Piling & Ground Improvement SPECIALISTS FEDERATION PILING ...
PILING LAYOUT FOUNDATION LAYOUT · 2021. 3. 15. · structural engineer. any pile outside the...
Transcript of PILING LAYOUT FOUNDATION LAYOUT · 2021. 3. 15. · structural engineer. any pile outside the...
1:50 1:25
M.N.
K.L.
K.L.
SUITE 106, ESSENVIEW BUILDING, STRATHMORE PARK,
305 MUSGRAVE ROAD, DURBAN, 4001
e-mail : [email protected]
FAX (031) 3092929 TEL. (031) 3095831
CLIENT
PROJECT
DATE
SCALES
DRAWN
DESIGNED
APPROVED
DRAWING No.
COPYRIGHT RESERVED
PL
REV
DETAILS
M.NAIR PrTechEng
DATEBYREV DESCRIPTION
professional person
PROJECT MANAGER | PRINCIPAL AGENT
200670211registration
UMALUSI OFFICESADDITIONS AND ALTERATIONS
4. CONCRETE CLASS :-
3. ALL CONCRETE WORK TO COMPLY WITH SABS 1200G.
2. THIS DRAWING TO BE READ IN CONJUNCTION WITH
1. ALL LEVELS AND DIMENSIONS TO BE CHECKED ON SITE.
THE ARCHITECTURAL DRAWINGS.
NOTES
a) PILECAPS & GROUND BEAMS = MPa25
b) STRIP FOOTINGS & BASES = MPa25
c) = MPa30
d) SLABS, BEAMS & STAIRCASES = MPa25
5. COVER TO REINFORCEMENT :-
f) SURFACE BEDS = MPa
g) BLINDING = MPa10
e) RETAINING WALLS = MPa25
30
AS INDICATED ON DRAWING
COVER NOT BEING MAINTAINED.
10. ALL STRUCTURAL CONCRETE TO BE CURED FOR
A MINIMUM OF FIVE DAYS.
IF SOIL CONDITIONS RESULT IN REINFORCEMENT
9. CONTRACTOR TO CONSTRUCT A BLINDING LAYER
REMAINDER AT TWENTY EIGHT DAYS. THE RESULTS
THREE TO BE TESTED AT SEVEN DAYS, THE
8. SIX CUBES TO BE TAKEN PER POUR.
TO BE FORWARDED TO THE ENGINEER.
6. ALL FOUNDATION EXCAVATIONS TO BE INSPECTED BY
THE ENGINEER PRIOR TO CASTING OF CONCRETE.
11. BRICKWORK SHOWN HATCHED ARE LOAD BEARING.
ALL LOAD BEARING BRICKWORK TO BE 14MPa NFX.
TOP OF ALL BRICKWORK TO RECEIVE 2 LAYERS OF
3 PLY MALTHOID ON SMOOTH RENDERED SURFACE.
7. ALL REINFORCING FIXING TO BE INSPECTED BY
THE ENGINEER PRIOR TO CASTING OF CONCRETE.
12. ALL SINGLE SKIN BRICKWORK TO BE STOPPED 2
COURSES BELOW SOFFIT OF SLAB AND COMPLETED
AFTER PROPS HAVE BEEN REMOVED.
13. ALL CONCRETE PLASTER AND BRICKWORK PLASTER
INTER-FACES TO RECEIVE V-JOINTS.
14. THE ENGINEER REQUIRES 24HRS NOTICE FOR ALL
INSPECTIONS.
COLUMNS, SHEAR & LIFT WALLS
29/01/2020
200-309 / 300
PILING LAYOUT
P 1 9P 1 8
P 1 7
P 1 6P 1 5P 1 4
P 1 3P 1 2P 1 1P 1 0
P 9P 8
P 7
P 6P 5
P 4
P 3P 2
P 1
3195
110
250
Gx
K
G
F
J
1 32
5400540090
Gx
K
G
F
J
830
4635
5745
830
295210
340
350
360
705970221597585522252100
1105
2285
4225
1265
465
321
+1349,530 lvl +1348,485 lvl
PILING PLATFORM LEVEL TOTALPILE 'CUT OFF' LEVELPILE NUMBERPILE TYPE
150
130
150mm thk.
r.c. surface bed slab.
150mm thk.
r.c. surface bed slab.
2
250450
700
220
595
150
445
800
AA
250450
Gx
K
G
F
J
FOUNDATION LAYOUTPILING NOTES :-
10
230
240 220
1 32
11560
32054005400440
1010900
5390 5860
31070042607004490900
2400
120
100
3870
10mm polystyrene isolation joint
between existing building
and new r.c. foundation.
2690
100
100
100
110110
340 140220
250350
100 220 380 4460
700
220 260220
500
100
100
500
220
700
240
120
340
1170mm x 220mm
r.c. shear wall.
1170
530
640
120
950
220
700100
350700mm x 220mm
r.c. column.
350
1170
640
530
220
500mm x 220mm
r.c. column.
220 260220
100 380220
Line of new r.c. foundation.
260340100
1046570037557004690700
250
250
100
100
500
10mm polystyrene isolation joint
between existing building
and new r.c. foundation.
10mm polystyrene isolation joint
between existing building
and new r.c. foundation.
10mm polystyrene isolation joint
between existing building
and new r.c. foundation.
10mm polystyrene isolation joint
between existing building
and new r.c. foundation.
220
480
220 280
220 500
220
220
500mm x 220mm
r.c. column.
480
220
480 500150
100100 500
350
240
500mm x 220mm
r.c. column.
380320
130
30
700
100
380
220
320
250
250
100
100
500
500mm x 220mm
r.c. column.
700
240
220
100 380220
10
1015
Line of Existing
Building
550465
100
100
700
240
120
340
1170mm x 220mm
r.c. shear wall.100
100
Line of new r.c. foundation.
321
Line of new
r.c. foundation.
Line of
Existing Building
500mm x 220mm
r.c. column.
Line of new r.c. foundation.
Line of Existing Building
500mm x 220mm
r.c. column.
Line of
Existing Building
Line of new r.c. foundation.Line of Existing BuildingLine of Existing Building
10
2500
830
4635
830
Gx
K
G
F
J
2500
830
4635
830
9900
1335
0
2580
870
700
1880
810
6064
035
2570
043
3570
0
810
1880
700
3390
810
700
1077
0
1335
0
4690
260340100
1046570037557004690700
3525
700
565
700
1880
700
3070
700
Existing
Building
Existing
Building
Note : This piling design is 'preliminary'
and will be subject to review and re-design
based on the results of the borehole
investigation currently being carried
out on site.
340 5400 5400
ALL PILES ARE PRESSURE GROUTED
CONTINUOUS FLIGHT AUGURED (CFA) PILES
s.o.p. 83
05
74
54
63
58
30
Note : Brickwork Strapping :
All brickwork to be 'strapped/tied' to r.c. columns,
shear walls and other concrete vertical elements with
30mm wide x 1,2mm thk. x 800mm long galvanised steel
straps. 100mm of steel strap shot fired to column and
700mm of steel strap built into brick wall every 3rd course.
Each brick skin (at every 3rd course) to be tied to r.c.
columns, shear walls and other concrete vertical elements.
UNLESS OTHERWISE NOTED
ALL R.C. GROUND BEAMS ARE :
800mm deep x 700mm wide
with t.o.c. @ + 1349,235 lvl.
41
01
35
5400 5400440
100 340
57
45
36
0
10
s.o.p.
11010 o/a concrete 10
57
45
36
0
10
35
03
50
11010 o/a concrete
2870mm x 220mm
r.c. shear wall.
80
195100
1. ALL PILING TO BE CARRIED OUT IN ACCORDANCE WITH SABS 1200F.
2. THE RESPONSIBILITY FOR THE DESIGN AND PERFORMANCE OF ALL PILES SHALL LIE WITH THE PILING CONTRACTOR AND THE PILING CONTRACTOR SHALL SUPPLY A 'PILING GUARANTEE' OR A 'PILING LIABILITY INSURANCE POLICY' IN THIS REGARD. THE 'PILING GUARANTEE OR A 'PILING LIABILITY INSURANCE POLICY' IS TO BE IN PLACE FOR A MINIMUM PERIOD OF 3 YEARS AFTER THE FINAL PILE HAS BEEN INSTALLED. THE PILING CONTRACTOR'S PILE DESIGN ENGINEER MUST SUBMIT A 'CERTIFICATE OF STABILITY' TO THE PRINCIPAL STRUCTURAL ENGINEER ON COMPLETION OF THE PILING CONTRACT.
3. THE 'PILING LIABILITY INSURANCE POLICY' SHOULD HAVE INSURANCE COVER FOR THE FOLLOWING SECTIONS :- a) PUBLIC LIABILITY COVER. b) GENERAL CONSTRUCTION LIABILITY COVER. c) FOUNDATION FAILURE INDEMNITY COVER. d) PRODUCTS AND DEFECTIVE WORKMANSHIP LIABILITY COVER. e) THE 'CERTIFICATE OF INSURANCE' IS TO BE SUBMITTED TO THE PRINCIPAL STRUCTURAL ENGINEER FOR APPROVAL. f) THE LIMIT OF INDEMNITY AND THE REQUIRED INSURANCE COVER AMOUNTS WILL BE AS STIPULATED IN THE PILING TENDER DOCUMENT OR AS ADVISED BY THE APPOINTED QUANTITY SURVEYOR.
4. CONCRETE STRENGTH FOR ALL PILES AT 28 DAYS IS 30 MPa. CONCRETE CUBE TESTS TO BE CARRIED OUT ON PILE GROUT FOR EVERY 20 PILES INSTALLED. 6 CUBES TO BE TAKEN AFTER EVERY 10 PILES INSTALLED (3 CUBES TO BE TESTED AT 7 DAYS AND 3 CUBES TO BE TESTED AT 28 DAYS). RESULTS OF THE CUBE TESTS TO BE SUBMITTED TO THE PRINCIPAL STRUCTURAL ENGINEER FOR APPROVAL.
5. PILE TYPE IS Ø450mm PRESSURE GROUTED CONTINUOUS FLIGHT AUGER (CFA) PILE WITH A SERVICE LOAD OF 790 kN.
6. PILE CUT-OFF LEVEL TO BE 50mm ABOVE SOFFIT OF THE GROUND BEAM OR AS INDICATED ON THE PILING LAYOUTS WITH 500mm PILE REBAR PROJECTION.
7. PILE INTEGRITY TESTING IS TO BE CARRIED OUT ON ALL PILES BY AN INDEPENDENT GEOTECHNICAL ENGINEER. NO 'IN-HOUSE' INTEGRITY TESTING BY THE PILING CONTRACTOR WILL BE ACCEPTED.
8. ALL PILE SETTING OUT IS TO BE CARRIED OUT BY THE PILING CONTRACTOR AND VERIFIED BY THE MAIN CONTRACTOR WHOM ASSUMES FULL RESPONSIBILITY FOR THE PILE SETTING OUT. ALL PILE POSITIONS ARE TO BE SET OUT BY THE PILING CONTRACTOR'S REGISTERED ENGINEERING SURVEYOR.
9. THE FINAL PILING DESIGN IS TO BE SUBMITTED BY THE PILING CONTRACTOR TO THE APPOINTED GEOTECHNICAL ENGINEER FOR APPROVAL. THE COST FOR THIS APPROVAL PROCESS IS TO BE PROVIDED FOR BY THE PILING CONTRACTOR. THE PILING CONTRACTOR CAN ONLY COMMENCE WITH PILING, PENDING THE APPROVAL OF THE FINAL PILE DESIGN FROM THE APPOINTED GEOTECHNICAL ENGINEER AND THE APPROVAL FROM THE PRINCIPAL STRUCTURAL ENGINEER.
10. THE MAXIMUM PERMISSIBLE DEVIATION OF THE PILE POSITIONS SHALL BE 50mm.
11. ALL PILES ARE TO BE NEATLY TRIMMED TO PILE CUT-OFF LEVEL. THE TOP SURFACE OF ALL TRIMMED PILES IS TO BE FINISHED 'LEVEL AND SMOOTH'. AN APPROVED NON-SHRINK LEVELING CONCRETE GROUT MUST BE ALLOWED FOR THE BY CONTRACTOR TO ACHIEVE THE 'LEVEL AND SMOOTH' FINISH REQUIREMENT NOTED ABOVE.
12. TWO COPIES OF AN 'AS-BUILT' LOCATION DRAWING SIGNED BY THE PILING CONTRACTOR SHOWING THE PRECISE POSITION OF EVERY PILE SHALL BE SUPPLIED TO THE PRINCIPAL STRUCTURAL ENGINEER. ANY PILE OUTSIDE THE TOLERANCE LIMITS SPECIFIED SHALL BE CLEARLY HIGHLIGHTED ON THE 'AS-BUILT' LAYOUT.
Ø450mm PRESSURE GROUTED CONTINUOUS FLIGHT AUGER (CFA) PILE WITH A SERVICE LOAD OF 790 kN.(19 No. Off)
P1 - P19 19 PILES
PILING KEY
240
200
450
10mm I.J.
See detail on
Dwg. No. : 200-309-301
220mm wide brickwall.10mm I.J.
See detail on
Dwg. No. : 200-309-301
t.o.c. @
+1349,235 lvl.
t.o.c. @
+1349,830 lvl.
DPM DPM
75
05
0
800mm deep x 700mm wide
r.c. ground beam.
Pile cut-off level.
See Piling Key.
CLpile
450 Ø pile
350350
225 225
SECTION A - A
NEW ABLUTIONS BUILDINGPILING & FOUNDATION
STRUCTURAL LAYOUT & DETAILS
BRICKWORK NOTES :
- All brickwork (solid brick walls or cavity brick walls) below surface bed level
to have brickforce in every course.
- All solid brick walls above surface bed level are 220mm wide or 110mm wide
with brickforce built in every 3rd course.
