PINE TREE LIMITED PARTNERSHIP - GezelmanPE · b7 b6 b5 b4 b3 b2 b1 b14 b13 b12 b19 d6 d5 ... i...

4
A4 1 A5 A6 A7 A8 A9 A1 A20 A19 A18 A17 A10 A11 2ND FLOOR A3 A2 A12 B10 B9 B8 A16 A15 A14 A13 B1 B2 B3 B4 B5 B6 B7 D14 D13 D12 D11 D10 D5 D6 B19 D16 D15 B12 B13 B14 D19 D20 D1 D2 D3 D4 C13 B20 D17 D18 B11 D9 D8 D7 B18 B17 B16 B15 C17 C16 C15 C14 C12 C11 C10 C18 C19 C20 C6 C7 C8 C9 C1 C2 C3 C4 C5 CB 1ST FLOOR UTILITY 1 1 1 1 2 2 2 2 3 14 CONTRACTOR TO ADJUST WIRE RUNS AS NEEDED TO MATCH FIELD CONDITIONS. REF. TO MECHANICAL DRAWING FOR ARRAY ROOF LAYOUT. STRG. A STRG. B STRG. D STRG. C NEW COMPONENTS ON WALL A20 INV 1 3 A19 INV 1 B20 INV 1 B19 INV 1 C20 INV 2 C19 INV 2 1 2 11 1 3 2 2 2 2 D20 INV 2 D19 INV 2 A1 B1 C1 D1 20 20 20 20 ON ROOF ON EXT. WALL T E S L A 10KWH POWER PACK STOREDGE STOREDGE 8" 8" 8" AUTO TRANSFORMER AUTO TRANSFORMER 8" DC AC DC DC AC LA 40 40 8 T E S L A 10KWH POWER PACK DC 8" 80 80 TO EXISTING HOUSE METER, LOAD SIDE INV 1 INV 2 5 25 L1 L2 25 L1 L2 STRG A STRG B STRG C STRG D 7 #6 GEC CONNECTED TO AC GROUNDING ELECTRODE I MAX: 15 AMPS V MAX: 500 V I MAX: 15 AMPS V MAX: 500 V I MAX: 15 AMPS V MAX: 500 V I MAX: 15 AMPS V MAX: 500 V I MAX: 30 AMPS V MAX: 500 V INV. 1 ON EXT. WALL I MAX: 30 AMPS V MAX: 500 V INV. 2 4 I MAX: 32 AMPS @ 240 V I MAX: 32 AMPS @ 240 V 5 5 I MAX: 64 AMPS @ 240V 6 4 4 5 6 6 10 7 6 9 12 AC AC AC AC AC 13 8 8 I MAX:8.5 AMPS V MAX:450 VOLT I MAX:8.5 AMPS V MAX:450 VOLT I MAX: 25 AMPS @ 240 V I MAX: 25 AMPS @ 240 V 1 ENLARGED VIEWING & HYPERLINKS: PRINT VERSION OF THIS PLAN PROVIDES MINIMUM INFORMATION NEEDED BY USERS. ELECTRONIC VERSION (EV) PROVIDES MAGNIFIED VIEWING UP TO 6400%. EV ALSO PROVIDES HYPERLINK ACCESS TO OEM MANUALS AND ABUNDANT OTHER SUPPLEMENTARY INFORMATION.EV MAY BE ACCESSED AT: WWW.CADVICE.US/SOLAR.DO/ 0392P.SA.PineTree_MiamiBeach_FL.dwg SHEET NO: PUBLISHED: SHEET NAME: DRAWN: CHECKED: SB AG REVISIONS: INSTALLATION OF A ROOF MOUNT PINE TREE LIMITED PARTNERSHIP 6000 PINE TREE DRIVE, MIAMI BEACH FL 33140 Siggi Brocks CONTRACTOR: Ƒ COMPONENT SCHEDULE 1 SOLAR PHOTOVOLTAIC MODULE SOLAR WORLD SUNMODULE PLUS SW265 M FSEC # SW12-NT90-0408 2 MANUFACTURER PROVIDED MODULE JUNCTION BOX 3 COMBINER BOX NEMA 3R POS. FUSED 20 A 4 DC DISCONNECT SOLAR EDGE SE 7600A-USS INTEGRATED DISCONNECT 5 INVERTER SOLAR EDGE SE 7600A-USS RE: 0392PV20 FOR INV. INTERFACE 6 AUTO TRANSFORMER SOLAR EDGE SEAUTO TX5000 7 AC DISCONNECT MIN. 80 AMP/2P/ FUSED 80 AMP, 240V AC, SERVICE RATED HEAVY DUTY, NEMA 3 8 CIR PANEL (COLLECTION PANEL) 120/240/AC/1 100 AMP MLO NEMA 3R 9 POINT OF CONNECTION LINE SIDE TAP 120/240/1 POLARIS TAP LOAD SIDE OF METER 10 OVER CURRENT PROTECTION DEVICE (2) CIRCUIT BREAKER DPL 40 AMPS 11 POWER OPTIMIZER SOLAR EDGE P300 DC TO DC PWR OPTIMIZER 12 CRITICAL LOAD PANEL 120/240/AC/1 100 AMP MLO NEMAR 3R 13 OVER CURRENT PROTECTION DEVICE (2) CIRCUIT BREAKER DPL 25 AMPS FED FROM STOREDGE RE: 0392PV20 ż WIRE SCHEDULE 1 PV SOURCE CIRCUIT MNFC. PROVIDED CABLE ASSEMBLIES (+/-) EQUIPPED WITH MC4 LOCKING CONNECTORS 2 PV SOURCE CIRCUIT HOME RUN #10 PV WIRE (+/-) EQUIPPED WITH MC4 LOCKING CONNECTORS & #8 GEC 3 GROUND EARTH CONDUCTOR #6 CU GROUND 4 PV OUTPUT CIRCUIT 4 - MIN. #8 THWN-2 & #8 GND IN MIN. 3/4" EMT OR 3/4" LFMC 5 INVERTER OUTPUT CIRCUIT 3 - #8 THWN-2 & #8 GND IN MIN. 3/4" EMT 6 SOLAR SYSTEM OUTPUT 3 - # 4 THWN-2,& #4 GND IN MIN. 1" EMT OR RMC 7 GEC TO GROUND ELECTRODE #6 EXISTING 8 CRITICAL LOAD PANEL 3 - #10 THWN AND #8GND IN 3/4" EMT OR LMFC APPLY TO COLLECTION PANEL & AC DISCONNECT: WARNING ELECTRIC SHOCK HAZARD DO NOT TOUCH