    PRADHAN MANTRI GRAM SADAK YOJANA

    Construction of Road from SALAMABAD TO DARDKO

    L!NGTH "#$# KMS Pac%a&' No

    BLOCK () *RI District () Baramu++a

    S. No D'scri,tion of It'm L'n&t- .idt- *nit /uantit0

    " 1 2 3 $ 4 5 6 7

    1

    "#$## "## ) H'ctar' "#2 3"344$1 32$

    Tota+ 3"$ +acs

    H'i&-t 8t-ic%n'ss

    Rat' RsN,

    Amount inLacs

    SIT! CLAR!NC! (-clearning and grabbing road landincluding uprooting wild vegatation ,grass, bushes , saplings,and trees ofgirth upto 300 mm , removal of stampsof such trees cut earlier and dispoasl ofunserviceable meterials and stackingof serviceable meterials to be used orauctioned upto a lead of 1000mmincluding removal and disposal of toporganic soil not exceeding 10 mm inthickness as per technicalSpecafication !lause "01 # $%manual means in area of thorn%&ungle '

  • 7/24/2019 Pitched Drain

    2/62

    T

  • 7/24/2019 Pitched Drain

    3/62

    PRADHAN MANTRI GRAM SADAK YOJANA

    Construction of Road from SALAMABAD TO DARDKOOT L'n&t- Of Road "#$# Km Pac%a&' No () JK#2

    BLOCK () *RI District Baramu++a

    Cost 'stimat' for sit' c+'ar'nc' and 'art- 9or%

    S. No (escription of )tem

    *ength +idth nit uantit%

    1 " 3 / 2

    "

    uantit% as per 4 Section !um /".00 10/. 1.23

    3

    uantit% as per 4 Sector !um "30/1.00 1".03 1.2

    uantit% as per 4 Sector !um "1/3..00 303. ./"

    00 0./ 0./ !um 1/"0.00 10/. 1.3

    Tota+ 1"266

    Assistant !:'cati;' !n&in''r

    !:'cati;' !n&in''r

    5eight6

    7hickness

    8ate

    8s. Np

    9mount in

    *acs

    :9875 +;8< =- :vacation of soil in hill% areas b%mechnical means including cuttingand trimming ofside slopes and disposal of excavated earth with alift upto 1. m and a lead up to "0 m as pertechnical specations clause 1/03.1

    :vacation in hilli areas in ordinar% rock not reuiringblasting b% mechnical means including cutting andtrimming of slopes and disposing of cut merteialwith a lift upto 1. m and a lead upto "0m as perclause 1/03." technical specifications

    :vaccation in hilli areas in hard rock reuiringblasting b% mecnical means , lift upto 1. m nanddiposal of excavated rock upto lead of "0 m as perclause 1/03."

    :arth work in excevation in hard rock forconstruction of kachha drain

  • 7/24/2019 Pitched Drain

    4/62

    Construction of Road from Natonal Highway .SALAMABAD TO DARDOOT

    L'n&t- Of Road "#$# Km Pac%a&' No ()

    B+oc% *ri District Baramu++a

    Cost 'stimat' for Pa;'m'nts La0'rs

    S No D'scri,tion of It'm L'n&t- .idt- *nit /uantit0

    " 1 2 3 $ 4 5

    1

    1000.00 .0 0.30 !um 1010.00 .0" .//

    "

    1000.00 .0 0.10 !um /0

    >or bus stand at dead end 30.00 "0.00 0.10 !um /0.00

    7 30.00 2. ".23

    !um 30.00 1./ .11

    Surface road 21//.00 t .00

  • 7/24/2019 Pitched Drain

    5/62

    1000 .00 3. 0. "23.1"

    !urves 100.00 0.2 0.0 !um 0.

    Dassing places 31 x 30.0 1./ 0.0 cum 11.02

    $us 9dda 30.0 "0.0 0.0 !um .00

    T 2"63 "22#3$ 3124

    /

    Stone 9ggregate /3- mm siEe B303/.3 !um 303/.3

    !um /.

    !um 0.

