NTPC Ltd Operation & Maintenance Department KSTPSMaintenance Planning Department
Daily Planning Meeting 29.09.15
Reported Target Datelaxya idnaa^k ivaBaaga
ASH LINE IN SERVICE: 3+2 nos
28.09.15 CONV-1B IDLER R/P & TAKE UP PULLEY WORK CHP
02.09.15 ALL BOILER DRAINS TO BE CONNECTED TO STORM DRAIN OPN
AVAILABLE
TIE TRANSFORMER-4 bushing replacement 03.10.15 EMD
EMD
24.09.15 ASP 3A HIGH VIBRATION (foundation curing in progress) U/P 30.09.15 AHD
14.09.15 ASL-1 FLUSHING V/V INOPERATIVE PTW REQD AHD
24.09.15 SEAL WATER P/P-2 TRIPPING IN O/L U/P AHD
28.09.15 SEAL WATER P/P-4 TRIPPED ON O/L (FIRST TO BE MADE AVAIL) 29.09.15 AHD
28.09.15 DL-4 SUCTION V/V INOPERATIVE 29.09.15 EMD
28.09.15 ASP-B2 MOTOR TB HOT SPOT 29.09.15 EMD
Fields out OPACITY METER RDG
UNIT#1 - 15/27 399/39715/16/22/23 -
UNIT#3 - 1/9/23 (PASS-C U/P) -UNIT#4 - 2R/3L/5L/8R/9R/11R/13/14L/16L -UNIT#5 - 14L/15L/25R/31R/45R -UNIT#6 - 13L/16R/20R/23R/26R/27/34R/37/43/45 -UNIT#7 -
22.09.15 MACHINE IN HYDRAULIC MODE 30.09.15 C&I
26.09.15 HFO HEATER B & C TEMP CONTROLLER NOT WORKING 29.09.15 C&I
28.09.15 IAC-2 VIB IN ALARM RANGE (177/10.6, Loose HP cylinder support)…U/P 02.10.15 TMD
28.09.15 MILL-A FREQUENT REJECT CHOKING 29.09.15 BMD
28.09.15 LP DOSING P/P-A ABN SOUND FROM HYD COUPLING & P/P C-POOR DISCH 29.09.15 TMD
29.09.15 CT 7B/FAN2…TRIAL TAKEN, MOTOR DE VIB IN TRIP RANGE (MISALIGNMENT) 29.09.15 OFS/EMD
irpaoT- IN MOTION WEIGH BRIDGE - AVAILABLE
kaola saoMplar kI ]plabQata/Availability Of Coal Sample : ST-1 AV, ST-2 AV, ST-3 NAV
CHP/ saI eca pI
SAFETY/सु�रक्षा�
MD/MS Status/sToTsa Aaof ema DI.ema esa
Main Plant Area/maona PlaaMT eiryaa
Station Common/sToSana ka^manaLIGHTENING ARRESTERS TO BE PROVIDED IN ASH DYKE AREA(STRENGHTHENING OF EXISTING ARRESTER IS BEING DONE)
AHP/eoSa hOMDilaMga PlaaMTStage-1/sToja -I
Stage-2/sToja -II
Stage-3/ sToja -III
ESP Fields NA / [- esa pI iflDsa
UNIT#2 -
Stage-1 Common/ sToja -I ka^mana
Unit#1/ yaUinaT -1
Unit#2/ yaUinaT -2
Unit#3/ yaUinaT -3
Stage-2 Common/ sToja -II ka^mana
Unit#4/ yaUinaT -4
Unit#5/ yaUinaT -5
Unit#6/ yaUinaT -6
Stage-3 common/ sToja -III ka^mana
28.09.15 13 NOS ESP FIELDS HOPPERS TAKING LESS CURRENT…I/P 29.09.15 EMD
Hydrogen Consumption5p+2 / 2/ 2/ 1/ 0/ 1/ 2
Members PresentDEPTT NAMEGM GM(O&M), GM(MAINT), GM(O)MM
C&I S DAS, SN DHARA, D KAR, S GHOSHCHEM V BHATTACHARYACHP D N TIWARICIVIL A ACHARYAEEMG B S RAO, A ANSARIEMD K CHANDRASHEKHAR, B CHAKRABORTHY, KS SINGHMTP GGK MURTHY, SHARAD TOPN SHIFT IN CHARGE, GK MOHANTY, S SENGUPTAMGRSATETY SAFETY TEAM
Unit#7/ yaUinaT -7
SK KESHKAR, D PRASAD, RAMESH BABU, N VARA PRASAD, A SENGUPTA, SK MISHRA, SK SINGH, A K VERMA
EQUIPMENTS N/A FOR MORE THAN 15 DAYS
DEPT AREA Equipment Out Since Present status
OFS DMP DM STORAGE TANK#3 09.12.13 30.09.15