TERMINALS. TERMINALS ON BOTH THE LINE AND LOAD SIDE MAY BE ENERGIZED IN THE OPEN POSITION APPLY TO DC DISCONNECT: WARNING ELECTRIC SHOCK HAZARD. THE DC CONDUCTORS OF THIS PHOTOVOLTAIC SYSTEM ARE UNGROUNDED AND MAY BE ENERGIZED PHENOLIC PLACARDS: ELECTRICAL NOTES: 1. ALL ASPECTS OF THE ELECTRICAL WORK REQUIRED TO COMPLETE THE PROJECT REPRESENTED IN THIS DOCUMENT SHALL COMPLY WITH THE MANUFACTURER'S RECOMMENDATIONS/SPECIFICATIONS AND ALL CODES, STATUTES, AND STANDARDS ADOPTED BY THE STATE AND THE LOCAL AUTHORITY HAVING JURISDICTION. 2. THE INFORMATION PROVIDED IN THESE DOCUMENTS IS NOT EXHAUSTIVE. IT REMAINS THE CONTRACTORS RESPONSIBILITY TO ACHIEVE THE PROPOSED INSTALLATION IN FULL EXERCISE OF AND COMPLIANCE WITH THE ITEMS IDENTIFIED IN GENERAL ELECTRICAL NOTE 1. 3. EXPOSED PV SOURCE CIRCUT "A" AND "B" CROSSING ROOF AND CONTINUE VERTICAL TO 2ND FLOORROOF IN METAL RACEWAY. 4. ALL UNIDENTIFIED CONDUCTORS UNDER MODULES ARE UL LISTED AND MANUFACTURER PROVIDED CABLES, CONNECTORS AND ASSEMBLIES. 5. ALL ELECTRICAL COMPONENTS, (RACEWAYS, JUNCTION BOXES, DISCONNECTS, PANEL BOARDS, ETC.), SHALL BE INSTALLED PLUMB, LEVEL, AND IN COMPLIANCE WITH ALL APPLICABLE SECTIONS OF NEC ARTICLE 110. 6. ALL RACEWAYS SHALL BE SUPPORTED ON INTERVALS AND BY METHODS AS APPROVED/REQUIRED BY THE CURRENTLY ADOPTED NEC ED. 7. ALL RACEWAYS, CABLES AND J-BOXES SHALL BE LOCATED OUT OF DIRECT SUNLIGHT. 8. SOLAR PANELS TO BE BONDED TO RACKING, UTILIZING WEEB OR SELF BONDING CLAMPING COMPONENTS. 9. RACKING SYSTEM TO HAVE CONTINUOUS BONDING, WITH #6 GND. 10. CONTRACTOR SHALL VERIFY THE INSTALLATION OF A BIDIRECTIONAL UTILITY SERVICE METER. 11. NOT USED. 12. THE CONTRACTOR SHALL SEAL ALL PENETRATIONS RESULTING FROM THIS SCOPE OF WORK. 13. ALL SIGNAGE SHALL BE PROVIDED, AS REQUIRED BY THE CURRENTLY ADOPTED NEC ED. 14. ALL RACEWAYS ON THE ROOF AND EXPOSED TO SUN LIGHT SHALL BE ELEVATED 8" ABOVE ROOF AND SUPPORTED IN COMPLIANCE WITH NEC 358.30. 15. CONTRACTOR TO MAINTAIN ORDERED CONDUCTOR PAIRS FROM STRING TO ASSIGNED CIRCUIT AS ASSIGNED ON HOME RUNS. APPLY TO RACEWAYS & JUNCTION BOX: WARNING PHTOVOLTAIC POWER SOURCE NEC 690.54 PERMANENT LABLE: APPLY TO AC DICONNECT & POINT OF INTERCONNECTION PHOTOVOLTAIC POWER SOURCE AC OUTPUT CURRENT = 64 AMP AC OPERATING VOLTAGE = 240 VOLT NEC 690.53 PERMANENT LABLE: APPLY TO INVERTER DC DISCONNECT: INVERTER 1 AND 2 WARNING, DC SHOCK HAZARD (1) MAXIMUM POWERPOINT CURRENT, Impp = 30 AMP (2) MAXIMUM POWERPOINT VOLTAGE, Vmpp = 400 VOLT (3) MAXIMUM SYSTEM VOLTAGE, Voc = 500 VOLT (4) MAXIMUM CIRCUIT CURRENT, Isc = 30 AMP ALLEN GEZELMAN 16502 HANNA RD. LUTZ, FLORIDA 33549 PH. 813 909 1956 Allen@Gezelman PE.COM www.GezelmanPE.com COPY RIGHT & INTELLECTUAL PROPERTY NOTICE x THIS PLAN SET IS COPY RIGHT PROTECTED AND CONTAINS INTELLECTUAL PROPERTY WHICH BELONGS TO ALLEN GEZELMAN PE. x ACCESS IS GIVEN TO THE INFORMATION HEREON SOLELY FOR THE PURPOSE OF COMPLETION OF THE PROJECT FOR WHICH IT IS INTENDED. x NO OTHER USE MAY BE MADE OF THE INFORMATION, DRAWINGS, OR IDEAS HEREON WITHOUT THE EXPRESS, WRITTEN, PERMISSION OF ALLEN GEZELMAN PE CONTACT DESIGN TEAM @ GezelmanPE.com SUBJECT TO EJCDC C-700: HTTP://GEZELMANPE.COM/REFERENCE/AG/C-700.PDF 473 Golden Isles Drive Suite 202 Hallandale Beach, FL 33009 Telephone: 877-678-6247 Fax: 954-200-6695 Email: [email protected] 01 SCALE: NTS, REFER TO MECHANICAL DRAWINGS FOR ACTUAL ROOF PLAN PV SOURCE CIRCUIT LAYOUT - 4 STRINGS, 80 PV MODULES 02 SCALE: NTS, REFER TO MECHANICAL DRAWINGS FOR ACTUAL ROOF PLAN PV OUTPUT CIRCUIT, RE 01 FOR SOURCE CIRCUIT

