PLANNED MAINTENANCE: Going Beyond Equipment
TJ Imberger
![Page 2: Planned Maintenance: Going Beyond Equipment](https://reader033.fdocuments.net/reader033/viewer/2022061106/54461867afaf9ff32a8b477b/html5/thumbnails/2.jpg)
What is Planned Maintenance?
Otherwise known
as... P.M.
![Page 3: Planned Maintenance: Going Beyond Equipment](https://reader033.fdocuments.net/reader033/viewer/2022061106/54461867afaf9ff32a8b477b/html5/thumbnails/3.jpg)
Facility Dude says:
![Page 4: Planned Maintenance: Going Beyond Equipment](https://reader033.fdocuments.net/reader033/viewer/2022061106/54461867afaf9ff32a8b477b/html5/thumbnails/4.jpg)
P.M. REPRESENTS
PHYSICAL PLANT
EQUIPMENT
![Page 5: Planned Maintenance: Going Beyond Equipment](https://reader033.fdocuments.net/reader033/viewer/2022061106/54461867afaf9ff32a8b477b/html5/thumbnails/5.jpg)
PHYSICAL PLANT EQUIPMENT
![Page 6: Planned Maintenance: Going Beyond Equipment](https://reader033.fdocuments.net/reader033/viewer/2022061106/54461867afaf9ff32a8b477b/html5/thumbnails/6.jpg)
PROBLEM
![Page 7: Planned Maintenance: Going Beyond Equipment](https://reader033.fdocuments.net/reader033/viewer/2022061106/54461867afaf9ff32a8b477b/html5/thumbnails/7.jpg)
WE ARE NOT A CONSTRUCTION & MAINTENANCE DEPARTMENT
![Page 8: Planned Maintenance: Going Beyond Equipment](https://reader033.fdocuments.net/reader033/viewer/2022061106/54461867afaf9ff32a8b477b/html5/thumbnails/8.jpg)
WE ARE A PARKS & RECREATION, PUBLIC
GROUNDS DEPARTMENT
![Page 9: Planned Maintenance: Going Beyond Equipment](https://reader033.fdocuments.net/reader033/viewer/2022061106/54461867afaf9ff32a8b477b/html5/thumbnails/9.jpg)
OUR EQUIPMENT IS DIFFERENT
![Page 10: Planned Maintenance: Going Beyond Equipment](https://reader033.fdocuments.net/reader033/viewer/2022061106/54461867afaf9ff32a8b477b/html5/thumbnails/10.jpg)
Why do we conduct PM’s?Record keepingLiability (court
records)Safety of usersMaintenance costs Why maintain PM’s
electronically?ELIMINATE PAPERWOR
K
REAL TIME IN THE FIELD
RECORDING
![Page 11: Planned Maintenance: Going Beyond Equipment](https://reader033.fdocuments.net/reader033/viewer/2022061106/54461867afaf9ff32a8b477b/html5/thumbnails/11.jpg)
ITEMS WE NEED TO RECORD FREQUENCY
TIME OF DAY
ACTION TAKEN
LOCATIONS
BATTERY LIFE
STAFF
FUNCTIONALITY
ITEMS INSPECTED
REPAIRS NEEDED
REPAIRS MADE
COST
PROCEDURES
(FOR
INSPECTIONS)
![Page 12: Planned Maintenance: Going Beyond Equipment](https://reader033.fdocuments.net/reader033/viewer/2022061106/54461867afaf9ff32a8b477b/html5/thumbnails/12.jpg)
ISSUE (OBJECTIVE)
+ =
SOLUTIONS
![Page 13: Planned Maintenance: Going Beyond Equipment](https://reader033.fdocuments.net/reader033/viewer/2022061106/54461867afaf9ff32a8b477b/html5/thumbnails/13.jpg)
