Piping Stress Analysis Using CAESAR-II Indonesia

download Piping Stress Analysis Using CAESAR-II Indonesia

of 4

Transcript of Piping Stress Analysis Using CAESAR-II Indonesia

  • 8/18/2019 Piping Stress Analysis Using CAESAR-II Indonesia

    1/4

    Register Now! Organised by: Tel : +607-225 4825

    Fax : +607-226 7351

    EMAIL : [email protected]

    Piping Stress Analysis using CAESAR-II11 - 15 November 2013 / International 5 Star Hotel, Jakarta, Indonesia

    TRAINER’S PROFILE

    Amrit Pal Singh (CEng IMechE)- Former Chief Piping StressEngineer of Technip, Worley Parson, Fluor, Costain Oil and Gas

     Amrit is fromGuildford, United Kingdom, and has a total experience of 18 years of diversied experience working with Multinational

    companies worldwide. The companies he has worked for including Technip, Worley Parson, Fluor, Costain Oil and Gas, BP and

    Agip KCO. Mr. Amrit’s specialties cover nearly every aspect of piping design and stress analysis at different stages of

    Engineering, construction and operation. He also develops extensive site experience, provides vibration solution, and handlesengineering coordination and held Lead and authority roles for various EPC projects.

    His latest experiences include Nuclear decommissioning project in the UK, Lead Pipe Stress Engineer for Kashagan Field Development

    Project under Agip KCO, responsible of design and engineering of standard &non-standard pipe supports for critical lines using

    FE-Pipe,STAAD. Apart from this, he also managed other projects such as In-Amenas Compression Project for a JV of BP,Statoil Hydroand the Algerian oil & gas State Company, Saudi Kayan Petrochemical Complex, Booster Stationfor SEIC, Sakhalin Island and PowerPlant Engineering.

     Amrit possesses a string of achievements. He has been awarded with “SCM Award for Innovation-2001” by Technip for developing a 

    design procedure to study the effects of six directional Earthquake loads on piping in Reneries and plants with various seismic

    combinations. Amrit was also awarded as nominee “Jacques Franquelin Award- 2002” for his effort as the same analysis was later

    recognised by the Technip corporate ofce.

    Targeted Audiences

    Features:

    Beginners and Intermediate level- Graduate Piping Engineers – Stress, layout and materials.- Plant Engineers responsible for operating and maintaining piping systems.- Graduate Mechanical Engineers.- Vessel & Civil Mechanical Engineers.- Project Engineers or Managers.

    - CAESAR program and usage explained.- Solving real life problems and application of what is learned.- Interactive workshop with Q&A at end of every session.

  • 8/18/2019 Piping Stress Analysis Using CAESAR-II Indonesia

    2/4

    Register Now! Organised by: Tel : +607-225 4825

    Fax : +607-226 7351

    EMAIL : [email protected]

    Piping Stress Analysis using CAESAR-II11 - 15 November 2013 / International 5 Star Hotel, Jakarta, Indonesia

    v  Introduction to Pipe Stress Analysis-Objectives & Denition of Stress Analysis-Critical Line List-Information Required for Stress Analysis-Classication of Loads-Failure criteria and Stress Theory-Requirements of ASME B 31.3 Code – Sustained Stress,Thermal Stress & Occasional Stress.-Stress Intensication (SIFs)-Pipe Span Calculations based on Stress, Deection &Natural Fre-quency-Pipe Span Reduction Factor for Elbows, ConcentratedLoads etc.-Selection of Supports-Location of Supports and Restraints

    v  Static stress analysis using CAESAR II-Overview of CAESAR II functions and how to use theprogram

    -Creating input data-Design for piping loads-Modelling of piping systems in CAESAR II-Detailed, important modelling issues – bends, reducers,valves, rigid elements, control parameters, connectingnodes, and built-in databases.

    -Editing the model-Practical examples using CAESAR II; input, analysis &redesign

    Day

    Day

    Day

    2

    3

    1

    v  Assorted modelling, analysis andcompliance topics:

    -Resolution of overstress due to thermal expansion-Friction effects-Adding exible connections (vessels)-Assessing equipment allowable loads API 610, WRC 107etc-Cold Spring-Combining piping systems

    -Load case combinations-Designing for sustained loads; support congurationissues,optimization of sustained loads.

    -Designing for expansion loads; exibility-Concept of Thermal Expansion-Providing Flexibility in Piping-Types of Expansion Loops-Minimum Leg Required to Absorb Thermal Expansion-Expansion Loop Sizing for Hot Piping

    v  Detailed problem solving of a complex

    model, including:-Imposed thermal displacements-Expansion Joints – Types, Application & Selection-Guide Spacing for Expansion Joints-Expansion joint modelling & evaluation-Spring hanger design-Evaluation of local vessel stresses according toincluding vessel modelling

    -Buried pipe modelling-Stress Range Reduction Factors – f

     

  • 8/18/2019 Piping Stress Analysis Using CAESAR-II Indonesia

    3/4

    Piping Stress Analysis using CAESAR-II

    11 - 15 November 2013 / International 5 Star Hotel, Jakarta, Indonesia

    v  Dynamic stress analysis using CAESAR II-Dynamic analysis theory, types of loads & evaluation of

    system responses-Modes, mode shapes and modal analysis-Harmonic loads & harmonic analysis-Mechanical vibration-Flow induced vibration-Steam hammer-Slug ow-Impact load types & analysis-Relief valve ring-Time History Analysis-Earthquake analysis

    4  5

    Corporate In-house Training Programme

    If you have more than 8 delegates attending an in-house course, the savings to your organization can be substantial since ourcorporate in-house courses are charged by the day, not per delegate, therefore you pay one rate regardless of the number of peopleyou wish to train (subject to a maximum class size).

