Pilot Testing of a Membrane System for Post-Combustion CO ...€¦ · Pilot Testing of a Membrane...

19
Pilot Testing of a Membrane System for Post-Combustion CO 2 Capture DE-FE0005795 Carlos Casillas, Ken Chan, Don Fulton, Jurgen Kaschemekat, Jay Kniep, Jennifer Ly, Tim Merkel, Vincent Nguyen, Zhen Sun, Xuezhen Wang, Xiaotong Wei, Steve White NETL CO 2 Capture Technology Meeting Tuesday, June 23, 2015

Transcript of Pilot Testing of a Membrane System for Post-Combustion CO ...€¦ · Pilot Testing of a Membrane...

Page 1: Pilot Testing of a Membrane System for Post-Combustion CO ...€¦ · Pilot Testing of a Membrane System for Post-Combustion CO 2 Capture DE-FE0005795 Carlos Casillas, Ken Chan, Don

Pilot Testing of a Membrane System for Post-Combustion CO2 Capture

DE-FE0005795

Carlos Casillas, Ken Chan, Don Fulton, Jurgen Kaschemekat, Jay Kniep, Jennifer Ly, Tim Merkel, Vincent Nguyen, Zhen Sun,

Xuezhen Wang, Xiaotong Wei, Steve White

NETL CO2 Capture Technology Meeting Tuesday, June 23, 2015

Page 2: Pilot Testing of a Membrane System for Post-Combustion CO ...€¦ · Pilot Testing of a Membrane System for Post-Combustion CO 2 Capture DE-FE0005795 Carlos Casillas, Ken Chan, Don

Project Overview

2

Award name: Pilot testing of a membrane system for post-combustion CO2 capture Project period: 10/1/10 to 9/30/15 Funding: $15 million DOE; $3.75 million MTR DOE program manager: Jose Figueroa Participants: MTR, Babcock & Wilcox, SCS/NCCC, EPRI, Vectren, ISTC

Project scope: Demonstrate a membrane process to capture 20 tons of CO2/day (TPD) from a flue gas slipstream of a coal-fired power plant.

Project plan: The key project work organized by budget period is as follows:

• BP1 – Membrane optimization though continued slipstream testing on the 1 TPD system and computational evaluation of sweep recycle with B&W

• BP2 – Design and construction of the 20 ton/day system, boiler testing at B&W with CO2-laden air; membrane/module optimization and durability testing through continued testing on 1 TPD system

• BP3 – Field test of the 20 ton/day system; comparative economic analysis; industrial 1 TPD field test; case study at 20 MW-scale

As of 5/31/15, project is 95% complete

Page 3: Pilot Testing of a Membrane System for Post-Combustion CO ...€¦ · Pilot Testing of a Membrane System for Post-Combustion CO 2 Capture DE-FE0005795 Carlos Casillas, Ken Chan, Don

MTR CO2 Capture Process

3

Benefits of selective recycle: • Increases CO2 concentration going to the capture step, and • Reduces the fractional CO2 removal required by the capture step

20% 10%

2%

8%

65%

U.S. Patents 7,964,020 and 8,025,715

Page 4: Pilot Testing of a Membrane System for Post-Combustion CO ...€¦ · Pilot Testing of a Membrane System for Post-Combustion CO 2 Capture DE-FE0005795 Carlos Casillas, Ken Chan, Don

MTR CO2 Capture Development Timeline

Feasibility study (DE-NT43085) • Sweep concept proposed • Polaris membrane conceived

APS Red Hawk NGCC Demo • First Polaris flue gas test • 250 lb/d CO2 used for algae farm

APS Cholla Demo (DE-NT5312) • First Polaris coal flue gas test • 1 TPD CO2 captured (50 kWe)

NCCC 1 MWe Demo ($18.7 MM) • 10,000 hours of 1 TPD system operation • 1 MWe (20 TPD) system operation

2006 2008 2010 2012 2014 2016 2018 2020

TRL6 TRL7 TRL8 TRL5 TRL4

Hybrid Capture (DE-FE13118) • Membrane-solvent hybrids with UT, Austin

Low Pressure Mega Module (DE-NT7553) • Design and build a 500 m2 optimized module

Future 10 MWe Large Pilot

TRL3

B&W Integrated Test

Page 5: Pilot Testing of a Membrane System for Post-Combustion CO ...€¦ · Pilot Testing of a Membrane System for Post-Combustion CO 2 Capture DE-FE0005795 Carlos Casillas, Ken Chan, Don