    T 276556 3215 "52

    Droviding ,la%ing , spreading and compactingstone aggregate of specified siEe to water bondmacadam specifiaction including spreading in inuniform thickness , handpacking , rollingwithsmooth wheel roller 0-100

  • 7/24/2019 Pitched Drain

    6/62

    10000.00 3. 0.0 !um "1".

    !urves 1000.00 0.2 0.0 !um /.0

    Dassing places 30 x 30.0 1./ 0.0 cum 111.3

    $us 9dda 30.0 "0.0 0.0 !um .00

    - - - 7otal 303/.3 1320.2 "."

    2 - - - - -

    - -

    Stone 9ggregate 3."" .0 m siEe - - - !um 303/.3 -

    - - - !um . - -

    !um 0

    Surfaced road # /0kms 'kacha road #

  • 7/24/2019 Pitched Drain

    7/62

    10 - - - - - -

    -

    - - - - - -

    -

    - - -

    -

    10

    10000 3. sm 300.00

    total 0.00 31. 1".

    - - - sm 0.00 2.3 3.2

    11

    10000.00 3. 0.0 cum 1.00

    5aulage of material for +$A @rade 3 fromFeerwan for an lead of / kms

    Stone 9ggregate 3-"". mm siEe B 303/.3 cumstone screnings 11."0

    mm siEe B . cum total B3. cum1.0 t6 cum B /1".3t

    Surfaced road # /0kms 'kacha road #

  • 7/24/2019 Pitched Drain

    8/62

    7 "0"." /1./0 110./

    1"

    - - - sm 0.00 2.3 3.2

    13

    - - - 0.00 10.00 3."

    1

    sm 0 3.1 1.2

    1

    - - - - - -

    - - - - - -

    - - - - - -

    - - - - - -

    total B "00 20kgs or "0 t t "0 10 / 0 "

    Tac% Coat=- Droviding and appl%ing tack coat with$itumen :mulsion # SS-1' using :mulsion(istributor C 0."0 to 0." kg 6 sm on the prepared$itumenous surface cleaned with 5%drolic broomas per technical specification clause 03

    1# MM THICK #GPC=- providing l%ing and rollingof open graded premix carpet of "0 mm thicknesscomposed of 13." mm to ./ mm aggregate eitherusing penetration grade bitumen or emulsion toreiured line , grade and level to serve as wearingcourse on a previousl% prepared base , includingmixing in a suitable plant , l%ing and rolling with athree wheeler 0-100

  • 7/24/2019 Pitched Drain

    9/62

    1

    "0. 1" km 7km 300/0 .03 1."1

    1

    total B 311."/ cum cum 311."/ 3." 1.3

    12

    cum "".21 1./ 0.1

    "0

    stone Screenings for ;@D! B 1023.01cum

    Surfaced road /11.0t 0kms - tkm "03. .03 11.31

    "1

    Surfaced road 3.// / km tkm ""/".20 .03 1.0"

    ""

    tkm "/"./ .03 1.03

    5aulage of $itumen from Dampore to plant for anav lead of 1"

  • 7/24/2019 Pitched Drain

    10/62

    "3 :arthen Shoulders 10000.00 1./ 0.30 cum 20 1.2 2."1

    T 47231

    PRADHAN MANTRI GRAM SADAK YOJANA

    L'n&t- Of Road "# Km Pac%a&' No () JK#2

    BLOCK () *RI District Baramu++a

    S. No (escription of )tem*ength +idth nit uantit%

    1 " 3 /

    1

    i' ;rdinar% soil

    8 6 wall "000.00 1.3 0.0 cum 130.00

    $ 6 +all 100.00 1.0 0.0 cum 0.00

    7 "100.00 1/".2 3."