OFS CTCW ST-II CT 5B/fan9 HI VIB 14.08.15 UNDER PERMIT 30.09.15
EMD CTCW ST-I CT P/P-7 Overhauling 20.07.15 15.09.15
EMD U5 CC PUMP-B MOTOR BURNT 16.01.15 WILL BE DONE DURING OH
AHD COMMON SERVICE WTR.P/P#3 (ST-1) PUMP N/A 30.06.14 INDENTED 31.12.15
TMD U4 MAIN AC AHU-6 30.09.14 30.09.15
TMD STG-3 IAC SCREW JAMMED 31.05.15 30.09.15
Reason for non-availability
Target Date
TANK COLLAPSED
26 PLATE OF 26 REPLACED, PAINTING TO BE DONE
HUB ASSEMBLED, MOTOR D/C TRAIL TO BE DONE
ABNORMAL SOUND
BLOWER TO BE REPLACED (SRM BID I/P)
LP SCREW ELEMENT TO BE REPLACED
st1 emergency hdr changing
Repeated failure of equipments.(From 01.04.11 to 29.02.12)Area: BMD (Mills)
Sr No EQUIPMENT DETAILS DESCRIPTION1 U02 MIL-00B Shaft seal oil lkg 22 U02 MIL-00D Reject choking 43 U03 MIL-00A Abnormal sound 4
Number of Times
4U04 MIL-00A
4
5 U04 MIL-00G High reject 76 U06 MIL-00F Reject choking 37 U06 MIL-00E Shaft seal oil lkg 2
COAL DUST LKG
REMARKS
P.O. NO- 4000138800
INSUFFICENT NUMBER OF BIDS; BOD 31.07.2015
MANUFACTURING COMPANY N/A, COMPLETE ASSEMBLY UNDER PROCUREMENT FROM DIFF COMPANY; PR NO 100111422 (UNDER TECHNICAL EVALUATION)
DAMAGED LP SCREW ELEMENT HAS BEEN SENT TO VENDORS WORKS FOR REPAIR. ALSO INDENT IS IN PROGRESS FOR NEW SCREW ELEMENT PROCUREMENT(TC DONE)
UNIT-7 ESP HOPPER HEATER CHECKING STATUS
S.N FIELD(Hopper Heater current Measured-R/Y/B)
1 13 (15,25,25)2 26(15.14,14)3 31(15,15,15)4 32(14,25,25)5 33(18,26,26)6 43(15,13,13)7 47(14,14,14)8 51(26,28,26)
9 53(22,12,24)10 55(18,18,18)11 62(17,24,24)12 67(22,12,22)13 71(14,14,14)14 72(15,24,24)
UNIT-7 ESP HOPPER HEATER CHECKING STATUS
REMARK
BOTH HEATERS -ONBOTH HEATERS -ONBOTH HEATERS –ONBOTH HEATERS –ONBOTH HEATERS ONBOTH HEATERS ONBOTH HEATERS -ON
BOTH HEATERS –ONBOTH HEATERS- ONBOTH HEATERS –ONBOTH HEATERS –ONBOTH HEATERS –ONBOTH HEATERS -ON
BOTH HEATERS ON IN LOCAL BUTHTR-1 OFF IN SWGR PANEL
NTPC Ltd
Reported Unit No
28.02.15 CHP20.05.15 CHP
26.08.15 CHP
02.09.15 CHP
09.05.15 MAIN PLANT
28.05.15 MAIN PLANT
10.07.15
24.04.15 STG-1 AHP
14.05.15 STG-1 AHP
07.09.15
14.02.15 STG-3 AHP
16.07.15
15.10.14 STG-1 COM
15.10.14 STG-1 COM
09.01.15 U#119.01.15 U#119.01.15 U#119.01.15 U#119.01.15 U#119.01.15 U#119.01.15 U#1
irpaoT-
06.12.14 U#2
29.06.15 U#209.07.15 U#2
18.09.14 U#320.09.14 U#304.03.15 U#3
10.04.15 U#3
01.06.15 U#3
10.08.15 U#3
09.09.15 U#3
20.10.14 STG-2 COM
31/10/14 STG-2 COM24.03.15 STG-2 COM
05.08.15 STG-2 COM
10.10.14 U#422.09.14 U#415.12.14 U#415.12.14 U#4
02.06.15 U#425.05.15 U#4
05.06.15 U#403.08.15 U#4
25.10.14 U#5
17.01.15 U#5
06.08.15
STG-3 COM20.10.14 STG-3 COM05.11.14 STG-3 COM
18.11.14 STG-3 COM18.05.15 STG-3 COM
16.10.14 U#7
02.12.14 U#7
19.05.15 U#7
17.04.15 U#7
06.06.15 U#7