5

Pros and Cons of a Membrane Post-Combustion Capture Process

Benefits: • No hazardous chemical handling, emissions, or disposal issues

• Not affected by oxygen, SOx or NOx

• Water use lower than other technologies (recovers H2O from flue gas)

• No steam use → no modifications to existing boiler/turbines

• Near instantaneous response; high turndown possible

• Modular and compact; relatively simple installation/operation

• Particularly well-suited for partial capture (40-60%)

Challenges: • Very low partial pressure driving force favors high permeance membranes

• Unknown impact of real flue gas on membrane-module lifetime

• Module pressure drop and flow distribution issues

5

Page 6: Pilot Testing of a Membrane System for Post-Combustion CO ...€¦ · Pilot Testing of a Membrane System for Post-Combustion CO 2 Capture DE-FE0005795 Carlos Casillas, Ken Chan, Don

6

Polaris Membrane Improvements

0

10

20

30

40

50

60

70

0 1,000 2,000 3,000

CO2/N2

selectivity

CO2 permeance (gpu)

PolarisTM

1st generation(commercial scale)

Commercial CO2 membranes

Polaris2nd generation

(pilot scale)

Polarisadvanced(lab scale)

• During this project, 75% increase in commercial membrane CO2 permeance; route to 3X increase

• In addition to lowering costs, these improvements are important to shrink the size of the capture system

1 gpu = 10-6 cm3(STP)/(cm2 s cmHg)= 3.35 x 10-10 mol/(m2 s Pa)

Page 7: Pilot Testing of a Membrane System for Post-Combustion CO ...€¦ · Pilot Testing of a Membrane System for Post-Combustion CO 2 Capture DE-FE0005795 Carlos Casillas, Ken Chan, Don

Systems Analysis: Importance of Membrane Improvements

• Study completed in BP1 to meet a project milestone; currently being updated by EPRI/WP

• All calculations for 90% CO2 capture use Bituminous Baseline report methodology

• Higher permeance (lower cost) membranes are key to approaching DOE goals

• Results are consistent with DOE report “Current and Future Technologies for Power Generation with Post-Combustion Carbon Capture” (DOE/NETL-2012/1557)

7 7

20

40

60

80

100

120

100 1,000 10,000

Changein COE

(%)

Membrane CO 2 permeance (gpu)

1st Generation Polaris

2nd Generation Polaris

MEA (Case 10)

DOE Target

AdvancedPolaris

Assumed membrane cost = $50/m2

Page 8: Pilot Testing of a Membrane System for Post-Combustion CO ...€¦ · Pilot Testing of a Membrane System for Post-Combustion CO 2 Capture DE-FE0005795 Carlos Casillas, Ken Chan, Don

8

1 TPD Testing at NCCC

• Field laboratory that allows lifetime evaluation (>10,000 hours cumulative), and validation testing of new membranes

• Many lessons learned (i.e., ammonium sulfate deposition) applied to scale up

• System is testing vacuum and air sweep membrane steps

• Sized to capture 1 ton CO2/day using commercial sized module

• System started operation in spring 2012

Page 9: Pilot Testing of a Membrane System for Post-Combustion CO ...€¦ · Pilot Testing of a Membrane System for Post-Combustion CO 2 Capture DE-FE0005795 Carlos Casillas, Ken Chan, Don

Sample 1 TPD Results from NCCC

9

New membrane validation Capture rate vs time

System allows more rapid materials optimization through real world testing 9

0

10

20

30

40

50

0 5 10 15 20 25 30 35 40

Mod

ule

CO

2 rem

oval

rate

(lb/

h)

Cumulative run time (h)

2nd generation Polaris

1st generation Polaris

0

20

40

60

80

100

0 100 200 300 400 500 600

Cap

ture

rate

(%)

Cumulative run time (h)

Page 10: Pilot Testing of a Membrane System for Post-Combustion CO ...€¦ · Pilot Testing of a Membrane System for Post-Combustion CO 2 Capture DE-FE0005795 Carlos Casillas, Ken Chan, Don

10

Scale up to 20 TPD Small Pilot

• 20 TPD skid (1 MWe) was installed by NCCC and MTR personnel during summer 2014

• Currently in operation

• Test objective is validation of advanced modules (multi-tube and plate-and-frame) designed for low pressure drop and small footprint

Membrane vessels

Vacuum pump

Air sweep blower

Page 11: Pilot Testing of a Membrane System for Post-Combustion CO ...€¦ · Pilot Testing of a Membrane System for Post-Combustion CO 2 Capture DE-FE0005795 Carlos Casillas, Ken Chan, Don

