Pit Final

2
SLOPE ANGLE 45 grados width 1.25 u thickness 1u ore cost 1.9 $ waste cost 1$ Longitud ore 5u calculos instantaneos waste 0re ISR NV waste 7.00 5.00 1.50 2.50 strip 1 8.00 1.25 9.38 6.25 8.00 5.00 1.70 1.25 strip2 9.00 1.25 10.63 6.25 9.00 5.00 1.90 0.00 10.00 strip3 10.00 1.25 10.00 11.88 6.25 50.00 10.00 5.00 2.10 -1.25 strip4 11.00 1.25 13.13 6.25

description

pit

Transcript of Pit Final

Page 1: Pit Final

SLOPE ANGLE 45 gradoswidth 1.25 uthickness 1 uore cost 1.9 $waste cost 1 $Longitud ore 5 u

calculos instantaneos calculos acumuladoswaste 0re ISR NV waste ore

7.00 5.001.50 2.50strip 1 8.00 1.25

9.38 6.258.00 5.00

1.70 1.25strip2 9.00 1.2510.63 6.25

9.00 5.001.90 0.00

10.00 10.00strip3 10.00 1.25 10.00 15.00

11.88 6.25 50.00 62.5010.00 5.00

2.10 -1.25strip4 11.00 1.2513.13 6.25

Page 2: Pit Final

calculos acumuladosOSR NV

0.80 68.75