    "

    86 wall "000.00 1.3 0.10 cum "0.00

    $6 +all 100.00 1.0 0.10 cum 10.00

    7 "0.00 3//.1 1.3/

    Cost 'stimat' for Construction of R89a++s and B8 9a++s from Natona+ Hi&-9a0 = NH)"A> to Ga9+ta

    5eight 6thickness

    8ate8s. Np

    9mount in*acs

    R8 B .ALLS =- :arth +ork in excavation for foundationof structures as per drawing and technical specificationsclause 110 including setting out, construction of shoringand bracing , removal of stumps and other deleterious

    materials and dressing of sides and bottom andbackfilling with approved material

    Droviding and la%ing cement A-10 grade inleveling course D!! grade A -10

  • 7/24/2019 Pitched Drain

    11/62

    3

    - - - - -

    86 wall "000.00 0.2 3.00 cum 0.00

    $6 +all 100.00 0.0 ".00 cum "00.00

    7 ""/.1 11"./

    - - - - -

    86 $ wall "000.00 0.2 3.00 cum 0.00

    $6 +all 100.00 0.0 ".00 cum "00.00

    7 1333.1 3.22

    8 6 +all "000.00 1.00 ".0 cum 000.00 23.33 "./

    / Dointing on Stone Aasonr% walls in 1=3

    86 $ wall "000.00 ".0 cum ,000.00$6 +all 100.00 1.0 cum ""0.00

    Sm .0 ".0

    86 $ wall "000 00 8A "000 00

    pol%gonal 6 8andonm 8ubble masoner%uncoursed 6 brought to course in cement sandmortor in 1./ uarr% stones in foundation and plinthincluding cost of bond stones and leveling up atspecified levels with A " with A- grade # Stone

    9ggragate "0 AA ' with aviliable stones

    "0 C/0HB20

    pol%gonal 6 8andonm 8ubble masoner%uncoursed 6 brought to course laid dr% in uarr%stones in foundation with plinth including cost ofbond stones with aviliable stones with aviliable

    "0C0H3300.

    $ackfilling stones behind wall complete as perdrawings and technical specifications clause1"0.3. with aviliable stones

    "0 .C/0B30

    providing D!! A "0 !oping on top of retaining wall6breast wall

  • 7/24/2019 Pitched Drain

    12/62

    Loadin&2 *aoding of cement for 8 walls b% manual means

    total B/3.0t or /.3 t - - - t /.3 2 0.

    10 Laodin& of sand

  • 7/24/2019 Pitched Drain

    13/62

    1

    Surface 8oad 11. t /0 km tkm //.0 .03 1.2/

  • 7/24/2019 Pitched Drain

    14/62

  • 7/24/2019 Pitched Drain

    15/62

  • 7/24/2019 Pitched Drain

    16/62

  • 7/24/2019 Pitched Drain

    17/62

  • 7/24/2019 Pitched Drain

    18/62

  • 7/24/2019 Pitched Drain

    19/62

  • 7/24/2019 Pitched Drain

    20/62

  • 7/24/2019 Pitched Drain

    21/62

  • 7/24/2019 Pitched Drain

    22/62

  • 7/24/2019 Pitched Drain

    23/62

  • 7/24/2019 Pitched Drain

    24/62

  • 7/24/2019 Pitched Drain

    25/62

  • 7/24/2019 Pitched Drain

    26/62

  • 7/24/2019 Pitched Drain

    27/62

  • 7/24/2019 Pitched Drain

    28/62

  • 7/24/2019 Pitched Drain

    29/62

  • 7/24/2019 Pitched Drain

    30/62

  • 7/24/2019 Pitched Drain

    31/62

    PRADHAN MANTRI GRAM SADAK YOJANA

    Construction of Da%i Post)Kundi Bir@a+a Road

    Cost !stimat' or Construction of Ston' Pitc-'d Sauc'r S-a,'d Drain

    L'n&t- Of Road 2#Km Pac%a&' No ( JK#2

    B+oc% () *ri District () Baramu++a

    (escription of )tem *ength #A' $radth #A' uantit% nit 8ate

    " / 2 10

    1

    5ardSoil 3000.00 0. 1"".1 cum 1/".2 1#5

    "