27.07.15 U#701.08.15 U#723.07.15 U#714.09.15 U#7
14.09.15 U#7
21.09.15 U#7
Operatin & Maintenance DeprtmentMaintenance Planning Department
Long Pending Defects
ONE SLUDGE P/P PIT TO BE MADESTACKER-2 SLEW OUT OF SERVICES
CRH-2 ROOF WATER LOGGING, SLOPE TO BE PROVIDED
Conv-2A/B TE penthouse area water getting ingress from wall
KORBA MAHAN LINE R PHASE REACTOR BUSHING FAILED U/P
CT-2 SATCOM AC SYSTEM MOTOR NA SINCE ONE MONTH
DYKE WETTING SYATEM TO BE MADE AVAILABLE
LP-2 DISCH V/V INOPERATIVE (CLOSED CONDITN)…PERMIT REQD
ALL BATPs CURRENT/PRESSURE TO BE PROVIDED IN UCB
IAC...U/P
UNIT-1 LIFT TO BE COMMISSIONED
BOILER DRUM SAFETY V/V B 13 PASSING /GAGGEDBFP-B OIL LKG BETWEEN LOC-A/BMAL-26 PASSINGMC-84 D/A OVERFLOW CV PASSINGBFP-B DISCH (FW-102A) DISCH INT. VALVE JAMMINGERV PASSINGFD-A DROPWISE OIL LKG FROM COOLER RETURN
CHP/ saI eca pI
Main Plant Area/maona PlaaMT eiryaa SMOKE DENSITY (OPACITY) TO BE MADE AVAIL IN UNIT-4, UNIT-6 (PO PLACED SIEMENS)
Station Common/sToSana ka^mana
AHP/eoSa hOMDilaMga PlaaMTStage-1/sToja -I
Stage-2/sToja -IIsToja -II
Stage-3/ sToja -IIIALL DL LINES SUCTION/DISCHARGE V/V NOT OPERATING AND ASL DISCHARGE VALVE INOPERATIVE
Stage-1 Common/ sToja -I ka^manaSTORM WATER DRAIN PUMP 2 NOS NO DISCHARGE....FOUNDATION FOR GATE TO BE MADE
Unit #1/ yaUinaT -1
OPACITY METER NOT WORKING (1/2) SPARE PROBBFP-B BCW V/V SEAT NOT AVAILABLE
MILL-D DRAWING HIGH CURRENT(40AMP/25TPH)ALL MECH EXHAUSTER VACUUM GAUGE N/AMS ERV TO BE COMMISSIONED (ISOLATING V/V PASSING)… S/D JOB
NOISE LEVEL VERY HIGH IN UCB -3 (ONLY SINGLE DOOR IS THERE)
APH 3B R PH FUSE BLOWN (CABLING I/P)
ME SEAL WATER TO BE DIVERTED TO STORM WATER DRAIN
R-52 BLOCK V/V PASSING s/d
LP ASH WTR P/P-1 DISCH V/V & NRV PASSING
CT4B-FAN-08MOTOR DE VIB IN ALARM RANGE(MISALIGNMENT)ST-2 TWS NEW COMMON DISCH DRAIN CONSTRUCTION IN PROGRESS
CT FAN 5B FAN 8 VIB IN TRIP RANGE (AFTER SHAFT RECEIVED)
PA FAN-B DUCT VIB IN TRIP RANGE….U/OPHE-A LKG FROM ECW SIDE….u/oCOLD GAS TEMP CONTROL V/V NOT CLOSING BELOW 15 %ESP OUTLET GATES NOT COMMISSIONED.CABLING TO BE DONE.
ESP PASS-D FIELD STATUS N/A IN UCBMS STRAINER-3 G/L LKG
ID ALL INLET/OUTLET GATES INOPERABLE FROM UCBESP PASS D COMMUNICATION NA
CC P/P-B TRIPPED ON E/F
Unit#2/ yaUinaT -2H2 DROP RATE HIGHER WITH DRIER -A IN SERVICE.V/V PASSING. (OVERHAULING JOB)
Unit#3/ yaUinaT -3
Stage-2 Common/ sToja -II ka^mana
Unit#4/ yaUinaT -4
Unit#5/ yaUinaT -5UNIT 5&6, BATP DISCHARGE LINES TO BE FITTED WITH PRESSURE GAUGE. P/P-A COMPLETED, B WITH OPPORTUNITY
MS RHS SAFETY V/V SIMERING AT PRESS 174.5
CW LWP-2 DISCH POORCW P/P-7A THRUST BRG TEMP MAINTAINING HIGH…U/O
CLF MAKE UP PUMP B VIBN IN ALARM RANGE . PUMP DE 135/7.0CW P/P-1 THRUST BRG TEMP MAINTAINING HIGH(83° IN DAY TIME)
PW TEMP CONTROLLER KEPT ON MANUAL.
