PIP FY14 PMG W. Pellico 7/8/14 7/8/2014PIP PMG. PIP Activities RIL & Linac – 200MHz RF Power...

20
PIP FY14 PMG W. Pellico 7/8/14 7/8/2014 PIP PMG

Transcript of PIP FY14 PMG W. Pellico 7/8/14 7/8/2014PIP PMG. PIP Activities RIL & Linac – 200MHz RF Power...

Page 1: PIP FY14 PMG W. Pellico 7/8/14 7/8/2014PIP PMG. PIP Activities RIL & Linac – 200MHz RF Power System High Level RF Linac Modulator 7835 Procurement – Accelerator.

PIP PMG

PIP

FY14 PMGW. Pellico 7/8/14

7/8/2014

Page 2: PIP FY14 PMG W. Pellico 7/8/14 7/8/2014PIP PMG. PIP Activities RIL & Linac – 200MHz RF Power System High Level RF Linac Modulator 7835 Procurement – Accelerator.

PIP PMG

PIP Activities• RIL & Linac

– 200MHz RF Power System • High Level RF • Linac Modulator • 7835 Procurement

– Accelerator Physics• Simulations and Studies • Linac Notch Creation

– Utilities• Power Distribution • LCW distribution• Vacuum System

• Booster– RF

• Anode• Bias Supplies• Cavity & Tuner Refurbishment

– New Tuners• New Cavities• 20th Cavity (ID # 1013)

– Accelerator Physics• Simulations and Studies• Booster Notcher• Cogging• Radiation Shielding

– Instrumentation• Beam Position Monitor• Dampers

– Utilities• Power Distribution• Vacuum Systems

7/8/2014

Page 3: PIP FY14 PMG W. Pellico 7/8/14 7/8/2014PIP PMG. PIP Activities RIL & Linac – 200MHz RF Power System High Level RF Linac Modulator 7835 Procurement – Accelerator.

PIP PMG

Linac – High Level – Klystron Effort

Lots of progress towards the effort to build the first 200.1 MHz Klystron• Meetings to discuss specifications – reached mutual

agreement on them (Fermi, SLAC and CPI)• The preliminary design review (PDR) milestone was completed• Seminar on topic was given• Progressing towards CDR in July 10th

– 7835 Procurement (4 year inventory goal)• One new tube purchased • One additional tube may be purchased 4th quarter

7/8/2014

Page 4: PIP FY14 PMG W. Pellico 7/8/14 7/8/2014PIP PMG. PIP Activities RIL & Linac – 200MHz RF Power System High Level RF Linac Modulator 7835 Procurement – Accelerator.

PIP PMG

Linac – Modulator (Talk Today)• Completion of 9 cell prototype (FNAL Design)– Full load current of 325 amps at 8kv– Slew rate of 20kV/us at 80 A– Tested with required waveforms– Pulse Width Modulation at 900V/cell tested

• Working on ripple - able to reach design goal of 50 V pp

– Beginning the buildup of 54 cell prototype– Controls system work progressing

• SLAC completed a stage 3 design study– Some question regarding beam loading and regulation– Deciding on continued SLAC effort – final report

presentation7/8/2014

Page 5: PIP FY14 PMG W. Pellico 7/8/14 7/8/2014PIP PMG. PIP Activities RIL & Linac – 200MHz RF Power System High Level RF Linac Modulator 7835 Procurement – Accelerator.

PIP PMG

Linac – Other Tasks• Accelerator Physics

– Improved DTL lattice translated to TraceWin

– Benchmarking results with old Parmila code

– Worked on MEBT lattice to understand installation of new beam line elements (FY14 Shutdown)

• Planning to add valve• Planning to add laser notch

vacuum chamber

– Laser Notch • Optical cavity design finished• Final prints finished – ready for

install (FY14 Shutdown)

• Progress on optical amp – issues with instability (vendor)

• Utilities– Power

• Preparations for install of the new (large) L1 transformer– Moving to Linac next week!

• Preparation for storage of old transformer in lower Linac

– Vacuum• Preparing for FY 14 shutdown• Some small parts ordered

– LCW• Work on the dual temp system

– Reviewed different replacement options

– Decided upon roof top unit» Preparing drawings» Planning for FY14

shutdown7/8/2014

Page 6: PIP FY14 PMG W. Pellico 7/8/14 7/8/2014PIP PMG. PIP Activities RIL & Linac – 200MHz RF Power System High Level RF Linac Modulator 7835 Procurement – Accelerator.