    3000.00 0.1 ".1 cum "/.1 "11#

    3

    3."0 At 2.00 ##2

    a' Surfaced 8oadB1"/km 3."0 tkm .03 #"6

    b' @ravel 8oad B 10.0

  • 7/24/2019 Pitched Drain

    32/62

    a' Surfaced 8oadB/3.0

  • 7/24/2019 Pitched Drain

    33/62

  • 7/24/2019 Pitched Drain

    34/62

  • 7/24/2019 Pitched Drain

    35/62

  • 7/24/2019 Pitched Drain

    36/62

  • 7/24/2019 Pitched Drain

    37/62

    PRADHAN MANTRI GRAM SADAK YOJANA

    Construction of road from NH) IA to Ga9-a+taDistrict () Baramu++a

    BLOCK () *RI

    COST !STIMAT! OR CONSTR*CTION O RCC CAL!RT = 2# M SPAN > ROAD= 4 No >

    S. No (escription of )tem No *ength +idthnit uantit% 9mount in *acs

    1 " 3 / 2 10

    1 -

    1 .0 . ".0 cum //.

    $ ' 8eturn +alls ".0 "./ ".0 cum 3.00

    9dd "0H for slips 112.0

    "3.20

    Tota+ 13.0 1/".2 0."3

    " (ewatering of trenches 1 1 000 0.0

    3 D6 l Stone soling with aviliable Stones

    9' 9butment " /.0 "./ 0.10 cum 3.1

    $ ' 8eturn +alls ".0 "./ 0.10 cum "./

    7otal .3 23.33 0.3

    9' 9butment " /.0 "./ 1.0 cum 3.1

    $ ' 8eturn +alls ".0 "./ 1.0 cum "./

    7otal .3 3//.1 0."1

    (epth 6height

    8ate8s. Np

    :rth work in excavation for foundation of structuresin hard rock upto 3m depth as per (rawing andspecifications clause 110,. inc setting outbconstruction of shoring nad bracing , removal ofstamps and bottom and back filling with approvedmaterial

    9' 9butment

    Droviding ? la%ing of cement concrete A10 inleveling course

  • 7/24/2019 Pitched Drain

    38/62

    9' 9butment .0 /.0 1. 1. ./0 0./ cum ."0 10.

    $ ' 8eturn +alls cum

    7otal 2.0 "0."3 .03

    /

    !ap " /.0 0./0 0.30 cum ".1/

    (irt +all " /.0 0.30 0./0 cum ".1/

    Slab 1 /.0 .0 0.30 cum .1+heel @uard " . 0." 0." cum 0./

    Tota+ 1".2 1". 0./3

    1"2cum C 10mtr6 cum B 130 mt 130 "23.1/ 0./2

    Droviding ? la%ing of cement concrete A"0 infoundation including from work costs

    ""

    ""

    ".0".0".0

    ".0

    ".01.

    1.0.0

    0./0.0./0

    0./01.0

    1".3010.0.0

    1".0

    providing ? la%ing of 8ainforced cement concreate A"nominal mix

    Suppl%ing fitting and placing 5IS( bar reinforcement# >e 1' in sub structure complete as per drawingand 7.S !lause 100",100

    providing for work of ordinar% planks so as to give

    rough finish inc. sthuttering, cenering and removal ofthe same # >orm +ork '

  • 7/24/2019 Pitched Drain

    39/62

    9butts sm

    8eturn +alls sm

    Slab 1 /.0 3.0 sm 1.0

    !ap "x " /.0 0.30 sm ."0

    (irt +all /.0 0./0 sm 1.0

    +heel @uard "x " .0 0." sm .0

    7otal "1.0 300.00 0.3

    2

    9' 9butment " /.0 1.0 1.0cum

    1.0

    $ ' 8eturn +alls ".0 .1.0 1.0 cum 1.0

    7otal 33.0cum 23.33 1.1/10 Loadin& of ston' A&&

  • 7/24/2019 Pitched Drain

    40/62

    7otal cum 101.21 3." 0.0

    11 Loadin& of sand

  • 7/24/2019 Pitched Drain

    41/62

    1

    Surface road 6132t km tkm /1"." .03 0."

  • 7/24/2019 Pitched Drain

    42/62

    CONSTR!CT"ON O# ROAD #ROM$ % SALAMAABAD TO DARDOT&%.%COST &ST"MAT& #OR CONSTR!CT"ON O# H!M& '"'& C!L(&RTS$ )*+++mm dia, .) -- NO,S.No Dscri/tion Of "tm No. 0idth )M, 1uantity !nit

    1

    pipes "" .0 ".0 ". cum 11./3

    !urtain wall "" ".0 1.0 0. cum 30."