IAC TRIPPED ON 1ST STG DISCH TEMP HIGH... U/P
#3 ARCW STRAINER - B INLET V/V INOPERATIVE IN CLOSED CONDITION
VAM-2 NOT MAINTAINING CHILLED WTR TRMP
GT 7R ACETYLENE LEVEL HIGH (UNDER Observation)TD BFP-A TH BRG TEMP 3/4 POINTS NAMILL A VIB IN ALARM RANGEHPCV-2 NOT OPERATING
SERVICE WATER P/P-A VIB IN ALARM RANGE (MAT NA)
SERVICE WATER P/P-A SHAFT SHEARED
Unit#6/ yaUinaT 6
Stage-3 common/ sToja -III ka^mana
STAGE III DFA SETTLING BIN DRAIN LINE -PNEUMATIC V/V TO BE PROVIDED.
Unit#7/ yaUinaT -7FD FAN-A, LOP-A DISCH VALVE /NRV SUSPECTED STUCK UP (IN CLOSED CONDITION)
KSTPS
Target Dept Remarks
01/05/15 CIVIL25.05.15 CHP
CHP/CIV
civil
C&I
31.05.15 EMD
EMD
AHD
AHD
EMD
AHD
17.07.15 TMD
CIVIL
EMD/CIV
TMD Minor Lkg./O/H jobTMD O/H jobTMD O/H jobTMD O/H jobBMDBMD
laxya ivaBaag
Erection & commissioning to be donePR processed, review in Tuesday meeting. Expected completion two years.
Spares available; Isolation permit required;permit to be issued
Spares not available , TC given on 04.08.2015
Civil front not ready for taking up balance works
EMD
C&I PR Raised, PO PendingTMD
BMDC&I PO placed
BMD/C&I
15.06.15 CIVIL
OPP EMD Opportunity job.
11.08.15
18.09.15 BMD
AHD
OFS10.06.15 CIVIL
OFS
BMDTMD regasketing of plates needed.
EMD,C&I To be taken up by C&IEMD,C&I
LONG EMD25.05.15 TMD OPPORTUNITY
OPP EMD/C&I10.08.15 EMD
AHD/C&I
EMD
3-way valve defective. Old drier to be replaced with new Refrigerant drier. PO placed and material is expected by 31.03.2015
BMD/CIVIL
Spares available; Isolation permit required;permit to be issued
Cabling and installation of coupling relays in progress. Commissioning during opportunity.
Already provided before line modification ;
Defective motor to be replaced during O/H. Spare motor to be made ready after removal from Unit-6. Spares under procurement.
07.08.15 BMD
OFSOFSC&I
OSMOFS
BMD
C&I Engg Issue taken up with BHEL/PE
LONG TMD
22.04.15 TMD SHUTDOWN
06.07.15 TMD
EMDC&I
31.08.15OPPORTUNITY TMD
OFS
MAT NA OFS
To be taken up by AHD for VV replacement
CIVIL/BMD
S. No. Pending Civil Works1 Unit 7 vacuum p/p new foundation to be made
2 DDCMIS ST – 2 CT BUILDING WORK
3 Rooms near Chimneys of stage-I &2 for CEMS Pkg
4 Stage-I DDCMIS RIO Rooms construction5 Seepage in Stage-III SWAS Room6 Closing of wall of stg-II SWAS Chiller room.7 UNIT # 7 ACID TANK APPROCH
8 ACID brick FILLING WORK IN DM PLANT
9 TRACK HOPPER MCC ROOM 2- SEEPAGE WORK
10 STACK YARD RETAINING WALL
11 CHIMNEY ST-1 & 2 REPAIR JOB12 RAW WATER PP HOUSE – BATTRY ROOM
13 U # 1 LIFT WORK
14
15
16
Repair of rail track near GT#7R. (Existing GT running with liability, may need replacement. without rail repair the job can not be done)
Five additional anchor points for dragging of GTs of Unit#7 during urgency.
Foundation work for relocation of LAs (Total 9 nos) of K-Bhilai#1 and 2 and K- Korba West Line for erection work of new wave trap of these three lines. Foundation work for erection of new wave traps (6nos) are also required. This is stage#1 R & M activity. Vendor is asking for erection charges of wave trap. So uregency is there for foundation work of LAs and wave traps. Drawing available with Civil.
17
18
19
20
21 Repair of switchyard fencing near bay#1.22
23
24
25
26
27
28
29
Completion of pending work of ST#1 GT foundation. Without that spare GT is lying in rail line and will obstruct movement of new GT due for delivery in Dec15.