Transcript of PINE TREE LIMITED PARTNERSHIP - GezelmanPE · b7 b6 b5 b4 b3 b2 b1 b14 b13 b12 b19 d6 d5 ... i...

Page 1: PINE TREE LIMITED PARTNERSHIP - GezelmanPE · b7 b6 b5 b4 b3 b2 b1 b14 b13 b12 b19 d6 d5 ... i certify that pv installations made iaw this plan can resist positive and ... bolts with

A4

1

A5

A6A7A8

A9

A1A20

A19

A18A17A10

A11

2ND FLOOR

A3 A2

A12

B10B9

B8A16A15

A14A13

B1B2

B3B4B5

B6B7

D14

D13

D12D11D10

D5D6B19

D16D15B12B13B14

D19

D20

D1D2D3

D4

C13

B20

D17D18

B11

D9

D8D7B18B17B16B15

C17

C16C15

C14C12C11C10

C18C19C20

C6C7C8C9

C1C2C3

C4C5

CB

1ST FLOOR

UTILITY

1

1

1 1

2

2

2

2

3

14

CONTRACTOR TO ADJUST WIRE RUNS AS NEEDED TO MATCH FIELD CONDITIONS. REF. TO MECHANICAL DRAWING FOR ARRAY ROOF LAYOUT.

ST

RG

. A

ST

RG

. B

ST

RG

. D

STRG. C

NEW COMPONENTS ON WALL

A20

INV 1

3

A19

INV 1

B20

INV 1

B19

INV 1

C20

INV 2

C19

INV 2

1

2 11

1

3

2

2

2

2

D20

INV 2

D19

INV 2

A1

B1

C1

D1

20

20

20

20

ON ROOF

ON EXT. WALL

T E S L A

10KWH

POWER PACK

STOREDGE STOREDGE

8" 8" 8"

AUTO

TRANSFORMER

AUTO

TRANSFORMER

8"

DC ACDC DC AC

LA

40

40

8

T E S L A

10KWH

POWER PACK

DC

8"

80 80

TO EXISTING

HOUSE METER,

LOAD SIDE

INV 1 INV 2

5

25

L1L2

25

L1L2

STRG A

STRG B

STRG C

STRG D

7

#6 GEC CONNECTED TO AC GROUNDING ELECTRODE

I MAX: 15 AMPS

V MAX: 500 V

I MAX: 15 AMPS

V MAX: 500 V

I MAX: 15 AMPS

V MAX: 500 V

I MAX: 15 AMPS

V MAX: 500 V

I MAX: 30 AMPS

V MAX: 500 V

INV. 1

ON

E

XT

. W

AL

L

I MAX: 30 AMPS

V MAX: 500 V

INV. 2

4

I MAX: 32 AMPS @ 240 V

I MAX: 32 AMPS @ 240 V

5

5

I MAX: 64 AMPS @ 240V

6

4

4

5

6 6

10

7

6

9

12

AC

AC

AC

AC AC13

8

8

I MAX:8.5 AMPS

V MAX:450 VOLT

I MAX:8.5 AMPS

V MAX:450 VOLT

I MAX: 25 AMPS @ 240 V

I MAX: 25 AMPS @ 240 V

1

EN

LA

RG

ED

V

IE

WIN

G &

H

YP

ER

LIN

KS

:

PR

IN

T V

ER

SIO

N O

F T

HIS

P

LA

N P

RO

VID

ES

M

IN

IM

UM

IN

FO

RM

AT

IO

N N

EE

DE

D B

Y U

SE

RS

.

EL

EC

TR

ON

IC

V

ER

SIO

N (E

V) P

RO

VID

ES

M

AG

NIF

IE

D V

IE

WIN

G U

P T

O 6

40

0%

. E

V A

LS

O P

RO

VID

ES

HY

PE

RL

IN

K A

CC

ES

S T

O O

EM

M

AN

UA

LS

A

ND

A

BU

ND

AN

T O

TH

ER

S

UP

PL

EM

EN

TA

RY

IN

FO

RM

AT

IO

N.E

V M

AY

B

E A

CC

ES

SE

D A

T:

WW

W.C

AD

VIC

E.U

S/S

OL

AR

.D

O/0

39

2P

.S

A.P

in

eT

re

e_

Mia

miB

ea

ch

_F

L.d

wg

SHEET NO:

PUBLISHED:

SHEET NAME:

DRAWN: CHECKED:SB AG

REVISIONS:

IN

ST

AL

LA

TIO

N O

F A

R

OO

F M

OU

NT

PIN

E T

RE

E L

IM

IT

ED

P

AR

TN

ER

SH

IP

60

00

P

IN

E T

RE

E D

RIV

E, M

IA

MI B

EA

CH

F

L 3

31

40

Siggi Brocks

CONTRACTOR:

□ COMPONENT SCHEDULE

1

SOLAR PHOTOVOLTAIC MODULE SOLAR WORLD SUNMODULE PLUS SW265 M FSEC # SW12-NT90-04082

MANUFACTURER PROVIDED MODULE JUNCTION BOX

3

COMBINER BOX NEMA 3R POS. FUSED 20 A

4

DC DISCONNECT SOLAR EDGE SE 7600A-USS INTEGRATED DISCONNECT

5

INVERTER SOLAR EDGE SE 7600A-USS RE: 0392PV20 FOR INV. INTERFACE

6

AUTO TRANSFORMER SOLAR EDGE SEAUTO TX5000

7

AC DISCONNECTMIN. 80 AMP/2P/ FUSED 80 AMP, 240V AC, SERVICE RATED HEAVY DUTY, NEMA 3

8

CIR PANEL (COLLECTION PANEL)

120/240/AC/1Ø 100 AMP MLO NEMA 3R

9

POINT OF CONNECTION LINE SIDE TAP 120/240/1Ø POLARIS TAP LOAD SIDE OF METER

10

OVER CURRENT PROTECTION DEVICE

(2) CIRCUIT BREAKER DPL 40 AMPS

11

POWER OPTIMIZER SOLAR EDGE P300 DC TO DC PWR OPTIMIZER

12

CRITICAL LOAD PANEL 120/240/AC/1Ø 100 AMP MLO NEMAR 3R

13

OVER CURRENT PROTECTION DEVICE

(2) CIRCUIT BREAKER DPL 25 AMPS

FED FROM STOREDGE RE: 0392PV20

○ WIRE SCHEDULE

1

PV SOURCE CIRCUIT

MNFC. PROVIDED CABLE ASSEMBLIES (+/-) EQUIPPED WITH MC4 LOCKING CONNECTORS

2

PV SOURCE CIRCUIT

HOME RUN #10 PV WIRE (+/-) EQUIPPED WITH MC4 LOCKING CONNECTORS & #8 GEC

3

GROUND EARTH CONDUCTOR #6 CU GROUND

4

PV OUTPUT CIRCUIT 4 - MIN. #8 THWN-2 & #8 GND IN MIN. 3/4" EMT OR 3/4" LFMC

5

INVERTER OUTPUT CIRCUIT 3 - #8 THWN-2 & #8 GND IN MIN. 3/4" EMT

6

SOLAR SYSTEM OUTPUT3 - # 4 THWN-2,& #4 GND IN MIN. 1" EMT OR RMC

7

GEC TO GROUND ELECTRODE #6 EXISTING

8

CRITICAL LOAD PANEL 3 - #10 THWN AND #8GND IN 3/4" EMT OR LMFC

APPLY TO COLLECTION PANEL & AC DISCONNECT:

WARNINGELECTRIC SHOCK HAZARD

DO NOT TOUCH TERMINALS.TERMINALS ON BOTH THE LINE AND LOAD SIDE

MAY BE ENERGIZED IN THE OPEN POSITION

APPLY TO DC DISCONNECT:

WARNINGELECTRIC SHOCK HAZARD.

THE DC CONDUCTORS OF THIS PHOTOVOLTAIC SYSTEM ARE UNGROUNDED AND MAY BE ENERGIZED

PHENOLIC PLACARDS:

ELECTRICAL NOTES:1. ALL ASPECTS OF THE ELECTRICAL WORK REQUIRED TO COMPLETE THE PROJECT REPRESENTED IN THIS DOCUMENT SHALL COMPLY WITH

THE MANUFACTURER'S RECOMMENDATIONS/SPECIFICATIONS AND ALL CODES, STATUTES, AND STANDARDS ADOPTED BY THE STATE ANDTHE LOCAL AUTHORITY HAVING JURISDICTION.

2. THE INFORMATION PROVIDED IN THESE DOCUMENTS IS NOT EXHAUSTIVE. IT REMAINS THE CONTRACTORS RESPONSIBILITY TO ACHIEVE THEPROPOSED INSTALLATION IN FULL EXERCISE OF AND COMPLIANCE WITH THE ITEMS IDENTIFIED IN GENERAL ELECTRICAL NOTE 1.

3. EXPOSED PV SOURCE CIRCUT "A" AND "B" CROSSING ROOF AND CONTINUE VERTICAL TO 2ND FLOORROOF IN METAL RACEWAY.4. ALL UNIDENTIFIED CONDUCTORS UNDER MODULES ARE UL LISTED AND MANUFACTURER PROVIDED CABLES, CONNECTORS AND

ASSEMBLIES.5. ALL ELECTRICAL COMPONENTS, (RACEWAYS, JUNCTION BOXES, DISCONNECTS, PANEL BOARDS, ETC.), SHALL BE INSTALLED PLUMB, LEVEL,

AND IN COMPLIANCE WITH ALL APPLICABLE SECTIONS OF NEC ARTICLE 110.6. ALL RACEWAYS SHALL BE SUPPORTED ON INTERVALS AND BY METHODS AS APPROVED/REQUIRED BY THE CURRENTLY ADOPTED NEC ED.7. ALL RACEWAYS, CABLES AND J-BOXES SHALL BE LOCATED OUT OF DIRECT SUNLIGHT.8. SOLAR PANELS TO BE BONDED TO RACKING, UTILIZING WEEB OR SELF BONDING CLAMPING COMPONENTS.9. RACKING SYSTEM TO HAVE CONTINUOUS BONDING, WITH #6 GND.10. CONTRACTOR SHALL VERIFY THE INSTALLATION OF A BIDIRECTIONAL UTILITY SERVICE METER.11. NOT USED.12. THE CONTRACTOR SHALL SEAL ALL PENETRATIONS RESULTING FROM THIS SCOPE OF WORK.13. ALL SIGNAGE SHALL BE PROVIDED, AS REQUIRED BY THE CURRENTLY ADOPTED NEC ED.14. ALL RACEWAYS ON THE ROOF AND EXPOSED TO SUN LIGHT SHALL BE ELEVATED 8" ABOVE ROOF AND SUPPORTED IN COMPLIANCE WITH

NEC 358.30.15. CONTRACTOR TO MAINTAIN ORDERED CONDUCTOR PAIRS FROM STRING TO ASSIGNED CIRCUIT AS ASSIGNED ON HOME RUNS.