PIP PMG

Booster - RF• Anodes– Preparing for FY14 shutdown install

• Specifications were agreed upon in early spring• Design developed and approved• Schedule of construction, testing and install (tight) provided• Ordering components

– Most items appear to be deliverable by required date but ….» Some items are long lead times» Several components are not standard – requiring more engineering time

to look at alternate options» Limited testing time - may result if late delivery

• Began software/controls• Reviewing testing (MI60 option) and install options

• Bias Supplies (10 supplies) (East gallery Completed)

– Upgrade the West gallery Bias supplies Transformers• Heat sinks

– One supply completed/tested, 2nd ready for testing , 3rd 50% done7/8/2014

Page 7: PIP FY14 PMG W. Pellico 7/8/14 7/8/2014PIP PMG. PIP Activities RIL & Linac – 200MHz RF Power System High Level RF Linac Modulator 7835 Procurement – Accelerator.

PIP PMG

Anode Work ScheduleVery tight – but proceeding

7/8/2014

Page 8: PIP FY14 PMG W. Pellico 7/8/14 7/8/2014PIP PMG. PIP Activities RIL & Linac – 200MHz RF Power System High Level RF Linac Modulator 7835 Procurement – Accelerator.

PIP PMG

Cavity and Tuner Refurbishment• 10 of 19 stations have been refurbished for 15Hz– Recent work rate is about 10 weeks per cavity– Additional labor has been supplied to effort• New hire is a full time employee• New contract technician• Training takes several months

– Process continues to be refined and documented– 4 refurbished cavities have had to be pulled and

reworked• Taper failure on 2 cavities (not part of refurbishment)• Two early refurbished cavities – failure of flange connection

– method of milling to resurface remedies this problem

– Still working on new cone options (to speed up work)7/8/2014

Page 9: PIP FY14 PMG W. Pellico 7/8/14 7/8/2014PIP PMG. PIP Activities RIL & Linac – 200MHz RF Power System High Level RF Linac Modulator 7835 Procurement – Accelerator.

PIP PMG

Cavity Refurbishment

7/8/2014

Additional cavity work added to the refurbishment process is the inspection and sometimes necessary repair of the cavity taper.

Two stations (located at RF3 and RF5) have required to have their downstream taper repaired. The work requires the end of the cavity to be cut off, ceramic window replaced and taper reworked.

The first of the reworked taper cavities is undergoing high power testing. This cavity also has the new tuner.

Scorched Ceramic Window (due to sparking)

Window and end of taper removed

End of taper removed New taper extension

Page 10: PIP FY14 PMG W. Pellico 7/8/14 7/8/2014PIP PMG. PIP Activities RIL & Linac – 200MHz RF Power System High Level RF Linac Modulator 7835 Procurement – Accelerator.

PIP PMG

PresentDate

Sum

mer

Sh

utdo

wn

Working on schedule and testing:15 Hz testing and shutdowns (this year and next)Need to verify 15 Hz operations – find unknown issues

Full 15 Hz system testing and operations can only begin when all installed cavities have been refurbished.

7/8/2014

Updated plot kept on PIP webpage

Page 11: PIP FY14 PMG W. Pellico 7/8/14 7/8/2014PIP PMG. PIP Activities RIL & Linac – 200MHz RF Power System High Level RF Linac Modulator 7835 Procurement – Accelerator.

PIP PMG

Tuners - New• Will speed up process• To build up inventory• Will help reliability/uptime• Reduce worker exposure rates

7/8/2014

The first new tuner took about 1.5 weeks to build.But extra time was spent on documenting the procedure (TD).

The new tuner has been installed on a cavity and is now undergoing high power testing. The plan is to verify its performance and then place a ferrite order.

Page 12: PIP FY14 PMG W. Pellico 7/8/14 7/8/2014PIP PMG. PIP Activities RIL & Linac – 200MHz RF Power System High Level RF Linac Modulator 7835 Procurement – Accelerator.

PIP PMG

New CavityPerpendicular Cavity

– 2nd Harmonic capture– Transition crossing

• Work on simulationsExploration of direct liquid coolingDifferent garnet geometriesExploring another way to put in a

perpendicular field called a “radial field”

• Work on testing ferritesBetter measurements of losses in AL400Testing of AL800 to begin soon

New Booster Cavities• Cavity 20 (old prototype parts)

– Ready for tuners

• Additional Cavities– Ensure reliability– Develop experience

• New Cavities– Long term operations– Higher current operations

• Working on PIP II requirements• Working on RLS

7/8/2014

Page 13: PIP FY14 PMG W. Pellico 7/8/14 7/8/2014PIP PMG. PIP Activities RIL & Linac – 200MHz RF Power System High Level RF Linac Modulator 7835 Procurement – Accelerator.

PIP PMG

Perpendicular Development

7/8/2014

Resonance measurements of ferrite

Started with TRIUMF design

Completed cavity model with magnetic field…Now looking at ferrite packing and cooling options

Page 14: PIP FY14 PMG W. Pellico 7/8/14 7/8/2014PIP PMG. PIP Activities RIL & Linac – 200MHz RF Power System High Level RF Linac Modulator 7835 Procurement – Accelerator.