Retaining wall of dewatering drain line near GT#3 rail track is to be carried out on urgent basis. Due to that some portion of earth under rail track near GT#3 got dislodged. It is unsafe for movement of GT.
Extension of transformer soak pit of Station transformer#5 to accommodate radiator of new spare transformer. New spare transformer is to be commissioned at ST#5 area to prove its performance.
Foundation for spare Tie Transformer in switchyard. At present spare transformer is standing on rail track obstructing movement of transformer in case of urgency/ or replacement. Rail track is sinking where spare transformer is lying.
Replacement of defective old gates of switchyard with motorized operated sliding type gates.
Relaying/ re build existing roads inside switchyard. (Approved note with civil maintenance)
New gravel filling in switchyard. (As per visit of GGM in switchyard and agenda point of BUH dash board).
Gravel filling/ gravel replacement in most of the transformers of the plant.
Fencing and flooring of spare cable yard in vaccant place in switchyard near bay#1.
Construction of new battery room in DM plant as existing room is in very bad shape and may collapse. approved note avaialble with civil since last 4/5 years.
Replacement of defective and not available pre cast slabs in switchyard. (Technical audit points pending since 2010-11)
HT/ LT motor maintenance shed/ room near the location of old auxiliary boiler. (Approved note available with civil). Without proper maintenance room it is very difficult to carry out overhauling and maintenance of motors creating obstruction in TG maintenance bay as per present practice. (old point)
30
31
32
33 Brick paving below 33KV trestle along its length.(New point)
34
35
36
37
38
39 C TOWER 4 A, 4B, 6A 7 6B – STRUCTURE REPAIR 40 ST – 1 CT 2 & 3 REFURSHIMENT
41
Cable trench underground/ overground from main trestle to transformer HT cable box in CT/ CW/ Raw water transformer. (Approximately 50mtr each cable trench is to be constructed for laying 33KV cables from main cable trestle to transformer cable box. trench is to be constructed for six transformer (ST#2 CT transformers(2nos), ST#2 CW Transformers (2nos), ST#1 CT and Raw water Transformer(2nos). At present cables are laid overground from main trestle to transformer and there is fire risk because of bushes.(old point)
Foundation along with soak pit for spare ST#2 CT transformer, Spare GT ST#3( with rail extension) and spare colony transformer.(New point)
Open shed for Genei, JLG, 15Ton Hydra, 20T crane and removed accessories of GTs and Tie Transformer. near Korba- Bhilai#1 (Switchyard bay#1 empty space).(New point)
Hard flooring with anchor points for removed 400KV CTs.(45nos)(New point)
Foundation along with soak pit for two nos 25MVA CW augmentation Transformer.(New point)
Earth filling, leveling and Hard flooring in front of unit#7 GT rail track for proper movement of hydra, filter machines, oil storage tank etc.(New point)
Stone paving on the face of high elevated area between stage#2 and ST#3 switchyard near Korba Raipur line#4.(New point)
Switchyard gardening in non equipment area of switchyard stage#1, 2 and 3 facing towards main road.(old point)
STG-1 CT 16 NOS LOUVERS DAMAGED NEEDS REPLACEMENT
Dept Remarks by CivilAHD
C&I
C&I Proposal initiated
C&I Work startedC&IC&ICHEM
CHEM
CHP
CHP #N/A
CIVIL Proposal under preparationEMD
EMD
EMD Will be completed by 30.08.15
EMD Will be completed by 30.08.15
EMD Proposal will be sent by 30.08.15
Approved Note with foundation drawing is required
OT Case PR 400016502. Tech Bid opened on 08.07.15
As the work is in Stg-III project scope , Approved Note required from the area in charge .
