Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and...

36
Planning and Implementing Adaptive Management in the Lower Fox River Basin Tom Sigmund, Executive Director NEW Water Wisconsin Land + Water Conference | March 3, 2016

Transcript of Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and...

Page 1: Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay (March 2012)

Planning and Implementing Adaptive

Management in the Lower Fox River

Basin

Tom Sigmund, Executive Director

NEW Water Wisconsin Land + Water Conference | March 3, 2016

Page 2: Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay (March 2012)

Protecting Our Most

Valuable Resource, Water

NEW Water Vision:

Page 3: Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay (March 2012)

NEW Water – the brand of the Green Bay Metropolitan Sewerage District

• Provides collection and treatment for 18 municipalities in Northeast Wisconsin

• Formed in 1931. Owns and operates: • Green Bay Facility, designed to

treat 49.2 mgd through secondary treatment

• De Pere Facility, designed to treat 14.3 mgd through tertiary treatment

• Serves a population of 230,000

Page 4: Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay (March 2012)

De Pere and Green Bay Water Resource Recovery Facilities

De Pere Facility

Green Bay Facility

Page 5: Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay (March 2012)

Why is NEW Water Considering Adaptive Management (AM)?

Page 6: Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay (March 2012)

Why is NEW Water Considering AM?

• In 2019 NEW Water will face a phosphorus effluent limit of 0.1 mg/l (current capability is 0.3 mg/l)

• NR 217 allows Water Quality Trading or Adaptive Management as alternative compliance strategies

• Began 5-year AM pilot project in 2014 to determine if this was a viable compliance option

• 20-year variance period is available

Page 7: Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay (March 2012)

7

31,624 lbs/year

22,292 lbs/year

Cost: $220 million

+

$2 million/year

Baseline

Phosphorus

Allocated

Phosphorus

Page 8: Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay (March 2012)

Distinct Gradient of Water Pollution

From Fox River into Green Bay

Page 9: Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay (March 2012)

Background: The Fox River Contributes 1/3 of All Nutrients to Lake Michigan

Photo credit: Steve Seilo

(www.photodynamix.com)

APRIL 15, 2011

Source: Val Klump, University of Wisconsin-Milwaukee

April 2011

Duck Creek

Fox River

NEW Water

Page 10: Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay (March 2012)

Fox Wolf Drainage Basin

10

Page 11: Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay (March 2012)

Sources of Phosphorus in Lower Fox River (LFR) Basin

Data Source: Total Maximum Daily Load – TMDL (DNR, EPA , Oneida Tribe)

Watershed Plan for Lower Fox River March 2012

Page 12: Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay (March 2012)

Total Phosphorus Loadings - TMDL

Source

Total

Phosphorus

(lbs./yr.)

Natural Background 5,609

Agricultural 251,382

Urban ( non-regulatory) 15,960

Urban Regulated (MS4) 65,829

Construction Sites 7,296

General Permits 2,041

Industrial WWTFs 114,426

Municipal WWTFs * 87,160

Total In-Basin 549,703

Lake Winnebago 716,954

Total (In-Basin + Lake Winnebago 1,266,657

Source of tables: Total Maximum Daily Load and Watershed Management Plan for Total

Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay

(March 2012)

Outfall of NEW Water

into Fox River

September 2013

Page 13: Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay (March 2012)

Business Case for Phosphorus (P)

Lower Fox River TMDL Estimated Capital Costs:

Estimated Costs Sources P TMDL

Municipal WWTF’s: $400 – $500 million ?? 87,160 lbs/yr

NEW Water: ($223 - $394 million) 31,624 lbs/yr

(capital costs 2010 and 2025) (included as part of total)

MS4’s storm water: $200 - $400 million 65,829 lbs/yr

(2013 FWWA Conference)

Industrial WWTF’s: $200 million ?? 114,429 lbs/ yr

Agriculture $ ??? 251,382 lbs/yr

Total: $800 Million - $1.1 Billion

Note: Brown

County LWCD

$45 million dollars

on all Agriculture

BMP’s, Staff, and

Programs from

1983-2012.

Page 14: Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay (March 2012)

River Sites

Current

NEW Water Sample Sites

Legend

Current Sample Sites

Continuous Monitors

Historical Sample Sites

Zone 1

Zone 2

Zone 3

Zone 4

Page 15: Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay (March 2012)

0.00

0.05

0.10

0.15

0.20

0.25

0.30

86 87 88 89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15

Tota

l Ph

osp

ho

rus

(mg

/L)

Year

Total Phosphorus

Above DePere Fox River Zone 1 Zone 2 Zone 3 TMDL Target

0

10

20

30

40

50

60

86 87 88 89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15

Tota

l Su

spen

ded

So

lids

(mg

/L)