- All parapet walls are 220mm wide or 110mm wide with brickforce built in
every course.
- All cavity brick walls above surface bed level are 340mm wide with 110mm
wide outer skin brickwork with 120mm central cavity with 3,15mm Ø x 300mm
long galvanised butterfly wire ties built vertically into brickwork every 3rd
course and horizontally at max. 500mm centres above surface bed level
and built vertically into brickwork in every course below surface bed level and
horizontally at max. 500mm centres.
- All brickwork to Architect's detail in Class 2 mortar.
FOR TENDER PURPOSES T1
T1 FOR TENDER PURPOSES S.A. 24/06/2020
DETAIL 'B'
110mm INTERNAL WALL TO
340mm EXTERNAL CAVITY WALL CONNECTION DETAIL
340
120
11
0
40 10
0
exte
rnal
wal
l
110110
strap fixed to connecting
wall with 'Hilti' drive pin
(or equally approved)
shot fired into wall.
30mm wide x 1,2mm thk.
galvanised steel strap
built into brickwork every
3rd course.
internal wallext
ern
al w
all
SECTION
10 joint
700
10mm deep x 10mm wide
'Dow Corning 813C' silicone
sealant (or equally approved)
applied to both sides of wall.
internal wall
PLAN
30
700220
11
0
DETAIL 'A'
110mm INTERNAL WALL TO
220mm INTERNAL WALL CONNECTION DETAIL
inte
rna
l wa
ll
inte
rna
l wa
ll
30mm wide x 1,2mm thk.
galvanised steel strap
built into brickwork every
3rd course.
strap fixed to connecting
wall with 'Hilti' drive pin
(or equally approved)
shot fired into wall.
internal wall
40
10mm deep x 10mm wide
'Dow Corning 813C' silicone
sealant (or equally approved)
applied to both sides of wall.
internal wall
SECTIONPLAN
30
700
10 joint
700
100
SECTION 2 - 2SECTION 1 - 1
2
2
1
TYPICAL SAW-CUT
JOINT DETAIL
Ø10mm backing
cord.
DPM
8mm wide x 13mm deep
'Dow Corning 813C' silicone sealant
(or equally approved).
7575
8mesh rebar
450450
30
150
4045
See
Detail 'B'
See
Detail 'B'
See
Detail 'A'
See
Detail 'A'
See
Detail 'A'
See
Detail 'A'
See
Detail 'A'
See
Detail 'A'
10mm Isolation joint between allload bearing brickwork / r.c. columnsand r.c. surface bed.
See Typical Isolation Joint Detail (I.J).
Note : Brickwork Strapping :
All brickwork to be 'strapped/tied' to r.c. columns,
shear walls and other concrete vertical elements with
30mm wide x 1,2mm thk. x 800mm long galvanised steel
straps. 100mm of steel strap shot fired to column and
700mm of steel strap built into brick wall every 3rd course.
Each brick skin (at every 3rd course) to be tied to r.c.
columns, shear walls and other concrete vertical elements.
BRICKWORK NOTES :
- All brickwork (solid brick walls or cavity brick walls) below surface bed level
to have brickforce in every course.
- All solid brick walls above surface bed level are 220mm wide or 110mm wide
with brickforce built in every 3rd course.
- All parapet walls are 220mm wide or 110mm wide with brickforce built in
every course.
- All cavity brick walls above surface bed level are 340mm wide with 110mm
wide outer skin brickwork with 120mm central cavity with 3,15mm Ø x 300mm
long galvanised butterfly wire ties built vertically into brickwork every 3rd
course and horizontally at max. 500mm centres above surface bed level
and built vertically into brickwork in every course below surface bed level and
horizontally at max. 500mm centres.
- All brickwork to Architect's detail in Class 2 mortar.
7
7
7
7
1010
200mm THK.
1150 90
REINFORCING SCHEDULE : STOOLS FOR TOP MESH SUPPORT
Y
TOT
R
TOT403225201612108
BEDSURFACE
FOR3503508301R101STOOLS
BARS
PER
MEMB
No
OF
TOTAL
NUM-
BER
S CMARKLENGTHDIA.MEMBER
E/rDCBA
B E N D I N G
DPM
DPM
mesh rebar
10
150
45
350mm x 350mm
edge thickening.
See detail.
350mm x 350mm
edge thickening.
See detail.
350mm x 350mm
EDGE THICKENING DETAIL
DPM
170mm fall
mesh rebar
50
50
350
150
200
350100
45
800mm deep x 700mm wide
r.c. ground beam.
800mm deep x 700mm wide
r.c. ground beam.
foundationbrickwork
EXTERNAL DOOR THRESHOLD (E.D.T.)
INTERNAL DOOR THRESHOLD (I.D.T.)
50
0
150
45
10
170mm fall
foundationcavity brickwork
DPM
15
0
45
mesh rebarmesh rebar
150
45
t.o.c. @
+1349,235 lvl
t.o.c. @
+1349,235 lvl
t.o.c. @
+1349,235 lvl
100 380220240220240
450mm Ø
pile.
220mm wide
brickwork.
220mm wide
brickwork.
150mm thk.
surface bed slab.10mm I.J.10mm I.J.
150mm thk.
surface bed slab.
800mm deep x 700mm wide
r.c. ground beam.
59
5
80
04
45
15
0
t.o.c. @
+1349,830 lvl
t.o. paving @
+1349,330 lvl
50
0
59
5
80
04
45
15
0
t.o.c. @
+1349,830 lvl
220905220
700 565 700
340mm wide
cavity brickwork.
120 240340
450mm Ø pile
800mm deep x 700mm wide
r.c. ground beam.
150mm thk.
walkway slab.170mmfall
15
0
t.o.c. @
+1349,830 lvl
59
5
340
110 110120
10mm I.J.10mm I.J.
t.o.c. @
+1349,680 lvl
700
80
02
45
15
0
10
Existing brickwork
Existing brickwork
Existing brickwork
Existing brickwork
SURFACE BED SLAB
21 3
K
J
G
F
2755
saw
cut j
oint
170m
m
fall
t.o.c. @ +1349,830 lvl
saw
cut j
oint
All 110mm wide single skin walls
are to be constructed directly
onto the top of the surface bed
slab (typical).
All 110mm wide single skin walls
are to be constructed directly
onto the top of the surface bed
slab (typical).
All 110mm wide single skin walls
are to be constructed directly
onto the top of the surface bed
slab (typical).
I.D.T.
I.D.T.
E.D.T.
500mm x 220mm r.c.
column above & below.
500mm x 220mm r.c.
column above & below.
3870mm x 220mm r.c.
wall above & below.
950mm x 220mm r.c.
wall above & below.
500mm x 220mm r.c.
column above & below.
saw
cut j
oint
700mm x 220mm r.c.
column above & below.
500mm x 220mm r.c.
column above & below.
500mm x 220mm r.c.
column above & below.
500mm x 220mm r.c.
column above & below.
500mm x 220mm r.c.
column above & below.
1170mm x 220mm r.c.
wall above & below.
t.o.c. @ +1349,660 lvl
500m
m
step
up
Paving to Architects details.
t.o. paving @ +1349,330 lvl.
Paving to Architects details.
t.o. paving @ +1349,330 lvl.
150mm thk. x 30MPa powerfloated concrete
surface bed reinforced with mesh ref. 193
(min. 300mm laps) placed at 45mm cover from
top on 250µm SABS approved DPM on
engineered layerworks as per Civil Engineers layouts.
Soil to be poisoned in accordance with SABS 1165.
Certificate must be provided. T.o.c. @ +1349,830 lvl.
500m
m
step
up
150mm thk. x 30MPa powerfloated concrete
surface bed reinforced with mesh ref. 193
(min. 300mm laps) placed at 45mm cover from
top on 250µm SABS approved DPM on
engineered layerworks as per Civil Engineers layouts.
Soil to be poisoned in accordance with SABS 1165.
Certificate must be provided. T.o.c. @ +1349,830 lvl.
250
25
0
150m
m
step
up
150mm
step up
2515
2515
2645
35
00
35
00
saw
cut j
oint
saw
cut j
oint
saw
cut j
ointsa
wcu
t joi
nt
sawcut joint
sawcut joint
K
G
F
J
321
COLUMNS, SHEAR & LIFT WALLS
27/01/2020
INSPECTIONS.
14. THE ENGINEER REQUIRES 24HRS NOTICE FOR ALL
INTER-FACES TO RECEIVE V-JOINTS.
13. ALL CONCRETE PLASTER AND BRICKWORK PLASTER
AFTER PROPS HAVE BEEN REMOVED.
COURSES BELOW SOFFIT OF SLAB AND COMPLETED
12. ALL SINGLE SKIN BRICKWORK TO BE STOPPED 2
THE ENGINEER PRIOR TO CASTING OF CONCRETE.
7. ALL REINFORCING FIXING TO BE INSPECTED BY
3 PLY MALTHOID ON SMOOTH RENDERED SURFACE.
TOP OF ALL BRICKWORK TO RECEIVE 2 LAYERS OF
ALL LOAD BEARING BRICKWORK TO BE 14MPa NFX.
11. BRICKWORK SHOWN HATCHED ARE LOAD BEARING.
THE ENGINEER PRIOR TO CASTING OF CONCRETE.
6. ALL FOUNDATION EXCAVATIONS TO BE INSPECTED BY
TO BE FORWARDED TO THE ENGINEER.
8. SIX CUBES TO BE TAKEN PER POUR.
THREE TO BE TESTED AT SEVEN DAYS, THE
REMAINDER AT TWENTY EIGHT DAYS. THE RESULTS
9. CONTRACTOR TO CONSTRUCT A BLINDING LAYER
IF SOIL CONDITIONS RESULT IN REINFORCEMENT
A MINIMUM OF FIVE DAYS.
10. ALL STRUCTURAL CONCRETE TO BE CURED FOR
COVER NOT BEING MAINTAINED.
AS INDICATED ON DRAWING
30
25 MPa=RETAINING WALLSe)
10 MPa=BLINDINGg)
MPa=SURFACE BEDSf)
5. COVER TO REINFORCEMENT :-
25 MPa=SLABS, BEAMS & STAIRCASESd)
30 MPa=c)
25 MPa=STRIP FOOTINGS & BASESb)
25 MPa=PILECAPS & GROUND BEAMSa)
NOTES
THE ARCHITECTURAL DRAWINGS.
1. ALL LEVELS AND DIMENSIONS TO BE CHECKED ON SITE.
2. THIS DRAWING TO BE READ IN CONJUNCTION WITH
3. ALL CONCRETE WORK TO COMPLY WITH SABS 1200G.
4. CONCRETE CLASS :-
UMALUSI OFFICESADDITIONS AND ALTERATIONS
registration 200670211
PROJECT MANAGER | PRINCIPAL AGENT
professional person
DESCRIPTIONREV BY DATE
M.NAIR PrTechEng
DETAILS
REV
PL
COPYRIGHT RESERVED
DRAWING No.
APPROVED
DESIGNED
DRAWN
SCALES
DATE
PROJECT
CLIENT
SUITE 106, ESSENVIEW BUILDING, STRATHMORE PARK,
305 MUSGRAVE ROAD, DURBAN, 4001
e-mail : [email protected]
FAX (031) 3092929 TEL. (031) 3095831
M.N.
Y.R.
Y.R.
1:50 1:25 1:10
200-309 / 301
10mm wide Isolation Joint
between new surface bed
and existing surface bed.
See typical Isolation Joint detail.All 110mm wide single skin walls
are to be constructed directly
onto the top of the surface bed
slab (typical).
1
1720250 10
14
90
25
01
0
15
00 200mm thk. x 30MPa powerfloated concrete surface bed
reinforced with 2 layers of mesh ref. 245 (min. 300mm laps)
placed at 60mm cover from top and 30mm cover from the
bottom on 250µm SABS approved DPM on engineered
layerworks as per Civil Engineers layouts.
Top mesh will be sitting on R10 stools (90mm high)
@ 800mm c/c and each leg of the stool will be supported
on B1 bar of the bottom mesh.
Soil to be poisoned in accordance with SABS 1165.
Certificate must be provided. T.o.c. @ +1349,680 lvl.
10mm deep x 10mm wide'Dow Corning 813C' siliconesealant (or equally approved)on 10mm wide polystyrene backing.
150mm thk. x 30MPa powerfloated concrete
walkway slab (to fall) reinforced with mesh ref. 193
(min. 300mm laps) placed at 45mm cover from
top on 250µm SABS approved DPM on
engineered layerworks as per Civil Engineers layouts.
Soil to be poisoned in accordance with SABS 1165.
Certificate must be provided.
170m
m
fall
170m
m
fall
200mm thk.
surface bed slab.
150mm thk.
surface bed slab. t.o.c. @
+1349,830 lvl
15
0
250
20
01
50
1490
J
6401500
Face of first floor
r.c. beam above.
Paving to
Architects
details and
specifications.
mesh rebar t.o.c. @
+1349,830 lvl
t.o.c. @
+1349,830 lvl
Paving to
Architects details
and specifications.t.o. paving @
+1349,330 lvl
59
5
t.o.c @
+1349,235 lvl
10mm wide polystyrene
spacer strip.10mm wide polystyrene
spacer strip.
Paving to
Architects details
and specifications.t.o. paving @
+1349,330 lvl
10mm deep x 10mm wide'Dow Corning 813C' siliconesealant (or equally approved)on 10mm wide polystyrene backing
Load bearingbrick wall /r.c. column / r.c. shear wall.
TYPICAL ISOLATION
JOINT DETAIL (I.J.)
3mm wide x 40mm deep sawcut joint
reamed out to 8mm wide.
NEW ABLUTIONS BUILDINGGROUND FLOOR
SURFACE BED SLABSTRUCTURAL LAYOUT & DETAILS
FOR TENDER PURPOSES T1
T1 FOR TENDER PURPOSES S.A. 24/06/2020
1:50 1:25
M.N.
