PLANNING & MANAGING
PRODUCTION FOR
SHIP REPAIR
![Page 2: Planning & Managing Ship Repair - sparusa.com](https://reader035.fdocuments.net/reader035/viewer/2022071613/61575e861b8d0c470d0ffa7e/html5/thumbnails/2.jpg)
Fundamental Project Tasks
• Identify Scope Of Work
• Identify Material Requirements
• Identify Technical Requirements
• Identify Organization Responsibilities
![Page 3: Planning & Managing Ship Repair - sparusa.com](https://reader035.fdocuments.net/reader035/viewer/2022071613/61575e861b8d0c470d0ffa7e/html5/thumbnails/3.jpg)
Develop Master Plan From Major
Spec Items
Strip OutStructural
Machinery
PipingElectrica l
HV ACOutfitPaint
Services
0.00
50.0
0
100.
00
150.
00
![Page 4: Planning & Managing Ship Repair - sparusa.com](https://reader035.fdocuments.net/reader035/viewer/2022071613/61575e861b8d0c470d0ffa7e/html5/thumbnails/4.jpg)
Identify Spec Items By Ship Zone
Super StructureExterior
MachinerySpaces Tanks
ForwardSection
![Page 5: Planning & Managing Ship Repair - sparusa.com](https://reader035.fdocuments.net/reader035/viewer/2022071613/61575e861b8d0c470d0ffa7e/html5/thumbnails/5.jpg)
•Strip Out (Access Areas)
•Hull Work (Structural Units)
•Outfit (Compartments)
•Electrical (Decks & Verticals)
•Painting (Decks, Tanks, & Exterior)
Categories of Ship Zones:
![Page 6: Planning & Managing Ship Repair - sparusa.com](https://reader035.fdocuments.net/reader035/viewer/2022071613/61575e861b8d0c470d0ffa7e/html5/thumbnails/6.jpg)
Develop Work Orders
•Ship Work
•Shop Work
•Subcontract Work
•Material
•Drawings
•Manpower
![Page 7: Planning & Managing Ship Repair - sparusa.com](https://reader035.fdocuments.net/reader035/viewer/2022071613/61575e861b8d0c470d0ffa7e/html5/thumbnails/7.jpg)
Time-Phasing Ship & Shop Work
Repair
AssembleFabricate
Install
Install
Test
Zone Strip
Out
![Page 8: Planning & Managing Ship Repair - sparusa.com](https://reader035.fdocuments.net/reader035/viewer/2022071613/61575e861b8d0c470d0ffa7e/html5/thumbnails/8.jpg)
Sequence On-Board Work by Ship
Zone or Area
1. Sequence areas to minimize traffic and enhance
flow of men and materials.
2. Consolidate like-work in an area where applicable.
It saves time and allows workers to be more
productive.
3. Avoid trade (craft) conflicts.
4. Sequence work in logical order, starting from rip-
out & uncover to hot work, outfit, fixtures, and
cleanup.
![Page 9: Planning & Managing Ship Repair - sparusa.com](https://reader035.fdocuments.net/reader035/viewer/2022071613/61575e861b8d0c470d0ffa7e/html5/thumbnails/9.jpg)
Steel Hot Work
Pipe Work
HVAC Work
Electrical Cables
Linings & Bulkheads
Paint & Deck Covering
Outfit & Furnishings
Fixtures & Breakables
Ship Zone Outfit
Work Type Scheduling
Ceilings & Doors
Maintain Clear AccessAlleys for Men & Materials
Groom & Clean
Scheduling
requires the
proper sequencing
of work and
related project
activities.
![Page 10: Planning & Managing Ship Repair - sparusa.com](https://reader035.fdocuments.net/reader035/viewer/2022071613/61575e861b8d0c470d0ffa7e/html5/thumbnails/10.jpg)
Schedule work to ensure that
work orders can be started
with all required equipment,
manpower and materials
ready on hand.
![Page 11: Planning & Managing Ship Repair - sparusa.com](https://reader035.fdocuments.net/reader035/viewer/2022071613/61575e861b8d0c470d0ffa7e/html5/thumbnails/11.jpg)
Sequence & Link Work Packages
To Tests & Trials
Shop - Ship
UpperDeck
Shop - Ship
LowerDeck
Shop - Ship
MainDeck
TESTS
![Page 12: Planning & Managing Ship Repair - sparusa.com](https://reader035.fdocuments.net/reader035/viewer/2022071613/61575e861b8d0c470d0ffa7e/html5/thumbnails/12.jpg)
Impose Schedule Constraints On
Plan
•Trade Manpower Constraints
•Shop Constraints
•Waterfront Constraints
•Vendor Delivery Constraints
•Technical Data Delivery Constraints
•Other Contract Constraints
![Page 13: Planning & Managing Ship Repair - sparusa.com](https://reader035.fdocuments.net/reader035/viewer/2022071613/61575e861b8d0c470d0ffa7e/html5/thumbnails/13.jpg)
Execute Plan & Update Plan
•Issue Purchase Orders
•Receive & Palletize Material
•Issue Drawings & Technical Data
•Issue Work Packages
•Execute Work Packages
•Close Out Completed Work
•Update Schedules
![Page 14: Planning & Managing Ship Repair - sparusa.com](https://reader035.fdocuments.net/reader035/viewer/2022071613/61575e861b8d0c470d0ffa7e/html5/thumbnails/14.jpg)
Time Charge Discipline
Ensure all workers charge their hours to
authorized work orders.
