also to carry out detail

AT IMO RIVER 1, OBIGBO NORTH AND OGUTA FLOWSTATIONS

design / engineering and preparation of Approved-for-Construction drawings, construction workscope and materials take-off for pump and driver hook-up to existing facilities. The new Centrifugal Pumps and

Drivers will be vendor supplied

Client Name: SPDC, Eastern DivisionLocation: Imo Riv., Obigbo & Oguta Drivers will be vendor supplied .

Point Engineering on behalf of Ozono Nigeria Limited carried out the full detailed engineering design for this project.

Obigbo & OgutaDate: Dec. 1999 -February 2000Contract Type:Lumpsum, Detail p ,Engineering

Client Contact: Elisha [email protected]

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified57

Making a POINT

The Obigbo North field has an existing Water Injection Plant (WIP) with an installed

i f 15Mb d fcapacity of 15Mbwpd for pressure maintenance. The WIP uses source water from 2 water wells. The Field Development Plan (FDP) of 1997 identified an additional requirement of 20Mbwpd. It also identified Produced Water Re-Injection (PWRI) as an economic alternative to the existing source

Obigbo North Water Re-injection Pilot

economic alternative to the existing source water injection and produced water disposal. The PWRI will increase oil production in Obigbo North, replace its produced water disposal at Bonny Terminal with a more environmentally friendly alternative and create more ullage in the pipeline trunklines.

Project

Client Name: Oiltest create more ullage in the pipeline trunklines. It will also alleviate the produced water processing capacity of Bonny Terminal in the long term.The FDP recommended this pilot scheme to quantify and thus reduce the risks that may be associated with a full-scale implementation of

C e t Na e: O test/ SPDCLocation: ObigboNorthDate: August 1998 -

PWRI.

The design scope for the project is to carry out detail design engineering and preparation of Approved-for-Construction drawings, construction workscope and materials take-off f S d Ski h k

gSeptember 1998Contract Type:Lumpsum, Detail Engineering

for Separators and Skimmer hook-up to existing facilities.

Client Contact: Patrick Amadi234-84230931

www.pointengineering.comwww.pointengineering.comNIS ISO 9001:2008 CertifiedNIS ISO 9001:2008 Certified58

Making a POINT