K.L.
K.L.
SUITE 106, ESSENVIEW BUILDING, STRATHMORE PARK,
305 MUSGRAVE ROAD, DURBAN, 4001
e-mail : [email protected]
FAX (031) 3092929 TEL. (031) 3095831
CLIENT
PROJECT
DATE
SCALES
DRAWN
DESIGNED
APPROVED
DRAWING No.
COPYRIGHT RESERVED
PL
REV
M.NAIR PrTechEng
DATEBYREV DESCRIPTION
professional person
PROJECT MANAGER | PRINCIPAL AGENT
200670211registration
4. CONCRETE CLASS :-
3. ALL CONCRETE WORK TO COMPLY WITH SABS 1200G.
2. THIS DRAWING TO BE READ IN CONJUNCTION WITH
1. ALL LEVELS AND DIMENSIONS TO BE CHECKED ON SITE.
THE ARCHITECTURAL DRAWINGS.
NOTES
a) PILECAPS & GROUND BEAMS = MPa25
b) STRIP FOOTINGS & BASES = MPa25
c) = MPa30
d) SLABS, BEAMS & STAIRCASES = MPa25
5. COVER TO REINFORCEMENT :-
f) SURFACE BEDS = MPa
g) BLINDING = MPa10
e) RETAINING WALLS = MPa25
30
AS INDICATED ON DRAWING
COVER NOT BEING MAINTAINED.
10. ALL STRUCTURAL CONCRETE TO BE CURED FOR
A MINIMUM OF FIVE DAYS.
IF SOIL CONDITIONS RESULT IN REINFORCEMENT
9. CONTRACTOR TO CONSTRUCT A BLINDING LAYER
REMAINDER AT TWENTY EIGHT DAYS. THE RESULTS
THREE TO BE TESTED AT SEVEN DAYS, THE
8. SIX CUBES TO BE TAKEN PER POUR.
TO BE FORWARDED TO THE ENGINEER.
6. ALL FOUNDATION EXCAVATIONS TO BE INSPECTED BY
THE ENGINEER PRIOR TO CASTING OF CONCRETE.
11. BRICKWORK SHOWN HATCHED ARE LOAD BEARING.
ALL LOAD BEARING BRICKWORK TO BE 14MPa NFX.
TOP OF ALL BRICKWORK TO RECEIVE 2 LAYERS OF
3 PLY MALTHOID ON SMOOTH RENDERED SURFACE.
7. ALL REINFORCING FIXING TO BE INSPECTED BY
THE ENGINEER PRIOR TO CASTING OF CONCRETE.
12. ALL SINGLE SKIN BRICKWORK TO BE STOPPED 2
COURSES BELOW SOFFIT OF SLAB AND COMPLETED
AFTER PROPS HAVE BEEN REMOVED.
13. ALL CONCRETE PLASTER AND BRICKWORK PLASTER
INTER-FACES TO RECEIVE V-JOINTS.
14. THE ENGINEER REQUIRES 24HRS NOTICE FOR ALL
INSPECTIONS.
500mm x 220mm
r.c. col. below.
500mm x 220mm
r.c. col. below.
4520 500
Line of Existing Building
280220 280 22018
0022
024
0022
022
9522
0
220
730
1170
280
220
210
220
220
220
700mm x 220mm
r.c. col. below.
1170
950
5004770
280220
500
500mm x 220mm
r.c. col. above and below.
Void for Lift
Sleeves cast in r.c. slab to
Architect's setting out and details.
All sleeve diameters and positions
to approved by the structural engineer
prior to casting r.c. slab.
3870
1500
220
4915
220
1070
1432
0
3650
220
280
500mm x 220mm
r.c. col. above and below.
2025
220
500mm x 220mm
r.c. col. above and below.
220 2880 220 1500
240 240
220
700
3870
mm
x 2
20m
m w
ide
r.c.
she
ar w
all a
bove
and
bel
ow.
5080 220
5520 230
480
700
220
700mm x 220mm
r.c. col. above and below.
220
500mm x 220mm
r.c. col. above and below.
220
10790
5050
500
3650
2200
220
2580
950mm x 220mm wide
r.c. shear wall above and below.
950
J
K
2480
220
950
220
280
1860
220
950
220
220
500
2200
2580
120
1170
3870
2400
830
220 240
220240
350 5400
220 4600240
700
5520 10
240
220
Line of entrance canopy r.c. slab above.
460
700mm x 220mm
r.c. col. above and below.
510m
m d
eep
x 22
0mm
wid
e r.
c. d
/sta
nd b
eam
t.o.c
. @ +
135
2,80
5 lv
l.
510mm deep x 220mm wide r.c. d/stand beam
t.o.c. @ + 1352,805 lvl.
510mm deep x 220mm wide r.c. d/stand beam
t.o.c. @ + 1352,805 lvl.
510mm deep x 220mm wide r.c. d/stand beam
t.o.c. @ + 1352,805 lvl.
510mm deep x 220mm wide r.c. d/stand beam
t.o.c. @ + 1352,805 lvl.
510m
m d
eep
x 22
0mm
wid
e r.
c. d
/sta
nd b
eam
t.o.c
. @ +
135
2,80
5 lv
l.
510mm deep x 220mm wide r.c. d/stand beam
t.o.c. @ + 1352,805 lvl.
510mm deep x 220mm wide r.c. d/stand beam
t.o.c. @ + 1352,805 lvl.
510mm deep x 220mm wide
r.c. d/stand beam
t.o.c. @ + 1352,805 lvl.
255mm thk. r.
c. canopy slab
t.o.c. @
+ 1354,080 lvl.
(Screed to fa
lls, waterproofin
g,
& FBOs to Archite
ct's details
and specificatio
ns).
510mm deep x 220mm wide r.c. upstand beam
t.o.c. @ + 1354,335 lvl.
510mm deep x 220mm wide r.c. d/stand beam
t.o.c. @ + 1356,120 lvl.
765mm deep x 220mm wide r.c. upstand beam
t.o.c. @ + 1356,630 lvl.
765mm deep x 220mm wide r.c. upstand beam
t.o.c. @ + 1356,630 lvl.
765m
m d
eep
x 22
0mm
wid
e r.
c. u
psta
nd b
eam
t.o.c
. @ +
135
6,63
0 lv
l.
765m
m d
eep
x 22
0mm
wid
e r.
c. u
psta
nd b
eam
t.o.c
. @ +
135
6,63
0 lv
l.
220mm x 220mm
r.c. col. above.
t.o.c. @ +1357,310 lvl
220mm x 220mm
r.c. col. above.
t.o.c. @ +1357,310 lvl
220mm x 220mm
r.c. col. above.
t.o.c. @ +1357,310 lvl
765m
m d
eep
x 22
0mm
wid
e
r.c.
ups
tand
bea
m
t.o.c
. @ +
135
6,63
0 lv
l.
1000
1000
1000
1000
1000
1000
8057
014
30
220mm x 220mm
r.c. col. above.
t.o.c. @ +1357,310 lvl
A A
500mm x 220mm
r.c. col below
1170mm x 220mm wide
r.c. shear wall above and below.
t.o.c. @ +1357,310 lvl
255m
m thk.
r.c. r
oof s
lab
t.o.c.
@ +
1356
,120 l
vl.
(Scre
ed to
falls
, wate
rpro
ofing
,
& FBOs t
o Arch
itect'
s deta
ils
and s
pecif
icatio
ns).
100
220
220 5080 220220
10790
510m
m d
eep
x 22
0mm
wid
e r.
c. d
/sta
nd b
eam
t.o.c
. @ +
135
6,12
0 lv
l.
500mm x 220mm
r.c. col. below.500mm x 220mm
r.c. col. below.
Line of Existing Building
Line of Existing Building
Existing
Building
10
Existing
Building
9900
o/a
exi
stin
g bu
ildin
g10
80
1015 o/a
existing building
Line of Existing Building
Line of Existing Building
Existing
Building
5975
280470 220280220
500500 230
510m
m d
eep
x 22
0mm
wid
e
r.c.
d/s
tand
bea
m
t.o.c
. @ +
135
2,80
5 lv
l.
500mm x 220mm
r.c. col. above and below.
Line of Existing BuildingLine of Existing Building
510m
m d
eep
x 22
0mm
wid
e
r.c.
d/s
tand
bea
m
t.o.c
. @ +
135
2,80
5 lv
l.
255mm th
k. r.c
. first
floor s
lab
t.o.c.
@ + 1352
,805 lv
l.
Line of Existing Building
J
K
2700
3870
1170
2400
830
640
Line of Existing Building
27/01/2020
510mm deep x 220mm wide
r.c. d/stand beam
t.o.c. @ + 1356,120 lvl.250
250
500mm x 220mm
r.c. col. above and below.
t.o.c. @ +1357,310 lvl30 220
3022
0
500
500
500
500
420
310
250
250
130
130
700
350 350
510m
m d
eep
x 22
0mm
wid
e
r.c.
d/s
tand
bea
m
t.o.c
. @ +
135
6,12
0 lv
l.
10
275
275
275
765m
m d
eep
x 22
0mm
wid
e r.
c. u
psta
nd b
eam
t.o.c
. @ +
135
6,63
0 lv
l.
500mm x 220mm
r.c. col. above and below.
t.o.c. @ +1357,310 lvl
275
275
230
350
350
10
650
9900
1030
0
180
1055
010
J
G
K
F
Gx
10mm wide isolation joint between
existing and new building.
See Isolation Joint Note. (Typical).
Line of existing building.
830
4635
5745
765mm deep x 220mm wide
r.c. upstand beam
t.o.c. @ + 1356,630 lvl.
120
4915
3745
1170
500
120
520
Outside face of new
brickwork pier.
1068
0
22010
1170mm x 220mm wide
r.c. shear wall below.
5170 2305400
120
220
5400
1 2 3
10920 o/a existing building
10mm wide isolation joint between
existing and new building.
See Isolation Joint Note. (Typical).
220Line of existing building.
1010790 o/a concrete
350 150
765mm deep x 220mm wide
r.c. upstand beam
t.o.c. @ + 1356,630 lvl.
220 2535 220 2310 220 2310 220 795 220220
11805
2535
5400 5400
1 2 3
110110
765mm deep x 220mm wide
r.c. upstand beam
t.o.c. @ + 1356,630 lvl.
220mm x 220mm
r.c. col. above.
t.o.c. @ +1357,310 lvl
950mm x 220mm wide
r.c. shear wall below.
1170
730
B
BLine of Existing Building
10230
220mm x 220mm
r.c. col. above.
t.o.c. @ +1357,310 lvl
75mm Ø overflow pipe.
(Typical).
1725
830
1038
083
0
J
G
K
F
Gx
1068
035
0
345
650
4635
5745
Line of
Existing Building
1180
180
120
300
Outside face of
new brickwork pier.
10mm wide isolation joint between
existing and new building.
See Isolation Joint Note. (Typical).
10mm wide isolation joint between
existing and new building.
See Isolation Joint Note. (Typical).
COLUMNS, SHEAR & LIFT WALLS
VOID
355 3845 o/a concrete
500mm x 220mm
r.c. col. above and below.
1070
o/a
conc
rete
255mm thk. r.c. first floor slab
t.o.c. @ + 1352,805 lvl.
10mm wide isolation joint between
existing and new building.
See Isolation Joint Note. (Typical). 345 10
Existing
Building
345
3845 970
10 460 10 220
10
10mm wide isolation joint between
existing and new building.
See Isolation Joint Note. (Typical).
J
F
G
K
Gx
1180
110
10 110
Line of Existing Building
830
5745
4635
830
2400
30
640
3745
10mm wide isolation joint between
existing and new building.
See Isolation Joint Note. (Typical).
10mm wide isolation joint between
existing and new building.
See Isolation Joint Note. (Typical).
22010
22010
10 1015
1170mm x 220mm wide
r.c. shear wall above and below.
2 3
500mm x 220mm
r.c. col. above and below.
10790 o/a concrete
C
C
510mm deep x 220mm wide
r.c. d/stand beam
t.o.c. @ + 1352,805 lvl.
510m
m d
eep
x 22
0mm
wid
e
r.c.
d/s
tand
bea
m
t.o.c
. @ +
135
2,80
5 lv
l.
420
1070
Note : Isolation Joint :
10mm isolation joint between existing building and new building.
10mm deep x 10mm wide 'Dow Corning 813C' silicone sealant
(or equally approved) on all exposed edges on 10mm wide polystyrene backing.
Note : Brickwork Strapping :
All brickwork to be 'strapped/tied' to r.c. columns,
shear walls and other concrete vertical elements with
30mm wide x 1,2mm thk. x 800mm long galvanised steel
straps. 100mm of steel strap shot fired to column and
700mm of steel strap built into brick wall every 3rd course.
Each brick skin (at every 3rd course) to be tied to r.c.
columns, shear walls and other concrete vertical elements.
830
830
1068
0
Line of Existing Building
350
J
F
G
K
Gx
Outside face of
new brickwork pier.
Line of
Existing Building
C
C
460
1170mm x 220mm wide
r.c. shear wall above.
10mm wide isolation joint between
existing and new building.
See Isolation Joint Note. (Typical).
1025
350
130
500
220 130280
350 350
5050 220 5080220 220
530
300
30
350
180
650
4635
5745
1180
1096
00 o
/a c
oncr
ete
130
3430
220
220 950mm x 220mm wide
r.c. shear wall above and below.
2 3Line of
Existing Building
220
220
510mm deep x 220mm wide r.c. d/stand beam
t.o.c. @ + 1356,120 lvl.
D D
150 25
5
765
200
5050
100
100
55
120110 110
340
765mm deep x 220mm wide
r.c. upstand beam.
110
t.o.c. @ + 1356,630 lvl.
50
75
30t.o.c. @
+ 1356,120 lvl.255mm thk. r.c.
roof slab.
