POCC activities

14
POCC activities AMS02 meeting at KSC October 11 th 2010

description

POCC activities. AMS02 meeting at KSC October 11 th 2010. main goals. finalize sub-system operations finalize DAQ operations finalize system operations. main goals. finalize sub-system operations finalize DAQ operations finalize system operations finalize monitoring tools - PowerPoint PPT Presentation

Transcript of POCC activities

Page 1: POCC activities

POCC activities

AMS02 meeting at KSCOctober 11th 2010

Page 2: POCC activities

main goals

• finalize sub-system operations• finalize DAQ operations• finalize system operations• • •

Page 3: POCC activities
Page 4: POCC activities

main goals

• finalize sub-system operations• finalize DAQ operations• finalize system operations• finalize monitoring tools• data taking for subdetector studies• data taking for system studies

Page 5: POCC activities

finalize sub-system operationsdata taking for subdetector studies

• TOF: scan of thresholds• TRD: trigger delay scan• Tracker: thresholds optimization (event size)• RICH: PMT gain calibration• ECAL: verify behavior with both power on (A & B)• …

Flight hardware needed

Page 6: POCC activities

finalize DAQ operations

• JBUX• Modification of startup and power steps for using

command files.• New DAQ and TAS run procedures by using

command files• Automatic restart DAQ when event mismatch• Level-3 trigger and data compression• …

FS and Flight hardware needed

Page 7: POCC activities

finalize system operations

• Modification of UG task• GPS task• TTCS tasks• Star Tracker task• On-board temperature monitor task• …

FS and Flight hardware needed

Page 8: POCC activities

finalize monitoring tools

• work is in progress on subsystems• new monitoring ready in 6-7 weeks• general test before the end of November• Critical Health Data …

Page 9: POCC activities

data taking for system studies

• long term performance of the system• MDR verification• muon flux measurement

Page 10: POCC activities

collected statistics at KSC

Page 11: POCC activities

the measurement

30 h data AMS02-SCM @ CERN Considering the acceptance ratios SCM/PM ~ 10, we roughtly need 300 h

Page 12: POCC activities

the use of the data

30 h data AMS02-SCM @ CERN

Page 13: POCC activities

Statistics Needed

= 3 level

2 TeV

< 3

> 3

A. Oliva

Page 14: POCC activities

AMS POCC for ISS

SOC

AMS GSC-N

Voice Loop

Commands

Nominal: All Data

Cmds to GSC-N

All Data All Data:Science Data,

Monitoring Data A+B, ISS Ancillary Data andCritical Health Data

1. Shift Leader (alt. Commander)

2. Commander

3. DAQ+Trigger +RunControl

4. Data Handling

10. Thermal

5. Tracker+Laser Align.+Cooling

6.TRD+TRD Gas

7. TOF+ACC

9. ECAL

8. RICH

0. Management

Functional Data Flow in the POCC(in reality, everything is done over Ethernet

with the Switch in the center of a star configuration).

Voice LoopOpen source voice loop server handles internal

communications and mixes in voice channel to/from NASA.

CommandsOne specific station can actually send commands, others can prepare them.

VideoLive NASA video feeds are just another network

service.

“All Data”Stored, processed and redistributed from the

Storage Server. Extra processing power provided by Processing Node.

POIC, MSFC,

AL

The Wall

POCC Station: PC + 2 Screens + headset + laptop location 14

11. Consultants

12. On call

13. Liason