PLANNING ME!TINC

0900 5/2/79

1. Agaada, 0900, 5/2/79, Task Management/Schedule Meeting

2. Review Top Priorities List

3. leview Ac:ion Itcu fr01a "1800", 5/1/79, Technical Review Meatiq

4. l.eviev Taaka U.ta

Page 2: PLANNING ME!TINC1979-05-02... · 2013-12-17 · " S/2/79 TOP PRIORITIES Development of plan for ~~~AMSe:Mnt of radioactivity in A-1 Auxiliary aeel ContaimDent Buildings. Identify

'5/2/79 ., \

.!~!l!E..!

Taak Kao&&ellleQt/Sc:hedule Heetina

0900 '5/2/79 .

~Radioactive Releases

a) 748, 219

I») Vacuua drav oa Auxiliary Building Ve'llthuder &Dd drab syst•

./. Plut Status - ICS ProfUe

/ lCS s .. ple 16 at 0'500 '5/2/79

..1. .balytical:

a) Feed flov aecesaary to maintaia RCS temperat~res vhile flaahina across the bypass

b) Miai.aauaa secondary vater flov necessary to maiataia natu~al circulatioa vhile ia solid secondary circ~lation

~-c

d) NDTt liait. for lCS

e) Temperat~re liait for BVST

~ hco-.ndation of vhat vater to a~ore in Unit 2 SFP taak farm

/Are aay cotDpoaenta/virin& for DBR letdovn valvu under water

~- Preparations for Dini-flov test of existing DBR system

8. Construction Status:

a) EPICOR (CAP-CUN II)

b) Tank Farm in Unit 2 Spent F~•l Pool

c) &eactor Coolant Preas~e/Volume Coatrol

d) Alternate Syst•· for solid circulatioa of OTSG

•> Auxiliary Buildina roof veatUation system

f) DHR upgt'ade

&) Alternate Decay Beat Removal System

:

Page 3: PLANNING ME!TINC1979-05-02... · 2013-12-17 · " S/2/79 TOP PRIORITIES Development of plan for ~~~AMSe:Mnt of radioactivity in A-1 Auxiliary aeel ContaimDent Buildings. Identify

., " S/2/79

TOP PRIORITIES

Development of plan for ~~~AMSe:Mnt of radioactivity in A-1 Auxiliary aeel ContaimDent Buildings.

Identify &eel isolate aourcu of iodine lultage. A-1

Coapleu tank farm in Uo.it 2 spent fuel pool. A-1

Colllplate roof-top Stack Filtration Syat•. A-2

Complete contingency plan for emergency cross-tie A-2 between the Auxiliary Building aud laactor Buildin& Filtration Syatu.

Completion of EPICOI. (CAP-ctJH II) Syatu. A-2

Develop!H11t of plan for treaa.ent of Auxiliary Building J-1 liquid vute.

Co=plete "B" OTSG cooling aud modiftcation (lons-term). C-1

Upgrade Decay Heat R.emoval Systea. C-1

Develop and calibrate alternate pressurizer level C-1 transmitter.

Development of alternate system for pressure/volume C-1 cont-rol system.

Complete "A" OTSG cooUns .adification (lons-term). c-2

Cmaplete external valve pit for ADD Syata. c-2

CATEGORY

A

B

c

Coat-rol (i.e •• containment) of radioactivity in Auxiliary and Containment Buildings.

Recovery of Auxiliary Building to near normal operations.

Place the plant in a cold coeelition auJ.tabla for depressurization vitb lons-term pressure/ volume control.

Page 4: PLANNING ME!TINC1979-05-02... · 2013-12-17 · " S/2/79 TOP PRIORITIES Development of plan for ~~~AMSe:Mnt of radioactivity in A-1 Auxiliary aeel ContaimDent Buildings. Identify