110 120
230
340
+ 1357,310 lvl.
230mm wide parapet wall.
680
Screed to falls to Architect's
specification and details.
510
1445
340mm wide cavity wall.
See brickwork notes.
500 500
15050
5050
100
100
100
200
150 25
5
765
200
5050
100
100
55
765mm deep x 220mm wide
r.c. upstand beam.
110
t.o.c. @ + 1356,630 lvl.
t.o.c. @
+ 1356,120 lvl.
110 120
230
340
+ 1357,310 lvl.
230mm wide parapet wall.
680
Screed to falls to Architect's
specification and details.
510
1445
SECTION B - B
255
255
220 950
120110 110
340
340mm wide cavity wall.
See brickwork notes.
1
510mm deep x 220mm wide
r.c. d/stand beam.
510mm deep x 220mm wide
r.c. upstand beam.
255mm thk. r.c. first floor slab
255
25551
0
220
255
25551
0
120 110110
340
t.o.c. @
+ 1352,805 lvl.
t.o.c. @
+ 1354,080 lvl.
t.o.c. @ + 1354,335 lvl.
120
340
110 110
120 110110
340
340mm wide cavity wall.
Screed to falls to Architect's
specification and details.
50 100
100
200
55
255
50
255 51
0
120
1530
510mm deep x 220mm wide
r.c. d/stand beam.
255mm thk. r.c. first floor slab
255
25551
0
t.o.c. @
+ 1352,805 lvl.
120
340
110 110
50 100
100
200
55
255
50
255 51
0
220 120
340mm wide cavity wall.
120 110110
340
220
30
250
250
250
250
500
500
3745
4915
220
220
280
1170
950
220
1055
012
0
500
4635
5745
FBOs to Architect's details
and specifications. (Typical).
1000
220
10
1055
0 o/
a co
ncre
te
Flashing between the new r.c. upstand beams
and the existing brickwork parapet walls, all
to Architect's details & specifications.
3865 (existing building)
5400 5400
10790120
220
1 2 3
10920 o/a existing building
1190
220
970Line of Existing Building
10
Line of existing building
10
960 1010
970
o/a conc.
10
10
Steel support angle for brickwork.
See detail and Section A - A
and Section B - B.
Steel support angle for brickwork.
See detail and Section C - C
and Section D - D.
Steel support angle for brickwork.
See detail and Section C - C and Section D - D.
ROOF SLAB PLAN
100x100x10mm thk. flat fixed to r.c. beamwith 1 No. M20 chemical anchor.See chemical anchor specification.
Brickwork Steel Support Angle :100x100x10L welded to100x100x10mm thk. flat with6mm full penetration bevel weld.(See brickwork steel support angle detail).Soffit of steel angle @ +1355,865 lvl.
51
0
510mm deep x 220mm wide
r.c. d/stand beam.100x100x10mm thk. flat fixed to r.c. beamwith 1 No. M20 chemical anchor.See chemical anchor specification.
Brickwork Steel Support Angle :100x100x10L welded to100x100x10mm thk. flat with6mm full penetration bevel weld.(See brickwork steel support angle detail).Soffit of steel angle @ +1355,865 lvl.
M20 CHEMICAL ANCHOR SPECIFICATION :
Fischer M20 (8.8) galvanised H.D. Anchor Studs
(with embedment length = 200mm) with Fischer
FIS-V-360 Chemical Mortar or equally approved
Chemical Anchors with 'ETA' ( European Technical
Approval).
Brickwork Steel Support Angle :100x100x10L welded to100x100x10mm thk. flat with6mm full penetration bevel weld.
255mm thk. r.c. canopy slab.
340mm wide cavity wall.
15
0
100x100x10mm thk. flat fixed to r.c. beamwith 1 No. M20 chemical anchor.See chemical anchor specification.
Brickwork to be 'strapped/tied' to r.c. beam with
30mm wide x 1,2mm thk. x 200mm long galvanised
steel straps. 100mm of steel strap shot fired to r.c. beam
and 100mm of steel strap built into brick wall every
2nd course @ 750mm centres.
Brickwork Steel Support Angle :100x100x10L welded to100x100x10mm thk. flat with6mm full penetration bevel weld.(See brickwork steel support angle detail).Soffit of steel angle @ +1352,550 lvl.
SECTION A - A
SECTION C - C
15
0
100x100x10mm thk. flat fixed to r.c. beamwith 1 No. M20 chemical anchor.See chemical anchor specification.
Brickwork to be 'strapped/tied' to r.c. beam with
30mm wide x 1,2mm thk. x 200mm long galvanised
steel straps. 100mm of steel strap shot fired to r.c. beam
and 100mm of steel strap built into brick wall every
2nd course @ 750mm centres.
Brickwork to be 'strapped/tied' to r.c. beam with
30mm wide x 1,2mm thk. x 200mm long galvanised
steel straps. 100mm of steel strap shot fired to r.c. beam
and 100mm of steel strap built into brick wall every
2nd course @ 750mm centres.
Brickwork to be 'strapped/tied' to r.c. beam with
30mm wide x 1,2mm thk. x 200mm long galvanised
steel straps. 100mm of steel strap shot fired to r.c. beam
and 100mm of steel strap built into brick wall every
2nd course @ 750mm centres.
SECTION D - D
FIRST FLOOR SLAB PLAN
CLanchor
CLanchor
CLanchor
500
centres
typical
500
centres
typicalAll structural steel angles and flats
to be grade S355JR hot-dipped
galvanised to ISO 1461 or EN 10240.
100x100x10mm thk. flat fixed to r.c. beamwith 1 No. M20 chemical anchor.See chemical anchor specification.
TYPICAL BRICKWORK STEEL
SUPPORT ANGLE DETAIL
640
Overflow rain water pipes to be
installed into parapet brick wall
along Grid '1', all to Architect's details
and specifications.
r.c. column behind.
75mm Ø rainwater
overflow pipe.
r.c. column behind.
255mm thk. r.c.
roof slab.CL
CL
Brickwork Steel Support Angle :100x100x10L welded to100x100x10mm thk. flat with6mm full penetration bevel weld.(See brickwork steel support angle detail).Soffit of steel angle @ +1352,550 lvl.
CL
200-309 / 302
CL
BRICKWORK NOTES :
- All brickwork (solid brick walls or cavity brick walls) below surface bed level
to have brickforce in every course.
- All solid brick walls above surface bed level are 220mm wide or 110mm wide
with brickforce built in every 3rd course.
- All parapet walls are 220mm wide or 110mm wide with brickforce built in
every course.
- All cavity brick walls above surface bed level are 340mm wide with 110mm
wide outer skin brickwork with 120mm central cavity with 3,15mm Ø x 300mm
long galvanised butterfly wire ties built vertically into brickwork every 3rd
course and horizontally at max. 500mm centres above surface bed level
and built vertically into brickwork in every course below surface bed level and
horizontally at max. 500mm centres.
- All brickwork to Architect's detail in Class 2 mortar.
UMALUSI OFFICESADDITIONS AND ALTERATIONS
NEW ABLUTIONS BUILDINGROOF SLAB,
ENTRANCE CANOPY SLAB &FIRST FLOOR SLAB
STRUCTURAL LAYOUT & DETAILS
DETAILS
3870mm x 220mm wide
r.c. shear wall below.
E E
5080
5520
220
230
220
2 3
ENTRANCE CANOPY SLAB PLAN
350 1025
510mm deep x 220mm wide
r.c. downstand beam.
510mm deep x 220mm wide
r.c. downstand beam.
F
F
t.o.c. @
+ 1354,080 lvl.255mm thk. r.c. canopy slab.
220
510mm deep x 220mm wide
r.c. downstand beam.
255
25551
0
SECTION F - F
Screed to falls to Architect's
specification and details.
220
t.o.c. @
+ 1354,080 lvl.
220mm wide
r.c. shear wall.
255mm thk. r.c. canopy slab.
255
SECTION E - E
Screed to falls to Architect's
specification and details.
M20 CHEMICAL ANCHOR SPECIFICATION :
Fischer M20 (8.8) galvanised H.D. Anchor Studs
(with embedment length = 200mm) with Fischer
FIS-V-360 Chemical Mortar or equally approved
Chemical Anchors with 'ETA' ( European Technical
Approval).
Rainwater side outlet to Architect's
details and specifications.
REV. P2
5050
510mm deep x 220mm wide
r.c. d/stand beam
t.o.c. @ + 1356,120 lvl.
30
FOR TENDER PURPOSES T1
T1 FOR TENDER PURPOSES S.A. 24/06/2020
New 220mm wide brickwork
to be constructed on existing
surface bed.
See Detail 'B' for brickwork
strapping to r.c. column.
Existing surface bed
Existing surface bed
Existing brick wall.
Existing brick wall.Existing brick wall.
Existing brick wall.Existing brick wall.
Existing brick wall.
strap fixed to connecting
wall with 'Hilti' drive pin
(or equally approved)
shot fired into wall.
230
30mm wide x 1,2mm thk.
galvanised steel strap built
into brickwork every 3rd course.
700
10mm thk. polystyrene
spacer strip.
DETAIL 'C'
NEW 230mm WALL TO EXISTING
230mm WALL CONNECTION DETAIL
700
10 joint
23
0
SECTION
40
40
30
30
PLAN
10
0
strap fixed to connecting
wall with 'Hilti' drive pin
(or equally approved)
shot fired into wall.
Strap ties :
30mm wide x 1,2mm thk.
galvanised steel strap built
into brickwork every 3rd course.
Existing r.c. column
concertina ties :
30mm wide x 1,2mm thk.
galvanised steel strap
built into brickwork every
3rd course.
10mm deep x 10mm wide
'Dow Corning 813C' silicone
sealant (or equally approved)
applied to both sides of brick wall.
10mm deep x 10mm wide
'Dow Corning 813C' silicone
sealant (or equally approved)
applied to both sides of brick wall.
strap fixed to connecting
wall with 'Hilti' drive pin
(or equally approved)
shot fired into wall.
ELEVATION
300
150
220
300
PLAN.
1010mm thk. polystyrene
spacer strip
Existing r.c. column
220
220
700 10New brick wall.
3040
ELEVATION
Existing r.c. column
Strap fixed to connecting r.c.
column with 'Hilti' drive pin
(or equally approved)
shot fired into r.c. column.
New brick wall.
10mm wide polystyrene
spacer strip.
700 10New brick wall.
150
Varies
PLAN
Existingr.c. column.
4030
Strap fixed to connecting r.c.
column with 'Hilti' drive pin
(or equally approved)
shot fired into r.c. column.
New brick wall.
New 220mm wide brickwork to
existing 220mm wide brickwork
connection. See Detail 'C'.
See Detail 'B' for brickwork
strapping to r.c. column.
See Detail 'A' for brickwork
strapping to r.c. column.
New 220mm wide brickwork
to be constructed on existing
surface bed.
Existing r.c.
column
Existing r.c.
column
Existing r.c.
column
Existing r.c.
column
Existing r.c.
column
Existing r.c.
column
20/01/2020M.N.
Y.R.
Y.R.
UMALUSI OFFICESADDITIONS AND ALTERATIONS
registration 200670211
PROJECT MANAGER | PRINCIPAL AGENT
professional person
DESCRIPTIONREV BY DATE
M.NAIR PrTechEng
B
A
432
INSPECTIONS.
14. THE ENGINEER REQUIRES 24HRS NOTICE FOR ALL
INTER-FACES TO RECEIVE V-JOINTS.
13. ALL CONCRETE PLASTER AND BRICKWORK PLASTER
AFTER PROPS HAVE BEEN REMOVED.
COURSES BELOW SOFFIT OF SLAB AND COMPLETED
12. ALL SINGLE SKIN BRICKWORK TO BE STOPPED 2
THE ENGINEER PRIOR TO CASTING OF CONCRETE.
7. ALL REINFORCING FIXING TO BE INSPECTED BY
3 PLY MALTHOID ON SMOOTH RENDERED SURFACE.
TOP OF ALL BRICKWORK TO RECEIVE 2 LAYERS OF
ALL LOAD BEARING BRICKWORK TO BE 14MPa NFX.
11. BRICKWORK SHOWN HATCHED ARE LOAD BEARING.
THE ENGINEER PRIOR TO CASTING OF CONCRETE.
6. ALL FOUNDATION EXCAVATIONS TO BE INSPECTED BY
TO BE FORWARDED TO THE ENGINEER.
8. SIX CUBES TO BE TAKEN PER POUR.
THREE TO BE TESTED AT SEVEN DAYS, THE
REMAINDER AT TWENTY EIGHT DAYS. THE RESULTS
9. CONTRACTOR TO CONSTRUCT A BLINDING LAYER
IF SOIL CONDITIONS RESULT IN REINFORCEMENT
A MINIMUM OF FIVE DAYS.
10. ALL STRUCTURAL CONCRETE TO BE CURED FOR
COVER NOT BEING MAINTAINED.
AS INDICATED ON DRAWING
30
25 MPa=RETAINING WALLSe)
10 MPa=BLINDINGg)
MPa=SURFACE BEDSf)
5. COVER TO REINFORCEMENT :-
25 MPa=SLABS, BEAMS & STAIRCASESd)
30 MPa=COLUMNS, SHEAR & LIFT WALLSc)
25 MPa=STRIP FOOTINGS & BASESb)
25 MPa=PILECAPS & GROUND BEAMSa)
THE ARCHITECTURAL DRAWINGS.
1. ALL LEVELS AND DIMENSIONS TO BE CHECKED ON SITE.
2. THIS DRAWING TO BE READ IN CONJUNCTION WITH
3. ALL CONCRETE WORK TO COMPLY WITH SABS 1200G.
4. CONCRETE CLASS :-
1:25 1:10
NOTES
DETAILS
REV
PL
COPYRIGHT RESERVED
DRAWING No.