PIP PMG

Accelerator Physics• Beta measurements – tune control– Have separated out the ability to change tunes and not

impact Beta corrections• Added hardware to sum signals from CAMAC cards• Modified ACNET software

– Working on speeding up the analysis (beta and coupling) and measurements

• Notch Absorber– Improving loss capture

• Modifying S12 spool piece• Adding insert to absorber

– Working on short kickers– Working on new pulser supply

7/8/2014

Page 15: PIP FY14 PMG W. Pellico 7/8/14 7/8/2014PIP PMG. PIP Activities RIL & Linac – 200MHz RF Power System High Level RF Linac Modulator 7835 Procurement – Accelerator.

PIP PMG

Cogging• Change cogging from radial to magnetic….– Why:• Aperture limitations• Help collimation (removal of radial position swings)• Ability to create notch at injection (even use a Linac notch)

7/8/2014

Page 16: PIP FY14 PMG W. Pellico 7/8/14 7/8/2014PIP PMG. PIP Activities RIL & Linac – 200MHz RF Power System High Level RF Linac Modulator 7835 Procurement – Accelerator.

PIP PMG

Instrumentation• Booster BPM system upgrade– Original analog frontend being upgraded to digital• 12 channel 250 MHz digitizers• 12 channel timing boards• VXS-based backplane crates• VXS processors

• Dampers– Replacing analog frontend with digital hardware• Original analog DDS no longer available• Greater flexibility and better signal to noise

7/8/2014

ISO

IN

OutRFIn

OutRFIn

P3

Amplifier2

RCBPF_Butterworth

P2R

L

C CHittite_HMC478ST89 PwrSplit2

C R

OpAmpIdeal

Amplifier2

R

BPF_ButterworthPwrSplit2PwrSplit2

R

L

CCHittite_HMC478ST89

R

BPF_Chebyshev

Hybrid180

AttenuatorCLPF_Butterworth

R

R

P1

Num=3

AMP3

R8C9BPF3

Num=2R7

L2

C8 C6SNP2 PWR3

C5 R6

AMP2

AMP1

R5

BPF2

MIX2

MIX1

PWR2PWR1

R4

L1

C3C2SNP1

R3

BPF1

HYB2

ATTEN1C1LPF1

R2

R1

Num=1

S12=0S22=polar(0,180)S11=polar(0,0)S21=dbpolar(0,0)

R=50 OhmC=100 pF

Astop=30 dBBWstop=65 MHzApass=3.0103 dBBWpass=20 MHzFcenter=50 MHz

R=50 Ohm

R=L=270 nH

C=100 pF C=100 pF

File="HMC478ST89_deeembedded.s2p"RF_Range=0-4.0 GHzGain=22 dBTemp=25

S31=0.707S21=0.707

C=100 pF R=50 Ohm

Delay=0 secFreq3db=Gain=2

S12=0S22=polar(0,180)S11=polar(0,0)S21=dbpolar(0,0)

R=50 Ohm

Astop=45 dBBWstop=65 MHzApass=3.0103 dBBWpass=10 MHzFcenter=50 MHz

S33=0S22=polar(0,180)S11=polar(0,0)ConvGain=dbpolar(0,0)RF_Rej=LO_Rej2=LO_Rej1=ImageRej=

S33=0S22=polar(0,180)S11=polar(0,0)ConvGain=dbpolar(0,0)RF_Rej=LO_Rej2=LO_Rej1=ImageRej=

S31=0.707S21=0.707

S31=0.707S21=0.707

R=50 Ohm

R=L=270 nH

C=100 pFC=100 pF

File="HMC478ST89_deeembedded.s2p"RF_Range=0-4.0 GHzGain=22 dBTemp=25

R=50 Ohm

Astop=65 dBBWstop=250 MHzRipple=0.3 dBBWpass=20 MHzFcenter=201 MHz

PhaseBal=0GainBal=0 dBLoss=0 dB

VSWR=1Loss=31.5 dB

C=1.0 nF

Astop=45 dBFstop=70 MHzApass=3.0103 dBFpass=50 MHz

R=50 Ohm

R=50 Ohm

ADC

x

x

CICDec

CICDec

BP FIR-45°

BP FIR+45°

CICInterp

CICInterp

x

x

Σ DAC

+

+ -

NCOcos

NCOsin

NCOsin

NCOcos

4*RF ~211MS/s

4*RF ~211MS/s

~25KHz

Page 17: PIP FY14 PMG W. Pellico 7/8/14 7/8/2014PIP PMG. PIP Activities RIL & Linac – 200MHz RF Power System High Level RF Linac Modulator 7835 Procurement – Accelerator.