APPLY TO RACEWAYS & JUNCTION BOX:

WARNINGPHTOVOLTAIC POWER SOURCE

NEC 690.54 PERMANENT LABLE:APPLY TO AC DICONNECT & POINT OF INTERCONNECTION

PHOTOVOLTAIC POWER SOURCEAC OUTPUT CURRENT = 64 AMPAC OPERATING VOLTAGE = 240 VOLT

NEC 690.53 PERMANENT LABLE:APPLY TO INVERTER DC DISCONNECT: INVERTER 1 AND 2

WARNING, DC SHOCK HAZARD(1) MAXIMUM POWERPOINT CURRENT, Impp = 30 AMP(2) MAXIMUM POWERPOINT VOLTAGE, Vmpp = 400 VOLT(3) MAXIMUM SYSTEM VOLTAGE, Voc = 500 VOLT(4) MAXIMUM CIRCUIT CURRENT, Isc = 30 AMP

ALLEN GEZELMAN

16502 HANNA RD.

LUTZ, FLORIDA 33549

PH. 813 909 1956

Allen@Gezelman PE.COM

www.GezelmanPE.com

C

OP

Y R

IG

HT

&

IN

TE

LLE

CT

UA

L P

RO

PE

RT

Y N

OT

IC

E

T

HIS

P

LA

N S

ET

IS

C

OP

Y R

IG

HT

P

RO

TE

CT

ED

A

ND

C

ON

TA

IN

S IN

TE

LL

EC

TU

AL

P

RO

PE

RT

Y W

HIC

H B

EL

ON

GS

T

O A

LL

EN

G

EZ

EL

MA

N P

E.

A

CC

ES

S IS

G

IV

EN

T

O T

HE

IN

FO

RM

AT

IO

N H

ER

EO

N S

OL

EL

Y F

OR

T

HE

P

UR

PO

SE

O

F C

OM

PL

ET

IO

N O

F T

HE

P

RO

JE

CT

F

OR

W

HIC

H IT

IS

IN

TE

ND

ED

.

N

O O

TH

ER

U

SE

M

AY

B

E M

AD

E O

F T

HE

IN

FO

RM

AT

IO

N, D

RA

WIN

GS

, O

R ID

EA

S H

ER

EO

N W

IT

HO

UT

T

HE

E

XP

RE

SS

, W

RIT

TE

N, P

ER

MIS

SIO

N O

F A

LL

EN

G

EZ

EL

MA

N P

E

CON

TACT

DES

IGN

TEA

M @

Ge

ze

lm

an

PE

.com

SU

BJE

CT

T

O E

JC

DC

C

-7

00

:

HT

TP

://G

EZ

EL

MA

NP

E.C

OM

/R

EF

ER

EN

CE

/A

G/C

-7

00

.P

DF

473 Golden Isles Drive Suite 202

Hallandale Beach, FL 33009

Telephone: 877-678-6247

Fax: 954-200-6695

Email:

[email protected]

01

SCALE: NTS, REFER TO MECHANICAL DRAWINGS FOR ACTUAL ROOF PLAN

PV SOURCE CIRCUIT LAYOUT - 4 STRINGS, 80 PV MODULES

02

SCALE: NTS, REFER TO MECHANICAL DRAWINGS FOR ACTUAL ROOF PLAN

PV OUTPUT CIRCUIT, RE 01 FOR SOURCE CIRCUIT

Page 2: PINE TREE LIMITED PARTNERSHIP - GezelmanPE · b7 b6 b5 b4 b3 b2 b1 b14 b13 b12 b19 d6 d5 ... i certify that pv installations made iaw this plan can resist positive and ... bolts with

EN

LA

RG

ED

V

IE

WIN

G &

H

YP

ER

LIN

KS

:

PR

IN

T V

ER

SIO

N O

F T

HIS

P

LA

N P

RO

VID

ES

M

IN

IM

UM

IN

FO

RM

AT

IO

N N

EE

DE

D B

Y U

SE

RS

.

EL

EC

TR

ON

IC

V

ER

SIO

N (E

V) P

RO

VID

ES

M

AG

NIF

IE

D V

IE

WIN

G U

P T

O 6

40

0%

. E

V A

LS

O P

RO

VID

ES

HY

PE

RL

IN

K A

CC

ES

S T

O O

EM

M

AN

UA

LS

A

ND

A

BU

ND

AN

T O

TH

ER

S

UP

PL

EM

EN

TA

RY

IN

FO

RM

AT

IO

N.E

V M

AY

B

E A

CC

ES

SE

D A

T:

WW

W.C

AD

VIC

E.U

S/S

OL

AR

.D

O/0

39

2P

.S

A.P

in

eT

re

e_

Mia

miB

ea

ch

_F

L.d

wg

SHEET NO:

PUBLISHED:

SHEET NAME:

DRAWN: CHECKED:SB AG

REVISIONS:

IN

ST

AL

LA

TIO

N O

F A

R

OO

F M

OU

NT

PIN

E T

RE

E L

IM

IT

ED

P

AR

TN

ER

SH

IP

60

00

P

IN

E T

RE

E D

RIV

E, M

IA

MI B

EA

CH

F

L 3

31

40

Siggi Brocks

CONTRACTOR:

ALLEN GEZELMAN

16502 HANNA RD.

LUTZ, FLORIDA 33549

PH. 813 909 1956

Allen@Gezelman PE.COM

www.GezelmanPE.com

C

OP

Y R

IG

HT

&

IN

TE

LLE

CT

UA

L P

RO

PE

RT

Y N

OT

IC

E

T

HIS

P

LA

N S

ET

IS

C

OP

Y R

IG

HT

P

RO

TE

CT

ED

A

ND

C

ON

TA

IN

S IN

TE

LL

EC

TU

AL

P

RO

PE

RT

Y W

HIC

H B

EL

ON

GS

T

O A

LL

EN

G

EZ

EL

MA

N P

E.

