Overview
• Looks at the following aspects of re-engineering:– Cost-effectiveness– Preferability
• Provides a method to quantify costs & prove benefits of reengineering – as a method to improve existing software prod’s and proc’s
Planning overview
• 5-step procedure:– Project justification (increased quality,
efficiency etc)– Portfolio analysis (prioritize candidate apps)– Cost estimation (include all sw components)– Cost-Benefit analysis (reengineering –
maintenance cost + value increase)– Contracting (max level of distribution, avoid
bottlenecks)(total planning estimated at 6 months)
Project justification
• Prove that it will reduce maintenance cost, improve quality by– Introducing a measurement program– Analyzing software quality– Analyzing maintenance costs– Assessing the software’s business value
Portfolio Analysis
• Plots applications in terms of business value and technical quality (ex: iso9126)
• Use chi-square chart (see article)
Cost Estimation
• Cost of the actual reengineering – must be lower than the benefits for specific projects...
Reengineering – definitions and objectives
• Business-process reengineering– Business process administration, supported by computer
processes
• Data reengineering– Restructuring existing databases
• Software reengineering– Renovation of applications and software artifacts (map
descriptions, job-control procedures, data structure views etc.)
• Recycling– Differs from reengineering in the sense that the result is a
collection of reusable components, not a fully working system...
Cost-Benefit analysis
• Not just benefits of reengineering, also compare with benefits of redevelopment and....the benefits of doing nothing...
• And other factors such as unavailability, system lifetime, user satisfaction (the list goes on)...
• Example: A number of factors selected by UBS (annual maintenance, annual operations etc. etc. etc. see article for full list)
Contracting
• By time/material or by result (turnkey)• Task definition
– Derived from the list of objects needing reengineering (restructuring, conversion, testing, postdocumentation, system testing, configuration mgmt, system documentation etc.)
• Effort distribution– Recommendations on how and where to carry out the
actual work (testing effort, component reengineering etc.)
Summary
• ”Reengineering is NOT easy to sell”