    Control -The activity of ensuring conformance to

    requirements and taking corrective action when necessaryto correct problems.

    Importance - Daily management of processes Prerequisite to longer-term improvements

    Quality Control-The process of control where the management

    tries to conform the quality of the product in accordance withthe predetermined standards and specifications.

    2

  • 8/8/2019 pm..unit v

    3/43

    To asses the quality of raw materials and finished goods. To ensure whether the product conforms to the pre-determined

    standards and specifications. To locate the reason for deviation and take remedial steps. To suggest suitable improvements. To develop quality consciousness. To asses various techniques of quality control. To reduce wastage.

    Principles ofQuality Control

    V

    ariable quality of manufactured goods with an upward trend undercompetitive manufacture conditions. Control of quality increases sales, decreases costs. The conformance of a finished product to its design specification and

    standards should be accomplished by avoiding the production of non-conforming material.

  • 8/8/2019 pm..unit v

    4/43

    Quality Policy andQuality Manual

    Contract management, design control and purchasingProcess control, inspection and testingCorrective action and continual improvementControlling inspection, measuring and test equipment (metrology,measurement system analysis and calibration)Records, documentation and audits

    Advantages of quality control system

    Reduction in cost Improvement in morale of employees Maximum utilization of resources Increase in sales Consumers satisfaction Minimize variations

  • 8/8/2019 pm..unit v

    5/43

    Statistical quality control is the application ofstatistical technique to determine how far the product conformsto the standards of quality and precision and to what extend itsquality deviates from the standard quality.

    Techniques of statistical quality control Control chart AcceptanceSampling

    Benefits of StatisticalQuality Control It saves on rejection It maintains high standard of quality Reduces expenses of inspection Ensures standard price Sense of responsibility among workers

    StatisticalQuality Control

  • 8/8/2019 pm..unit v

    6/43

    6

    Lot received for inspection

    Sample selected and analyzed

    Results compared with acceptance criteria

    Accept the lot

    Send to production

    or to customer

    Reject the lot

    Decide on disposition

  • 8/8/2019 pm..unit v

    7/43

    Merits Provides an assessment

    of risk

    Inexpensive and suitedfor destructive testing

    Requires less time thanother approaches

    Requires less handling Reduces inspector

    fatigue

    Demerits:

    Does not make sense for

    stable processes

    Only detects poor

    quality; does not help toprevent it

    Is non-value-added

    Does not help suppliersimprove

    7

  • 8/8/2019 pm..unit v

    8/43

    1. Receiving Inspection2. Decentralized Inspection3. Centralized Inspection4. Trail run Inspection

    5. F

    irst offInspection6. Pilot-piece Inspection7. Tool Inspection8. Working Inspection9. Operation Inspection10. Final Inspection

    11. Inspection by self control12. Percentage Inspection

    13. Efficiency Inspection14. Endurance Inspection15. Destructive Inspection16. Product Inspection1

    7. T

    ests allied to completeInspection18. Piecework Inspection19. Remedial & Preventive

    Inspection20. Materials Inspection

    21. Work-In-Processlnspection22. Final Inspection23. Functional Inspection24. Sampling Inspection Plan

    or Acceptance sampling

  • 8/8/2019 pm..unit v

    9/43

    Advantages No chances of collusion between production men and inspectors. Accurate counting is done for good and bad items. Sophisticated instruments can be used.

    Disadvantages Errors are not quickly resolved.

    Requires more material handling. Larger work-in-progress inventory may be required. Not suitable for heavy and unwieldy components.

    Inspection is done at one place. All items are brought at the centralized place forinspection

  • 8/8/2019 pm..unit v

    10/43

    Advantages Production delays defective work are reduced Handling cost is reduced Helps to increase the rate of production Its ideal for products which are large and weigh more

    Disadvantages

    Less freedom of movement to the operator Sufficient space is not available for inspection Work-in-process is scattered resulting in inspection difficulties Dust, vibration, noise and other floor conditions are less suitable for

    close inspection

    Inspection is done on the machines or at shop floor. The measuring instruments are takento the job

  • 8/8/2019 pm..unit v

    11/43

    It is a day-to-day graphical representation ofthe measured or otherwise judged qualitycharacteristics of the items or samples.

    It is a diagnostic tool. It is dynamic in nature. It depicts any change in the characteristics of the

    item from the start of the production.

  • 8/8/2019 pm..unit v

    12/43

    It is constructed to show the fluctuations of the means of samples about the mean of the process andcan be used to determine whether or not the fluctuations are due to random causes or to an assignablecause.

    When used along the r-chart, it tells when to leave the process along and when to chase and go for thecause leading to variation.