APPROVED
DESIGNED
DRAWN
SCALES
DATE
PROJECT
CLIENT
5400 5400
830
6260
D
110 110
SUITE 106, ESSENVIEW BUILDING, STRATHMORE PARK,
305 MUSGRAVE ROAD, DURBAN, 4001
e-mail : [email protected]
FAX (031) 3092929 TEL. (031) 3095831
PART PLAN SHOWING NEW BRICK WALL
CAST ON EXISTING GROUND FLOOR SURFACE BED
DETAIL 'B'
BRICKWORK STRAPPING TO
EXISTING R.C. COLUMN
10mm deep x 10mm wide
'Dow Corning 813C' silicone
sealant (or equally approved)
applied to both sides of wall.
new brick wall
exi
stin
g b
rick
wa
ll
new brick wall
New brick wall
new brick wall
DETAIL 'A'BRICKWORK STRAPPING TO
EXISTING R.C. COLUMN
exi
stin
g b
rick
wa
ll
200-309 / 303
EXISTING MAIN BUILDINGNEW BRICK WALL CAST ON
EXISTING GROUND FLOOR SURFACE BEDSTRUCTURAL LAYOUT & DETAILS
FOR TENDER PURPOSES T1
T1 FOR TENDER PURPOSES S.A. 24/06/2020
UMALUSI OFFICESADDITIONS AND ALTERATIONS
registration 200670211
PROJECT MANAGER | PRINCIPAL AGENT
professional person
DESCRIPTIONREV BY DATE
M.NAIR PrTechEng
INSPECTIONS.
14. THE ENGINEER REQUIRES 24HRS NOTICE FOR ALL
INTER-FACES TO RECEIVE V-JOINTS.
13. ALL CONCRETE PLASTER AND BRICKWORK PLASTER
AFTER PROPS HAVE BEEN REMOVED.
COURSES BELOW SOFFIT OF SLAB AND COMPLETED
12. ALL SINGLE SKIN BRICKWORK TO BE STOPPED 2
THE ENGINEER PRIOR TO CASTING OF CONCRETE.
7. ALL REINFORCING FIXING TO BE INSPECTED BY
3 PLY MALTHOID ON SMOOTH RENDERED SURFACE.
TOP OF ALL BRICKWORK TO RECEIVE 2 LAYERS OF
ALL LOAD BEARING BRICKWORK TO BE 14MPa NFX.
11. BRICKWORK SHOWN HATCHED ARE LOAD BEARING.
THE ENGINEER PRIOR TO CASTING OF CONCRETE.
6. ALL FOUNDATION EXCAVATIONS TO BE INSPECTED BY
TO BE FORWARDED TO THE ENGINEER.
8. SIX CUBES TO BE TAKEN PER POUR.
THREE TO BE TESTED AT SEVEN DAYS, THE
REMAINDER AT TWENTY EIGHT DAYS. THE RESULTS
9. CONTRACTOR TO CONSTRUCT A BLINDING LAYER
IF SOIL CONDITIONS RESULT IN REINFORCEMENT
A MINIMUM OF FIVE DAYS.
10. ALL STRUCTURAL CONCRETE TO BE CURED FOR
COVER NOT BEING MAINTAINED.
AS INDICATED ON DRAWING
30
25 MPa=RETAINING WALLSe)
10 MPa=BLINDINGg)
MPa=SURFACE BEDSf)
5. COVER TO REINFORCEMENT :-
25 MPa=SLABS, BEAMS & STAIRCASESd)
30 MPa=COLUMNS, SHEAR & LIFT WALLSc)
25 MPa=STRIP FOOTINGS & BASESb)
25 MPa=PILECAPS & GROUND BEAMSa)
THE ARCHITECTURAL DRAWINGS.
1. ALL LEVELS AND DIMENSIONS TO BE CHECKED ON SITE.
2. THIS DRAWING TO BE READ IN CONJUNCTION WITH
3. ALL CONCRETE WORK TO COMPLY WITH SABS 1200G.
4. CONCRETE CLASS :-
1:25 1:10
NOTES
DETAILS
REV
PL
COPYRIGHT RESERVED
DRAWING No.
APPROVED
DESIGNED
DRAWN
SCALES
DATE
PROJECT
CLIENT
SUITE 106, ESSENVIEW BUILDING, STRATHMORE PARK,
305 MUSGRAVE ROAD, DURBAN, 4001
e-mail : [email protected]
FAX (031) 3092929 TEL. (031) 3095831
200-309 / 304
30/01/2020
K.L.
K.L.
M.N.
180180
180180
EXISTING FIRST FLOOR SLAB
3780
3730
1038
0
2040
5400
A 2870
o/a
ste
el a
ngle
A
A
G
J
43
43
G
J
New 255mm thk.
(25MPa) r.c.
slab in
fill panel
supporte
d on steel a
ngles.
3360 o/a steel angle
A
A
3350 o/a concrete slab
3360 o/a steel angle
2870
2850
o/a
con
cret
e sl
ab
9
9
10
10
O O
N N
New 25
5mm th
k. (2
5MPa)
r.c.
slab i
nfill p
anel
supp
orted
on st
eel a
ngles
3015 o/a steel angle
EXISTING FIRST FLOOR SLAB
3005 o/a concrete slab
3015 o/a steel angle27
80 o
/a s
teel
ang
le
2780
A
A
AA
3780
3820
1038
0
2510
5400125
2760
o/a
con
cret
e sl
ab500 500 500 500 500 500
500 500 500 500 500 500
500
500
500
500
500
185
185
500 500 500 500 500 315200
500 500 500 500 500 31520050
050
050
050
050
014
014
0
M20 chemical anchors @ 500mm centres as shown.
See chemical anchor specification. (Typical)
M20 chemical anchors @ 500mm centres as shown.
See chemical anchor specification. (Typical)
M20 CHEMICAL ANCHOR SPECIFICATION :
Fischer M20 (8.8) galvanised H.D. Anchor Studs
(with embedment length = 200mm) with Fischer
FIS-V-360 Chemical Mortar or equally approved
Chemical Anchors with 'ETA' ( European Technical
Approval).
All structural steel angles and flats
to be grade S355JR hot-dipped
galvanised to ISO 1461 or EN 10240.
255
Slab Infill Steel Support Angle :100x100x10L welded to100x100x10mm thk. flat with6mm full penetration bevel weld.Soffit of steel angle @ +1352,550 lvl.
100
100
5520
0
50
150
50 50
100
500 500500
centres
typical
500
centres
typical
CLanchor
CLanchor
CLanchor
200
55
255
CL100 50
50
10015
0255
New 255mm thk. (25MPa)
r.c. slab infill panel
supported on steel angles. Existing first floor slab.
SECTION A - A
EXISTING MAIN BUILDINGNEW R.C. SLAB IN-FILL PANELS
ON THE EXISTING FIRST FLOOR SLABSTRUCTURAL LAYOUT & DETAILS
10 I.J.
10 I.J.
A
10
I.J.
PLAN
R.C. SLAB INFILL PANEL ON EXISTING FIRST FLOOR
A
A
10 I.J.
10 I.J.
10
I.J.
TYPICAL ELEVATION
R.C. SLAB INFILL PANEL
STEEL SUPPORT ANGLE DETAIL
Existing first floor slab.First floor t.o.c.
@ + 1352,805 lvl.First floor t.o.c.
@ + 1352,805 lvl.
10mm deep x 10mm wide
'Dow Corning 813C' silicone
sealant (or equally approved)
on 10mm thk. polystyrene backing.
CL
100x100x10mm thk. flat fixed to the side of
r.c. slab with 1 No. M20 chemical anchor.
See chemical anchor specification.
Slab Infilll Steel Support Angle :
100x100x10L welded to
100x100x10mm thk. flat with
6mm full penetration bevel weld
fixed to the side of the existing r.c. slab
with M20 chemical anchors.
See chemical anchor specification.
Soffit of steel angle @ +1352,550 lvl.
(Typical).
Slab Infilll Steel Support Angle :
100x100x10L welded to
100x100x10mm thk. flat with
6mm full penetration bevel weld
fixed to the side of the existing r.c. slab
with M20 chemical anchors.
See chemical anchor specification.
Soffit of steel angle @ +1352,550 lvl.
(Typical).
PLAN
R.C. SLAB INFILL PANEL ON EXISTING FIRST FLOOR
Slab Infilll Steel Support Angle :
100x100x10L welded to
100x100x10mm thk. flat with
6mm full penetration bevel weld
fixed to the side of the existing r.c. slab
with M20 chemical anchors.
See chemical anchor specification.
Soffit of steel angle @ +1352,550 lvl.
100x100x10mm thk. flat fixed to the side of theexisting r.c. slab with 1 No. M20 chemical anchor.See chemical anchor specification.
FOR TENDER PURPOSES T1
T1 FOR TENDER PURPOSES S.A. 24/06/2020
4710 4710
5400 5400345 345
M24 CHEMICAL ANCHOR SPECIFICATION :
M.N.
UMALUSI OFFICESADDITIONS AND ALTERATIONS
registration 200670211
PROJECT MANAGER | PRINCIPAL AGENT
professional person
DESCRIPTIONREV BY DATE
M.NAIR PrTechEng
DETAILS
REV
PL
COPYRIGHT RESERVED
DRAWING No.
APPROVED
DESIGNED
DRAWN
SCALES
DATE
PROJECT
CLIENT
SUITE 106, ESSENVIEW BUILDING, STRATHMORE PARK,
305 MUSGRAVE ROAD, DURBAN, 4001
e-mail : [email protected]
FAX (031) 3092929 TEL. (031) 3095831
200-309 / 500
1:15 1:50
28/01/2020
STRUCTURAL STEEL NOTES :
1. ALL WORK IN ACCORDANCE WITH SANS 1200 H.
2. ALL WELDS TO BE MIN. 6mm CONTINUOUS FILLET WELDS (U.O.N.)
3. ALL STRUCTURAL STEELWORK TO BE GRADE S355JR
(UNLESS OTHERWISE NOTED).
4. ALL PURLINS AND GIRTS TO BE COMMERCIAL GRADE AND TO BE
GALVANISED IN ACCORDANCE WITH SANS 4998 / ISO 4998:1996
FOR 'STRUCTURAL QUALITY'.
5 ALL BOLTS TO BE GRADE 8.8 BOLTS AND TO BE
HOT DIPPED GALVANISED TO SANS 121:2011 (ISO 1461:2009(E)).
6. ALL COMMERCIAL QUALITY H.D. BOLTS, PURLINS AND GIRTS
TO HAVE A MIN. GRADE STRESS OF 200 MPa.
7. ALL STRUCTURAL STEELWORK, H.D BOLTS, NUTS
AND WASHERS TO BE HOT DIPPED GALVANISED
TO SANS 121:2011 (ISO 1461:2009 (E)). ALL STRUCTURAL
STEEL TUBES ARE TO BE HOT-DIPPED GALVANISED TO
SANS 32 / EN 10240.
GALVANISING CERTIFICATE FOR ALL STEELWORK IS TO
BE SUBMITTED TO THE ENGINEER ON COMPLETION.
8. IF THE GALVANISING IS DAMAGED OR SCRATCHED DURING
THE INSTALLATION PROCESS, IT MUST BE 'TOUCHED UP' WITH
'PLASCON PLASCOZINC POLY GALV PRIMER' OR EQUALLY
APPROVED.
9. 2 SETS OF FABRICATION SHOP DRAWINGS (HARDCOPIES) ARE
TO BE DELIVERED TO THE ENGINEER'S OFFICES FOR REVIEW AND
APPROVAL BEFORE COMMENCING WITH ANY FABRICATION.
NOTE : EMAIL SUBMISSION OF ELECTRONIC (PDF) COPIES OF SHOP
DRAWINGS WILL NOT BE ACCEPTED.
10. CERTIFICATES CONFIRMING THE GRADE STRESS OF ALL
STEELWORK, PURLINS, GIRTS, H.D BOLTS AND BOLTS SPECIFIED
IS TO BE SUBMITTED TO THE ENGINEER ON COMPLETION.
11. THE STRUCTURAL STEELWORK CONTRACTOR IS TO
VERIFY ALL SETTING OUT DIMENSIONS ON SITE
PRIOR TO FABRICATION.
Fischer M24 (8.8) galvanised H.D. Anchor Studs
(with embedment length = 350mm) with Fischer
FIS-V-360 Chemical Mortar or equally approved
Chemical Anchors with 'ETA' ( European Technical
Approval).
315
130
300555
600
16001600
200
950 235
radius = 65mm
130x16mm thk. plate cleat slot welded to tube tie with1 No. 28mm Ø hole for M24 bolt.
310
5050
0,55mm thk. 'Klip-Tite Zincal / Colorplus AZ150'roof sheeting at 2° pitch. Colour of sheetingto Architects specification.
150
slot
13.0°2° fall
16mm thk. plate cleat weldedto UB rafter with 1 No.28mm Ø hole for M24 bolt.
4585
80 3535
4090
55
150
18
5
203x133x25 UB rafter
4575 extent of structural steel canopy
115mm Ø x 4,5mm thk. CHS tube tie
203x133x25 UB rafter
240
290
radius = 65mm
240
130x16mm thk. plate cleat slot welded to tube tie with1 No. 28mm Ø hole for M24 bolt.
31816mm thk. plate cleatwith 1 No. 28mm Ø holefor M24 bolt.
1060existing r.c. column
Existing r.c. column
Flashing toArchitects detailsand specifications.
Flashing toArchitects detailsand specifications.
Face of existingr.c. column.
s.o.pExisting face brickwork to becarefully removed and replacedafter UB rafter end plate is installed.
Existingbrick wall.
Existing r.c. column
Face of existingr.c. column.
Face of existingr.c. column.
PURLIN CLEAT DETAIL
50
50
30
0
40
0
20
02
00
CL
UB rafter
220
CLexisting r.c. column
& new UB rafter
203x133x25UB rafter.
