PILING WORK C.1 Piling Work (including pile supply, pile driving, Unit: Set pile head cutting and pile splicing) Definition of work to be included in rate. To be used for “all in” prices when C2, C3, C4 & C5 are not separately itemised Pile supply as defined in item C.2 Pile driving as defined in item C.3. Pile splicing as defined in item C.4 Pile head cutting as defined in item C.5. Measurement The pay quantity shall be in sets. C.2 Pile Supply (applicable to all types of piles such as Unit: Pc or length R.C. piles, P.C.piles, steel pipe, steel Upiles and wooden piles) Definition of work to be included in rate. Prefabrication or procurement of the specified type of pile. Preservation, painting, or coating, including surface preparation as specified. Handling, transporting, unloading and storing of the piles to, or at the jobsite. Test and inspection Measurement The Pay quantity shall be for each type, size, and length or pile as ordered and accepted by Contractor. There will be no payment for Piles damaged during fabrication, transportation or driving. C.3 Pile Driving (applicable to all types of piles) Unit: LM

description

Working method of Pilling Works

Transcript of Piling Work

  • PILINGWORKC.1 PilingWork(includingpilesupply,piledriving, Unit:Set

    pileheadcuttingandpilesplicing) Definitionofworktobeincludedinrate. TobeusedforallinpriceswhenC2,C3,C4&C5arenotseparatelyitemised PilesupplyasdefinedinitemC.2 PiledrivingasdefinedinitemC.3. PilesplicingasdefinedinitemC.4 PileheadcuttingasdefinedinitemC.5. Measurement Thepayquantityshallbeinsets.C.2 PileSupply(applicabletoalltypesofpilessuchas Unit:Pcorlength

    R.C.piles,P.C.piles,steelpipe,steelUpilesandwoodenpiles) Definitionofworktobeincludedinrate. Prefabricationorprocurementofthespecifiedtypeofpile. Preservation,painting,orcoating,includingsurfacepreparationasspecified. Handling,transporting,unloadingandstoringofthepilesto,oratthejobsite. Testandinspection Measurement The Pay quantity shall be for each type, size, and length or pile as ordered and

    accepted by Contractor. There will be no payment for Piles damaged duringfabrication,transportationordriving.

    C.3 PileDriving(applicabletoalltypesofpiles) Unit:LM

  • Definitionofworktobeincludedinrate. Loadingandhaulingofpilesfromstorageyardtodrivingspot. Touchuppaintingand/orcoating. Drivingofpiles. Recordingandreportingonpiledriving. PilesplicingasdefinedinitemC.4.*) PileheadcuttingasdefinedinitemC.5.**)*) IfPileSplicingisitemizedseparatelyintheBillsofQuantities,thisworkshallnotbe

    includedinthescopeofPileDriving.**)IfPileHeadCuttingisitemizedseparatelyintheBillsofQuantities,thisworkshall

    notbeincludedinthescopeofPileDriving. Measurement Thepayquantity shallbe the totalnetpenetration length successfullydriven into

    thegroundinaccordancewiththerequirementsofthedrawingsandspecifications. Compensatingpilesshallnotbeincluded. There shall be no payment for lengths of piles driven in excess of specified

    requirements.

    C.4 PileSplicing Unit:Ea Definitionofworktobeincludedinrate. Settingandalignmentofpilestobespliced. Splicing,includingsupplyofnecessarymaterials,endpreparation,bevellingwelding,

    coating,painting,etc. Nondestructivetest(N.D.T)

    Measurement The pay quantity shall be for each splice completed as per drawings and

    specifications(sizestobespecified). SplicingdonefortheSubcontractorsownreasonsandmethodofconstructionshall

    notbeincluded SplicingrequiredforcompensationpilesshallnotbeincludedC.5

  • C.5PileHeadCutting Unit:Ea Definitionofworktobeincludedinrate. Cuttingandtrimmingofpiles. Preparationofpileheadsforembeddingintothefoundation. Reformingnecessaryitemssuchascrushingintosmallpieces. Removalanddisposalofcutoffpilestothedesignatedarea. Measurement Thepayquantityshallbecountedseparatelybyeachtypeandsizeofpile. Thepileheadcuttingrequiredforcompensationpilesshallnotbeincluding.C.6 PileLoadingTest(includingcompactiontest,horizontal Unit:Ea

    test,pullingtest) Definitionofworktobeincludedinrate. Pileheadpreparationforpileloadingtest. Supplyandinstallationofanchors. Provisionandinstallationofnecessaryinstruments,apparatus,weightsandrelevant

    work. Testingandmeasuring. Recordingandreportingoftheresults. Cutting,removalanddisposalofthetestpiles,whennecessaryNotes: CompensationPilescalledforabovemeansthefollowingpiles.

    (1) Drivenpileswhichdonotmeetthespecifiedtolerances(location,slopeandelevation)

    (2) Pileswhicharenotsuccessfullydriven(i.e.,structurally)

  • Measurement ThepayquantityshallbeasorderedbyCONTRACTOR. Theunitforthisitemshallbethenumberofpilestobetested..AlternativelythePay

    itemshallbeforeachsetofpilestobetestedasdefinedbyCONTRACTOR

    pile head cutting and pile splicing) Definition of work to be included in rate. To be used for all in prices when C2, C3, C4 & C5 are not separately itemised Pile supply as defined in item C.2 Pile driving as defined in item C.3. Pile splicing as defined in item C.4 The pay quantity shall be in sets.R.C. piles, P.C.piles, steel pipe, steel U-piles and wooden piles) Definition of work to be included in rate. Prefabrication or procurement of the specified type of pile. Preservation, painting, or coating, including surface preparation as specified. Handling, transporting, unloading and storing of the piles to, or at the jobsite. Test and inspection Loading and hauling of piles from storage yard to driving spot. Touch-up painting and/or coating. Driving of piles. Recording and reporting on pile driving. Pile splicing as defined in item C.4.*)*) If Pile Splicing is itemized separately in the Bills of Quantities, this work shall not be included in the scope of Pile Driving.**) If Pile Head Cutting is itemized separately in the Bills of Quantities, this work shall not be included in the scope of Pile Driving. Measurement The pay quantity shall be the total net penetration length successfully driven into the ground in accordance with the requirements of the drawings and specifications. Definition of work to be included in rate. Setting and alignment of piles to be spliced. Splicing, including supply of necessary materials, end preparation, bevelling welding, coating, painting, etc. Non-destructive test (N.D.T) Measurement The pay quantity shall be for each splice completed as per drawings and specifications (sizes to be specified). Definition of work to be included in rate. Cutting and trimming of piles. Preparation of pile heads for embedding into the foundation. Reforming necessary items such as crushing into small pieces. Measurement The pay quantity shall be counted separately by each type and size of pile. The pile head cutting required for compensation piles shall not be including. Definition of work to be included in rate. Pile head preparation for pile loading test. Provision and installation of necessary instruments, apparatus, weights and relevant work. Testing and measuring. Recording and reporting of the results.Measurement

    The pay quantity shall be as ordered by CONTRACTOR.