Urgent work completed. Proposal for other areas under preparation will be sent by Sep'15
To be undertaken under roof Waterproofing works . The proposal with C&M for preparation of Tender papers
Construction of New Battery room will be completed by Dec'2015
Under progress will be completed by 30.08.15
EMD Proposal will be sent by 30.08.15
EMD Proposal will be sent by 30.08.15
EMD Proposal will be sent by 30.08.15
EMD Proposal will be sent by 30.08.15
EMD Proposal will be sent by 30.08.15EMD Proposal will be sent by 30.08.15
EMD Proposal will be sent by 30.08.15
EMD Proposal will be sent by 30.08.15
EMD Proposal will be sent by 30.08.15
EMD Proposal will be sent by 30.08.15
EMD Proposal will be sent by 30.08.15
EMD Proposal will be sent by 30.08.15
EMD
EMD
EMD
EMD
EMD
EMD
EMD
EMD
EMD
EMD
OFS PROPOSAL BEING INITIATEDOFS
OFS
status as on 07.09.15Approved Note with foundation drawing is required
OT Case PR 400016502. Tech Bid opened on 08.07.15
Proposal initiated PR NO-200056181 Dated 17.04.2015
Work startedWill be attended in waterproofing contract0Will be completed by 30.11.15
Proposal under preparation
Under progress will be completed by 20.09.15
Will be completed by 15.09.15
Will be completed by 15.09.15
Will be completed by 30.11.2015
Urgent work completed. Proposal for other areas under preparation will be sent by Sep'15
To be undertaken under roof Waterproofing works . The proposal with C&M for preparation of Tender papers
Will be attended under CHP civil works contract. Tech. Bid opened on 08.07.15
Construction of New Battery room will be completed by Dec'2015
Proposal will be sent by 30.09.15
Proposal will be sent by 30.09.15
Proposal will be sent by 30.09.15
Proposal will be sent by 30.09.15
Proposal will be sent by 30.09.15Proposal will be sent by 30.09.15
Proposal will be sent by 30.09.15
Proposal will be sent by 30.09.15
Proposal will be sent by 30.09.15
Proposal will be sent by 30.09.15
Wil be constructed by 31.12.2015
Proposal will be sent by 30.09.15
Proposal will be sent by 30.09.15
Proposal will be sent by 30.09.15
Approved Note with foundation drawing is required
Approved Note with foundation drawing is required
Approved Note with foundation drawing is required
Approved Note with foundation drawing is required
Approved Note with foundation drawing is required
Approved Note with foundation drawing is required
PROPOSAL INITIATED
WILL BE ATTENDED BY 30.11.2015
Approved Note along with Foundation Drawing Required for making Proposal
Approved Note along with Foundation Drawing Required for making Proposal
WILL BE TAKEN UP AFTER STG II CT REPAIR WORKS
TURBINE AREA DEWATERING PUMPS AVAILABILITY
Unit Total Dewatering pumps
Unit 1 3 2
Unit 2 3 2
Unit 3 3 1
Unit 4 5 5
Unit 5 5 5
Unit 6 5 5Unit 7 3 --
Number of Pumps available in Auto
TURBINE AREA DEWATERING PUMPS AVAILABILITY
-- 1
1 --
1 1
-- --
-- --
-- 1
2 1
Number of Pumps available in Manual
Number of Pumps not available
Points discussed and decided in review meeting of CHP with GM (O&M) on 22.07.15Points Discussed
1
2
3 5 nos. poking rod per crusher and 2 nos. poking rod per TP should be made available.4 Resource mapping of the contractors is to be done and to be submitted to MTP.5
6 Deflectors to be provided in all chutes where central loading is there.7 Paddle feeder to be fully utilized at its full capacity.
8 All blades of plough feeder should be maintained as design size.
9 Daily report of chute cleaning/choking is to be submitted to GM (O&M)10 If any contract requirement is there urgent proposal are to be initiated.11
12 Tripper by pass gate to be made operable in all hoppers.13 Mill 3F is to run at any time by operation on request of CHP dept.14 All safety norma are to be followed and PPEs to be used al CHP area.
Availability of torch to be ensured with every shift in charge (4-5 torches per group) and maintenance engineers.
For chute cleaning 4 nos hose pipe with nozzle should be made available in each crusher house.
Extension of skirt board is to be done. Clearance between skirt plate and belt to be maintained as 50mm.
It is to be ensured that at a single time only 2 nos. crushers are running as per the running stream.
Points discussed and decided in review meeting of CHP with GM (O&M) on 22.07.15Remarks
Complied (2 in UCB & 6 with Maint avail)
Complied
3 Available, 2 will be available by todayData collection i/p. 31.07.15Work taken up
Work in progress
In practice
In practice
6A,6B done
In practice
Blade dimensions to be taken up & blade will be replaced on need basis
Blade dimensions to be taken up & blade will be replaced on need basis
GM(O&M)POINTS
Page 34
GM(O&M) POINTSS. No. DATE DESCRIPTION RESPONSIBILITY REMARKS1 01.11.14 AHD
2 05.11.14 SCRAP REMOVAL FROM VARIOUS AREAS ALL DEPT In Progress3 13.12.14 CIVIL gate-2 done. Rest in progress
4 02.06.15 COMPLIANCE REPORT TO BE MADE FOR HOD MEETS TO MTP HODs Offsite, EMD, C&I done. 5 24.02.15 C&I PR no 100113800
6 25.06.15 CIVIL
7 26.06.15 CIVIL FIN VETTING DONE.
8 02.07.15 DM STORAGE TANK -3 REPAIR WORK OFFSITE
9 06.07.15 SCRAP FENCING TO BE REMOVED FROM UNIT#6 & 7 AREA. TMD 30.09.1510 06.07.15 DEBRIS REMOVAL FROM AREA BETWEEN #6 & 7 CIVIL 30.09.1511 10.07.15 OPN
12 14.07.15 Ph auto control system is to be indented C&I13 SOX, NOX & OPACITY METER READING TO BE EXTENDED TO # 1-6 C/R C&I SOX, NOX BY 20.09.15.