Existingr.c. column.
220x400x20mm thk. end platewith 2 No. M24 chemical anchors.See chemical anchor specification. s.o.p
220
31
0
41
0
10
02
10
10
0
41
0
220
existing
r.c. column
CL
16mm thk. plate cleat
with 1 No. 28mm Ø hole
for M24 bolt.
410x220x20mm thk.
end plate with 2 No.
M24 chemical anchors.
See chemical anchor
specification.
Existingr.c. column.
2 3 4
11490
rafter bracing:100x100x8L fixed to10mm thk. plategussets welded to rafter webwith 2 No. M20 bolts each end.
4 rows 175x75x20x2,5mm thk.CRLC purlins.
50x5
0x3L
fals
e ra
fter
203x
133x
25 U
B r
afte
r
See End Plate Detail '1'
& End Plate Detail '2'. See End Plate
Detail '3'.
22
01
30
11
01
10
A
B
83
0
12
90
A
690
345 345
690 690
345 345 345 345
2 3 4
5400 5400
A
Existing
r.c. column.Existing
brickwork.
203x
133x
25 U
B r
afte
r
See End Plate Detail '1'
& End Plate Detail '2'.
UB RafterEND PLATE DETAIL '1'
13
02
20
Existing
r.c. column.
PLAN ON STRUCTURAL STEEL CANOPY
sag angles: 50x50x3L withend cleats:50x50x3L with2 No. M12 bolts for eachcleat (typical). 50
x50x
3L fa
lse
rafte
r
203x
133x
25 U
B r
afte
r
See End Plate Detail '1'
& End Plate Detail '2'.See End Plate
Detail '3'.
Existing
r.c. column.
13
02
20
11
01
10
22
0
A
B
83
0
12
90
220 1060extent of existing
r.c. column
220Face of existingr.c. column.
32
30
existing concrete
surface bed
@ +1349,830 lvl
Existing paving
S.M.
S.M.
Note : All flashings, fascias, gutters &
rwdp to Architects details & specifications.
M12 CHEMICAL ANCHOR SPECIFICATION :
Fischer M12 (8.8) galvanised H.D. Anchor Studs
(with embedment length = 220mm) with Fischer
FIS-V-360 Chemical Mortar or equally approved
Chemical Anchors with 'ETA' ( European Technical
Approval).
Existing face brickwork to becarefully removed and replacedafter CHS tube tie end plate isinstalled.
See CHS tube tieEnd Plate Detail '2'.
See UB rafter
End Plate Detail '1'.
See Purlin to BrickworkEnd Plate Detail '3'.
240x100x8mm thk.plate stiffners.
50
240x100x8mm thk.plate stiffners.
50
110 110
220
CHS Tube TieEND PLATE DETAIL '2'
COLUMNS, SHEAR & LIFT WALLS
INSPECTIONS.
14. THE ENGINEER REQUIRES 24HRS NOTICE FOR ALL
INTER-FACES TO RECEIVE V-JOINTS.
13. ALL CONCRETE PLASTER AND BRICKWORK PLASTER
AFTER PROPS HAVE BEEN REMOVED.
COURSES BELOW SOFFIT OF SLAB AND COMPLETED
12. ALL SINGLE SKIN BRICKWORK TO BE STOPPED 2
THE ENGINEER PRIOR TO CASTING OF CONCRETE.
7. ALL REINFORCING FIXING TO BE INSPECTED BY
3 PLY MALTHOID ON SMOOTH RENDERED SURFACE.
TOP OF ALL BRICKWORK TO RECEIVE 2 LAYERS OF
ALL LOAD BEARING BRICKWORK TO BE 14MPa NFX.
11. BRICKWORK SHOWN HATCHED ARE LOAD BEARING.
THE ENGINEER PRIOR TO CASTING OF CONCRETE.
6. ALL FOUNDATION EXCAVATIONS TO BE INSPECTED BY
TO BE FORWARDED TO THE ENGINEER.
8. SIX CUBES TO BE TAKEN PER POUR.
THREE TO BE TESTED AT SEVEN DAYS, THE
REMAINDER AT TWENTY EIGHT DAYS. THE RESULTS
9. CONTRACTOR TO CONSTRUCT A BLINDING LAYER
IF SOIL CONDITIONS RESULT IN REINFORCEMENT
A MINIMUM OF FIVE DAYS.
10. ALL STRUCTURAL CONCRETE TO BE CURED FOR
COVER NOT BEING MAINTAINED.
AS INDICATED ON DRAWING
30
25 MPa=RETAINING WALLSe)
10 MPa=BLINDINGg)
MPa=SURFACE BEDSf)
5. COVER TO REINFORCEMENT :-
25 MPa=SLABS, BEAMS & STAIRCASESd)
30 MPa=c)
25 MPa=STRIP FOOTINGS & BASESb)
25 MPa=PILECAPS & GROUND BEAMSa)
NOTES
THE ARCHITECTURAL DRAWINGS.
1. ALL LEVELS AND DIMENSIONS TO BE CHECKED ON SITE.
2. THIS DRAWING TO BE READ IN CONJUNCTION WITH
3. ALL CONCRETE WORK TO COMPLY WITH SABS 1200G.
4. CONCRETE CLASS :-
145
70
205
150
21
0
30 30
3030
10
03
73
8
17
5
40 30
70
175x70x10mm thk. plate cleatwelded to end plate with2 No. M12 bolts.
PURLIN TO BRICKWORKEND PLATE DETAIL '3'
typical purlin cleatwelded to rafter150x185x10mm thk.plate with 4 No. M12 bolts.
22
0
See End Plate
Detail '3'.
See End Plate
Detail '3'.
Existing paving
SECTION A - A
210x205x10mm thk. end platewith 4 No. M12 chemical anchorsthru' brickwork cladding, into existingconcrete. See chemical anchor specification.
EXISTING MAIN BUILDINGNEW STRUCTURAL STEEL CANOPY
STRUCTURAL DETAILS
10
FOR TENDER PURPOSES T1
T1 FOR TENDER PURPOSES S.A. 24/06/2020
M.N.
UMALUSI OFFICESADDITIONS AND ALTERATIONS
registration 200670211
PROJECT MANAGER | PRINCIPAL AGENT
professional person
DESCRIPTIONREV BY DATE
M.NAIR PrTechEng
DETAILS
REV
PL
COPYRIGHT RESERVED
DRAWING No.
APPROVED
DESIGNED
DRAWN
SCALES
DATE
PROJECT
CLIENT
SUITE 106, ESSENVIEW BUILDING, STRATHMORE PARK,
305 MUSGRAVE ROAD, DURBAN, 4001
e-mail : [email protected]
FAX (031) 3092929 TEL. (031) 3095831
200-309 / 501
29/01/2020
1:10 1:20 1:50
2000
35
19651560 8502250
35
30
1060 300
780 35
2000
1525landing
1130landing
280typ
180
typ
1
BA
1420 o/a'Vastrap' plate
11
0
22
0
Line of existingfirst floor slab.
110110
220
830
1070
34
5
230029001125110
CC
B
50
06
90
73
5 o
/a'V
ast
rap
' pla
te
Existing
r.c. column.
Existingbrickwork.
75
1
34
5
11
51
10
11
0
33
55
00
34
5
10
150x75x10L cleat fixed toside of existing concrete slabwith M12 chemical anchors at300mm centres. See chemicalanchor specification.
11
0
Existing firstfloor slab.t.o.c @+1352,805 lvl.
1100
o/a
'Vas
trap
' pla
te
200
PF
C e
nd b
eam
End plate detail,as shown onSection B - B.
180
PF
C c
ross
-bea
m
CLpost
200 PFC post
180 PFC beam
CLpost
Hand / knee rail.See balustrade note.
200 PFC stringer
Hand / knee rail.See balustrade note.
200 PFC post
CLpost
1180
s.o.p
1290 75 200
350 830 385
1565
BA
19
10
A
Hand / knee rail.See balustrade note.
200 PFC post200 PFC stringer
180
PF
C c
ross
-bea
m
180
PF
C c
ross
-bea
m
CLpost
200 PFC post
CLpost
200 PFC postHand / knee rail.See balustrade note.
CLpost
CLpost
200 PFC post
200 PFC post
100
Hand / knee rail.See balustrade note.
PLAN ON STRUCTURAL STEEL STAIRCASE
9055
200x75x12mm thk. end plateswith 2 No. M20 bolts.
55
55
90
55
3540
75
20
0
200 PFC stringer
20
0
STRINGER SPLICE DETAIL55
90END BEAM TO STRINGER
CONNECTION DETAIL5
5
20
0
35 40
200x75x12mm thk. end platewith 2 No. M20 bolts.
75
200 PFC end beam
200 PFC stringer
CLpost
CROSS-BEAM TO STRINGERCONNECTION DETAIL
90
45
30 40
70
'Vastrap' floor plateflush with top of stringer.
45
6
18
6
180x70x10mm thk. end platewith 2 No. M20 bolts.
200 PFC stringer
180 PFC cross-beamtop flush with u/s 'Vastrap' plate.
180 PFC beam
235
1
110
30
80
Stitch weld'Vastrap plateon site.
Remove existing face brickworkcarefully and re-constructbrickwork after the 150x75x10Lcleat is installed.
SECTION A - A
115110 110
335 10
345
Existing
brickwork.
Existing first floorr.c. slab.
25
5
t.o.c. @
+1352,805 lvl
t.o.c. floor finish
@ +1352,835 lvl
30
20
10
60 130
220
280
150x75x10L cleat fixed to side of existing concrete slabwith M12 chemical anchors at 300mm centres. See chemicalanchor specification.
50x50x5L cleat
t.o. 'Vastrap' plate
@ +1352,805 lvl
75
200 PFC stringer
Top of 'Vastrap' floor plateto be constructed flush withexisting first floor slab finishes. 1100 o/a
'Vastrap' plate735 o/a
'Vastrap' plate
500
30
303
0
50x50x5L cleatwelded to steel treadwith 2 No. M12 boltsfixed to stringer.
200 PFC
stringer.
TREAD :7,6mm / 6mm thk.under pattern'Vastrap' plate(or equally approved).
TYPICAL STEEL TREAD
1. ALL WORK IN ACCORDANCE WITH SANS 1200 H.
2. ALL WELDS TO BE MIN. 6mm CONTINUOUS FILLET WELDS (U.O.N.)
3. ALL STRUCTURAL STEELWORK TO BE GRADE S355JR
(UNLESS OTHERWISE NOTED).
4. ALL PURLINS AND GIRTS TO BE COMMERCIAL GRADE AND TO BE
GALVANISED IN ACCORDANCE WITH SANS 4998 / ISO 4998:1996
FOR 'STRUCTURAL QUALITY'.
5 ALL BOLTS TO BE GRADE 8.8 BOLTS AND TO BE
HOT DIPPED GALVANISED TO SANS 121:2011 (ISO 1461:2009(E)).
6. ALL COMMERCIAL QUALITY H.D. BOLTS, PURLINS AND GIRTS
TO HAVE A MIN. GRADE STRESS OF 200 MPa.
7. ALL STRUCTURAL STEELWORK, H.D BOLTS, NUTS
AND WASHERS TO BE HOT DIPPED GALVANISED
TO SANS 121:2011 (ISO 1461:2009 (E)). ALL STRUCTURAL
STEEL TUBES ARE TO BE HOT-DIPPED GALVANISED TO
SANS 32 / EN 10240.
GALVANISING CERTIFICATE FOR ALL STEELWORK IS TO
BE SUBMITTED TO THE ENGINEER ON COMPLETION.
8. IF THE GALVANISING IS DAMAGED OR SCRATCHED DURING
THE INSTALLATION PROCESS, IT MUST BE 'TOUCHED UP' WITH
'PLASCON PLASCOZINC POLY GALV PRIMER' OR EQUALLY
APPROVED.
9. 2 SETS OF FABRICATION SHOP DRAWINGS (HARDCOPIES) ARE
TO BE DELIVERED TO THE ENGINEER'S OFFICES FOR REVIEW AND
APPROVAL BEFORE COMMENCING WITH ANY FABRICATION.
NOTE : EMAIL SUBMISSION OF ELECTRONIC (PDF) COPIES OF SHOP
DRAWINGS WILL NOT BE ACCEPTED.
10. CERTIFICATES CONFIRMING THE GRADE STRESS OF ALL
STEELWORK, PURLINS, GIRTS, H.D BOLTS AND BOLTS SPECIFIED
IS TO BE SUBMITTED TO THE ENGINEER ON COMPLETION.
11. THE STRUCTURAL STEELWORK CONTRACTOR IS TO
VERIFY ALL SETTING OUT DIMENSIONS ON SITE
PRIOR TO FABRICATION.
STRUCTURAL STEEL NOTES :
100
100
cent
relin
epl
inth
cent
relin
epl
inth
280
1175
280
100 100400400 300400300300400300
70
704
04
0
15
0
30 30
130
1
50075
200 PFC stringer.
70
3030 150
110115110
335 10
345
235 110
345
810
210
7510
5
180
Existing first floorr.c. slab.
COLUMNS, SHEAR & LIFT WALLS
INSPECTIONS.
14. THE ENGINEER REQUIRES 24HRS NOTICE FOR ALL
INTER-FACES TO RECEIVE V-JOINTS.
13. ALL CONCRETE PLASTER AND BRICKWORK PLASTER
AFTER PROPS HAVE BEEN REMOVED.
COURSES BELOW SOFFIT OF SLAB AND COMPLETED
12. ALL SINGLE SKIN BRICKWORK TO BE STOPPED 2
THE ENGINEER PRIOR TO CASTING OF CONCRETE.
7. ALL REINFORCING FIXING TO BE INSPECTED BY
3 PLY MALTHOID ON SMOOTH RENDERED SURFACE.
TOP OF ALL BRICKWORK TO RECEIVE 2 LAYERS OF
ALL LOAD BEARING BRICKWORK TO BE 14MPa NFX.
