Pilot Program on the Application of Electronic Resettable Sectionalizers to Improve Reliability
description
Transcript of Pilot Program on the Application of Electronic Resettable Sectionalizers to Improve Reliability
1
Pilot Program on the Application of Electronic Resettable Sectionalizers to
Improve Reliability
SWEDE ConferenceMay 1, 2008
2
Pilot Program Review
• Circuit History on Hockley (HK) -04 and -06– Circuit Demographics– Reliability Performance
• Root Cause Analysis on Circuit Operations and Fuse Outages– Review of Outage Data in Early 2005– Potential Solutions
• Course of Action for Electronic Resettable Sectionalizers (ERS )– Functions– Advantages– Safety Concerns– Implemented by Early 2006– Education
• Performance Results for 2006 and 2007
3
Circuit History
4
5
HK-04 Lateral
6
Circuit History (con’t)
• Reliability Performance on HK-04– 10% SAIDI circuit in 2003, 2004 and 2005– Excessive circuit operations in 2004– 9 specific fuses accounted for 60% of total
circuit SAIDI minutes from potential temporary events (lightning, wind, wildlife, etc…) in 2004
– Similar performance in 2003 and 2005
7
Circuit History (con’t)
• Reliability Performance on HK-06– 10% SAIDI circuit in 2004 and 2005– Excessive circuit operations in 2004– 5 specific fuses accounted for 58% of total
circuit SAIDI minutes from potential temporary events in 2004
8
Root Cause Analysis
• Review of Outage Data in Early 2005– 60% (HK-04) and 58% (HK-06) of total circuit SAIDI
mins from potential temporary events in 2004– Excessive circuit operations in 2004
• HK-04 – 27 operations• HK-06 – 36 operations
– Source of excessive operations unknown– Fault current data ( < 1kA to > 4kA ) from relays
indicated activities may be at multiple points
9
Root Cause Analysis (con’t)
• Review of Outage Data in Early 2005– Lightning analysis investigation
• No static construction• Flat, grasslands, agricultural areas• Temporary events such as lightning and wind• Erratic fault current values• Correlation between outages and lightning strikes
10
Mapping of Hockley Circuits
11
Lightning Data Plot for 2004
12
Root Cause Analysis (con’t)
• Investigation of Potential Solutions– Installation of lightning arresters
• Effective but costly– Installation of static neutral
• Effective but costly– Remote controlled equipment
• Limited effectiveness– Electronic resettable sectionalizers (ERS)
• Effective and economical
13
Course of Action
• Functions of ERS Devices– Works in conjunction with upstream reclosing
protective device– Similar in operation as a typical sectionalizer
• Registers current greater than its actuating level• Registers loss of voltage • Device opens on predetermined number of counts of
fault current AND loss of voltage– 1, 2 and 3-count devices can be placed in series
14
Course of Action (con’t)
• Advantages of ERS Devices– Allow temporary faults to clear without
experiencing a sustained interruption– Less expensive alternative to reclosers to isolate
faulted (sustained) sections of conductor– Fits into standard fuse cutout body– Simple to install and implement– Ideal for replacing existing fuses
15
Course of Action (con’t)
• Safety Concerns on ERS Devices– Must be used in conjunction with an upstream
reclosing protective device– Cannot be blindly used to replace fuses– Detailed engineering analysis must be
performed prior to implementing– Lack of familiarity by line crews on the
operation of ERS devices
16
Course of Action (con’t)
• Implemented by Early 2006– Protection analysis conducted by engineering– Breaker coordination with hydraulic reclosers– HK-04
• 3 hydraulic reclosers installed• 9 fuses replaced with ERS devices
– HK-06• 1 hydraulic recloser installed• 5 fuses replaced with ERS devices
17
Hockley-04 Oneline
18
Recloser 127Z
19
20
Sectionalizer 112N
21
22
Hockley-06 Oneline
23
Course of Action (con’t)
• Education– Line crews trained on application– Article published in company-wide newsletter– Stenciling nomenclature (###N or N###)
24
Stenciling Nomenclature
25
Performance Results for 2006
• HK-04 and HK-06 – 47% combined decrease in SAIDI values– Neither repeated as 10% SAIDI circuits
• Pilot program deemed successful• CPE approved the deployment of ERS
devices on other circuits
26
Performance Results for 2007
• HK-06 was not a 2007 10% SAIDI circuit
• HK-04 was a 2007 10% SAIDI circuit– 16% of total circuit SAIDI mins from potential
temporary events behind line fuses– Trees, collisions, material failures and unknown
causes also contributed to SAIDI mins
27