ACTION In:MS

ttcBNICAL CROUP MEETING

1700 _S/l/79

1. Maaaure the iodine activity iG the Auxiliary BuilcU.na

2. Iaduca ICP aaal injection to 2 CPK/Puap

3. leviev turbine bypua valve .:haractari.atica

4. lack lCl' br...Ura opau

S. Iaolate coolin& vatar to the letdovn hut e.xchauaer

6. Prepare lev. 3 of the 'IHI recovery baa• pl.all for 0900 Sll

7. Prepare a memo for reviev detailing iustructioua. precautions end sequence to be fo11oved vhen throttling the turbine bypass valve and reducing RCS preuure

e. Stop dreinin& 'B' OTSG

9. Provide aualys1a of beuefita of drainiDg 'B' OTSG va leaving aa 1a

10. Cb•ck if the DVM praaaurizer laval rudinaa are currently being bieaed baaed on LT-3'• indication

11. Detandne if any electrical componmts or viriQ& for the DHll letdown valvu are DOV wder vater

12. Secure the Hydrogen Recombiner

13. Survey DBll return Une

5/2/79

ACTION

Berbeitl

Berbein

WUson

Berbeitl

Berbeia

Wilson

WUson

llerbeia

Wilson

WUaon

Co bean/ Wllaon

Berbein

Berbaia

Page 5: PLANNING ME!TINC1979-05-02... · 2013-12-17 · " S/2/79 TOP PRIORITIES Development of plan for ~~~AMSe:Mnt of radioactivity in A-1 Auxiliary aeel ContaimDent Buildings. Identify

0800 S/2/79 .. . .. PLANT OPEllATION stAFF

Priority Expected task

Task Desc:r~t1on C=letion Status Coord.

1. Obtain RCS saaple. C-1 To be shipped Surple taken, Thorpe/ 6:30 a.111. S/2 began 4:30 a.111. Hetrick

2. Pza Beiaa &Di cliff. pressure C-1 bc:all'bratin& Vilson/ aaae. !roushton

3. Obtain M!C app-oval. C-1 lfeed ECH' • 035, Porter/ 133, 172, 179. Faulber 180. 191, 195, 197, 204, 206, 214.

4. ssav pumps. C-1 "A"-In Service Parts S/07 /79 "B"-Available "C"-Under

Repair

s. K&k.e. calculation of lAD levels C-1 Toaa CTiJIDina Co bean/ that vlll occur in ccmd. Deaina- to define Cunn if ve circulate and clean "!" ahieldin& OTSC. requir•enta.

-.~· 6. Prepare instruct !old for J osa c-1 Procedure due 'In proar•••· Floyd/ of &land at ... to turbine. 4/30. ~uDder

7. Be prepared to run !xi~tina B C-1 Expect to run Toole Decaf Beat ~p on lecirc. S/2 •·•·

8. Review tie-in to ataclr. for AB A-1 Tie-In Cola- Cunn/ H&V. No up on ataek; verify plete 5/1. Toole/ flov aaoDitor capability. filters, install daaaper.

Mod if) Thorpe

9. Repair 4 secondary plant leaka !-1 In proi'CUS. co-v-sJc Shovlin/ and clean up water around ccnd. FV-V4B Iunder puaaps. co-v-6A

co-V-6B

10. Get sec. plant 8UIIp levels Iunder dov.l.

11. Drain OTSC "B" and process A-1 Start 4/30. On hold. Iunder vater through CAP-GUN I.

.

. . .

Page 6: PLANNING ME!TINC1979-05-02... · 2013-12-17 · " S/2/79 TOP PRIORITIES Development of plan for ~~~AMSe:Mnt of radioactivity in A-1 Auxiliary aeel ContaimDent Buildings. Identify

0800 5/2/79 4 .

PLANT MODIFICATIONS

tz?ected Task Task. Desc:ri~tion Priori tv Como let ion Status Coord.

WG-2 Dec:on. water in AB using EPICOR A-1 Turn over for Co bean (L-1) ion exchange process. ten 5/S.

Operational 5/1 .

WCi-ll Water Chemistry Lab for A-1 Schedule to Scbadule to Co bean use with CAP-CUM (WG-2). be revised. be revised.

VG-6 Iestall storaae veasela 1n A-1 Operational Co bean/ (L-2) Fuel Pool "A". . by 5/7 . Cwm

WG-1 Install AB/FB! filter system. A-2 Units 1 ·au.~ 2 Buildiua coe- Cunni K£C install high noise level (tested) plete by S/4. Thorpe/ atans. Units 3 aDd 4· Bacbofer

5/3.

TS-JC Develop complete package for C-1 Instal. comp. Split in FW- Wilson/ long-term cooling of OTSG "B". 5/8. 2.5 days. Co bun Use Unit 12 Demina for long- B Team tie-in -tena system. 2.5 days .