EVERY DAY, WITHOUT EXCEPTION
Time charges may be logged either directly
into PERCEPTION or onto hard copy
time sheets.
![Page 15: Planning & Managing Ship Repair - sparusa.com](https://reader035.fdocuments.net/reader035/viewer/2022071613/61575e861b8d0c470d0ffa7e/html5/thumbnails/15.jpg)
Ensure all time charges are entered into
PERCEPTION EVERY DAY, WITHOUT
EXCEPTION.
Ensure all time charge errors are corrected
before the end of following day WITHOUT
EXCEPTION.
![Page 16: Planning & Managing Ship Repair - sparusa.com](https://reader035.fdocuments.net/reader035/viewer/2022071613/61575e861b8d0c470d0ffa7e/html5/thumbnails/16.jpg)
Material Control Discipline
Ensure all contract material is logged
against authorized work orders
WITHOUT EXCEPTION.
Ensure all contract material withdraws
are entered into PERCEPTION EVERY
DAY WITHIOUT EXCEPTION.
![Page 17: Planning & Managing Ship Repair - sparusa.com](https://reader035.fdocuments.net/reader035/viewer/2022071613/61575e861b8d0c470d0ffa7e/html5/thumbnails/17.jpg)
Manage Change Orders
Establish strict procedures for performing
change orders.
![Page 18: Planning & Managing Ship Repair - sparusa.com](https://reader035.fdocuments.net/reader035/viewer/2022071613/61575e861b8d0c470d0ffa7e/html5/thumbnails/18.jpg)
Before work begins, ensure for all changes
orders
1. That they are authorized by the ship
owner
2. That work orders have been set up for
time charging and material issues.
3. That schedules have been considered
and integrated within on-going work
to minimize delays and disruptions.
![Page 19: Planning & Managing Ship Repair - sparusa.com](https://reader035.fdocuments.net/reader035/viewer/2022071613/61575e861b8d0c470d0ffa7e/html5/thumbnails/19.jpg)
PERCEPTION specifically tags
all change orders so that exact
shipyard costs in time and
materials are clearly identified
and that these costs can be
recorded immediately and
without delay.
![Page 20: Planning & Managing Ship Repair - sparusa.com](https://reader035.fdocuments.net/reader035/viewer/2022071613/61575e861b8d0c470d0ffa7e/html5/thumbnails/20.jpg)
Measure & Report Performance
•Progress Measurement
•Labor Cost Performance & Forecast
•Material Cost Performance & Forecast
•Schedule Impact Analysis
•Resource Requirements Re-Evaluation
•Technical Requirements Re-Evaluation
![Page 21: Planning & Managing Ship Repair - sparusa.com](https://reader035.fdocuments.net/reader035/viewer/2022071613/61575e861b8d0c470d0ffa7e/html5/thumbnails/21.jpg)
Modify Plan To Work Around
Problems
Re-Schedule For Delays & New
Work
•Alternative Production Methods
•Subcontracted Additional Resources
•Alternative Vendor Selections
•Revised Supervision Plan
•Modified Manpower Requirements
![Page 22: Planning & Managing Ship Repair - sparusa.com](https://reader035.fdocuments.net/reader035/viewer/2022071613/61575e861b8d0c470d0ffa7e/html5/thumbnails/22.jpg)
Generate Billing Invoices
PERCEPTION can generate billing invoices
at any time.
PERCEPTION records all shipyard contract
costs on a real-time basis:
a) As soon as time charges are entered
b) As soon as material withdraw
transactions are entered.
![Page 23: Planning & Managing Ship Repair - sparusa.com](https://reader035.fdocuments.net/reader035/viewer/2022071613/61575e861b8d0c470d0ffa7e/html5/thumbnails/23.jpg)
Billing invoices can indicate both actual
labor and material cost transactions as
well as other miscellaneous costs
manually entered.
Invoices can specify milestone payments,
handling charges, mark-ups, taxes,
special service fees, credits, etc.
![Page 24: Planning & Managing Ship Repair - sparusa.com](https://reader035.fdocuments.net/reader035/viewer/2022071613/61575e861b8d0c470d0ffa7e/html5/thumbnails/24.jpg)
Lessons Learned
•Evaluate Competitive Bid Performance
•Evaluate Schedule Performance
•Evaluate Cost Performance
•Evaluate Quality Of Service
•Evaluate Response To Problems
•Identify Non-Value Work
•Revise Future Bid Strategy
![Page 25: Planning & Managing Ship Repair - sparusa.com](https://reader035.fdocuments.net/reader035/viewer/2022071613/61575e861b8d0c470d0ffa7e/html5/thumbnails/25.jpg)
PERCEPTION
An integrated shipyard management
system
•Contract Estimating
•Planning & Scheduling
•Labor Work Orders & Time Charge Management
•Purchasing & Inventory Control
•Contract Cost & Schedule Performance Reporting
A Microsoft Windows PC-Based Client/Server System
![Page 26: Planning & Managing Ship Repair - sparusa.com](https://reader035.fdocuments.net/reader035/viewer/2022071613/61575e861b8d0c470d0ffa7e/html5/thumbnails/26.jpg)
30 Years Serving the Shipbuilding &
Repair Industry