    (rop +all "" ". 1.0 0. cum 30."

    !atch Dit "" 1. 1.0 " cum 22

    Lngth) M,

    D/th2Thic3nss

    )M,

    Rat2 unitRs . N/

    AmountRs. N'

    :arth work in excavation for foundation of structuresup to 3m depth as per drawing and technicalspecifications clause 110.including setting out ,construction of shoring nad bracing , removal ofstamps and other deleterious matter , drassing ofsides and bottom and back filling with approvedmaterial .

  • 7/24/2019 Pitched Drain

    43/62

    7otal 1335.13 162.89 2.18

    "

    >ountai bed "" .0 1.30 0.10 cum 21.45

    cradle "" .0 "."0 0.1 cum 54.45

    !atch Dit "" .0 0.1 ".0 cum 35.64

    parapet "" 1.0 0./ cum 6.93

    total 118.47 3656.41 4.33

    !urtain +alll "" ".0 "./ cum 111.60

    (rop +all "" ".0 "./ cum 111.60

    Tota+( 233.20 2276.18 5.31

    !urtain +alll "" ".0 8m 55.00

    (rop +all "" ".0 8m 55.00

    Tota+( 110.00 268.32 0.30

    Dointing on stone work with cement sand 1=3 mix.

    !urtain +alll "" ".0 "./ sm 145.75

    (rop +all "" ".0 "./ sm 145.75

    Droviding 6 *a%ing cement A10 grade in levelingcourse D!! grade A-10

    #0./0J0.'"

    Dol%gonal6 random rubble masonr% uncoursed6brought to course in cement sand mortar 1=/ mix with

    uarr% stones in foundation and plinth including costof bond stones and leveling up at specified levels withA- grade using stone aggregate "0mm nominalsiEe.

    # 1.0J0./0'"

    # 1.0J0./0'"

    Droviding ? la%ing of !ement !oncrete A-"0 nominal

    mix for coping .#0mm thick' 9rch.

  • 7/24/2019 Pitched Drain

    44/62

    7otal 291.50 47.05 0.14

    / >orm work of ordinar% timber

    !atch Dit "" x 1.0 ".00 sm 264.00

    cradle "" x " .0 0.3 sm 181.50

    parapet "" 1.0 ".0 sm 52.80Tota+( 498.30 300.00 1.50

    a' 1000 mm dia "" .0 8m 165.00 6798.19 11.22

    "" /.0 ". 1.0 !um 330.00 1161.30 3.830

    2 Loadin& of ston' A&&

  • 7/24/2019 Pitched Drain

    45/62

    total t 47.67 2.00 0.0

    1" - - - N; 66.00 2. 0.0

    13

    Surface road 12.1 /0 tkm 11/2.00 .00 0.

  • 7/24/2019 Pitched Drain

    46/62

    2"5" +acs

    Assistant !c'cati;' !n&in''r !:'cati;' !n&in''r

    Gross Total

  • 7/24/2019 Pitched Drain

    47/62

  • 7/24/2019 Pitched Drain

    48/62

  • 7/24/2019 Pitched Drain

    49/62

  • 7/24/2019 Pitched Drain

    50/62

  • 7/24/2019 Pitched Drain

    51/62

  • 7/24/2019 Pitched Drain

    52/62

  • 7/24/2019 Pitched Drain

    53/62

  • 7/24/2019 Pitched Drain

    54/62

  • 7/24/2019 Pitched Drain

    55/62

  • 7/24/2019 Pitched Drain

    56/62

  • 7/24/2019 Pitched Drain

    57/62

  • 7/24/2019 Pitched Drain

    58/62

  • 7/24/2019 Pitched Drain

    59/62

  • 7/24/2019 Pitched Drain

    60/62

  • 7/24/2019 Pitched Drain

    61/62

  • 7/24/2019 Pitched Drain

    62/62