    It secures information in establishing or modifying processes, specifications or inspection proceduresand

    It can control the quality of incoming material. The control limits of

    n is the number of observations

    k is the number of subgroups

    Upper control limit:

    Lower control limit:

  • 8/8/2019 pm..unit v

    13/43

  • 8/8/2019 pm..unit v

    14/43

    It can be a fraction defective chart or % defective chart(100p).

    Each item is classified as good (non-defective) or bad (defective). This chart is used to control the general quality of the component part and it checks if the fluctuation in

    product quality are due to chance cause alone.

    Calculation and plotting

    The control limits for this chart type arewhere is the estimate of the long-term process mean established during control-chart setup. Naturally,

    if the lower control limit is less than or equal to zero, process observations only need be plotted against

    the upper control limit. Note that observations of proportion nonconforming below a positive lower

    control limit are cause for concern as they are more frequently evidence of improperly calibrated test

    and inspection equipment or inadequately trained inspectors than of sustained quality improvement.

    Some organizations may elect to provide a standard value for p, effectively making it a target value for

    the proportion nonconforming. This may be useful when simple process adjustments can consistently

    move the process mean, but in general, this makes it more challenging to judge whether a process is

    fully out of control or merely off-target (but otherwise in control).

  • 8/8/2019 pm..unit v

    15/43

  • 8/8/2019 pm..unit v

    16/43

    Logistics is the management of the flow of goods, informationand other resources between the point of origin and the point of

    consumption in order to meet the requirements of consumers(frequently, and originally, millitary organizations).

    Logistics involves the integration of information, transportation,inventory, warehousing, material handling, and packaging, andoccasionally security. Logistics is a channel of the supply chain

    which adds the value of time and place utility.

    Today the complexity of production logistics can be modeled,analyzed, visualized and optimized by plant simulation software.

  • 8/8/2019 pm..unit v

    17/43

    Six Sigma is a business management strategy originallydeveloped by Motorola, USA in 1981.As of 2010, it enjoyswidespread application in many sectors of industry.

    A six-sigma process is one in which 99.99999% of the productsmanufactured are statistically expected to be free of defects.Motorola set a goal of "six sigmas" for all of its manufacturingoperations, and this goal became a byword for the management

    and engineering practices used to achieve it.

    SixSigma seeks to improve the quality of process outputs byidentifying and removing the causes of defects (errors) andminimizing variability in manufacturing and business processes.

  • 8/8/2019 pm..unit v

    18/43

    18

    Sigma

    Level

    Defects Per Million

    Opportunities

    Rate of

    Improvement

    1 WW 690,000

    2WW 308,000 2 times

    3WW 66,800 5 times

    4WW 6,210 11 times

    5WW 230 27 times

    6WW 3.4 68 times

  • 8/8/2019 pm..unit v

    19/43

    DEFINITION:The first step in any SixSigma is to clarify the problem and narrow

    its scope in such a way that measureable goals can be achieved within a fewmonths. Then a team is assembled to examine the process in detail, suggest

    improvements, and implement those recommendations. In themanufacturing world, project managers begin by defining what constitutesa defect and then establish a set of objectives to reduce their occurrence.

    MEASUREMENT:In the second step of a SixSigma project, the team gathers data

    and prepares it for high-level analysis.

    ANALYSIS:Once a process has been mapped and documented, and the quality

    of the hard supporting data has been verified, theSixSigma team can begin

    the analysis of control.

    Five steps in six sigma

  • 8/8/2019 pm..unit v

    20/43

    IMPROVEMENT:

    Recommend, decide and implement

    improvements.

    CONTROL:

    In the final stages of a SixSigmaproject, the team creates controls. These are

    enabling the company to sustain and extend

    the improvements.

    Package

  • 8/8/2019 pm..unit v

    21/43

    Just In Time Purchasing is purely the technique of eliminatingthe wastes in purchase functions by developing long term,mutually beneficial relationship, with fewer but better supplies.

    It aims at: eliminating wastes in the purchase process e.g., order

    processing costs, follow up costs, etc. eliminating wastes at suppliers end.

    eliminating purchased inventory.

  • 8/8/2019 pm..unit v

    22/43

    Suppliers facilities are the extension of buyers ownfacilities

    Long term and mutually beneficial relationship with fewer

    but better suppliers are necessaryDelivery lot size should be just enough to satisfyimmediate higher level requirement

    Rejections interrupt supply chain and hence must beeliminated

    Buyer and seller jointly identify problems and activitiesthat do not add value and initiate action to achievecontinuous improvement

    Fundamental Principles ofJIT Purchasing:

  • 8/8/2019 pm..unit v

    23/43

    PurchasingActivity

    Purchase lot sizeSelectingsupplierEvaluating

    supplier

    Receivinginspection

    Negotiating and

    bidding process

    Determiningmode of

    transportation

    JITPurchasing

    Small with frequent deliveriesSingle source, nearby area,long-term contractEmphasis on product quality,

    delivery performance,price but0% rejection from supplier

    Counting and receivinginspection of incoming parts isreduced and eventuallyeliminated

    Primary objective is to achieveproduct quality through a long

    term contract and fair priceConcern for both inbound &

    outbound freight, on timedelivery.