A

CC

ES

S IS

G

IV

EN

T

O T

HE

IN

FO

RM

AT

IO

N H

ER

EO

N S

OL

EL

Y F

OR

T

HE

P

UR

PO

SE

O

F C

OM

PL

ET

IO

N O

F T

HE

P

RO

JE

CT

F

OR

W

HIC

H IT

IS

IN

TE

ND

ED

.

N

O O

TH

ER

U

SE

M

AY

B

E M

AD

E O

F T

HE

IN

FO

RM

AT

IO

N, D

RA

WIN

GS

, O

R ID

EA

S H

ER

EO

N W

IT

HO

UT

T

HE

E

XP

RE

SS

, W

RIT

TE

N, P

ER

MIS

SIO

N O

F A

LL

EN

G

EZ

EL

MA

N P

E

CON

TACT

DES

IGN

TEA

M @

Ge

ze

lm

an

PE

.com

SU

BJE

CT

T

O E

JC

DC

C

-7

00

:

HT

TP

://G

EZ

EL

MA

NP

E.C

OM

/R

EF

ER

EN

CE

/A

G/C

-7

00

.P

DF

473 Golden Isles Drive Suite 202

Hallandale Beach, FL 33009

Telephone: 877-678-6247

Fax: 954-200-6695

Email:

[email protected]

Siggi
Image
Siggi
Snapshot
Siggi
Snapshot
Siggi
Snapshot
Siggi
Snapshot
Siggi
Snapshot
Siggi
Snapshot
Siggi
Highlight
Siggi
Highlight
Siggi
Highlight
Siggi
Highlight
Siggi
Highlight
Siggi
Highlight
Siggi
Highlight
Siggi
Highlight
Siggi
Highlight
Siggi
Highlight
Siggi
Highlight
Siggi
Highlight
Siggi
Highlight
Siggi
Highlight
Siggi
Highlight
Siggi
Highlight
Siggi
Highlight
Siggi
Highlight
Siggi
Highlight
Siggi
Highlight
Siggi
Highlight
Siggi
Highlight
Siggi
Highlight
Siggi
Highlight
Siggi
Snapshot
Siggi
Highlight
Siggi
Highlight
Siggi
Highlight
Page 3: PINE TREE LIMITED PARTNERSHIP - GezelmanPE · b7 b6 b5 b4 b3 b2 b1 b14 b13 b12 b19 d6 d5 ... i certify that pv installations made iaw this plan can resist positive and ... bolts with

32'

6' E-W Z RAILPAIRS (ZR)

PV MODULE

E-W 8" HZB

6' VCS

REARPARAPET

N-S 8" SLOPING ZEE (SZB)

E-W 8" HZB5°+

VCS: VERTICAL CEE SUPPORTHZB: HORIZONTAL ZEE BEAMSZB: SLOPING ZEE BEAMZR : ZEE RAIL

6' C-C BOLT SPACING. MINIMUM3-1/2 " Ø BOLTS, 3" INTO CONCRETE

TOP OF ROOF EXTERIOR WALKWAY

TOP OF PARAPET

43"

5'±

6' VCS

16''

2'±

4'

6' VCS

6' VCS6' VCS

8'c-c

8'c-c

8'c-c

18'

16'

14'

16'

19'4'

8'

43'

16'

6'

7'

13'

5'

ELEC. SVC. ENTRANCE

2-STOREDGE POWERWALL& BATTERIES

12'-6"12'-6"

8'

VCS

ABSA

VCS AT EACHEND OF ZHB

HZB

SZB

2'

02

03

I CERTIFY THAT PV INSTALLATIONS MADE IAW THIS PLAN CAN RESIST POSITIVE AND NEGATIVE WIND FORCES PREDICTED IAWASCE 7. THIS IS ATTESTED TO BY MY SIGNATURE AND SEAL ON THIS DRAWING AT THE UPPER RIGHT.

SCALE:NTS

SCALE:NTS

2014 FBC ( 5TH EDITION FLORIDA BUILDING CODE)

05SCALE: 1" : 4'-11"

PLAN VIEW

04SCALE: NTS

ELEVATION VIEW

SITE

60

00

Pin

e T

ree

Dri

ve

Mia

mi

Be

ac

h

INSTALLATION NOTES: COMBINED PLAN CONSISTING OF STRUCTURAL & ELECTRICAL PLAN SHEETS

1. THIS NOTE SECTION DEALS WITH STRUCTURAL ELEMENTS OF PLAN.2. ELECTRICAL NOTES ARE ON RESPECTIVE PLAN SHEETS.3. GROSS AREA OF UPPER ROOF SYSTEM INCLUDING WALKWAYS IS 2820-SF, SOLAR COVERS 920-SF.4. GROSS AREA OF LOWER ROOF IS 1593-SF, SOLAR COVERS 550 SF5. PV MODULE HAS A 113-PSF PRESSURE RATING.6. 39-INCH WIDE ROOF PERIMETER WALKWAYS, 9-INCH THICK PARAPET WALLS, & HEIGHT OF REAR

OF ARRAYS (NORTH ENDS) ARE DEEMED ADEQUATE TO PROVIDE PRESSURE ZONE 1 SET-BACK PERASCE 7 & FIRE ACCESS PER NFPA 1.