11. BRICKWORK SHOWN HATCHED ARE LOAD BEARING.
THE ENGINEER PRIOR TO CASTING OF CONCRETE.
6. ALL FOUNDATION EXCAVATIONS TO BE INSPECTED BY
TO BE FORWARDED TO THE ENGINEER.
8. SIX CUBES TO BE TAKEN PER POUR.
THREE TO BE TESTED AT SEVEN DAYS, THE
REMAINDER AT TWENTY EIGHT DAYS. THE RESULTS
9. CONTRACTOR TO CONSTRUCT A BLINDING LAYER
IF SOIL CONDITIONS RESULT IN REINFORCEMENT
A MINIMUM OF FIVE DAYS.
10. ALL STRUCTURAL CONCRETE TO BE CURED FOR
COVER NOT BEING MAINTAINED.
AS INDICATED ON DRAWING
30
25 MPa=RETAINING WALLSe)
10 MPa=BLINDINGg)
MPa=SURFACE BEDSf)
5. COVER TO REINFORCEMENT :-
25 MPa=SLABS, BEAMS & STAIRCASESd)
30 MPa=c)
25 MPa=STRIP FOOTINGS & BASESb)
25 MPa=PILECAPS & GROUND BEAMSa)
NOTES
THE ARCHITECTURAL DRAWINGS.
1. ALL LEVELS AND DIMENSIONS TO BE CHECKED ON SITE.
2. THIS DRAWING TO BE READ IN CONJUNCTION WITH
3. ALL CONCRETE WORK TO COMPLY WITH SABS 1200G.
4. CONCRETE CLASS :-
230029001125
3035
25gr
out
200
3175
85
3260
200 PFCbeam
t.o. first floor finish
@ +1352,835 lvl
200
PF
C p
ost
100100
20010075
100
200 PFC stringer
180 PFC beam
100100
200
PF
C p
ost
See TypicalBase Plate Detail.
See TypicalBase Plate Detail.
t.o. paving @
+1349,660 lvl
200 PFC stringer
180 PFC beam
Stringersplice.
250
200 PFC stringer
CLpost
180 PFCbeam.
100100
1415
200
PF
C p
ost
t.o.c. r.c. plinth
@ +1349,575 lvl
(typical).
See TypicalBase Plate Detail.
25mm thk. non shrinkgrout below base plate(typical).
200 PFC stringer
30typ
200 PFCpost.
25gr
out
8512
00r.
c. p
linth
(ty
pica
l)30
0r.
c. b
ase
(typ
ical
)
CLpost
CLpost
CLpost
CLpost
t.o.c. r.c. bases
@ +1348,375 lvl
(typical)
400x360x1200mm highr.c. plinth (typical).
SECTION C - C
CLpost
BALUSTRADE NOTE :'Mentis' Ball and Tube heavy dutyindustrial hand rail / knee rail and posts(or equally approved). Fixed to top ofstringers as per manufacturer'sspecification and details (typical).
100 100
25gr
out
175
1440
8 ris
ers
@ 1
80m
m16
209
riser
s @
180
mm
200
3175
85
3260
See TypicalBase Plate Detail.
210x180x12mm thk.end plate with 2 No. M16 chemical anchors. Seechemical anchor specification.
centreline
plinth
centreline
plinth
centreline
plinth
centreline
plinth
BA
CLpost
CLpost
200400mm x 360mm x1200mm high r.c. plinth.
40 40
280
200200
606
0
75
83
36
0
6028060
400
37
38
12
01
20
16
04
04
0
24
0
200 PFC post280x240x16mm thk. base platewith 4 No. M20 chemical anchors.See chemical anchor specification.
TYPICAL BASE PLATEDETAIL
1725 2100 1000 1300 100085
11
BA
CLsteelpost
CLsteelpost
CLsteelpost
CLsteelpost
CLsteelpost
SECTION B - B
830 385 1125 2900 2300
360
typ.
360
typ.
815
typi
cal
345
280
1175
280
CLsteelpost
345
1175
537 25
7
s.o.p.
385830350
1565
1735
CLsteelpost
7550
0
200 200
280
1175
280
1735
200
280
1175
280
1735
200
1735x1000x300mm deepr.c. base with 2 No.400x360x1200mm highr.c. plinths.
1735x1725x300mm deepr.c. base with 4 No.400x360x1200mm highr.c. plinths.
FOUNDATION PLAN
M20 CHEMICAL ANCHOR SPECIFICATION :
Fischer M20 (8.8) galvanised H.D. Anchor Studs
(with embedment length = 300mm) with Fischer
FIS-V-360 Chemical Mortar or equally approved
Chemical Anchors with 'ETA' ( European Technical
Approval).
M16 CHEMICAL ANCHOR SPECIFICATION :
Fischer M16 (8.8) galvanised H.D. Anchor Studs
(with embedment length = 250mm) with Fischer
FIS-V-360 Chemical Mortar or equally approved
Chemical Anchors with 'ETA' ( European Technical
Approval).
M12 CHEMICAL ANCHOR SPECIFICATION :
Fischer M12 (8.8) galvanised H.D. Anchor Studs
(with embedment length = 220mm) with Fischer
FIS-V-360 Chemical Mortar or equally approved
Chemical Anchors with 'ETA' ( European Technical
Approval).
t.o.c. r.c. bases @ +1348,375 lvlt.o.c. r.c. plinths @ +1349,575 lvl
S.M.
S.M.
End plate detail, as shown onSection B - B.
50x50x5L cleat below'Vastrap' plate. Stitchweld plate to cleaton site. Angle cleatbolted to stringer / beamwith M12 bolts @ max.250mm centres (typical).
75
75
50x50x5L cleatshop welded to 'Vastrap' plate(or equally approved) bolted tostringer with M12 bolts.
Note : 50mm blinding to all foundationexcavations. The bottom of allfoundation excavations is to be platecompacted to 90% Mod AASHTO,prior to installing reinforcement.
25
8511
5
CL
130x150x10mm thk end platewith 4 No. M12 bolts.
82
180 PFC tie fixedflush with underside of'Vastrap' plate notchPFC tie to suit.
Remove existing face brickworkcarefully and re-constructbrickwork after the 180 PFCend plate is installed.
257
EXISTING MAIN BUILDINGNEW STRUCTURAL STEELFIRE ESCAPE STAIRCASE
STRUCTURAL DETAILS
50x50x5L cleatsshop welded to 'Vastrap'plate (or equally approved)bolted to stringer/beam withM12 bolts @ max. 250mmcentres (typical).
FOR TENDER PURPOSES T1
T1 FOR TENDER PURPOSES S.A. 24/06/2020
PROPOSED NEW
ABLUTION.
BLOCK A
BLOCK B
BLOCK C
63
64
65
66
67
68
69
70
71
62
FA
LL
F
A
L
L
F
A
L
L
HP
F
A
L
L
SWMH 1
CL=1349.60
IL=1348.95
SWHW 1
IL=1348.50
FALL
FALL
F
A
L
L
FA
LL
FA
LL
DEMOLISH KERBS AND TIE INTO
EXISTING BLOCK PAVED ROAD
LEVELS WITH NEW 80mm G-BLOCK
PAVERS TO MATCH EXISTING
NEW FIG. 6
NON-MOUNTABLE
KERB
NEW FIG. 6 NON-MOUNTABLE
KERB WITH 300mm WIDE
CONCRETE CHANNEL
NEW FIG. 12 KERB
EDGE RESTRAINT
EXISTING
KERB LINE
NEW FIG. 12 KERB
EDGE RESTRAINT
NEW FIG. 6
NON-MOUNTABLE
KERB
NEW FIG. 12 KERB
EDGE RESTRAINT
NEW FIG. 12 KERB
EDGE RESTRAINT
NEW 1m WIDE X 3m
LONG X 0.23m THICK
RENO MATTRESS
NEW 1m WIDE
CONCRETE V-DRAIN.
REFER TO DETAIL
NEW 110mm Ø CL34
SEWER PIPE
EXISTING
CONSERVANCY
TANK
NEW 250mm Ø CL34
UPVC STORMWATER
PIPE
NEW 250mm Ø
CL34 UPVC
STORMWATER
PIPE
NEW STORMWATER
HEADWALL WITH 1m WIDE
X 3m LONG X 0.23m THICK
RENO MATTRESS
NEW BLOCK PAVED
WALKWAYS. REFER
TO LAYERWORKS
DETAIL
NEW BLOCK PAVED
WALKWAYS. REFER TO
LAYERWORKS DETAIL
EXISTING
KERB LINE
NEW BLOCK PAVED
WALKWAYS. REFER
TO LAYERWORKS
DETAIL
EXISTING BLOCK
PAVED CARPARK
NEW 80mm G-BLOCK
PAVERS TO MATCH
EXISTING
1350.02
1350.05
1349.83
1349.65
1349.74
1349.82
1349.80
1349.97
1350.00
EXISTING
KERB LINE
EXISTING
KERB LINE
EXISTING
KERB LINE
NEW 250mm Ø CL34
UPVC STORMWATER
PIPE
SMH 1
CL=1349.55
IL=1348.85
TIE INTO EXISTING SEWER
MANHOLE AT INVERT LEVEL.
CONTRACTOR TO PROVE
EXISTING LINE PRIOR TO
CONSTRUCTION
SMH 2
CL=1349.55
IL=1348.65
NEW
SMH 3
CL= C.O.S
IL= 1345.55
S-RE 1
CL=1349.60
IL=1349.05
SWMH 2
CL=1349.60
IL=1348.90
SWMH 3
CL=1349.60
IL=1348.85
SWMH 4
CL=1349.55
IL=1348.75
SWMH 4
CL=1349.55
IL=1348.65
1350.15
1350.03
1350.07
1350.15
1349.91
1349.76
1349.95
1349.77
1349.94
1349.94
1349.90
1349.66
1349.75
1349.80
1349.80
1349.70
1349.67
1349.60
1349.50
1349.82 1349.82
1349.75
1349.75
DEMOLISH PORTION OF
EXISTING KERB LINE AND
CONSTRUCT NEW 80mm
G-BLOCK PAVING. REFER TO
LAYERWORKS DETAIL BELOW
TIE INTO EXISTING SEWER
MANHOLE AT INVERT LEVEL.
CONTRACTOR TO PROVE
EXISTING LINE PRIOR TO
CONSTRUCTION NEW
SMH 4
CL= C.O.S
IL= 1348.30
NEW SEWER GULLY
TIE INTO
EXISTING
WATER LINE
INSTALL NEW 160mm Ø PIPE
SLEEVE OF EXISTING WATER LINE
ROUTED THROUGH NEW CARPARK
REFER TO BULK
LAYERWORKS
DETAIL
NEW 110mm Ø CL34
SEWER PIPE
NEW 110mm Ø CL34
SEWER PIPE
EXISTING CONSERVANCY TANK TO BE
SERVICED (EMPTIED OUT) AND HIGH
PRESSURE CLEANED TO UNDERTAKE
CONDITIONAL ASSESSMENTS
CONTRACTOR TO
PROVE INVERT LEVEL
OF TANK
X
X
MA
X. 1
20
0
D
EE
P
SECTION X-X
PLAN
20MPA CONCRETE APRON
AROUND GRATING
115mm NFX LOAD BEARING
BRICKWORK TO SABS 227
FGL
INSITU MATERIAL TO BE
COMPACTED TO 93%
MOD AASHTO DENSITY
SAINT GOBAIN PRODUCT No
2934OR SIMILAR APPROVED
300 X 300 CAST IRON LIGHT
DUTY COVER AND FRAME
150mm THICK 25MPA
CONCRETE FOUNDATION
SAINT GOBAIN PRODUCT No
2934 OR SIMILAR APPROVED
300 x 300 CAST IRON LIGHT
DUTY COVER AND FRAME
STORMWATER MANHOLE - TYPE A
300 X 300 SUMP DETAIL
(MAX. 500mm DEEP ; PIPES < 200mm ∅ )
NTS
630
50 115 300 115 50
630
50
11
53
00
11
55
0
1:1
0 F
ALL
MORTAR BENCHING
(1 SAND : 3 SAND)
110 Ø CL 34 UPVC PIPE
LAID AT 1:80 GRADE TO
CLOSEST STORMWATER MH
x = D/4
SUBJECT TO x BEING
NOT LESS THAN 100mm AND
NOT MORE THAN 200mm
BACKFILL TO BE PLACED
AND COMPACTED IN
MAXIMUM 200mm THICK
LAYERS TO 93% MOD
AASHTO
CLASS B BEDDING
SELECTED GRANULAR
MATERIAL PLACED AND
COMPACTED IN UNIFORM
LAYERS ON BOTH SIDES
OF THE PIPE FOR
BEDDING CRADLE
CLASS B BEDDING
SELECTED FILL FOR
BEDDING BLANKET
COMPACTED UNIFORMLY
IN LAYERS WITH LIGHT
COMPACTION OF PIPE
PIPE OD
TYPICAL PIPE BEDDING DETAIL
SCALE 1:20
300 300
50
150
75
MA
X. 1500m
m D
EE
P250
HD PRECAST CONCRETE
COVERS AND FRAMES IN
VERGES / HD POLYMER COVERS
AND FRAMES WITHIN ROADWAYS
GROUND LEVEL
JOINT SURFACES TO BE
PRIMED BEFORE BITU-JOINT
OR SIMILAR SEALANT IS
APPLIED.
750mm Ø PRECAST
CONCRETE MANHOLE
RINGS
RING OD
75
SEWER MANHOLE - TYPE A
(0.0m TO 1.5m DEEP)
N.T.S
25MPA CONCRETE BASE WITH
MESH REF. 245 PLACED 50mm
BOTTOM OF CONCRETE
INSITU GROUND TO BE
COMPACTED TO 95% MOD.
AASHTO.