T5-l0" Install 2/2500 kw diesel genera· C-1 Run on 5/2. Instal . COIIIplet Co bean/ tors - veDdor. llun c!i .. el. fil 4/20. Cuun/ fuel systc. -. Toole

TS-11 Develop electrical distribution C-1 Turn over for Inat. comp. 5/4 Co bean system - 13.2 XV line. teat S/3.

Run on 5/8.

TS-6!1 RCS pressure control system. C-1 Turn over for Miller/ test 5/10. LWy

TS- 6C Evaluate letdown capabilities C-1 To be scheduled for IIOd. to RCS.

ts-13 Inatall alec. heaters on Aux. A-2 turn <lVOr for Coalp lete two lllda. 1ntalta ducts. t .. t 5/2. (2) days after

Aux. Blda. decon.

TS-14 Shield for decay beat pump. C-2 Turn over for Inatallatioc to Wilson test 5/3. be scheduled by

4/30 • .

. .

I - -l. -- .

- · ·- -··-- ·- .. - -··- - -

Page 7: PLANNING ME!TINC1979-05-02... · 2013-12-17 · " S/2/79 TOP PRIORITIES Development of plan for ~~~AMSe:Mnt of radioactivity in A-1 Auxiliary aeel ContaimDent Buildings. Identify

0800 S/2179 .. TECBNtCAL SUPPORT

~ectecl Tuk Task Descriot1o:t Priori tv Co~:~i:>letion Status Coord.

LS-2 Tech Spec. deletions. changes. C-1 No status. Active: NllC Harding &Del additions for long-term interactions (Stair) cooling. . under n•&otia-

tion.

'IM-35 Establilh long-term plant· · C-1 No status. Active: Bei~g Capadanoo/ instrumentation requirements. Due 4/27. revised. Lanaenbac b

.V.-64 A. ltepol't fol' eooldovn on OSTG ":a".

C-1 5/1 Active • Crimain.a

B. Report for solid on OSTG "A".

C-1 5/5 Active. Crbaina

AA-78 Evaluate options for mid-term continued operation.

a. Steaa "B" to get natural C-1 4/30 Active. c. Bond circulation.

b. Take ":a" solid to get C-1 natural circulation.

4/30 Active. G. Bond

c. Dynamics of switching C-1 4/30 -··· ·Active. G. Bond fr011 ''A" to "!" • uB .. to .. A": cOIIIblnations of ate&llling ard ac-li.d conditions.

M-79 Define "alel't levels" for C-1 Inactive. .J. A. various parameters.

. ' .

------ •· - - ·-

Page 8: PLANNING ME!TINC1979-05-02... · 2013-12-17 · " S/2/79 TOP PRIORITIES Development of plan for ~~~AMSe:Mnt of radioactivity in A-1 Auxiliary aeel ContaimDent Buildings. Identify

• WESTDIGBOUSE

Expected Tuk Taak Description PrioritY Colll1)1etion Status Coord.

t. 1.1 Deccnataainate for DIUl Sys. checkout 1 Collp. S/1 Si&Do

t. 1.2 Install Aux. lulldiaa TV l eo.p. .5/1 Siaao Monitor Syat•.

t. 1.4 Install DRl r..ate ops. equip. 1 S/2 Onaoina Siano

t. 1 • .5 DHl flov/pr .. s~r• testa. 1 .5/3 Oqoina Si&Do

tt .A.1 ADBR. (aev) ays. cS .. ian &lUi 1 S/2 Onsoina Siano approval.

tl .A.1 Fi.Dd ADHI. ten proc..ture. 1 '5/3 On&oina Si&Do

t1 .A.1 Find ADIUl ir.at&llation procedure.

1 S/10 On&oiag Si&Do

ti .A.2 ADHR Procurement. l Comp. 5/1 Siano

u . I ADHll Iast&llation. 1 .5/18 Ongoiag Siano

Licensiag lepor ;. 1 4/26 Formal sub- Siano adttal to CPU

. .

. .

.

.

Page 9: PLANNING ME!TINC1979-05-02... · 2013-12-17 · " S/2/79 TOP PRIORITIES Development of plan for ~~~AMSe:Mnt of radioactivity in A-1 Auxiliary aeel ContaimDent Buildings. Identify

~aa._l of 6 0800 S/2/19

Expected 1&alt Tult Desc:ril)t1on Priorlty r. •1•tion Status Coord.

