Schneider Electric 1 - Shore Connection – Confidential
Plug in to
Green Power
Shore Connection Solution
MARCOD event
Shore Connection
March 2015
René Andersen
Schneider Electric Shore
Connection team
Schneider Electric 2 - Shore Connection – Confidential
Shore to Ships• Available power on port ?
• Voltage on the MV ring ?
• Number of berths concerned ?
Schneider Electric 3 - Shore Connection – Confidential
To
ShoreBoxTM
Shore Utility
provider Ship
G
Existing or
New substation
Electrical
network
Cable dispenser
to ship connection
Ship to
supply
Frequency adaptation
And safety operation
Shore Connection general overview
Utility
Energy provider
Port
Terminal Operator
Quay, Wharf
Ship
Shore / Ship Interface
Ferry
Schneider Electric 4 - Shore Connection – Confidential
To
ShoreBoxTM
Shore Hinterland
Existing or
New substation
Electrical
network
Cable dispenser
to ship connection
Ship to
supply
Frequency adaptation
And safety operation
Shore connection general overview
Utility
Energy provider
Port
Quay, Wharf
Ship
Shore / Ship Interface
Container ship
Ship
Terminal Operator
Schneider Electric 5 - Shore Connection – Confidential
Shore side PORT project /
how to co-operate with partners Project Management
Electrical Studies
Civil works studies
Buried MV Cable
Interface Shore
Ship
Up stream MV Switchboard
Commissionning Shore
Commissionning Shore + Ship
Training
Services
Maintenance & Spare parts
Step 1 Engineering
Step 3 Commissionning
ShoreBox Basement preparation
ShoreBox
ShoreBox Implementation
Step 2 Procurement &
Implementation
Civil Works
Civil Works
Existing
MV Substation
Excavation
Cabling preparation
Cable connection
Excavation
Cabling preparation
Cable connection
ShoreBoxTM
Buried MV Cable
Jib Crane (Cable dispenser)
Erection of cable dispenser
Ship
X X X
X X
X X X X X
Local
Partner
X X
X
X X X
X
X X X
X X
X X
X X
Schneider Electric 6 - Shore Connection – Confidential
MV solution for Vessel Project plan
How to co-operate with partners
Project Management
Electrical Studies
Mecanical studies
1 Incomer Waterproof Door
Ship Jonction Box
Control cde cabinet
Implementation
MV Cables
2 MV Premset Cubicle
Interlocking system
Sepam Trip Unit
Implementation
MV Cables
3 Transformer MV/MV or MV/LV
(if required) Implementation
MV / LV Cables
4 Main Switchboard
Shore incomer CB
Synchro module
Ship PMS modification
Switch board adaptation
Supervision adaptation
5 Captain piloting room
Commissionning Ship
Commissionning Ship + Shore
Training
Services
Maintenance & Spare parts
Step 1 Engineering
Step 3 Commissionning
Local
Partner
1
2
3
4
5
Step 2 Implementation
X
X
X
Schneider Electric 7 - Shore Connection –
Plug in to
Green Power
Shore Connection Solution
Understand
What Shore
Connection is
& how to implement
it.
Preliminary phase Questions to answer in order to be able
to plug a ship on the electrical network
Schneider Electric 8 - Shore Connection –
Shore Power / Port - Partners and Suppliers how can
they work together
Terminal
Operator
National
Grid
Terminal
Operator
Shipyards Classification
Societies
Ship Be compliant
with regulation
IMO MARPOL 6
Country Europe Regional
Port Authority
Ship
City
Naval
Base
Energy
provider
Terminal
Operator
ShipYards
EU 2005/33/EC
Ferry
Cargo
Tanker
Container
Repair
Maintenance
Cruise
Port & Terminal
Associations
Association
of Port Cities
Investors
Financial agencies
Decision Makers
Politicians
Stakeholders
Navy
Schneider Electric 9 - Power Solutions – Shore Connection – June 2012
Which kind of ships could be
connected in your port and
for which level of power? Container
Ferry, Cargo, RoRo,
RoPax < 3 MVA
River Cruise LV , < 1 MVA
Cruise
Navy
Level of Power MVA ?
< 6 MVA
< 3 MVA
< 6 MVA
< 9 MVA
< 12 MVA
• Number of calls a year ?
• Time spent at berth ?
• On board frequency ?
• Power required ?
• Blackout accepted ?