14 26.09.15
ASH AROUND ASHLINE (INSIDE PLANT) TO BE DISPOSED AS PER CONTRACT
PO to be placed. Negotiation in process
GRASS CUTTING TO BE DONE- 1. UNIT 3 AREA, 2.GATE NO 2 TO FIRE STATION 3.UNIT 7 SIDE GRASS CUTTING TO BE DONE.
AAQMS DISPLAY BOARD AT TOWNSHIP GATE TO BE REPLACED (PR RAISED)PROPOSAL TO BE MOVED FOR DEVIATION IN WHITEWASHING CONTRACT
Proposal to be initiated for internal white washing of Office buildings by 30.09.15
BUSHES IN FLOW AND SLOPE DRAINS TO BE CLEANED AT CHARPARA ASH DYKE AREA
REPAIR COMPLETED. PAINTING WILL BE COMPLETED BY 30.09.15
OPERATION DEPT TO PROCURE SMALL/MINI JCB FOR HOUSEKEEPING
stg-1 ALKALI STORAGE TANK TO BE CONVERTED INTO ACID STORAGE TANK
MILL RUNNING HOURS AND AVAILABILITY FOR THE MONTH OF JULY-2015.MILL NO. STD AVB
MILL-1A 725.25 3168.7 3893.9 ### 8 744.0MILL-1B 724.50 2381.3 3105.8 ### 9 744.0MILL-1C 662.75 1769.5 2432.3 ### 8 744.0MILL-1D 675.25 11269.2 11944.4 ### 12 744.0MILL-1E 668.50 11270.6 11939.1 ### 10 744.0MILL-1F 217.20 11653.0 11870.2 ### 56 744.0MILL-2A 480.00 3315.3 3795.3 ### 0 744.0MILL-2B 480.00 2659.5 3139.5 ### 0 744.0MILL-2C 421.00 1070.0 1491.0 ### 0 744.0MILL-2D 266.25 115.0 381.3 ### 8 744.0MILL-2E 406.75 7739.5 8146.3 ### 8 744.0MILL-2F 346.00 11169.8 11515.8 ### 0 744.0MILL-3A 677.00 10147.5 10824.5 ### 24 744.0MILL-3B 653.25 6959.9 7613.1 ### 14 744.0MILL-3C 517.50 2249.3 2766.8 ### 15 744.0MILL-3D 600.50 3802.5 4403.0 ### 13 744.0MILL-3E 688.50 4642.5 5331.0 ### 9 744.0MILL-3F 557.75 7263.5 7821.2 ### 8 744.0MILL-4A 497.50 14700.4 15197.9 ### 48 744.0MILL-4B 624.80 6521.4 7146.2 ### 72 744.0MILL-4C 649.00 13263.8 13912.8 ### 8 744.0MILL-4D 463.50 12955.8 13419.3 ### 12 744.0MILL-4E 723.75 13280.7 14004.5 ### 0 744.0MILL-4F 698.50 14557.7 15256.2 ### 12 744.0MILL-4G 353.50 6473.5 6827.0 ### 40 744.0MILL-4H 661.00 4040.8 4701.8 ### 0 744.0MILL-4J 47.00 2474.7 2521.7 ### 0 744.0MILL-5A 705.00 5724.2 6429.2 ### 16 744.0MILL-5B 676.75 4585.1 5261.8 ### 16 744.0MILL-5C 671.75 5341.5 6013.3 ### 16 744.0MILL-5D 587.25 14511.3 15098.6 ### 12 744.0MILL-5E 621.75 11488.0 12109.7 ### 0 744.0MILL-5F 325.00 9596.7 9921.7 ### 8 744.0MILL-5G 476.00 10815.1 11291.1 ### 56 744.0MILL-5H 464.00 3970.3 4434.3 ### 0 744.0MILL-5J 163.50 980.4 1143.9 ### 12 744.0MILL-6A 711.00 2888.8 3599.8 ### 12 744.0
TOTAL RUN HRS(MILL) JULY-2015
CU.RUN HR TILL JUNE-
2015
CU.RUN HR (IN SER GR) UP TO JULY-
2015
REPLACED GR LIFE. Hrs.
LAST REPLACEMENT DATE
Outage hrs.