7. PV RACK SYSTEM DESCRIPTION BEGINNING UPWARD FROM 9-INCH THICK SOLID CONCRETEPARAPET WALLS:

a. FOLLOWING DESCRIBED FRAMING MEMBERS SHALL BE GALVALUME-COATED, MINIMUM14-GAUGE, COLD-FORMED, STEEL. SHAPE & MINIMUM LONG CROSS SECTION DIMENSIONSHALL BE AS SHOWN IN DRAWINGS.

b. VCS (VERTICAL CEE SUPPORTS) SHOWN IN DRAWINGS SHALL EACH BE ATTACHED TO OUTSIDEOF PARAPET WALL BY MINIMUM THREE ½-INCH DIAMETER X 3-INCH LONG CRS (CORROSIONRESISTANT STEEL) BOLTS WITH MINIMUM 6-INCH C-C (CENTER TO CENTER) VERTICALSPACING.

c. BOLTS SHALL BE SET INTO POWERS OR EQUAL DROPIN ANCHORS INSTALLED INTO PARAPETSIAW (IN ACCORDANCE WITH) OEM (ORIGINAL EQUIPMENT MANUFACTURER) INSTRUCTIONShttp://www.powers.com/product_06308.php

d.HZB (HORIZONTAL ZEE BEAMS) SHALL RUN EAST-WEST & SHALL ATTACH TO VCS EACH END BYMINIMUM OF TWO ½-INCH DIAMETER CRS BOLTS.

e. CONTRACTOR SHALL ADJUST FRAMING IN ORDER THAT THE HZB &ZR MEMBERS DO NOT HOLDWATER BY ESTABLISHING A SLIGHT POSITIVE BUBBLE LEVEL TO WEST.

f. SZB (SLOPING ZEE BEAMS) SHALL RUN NORTH-SOUTH RESTING UPON & ATTACHED TO HZB BYSIX (THREE INTO EACH), MINIMUM #12, 1-INCH LONG, SS, TEK SCREWS THRU 2-INCH X 2-INCH,MINIMUM LENGTH SIX INCH, ANGLE.

g. ZR (ZEE RAILS) SHALL RUN EAST WEST PERPENDICULAR TO & ON TOP OF SZB. SZB-ZR ATTACHSAME AS E ABOVE.

h. PV MODULES SHALL REST UPON & ATTACH TO ZR USING GROUNDING MID CLAMPS,STANDARD END CLAMPS, & 3-INCH LONG X #12 SS TEK SCREWS.

i. GEZELMAN PROPRIETARY ABSAS (ADHERED BALLAST SOLAR ATTACHMENT SYSTEM) SHALL BEUSED ON SLOPING ROOF PLANES AS SHOWN IN DRAWING FIGURES TO PROVIDESUPPLEMENTAL/REDUNDANT VERTICAL SUPPORT & UPLIFT RESISTANCE-DETAILS ARE SHOWNIN DRAWING FIGURES. TESTING UNDER EOR (ENGINEER OF RECORD) SUPERVISON IN FACTORY& FIELD SITUATIONS HAS ESTABLISHED 900-POUNDS ALLOWABLE PER SINGLE ABSASATTACHMENT.

8. CONTRACTOR SHALL PROVIDE SUCH ADDITIONAL STRUCTURAL & ELECTRICAL INFORMATION ASAHJ (AUTHIORITY HAVING JURISDICTION AKA BUILDING DEPARTMENT) MAY REQUIRE.

9. EOR PREFERS EMAIL [email protected]

STEEL SCHEDULE

RESIDENTIAL PV INSTALLATIONMiami-Dade FOLIO: 02-3211-014-0590

CONTRACTOR:

473 GOLDEN ISLES DRIVE SUITE 202

HALLANDALE BEACH, FL 33009

Telephone: 877-678-6247

Fax: 954-200-6695

Email: [email protected]

LAYOUT DETAILING

BALLAST,4X4 PLATESREWS,CARRIAGEBOLT ADHERING

NAME ABBREV./SYMBOL FULL NAME CROSS SECTION LONG DIMENSION

CA CONNECTION ANGLE 2-INCHES

HZB HORIZONTAL ZEE BEAM 8-INCHES

SZB SLOPING ZEE BEAM 8-INCHES

VCS VERTICAL CEE SUPPORT 8-INCHES

ZR ZEE RAIL 6-INCHES

Vult175/Vasd135.6-MPH, RISK II, EXP. C , UPLIFT: PZ1-37.6, PZ2-WIDTH 3-FT;INSTALLATION ENTIRELY WITHIN PZ1. GROSS FORCES: SLIDING<4000LBS.OVERTURNING <14000FT-LB, UPLIFT <35000LBS

WIDTH=39.1"

PROJECTED

HEIGHT=64.32"

9 8 7 6 5 4 3 2 1

9 8 7 6 5 4 3 2 1

A

B

C

D

E

F

A

B

C

D

E

F

CO

PYR

IGH

T &

INTE

LLEC

TUA

L P

RO

PER

TY N

OTI

CE

·TH

IS P

LAN

SE

T IS

CO

PYR

IGH

T P

RO

TE

CTE

D A

ND

CO

NTA

INS

INTE

LLE

CTU

AL

PR

OP

ERTY

WH

ICH

BEL

ON

GS

TO A

LLEN

GEZ

ELM

AN

PE.

·A

CC

ESS

IS G

IVE

N T

O T

HE

INFO

RM

ATI

ON

HE

RE

ON

SO

LELY

FO

R T

HE

PU

RP

OSE

OF

CO

MP

LETI

ON

OF

THE

PR

OJE

CT

FOR

WH

ICH

IT IS

INTE

ND

ED.

