PNOC RENEWABLES CORPORATION - Amazon … resources by providing fiscal and non-fiscal incentives to...
Transcript of PNOC RENEWABLES CORPORATION - Amazon … resources by providing fiscal and non-fiscal incentives to...
PNOC RENEWABLESCORPORATION
YOUR PARTNER
IN RENEWABLE ENERGY DEVELOPMENT
RenewablesCorporationSolar & Off-Grid Renewables South East Asia Conference 2015
November 25-26
Bangkok Thailand
PHILIPPINE ENERGY SITUATIONER
RenewablesCorporation
R.A. No. 9513: RENEWABLE ENERGY ACT of 2008
Accelerate the development of the country’s renewable energy resources by providing fiscal and non-fiscal incentives to private sector investors and equipment
manufacturers / suppliers.
RenewablesCorporation
Charter: P.D. 334• There is hereby created body corporate to be
known as PNOC.
• It may establish such offices, agencies,
subsidiaries, branches or correspondents in
the Philippines or abroad as its business
operations would require.
• Thus, PNOC Renewables Corporation was
established as a subsidiary in 2008.
RenewablesCorporation
Government Policy
National Renewable Energy Program
� Increase RE-based capacity by 200% within the next 20 years (2011-2030)
� Increase non-power contribution of RE to the energy mix by 10 MMBFOE in the
next ten years
� Be the number one geothermal energy producer in the world (additional
1,495 MW)
� Be the number one wind energy producer in Southeast Asia (up to 2,500
MW)
� Double hydro capacity (additional 5,400 MW)
� Expand contribution of;
� biomass - 265 MW
� solar - at least 280 MW
� ocean energy – at least 10 MWRenewablesCorporation
2013*2012
Renewable Energy (RE) - 40.9%
Green Energy (RE + Nat Gas) – 47.3 %Renewable Energy (RE) - 42.8 %
Share of Green Energy (RE+Nat Gas) – 50.1 %
PRIMARY ENERGY MIX
Oil
31.44%
Natural Gas
7.33%
Coal
18.45%
Hydro
5.82%
Geothermal
20.12%
Biomass
16.17%
Solar/Wind
0.02%Biofuels
0.67%
Oil
30.49%
Natural
Gas
6.42%
Coal
22.25%
Hydro
5.51%
Geothermal
18.31%
Biomass
16.22%
Solar/Wind
0.01%
Biofuels
0.78%
RenewablesCorporation
* Preliminary as of August 2014
2012
Coal38.76%
Oil-based5.83%
Natural Gas26.93%
Geothermal14.06%
Hydro14.06%
Solar/Wind0.11%
Biomass0.25%
2013*
Coal42.68%
Oil-based5.97%
Natural Gas25.00%
Geothermal12.74%
Hydro13.24%
Solar/Wind0.09%
Biomass0.28%
Total Generation: 72,922.01 GWh Total Generation: 75,172.86 GWh
RE - 28.5 %
Green Energy (RE + Nat Gas) – 55.4 %
RE - 26.4 %
Green Energy (RE + Nat Gas) – 51.3 %
POWER GENERATION MIX
* Preliminary as of August 2014
RenewablesCorporation
Department of Energy
PNOC RCPNOC Renewables Corporation
PNOC RCPNOC Exploration Corporation
VISION
PNOC Renewables Corp will be
a catalyst & prime mover for
Philippine Renewable energy
development by 2030.
RenewablesCorporation
PNOC RENEWABLESCORPORATION
PROJECTS
RenewablesCorporation
�PNOC RC has a 10%
investment in the project
�The 20MW geothermal
project was commissioned
in Feb 2014
�We are investing in the
10MW expansion, which
will be operational in 2017
MINOR INVESTOR IN THE 20 MW MAIBARARA GEOTHERMAL PROJECT
100 kW PNOC RC & Philippine 100 kW PNOC RC & Philippine 100 kW PNOC RC & Philippine 100 kW PNOC RC & Philippine Heart Center InaugurationHeart Center InaugurationHeart Center InaugurationHeart Center Inauguration
100 kW PNOC RC & Philippine 100 kW PNOC RC & Philippine 100 kW PNOC RC & Philippine 100 kW PNOC RC & Philippine Heart Center InaugurationHeart Center InaugurationHeart Center InaugurationHeart Center Inauguration
100 kW PNOC RC & Philippine 100 kW PNOC RC & Philippine 100 kW PNOC RC & Philippine 100 kW PNOC RC & Philippine Heart Center InaugurationHeart Center InaugurationHeart Center InaugurationHeart Center Inauguration
WE TARGET TO HAVE 20 GOVERNMENT AGENCIES SIGNED-UP BY NEXT YEAR
15
Ground breaking
in July 2014
� Located at the Pampanga River
Irrigation System (PRIS) Main in
Rizal, Nueva Ecija
� Signed MOA with NIA
� Over 300 NIA Canals all over PH
PNOC RCPNOC RC
National Devt
Company
National Devt
Company
NEECO II Area-2
NEECO II Area-2
National Irrigation
Admin
National Irrigation
Admin
OfftakerNIA canal
50% investment
Implementation
50% investment
+ Project
Implementation
50%
Investment
WE WILL SOON COMMISSION THE 1 MW RIZALHYDRO PROJECT
� Located along the Super Diversion Canal Lateral C in the
Science City of Munoz, Nueva Ecija
� Service Contract awarded in Feb 2014
� Ongoing bidding for EPC contractor
� Target commissioning in 2017
NEXT IN THE PIPELINE IS THE 630KW MUÑOZ HYDRO PROJECT
WE CAN DEVELOP PROJECTS FROM START TO FINISH
18
PRE-DEVELOPMENT STAGE DEVELOPMENT STAGE
Commercial
Operation
Award of
contract area
Service Contract
• Studies
• Secure Permits
• Sales Agreement
Pre-Dev Stage
• Financial Closure
• Detailed Design
• Construction
Dev Stage
WE CAN DEVELOP PROJECTS FROM START TO FINISH
WHAT ARE THE REQUIREMENTS?
�Foreign partners:
� Register the company in
the Philippines
� Letter of Intent to either
partner with PNOC RC or
engage PNOC RC for its
services
� Proof of Legal, Technical
and Financial
Capabilities
19
RenewablesCorporation
THANK YOU and get in touch:
Email: [email protected]
Website: http://www.pnoc-rc.com.ph/
Phone: +63 (02) 840 – 3080
RenewablesCorporation