11

Installation of 20 TPD Small Pilot at NCCC

Crane lowering 2nd floor of system into place

Photo courtesy of Tony Wu

1st floor of system arriving by truck

Photos courtesy of Tony Wu

Page 12: Pilot Testing of a Membrane System for Post-Combustion CO ...€¦ · Pilot Testing of a Membrane System for Post-Combustion CO 2 Capture DE-FE0005795 Carlos Casillas, Ken Chan, Don

20 TPD System at PC4

12

MTR system

• System installation completed Aug 2014

• Operation during Jan – Jun 2015

• Membranes are modular, compact,

and require relatively little on-site

construction

Page 13: Pilot Testing of a Membrane System for Post-Combustion CO ...€¦ · Pilot Testing of a Membrane System for Post-Combustion CO 2 Capture DE-FE0005795 Carlos Casillas, Ken Chan, Don

System Tests Scaled-Up Membrane Modules

13

Advanced modules demonstrate lower cost and pressure drop

Bundled spiral sweep modules

Bundled Polaris spirals

Polaris plate-and-frame (designed in DE-NT7553)

Page 14: Pilot Testing of a Membrane System for Post-Combustion CO ...€¦ · Pilot Testing of a Membrane System for Post-Combustion CO 2 Capture DE-FE0005795 Carlos Casillas, Ken Chan, Don

14

20 TPD System Shows Stable Performance

• Stable system performance through various startup / shutdowns and large variations in ambient conditions (sub-freezing in Jan to >95°F now)

• System goes from cold start to steady state in ~15 minutes

Run time (hours)

CO2 capture

rate (%)

Figure data from current NCCC campaign (PO3: May to July 2015)

Page 15: Pilot Testing of a Membrane System for Post-Combustion CO ...€¦ · Pilot Testing of a Membrane System for Post-Combustion CO 2 Capture DE-FE0005795 Carlos Casillas, Ken Chan, Don

New Modules Demonstrate Improved Pressure Drop Performance

15

0

0.5

1

1.5

2

2.5

3

3.5

4

900 1,000 1,100 1,200 1,300 1,400 1,500 1,600

Sweep-sidepressure dop

(psi)

Sweep flowrate (lb/h)

Spiral with flue gas

Plate-and-framewith flue gas

Plate-and-framelab data

• Field data is consistent with lab results, and confirms much lower air sweep pressure drop in new modules

• At full scale, the difference in pressure drop amounts to savings of about 10 MWe

Page 16: Pilot Testing of a Membrane System for Post-Combustion CO ...€¦ · Pilot Testing of a Membrane System for Post-Combustion CO 2 Capture DE-FE0005795 Carlos Casillas, Ken Chan, Don

Systems Analysis: Membranes are Particularly Effective at Partial Capture

16

• Membranes show a minimum in capture cost

• To meet proposed EPA emission limits for coal (~40% capture), a simple system without recycle may be preferable

30

40

50

60

70

0 20 40 60 80 100CO2 capture rate (%)

Cost ofCO2 captured

($/tonne)

Single-step process, no recycle

Two-step process with CO2 recycle

DOE target

Page 17: Pilot Testing of a Membrane System for Post-Combustion CO ...€¦ · Pilot Testing of a Membrane System for Post-Combustion CO 2 Capture DE-FE0005795 Carlos Casillas, Ken Chan, Don

Ashkelon desalination plant • 40,000 spiral-wound RO membrane

modules (Dow Filmtec®)

• 1.5 million m2 membrane area

Flue gas membrane vessels • ~100 vessels required for 550 MWe plant

with today’s membranes

• Double permeance → halve the vessels

What Would a Large Membrane System Look Like?

Page 18: Pilot Testing of a Membrane System for Post-Combustion CO ...€¦ · Pilot Testing of a Membrane System for Post-Combustion CO 2 Capture DE-FE0005795 Carlos Casillas, Ken Chan, Don

Summary

• CO2 capture membrane performance continues to improve, and has been validated on a 1 TPD slipstream system at NCCC (now ~10,000 hours total run time)

• 20 TPD small pilot operation at NCCC is nearly complete; Testing successfully demonstrated optimized modules (low ∆p, low cost)

• Systems analysis shows low-cost “sweet spot” for membranes at 40-60% capture; updated TEA underway

18

Page 19: Pilot Testing of a Membrane System for Post-Combustion CO ...€¦ · Pilot Testing of a Membrane System for Post-Combustion CO 2 Capture DE-FE0005795 Carlos Casillas, Ken Chan, Don

U.S. Department of Energy, National Energy Technology Laboratory

– Jose Figueroa – Mike Mosser

Southern Company Services (NCCC)

Acknowledgements

19 19 759 - NETL Mtg 062315