·N

O O

TH

ER

USE

MA

Y B

E M

AD

E O

F T

HE

INFO

RM

ATI

ON

, DR

AW

ING

S, O

R ID

EA

S W

ITH

OU

T T

HE

EX

PR

ESS,

WR

ITTE

N P

ERM

ISSI

ON

OF

ALL

EN G

EZEL

MA

N P

E. ENGINEER

ALLEN GEZELMAN16502 HANNA RD.LUTZ, FLORIDA 33549

PH.813 909 1956

[email protected]

PE 59180

VOID WITHOUT

VO

ID W

ITH

OU

T

RA

ISE

D O

R E

LE

CT

RO

NIC

SE

AL

RAISED OR ELECTRONIC SEAL

DRAFTSMAN:

ALPER [email protected]

SCOPE OF WORK:EN

LAR

GED

VIE

WIN

G &

HYP

ERLI

NK

S:P

RIN

T V

ERSI

ON

OF

THIS

PLA

N P

RO

VID

ES IN

FOR

MA

TIO

N N

EED

ED B

Y U

SER

S.EL

ECTR

ON

IC V

ERSI

ON

PR

OV

IDES

VIE

WIN

G U

P T

O 6

400%

.C

ON

TAC

T D

ESIG

N T

EAM

@ w

ww

.Gez

elm

anP

E.co

m

SUB

JEC

T TO

EJC

DC

C-7

00

htt

p:/

/ge

zelm

anp

e.c

om

/REF

EREN

CE/

AG

/C-7

00

.PD

F

01SCALE:NTS

ENGINEERING NOTES.

WIND

AXITEC AC-260P

Siggi
Text Box
0392 PV 30
Siggi
Text Box
2ND FLOOR MECHANICAL
Siggi
Text Box
DATE: 01/24/16
Page 4: PINE TREE LIMITED PARTNERSHIP - GezelmanPE · b7 b6 b5 b4 b3 b2 b1 b14 b13 b12 b19 d6 d5 ... i certify that pv installations made iaw this plan can resist positive and ... bolts with

6' E-W Z RAIL (ZR)PV MODULE

RIDGE

TOP OF PARAPET

5'+

19"

ABSA

10" VCS

N-S10" SZB

4' - 4" CEE BRACE

8' 8' 6'

1'-412"

4'

12"

21'

8'

25'

12'

20'

10'

8'

43'

16'

13'

12'12'1'-4"

8'

8'

6'

33'

VCSABSA ZR

VCS

6' C-C BOLT SPACING. MINIMUM3-1/2 " Ø BOLTS, 3" INTO CONCRETE

PV MODULE6' E-W Z RAIL (ZR)

4" CEE BRACE

12"

12' 12' 1.5'

TOP OF PARAPET

9 8 7 6 5 4 3 2 1

9 8 7 6 5 4 3 2 1

A

B

C

D

E

F

A

B

C

D

E

F

CO

PYR

IGH

T &

INTE

LLEC

TUA

L P

RO

PER

TY N

OTI

CE

·TH

IS P

LAN

SE

T IS

CO

PYR

IGH

T P

RO

TE

CTE

D A

ND

CO

NTA

INS

INTE

LLE

CTU

AL

PR

OP

ERTY

WH

ICH

BEL

ON

GS

TO A

LLEN

GEZ

ELM

AN

PE.

·A

CC

ESS

IS G

IVE

N T

O T

HE

INFO

RM

ATI

ON

HE

RE

ON

SO

LELY

FO

R T

HE

PU

RP

OSE

OF

CO

MP

LETI

ON

OF

THE

PR

OJE

CT

FOR

WH

ICH

IT IS

INTE

ND

ED.

·N

O O

TH

ER

USE

MA

Y B

E M

AD

E O

F T

HE

INFO

RM

ATI

ON

, DR

AW

ING

S, O

R ID

EA

S W

ITH

OU

T T

HE

EX

PR

ESS,

WR

ITTE

N P

ERM

ISSI

ON

OF

ALL

EN G

EZEL

MA

N P

E.

ENLA

RG

ED V

IEW

ING

& H

YPER

LIN

KS:

PR

INT

VER

SIO

N O

F TH

IS P

LAN

PR

OV

IDES

INFO

RM

ATI

ON

NEE

DED

BY

USE

RS.

ELEC

TRO

NIC

VER

SIO

N P

RO

VID

ES V

IEW

ING

UP

TO

640

0%.

SUB

JEC

T TO

EJC

DC

C-7

00

htt

p:/

/ge

zelm

anp

e.c

om

/REF

EREN

CE/

AG

/C-7

00

.PD

FC

ON

TAC

T D

ESIG

N T

EAM

@ w

ww

.Gez

elm

anP

E.co

mENGINEER

ALLEN GEZELMAN16502 HANNA RD.LUTZ, FLORIDA 33549

PH.813 909 1956

[email protected]

PE 59180

VOID WITHOUT

VO

ID W

ITH

OU

T

RAISED OR ELECTRONIC SEAL

DRAFTSMAN:

ALPER [email protected]

02PLAN VIEW

01SCALE: NTS

ELEVATION VIEW

03REAR ELEVATION

60

00

Pin

e T

ree

Dri

ve

Mia

mi

Be

ac

h

CONTRACTOR:

473 GOLDEN ISLES DRIVE SUITE 202

HALLANDALE BEACH, FL 33009

Telephone: 877-678-6247

Fax: 954-200-6695

Email: [email protected]

SCALE: 1" = 3' - 6"

SCALE: NTS

Siggi
Text Box
0392 PV 40
Siggi
Text Box
1ST FLOOR MECHANICAL
Siggi
Text Box
DATE: 01/24/16