L-10 Puraue activities ou proc: .. aiDa A-1 In progrus. Canun/ Ullit 1 water throuah CAP-GUN to *Weller both provide .upport to illsure available freeboard for Unit 2 aad to develop ruin for11Ul.a-tiona for Uait 2 water.

L-14 Evaluate vaate aaa vent header A-1 Work.ina per HcConaell luk.aae probl ... aad rae:~ .1. SeeliDaer' a Arthur/ fixea depeadiDa ou reaulta. vaate pa plau *lanett

I

of 4/17/79.

L-36 Inveatlgate the effects vb.icb C-1 In proarua. McGoey/ the operations associated with llo .. reactor plant long-term cool *Collins down will have on discharge to the waste aystems. Related to L-6.

L-42 Development recommaad&tiona &ad C-1 McGoey/ procedure for dra1n.lng anc.i loa a diapoaition of aCBT water to support plant needa to aalte up

- . : with deaaaeed deain. water.

L-44 Evaluate ayat .. deaians with B-1 Report beiaa Iraft Technical functions and W to prepared; .. aesa poaaible iaterfer~e delayed by probleaa frO. ataadpoint of higher priority location&, operations, aainte- tasks. asnce, etc.

G-1 Inatall AB/FHB off-gas filter A-1 Phase I deaiga Hontgome ayst .. to back-up plant syataa. complete. Itscbner/

ry/

Syatea d .. crip-tion ia C:OIIt-plete • start-up procedure in draftiaa. Preop procedure iD draftf.Da by Met-ed. tJE&C aup-portins con-struction. Plac u Phase I, 2 or 4 trains runaing.

* NRC contact (Cont.)

. .

Page 10: PLANNING ME!TINC1979-05-02... · 2013-12-17 · " S/2/79 TOP PRIORITIES Development of plan for ~~~AMSe:Mnt of radioactivity in A-1 Auxiliary aeel ContaimDent Buildings. Identify

Paae ~ of 6 0800 S/2/79

WASTE MANAG~ GROUP

Ex;lected Tuk Task Description Priori tv Co::tt)lflltion Status Coord.

Install AB/FHB off-gas filter (Cont.)

G-1 A-1 Ph&se 1 schedul Mont gomer system to back-up plant system. developed. shov Itschner/

y/

4/28 coapletion *Collins Pba .. II & III lead to per~~a-nent system. schedule shows 5/1 opuation. Noi .. problea requires evaluation.

G-S Change out AB/FHB HVAC A-1 Long-una McConnell I vent filter train charcoal bed. storage plan. Edwards

under study. 35 permanent storage/shippin containers in fabrication. delivery starts 4/25. "A" aDd "B" trains of the AB fUtera -.. aud ""A" train of FBB filters removed and replaced. units back in aervice High radiation level in "B" train dictatea delay "B" train change out.

G-31 Determine air flow paths in A-1 Operating matrb 'Savaz/ AB/FHB. being developed Itschner/

available 4/22. Robison/ Update achedulec *Barrett 4/28.

G-32 Determine that there are no A-1 Examination of Navaz/ unidentified air flow paths. plant atatus/ ltachner/

configuration Robison/ underway. *Barrett First cuat.

. review complete

• NRC contact

. .

- ·· - ·--·--:---

Page 11: PLANNING ME!TINC1979-05-02... · 2013-12-17 · " S/2/79 TOP PRIORITIES Development of plan for ~~~AMSe:Mnt of radioactivity in A-1 Auxiliary aeel ContaimDent Buildings. Identify

'Paae 3 of 6 • 0800 S/2/79

WASTE M.\NAC~ CROUP

ElQec:ted Task Task Description Priority Comuion Status Coord.

C..34 Review overall Cnit l aod 2 AB B-1 Review undervay; Itsehner/ and FHB ventilation requirement• dOCUIUDt&tion Robison/ vith a viev tovarcb •ini•tm flo" coapleted. *Barrett/ froa Unit 2 to Unit 1. *Collins

c-40 Criteria for and control tasks A-l 20 ''lt.ed Devil" resultin& in the evolution of . type local c:ont&la1D&t.. that could poison filtration charcoal filters. &)'Stea. on

order to control veldin& fuaea.