    Traditional Purchase

    Large batches with less frequentdeliveriesMultiple sources, short-termcontract

    Emphasis on product quality,delivery performance,price but

    about 2% rejectionBuyer is responsible for receiving,counting and inspecting allincoming parts

    Primary objective is to get the

    lowest possible price

    Concern for outbound freight and

    lower outbound costs.

    JITPurchase Vs.Traditional Purchase

  • 8/8/2019 pm..unit v

    24/43

    PurchasingActivity

    Productspecification

    Paper work

    Packaging

    JITPurchasing

    Loose specifications

    Less formal paper work

    Small standard containers used to

    hold exact quantity, precisespecifications

    Traditional Purchasing

    Rigid specifications

    Requires great deal of timeand formal paper work

    changesRegular packaging for every

    part type and part numberwith no clear specifications on

    product content

  • 8/8/2019 pm..unit v

    25/43

    JIT System of inventory control, originally developed by Taiichi Oknoimplies that the firm should maintain a minimum level of inventory andrely on suppliers to provide parts and components just-in-time to meetassembly requirements.

    This systems may be a contradiction to the traditional system ofinventory or the just-in-case system which believes in maintaining ahealthy level of safety stock.

    JIT System requires an integration of the following:1. A strong and dependable relationship with suppliers located in the

    vicinity2. A reliable transport system3. An easy physical access and convenient layout of docks and storage

    areas

  • 8/8/2019 pm..unit v

    26/43

    1.Flow Layout2.Smoothed build-up rate3.Mixed model scheduling4.Small lots and minimum set-up time5.Buffer stock removal6.Kanban Card7.Quality8.Product and Process Simplification9.Standard Container

    10.Preventive maintenance11.Flexible work force12.Organization in modules or cells13.Continuous Improvement14.JIT Purchasing15.Pull and Push Systems

    Basic Elements Of JITInventory

  • 8/8/2019 pm..unit v

    27/43

    Reduction in Production Cost Improve quality

    Quick alternative designProductivity improvement

    Characteristics of JIT:Product orientationShort-term objectivesNo common company objectivesEach department functions differently.

    Benefits ofJIT

  • 8/8/2019 pm..unit v

    28/43

    Differences between Traditional method and JIT:

    FACTOR

    QualityWorkers-Managers-Engineers

    RelationshipE

    rrors

    InventoriesLot size

    Queue

    Automation

    Cost Reduction

    Lead times

    TRADITIONALMETHOD

    Quality has costManagers are experts, Workersexecute their orders

    E

    rrors are eliminated by inspection

    Always in stock

    Mass production

    Queues at production stations help

    bettermachine utilizationSubstitutes labor

    Tools: high machine utilization, labor

    reduction

    Increased delivery lead time

    JIT

    Quality is freeWorkers are experts,Managers & Engineers arefacilitators

    Concept of zero defects.

    Learn from errorsLow inventories

    Small lot sizesAgainst queue formation

    For consistency in qualityTools: accelerated flow of

    product due to reduction inlead time

    Decreased delivery leadtime

  • 8/8/2019 pm..unit v

    29/43

    FactorFlexibility

    Line & Staff

    functionsLabor

    Breakdowns

    Purchasing

    Implementation

    Traditional MethodAt the cost of excess capacity,

    generalpurpose equipment,accumulation of inventories &

    overheadSeparated

    Retrenchment when demand falls

    Accepted as routineFrommultiple vendors

    Depends on attitude towardswork

    JITBy reducing all lead times

    Line workers performminimum

    staff functionsRelocation to other areas

    Preventivemaintenance

    Purchase in small lots. Supplier

    evaluation is stringentDepends on attitude towardswork

  • 8/8/2019 pm..unit v

    30/43

    SUPPLY CHAIN MANAGEMENT

    " Is the strategic management of activities involved in

    the acquisition and conversion of materials to finished

    products delivered to the customer"

    Supplier

    Management

    Schedule /

    ResourcesConversion

    Stock

    Deployment Delivery

    Customer

    Management

    Leads to Business Process Integration

    Material Flow

    Infor ation Flow

  • 8/8/2019 pm..unit v

    31/43

    Supply chain is the system by which organizations

    source, make and deliver their products or servicesaccording to market demand.

    Supply chain management operations and

    decisions are ultimately triggered by demandsignals at the ultimate consumer level .