INTERNET ACCESSSOLUTION
SCPU CONNECTIONS
WIFI (BUILDINGS)
HOT SPOTS
WIRELESS CARDS
JET PACK (VERIZON)
![Page 14: Planned Maintenance: Going Beyond Equipment](https://reader033.fdocuments.net/reader033/viewer/2022061106/54461867afaf9ff32a8b477b/html5/thumbnails/14.jpg)
HARDWARE SOLUTIO
NSCPU
LAPTOPS
VEHICLE
LAPTOPS
TABLETS
SMART PHONES
![Page 15: Planned Maintenance: Going Beyond Equipment](https://reader033.fdocuments.net/reader033/viewer/2022061106/54461867afaf9ff32a8b477b/html5/thumbnails/15.jpg)
ROLE SET UP SOLUTIONS
EMPOWER YOUR STAFF
ALLOW YOUR STAFF
THE ABILITY TO USE
THE SYSTEM
SUPERVISOR II
ALLOWS FOR TWO-WAY
INTERACTION
![Page 16: Planned Maintenance: Going Beyond Equipment](https://reader033.fdocuments.net/reader033/viewer/2022061106/54461867afaf9ff32a8b477b/html5/thumbnails/16.jpg)
CHECKLIST DEVELOPMENTSOLUTION
S CREATE ONE PM SCHEDULE
FOR INSPECTIONS ON SAME
STYLE OF EQUIPMENT
LIST ALL DESCRIPTION ITEMS
THAT APPLY FOR ALL PIECES OF
EQUIPMENT
INDICATE WITH AN “N/A” ITEMS
THAT DO NOT APPLY
THIS ELIMINATES THE NEED
FOR MULTIPLE PM SCHEDULES
FOR LIKE EQUIPMENT
![Page 17: Planned Maintenance: Going Beyond Equipment](https://reader033.fdocuments.net/reader033/viewer/2022061106/54461867afaf9ff32a8b477b/html5/thumbnails/17.jpg)
SUPERVISOR NOTIFICATIONSOLUTION
SCOMPLETE “ACTION
TAKEN”
COMPLETE A
JOURNAL NOTE
FORWARD THE
WORK ORDER
![Page 18: Planned Maintenance: Going Beyond Equipment](https://reader033.fdocuments.net/reader033/viewer/2022061106/54461867afaf9ff32a8b477b/html5/thumbnails/18.jpg)
SCHEDULINGSOLUTION
SISSUE WEEKLY M-F
ISSUE WEEKEND S-S
FOR ON-CALL
PRINT OUT P.M. ON
MONDAY, USE DAILY
GENERATE A WORK
ORDER FOR PROBLEMS/
INDICATE BY A JOURNAL
NOTE
![Page 19: Planned Maintenance: Going Beyond Equipment](https://reader033.fdocuments.net/reader033/viewer/2022061106/54461867afaf9ff32a8b477b/html5/thumbnails/19.jpg)
TIPS & TRICKSSOLUTIONS BATCH CLOSED WORK ORDERS
USE THE ACTIONS AREA TO INDICATE
“INSPECTED” OR “NO ACTION
NEEDED” UTILIZE WORK STATUS
CHANGE YOUR WORK STATUS
UNTIL JOB IS COMPLETE STAFF USAGE
ENCOURAGE STAFF TO SIGN IN
OFTEN UTILIZE “NEW REQUEST”& “HIT
CANCEL”
DO NOT CHANGE WORK ORDERS
INTO “IN PROGRESS” UNTIL IT HAS
BEEN ROUTED CORRECTLY
![Page 20: Planned Maintenance: Going Beyond Equipment](https://reader033.fdocuments.net/reader033/viewer/2022061106/54461867afaf9ff32a8b477b/html5/thumbnails/20.jpg)
![Page 21: Planned Maintenance: Going Beyond Equipment](https://reader033.fdocuments.net/reader033/viewer/2022061106/54461867afaf9ff32a8b477b/html5/thumbnails/21.jpg)
PRESENTED BY:TJ IMBERGER, APR, CPSI
SUPERINTENDENT OF PARKS, SPALDING COUNTY PARKS & RECREATION