Po Ceklis Blangko Iso 1
description
Transcript of Po Ceklis Blangko Iso 1
-
Kepada Yth:Ir.Fachrizal NaikemManager Logistik
SURAT PERMINTAAN BARANG
NO NAMA BARANG SPESIFIKASI SATUAN JUMLAH NO.ITEM1 MINYAK BEKISTING ROBINAIR LITER 14
Jakarta: 23 Maret 2015
Mengetahui : Diajukan Oleh :
(___________________) ( AFRIZAL ARDIANSYAH )KC/Kapro/SE
-
Form-P-1
Kepada Yth:Ir.Fachrizal NaikemManager Logistik
SURAT PERMINTAAN BARANG
KETERANGAN
Jakarta: 23 Maret 2015
Diajukan Oleh :
( AFRIZAL ARDIANSYAH )
-
MONITORING KEDATANGAN MATERIAL ( PO )
No TANGGAL Nomor PO Nama Barang Sat. Volume Harga Tanggal Besi Ulir D-25 mm Besi Ulir D-19 mm Besi Ulir D-13 mm Satuan Realisasi Sisa Realisasi Sisa Realisasi Sisa
1 28-07-06 1461/ORD/635R BesiI D-25mm btg 15,606.00 4,550.00 Besi D-19mm btg 16,533.00 Besi D-13mm btg 26,800.00
28-07-2006 1,000.00 14,606.00 - 16,533.00 1,211.00 25,589.00 31-07-2006 14,606.00 1,000.00 15,533.00 289.00 25,300.00 05-08-2006 1,000.00 13,606.00 1,000.00 14,533.00 1,500.00 23,800.00 12-08-2006 1,000.00 12,606.00 1,000.00 13,533.00 1,500.00 22,300.00 29-08-2006 650.00 11,956.00 600.00 12,933.00 1,200.00 21,100.00 30-08-2006 - 11,956.00 700.00 12,233.00 950.00 20,150.00
11,956.00 12,233.00 20,150.00 03-09-2006 115.00 11,841.00 1,000.00 11,233.00 1,500.00 18,650.00 03-09-2006 885.00 10,956.00 - 11,233.00 - 18,650.00 06-09-2006 1,000.00 9,956.00 540.00 10,693.00 18,650.00 07-09-2006 9,956.00 460.00 10,233.00 1,500.00 17,150.00 09-09-2006 1,000.00 8,956.00 1,000.00 9,233.00 1,500.00 15,650.00 14-09-2006 8,956.00 1,000.00 8,233.00 1,500.00 14,150.00 15-09-2006 660.00 8,296.00 - 8,233.00 14,150.00 17-09-2006 340.00 7,956.00 1,000.00 7,233.00 1,500.00 12,650.00 19-09-2006 650.00 7,306.00 - 7,233.00 - 12,650.00 21-09-2006 92.00 7,214.00 1,000.00 6,233.00 12,650.00 22-09-2006 258.00 6,956.00 - 6,233.00 1,500.00 11,150.00
6,956.00 6,233.00 11,150.00 Tahap II 6,956.00 6,233.00 11,150.00
25-09-2006 850.00 6,106.00 500.00 5,733.00 3,000.00 8,150.00 29-09-2006 - 6,106.00 500.00 5,233.00 3,000.00 5,150.00 04-10-2006 1,940.00 4,166.00 - 5,233.00 5,150.00 05-10-2006 610.00 3,556.00 1,000.00 4,233.00 5,150.00 06-10-2006 - 3,556.00 - 4,233.00 5,150.00 07-10-2006 - 3,556.00 - 4,233.00 5,150.00 08-10-2006 850.00 2,706.00 - 4,233.00 5,150.00 10-10-2006 870.00 1,836.00 - 4,233.00 5,150.00 - 10-10-2006 - 1,836.00 - 4,233.00 12-10-2006 850.00 986.00 - 4,233.00 13-10-2006 - 986.00 2,000.00 2,233.00 17-10-2006 - 986.00 100.00 2,133.00 04-11-2006 235.00 751.00 - 2,133.00 07-11-2006 - 751.00 - 2,133.00 18-11-2006 - 751.00 - 2,133.00 20-11-2006 - 751.00 - 2,133.00 - 23-11-2006 - 751.00 - 2,133.00 29-11-2006 650.00 101.00 2,133.00 04-12-2006 101.00 - 2,133.00