    Supply chain as defined by experiencedpractitioners extends from suppliers suppliers to

    customers customers.

  • 8/8/2019 pm..unit v

    32/43

    SUPPLYCHAIN INCLUDES :

    MATERIAL FLOWS

    INFORMATION FLOWS

    FINANCIAL FLOWS

    SUPPLYCHAIN MANAGEMENTIS FACILITATEDBY:

    PROCESSES

    STRUCTURE

    TECHNOLOGY

  • 8/8/2019 pm..unit v

    33/43

    Supply Chain Structure

    Information Flow

    Raw Materials

    RETAILERFACTORY DC RDCSUPPLIER

    Finished Goods

  • 8/8/2019 pm..unit v

    34/43

    SUPPLY CHAIN ELEMENTS

    Supply Chain Design

    Resource Acquisition

    Long TermPlanning (1Year ++)Strategic

    Production/ Distribution Planning Resource Allocation

    MediumTermPlanning (Qtrly,Monthly)Tactical

    Shipment Scheduling

    Resource Scheduling

    Short TermPlanning (Weekly,Daily)Operational

  • 8/8/2019 pm..unit v

    35/43

    Supply Chain Goals

    Efficient supply chain management must

    result in tangible business improvements.

    It is characterized by a sharp focus on Revenue growth

    Better asset utilization

    Cost reduction.

  • 8/8/2019 pm..unit v

    36/43

    Meaning and Definition:Total Quality Management is an

    enhancement to the traditional way of doing business.

    It is the art of managing the whole to achieveexcellence.TQM is a total organizational approach for

    meeting and exceeding customers expectations,

    involving all employees of an organization and usingquantitative methodsquantitative methods to continuously improve theorganization's processes, products and services

  • 8/8/2019 pm..unit v

    37/43

    TQM requires the whole of the organization to adopt the culture ofquality. In a TQM organization, quality will dictate the decisions,tasks and processes.

    TQM is committed at all levels within every department or function to

    continuously improve quality.

    The 4 basic components of TQM are:1. Put customers first2. Make continuous improvement3. Aim for zero defects

    4. Training and Development

    Putting Customers first:A quality product or service satisfies customers needs

    and expectations. If not so, their expectations will not be satisfiedand consequently quality will not be achieved.

    BASIC COMPONENTS

  • 8/8/2019 pm..unit v

    38/43

    Initiatives:Undertaking market research1. Looking after all customers whether internal or external2. Listening to customer views and opinions

    Make Continuous Improvement:The Japanese term kaizen believes that there are no limits tocontinuous improvement. This means that a TQM organization willcontinuously strive to improve their product/service and increase qualitystandards.

    Aim for zero defects:There are a number of reasons behind the aim to eradicate defects.oDefects are expensive because they will lower the customersconfidence in the productoIt is more expensive to rectify defects than it is to prevent themoccurring in the first place

  • 8/8/2019 pm..unit v

    39/43

    Training & Developement: An organization will need to train theiremployees to ensure that they understand the principles of TQM

    In a TQM organization, employees will need to understand howTQM is to be achieved or maintained and how they as an employee

    will ensure that the organization emulates TQM.

    Characteristics ofTQM:

    Quality-centeredCustomer-focusedFact-basedTeam-drivenSeniormanagement-ledprocess

    Principles OfTQM:Total quality improvementWorld-class qualityContinuous quality

    improvementTotal service qualityTotal quality leadership

  • 8/8/2019 pm..unit v

    40/43

    Performance

    Rugged Design

    FinishStyle

    Reliability

    Aroma

    Serviceability

    Versatility

    Interchangeability

    Maintainability

    Size

    Safety

    Operatibility

    ColourShape

    Life

    Efficiency

  • 8/8/2019 pm..unit v

    41/43

    Strategic Tools for

    Quality ControlCheck Sheet

    Pareto Chart

    Cause & Effect Diagram

    Flowchart

    Histogram

    Scatter Diagram

    Control Chart

  • 8/8/2019 pm..unit v

    42/43

    1. AffinityDiagram

    2. RelationsDiagram

    3. SystematicDiagram

    4. MatrixDiagram

    5. Matrix data AnalysisDiagram

    6. ProcessDecision

    7. ArrowDiagram

    -Used to organize abstract thinking

    about a problem

    -Used for determining causalitiesamong parts of a problem

    -A planning tool

    -Used to organize data in matrices

    -Principles Component Technique onmatrix data

    -Selection of right process byevaluating alternatives

    -Used to do what if-ing on flow of

    process

  • 8/8/2019 pm..unit v

    43/43

    Team Members:Sowmya Ravi

    Sukanya.CTrisha Agarwal

    Uma Rungta