L-3 Determination of leakage paths 2 Plant staff r.raft/ and flow rates in Unit 2 Aux. following. Arthur/ Bldg. and FHB and repair *Cwalina of luks where possible. Plant has leakage 10 and Status Board in Unit 2 Control Room. Pursue Plant activities associated with this.

L-12 tliah level solid vasta diaposal B-2 In prOJ'CU& • Edwards/ 1nveatiaat1on. -~-: . *Weller/

*Collins

L-26 Perfona asses ... nt of the value A-2 Price propo.al 'lzaf.t/ and need for a closed circuit being assessed Lutz/ TV Monitor to provide r~te versus decon. *Stoddart indicator of radwaste panel schedule of data. Aux. Bldg.

L-29 Investigate reported vater B-2 Water froa Willi&ms/ collection in the "B" fuel pool, Unit 2 const. *Barrett obtain samples and III&Q plana Sample needed. for disposition. Also invest!-sate the preoperational condition of the fuel pool from a lukage standpoint.

L-33 Develop a plan for tying in the . B-2 In proJ'Cess - Snider/ tank fal"'ll to !PICOR 2. inv .. tigstin& *Waller/

secondary tie-'in.

*Colli.M

* NRC contact

. .

--·---- ·------- -·- - -· -- ---·- ---- . .. .. .... _-

Page 12: PLANNING ME!TINC1979-05-02... · 2013-12-17 · " S/2/79 TOP PRIORITIES Development of plan for ~~~AMSe:Mnt of radioactivity in A-1 Auxiliary aeel ContaimDent Buildings. Identify

Paie 4 of 6 0800 S/2/79 • ~

WASTE MA..'W:~!N1' CROUP

E:qected Task Task ~scri~tfon PrioritY Comoletion Status Coord.

L-35 In~esttgate the need for a B-2 Alternate Williams/ design and construction task to design Unit l *Barrett erect a barrier between the side to be Unit 1 and Unit 2 Fuel Handling submitted Bldg. to enable Unit 1 opera- 4/27/79.

. tioas with Unit 2 in processing Mode. .

L-37 Develop a plaD for removing all B-2 Requires com- Rosa radioactive gases from the ays- pletion of L-14. teu in the AB and FH.B.

G-7 Condenser vacuum pump discharge A-2 FU tar opera- Robison/ filter system. tional. laves- Mont gomer/

tigating opera- *Collins ting criteria. Will evaluate DF.

G-30 Reactor Purge Systam Charcoal A-2 bdiatioa sur- McCoiUlell I Filter Sample. vey requested. *Collins

G-33 Desensitize AB and FHB Filter A-2 Preliminary Sieg/ Monitors. - .--:· investigation - *Stoddart

desenaitiza tion infeasible.

G-36 Develop "standard" contaminated B-2 Sugge.e tasking *Stoddart work area radiological protectio a Met-Ed BP, system{s), including air supply, Met-Ed Kainte-clothing, coiiiiiiUDicatioas nance, ALJ.:BA systems, etc. , vhich permit on WG te&lll to best possible working conditions develop stan-

dard work package.

* NRC contact

. .

. .

Page 13: PLANNING ME!TINC1979-05-02... · 2013-12-17 · " S/2/79 TOP PRIORITIES Development of plan for ~~~AMSe:Mnt of radioactivity in A-1 Auxiliary aeel ContaimDent Buildings. Identify

Page .s of 6 0800 S/2/79

Expee~lld Task Task Descr~tion Prior!tv Co=~ let ion Status Coord.

G-39 Develop and assess back-up gas B-2 B&R has devel- He: Connell filtration scheme to cross- oped a concept. connect the AuziU.ary Building Seeoad .. tiute filters to the U purae filters. . scheduled shows

14 day + schedule. He1slun Co. has developed dravtnaa. Ez-poaure/schedule c<.'st appears . too hiab. Con-tiD&ency plan is to open roughly filter manway if aaer-genc:y Vantil&-don of Auxiliary Building 1a needed.

G-41 Develop filter managemaut str&teSY.

B-2

--· L-11 Investi&ate/develop process for B-3 beta.U design Snider/ eliDlinaUng Unit 2 water in scheduled to *Weller RCBT's. Process planning for stare 4/25/79. Unit 1 and 2. Desi&n (con-ceptually) a waste processin& system for Unit 2 High Level Liquid Wastes.