- 2,133.00
15,606.00 - 14,400.00 2,133.00 26,800.00 -
-
REKAP KEBUTUHAN MATERIAL PROYEK
No No.SPB Nama Barang Sat. Volume ITEM PEKERJAAN
1 01/P1-BT/VII/06 Besi Ulir D-19 mm U-40 btg 14,400.00 u/Pek.Pembesian Soldier Pile Besi Ulir D-13 mm U-40 btg 6,000.00
2 02/P1-BT/VII/06 Besi Ulir D-25 mm U-40 btg 15,606.00 u/Pek.Pembesian Pondasi Bored PilBesi Ulir D-13 mm U-40 btg 20,800.00
3 62/P1-BT/IX/06 Besi Ulir D-19 mm U-40 btg 600.00 u/Pek. Pondasi TC 3 Unit Besi Ulir D-13 mm U-40 btg 566.00 Besi Ulir D-25 mm U-40 btg 150.00
4 63/P1-BT/IX/06 Besi Ulir D-25 mm U-40 btg 475.00 u/Pek. Capping Beam Besi Ulir D-10 mm U-40 btg 1,996.00
5 65/P1-BT/IX/06 Besi Ulir D-25 mm U-40 btg 1,726.00 u/Pek.Bored Pile 1500 & 1000 Besi Ulir D-13 mm U-40 btg 15,797.00
6 136/P1-BT/X/06 Besi Ulir D-13 mm U-40 btg 3,457.00 u/Pek.stek dinding & pla lt.1,2,3 Besi Ulir D-16 mm U-40 btg 618.00
7 141/P1-BT/X/06 Besi Ulir D-32 mm U-40 btg 6,689.00 u/Raf Foundation
8 222/P1-BT/XI/06 Besi Ulir D-13 mm U-40 btg 205.00 u/Pek.Kolom CA Besi Ulir D-25 mm U-40 btg 152.00
Besi Ulir D-10 mm U-40 btg 1,030.00 u/Pek.Peri Meter Beam Besi Ulir D-25 mm U-40 btg 736.00
Besi Ulir D-13 mm U-40 btg 2,381.00 u/Pek.Tambahan BP.1500 Besi Ulir D-25 mm U-40 btg 1,326.00
9 230/P1-BT/XI/06 Besi Ulir D-32 mm U-40 btg 9,250.00 u/Raf Foundation
10 231/P1-BT/XI/06 Besi Ulir D-19 mm U-40 btg 3,900.00 u/Pek.Bore Pile BP.1500 & 1000
-
11 235/P1-BT/XI/06 Besi Ulir D-32 mm U-50 btg 1,500.00 u/Pek.Kolom dari groun s/d bsm 4 Besi Ulir D-25 mm U-50 btg 2,700.00
12 238/P1-BT/XI/06 Besi Ulir D-13 mm U-40 btg 3,600.00 u/Pek.Kolom dari lt Bsm 4 s/d Gf Besi Ulir D-16 mm U-40 btg 8,800.00
Besi Ulir D-10 mm U-40 btg 1,000.00 u/Pek.Dinding Sher Wall Bsm 4 s/dBesi Ulir D-19 mm U-50 btg 4,700.00 Besi Ulir D-32 mm U-50 btg 1,296.00
13 273/P1-BT/XII/06 Besi Ulir D-32 mm U-40 btg 17,478.00 u/Raf Foundation
14 364/P1-BT/II/07 Besi Ulir D-10 mm U-40 btg 312.00 u/Peb.Slab Podium Besi Ulir D-13 mm U-40 btg 150.00 Besi Ulir D-19 mm U-40 btg 4,378.00 Besi Ulir D-22 mm U-40 btg 4,258.00 Besi Ulir D-25 mm U-40 btg 2,247.00 Besi Ulir D-32 mm U-50 btg 33,152.00 u/Raft Foundation
15 366/P1-BT/II/07 Besi Ulir D-19 mm U-50 btg 250.00 u/Pek Pemb.Area Podium Besi Ulir D-25 mm U-50 btg 447.00 Besi Ulir D-32 mm U-50 btg 375.00
16 401/P1-BT/II/07 Besi Ulir D-32 mm U-50 btg 265.00 U/Pek Tie Beam
17 403/P1-BT/III/07 Besi Ulir D-10 mm U-40 btg 293.00 u/Pemb.Pondasi Pit Lift Besi Ulir D-13 mm U-40 btg 68.00 Besi Ulir D-19 mm U-40 btg 62.00 Besi Ulir D-25 mm U-40 btg 26.00 Besi Ulir D-32 mm U-50 btg 262.00
