Plant Layout Engineering Tutorial
Transcript of Plant Layout Engineering Tutorial
![Page 1: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/1.jpg)
© 2015 – Hervé Baron
HERVE BARON
Engineering Training
Welcome to this presentation.
It is part of a suite of Engineering training modules.
It shows the activities and deliverables of the Plant Layout discipline.
Comments are most welcome ([email protected]), which I will incorporate for the benefit of all.
Please download this file so that you can see my trainer’s notes in the top left corner – latest Acrobat Pro feature.
Hervé
![Page 2: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/2.jpg)
© 2015 – Hervé Baron
HERVE BARON
Engineering disciplines: activities and deliverables
PROCESS
PLANT LAYOUT
EQUIPMENT
SAFETY & ENVIRONMENT
CIVIL
PIPING
PIPELINE
INSTRUMENTATION
ELECTRICAL
![Page 3: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/3.jpg)
© 2015 – Hervé Baron
HERVE BARON
Piping discipline
Plant Layout & Piping discipline
Plant Layout Piping installation
Piping materials
Piping stress analysis
![Page 4: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/4.jpg)
© 2015 – Hervé Baron
HERVE BARON
Plant layout
What has to be considered in the layout of a plant?
![Page 5: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/5.jpg)
© 2015 – Hervé Baron
HERVE BARON
Layout/principles
From which direction comes the prevailing wind?
![Page 6: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/6.jpg)
© 2015 – Hervé Baron
HERVE BARON
Layout/principles
The wind rose shows the frequency of winds blowing from particular directions. The length of each "spoke" around the circle is related to the frequency that the wind blows from a particular direction per unit time, emanating from zero at the center to increasing frequencies at the outer circles.
![Page 7: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/7.jpg)
© 2015 – Hervé Baron
HERVE BARON
Plant layout
The first step of Plant layout is to divide the Plant area into separate blocks and units. Why is this done? How?
![Page 8: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/8.jpg)
© 2015 – Hervé Baron
HERVE BARON
The Block Flow Diagram (BFD)
![Page 9: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/9.jpg)
© 2015 – Hervé Baron
HERVE BARON
Plant layout
Minimum distances between Process Units are determined according to GE GAP 2.5.2/2A Classify Units in terms of Fire and
Explosion Hazard into 3 categories:
• Moderate Hazard (MH) • Intermediate Hazard (IH) • High Hazard (HH)
Apply the following minimum distances
between units of various hazard category:
![Page 10: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/10.jpg)
© 2015 – Hervé Baron
HERVE BARON
Plant layout
The first step of Plant layout is to divide the Plant area into separate blocks and units. The second step of Plant layout is to locate Equipment within each unit. Which document are used as starting points by Plant Layout?
![Page 11: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/11.jpg)
© 2015 – Hervé Baron
HERVE BARON
Plot Plan
![Page 12: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/12.jpg)
© 2015 – Hervé Baron
HERVE BARON
Plant layout
What else shall be taken into account to locate equipment?
![Page 13: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/13.jpg)
© 2015 – Hervé Baron
HERVE BARON
Layout Requirements from Process
REFLUX CONDENSER
REFLUX ACCUMULATOR
REFLUX PUMP
COLUMN
What shall be the respective elevation of these equipment?
![Page 14: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/14.jpg)
© 2015 – Hervé Baron
HERVE BARON
Layout Requirements from Process
REFLUX CONDENSER
REFLUX ACCUMULATOR
REFLUX PUMP
COLUMN
What shall be the respective elevation of these equipment?
![Page 15: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/15.jpg)
© 2015 – Hervé Baron
HERVE BARON
On-shore plant: Equipment spacing recommendations as per GE GAP Guidelines .2.5.2
Clear horizontal distance, in meters, between adjacent edges of equipment
![Page 16: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/16.jpg)
© 2015 – Hervé Baron
HERVE BARON
Layout Requirements from Process
What shall be the respective elevation of the column and reboiler?
REBOILER
COLUMN
![Page 17: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/17.jpg)
© 2015 – Hervé Baron
HERVE BARON
Layout Requirements from Process
REBOILER
COLUMN
![Page 18: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/18.jpg)
© 2015 – Hervé Baron
HERVE BARON
Layout/principles Accesses
![Page 19: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/19.jpg)
© 2015 – Hervé Baron
HERVE BARON
Layout principles: provision for piping flexibility
![Page 20: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/20.jpg)
© 2015 – Hervé Baron
HERVE BARON
Layout principles: typical Unit Layout
![Page 21: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/21.jpg)
© 2015 – Hervé Baron
HERVE BARON
Structured-mounted vertical vs grade-mounted horizontal Equipment arrangement
![Page 22: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/22.jpg)
© 2015 – Hervé Baron
HERVE BARON
Layout principles: typical Unit Layout
![Page 23: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/23.jpg)
© 2015 – Hervé Baron
HERVE BARON
Unit Layout
What type of equipment has a large impact on the layout?
![Page 24: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/24.jpg)
© 2015 – Hervé Baron
HERVE BARON
Layout / Equipment size by vendors
˜ 14 meters
˜ 8 meters
Duty spec
Waste Heat
Boiler
![Page 25: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/25.jpg)
© 2015 – Hervé Baron
HERVE BARON
Layout / package arrangement
![Page 26: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/26.jpg)
© 2015 – Hervé Baron
HERVE BARON
Layout principles: pipe routing
There are 2 ways to run pipes. Name them.