L-16 Low level waste (paper, rags, B-3 In progress i Edwards/ wood, etc . ) disposal . second com- *\Zeller/

pac:~or ordered. *Collins

L-17 Develop CAP-GUN 3 System. B-3 Initial plannin1 Snider/ only. Detail *Weller/ design *Collins scheduled to start 4/25/79.

L-20 Obtain a level measurement and B-3 Measurement Rosa/ a auple of watar froa the R.B .usiD& Heise *Cwalina sump and basement. gage being

eJCl) lor ed. •

* NllC contact .

Page 14: PLANNING ME!TINC1979-05-02... · 2013-12-17 · " S/2/79 TOP PRIORITIES Development of plan for ~~~AMSe:Mnt of radioactivity in A-1 Auxiliary aeel ContaimDent Buildings. Identify

Paae 6 of 6 0800 S/2/19 .. ._

WAST£ MANAGFMEm' CROUP

Prior !tv Expected Task

task Descr~tfon _Co!:lpletion Status Coord.

L-22 Develop a plan for long-te~ B-3 Open/ cleanup to provide aeeeaa to *Collins Auxiliary Jllq. for rutoration aetivitiea.

L-30 Dwelop plan for radiation B-3 Open/ aurvey in Awd.liary aad Fuel *Stoddart llaDclling. Bldg.

-G-1.5 !lleraeney RB Gas Purae Cl~up A-3 On bold: no Open/

Syat•. plan to *Collins illlplement.

-G-29 FRB Airlock. B-3 Airlock Inactive/

unnecessary at *Barrett this time •

.

- .·: ·

.

* mtc contact

. .

--:------ .. --- .- - · ·--------·- .. - . • ., . . . ·--I

Page 15: PLANNING ME!TINC1979-05-02... · 2013-12-17 · " S/2/79 TOP PRIORITIES Development of plan for ~~~AMSe:Mnt of radioactivity in A-1 Auxiliary aeel ContaimDent Buildings. Identify

Task

2.

11.

20.

25.

34.

37.

39.

40.

41.

42.

43.

12.

13.

14.

.. .. L'fDUSTRIAL ADVISORY CROUP

Expected Description Priority ~let ion

Provide recom=eadation for 1 alternate methods of P/V control.

. IutTUDent diasaostics. 1

Evaluate various alternatives 1 to decontaminate plant; long-term.

Iastrwaeut

•• 12 selected TC's on 1 recorder or computer

b. TH & TC on recorder l

Evaluate core significance of 1 Coap. 5/1 ex-cure upper-lover ratio.

Switching mode aod analyzing 1 Comp. 4/29 of "B" solid state with present . equipment.

Need for "B" generator long- 1 Comp . 5/1 term cooling

Participate in EP-32 changes. 1 .

Examine iD-c:ore thermocouple: l CoiiiP. 4/30 rise and reasons for.

Options for short-term core 1 cooling (2-3 mos.)

Lons-term cooling 1

Specifications for Reflux Boller Teat

a . Feasibility 2 . b. Specific parameter 2

Water Level/Reactor P/V

a . Short-term 2 Comp. 4/28

b. Long-term 2 Comp. 4/28

Model for boron/gas in primary 2 ay•t•. .

0800 5/2/79

Task Status Coord.

In progress Ackerman

Continuous Ackerman

Not started Lavborski .

In prosress Stroupe

In proaress Stroupe

L\ 34 Zebroslr.i/ Ackerman

tA 37 Buhl

tA 39 Levy

In proareaa • Stroupe

IA 41 Buhl

In progress Stroupe

In progress Kolar

In typing Fornandoz

In typing Fornaadoz

. IA 13 Ackerman

IA 13 Ackerman

Being written Kolar

Page 16: PLANNING ME!TINC1979-05-02... · 2013-12-17 · " S/2/79 TOP PRIORITIES Development of plan for ~~~AMSe:Mnt of radioactivity in A-1 Auxiliary aeel ContaimDent Buildings. Identify

0800 S/2/79 INDUSTRIAL ADVISORY CROUP ..

Expected Task Taak Description Priori tv Co.Dletion Statu• Coord.

19. Tiae to c:ore melt vith no 2 Not a tar ted Fornaadoz uternal c:oolina aDd re110val throuah flooding of contain-aent.

22. Plan Hod - pipina and equip- 2 Ia proarua Lavboraki ment.

.

.

.

.