18 408/P1-BT/III/07 Besi Ulir D-10 mm U-40 btg 312.00 u/Pek Slab Podium & Rettining Wall Besi Ulir D-16 mm U-40 btg 300.00 BSM 4 Besi Ulir D-19 mm U-40 btg 200.00 Besi Ulir D-22 mm U-40 btg 200.00 Besi Ulir D-25 mm U-40 btg 1,340.00
19 417/P1-BT/III/07 Besi Ulir D-19 mm U-40 btg 450.00 u/Pemb.Slab Podium Besi Ulir D-25 mm U-40 btg 500.00
20 547/P1-BT/V/07 Besi Ulir D-25 mm U-40 btg 2,280.00 u/Balok , Plat B3 Besi Ulir D-22 mm U-40 btg 4,201.00 Besi Ulir D-19 mm U-40 btg 857.00 Besi Ulir D-16 mm U-40 btg 2,900.00
-
Besi Ulir D-13 mm U-40 btg 27,415.00 Besi Ulir D-10 mm U-40 btg 1,542.00 Besi Ulir D-32 mm U-40 btg 6.00
21 559/P1-BT/VI/07 Besi Ulir D-25 mm U-40 btg 2,070.00 u/Balok , Plat B2 Besi Ulir D-22 mm U-40 btg 4,260.00 Besi Ulir D-19 mm U-40 btg 790.00 Besi Ulir D-16 mm U-40 btg 3,080.00 Besi Ulir D-13 mm U-40 btg 25,770.00 Besi Ulir D-10 mm U-40 btg 2,010.00
22 602/P1-BT/VI/07 Besi Ulir D-19 mm U-40 btg 2,400.00 u/Serwall Besi Ulir D-19 mm U-40 btg 200.00 u/Gadangan
23 620/P1-BT/VI/07 Besi Ulir D-10 mm U-40 btg 2,850.00 u/Parameter Beam B3 s/d B1 Besi Ulir D-13 mm U-40 btg 4,640.00 u/Facing Wall B4 - GF Besi Ulir D-25 mm U-40 btg 1,050.00
24 621/P1-BT/VI/07 Besi Ulir P- 8 mm U-40 btg 1,200.00 Pek.STP B4 - Gf Besi Ulir D-10 mm U-40 btg 2,100.00 Pek Tangga B4 - Gf Besi Ulir D-13 mm U-40 btg 2,500.00 Besi Ulir D-16 mm U-40 btg 310.00
25 622/P1-BT/VI/07 Besi Ulir D-10 mm U-40 btg 1,470.00 u/Plat & Balok B1 Besi Ulir D-13 mm U-40 btg 11,300.00 Besi Ulir D-16 mm U-40 btg 2,280.00 Besi Ulir D-19 mm U-40 btg 970.00 Besi Ulir D-22 mm U-40 btg 1,050.00 Besi Ulir D-25 mm U-40 btg 1,100.00 Besi Ulir D-32 mm U-40 btg 47.00
26 642/P1-BT/VI/07 Besi Ulir P- 8 mm U-40 btg 785.00 u/B2 s/d Lt.5 Besi Ulir D-10 mm U-40 btg 28,283.00 Periode 30 Juni 31 Juli 07 Besi Ulir D-13 mm U-40 btg 3,599.00 Besi Ulir D-16 mm U-40 btg 34,784.00 Besi Ulir D-19 mm U-40 btg 10,360.00 Besi Ulir D-22 mm U-40 btg 528.00 Besi Ulir D-25 mm U-40 btg 1,925.00 Besi Ulir D-32 mm U-40 btg 6,159.00
27 747/P1-BT/8/07 Besi Ulir P- 8 mm U-40 btg 70.00 u/Pekerjaan Lt.6 & 7 tanpa besi Slab Besi Ulir D-10 mm U-40 btg 8,855.00 Besi Ulir D-13 mm U-40 btg 1,271.00 Besi Ulir D-16 mm U-40 btg 1,147.00 Besi Ulir D-19 mm U-40 btg 2,630.00
-
Besi Ulir D-22 mm U-40 btg 208.00 Besi Ulir D-25 mm U-40 btg 1,009.00 Besi Ulir D-32 mm U-40 btg 1,043.00