PIP PMG

Booster Utilities

Power• Transformers for gallery

power – One for East and West– Associated control panels

• Being prepared for shutdown– Cranes– Safety– Contract labor in place

Vacuum• Most hardware purchased

– Vacuum pumps– Cabling– Controllers

• Working on firmware• Working out schedule

– Only part will be done this shutdown

– Penetrations to be opened– Contract labor in place

7/8/2014

Page 18: PIP FY14 PMG W. Pellico 7/8/14 7/8/2014PIP PMG. PIP Activities RIL & Linac – 200MHz RF Power System High Level RF Linac Modulator 7835 Procurement – Accelerator.

PIP PMG

Project Labor and M&S (Through June)

7/8/2014

FY14 PIP OBL BUDGET K$OBL

BUDGET YTD OBL RIP BUDGET BAL

M&S 7,852,7 4,019.2 82.1 3,751.4

Labor 5,577.7 3,813.1

1,764.6

FY14 Sums 13,430.4 7,832.3 82.1

5,516.0

AD APC CD FESS PPD TD0.0

5.0

10.0

15.0

20.0

25.0

Act thru June

Fcst thru June

Actual FTEs to date = 23.3Forecast FTEs to date = 25.5

Page 19: PIP FY14 PMG W. Pellico 7/8/14 7/8/2014PIP PMG. PIP Activities RIL & Linac – 200MHz RF Power System High Level RF Linac Modulator 7835 Procurement – Accelerator.

PIP PMG7/8/2014

Level Task DESCRIPTION Original Due Date Comment

3 1.1.1.1 High Level Klystron critical design review (CDR) 6/30/14 Now scheduled for July 10th.3 1.1.2.3 Laser Notch OPG ready for installation Instability in the seed diode – being investigated

3 1.1.2.3 Laser Notch

Three stages of fiber amplifiers ready for installation Instability in the 2W amplifier – working with vendor

3 1.1.2.3 Laser Notch Beam Shaping Technology chosen Both technologies need to be documented

3 1.2.3.2 DamperDamper prototype board for transverse system complete 10/18/13 Done

3 1.2.3.2 Damper Damper prototype board testing complete 11/22/13 Done

3 1.2.1.1. AnodeSpecifications for Anode Power Supply Documented 2/17/14 Done

31.2.3.2 Damper Specifications document for longitudinal

dampers complete 2/18/14 95% complete for defining hardware (labor)

3 1.2.2.3 Booster Notcher Test new Notcher kicker power supplies 2/19/14 Done

3 1.2.2.3 Booster Notcher Finish Testing of Short Kicker magnets 4/16/14 Final 7th kicker3 1.2.3.2 Damper Longitudinal damper boards tested 4/21/14 Expected done mid-July (labor)3 1.2.2.3 Booster Notcher Install 2 short kickers 4/23/14 Problems with power supplies 3 1.2.3.1 BPM BPM Specification Complete 4/25/14 50% complete – possibly finished in August (labor)3 1.2.1.2 Bias First Bias Supply Re-hab Complete 4/28/14 Done3 1.2.1.2 Bias First Bias Supply Tested 5/5/14 Done Done but tied up with cavity testing…3 1.2.2.4 Cogging Install the FPGA board & RF feedback 5/5/14 80% complete (Should be done by end of FY14)3 1.2.1.2 Bias Start Bias Supply installation 5/19/14 Will swap with next cavity refurb install2 1.2.2.3 Booster Notcher L12 Short Notcher Complete 6/6/14 3 short kickers finished – 3 more in production3 1.2.2.6 Shielding Determine shielding action 6/15/14 Working through calculations/simulations /measurements3 1.2.5.2 Power Receive Y-BW2 Transformer 6/16/14 Done 3/30/20143 1.2.2.5 Collimation Review requirements for Collimation 7/3/143 1.2.2.1. Anode Supply Test anode supply systems 7/14/14 End of summer – just before install (labor)

21.2.3.2 Damper Longitudinal Dampers Complete - boards

installed & operational 7/23/14 August for one mode damper test and replacement3 1.2.5.2 Power Receive Motor Control Center parts 7/25/14

3 1.2.3.1 BPMBPM System, Hardware & Firmware Prototype Design Complete 8/5/14

PIP Milestones

Page 20: PIP FY14 PMG W. Pellico 7/8/14 7/8/2014PIP PMG. PIP Activities RIL & Linac – 200MHz RF Power System High Level RF Linac Modulator 7835 Procurement – Accelerator.

PIP PMG

Summary

• FY14 PIP – Progress has been made on all scheduled tasks. Critical items like refurbishment and new tuners have made significant progress but no improvement in schedule. An increase in labor has been beneficial in moving several tasks along and should help to meet the milestones goals.

• PIP continues to adjust to changes in budget and planning – recent work on FY15 budget and PIP II plans are being worked through.

7/8/2014