![Page 27: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/27.jpg)
© 2015 – Hervé Baron
HERVE BARON
Layout principles: typical Unit Layout
B/L(Battery limit)
C/L of Road
R
Min. 7.5 m
![Page 28: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/28.jpg)
© 2015 – Hervé Baron
HERVE BARON
Layout principles: typical Unit Layout
What is the purpose of leaving 3 meters distance between the 2 vessels??
![Page 29: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/29.jpg)
© 2015 – Hervé Baron
HERVE BARON
Layout principles: typical Unit Layout
![Page 30: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/30.jpg)
© 2015 – Hervé Baron
HERVE BARON
Layout principles: typical Arrangement of Air-coolers
![Page 31: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/31.jpg)
© 2015 – Hervé Baron
HERVE BARON
Plant Layout Job specification for design / Plant layout guidelines
Site elevation (s)
Minimum distances between units, equipment, buildings: applicable code + supplementary information
Clearance around equipment
Road width, clearance
Headroom clearance
B/L(Battery limit)
C/L of Road
R
Min. 7.5 m
A
Line Up C/L of Equipment
Pipe Rack of Structure
Min. 3 m
![Page 32: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/32.jpg)
© 2015 – Hervé Baron
HERVE BARON
Interfaces between Engineering disciplines Plot Plan
Plot Plan
Process design & simulations
Process eqt specs
Process Flow diagrams
Process eqt sizing
Eqt sizing by vendors
Equipment dimensions
Piping routing
Fire water network routing
Electrical distribution & cable routing
Instrument JB & cable routing
Sewage sizing & layout
![Page 33: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/33.jpg)
© 2015 – Hervé Baron
HERVE BARON
Overall Site plan
![Page 34: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/34.jpg)
© 2015 – Hervé Baron
HERVE BARON
General plot plan
![Page 35: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/35.jpg)
© 2015 – Hervé Baron
HERVE BARON
Unit plot plan
![Page 36: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/36.jpg)
© 2015 – Hervé Baron
HERVE BARON
Unit plot plan Elevation view
![Page 37: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/37.jpg)
© 2015 – Hervé Baron
HERVE BARON
Unit plot plan Plan view
![Page 38: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/38.jpg)
© 2015 – Hervé Baron
HERVE BARON
3D modelling
![Page 39: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/39.jpg)
© 2015 – Hervé Baron
HERVE BARON
3D model clash check
![Page 40: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/40.jpg)
© 2015 – Hervé Baron
HERVE BARON
3D model review
3 model reviews are usually done
![Page 41: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/41.jpg)
© 2015 – Hervé Baron
HERVE BARON
3D model review
3 model reviews are usually done:
What is the scope of the first model review?
![Page 42: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/42.jpg)
© 2015 – Hervé Baron
HERVE BARON
First model review: Scope: finalize the Plot Plan Content: Equipment + 30% of piping is modelled, i.e. all ines on PFDs Outcome: after incorporation of COMPANY’s comments, the Plot plan is released as the base for the design (IFD). Aspects reviewed: Unit location, equipment location, main access and escape routes to facilities, major piping routes indicated on PFDs, arrangement around LLI, location of main manifolds, space around equipment for maintenance, platforms for main operation access
3D model review
![Page 43: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/43.jpg)
© 2015 – Hervé Baron
HERVE BARON
30% model review
![Page 44: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/44.jpg)
© 2015 – Hervé Baron
HERVE BARON
Air-Cooled Heat Exchangers In which case would you install the ACHE at grade vs on pipe-rack?
![Page 45: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/45.jpg)
© 2015 – Hervé Baron
HERVE BARON
Air-Cooled Heat Exchangers In the case of installation on top of pipe-rack, what extra access shall be provided?
![Page 46: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/46.jpg)
© 2015 – Hervé Baron
HERVE BARON
Plot Plan review Hands-on exercise
Please review and comment the Plot Plan
![Page 47: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/47.jpg)
© 2015 – Hervé Baron
HERVE BARON
Piping Layout Modular plants
In which cases is a modular plant preferable vs a stick built?
![Page 48: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/48.jpg)
© 2015 – Hervé Baron
HERVE BARON
Design development
This is the Plot at FEED stage. Which parts of it do you expect will change at EPC stage?
![Page 49: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/49.jpg)
© 2015 – Hervé Baron
HERVE BARON
Incinerator Package
Design development
FEED stage EPC Stage
![Page 50: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/50.jpg)
© 2015 – Hervé Baron
HERVE BARON
Combustion Air blowers + heater
Plant layout evolution
FEED EPC - IFD EPC - IFC
![Page 51: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/51.jpg)
© 2015 – Hervé Baron
HERVE BARON
The Oil & Gas Engineering Guide 2nd edition
Do you want to know more... Much more?
![Page 52: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/52.jpg)
© 2015 – Hervé Baron
HERVE BARON
The Oil & Gas Engineering Guide - 2nd edition
Table of Contents
![Page 53: Plant Layout Engineering Tutorial](https://reader031.fdocuments.net/reader031/viewer/2022012307/55a61b391a28abd6098b4766/html5/thumbnails/53.jpg)
© 2015 – Hervé Baron
HERVE BARON
The Oil & Gas Engineering Guide 2nd edition
Order direct from the publisher:
http://www.editionstechnip.com/en/catalogue-detail/1111/oil-gas-engineering-guide-the.html