28 773/P1-BT/7/07 Besi Ulir P- 8 mm U-40 btg 228.00 u/Pemb.Lt 8 s/d 15 Besi Ulir D-10 mm U-40 btg 16,535.00 tidak termasuk pembesian slab Besi Ulir D-13 mm U-40 btg 6,526.00 Besi Ulir D-16 mm U-40 btg 4,643.00 Besi Ulir D-19 mm U-40 btg 9,706.00 Besi Ulir D-22 mm U-40 btg 525.00 Besi Ulir D-25 mm U-40 btg 8,241.00 Besi Ulir D-32 mm U-40 btg 1,943.00
29 774/P1-BT/7/07 Besi Ulir P- 8 mm U-40 btg 353.00 u/Pemb.Lt 16 s/d 25 Besi Ulir D-10 mm U-40 btg 20,337.00 tidak termasuk pembesian slab Besi Ulir D-13 mm U-40 btg 11,004.00 Besi Ulir D-16 mm U-40 btg 5,073.00 Besi Ulir D-19 mm U-40 btg 5,506.00 Besi Ulir D-22 mm U-40 btg 281.00 Besi Ulir D-25 mm U-40 btg 10,140.00 Besi Ulir D-32 mm U-40 btg 2,801.00
30 996/P1-BT/1/08 Besi Ulir P- 6 mm U-40 btg 2,766.00 u/Struktur s/d lt.45 Besi Ulir P- 8 mm U-40 btg 5,510.00 Besi Ulir D-10 mm U-40 btg 79,431.00 Besi Ulir D-13 mm U-40 btg 26,791.00 Besi Ulir D-16 mm U-40 btg 6,051.00 Besi Ulir D-19 mm U-40 btg 3,041.00 Besi Ulir D-22 mm U-40 btg 8,322.00 Besi Ulir D-25 mm U-40 btg 32,170.00 Besi Ulir D-32 mm U-40 btg 4,024.00
SPB REALISASI Besi Ulir P- 6 mm U-40 btg 2,766.00 - Besi Ulir P- 8 mm U-40 btg 8,146.00 2,636.00
-
Besi Ulir D-10 mm U-40 btg 168,356.00 139,851.00 Besi Ulir D-13 mm U-40 btg 173,840.00 169,813.00 Besi Ulir D-16 mm U-40 btg 69,986.00 72,126.00 Besi Ulir D-19 mm U-40 btg 60,450.00 78,386.00 Besi Ulir D-19 mm U-50 btg 4,950.00 2,549.00 Besi Ulir D-22 mm U-40 btg 23,833.00 19,237.00 Besi Ulir D-25 mm U-40 btg 84,269.00 95,250.00 Besi Ulir D-25 mm U-50 btg 3,147.00 1,779.00 Besi Ulir D-32 mm U-40 btg 49,440.00 18,623.00 Besi Ulir D-32 mm U-50 btg 36,850.00 31,777.00
-
REKAP KEBUTUHAN MATERIAL PROYEK
ITEM PEKERJAAN TERKIRIM SISA KG
u/Pek.Pembesian Soldier Pile 14,400.00 - 6,000.00 -
- u/Pek.Pembesian Pondasi Bored Pil 15,606.00 -
20,800.00 - - - - -
u/Pek. Pondasi TC 3 Unit 600.00 - 566.00 - 150.00 -
- -
u/Pek. Capping Beam 475.00 - 1,996.00 -
- u/Pek.Bored Pile 1500 & 1000 1,726.00 - -
15,797.00 - - - - -
u/Pek.stek dinding & pla lt.1,2,3 3,457.00 - - 618.00 -
- u/Raf Foundation 6,689.00 - -
- u/Pek.Kolom CA 205.00 - -
152.00 - - -
u/Pek.Peri Meter Beam 1,030.00 - - 736.00 - -
- u/Pek.Tambahan BP.1500 2,381.00 - -
1,326.00 - - -
u/Raf Foundation 9,250.00 - - -
u/Pek.Bore Pile BP.1500 & 1000 3,900.00 - -
-
- u/Pek.Kolom dari groun s/d bsm 4 993.00 507.00 38,390.04
1,332.00 1,368.00 63,201.60 -
u/Pek.Kolom dari lt Bsm 4 s/d Gf 3,600.00 - - 8,800.00 - -
- u/Pek.Dinding Sher Wall Bsm 4 s/d 1,000.00 - -
2,299.00 2,401.00 64,250.76 - 1,296.00 98,133.12
- u/Raf Foundation - 17,478.00 1,323,434.16
- u/Peb.Slab Podium 312.00 - -
150.00 - - 4,378.00 - - 4,258.00 - - 2,247.00 - -
u/Raft Foundation 30,875.00 2,277.00 172,414.44 -