    For more information please contact Ms. Vimy Hue on:

    Tel : +607 225 4825

    Email : [email protected]

    *Practical Examples to show the calculations to participants.

    0845  Registration and coffee0900  Workshop commence1030  Morning refreshments and networking break 1100  Workshop commence1230  Networking & Luncheon1330  Workshop commence1500  Afternoon refreshments1530  Workshop commence1700  Workshop wrap-up

    Workshop Timetable

    Others Events that You Might Be Interested in

    * Event Subject to Change

     In the event of a change, we will make every effort to contact all attendees. We must reserve the right to make any changes whatsoever in the

    event owing to any unforeseen or unavoidable cause; or to cancel the event for any reason beyond our control without notice.

    Day Day&

  • 8/18/2019 Piping Stress Analysis Using CAESAR-II Indonesia

    4/4

    Name (Dr / Mr / Mrs / Ms)

    Job Title & Department

    Mobile

    Email Address

    Delegate 1

    Delegate 2

    Name (Dr / Mr / Mrs / Ms)

    Job Title & Department

    Mobile

    Email Address

    CODE : TLTRID002MVIMYH

    Conversion Rate of USD to RM is 3.40

    Approving Manager 

    Name : Job Title & Department :

    Signature : Company Phone Number:

    Email :

    Company Name :

    Upcoming Conferences & Workshops (Please check more other events’ information on www.toplink-asia.com)

    Please send me the brochures for the following conferences and workshops as ticked below (Please ll in contact details above and return via fax)

    * Event Subject to Change

    In the event of a change, we will make every effort to contact all attendees. We must reserve the right to make any changes whatsoever in the event owing to any unforeseen or

    unavoidable cause; or to cancel the event for any reason beyond our control without notice.

    c Best Practices of Piping Design & Vibration Analysisc Pump Optimisation: Performance, Reliability & Efciencyc Piping Dynamic Analysis & Vibration

    Important Notes1. Early Bird & Special Price Promotion: Fees will only be valid if payment is receivedby the stipulated dates, after which normal rate will apply.2. Fee includes luncheons, refreshments and complete set of ducumentation in CD. Itdoes not include the cost of accommodation and travel.

    3. Full payment is mandatory upon registration for admission to the event4. Walk-in delegates will only be admitted on the basis of space availability at the event5. The organiser reserves the right to make any amendments in the programme,

    Speakers that it deems to be in the interests of the event without any notice and please constantly check our website(www.toplink-asia.com) for updates

    Cancellation & Substitution1. A replacement is welcome if you are unable to attend. A 50% refund and a set of

    conference documentation will be given for cancellation received at least one week before the event. Regrettably, no refund can be made for “no show” participant. Youwill however receive a set of documentation.

    2. If TOP LINK cancels the Event due to circumstances beyond the reasonable control  of TOP LINK (such as acts of God, acts of war, governmental emergency, labor

    strike or terrorism), TOP LINK shall refund to each Exhibitor & attendees its payment previously paid, minus a share of costs and expenses incurred, in fullsatisfaction of all liabilities of Organizer to Exhibitor.

    3. TOP LINK reserves the right to postpone, re-name or re-locate the event in the samecity on which it is held if the written notice is given at least 10 days to the delegatesin advance to the event without any refund.

    4. A 50% cancelation fee will be charged after the submission of this contract withsignature. We reserve the right to refuse admission if payment is not received on time.

    REGISTER

    NOW!Tel : +607-225 4825

    Fax : +607-226 7351

    EMAIL : [email protected]

    Fee Per Delegate Early Bird RateRegister before 30 September 2013

    Special Discount RateRegister before 31 October 2013

    Normal RateRegister after 31 October 2013

    Please register the following delegate(s) for the event

    c 5 Days Workshop O Jakarta, 11 - 15 November 2013

    c I am unable to attend but I would like to purchase the documentation at USD 525 

    (Please photocopy for more delegates)

    For Ofcial Use

    5 days Workshop USD 3688 USD 3888 USD 3988

    11 - 15 November 2013 / International 5 Star Hotel, Jakarta, Indonesia

    Piping Stress Analysis using CAESAR-II

    Payment Methods

    All payments to be made payable to Top Link Conference & Event Management inRM or USD and are net of bank charges. Bank charges are to be borne by registrants.

    Please tick and ll in the following:c Cheque / Bank Draft No.Please mail payment in RM (Ringgit Malaysia) with registration form to Suite 13-06, Level 13,JB City Square (Ofce Tower), 106-108, Jalan Wong Ah Fook, 80000, Johor Bahru, Johor.

    c Pay by Telegraphic Transfer to Top Link Conference & Event ManagementRinggit Malaysia A/C: 311 - 043855 - 101, USD A/C: 311 - 043855 - 725Swift/ Transfer Code: HBMBMYKL (This only applies if you transferred from the bankOUTSIDE Malaysia)HSBC Bank Bank Address: 1 Jalan Bukit Timbalan 80000 Johor Bahru Johor Darul TakzimPlease fax conrmation of bank transfer to Ms. Chua Bin Jue at (607) 225 4801 quoting yourcompany’s name, delegate’s name and invoice number on your fax and banktransfer.