Plastec Expander Joint or...

1
07 5413 4444 - www.plastec.com.au Technical Data Specifications as at 012/08/2020, but are subject to change at any time without notice. Typical Downpipe Installation for M, H1, H2 & E Class Sites Important Notes for Plumbing and Drainage in Reactive Clays and Unstable Soil Sites as per AS2870 Drains shall incorporate flexible joints immediately outside the footing within 1m of the building perimeter. These flexible joints need to accommodate the amount of movement in any direction equal to the estimated movement of the site. These flexible joints must be set in the mid-position of their range of movement and must allow equal movement in any direction at the time of installation. This applies for all sanitary and stormwater discharge pipes. The base of trenches shall be sloped away from the building. Surface drainage shall be considered in the design of the footing system. Surface drainage of the site shall be controlled from the start of site preparation and construction. Sub-Surface drainage of the site shall be a minimum 1.5m from the building perimeter. ID INLET OUTLET 15131 90 Pipe Size Socket 100 18798 100 Socket Socket 60 15130 100 Pipe Size Socket 150 15642 150 Pipe Size Socket 200 18823 225 Pipe Size Socket 200 MAX. EXPAN Recommended for H1, H2 and E class sites Plastec Expander Joint or Equal Plastec Flexitec Coupling Lagging as per Aust Standards

Transcript of Plastec Expander Joint or...

Page 1: Plastec Expander Joint or Equalplastec.com.au/wp-content/uploads/2020/05/Tech-Data-Downpipe-Installation.pdfLagging as per Aust Standards xitec Coupling. Title: Tech-Data-Downpipe-Installation

07 5

413

4444

- w

ww

.pla

stec

.com

.au

Tech

nica

l Dat

a

Spec

ifica

tions

as

at 0

12/0

8/20

20, b

ut a

re s

ubje

ct to

cha

nge

at a

ny ti

me

with

out n

otic

e.

Typi

cal D

ownp

ipe

Inst

alla

tion

for M

, H1,

H2

& E

Cla

ss S

ites

Impo

rtan

t Not

es fo

r

Plum

bing

and

Dra

inag

e in

Rea

ctiv

e C

lays

and

Uns

tabl

e

Soil

Site

s as

per

AS2

870

Dra

ins

shal

l inc

orpo

rate

fle

xibl

e jo

ints

imm

edia

tely

outs

ide

the

foot

ing

with

in 1

m o

f th

e bu

ildin

g pe

rimet

er.

Thes

e fle

xibl

e jo

ints

nee

d to

acc

omm

odat

e th

e am

ount

of

mov

emen

t in

any

dire

ctio

n eq

ual t

o th

e es

timat

ed

mov

emen

t of

the

site.

Thes

e fle

xibl

e jo

ints

mus

t be

set i

n th

e m

id-p

ositi

on o

f

thei

r ra

nge

of m

ovem

ent a

nd m

ust a

llow

equ

al m

ovem

ent

in a

ny d

irect

ion

at th

e tim

e of

inst

alla

tion.

This

appl

ies

for

all s

anita

ry a

nd s

torm

wat

er d

ischa

rge

pipe

s.

The

base

of

tren

ches

sha

ll be

slo

ped

away

fro

m th

e

build

ing.

Surf

ace

drai

nage

sha

ll be

con

sider

ed in

the

desig

n of

the

foot

ing

syst

em. S

urfa

ce d

rain

age

of th

e sit

e sh

all b

e

cont

rolle

d fr

om th

e st

art o

f sit

e pr

epar

atio

n an

d

cons

truc

tion.

Sub-

Surf

ace

drai

nage

of

the

site

shal

l be

a m

inim

um

1.5m

fro

m th

e bu

ildin

g pe

rimet

er.

ID

INLE

T O

UTL

ET

1513

1 90

Pi

pe S

ize

Sock

et

100

1879

8 10

0 So

cket

So

cket

60

1513

0 10

0 Pi

pe S

ize

Sock

et

150

1564

2 15

0 Pi

pe S

ize

Sock

et

200

1882

3 22

5 Pi

pe S

ize

Sock

et

200

MAX

.EX

PAN

Reco

mm

ende

d fo

r H1,

H2

and

E cl

ass

site

s

Plas

tec

Expa

nder

Jo

int o

r Eq

ual

Plas

tec

Flex

itec

Cou

plin

g

Lagg

ing

as

per

Aus

t St

anda

rds