u/Pek Pemb.Area Podium 250.00 - 447.00 - 375.00 -
- 265.00 -
- u/Pemb.Pondasi Pit Lift 293.00 - -
68.00 - - 62.00 - - 26.00 - - 262.00 -
- u/Pek Slab Podium & Rettining Wall 312.00 - -
300.00 - - 200.00 - - 200.00 - - 1,340.00 - -
- - u/Pemb.Slab Podium 450.00 - -
500.00 - - - -
2,280.00 - - 4,201.00 - - 857.00 - - 2,900.00 - -
-
27,415.00 - - 1,542.00 - - 6.00 - -
- - 2,070.00 - - 4,260.00 - - 790.00 - - 3,080.00 - - 25,770.00 - - 2,010.00 - -
- - 2,400.00 - - 200.00 - - - -
u/Parameter Beam B3 s/d B1 2,850.00 - u/Facing Wall B4 - GF 4,640.00 - -
1,050.00 - -
1,200.00 - Pek Tangga B4 - Gf 2,100.00 - -
2,500.00 - - 310.00 -
- 1,470.00 - 11,300.00 - - 2,280.00 - - 970.00 - 1,050.00 - -
903.00 1,100.00 - - 47.00 - -
- 785.00 - -
Periode 30 Juni 31 Juli 07 28,283.00 - - 3,599.00 - - 34,784.00 - - 10,360.00 - - 528.00 - - 1,925.00 - - 1,622.00 4,537.00 343,541.64
- u/Pekerjaan Lt.6 & 7 tanpa besi Slab 70.00 - -
8,855.00 - - 1,271.00 - - 1,147.00 - - 2,630.00 - -
-
208.00 - - 1,009.00 - -
1,043.00 78,975.96 - -
u/Pemb.Lt 8 s/d 15 228.00 - - tidak termasuk pembesian slab 16,535.00 - -
6,202.00 324.00 24,533.28 4,643.00 - - 9,706.00 - - 525.00 - - 8,241.00 - -
1,943.00 147,123.96 - -
u/Pemb.Lt 16 s/d 25 353.00 - - tidak termasuk pembesian slab 20,337.00 - -
11,004.00 - - 5,073.00 - - 5,506.00 - - 281.00 - - 10,140.00 - - 853.00 1,948.00 147,502.56
- 2,766.00 6,251.16 5,510.00 12,452.60 79,431.00 179,514.06 26,791.00 60,547.66 6,051.00 13,675.26 3,041.00 6,872.66 8,322.00 297,594.72 32,170.00 1,486,254.00 4,024.00 304,697.28
SELISIH KG (terhadap Rea.) LP.10 MUTASI 2,766.00 2,160.00 5,745.60 5,510.00 12,494.64 9,718.00 46,063.32 1,508.00
-
28,505.00 1,034,897.40 138,329.00 1,023,634.60 11,285.00 4,027.00 2,119,266.24 177,351.00 2,213,340.48 16,551.00 (2,140.00) 1,367,508.96 75,486.00 1,431,214.56 9,538.00 (17,936.00) 2,097,609.36 88,473.00 2,367,537.48 13,950.00 2,401.00 68,211.24 2,549.00 68,211.24 4,596.00 687,915.12 21,581.00 771,736.56 4,862.00 (10,981.00) 4,400,550.00 100,064.00 4,622,956.80 9,090.00 1,368.00 82,189.80 1,779.00 82,189.80 30,817.00 1,410,133.56 19,125.00 1,448,145.00 808.00 5,073.00 2,406,154.44 31,777.00 2,406,154.44
15,686,930.76 16,486,929.88
-
10 13 16.00 19.00 25 32 150,351.00 184,288.00 75,486.00 88,473.00 ### ###
4,338.00 52,806.00 9,418.00 23,600.00 22,871.00 ###
(146,013.00) ### (66,068.00) (64,873.00) ### ###
324.00 477.00
The Grove.324 The Grove.477
1,441.00
cukup
0./
15,000.00
-
33,417.00
6,226.00
32,770.00
22 500.00 17,880.00 19 450.00 12,042.00
29,922.00