• Seasonality
Landscape analyse
Data from Ships side
Schneider Electric 10 - Partner Solutions – Shore Connection – August 2013
Plug Into
Green Power
Actual ships context
& main
characteristics
Schneider Electric 11 - PWB – Energy Management Solutions – Shore Connection Solution
Vessels - Power demand at berth
MVA
Oil Tanker LNG Tanker
Cargo
RoPax
Cruise
Ferries, RoRo
12 1 3 6 9 15 20
Go
od
s
Pa
ss
en
ge
rs
Big Cruise Small Cruise
Oth
ers
River Cruise
OSV
Container
Schneider Electric 16 - Partner Solutions – Shore Connection – August 2013
Plug Into
Green Power
The technical
challenge raised by
Schneider Electric
Schneider Electric 17 - Partner Solutions – Shore Connection – August 2013
Functional Architecture with conversion
0
1
2
3
4
5 8
6
7
0. Supply from energy provider
1. Input & grid connection
2. Output
3. Grid Conversion frequency
4. Load Management
5. Monitoring
6. Thermal Management
7. Enclosure box
8. Ship to shore connection
Schneider Electric 18 - Partner Solutions – Shore Connection – August 2013
US Container ports 60 / 60hz
Europ Ferry ports 50 / 50hz
Functional Architecture
Without conversion
Schneider Electric 19 - Partner Solutions – Shore Connection – August 2013
Navy Ships
Supply Ships
Small Container Ships
Usual power ~ 500kVA
Functional Architecture
In Low Voltage
Schneider Electric 20 - Partner Solutions – Shore Connection – August 2013
Plug Into
Green Power
A genuine test in
labs
Since 2010,
3 years to learn, Functional & Real Tests
Schneider Electric 21 - Partner Solutions – Shore Connection – August 2013
1 Montbonnot
Platform GFC • 10 GFC //, 5 MVA
• Genset 1 MVA
• Network Synchronization
• General behaviour
Final test in Lab • Test at In, 3 MVA
• TVD
• Type tested
2 Eybens
3 Years of tests to learn the behaviour of
a global Solution in 3 test platforms
3 Volta Lab
Simulation Platform • HVAC
• Fans
• LV Automation
Control Command • Safety loop
• Interface Shore / Ship
• Adaptation to Ship
Schneider Electric 22 - Shore Connection – Confidential
Plug in to
Green Power
Shore Connection Solution
Our Solution Offer
Schneider Electric 23 - Partner Solutions – Shore Connection – August 2013
ShoreBoxTM handling & lifting principle
Schneider Electric 24 - Shore Connection – Confidential
ShoreBox design for Transportation
Schneider Electric 25 - Shore Connection – Confidential
Riga Project, ShoreBoX departure
August 2014
Schneider Electric 26 - Shore Connection – Confidential
Interface
Shore to Ship
Ship Gabriella
Mariella Terminal Hinterland
Utility
G
Electrical
network
Ship to
supply
LV Cable dispenser Cable to ship
connection
ShoreBoxTM
Helsinki project Connection to the vessel
Schneider Electric 27 - Shore Connection – Confidential
Energy Provider
Substation
Electrical
network
HV Cable
To
ShoreBoxTM
Shore Ship
G
Supply Ships connection in Bergen
ShoreBoxTM
G
Power demand for 1 MVA :
• 3 Cables
• 2 output : 440V or 690V
• Frequency: 50 or 60hz
Schneider Electric 28 - Shore Connection – Confidential
8MVA
8MVA
8MVA
Future secure shore power investment
Example:Total Power : 24 MVA (8+8+8)
8MVA
8MVA
8MVA
Schneider Electric 29 - Shore Connection – Confidential
8MVA
8MVA
8MVA
Modular system
Total Power : 24 MVA (8+8+8)
8MVA
8MVA
+8MVA
=16MVA
-MVA
Schneider Electric 30 - Shore Connection – Confidential
16MVA
Total Power : 36 MVA (12+12+12)
12MVA 12MVA
12MVA
12MVA 12MVA
8MVA
10MVA
Schneider Electric 31
Industrialised Solution offer time to market reduction of 50%
Shorebox solution Vs Ususal projects Optimize Leadtime & Site Works
20 Design &
Engineering
Procurement
Integration
Testing FAT
On-site
Installation
Commissioning
4
18 13
20 9
4 2
1
2
2
5
0 31 65
Order 50 % Time
Saving
Weeks
Traditional ETO Industrialised
3 weeks only
on shore side to implement
31 weeks
on shore side to implement
Schneider Electric 32 - Shore Connection
Shore Connection Solutions
Plug in to
Green Power