MILL-6B 584.00 14472.1 0.0 15056.1 ### 84 744.0MILL-6C 713.00 8371.6 9084.6 ### 0 744.0MILL-6D 636.50 2571.9 3208.4 ### 0 744.0MILL-6E 369.50 13851.5 14221.0 ### 0 744.0MILL-6F 495.25 13774.8 14270.0 ### 14 744.0MILL-6G 551.00 5953.0 6504.0 ### 6 744.0MILL-6H 550.50 1924.3 2474.8 ### 8 744.0MILL-6J 151.00 1959.8 2110.8 ### 24 744.0MILL-7A 379.75 4347.8 4727.5 ### 0 744.0MILL-7B 446.65 11015.6 11462.2 ### 0 744.0MILL-7C 413.50 13335.6 13749.1 ### 8 744.0MILL-7D 359.00 7877.0 8236.0 ### 0 744.0MILL-7E 327.45 10296.6 10624.0 ### 0 744.0MILL-7F 263.75 15061.6 262.0 15325.4 ### 12 744.0MILL-7G 278.75 5979.7 6258.4 ### 0 744.0MILL-7H 373.00 6203.5 6576.5 ### 4 744.0MILL-7J 67.75 5887.0 5954.7 0 744.0MILL-7K 0.00 848.9 848.9 0 744.0
Note: GRS,BRS replaced in Coal mill -6B,7F : Unit-2 under OH
MILL RUNNING HOURS AND AVAILABILITY FOR THE MONTH OF JULY-2015.
736 98.9% 30/03/44735 98.8%736 98.9%732 98.4%734 98.7%688 92.5%744 100.0% 14014.25744 100.0% 14669.85744 100.0%736 98.9%736 98.9%744 100.0% 720 96.8%730 98.1%729 98.0%731 98.3%735 98.8%736 98.9%696 93.5%672 90.3%736 98.9%732 98.4%744 100.0%732 98.4%704 94.6%744 100.0%744 100.0%728 97.8%728 97.8%728 97.8%732 98.4%744 100.0%736 98.9%688 92.5%744 100.0%732 98.4%732 98.4% 12715.35
AVAILABILITY( Hrs)
% AVAILABILITY
LAST RUNNING HR
660 88.7%744 100.0%744 100.0% 13369.55744 100.0%730 98.1%738 99.2%736 98.9%720 96.8%744 100.0%744 100.0%736 98.9%744 100.0%744 100.0%732 98.4%744 100.0%740 99.5%744 100.0%744 100.0%
U#1 ESP Pass-C various Air ingress points. Left (L)-U#4 side, Right (R)-U#2 side )
1. R1H3 (Field 15-R) hopper Man hole puncture.2. R2H4 (Field 16-L) hopper man hole air ingress from sides.3. R3H4 (Field-17-L) hopper air ingress from side of poking hole shaft.4. R4H3 (Field-18-R) air ingress from bellow5. R5H3 (Field 19-R) hopper man hole air ingress from sides.6. R7H4 (Field-18-L) air ingress from bellow.7. Field 15,20 Rapping motor shaft seal air ingress8. Field 21 Rapping motor lower side air ingress.
U#1 ESP Pass-C various Air ingress points. Left (L)-U#4 side, Right (R)-U#2 side )
Flushing Apparatus valve passing/defects:
4B-1: Valve wheel broken (N/F: 102217956)4D-8, 19: isolating valve jam and passing ( N/F:102217963, 102217960)5B-19: Isolating valve spindle free in open condition (N/F: 102217943)5C-19/20/24: isolating valve passing (N/F:102217948,102217950, 102217953)5D-7 : Isolating valve spindle free in open condition (N/F:102217945)5D-8/14: isolating valve passing (N/F:102217955, 102217958)6B-7: Isolating valve spindle free in open condition (N/F:102217952) 6B-13: isolating valve passing (N/F:102217965)6C-7: isolating valve jam and passing (N/F:1022179966)6C-19: isolating valve passing (N/F:102217968)
Buffer Heater Status:
4A: Module DEFECTIVE4B: OK (Temp 60 deg cel and increasing)5A: Power & Control fuse missing5B: OK (Temp 85 deg cel)6A: Power Fuse glass cover/holder missing6B: Heater On temp not increasing
TAC Drier Defects:
TAD A: one drier missing and remaining drier not workingTAD-B : drier not working: gas leakage TAD-C : Modification done and drier bypassedTAD-D: one drier missing and remaining drier not working.TAD- E:one drier missing and remaining drier not workingTAD-F: Drier not working
4D-8, 19: isolating valve jam and passing ( N/F:102217963, 102217960)5B-19: Isolating valve spindle free in open condition (N/F: 102217943)5C-19/20/24: isolating valve passing (N/F:102217948,102217950, 102217953)5D-7 : Isolating valve spindle free in open condition (N/F:102217945)5D-8/14: isolating valve passing (N/F:102217955, 102217958)6B-7: Isolating valve spindle free in open condition (N/F:102217952)