5,090.00 Besi Ulir D-25 btg 2,280.00 2280 - 5,790.00 Besi Ulir D-22 btg 4,201.00 3061 1,140.00
Besi Ulir D-19 btg 857.00 857 - Besi Ulir D-16 btg 2,887.00 1580 1,307.00
-
Besi Ulir D-13 btg 27,415.00 16366 ### 42.00 Besi Ulir D-10 btg 1,542.00 1542 - 2,010.00 Besi Ulir D-32 btg 6.00 6.00
13,766.00 (13,649.00)
3,050.00
8/12 1,131.00 5/7 600.00
2,002.00 53,573.52 1,858.00 66,442.08 1,145.00 52,899.00
172,914.60 13 45,659.00 22 3,900.00
-
650.00 650.00 209.00 650.00 600.00 650.00 650.00
800.00
650.00 291.00
MUTASI
7,147.92 2,636.00 -
-
83,509.00 88,925.00 50,926.00 206,556.48 145,454.00 24,359.00 180,840.48 63,935.00 8,191.00 373,302.00 57,409.00 20,977.00
173,865.12 15,511.00 3,726.00 419,958.00 52,099.00 43,151.00
61,181.76 18,467.00 (156.00) 2,275.00
1,506,360.76
-
Kepada Yth :PT. FAJAR RAYAJl.Danau Sunter BaratDi Jakarta
PESANAN PEMBELIAN BARANGNo.13/SK/P3/PBI/PTK6/09
Berdasarkan Surat Penawaran Sdr .Via Telepontgl, 24 Maret 2015 Kami Mengharap Agar Saudara dapatMengirimkan Barang-barang Seperti Tersebut Dibawah Ini:
No Nama Barang Satuan/No.SC Sat. JumlahHarga Satuan Jumlah Harga
( Rp ) ( Rp )
1 MINYAK BEKISTING LITER 14.00 7,000.00 98,000.00
Sub Total : 98,000.00 Terbilang : Sembilan Juta Delapan ratus Sembilan Puluh Delapan Ribu Rupiah PPN 10% :Dua Ratus Empat Puluh Rupiah Total : 98,000.00 Tanggal Penyerahan : Tempat Penyerahan :tgl, 27 Maret 2015 PROYEK BAKRIE TOWER
JL.RASUNA SAID KUNINGAN JAKARTA
SPB:No:
Dengan Syarat - Syarat Sebagai Berikut : 1. Mutu Barang : Sesuai Dengan Contah Atau Standar Yang Telah Ditentukan Dan Memperhatikan
2. Penyerahan Barang : Penjual Menjamin Bahwa barang Diserahkan Dalam Keadaan Baik Dan Lengkap3. Sanksi : a. Apabila Penjual Terlambat Menyerahkan Barang Tersebut Diatas,Maka Penjual
Dikenakan Denda 0,1%(Satu Permil) dari Nilai barang Terlambat Dikirim Per- hari,Maksimum 5%(Lima Persen)dari Nilai Pesanan,Kecuali Terjadi Force Majeure.: b. Apa Bila Barang Yang Dikirim Tidak Sesuai Pasal 1 Tersebut Diatas Atau Ter- dapat Kerusakan / Cacat,Maka Penjual Akan Mengganti Dengan Barang Yang Sama Dalam WaktuSatu Hari Sejak Tanggal Pesanan Ini.
4. Pembayaran : a. Pembayaran Dilaksanakan Berdasarkan Tagihan Penjualan Yang Dilampiri Dengan Pesanan Pembelian Barang (P3)Dan Berita Acara Penerimaan/ Penyerahan.: b. Pembayaran Dilakukan, 60 Hari Setelah invoice diterima dan barang dikirim
5. Lain -Lain : . . .
Jakarta, 24 Maret 2015Setuju Mengirim Barang-Barang Hormat KamiDegan Syarat-Syarat Tersebut PT.HUTAMA KARYA (Persero)
PT. FAJAR RAYA
HARTONO Ir.Fachrizal NaikemManager Logistik
Persyaratan Mutu K3 Dan Lingkungan.