150 150
80mm THICK TYPE S-A (G-BLOCK) BLOCK PAVERS
PLACED OF 20mm THICK CLEAN COARSE RIVER SAND
BEDDING
150mm THICK G2 BASE COMPACTED TO
100% MOD. AASHTO DENSITY
ACCESS SCOOP LAYERWORKS DETAIL
NTS
150mm RIP & RECOMPACT TO 93%
MOD. AASHTO DENSITY
150mm THICK G5 SUBGRADE COMPACTED TO
95% MOD. AASHTO DENSITY
60mm PAVERS PLACED OF 20mm THICK CLEAN
COARSE RIVER SAND BEDDING. PAVERS TO
ARCHITECTS SPECIFICATIONS
150mm THICK G2 BASE COMPACTED TO
100% MOD. AASHTO DENSITY
WALKWAY LAYERWORKS DETAIL
NTS
150mm RIP & RECOMPACT TO 93%
MOD. AASHTO DENSITY
O = 60° MIN. ; 90° MAX.
= O/2 - 5° (30° MAX.)
= 75° - O/2
D = NOMINAL PIPE DIAMETER
APRON SLAB IN 20 MIX CONCRETE
ALL EXPOSED CORNERS 10 x 10
CHAMFERED
HEADWALL AND WINGWALL :
230 BRICKWORK PLASTERED WITH 12
THICK 1:3 CEMENT/SAND MORTAR
WITH WOOD FLOAT FINISH
OUTLET\INLET DIMENSIONS IN mm FOR :
O = 90° ; = 1:1,5 ; h = 300mm & H = 600mm
NOM.PIPE
DIA.
D
W B L
225 725 1000 1580
16501000800300
375 875 1000 1720
18001000950450
h
= HEIGHT TO SUIT GRADIENT ' ' (300 MIN.)
H
= 300 MIN. ; 900 MAX.
R12 AT 600
ANCHOR BARS
APRONSLAB
GRADIENT AS
SPECIFIED
FILL OR NATURAL
GROUND SLOPE
NOTES
STORMWATER PIPE
BRICKWORK HEADWALL
WINGWALL
1
2
3
4
B
H
D
h
D
B
W
D
L
230
75
200
15
0
10
0
25
0
A A
B
B
0,6B D + 150 0,6B
L/2 L/2
7
5
2
3
0
2
3
0
7
5
75
23
0=
S
/V
(D
+H
-h
-1
50
)
1
00
0 M
IN
IM
UM
+-30° +-30°
O
60
0
D +
2
00
MIN
IM
UM
15
0
D + 150
= D + 500
V
EROSION PROTECTION MEASURES AS SPECIFIED BY THE ENGINEER. WHERE
- CLORIS GYANA (10kg/ha)
- ERAGROSTIS TEF (5kg/ha)
- CYNODON DACTYLON (15kg/ha)
GRASS IS SPECIFIED, SCARIFY AND HYDROSEED WITH THE FOLLOWING MIX
S
OF GRASS SEED UNLESS ANOTHER MIX HAS BEEN SPECIFIED:
215012001100600
230012501250750
DISSIPATERS
40
0
UNLESS OTHERWISE DIRECTED
BY ENGINEER ON SITE
6000 L x 2000 W x 230 H
REMO MATTRESS
STORMWATER HEADWALL DETAILS
SCALE 1:20
ELEVATION A-A ELEVATION B-B
PLAN
= V/S = GRADIENT TO SUIT FILL OR NATURAL
GROUND SLOPE (1:1,5 MAX.)
75
75
F.R.L
75 75 75
F.G.L
CLASS 20/19
CONTINUOUS
CONCRETE
HAUNCHING
CLASS 20/19
CONCRETE
BEDDING
FIG. 12 KERB EDGE
RESTRAINT DETAIL DETAIL
N.T.S
50
125
13
07
5
100
S.O
.P
286
13
0
CROSSFALL
300
10
0
FIG. 6 NON-MOUNTABLE
KERB WITH 270mm WIDE
CHANNEL DETAIL
N.T.S
CLASS 20/19
CONTINUOUS
CONCRETE
HAUNCHING
F.G.L
300mm WIDE CLASS
20/19 CONCRETE
CHANNEL WITH 30 X
30mm PREMIX KEY
1
:1
0
100100 125
13
0
S.O
.P
FIG. 6 NON-MOUNTABLE
KERB DETAIL
N.T.S
CLASS 20/19
CONTINUOUS
CONCRETE
HAUNCHING
CROSSFALL
F.G.L
F.R.L
F.R.L
10
01
00
CLASS 20/19
CONCRETE
BEDDING
CLASS 20/19
CONCRETE
BEDDING
230mm THICK
BRICKWORK WITH
NFX LOAD BEARING
BRICKWORK.
BRICKWORK TO BE
COBBLED TO SUIT
GRATING
FRL
1
:
51
:
5
100
100
600 230
15
0M
AX
. 1
50
0m
m D
EE
P
COBBLE
BRICKWORK TO
SUIT GRATING
230mm THICK
BRICKWORK WITH
NFX LOAD BEARING
BRICKWORK
MORTAR BENCHING
(1 CEMENT: 3 SAND)
25MPA CONCRETE
BASE
X
450 X 600 TYPE 9D MEDIUM
DUTY CAST IRON COVER
AND FRAME
230
SECTION X-X
100
10
02
30
10
0
PLAN
STORMWATER MANHOLE - TYPE B
450mm X 600mm MANHOLE DETAIL
(MAX. 1500mm DEEP ; PIPES < 450mm Ø )
SCALE 1:20
100230
1260
1260
12
60
20mm THICK
PLASTER TO ALL
INTERNAL WALLS
230600
23
06
00
450 X 450 LIGHT DUTY /
450 X 600 HEAVY DUTY
CAST IRON GRID INLET
GRATING AND FRAME
1000
1
5
0
25MPa CONCRETE V-DRAIN WITH
MESH REF. 193 REINFORCEMENT
PLACED 50mm FROM T.O.C. V-DRAIN
TO BE CAST IN MAX. 2m LONG
PANELS.
INSITU MATERIAL TO BE
RIPPED TO A DEPTH OF 150mm
AND RECOMPACTED TO 93%
MOD AASHTO
FGL FGL
15
0
CONCRETE V-DRAIN CHANNEL
DETAILS
SCALE 1:10
NEW 160mm Ø CL 34 uPVC SEWER PIPE
KEY
NEW TYPE A SEWER PRECAST RING MANHOLE
NEW 32mm Ø HDPE PE 100 PN 12.5 WATER LINE
STORMWATER SUMP (TYPE A)
STORMWATER MANHOLE (TYPE B)
NEW 250mm Ø CL 34 UPVC STORMWATER PIPE
HIGH POINTHP
END CAP ON WATER LINE
NEW BLOCK PAVED CAR PARK
NEW BLOCK PAVED WALKWAYS
EXISTING WATER LINE
EXISTING SEWER LINE
SURFACE BED TO STRUCTURAL
ENGINEER'S DETAIL
150mm THICK G2 BASE
COMPACTED TO 100% MOD.
AASHTO DENSITY
BULK LAYERWORKS DETAIL
NTS
700mm TO 1000mm THICK BULK
FILL MINIMUM G7 MATERIAL
COMPACTED TO
93% MOD. AASHTO DENSITY
SCALE (mm)
010 20
REV
PL
COPYRIGHT RESERVED
DRAWING No.
APPROVED
DESIGNED
DRAWN
S.S
SCALES
DATE
DESCRIPTION
PROJECT MANAGER / PRINCIPAL AGENT
REV
BY
No.
REFERENCE DRAWINGS
DATE
PROJECT
DETAILS
2020.01.27
TENDER No.
Professional person S. SIRPUTH Registration 201470135
AS SHOWN
K.G
K.G
200-309/900 T1
T1 FOR TENDER PURPOSES 24/06/2020
PROPOSED NEW PARKING AND
BULK SERVICES LAYOUT
FOR TENDER PURPOSES
NOTES
GENERAL
1. ALL CIVIL WORKS SETTING OUT TO BE
UNDERTAKEN BY A REGISTERED
PROFESSIONAL SURVEYOR.
2. ALL BUILDING WORKS SETTING OUT TO BE
UNDERTAKEN IN ACCORDANCE WITH
ARCHITECT'S DETAILS.
3. PROVE ALL SERVICES PRIOR TO CONSTRUCTION.
4. ALL WORK AREAS TO BE REINSTATED (PREMIX,
CONCRETE, ETC.)
5. MUNICIPALITY TO EXECUTE ALL CONNECTIONS INTO
MUNICIPAL LINES.
6. SUPPLY AND INSTALLATION TO COMPLY WITH SANS
1200.
7. ALL LEVELS AND DIMENSIONS TO BE VERIFIED ON
SITE.
8. THIS DRAWING IS TO BE READ IN CONJUNCTION
WITH THE ARCHITECTURAL AND STRUCTURAL
ENGINEERS DRAWINGS.
9. ALL WORK IS TO BE EXECUTED IN ACCORDANCE
WITH SANS 1200.
STORMWATER
1. STORMWATER PIPES CONSIST OF 250mm NOMINAL
DIAMETER - HD CL 34 UPVC PIPES
2. ALL UPVC PIPES TO COMPLY WITH SANS 966
STANDARDS.
3. ALL JOINTS TO BE 'SPIGOT AND SOCKET' TYPE.
4. ALL STORMWATER PIPES TO BE LAID ON CLASS B
BEDDING.
WATER
1. BEDDING TO SUIT FLEXIBLE PIPES.
2. PIPES TO BE INSTALLED WITH ALL COUPLINGS AND
TO BE TESTED AND DISINFECTED.
3. MINIMUM COVER TO PIPES TO BE 800MM.
SLEEVES
1. ALL SLEEVES UNDER ROADWAYS AND PARKING
AREAS TO BE CONCRETE ENCASED 150mm ALL
ROUND WITH 25MPA CONCRETE AT 28 DAYS
STRENGTH.
MATERIAL COMPLIANCE TESTING
1. RESULTS OF COMPACTION AND CBR TESTS ON
INSITU SUB-BASE MATERIAL AND FILLED SUB-BASE
MATERIAL MUST BE SUBMITTED TO THE ENGINEER
FOR APPROVAL BEFORE THE UPPER LAYERWORKS
ARE IMPORTED TO THE SITE AND PLACED.
FREQUENCY OF TESTS
1. CBR TESTS 1 PER 500m2
2. COMPACTION TESTS 1 PER 200m2 NOTE :
COMPACTION TESTS WILL ALSO BE REQUIRED FOR
EACH OF THE VARYING UPPER LAYERWORKS I.E G7,
G5 AND G2 THAT IS IMPORTED AND COMPACTED IN
PLACE.
SEWER
1. ALL SEWER PIPES ARE 160mm NOMINAL DIAMETER
CLASS 34 HEAVY DUTY UPVC PIPES.
2. ALL SEWER PIPES TO BE LAID ON CLASS B BEDDING.
3. ALL SEWER PIPES TO COMPLY WITH SANS 1601
STANDARDS.
UMALUSI OFFICES
ADDITIONS AND ALTERATIONS
S.A.
PROPOSED CARPARK AND BULK SERVICES UPGRADES LAYOUT
SCALE 1:200
CLIENT
ALLOWANCES TO BE MADE:
1. PROVE EXISTING SEWER LINE AND
CONFIRM COVER AND INVERT LEVELS OF
ALL EXISTING MANHOLES.
2. PROVE EXISTING WATER LINE AND PSITION
AND ROUTE OF LINE.
3. PROVE EXISTING SERVICES LOCATED
WITHIN NEW CAR PARK AREA.
4. REMOVAL OF TREES AS SHOWN ON THE
ARCHITECTURAL LAYOUTS.
e-mail : [email protected]
FAX (031) 309 2929
website : www.mapafrica.co.za
TEL. (031) 309 5831
SUITE 102, WHEELER HOUSE
14A MAZENOD ROAD,
MORNINGSIDE, DURBAN
TEL. (011) 234 3819
1ST FLOOR, APTUS HOUSE
RIVERWORLD PARK
53 AUTUMN ROAD, RIVONIA
Project Title :
Project No : 200-309
Date :
year 20
month 06
date 24
Distribution
Umalusi
LDM Project Managers E
PGA Architects E
LDM Quantity Surveyors E
LSG International E
Ibuya Consulting E
No. Size
200-309-300 A0 T1
200-309-301 New Ablutions Building - Ground Floor - Surface Bed Slab A0 T1
200-309-302 A0 T1
200-309-303 A1 T1
200-309-304 A1 T1
200-309-500 A1 T1
200-309-501 A1 T1
200-309-900 A0 T1
__________________ _______________________ ___________________ ____________ RECEIVED BY (PRINT NAME) E: e-mail F: Fax R: Roll Size : P = PDF
Existing Main Building - New Brick Wall Cast on Existing Ground Floor Surface Bed
Proposed New Parking and Bulk Services Layout
Existing Main Building - New R.C. Slab Infill Panels on the Existing First Floor Slab
Existing Main Building - New Structural Steel Canopy
Existing Main Building - New Structural Steel Fire Escape Staircase
Client
Architect
QS
Mechanical Eng.
Electrical Eng.
Project Manager
New Ablutions Building - Piling & Foundation
Umalusi Offices - Additions and Alterations
2020.06.24
DESIGNATION DATE
CIVIL LAYOUTS
Contractor
New Ablution Building - Roof Slab, Entrance Canopy Slab & First Floor Slab
Title
STRUCTURAL LAYOUTS
MAP AFRICA CONSULTING ENGINEERS
Suite 106, Essenview Building, Strathmore Park305 Musgrave Road, Durban, 4001
P.O. Box 65610, Reservoir Hills 4090Tel:+27 (31) 3095831 Fax: +27 (31) 3092929
e-mail: [email protected]
DRAWING ISSUE RECORDPage 1 of 1