Year

Total Suspended Solids

Above De Pere Fox River Zone 1 Zone 2 Zone 3 TMDL Target

Page 16: Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay (March 2012)

Water Quality Trends

TMDL

Target

Source: Kevin Fermanich UWGB

Fox River TP Export to Green Bay and WWTP Discharges

Page 17: Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay (March 2012)

Silver Creek AM Pilot Project

Page 18: Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay (March 2012)

Silver Creek AM Pilot Project

Page 19: Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay (March 2012)

AM

SL-172

SL-FLD

SL-COU

SL-CKR

SL-FCR

Page 20: Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay (March 2012)

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

SL - 172 SL - FLD grab SL - FLD Event SL - COU SL - CKR SL - FCR

Tota

l Ph

osp

ho

rus

(mg

/L)

Sample Sites

Silver Creek Total Phosphorus

2014 2015 WQ Std

0

5

10

15

20

25

30

SL - 172 SL - FLD grab SL - FLD Event SL - COU SL - CKR SL - FCR

Tota

l Su

spen

ded

So

lids

(mg

/L)

Sample Sites

Silver Creek Total Suspended Solids

2014 2015 WQ Std

Page 21: Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay (March 2012)

Soil Sampling: Phosphorus, Biological Assessment

21 Jim Snitgen, Biologist / Oneida Tribe

Page 22: Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay (March 2012)

2015 – A Year of Inventory

• 108 Fields sampled – 2.5 acre grid

Comprehensive Field Evaluations

• ArcGIS Collector – tablet application

Page 23: Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay (March 2012)

2015 – A Year of Inventory

Agronomists, County, Oneida, NRCS, CH2M, NEW Water Staff

Grazing & Wetland Planning Meetings

Page 24: Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay (March 2012)

Initial Results - Insight

• Variability • Soil P: 3 to 553ppm

• 27 fields (25%) > 50ppm average soil P

• Historic land use

• Nutrient spreading patterns

24

??

??

Page 25: Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay (March 2012)

Nutrient Management Plan Strategy

• Nearly all fields in NMPs

• Update with “Enhanced” NMPs (ENMP) • Push convention

• Opportunities • Rotations

• Tillage

• Cover or companion crops

• Custom fertilizer blends

• Variable rate technology

• Track grower acceptance and barriers to implementation

Page 26: Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay (March 2012)

Conservation Field Walk Expertise

• Expertise by professionals • Agronomists: conservationists and grower/owner liaison

• County: conservationists

• NRCS: conservationists

• Engineer: storm water management expertise

• Focus on structural and operational opportunities

• Compliment nutrient management planning

26

Page 27: Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay (March 2012)

Field Walks Build on Desktop Evaluation

Desktop Evaluation After Field Walk

Page 28: Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay (March 2012)

Conservation Field Walks

28

Stream Crossing

Page 29: Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay (March 2012)

29

Buffer

Conservation Field Walks

Page 30: Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay (March 2012)

30

Poorly Drained Area

Conservation Field Walks

Page 31: Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay (March 2012)

2015 Field Walk Accomplishments

• Field walks on 91 of 109 fields • 10 more after corn grain harvested

• Identified 2 to 3 “hard” practices per field 200-300 practices

• 5 to 8 “soft” practices

• Began implementation

31

Page 32: Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay (March 2012)

Silver Creek AM Pilot Funding

• Great Lakes Restoration Initiative grant

• Ducks Unlimited grant

• Fund for Lake Michigan grant

• Natural Resources Damage Assessment grant

• NEW Water

Page 33: Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay (March 2012)

Silver Creek AM Progress

APRIL 15, 2011

APRIL 15, 2011

• Coordination of partnerships work in Pilot

• Inventory – before and after implementation

• Water quality monitoring – started in fall of 2013

• Soil samples at 2.5 acre grids – 2014

• Grants - NRDA, Ducks Unlimited, EPA

• Conservation planning – 2015

• GIS development - 2015

• Snap plus modeling

• Implementation - 2016

Page 34: Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay (March 2012)

Observations Impactful to the Pilot Project

• Diverse field walk teams yields new perspectives and multiple options for conservation opportunities

• Every field has a need

• Individualized review important, commonalities apparent

• Culture of “why should I do it”

• Contracts may not be required, or possible, for some growers

• Growers are stewards, but are businessmen first

• Grower trust is critical, but is variable

Page 35: Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay (March 2012)

Next Steps

• Refine Conservation Plans and Enhanced Nutrient Management Plans

• “Kitchen table” meetings with growers and owners

• SWAT Modeling

• Implementation in 2016

• Continue to evaluate AM feasibility for permit decision in 2018

Page 36: Planning and Implementing Adaptive Management in the Lower ... · 3/3/2016  · Phosphorus and Total Suspended Solids in the Lower Fox River Basin and Lower Green Bay (March 2012)

is Looking for Partners