-
BUKU REGISTER PENERIMAAN BAHAN
NO TANGGAL NO.P4 NO.SPB NAMA BARANG SAT. VOL. H.SAT.
1 27-03-2015 875/P4-BT/3/15 001/P1-BT/3/15 MINYAK BEKISTING LITER 14.00 7000.000
2 01-06-2015 876/P4-BT/6/15 002/P1-BT/6/15 MINYAK BEKISTING LITER 14.00 7000.000
-
BUKU REGISTER PENERIMAAN BAHAN
STOCK
HARI INI S/D HR INI SUPPLIER
0 14 PT. FAJAR RAYA
2 16 PT. FAJAR RAYA
-
Form P-4
BERITA ACARA PENERRIMAAN / PENYERAHAN BARANGNomor :.
Pengirim :.. Order Pembelian :..Alamat :. Tanggal :..
:. Faktur No :..No.Kendaraan :. Tanggal :..
NO NAMA BARANG/BAHAN SAT. JUMLAH JUMLAHKETERANGAN
BAIK RUSAK HILANG
Jakarta,
Mengetahui : Yang Menyerahkan : Penerima Barang :
(---------------------------- ) '(-----------------------------) (---------------------)
-
KARTU GUDANGNAMA BARANG : MINYAK BEKISTINGSATUAN : LITERHARGA SATUAN :Rp.7000,00
HALAMAN :
TANGGALPENERIMAAN PENGELUARAN SALDO
KETERANGANHARI INI S/D HR INI HARI INI S/D HR INI HAI INI
27-03-2015 14 14 2 2 12
03-04-2015 0 14 2 4 8
20-04-2015 0 14 2 6 6
03-05-2015 0 14 2 8 4
17-05-2015 0 14 2 10 2
01-06-2015 14 28 0 10 16
-
SCHEDULE PENGIRIMAN MATERIAL DRYMIXPROYEK BAKRIE TOWER
NO URAIAN SAT. VOLUME STATUSSCHEDULE PENGIRIMAN
TOTAL SALDOPERIODE TGL, 31 Mei s/d 7 Juni 200831 2 3 4 5 6 7
1Skimcoat zak 100.00
Renc. 100.00 100.00 - Real. 100.00 100.00 -
@ 30 kg Kg 3,000.00 - - - - - 3,000.00 - 3,000.00
2Thinbed 101 zak 137.00
Renc. 37.00 50.00 ### 137.00 - Real. 37.00 50.00 ### 137.00 -
@ 40 kg Kg 5,480.00 - 1,480.00 - 2,000.00 - 2,000.00 - 5,480.00
3Concrete Fill zak 100.00
Renc. 50.00 ### 100.00 - Real. 50.00 ### 100.00 -
@ 40 kg Kg 4,000.00 - - - 2,000.00 - 2,000.00 - 4,000.00
4Plesteran zak 2,920.00
Renc. 480.00 360.00 480.00 320.00 480.00 320.00 480.00 2,920.00 Real. 320.00 390.00 480.00 320.00 480.00 320.00 480.00 2,790.00 130.00
@ 50 kg Kg 146,000.00 24,000.00 18,000.00 24,000.00 16,000.00 24,000.00 16,000.00 24,000.00 146,000.00
5Acian zak 217.00
Renc. 100.00 100.00 17.00 217.00 Real. 100.00 100.00 17.00 217.00 -
@ 30 kg Kg 6,510.00 - 3,000.00 - 3,000.00 - 510.00 - 6,510.00
164,990.00 24,000.00 22,480.00 24,000.00 23,000.00 24,000.00 23,510.00 24,000.00 164,990.00
Jakarta, 30 Mei 2008Dibuat oleh :
Ir.Zaim SusiloManager Logistik
-
PT.HUTAMA KARYAPROYEK BAKRIE TOWER
NO URAIAN SAT. VOLUMESTATUS
SCHEDULE PENGIRIMANTOTAL SALDOPERIODE TGL, 15 MEI 2008 s/d 30 MEI 2008
TANGGAL 15 16 17 19 21 22 23 24 26 27 28 29 30
1 AEROBLOK M3 499.20
Renc. 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 499.20 - Real. -
- TOTAL #REF! 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 499.20
Jakarta, 14 Mei 2008Dibuat oleh :
Ir.Zaim SusiloManager Logistik
SPBporekap spborderbk reg.penP-4KARTU GUDANGSCH DRYMIXSCH EARPBLOK